36C25018B0815-0002002.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25018B0815
About this file
36C25018B0815 0002 A8-02.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0025-000.docx | DOCX document | |
| 36C25018B0815-0003000.docx | DOCX document | |
| 36C25018B0815-0002007.pdf | ||
| 36C25018B0815-0002004.pdf | ||
| 36C25018B0815-0002006.pdf | ||
| 36C25018B0815-0002005.pdf | ||
| 36C25018B0815-0002003.pdf | ||
| 36C25018B0815-0002000.docx | DOCX document | |
| 36C25018B0815-0002008.pdf | ||
| 36C25018B0815-0002001.pdf | ||
| 36C25018B0815-0002010.pdf | ||
| 36C25018B0815-0002009.pdf | ||
| 36C25018B0815-0001000.docx | DOCX document | |
| 36C25018B0815-003.pdf | ||
| 36C25018B0815-001.docx | DOCX document | |
| 36C25018B0815-004.txt | TXT text file | |
| 36C25018B0815-002.pdf | ||
| 36C25018B0815-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A8.03
A8.03
A8.03 B
A8.03
A
A8.03
C
E D
A8.03
F
A8.03
G
A8.03
23'-0" +/-
3' -6
8'-0"
8' -7
/4
'-3
/2
8'
-7
/4
31'-0"
'-0
8'-0"
'-0
1'-0"
3'
0"
1' - 8"
T.B.V.
T .B
.V
3' -4
A8.03 B
A8.03
A
A8.03
C
E D
A8.03
F
A8.03
G
3' -4
MEMBRANE ROOFING ON
2" RIGID INSULATION
1/4" / 1'-0" MIN.
1/4" / 1'-0" MIN.
MEMBRANE ROOFING ON
2" RIGID INSULATION
PREFINISH ALUM.
DOWNPOUT
AND GUTTER
PREFINISH ALUM.
DOWNPOUT
AND GUTTER
MOBILE SPS
BY OTHER
PROVIDE
WATER TIGHT
SEAL
SYSTEM WITH
MOBILE SPS
UNIT
PROVIDE
WATER TIGHT
SEAL
SYSTEM WITH
MOBILE SPS
UNIT
PROVIDE ROOF
FLASHING AT
CONNECTION WITH
EXISTING
EXISTING
BUILDING
/4
M
IN
CLG. HT.8'-0"
AFF.
CLG. HT.8'-0"
AFF.
WALLBOARD
HEADER AT 1"
BELOW CLG. HT.
TYP.
WALLBOARD
HEADER AT 1"
BELOW CLG. HT.
TYP.
WALLBOARD
HEADER AT 1" BELOW
CLG HT. TYP.
CLG. HT. VARIES
PROVIDE
HORIZONTAL CEILING
AT RAMP AREA MIN.
8'-0" AFF.
CLG. HT. VARIES
PROVIDE
HORIZONTAL CEILING
AT RAMP AREA MIN.
8'-0" AFF.
WALL MOUNTED MECH.
UNIT. SEE MEP DWGS.
BOTTOM OF UNIT AT 7'-
6" AFF.
WALL MOUNTED MECH.
UNIT. SEE MEP DWGS.
BOTTOM OF UNIT AT 2'-0"
AFF.
EL.+23"
EL.+46" (T.B.V.)
FLUSH WITH
MOBILE SPS
MOBILE SPS
TRAILER
BY OTHER
EXISTING
BUILDING
EL.+0"
FLUSH W/
EXISTING BLDG.
U P
UP
1 1/2" DIA STAINLESS
STL. HANDRAIL
ELECTRICAL PANEL
SEE MEP DWGS.
1TOO1E
1TOO1A
3'-0" WIDE X 3'-6"
SINGLE HUNG
INSULATED ALUM.
WINDOW UNIT. TYP. OF 4
FIRE EXTINGUISHER
NEW DOOR IN EXISTING
EXTERIOR WALL. LOCATE
DOOR WITHIN EXISTING
METAL PANELS. VERIFY
LOCATION IN FIELD WITH
COR.
NOTE:
THIS IS A TEMPORARY
STRUCTURE TO BE
BUILT AND OCCUPIED
WHILE THE SPS TRAILER
IS IN OPERATION. REMOVE
CORRIDOR CONNECTOR, RAMP
AND FOUNDATIONS AFTER
THE SPS TRAILER IS REMOVED
AND RESTORE SITE TO GRASS
COVERED LAWN.
NOTE:
CONCRETE
PAD
REMAINS
AFTER
TRAILER
REMOVED;
SEE
CIVIL
SITE
DRAWINGS.
WALL MOUNTED MECH.
UNIT. SEE MEP DWGS.
BOTTOM OF UNIT AT 7'-
6" AFF.
VIF.
WEATHER COMPRESSION
SEAL AT FLOOR, WALL &
CEILING AT DOOR
OPENING. EXP. JOINT
COVER AT FINISH FLOOR.
COORDINATE WITH
MOBILE SPS PROVIDER.
REFER TO PROJECT
MANUAL.
DOOR BY MOBILE SPS
VERIFY LOCATION &
SIZE
DOOR BY MOBILE SPS
VERIFY LOCATION &
SIZE
WEATHER COMPRESSION
SEAL AT FLOOR, WALL &
CEILING AT DOOR
OPENING. EXP. JOINT
COVER AT FINISH FLOOR.
COORDINATE WITH
MOBILE SPS PROVIDER.
REFER TO PROJECT
MANUAL.
CARD READER
CARD READERS
OPENING TO BE 6"
BEYOND TRAILER DOOR
SIZE. COORDINATE W/
GFCI TRAILER
WALL MOUNTED MECH.
UNIT. SEE MEP DWGS.
BOTTOM OF UNIT AT 2'-0"
AFF.
Expires 12/31/2017 Mark R Hollern 08833
11 / 18 / 2016
Drawing Title
Approved:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
CHALMERS P. WYLIE VA AMBULATORY CARE CENTER
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
CONSULTANTS:
SCHEMATIC DESIGN REVISIONS - 25% REVIEW SET 2015 10-21
1A
FARID MEHR, PE
CHIEF, ENGINEERING SERVICE
SCHEMATIC DESIGN - 25% REVIEW SET 2015 10-07
DESIGN DEVELOPMENT ONE - 50% REVIEW SET 2015 11-25
DESIGN DEVELOPMENT TWO - 75% REVIEW SET 2016 02-03
CONSTRUCTION DOCUMENTS - 95% REVIEW SET 2016 03-30
BID DOCUMENTS - 100% SET 2016 05-11
BID DOCUMENTS - 100% SET REVISED 2016 11-18
C T e m p \R e v it L o c a lF ile s \1
V
A L a b a n d S
P S
-1
-1 m a rk h .r v t
BID DOCUMENTS - BID
A8.02
ATRK
SPS Temporary Trailer Ramp -plans
2016-11-18
757-16-101
EXPAND LAB AND SPS
DEPARTMENTS
1/4" = 1'-0"A8.02
2 roof plan - ramp for mobile SPS 1/4" = 1'-0"A8.02
3 ceiling plan - ramp for mobile SPS 1/4" = 1'-0"A8.02
1 floor plan - ramp for mobile SPS