36C25018B0795-018.pdf
PDF 6 MB Posted
- Attached to
- Construct Clinical and Admin Building 506-329 Federal contract opportunity
- Solicitation number
- 36C25018B0795
About this file
36C25018B0795 506-329 VA Ann Arbor Admin Bldg BID DWGS REVISED_Part8.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0795-0005000.docx | DOCX document | |
| 36C25018B0795-0004000.docx | DOCX document | |
| 36C25018B0795-0003001.xlsx | XLSX spreadsheet | |
| 36C25018B0795-0003000.docx | DOCX document | |
| 36C25018B0795-0002000.docx | DOCX document | |
| 36C25018B0795-0001000.docx | DOCX document | |
| 36C25018B0795-0001001.pdf | ||
| 36C25018B0795-0001002.pdf | ||
| 36C25018B0795-010.pdf | ||
| 36C25018B0795-008.docx | DOCX document | |
| 36C25018B0795-020.pdf | ||
| 36C25018B0795-015.pdf | ||
| 36C25018B0795-022.docx | DOCX document | |
| 36C25018B0795-014.pdf | ||
| 36C25018B0795-011.pdf | ||
| 36C25018B0795-019.pdf | ||
| 36C25018B0795-017.pdf | ||
| 36C25018B0795-021.pdf | ||
| 36C25018B0795-013.pdf | ||
| 36C25018B0795-009.docx | DOCX document | |
| 36C25018B0795-012.pdf | ||
| 36C25018B0795-007.docx | DOCX document | |
| 36C25018B0795-016.pdf | ||
| 36C25018B0795-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5.45.4
STAIRS
S-2
MEN'S TOILET
HAC
IT
ELECTRICAL
STAIRS
S-1
ELEVATOR
E-1
P.I.V
P.I.V.
4" SLEEVES (QUANTITY AS REQUIRED)
12" BASKET TRAY
12"W X 4"D
BOCT= 9' - 8 1/2"
12"W X 4"D
BOCT= 9' - 8 1/2"
12"W X 4"D
BOCT= 9' - 8 1/2"
WATERFALL
5 5
5 5
W
5555555
5555555
OPEN OFFICE
WAP
WAP
WAPWAP
WAP
WAP 6
WAP
W
W
HR CHIEF OFFICER
HR SPECIALIST OFFICER
HR SPECIALIST OFFICER
HR BENEFITS
SPECIALIST
OWC
PHYS / PROV
EXAM
RECORDS STORAGE
136 OPEN OFFICE
WAITING
VESTIBULE
ELEVATOR LOBBY
TREATMENT AREA
TLT
EXAM
HR PROCESS
HR SPECIALIST OFFICER
CORRIDOR
OPEN OFFICE
ASSIST HR CHIEF
OFFICER
HR RECRUITMENT
HR PROCESS BENEFITS
WOMEN'S TOILET
OPEN OFFICE
HR BENEFIT RA/FMLA
WAITING
CORRIDOR
12"W X 4"D
BOCT= 9' - 10"
12"W X 4"D
BOCT= 10' - 9 3/4"
12"W X 4"D
BOCT= 9' - 11 1/2"
12"W X 4"D
BOCT= 9' - 8 25/32"
ELEVATION CHANGE
ELEVATION CHANGE
ELEVATION CHANGE
A
A
B
B
C
C
D
D
6 6
5 5
3 3
2 2
H
HE
E
4.2
4 4
J
J
2.8
4.8
G
G
5.4
KF
F
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:2
A
M
ET110
TELECOMMUNICATIONS - FIRST FLOOR
PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
R.BRYANT04-12-18
139 148
SCALE: 3/16" = 1'-0"
FIRST FLOOR TECHNOLOGY PLAN
GENERAL NOTES
A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,
MOUNTING INFORMATION AND GENERAL NOTES.
B COVER ALL WALLS WITH 3/4" FIRE RATED PLYWOOD IN
IT ROOMS.
C ALL OF THE HORIZONTAL DATA CABLING WILL EXTEND
FROM THE WORK AREA OUTLETS THROUGH THE IT
ROOM AND BE TERMINATED ON A RACK MOUNT PATCH
PANEL IN THE BASEMENT IT ROOM.
