36C25018B0815-0002008.pdf
PDF 379 KB Posted
- Solicitation number
- 36C25018B0815
About this file
36C25018B0815 0002 P8-01.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0025-000.docx | DOCX document | |
| 36C25018B0815-0003000.docx | DOCX document | |
| 36C25018B0815-0002007.pdf | ||
| 36C25018B0815-0002004.pdf | ||
| 36C25018B0815-0002002.pdf | ||
| 36C25018B0815-0002006.pdf | ||
| 36C25018B0815-0002005.pdf | ||
| 36C25018B0815-0002003.pdf | ||
| 36C25018B0815-0002000.docx | DOCX document | |
| 36C25018B0815-0002001.pdf | ||
| 36C25018B0815-0002010.pdf | ||
| 36C25018B0815-0002009.pdf | ||
| 36C25018B0815-0001000.docx | DOCX document | |
| 36C25018B0815-003.pdf | ||
| 36C25018B0815-001.docx | DOCX document | |
| 36C25018B0815-004.txt | TXT text file | |
| 36C25018B0815-002.pdf | ||
| 36C25018B0815-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
BFP
BFP
11' - 5 3/8"
NEW CONC PAVEMENT
SEE CIVIL DWGS.
UTILITIES HOOK UP
LOCATION SEE MEP DWGS.
SEE SHEET A8.02
FOR ENLARGED
PLANS
ALIGN EXT. WALL W/
EXIST. CANOPY. VIF. CONC SAFETY
BARRIER
TEMPORARY
MOBILE STERILE
PROCESSING
TRAILER UNIT
EXISTING
DUMPSTER
LINE OF EXIST. CANOPY
VIF.
NOTE: CONC PAD
TO REMAIN AFTER
MOBILE UNIT IS
REMOVED
NOTE: REMOVE
VESTIBULE AND
TEMPORARY
CORRIDOR AND
FOUNDATIONS
AFTER MOBILE
UNIT IS REMOVED
EXISTING VA FACILITY
FIRE(E)
FI
RE
FIRE
FI
RE
F4
F4
F5
F4
P1
P2
P5
CW
2"
2"
2"
3"
1 1/4"1 1/4"
BFP-2
P3
1"
HW
1"
HW
1"
HW
1"
HW
P6P7
P10
P8
P9
P8
P10
P4
HW
1"
HW
1"
P10
P9
1 1/4"1"
BFP-1
HW
CW
CW
HW
EXISTING 3" SPRINKLER
CROSSMAIN
F1
FIRE
F2
F3
PLUMBING PLAN NOTES
P1.- MAKE NEW 1-1/4" CONNECTION TO EXISTING 1-1/2" CW AT THIS APPROXIMATE LOCATION
OUTSIDE OF 1B103A REVERSE OSMOSIS EQUIPMENT ROOM.
P2.- MOUNT 1-1/4" RPZ BACKFLOW PREVENTER AT AN ACCESSIBLE LOCATION ABOVE EXISTING
R.O. EQUIPMENT. EXTEND RELIEF DRAIN FROM AIR GAP FITTING TO NEAREST FLOOR DRAIN.
P3.- EXTEND 1-1/4" CW TO THE LOCATION OF MOBILE STERILE PROCESSING SERVICES (SPS)
TRAILER.
P4.- 1-1/4" VALVED AND CAPPED CW OUTLET. CONNECTION FOR AND EXTENSION TO CW
WATER CONNECTION AT MOBILE SPS TRAILOR TO BE PROVIDED BY MOBILE SPS TECHNICIANS.
P5.- 1" VALVED AND CAPPED HW OUTLET. CONNECTION FOR AND EXTENSION TO HW WATER
CONNECTION AT MOBILE SPS TRAILOR TO BE PROVIDED BY MOBILE SPS TECHNICIANS.
P6.- 1" VALVED CONNECTION TO 2-1/2" HW AT THIS APPROXIMATE LOCATION OF DOMESTIC
WATER HEATER SYSTEM FOR MOBILE SPS TRAILOR.
P7.- 1" RPZ BACKFLOW PREVENTER. EXTEND RELIEF DRAIN FROM AIR GAP FITTING TO NEAREST
FLOOR DRAIN.
P8.- ELECTRICAL HEAT TRACING CIRCUIT POWER CONNECTION FOR 140 DEGREE HOT WATER
TEMPERATURE MAINTENANCE CABLE. COORDINATE ELECTRICAL REQUIREMENTS.
