36C25018B0815-0002002.pdf

PDF 2 MB Posted

Attached to
Remodel Pharmacy IV Prep Room - FCA Project 757-19-101
Solicitation number
36C25018B0815
Issued by

About this file

36C25018B0815 0002 A8-02.pdf

View the file

Other files

File Type Posted
36C25019C0025-000.docx DOCX document
36C25018B0815-0003000.docx DOCX document
36C25018B0815-0002007.pdf PDF
36C25018B0815-0002004.pdf PDF
36C25018B0815-0002006.pdf PDF
36C25018B0815-0002005.pdf PDF
36C25018B0815-0002003.pdf PDF
36C25018B0815-0002000.docx DOCX document
36C25018B0815-0002008.pdf PDF
36C25018B0815-0002001.pdf PDF
36C25018B0815-0002010.pdf PDF
36C25018B0815-0002009.pdf PDF
36C25018B0815-0001000.docx DOCX document
36C25018B0815-003.pdf PDF
36C25018B0815-001.docx DOCX document
36C25018B0815-004.txt TXT text file
36C25018B0815-002.pdf PDF
36C25018B0815-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A8.03

A8.03

A8.03 B

A8.03

A

A8.03

C

E D

A8.03

F

A8.03

G

A8.03

23'-0" +/-

3' -6

8'-0"

8' -7

/4

'-3

/2

8'

-7

/4

31'-0"

'-0

8'-0"

'-0

1'-0"

3'

0"

1' - 8"

T.B.V.

T .B

.V

3' -4

A8.03 B

A8.03

A

A8.03

C

E D

A8.03

F

A8.03

G

3' -4

MEMBRANE ROOFING ON

2" RIGID INSULATION

1/4" / 1'-0" MIN.

1/4" / 1'-0" MIN.

MEMBRANE ROOFING ON

2" RIGID INSULATION

PREFINISH ALUM.

DOWNPOUT

AND GUTTER

PREFINISH ALUM.

DOWNPOUT

AND GUTTER

MOBILE SPS

BY OTHER

PROVIDE

WATER TIGHT

SEAL

SYSTEM WITH

MOBILE SPS

UNIT

PROVIDE

WATER TIGHT

SEAL

SYSTEM WITH

MOBILE SPS

UNIT

PROVIDE ROOF

FLASHING AT

CONNECTION WITH

EXISTING

EXISTING

BUILDING

/4

M

IN

CLG. HT.8'-0"

AFF.

CLG. HT.8'-0"

AFF.

WALLBOARD

HEADER AT 1"

BELOW CLG. HT.

TYP.

WALLBOARD

HEADER AT 1"

BELOW CLG. HT.

TYP.

WALLBOARD

HEADER AT 1" BELOW

CLG HT. TYP.

CLG. HT. VARIES

PROVIDE

HORIZONTAL CEILING

AT RAMP AREA MIN.

8'-0" AFF.

CLG. HT. VARIES

PROVIDE

HORIZONTAL CEILING

AT RAMP AREA MIN.

8'-0" AFF.

WALL MOUNTED MECH.

UNIT. SEE MEP DWGS.

BOTTOM OF UNIT AT 7'-

6" AFF.

WALL MOUNTED MECH.

UNIT. SEE MEP DWGS.

BOTTOM OF UNIT AT 2'-0"

AFF.

EL.+23"

EL.+46" (T.B.V.)

FLUSH WITH

MOBILE SPS

MOBILE SPS

TRAILER

BY OTHER

EXISTING

BUILDING

EL.+0"

FLUSH W/

EXISTING BLDG.

U P

UP

1 1/2" DIA STAINLESS

STL. HANDRAIL

ELECTRICAL PANEL

SEE MEP DWGS.

1TOO1E

1TOO1A

3'-0" WIDE X 3'-6"

SINGLE HUNG

INSULATED ALUM.

WINDOW UNIT. TYP. OF 4

FIRE EXTINGUISHER

NEW DOOR IN EXISTING

EXTERIOR WALL. LOCATE

DOOR WITHIN EXISTING

METAL PANELS. VERIFY

LOCATION IN FIELD WITH

COR.

NOTE:

THIS IS A TEMPORARY

STRUCTURE TO BE

BUILT AND OCCUPIED

WHILE THE SPS TRAILER

IS IN OPERATION. REMOVE

CORRIDOR CONNECTOR, RAMP

AND FOUNDATIONS AFTER

THE SPS TRAILER IS REMOVED

AND RESTORE SITE TO GRASS

COVERED LAWN.

NOTE:

CONCRETE

PAD

REMAINS

AFTER

TRAILER

REMOVED;

SEE

CIVIL

SITE

DRAWINGS.

WALL MOUNTED MECH.

UNIT. SEE MEP DWGS.

BOTTOM OF UNIT AT 7'-

6" AFF.

VIF.

WEATHER COMPRESSION

SEAL AT FLOOR, WALL &

CEILING AT DOOR

OPENING. EXP. JOINT

COVER AT FINISH FLOOR.

COORDINATE WITH

MOBILE SPS PROVIDER.

REFER TO PROJECT

MANUAL.

DOOR BY MOBILE SPS

VERIFY LOCATION &

SIZE

DOOR BY MOBILE SPS

VERIFY LOCATION &

SIZE

WEATHER COMPRESSION

SEAL AT FLOOR, WALL &

CEILING AT DOOR

OPENING. EXP. JOINT

COVER AT FINISH FLOOR.

COORDINATE WITH

MOBILE SPS PROVIDER.

REFER TO PROJECT

MANUAL.

CARD READER

CARD READERS

OPENING TO BE 6"

BEYOND TRAILER DOOR

SIZE. COORDINATE W/

GFCI TRAILER

WALL MOUNTED MECH.

UNIT. SEE MEP DWGS.

BOTTOM OF UNIT AT 2'-0"

AFF.

Expires 12/31/2017 Mark R Hollern 08833

11 / 18 / 2016

Drawing Title

Approved:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

CHALMERS P. WYLIE VA AMBULATORY CARE CENTER

o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

CONSULTANTS:

SCHEMATIC DESIGN REVISIONS - 25% REVIEW SET 2015 10-21

1A

FARID MEHR, PE

CHIEF, ENGINEERING SERVICE

SCHEMATIC DESIGN - 25% REVIEW SET 2015 10-07

DESIGN DEVELOPMENT ONE - 50% REVIEW SET 2015 11-25

DESIGN DEVELOPMENT TWO - 75% REVIEW SET 2016 02-03

CONSTRUCTION DOCUMENTS - 95% REVIEW SET 2016 03-30

BID DOCUMENTS - 100% SET 2016 05-11

BID DOCUMENTS - 100% SET REVISED 2016 11-18

C T e m p \R e v it L o c a lF ile s \1

V

A L a b a n d S

P S

-1

-1 m a rk h .r v t

BID DOCUMENTS - BID

A8.02

ATRK

SPS Temporary Trailer Ramp -plans

2016-11-18

757-16-101

EXPAND LAB AND SPS

DEPARTMENTS

1/4" = 1'-0"A8.02

2 roof plan - ramp for mobile SPS 1/4" = 1'-0"A8.02

3 ceiling plan - ramp for mobile SPS 1/4" = 1'-0"A8.02

1 floor plan - ramp for mobile SPS

File details come from the government source that posted it.