N
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
S-2
ELECTRICAL
IT
HAC
MEN'S TOILET
OPEN OFFICE
AFO
CFO
INTERNAL AUDITOR
ASSISTANT CHIEF
230 CHIEF
UNISEX RR
STAIRS
S-1
ELEVATOR
E-1
4" SLEEVES
(QUANTITY AS
REQUIRED)
12" BASKET TRAY
12"W X 4"D
BOCT= 9' - 9"
WATERFALL
12"W X 4"D
BOCT= 10' - 0"
W
222 2
5 5
5 5
2 2 2 2 2 2
W
VESTIBULE
OPEN OFFICE
CORRIDOR
OPEN OFFICE
OPEN OFFICE
WAP
WAP
WAP
WAP
NOTE 1
WAP6
WAP6
WAP
W
BREAK ROOM
CORRIDOR
MCA PROGRAM OFFICE
PAYROLL SUPERVISOR
WOMEN'S TOILET
222 ELEVATOR LOBBY
CORRIDOR
CONFERENCE ROOM
OPEN OFFICE
OPEN OFFICE
ACCOUNTING
SUPERVISOR
12"W X 4"D
BOCT= 9' - 9"
12"W X 4"D
BOCT= 10' - 0"
12"W X 4"D
BOCT= 9' - 9"
12"W X 4"D
BOCT= 9' - 9"
12"W X 4"D
BOCT= 9' - 9"
12"W X 4"D
BOCT= 10' - 0"
12"W X 4"D
BOCT= 9' - 9"
ELEVATION CHANGE
ELEVATION CHANGE
A
A
B
B
C
C
D
D
6 6
5 5
3 3
2 2
H
HE
E
4.2
4 4
J
J
2.8
4.8
G
G
5.4
KF
F
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:3
A
M
ET120
TELECOMMUNICATIONS - SECOND
FLOOR PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
R.BRYANT04-12-18
140 148
SCALE: 3/16" = 1'-0"
SECOND FLOOR TECHNOLOGY PLAN
GENERAL NOTES
A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,
MOUNTING INFORMATION AND GENERAL NOTES.
B COVER ALL WALLS WITH 3/4" FIRE RATED PLYWOOD IN
IT ROOMS.
C ALL OF THE HORIZONTAL DATA CABLING WILL EXTEND
FROM THE WORK AREA OUTLETS THROUGH THE IT
ROOM AND BE TERMINATED ON A RACK MOUNT PATCH
PANEL IN THE BASEMENT IT ROOM.
N
PLAN NOTES - ET120
1. INSTALL AN HDMI CABLE BETWEEN THE TV AND THE
PC LOCATION IN THE NORTHWEST CORNER OF THE
ROOM.
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
S-2
HBU SUPRVISOR
CHIEF MAS OFFICER
ASST CHIEF MAS OFF
SCANNING SUPV
RECORD MANAGER
OFFICER
NON-VA CARE SUPV
MED RECORDS
SUPERVISOR
MEN'S TOILET
VESTIBULE
HAC
IT
ELECTRICAL
ELEVATOR
E-1
STAIRS
S-1
12"W X 4"D
BOCT= 9' - 9"
12"W X 4"D
BOCT= 9' - 9"
12"W X 4"D
BOCT= 9' - 9"
12"W X 4"D
BOCT= 9' - 9"
4" SLEEVES
(QUANTITY AS
REQUIRED)
12" BASKET TRAY
WATERFALL
222222
5 5
5 5
W
6 6
OPEN OFFICE
OPEN OFFICE
WAP
WAP
WAP
WAP
NOTE 1
WAP
WAP
WAP
W
2 2
OPEN OFFICE
ADMINISTRATIVE
OFFICER
CODING SUPERVISOR
OFFICE
OPEN OFFICE
CONF. ROOM
CORRIDOR
ELEVATOR LOBBY
A
A
B
B
C
C
D
D
6 6
5 5
3 3
2 2
H
HE
E
4.2
4 4
J
J
2.8
4.8
G
G
5.4
KF
F
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:4
A
M
ET130
TELECOMMUNICATIONS - THIRD FLOOR
PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
R.BRYANT04-12-18
141 148
SCALE: 3/16" = 1'-0"
THIRD FLOOR TECHNOLOGY PLAN
GENERAL NOTES
A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,
MOUNTING INFORMATION AND GENERAL NOTES.
B COVER ALL WALLS WITH 3/4" FIRE RATED PLYWOOD IN
IT ROOMS.