P9. OVERHEAD HW SUPPLY FOR MOBILE SPS TRAILOR. HEAT TRACE FOR HW TEMPERATURE
MAINTENANCE. CABLE CIRCUIT MAXIMUM LENGTHS VARY PER MANUFACTURER. THIS DESIGN
IS BASED ON 200 FT MAXIMUM CABLE LENGTH. VERIFY MAX CABLE LENGTH WITH CABLE
MANUFACTURER
P10.- ELECTRICAL HEAT TRACING END OF CIRCUIT CONNECTION.
FIRE PROTECTION PLAN NOTES
F1.- FIELD VERIFY LOCATION OF EXISTING ZONE CONTROL VALVE FOR THIS AREA OF THE
BUILDING. COORDINATE TEMPORARY SPRINKLER ZONE SHUT-DOWN WITH VA. MAKE NEW 2"
CONNECTION TO EXISTING FIRE SPRINKLER MAIN AT THIS APPROXIMATE LOCATION.
F2.- PROVIDE ISOLATION VALVE ABOVE CEILING WITH TAMPER SWITCH FOR MOBILE SPS
TRAILER AT THIS APPROXIMATE LOCATION.
F3.- 2" FIRE SPRINKLER MAIN FOR MOBILE SPS TRAILER. EXTEND ABOVE CEILING OF
TEMPORARY CORRIDOR.
F4.- PROVIDE SPRINKLERS SPACED PER ORDINARY HAZARD OCCUPANCY FOR TEMPORARY
CORRIDOR.
F5.- 2" CAPPED FIRE SPRINKLER OUTLET FOR MOBILE SPS TRAILOR. CONNECTION FOR AND
EXTENSION TO 2" SPRINKLER WATER SUPPLY AT MOBILE SPS TRAILOR TO BE PROVIDED BY
MOBILE SPS TECHNICIANS.
GENERAL NOTES
A.- PROVIDE HYDRAULIC CALCULATIONS FOR MOBILE SPS TRAILER SPRINKLER SYSTEM.
B.- UPON COMPLETION AND OCCUPATION OF THE RENOVATED SPS AREA ON THE SECOND
FLOOR, TEMPORARY CORRIDOR IS TO BE REMOVED. DISCONNECT AND REMOVE ALL
EQUIPMENT AND TURN OVER TO THE GOVERNMENT. DEMO ALL PIPING BACK TO THE
CONNECTION POINTS.
(B1) FOR DOMESTIC WATER: THE EXISTING TEES OR FITTINGS AT THE CONNECTION
POINTS SHALL BE REMOVED AND THE SOURCE PIPE MADE CONTINUOUS. TURN
OVER BACKFLOW PREVENTERS TO THE GOVERNMENT.
(B2) FOR FIRE PROTECTION: REMOVE PIPING BACK TO THE ISOLATION VALVE.
ABANDON LOCKED ISOLATION VALVE IN PLACE.
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHALMERS P. WYLIE VA AMBULATORY CARE CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
CONSULTANTS:
SCHEMATIC DESIGN REVISIONS - 25% REVIEW SET 2015 10-21
1A
FARID MEHR, PE
CHIEF, ENGINEERING SERVICE
SCHEMATIC DESIGN - 25% REVIEW SET 2015 10-07
DESIGN DEVELOPMENT ONE - 50% REVIEW SET 2015 11-25
DESIGN DEVELOPMENT TWO - 75% REVIEW SET 2016 02-03
CONSTRUCTION DOCUMENTS - 95% REVIEW SET 2016 03-30
BID DOCUMENTS - 100% SET 2016 05-11
BID DOCUMENTS - 100% SET REVISED 2016 11-18
C :\U se rs
\m ba ke r\D oc um en ts
\1
PL
U
M B_
C en tra l_ m ba ke r.r vt
BID DOCUMENTS - BID
P8.01
DELDEL
Plumbing Site Plan
2016-05-11
757-16-101EXPAND LAB AND SPS
DEPARTMENTS
1/16" = 1'-0"P8.01
1 PLUMBING SITE PLAN
GI
RS
S
R P
F E
O
E E T
L
I G
S
N A O N
RE
E
D
I
R
S
E N
E
HTAT
S
E OF
MACE E-50556
O
OI
MONTGOMERY E-66852
GRIFFIN E-57049