C ALL OF THE HORIZONTAL DATA CABLING WILL EXTEND
FROM THE WORK AREA OUTLETS THROUGH THE IT
ROOM AND BE TERMINATED ON A RACK MOUNT PATCH
PANEL IN THE BASEMENT IT ROOM.
N
PLAN NOTES - ET130
1. INSTALL AN HDMI CABLE BETWEEN THE TV AND THE
PC LOCATION IN THE NORTHWEST CORNER OF THE
ROOM.
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:4
A
M
ET601
TELECOMMUNICATIONS RISER PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
R.BRYANT04-12-18
143 148
BASEMENT FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
PAGING RISER DIAGRAM
SCALE: NOT TO SCALE
1. ALL CEILING SPEAKERS SHALL BE TAPPED AT 2 WATTS.
NOTES:
SCALE: 6" = 1'-0"
TELECOMMUNICATIONS RISER DIAGRAM
SCALE: NOT TO SCALE
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
T ectonic Cop yright 2007
F A
P
F
CR
RTM
AOM
DC ES
AOM
AOM AOM
RTM
DCES
CR
FS
TS
AIM
AIM
TS AIM
AOM AIMAOMAOMAOM
AIM
RT
RT
RT
RT
FS TS TS TS TS
AIM AIM AIM AIM
DC
AIM
AOM
AOM
RT
A
A
B
B
C
C
D
D
5 5
3 3
2 2
H
HE
E
4 4
J
J
G
G
MECHANICAL
HAC
CORRIDOR
STAIRS
S-1
CORRIDOR
ELEVATOR
E-1
ELEV. MAC. RM.
ELECTRICAL
IT
UNIT SHUT DOWN
RETURN
SUPPLY
SECURITY SYSTEM
RACK
MOUNTED AT BOTTOM
OF SHAFT
UNIT SHUT DOWN
PRIMARY RECALL
ALTERNATE RECALL
SHUNT TRIP
SHUNT TRIP POWER MONITOR
FIRE HAT
SPRINKLERS
A
A
B
B
C
C
D
D
5 5
3 3
2 2
H
HE
E
4.2
4 4
J
J
2.8
4.8
G
G
5.4
KF
F
NOTE 1NOTE 2
NOTE 3
NOTE 3 NOTE 3 NOTE 3
CORRIDOR
NOTE 4
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:4
A
M
EY100
FIRE ALARM / SECURITY - BASEMENT
FLOOR PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
M.SMITH04-12-18
144 148
SCALE: 3/16" = 1'-0"
FIRE ALARM / SECURITY - BASEMENT FLOOR PLAN
GENERAL NOTES
A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,
MOUNTING INFORMATION AND GENERAL NOTES.
B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM
N
PLAN NOTES - EY100
1. MONITOR MODULE FOR HIGH WATER LEVEL ALARM.
FIRE ALARM CONTRACTOR TO COORDINATE WITH
THE PLUMBING CONTRACTOR FOR THE EXACT
LOCATION OF THE DRY CONTACT TO MONITOR FOR
THIS ALARM.
2. SECURITY CONTRACTOR TO PROVIDE A
SURFACE MOUNT CONTACT FOR THE OVERHEAD
DOOR. COORDINATE WITH VA SECURITY ON HOW
THIS SHOULD REPORT TO THE MONITORING
STATION.
3. DUCT SMOKE DETECTOR AND CONTROL RELAY
FOR FIRE SMOKE DAMPER.
4. INSTALL HEAT DETECTOR WITHIN 24" OF SPRINKLER HEAD.
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
REF. REF.
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007T ectonic Cop yright 2007
FAA
F
F
CR
CR
CR
CR
CR
RTM
ESDC
RTM
ES
DC
DC
ESDC
ES
DC
RTM
ES
DC
C
C
CR
DC ES
AOM
AOM
TS
FSAIM
AIM
RT RT
TS
AIM
RTDEPT
RTD
EPT
RTD
EPT
CR
RTM
DCES
ES
RTE
CR
CR
RTE
CR
ES
DC
RTM
AOM
AOM
A
A
B
B
C
C
D
D
5 5
3 3
2 2
H
HE
E
4 4
J
J
G
G
5.45.4
STAIRS
S-2
MEN'S TOILET
HAC
IT
ELECTRICAL
STAIRS
S-1
ELEVATOR
E-1
P.I.V
P.I.V.
SECURITY
SYSTEM RACK
IP
MP
IP
MP
NOTE 2
WP
NOTE 1
NOTE 1
NOTE 1
NOTE 3
NOTE 3
OPEN OFFICE
WP
OPEN OFFICE
RECORDS STORAGE
EXAM
PHYS / PROV
OWC
HR BENEFITS
SPECIALIST
HR SPECIALIST OFFICER
HR SPECIALIST OFFICER
HR CHIEF OFFICER
ASSIST HR CHIEF
OFFICER
CORRIDOR
HR SPECIALIST OFFICER
HR RECRUITMENT
HR PROCESS BENEFITS
HR PROCESS
EXAM
TLT
TREATMENT AREA
WOMEN'S TOILET
VESTIBULE
WAITING
ELEVATOR LOBBY
CORRIDOR
WAITING
HR BENEFIT RA/FMLA
OPEN OFFICE
A
A
B
B
C
C
D
D
6 6
5 5
3 3
2 2
H
HE
E
4.2
4 4
J
J
2.8
4.8
G
G
5.4
KF
F
NOTE 4
NOTE 5
NOTE 6
NOTE 5
WP
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:4
A
M
EY110
FIRE ALARM / SECURITY - FIRST FLOOR
PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
M.SMITH04-12-18
145 148
SCALE: 3/16" = 1'-0"
FIRE ALARM / SECURITY - FIRST FLOOR PLAN
GENERAL NOTES
A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,
MOUNTING INFORMATION AND GENERAL NOTES.
B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM
N
PLAN NOTES - EY110
1. GENERAL CONTRACTOR SHALL PROVIDE A REQUEST
TO EXIT DEVICE IN THE DOOR HANDLE. REQUEST TO
EXIT CABLE SHALL BE ROUTED THROUGH THE DOOR.
GENERAL CONTRACTOR SHALL PREPARE DOOR AND
FRAME FOR CABLE INSTALLATION.
2. WEATHERPROOF HORN STROBE TO ACTIVATE ON
WATERFLOW ALARM ONLY.
3. THE GENERAL CONTRACTOR IS TO PROVIDE A
BUTTON FOR RELEASING THE ELEVATOR LOBBY
DOOR. THE SECURITY CONTRACTOR IS TO PROVIDE
THE NECESSARY CABLE AND PROGRAMMING OF THE
ACCESS CONTROL SYSTEM SO THAT WHEN THE
BUTTON IS ACTIVATED THE DOOR MAY BE OPENED
BY A VISITOR.
4. CONTRACTOR TO PROGRAM DOOR TO BE UNLOCKED
DURNING BUSINESS HOURS. COORDINATE EXACT
HOURS WITH OWNER'S REPRESENTATIVE.
5. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR
FIRE SMOKE DAMPER.
6. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR
SMOKE DAMPER.
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16 ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
F
F
DC
CR
CR
CR
RTM
ES
RTM
DC
ES
RTD
DC
ES
C
C
AOM
AOM
RTM
DCES
CR
RT RT
TS
TS
AIM
AIM
RTM
CR
RTE
EPT
AOM
DC
ES
A
A
B
B
C
C
D
D
5 5
3 3
2 2
H
HE
E
4 4
J
J
G
G
STAIRS
S-2
ELECTRICAL
IT
HAC
MEN'S TOILET
OPEN OFFICE
AFO
CFO
INTERNAL AUDITOR
ASSISTANT CHIEF
230 CHIEF
UNISEX RR
STAIRS
S-1
ELEVATOR
E-1
SECURITY SYSTEM
RACK
IP
MP
IP
MP
NOTE 1
OPEN OFFICE
OPEN OFFICE
CONFERENCE ROOM
ELEVATOR LOBBY
CORRIDOR
BREAK ROOM
MCA PROGRAM OFFICE
PAYROLL SUPERVISOR
WOMEN'S TOILET
OPEN OFFICE
ACCOUNTING
SUPERVISOR
A
A
B
B
C
C
D
D
6 6
5 5
3 3
2 2
H
HE
E
4.2
4 4
J
J
2.8
4.8
G
G
5.4
KF
F
NOTE 2
NOTE 2
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:4
A
M
EY120
FIRE ALARM / SECURITY - SECOND
FLOOR PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
M.SMITH04-12-18
143 148
SCALE: 3/16" = 1'-0"
FIRE ALARM / SECURITY - SECOND FLOOR PLAN
GENERAL NOTES
A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,
MOUNTING INFORMATION AND GENERAL NOTES.
B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM
N
PLAN NOTES
1. THE GENERAL CONTRACTOR IS TO PROVIDE A
BUTTON FOR RELEASING THE ELEVATOR LOBBY
DOOR. THE SECURITY CONTRACTOR IS TO PROVIDE
THE NECESSARY CABLE AND PROGRAMMING OF
THE ACCESS CONTROL SYSTEM SO THAT WHEN
THE BUTTON IS ACTIVATED THE DOOR MAY BE
OPENED BY A VISITOR.
2. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR
FIRE SMOKE DAMPER.
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16 ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
F
F
RTM
RTM
CR
CR
CR
ES
DC
DC
ES
C
C
P
P P
P
RTM
CR
DC ES
RTRT
AOM
AOM
TSAIM
TSAIM
RTD
EPT
DC
RTE
AOM
DC
ES
A
A
B
B
C
C
D
D
5 5
3 3
2 2
H
HE
E
4 4
J
J
G
G
STAIRS
S-2
HBU SUPRVISOR
CHIEF MAS OFFICER
ASST CHIEF MAS OFF
SCANNING SUPV
RECORD MANAGER
OFFICER
NON-VA CARE SUPV
MED RECORDS
SUPERVISOR
MEN'S TOILET
VESTIBULE
304 HAC
IT
ELECTRICAL
ELEVATOR
E-1
STAIRS
S-1
SECURITY
SYSTEM
RACK
IP
MP
IP
MP
IP
MP
WP
IP
MP
WP
IP
MP
WP
IP
MP
WP
MOUNT CAMERA AT
ROOF LEVEL
MOUNT CAMERA AT
ROOF LEVEL
MOUNT CAMERA AT
ROOF LEVEL
MOUNT CAMERA AT
ROOF LEVEL
NOTE 1
NOTE 3
NOTE 2
OPEN OFFICE
OPEN OFFICE
OPEN OFFICE
CONF. ROOM
CORRIDOR
ELEVATOR LOBBY
OPEN OFFICE
ADMINISTRATIVE
OFFICER
CODING SUPERVISOR
OFFICE
WOMEN'S TOILET
A
A
B
B
C
C
D
D
6 6
5 5
3 3
2 2
H
HE
E
4.2
4 4
J
J
2.8
4.8
G
G
5.4
KF
F
NOTE 4
NOTE 4
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:4
A
M
EY130
FIRE ALARM / SECURITY - THIRD FLOOR
PLAN
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
M.SMITH04-12-18
147 148
SCALE: 3/16" = 1'-0"
FIRE ALARM / SECURITY - THIRD FLOOR PLAN
GENERAL NOTES
A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,
MOUNTING INFORMATION AND GENERAL NOTES.
B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM
N
PLAN NOTES
1. GENERAL CONTRACTOR SHALL PROVIDE A
REQUEST TO EXIT DEVICE IN THE DOOR HANDLE.
REQUEST TO EXIT CABLE SHALL BE ROUTED
THROUGH THE DOOR. GENERAL CONTRACTOR
SHALL PREPARE DOOR AND FRAME FOR
CABLE INSTALLATION.
2. THE GENERAL CONTRACTOR IS TO PROVIDE A
BUTTON FOR RELEASING THE ELEVATOR LOBBY
DOOR. THE SECURITY CONTRACTOR IS TO PROVIDE
THE NECESSARY CABLE AND PROGRAMMING OF
THE ACCESS CONTROL SYSTEM SO THAT WHEN
THE BUTTON IS ACTIVATED THE DOOR MAY BE
OPENED BY A VISITOR.
3. SECURITY CONTRACTOR TO PROVIDE A SURFACE
MOUNT CONTACT FOR THE ROOF HATCH.
COORDINATE WITH VA SECURITY ON HOW THIS
SHOULD REPORT TO THE MONITORING STATION.
4. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR
FIRE SMOKE DAMPER.
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
AIM
AOM AOM AOM
LOCAL
SPEAKER &
STROBES
EOL
(1) PR #12, TW, SHLD
ADDRESSABLE FIRE
ALARM CONTROL PANEL
TAMPER
SWITCH
(TYPICAL)
FS
(1) PR #16, TW, SHLD &
(1) PR #14,TW, SHLD (POWER)
HVAC UNIT
HVAC
SHUTDOWN
(1) 1PR #16,
TW, SHLD
(1) PR #16, TW, SHLD
(1) PR#16, TW, SHLD
TS
(1) PR #16, TW, SHLD
(TYPICAL TO EACH
MONITORED DEVICE
TSFS
FLOW SWITCH
(TYPICAL)
ADDRESSABLE
INPUT MODULE
(TYPICAL)
ADDRESSABLE
OUTPUT MODULE
(TYPICAL)
REMOTE
POWER
SUPPLY
DEDICATED
120VAC
CIRCUIT
MINIMIZE
QUANTITY
(1) PR #12,
TW, SHLD
REMOTE
SPEAKERS &
STROBES
F
SYSTEM CONNECTION
TO THE EXISTING
CAMPUS FIRE ALARM
NETWORK.
EOL
EOL
DEDICATED
120VAC
CIRCUIT
(1) PR #16,
TW, SHLD
EOL
EOL
(1) PR #16, TW, SHLD
EOL
EOL
EOL EOL EOL
FS TS
AIM AIM AIM
EOL
AIM AIM
F
F F
AT MAIN FIRE
DEPARTMENT
ENTRANCES
FIRE ALARM
ANNUNCIATOR
FAA
CABLE AS REQUIRED
BY THE SYSTEM
MANUFACTURER
AOM
AOM
RT RT
FIRE ALARM SYSTEM GENERAL NOTES:
1. SEE SHEET ET001 FOR SYMBOL SCHEDULE AND GENERAL NOTES.
2. INSTALLATION SHALL BE DONE IN STRICT ACCORDANCE WITH ALL PERTINENT CODES, REGULATIONS, RULES, AND LAWS OF THE
AUTHORITY, AND LOCAL JURISDICTION, AS WELL AS PER PLANS AND SPECIFICATIONS.
3. THE CONTRACTOR SHALL FURNISH ALL LABOR, SERVICES AND MATERIALS NECESSARY TO INSTALL A COMPLETE, AND FUNCTIONAL
FIRE ALARM SYSTEM AND BE LICENSED IN THE JURISDICTION FOR FIRE ALARM SYSTEM INSTALLATION. PROVIDE NICET LEVEL TWO
MINIMUM CERTIFICATION FOR INSTALLATION TEAMS AND COMMISSIONING TECHNICIANS. THE SYSTEM SHALL BE COMPLETELY
COMPATIBLE WITH AND CONNECTED TO THE EXISTING CAMPUS FIRE ALARM NETWORK.
4. THE CONTRACTOR SHALL HAVE SUCCESSFULLY INSTALLED A SIMILAR FIRE DETECTION SYSTEM AND SIGNALING CONTROL
COMPONENTS ON A PREVIOUS PROJECT OF COMPARABLE SIZE AND COMPLEXITY.
5. ALL EQUIPMENT AND COMPONENTS SHALL BE THE MANUFACTURER'S CURRENT MODEL. ALL SYSTEM COMPONENTS SHALL BE
CATALOGED PRODUCTS OF A SINGLE SUPPLIER. ALL PRODUCTS SHALL BE LISTED BY THE MANUFACTURER FOR THEIR INTENDED
PURPOSE.
6. EACH FIRE ALARM AUTOMATIC OR MANUAL INITIATING DEVICE SHALL BE A SINGLE ADDRESSABLE POINT.
7. MONITORING OF ALL FIRE PUMP CONTROLLERS, POST INDICATOR VALVES, SECTIONAL CONTROL VALVES, SPRINKLER FLOW
SWITCHES, AND SPRINKLER VALVE TAMPER SWITCHES SHALL BE PROVIDED. PROVIDE EXTERIOR NOTIFICATION APPLIANCES AT
THE LOCATION OF ALL SUPPRESSION SYSTEM RISERS.
8. THE FIRE ALARM VENDOR SHALL PROVIDE MONITORING OF ALL CODE REQUIRED SYSTEMS INCLUDING ALARM, TROUBLE, AND
SUPERVISORY SIGNALS.
9. ADDRESSABLE DUCT SMOKE DETECTORS SHALL BE INSTALLED IN ALL AIR HANDLER UNITS AS REQUIRED BY CODE, IN A LOCATION
ACCESSIBLE FOR CLEANING AND TESTING, IN A LOCATION APPROVED BY THE HVAC UNIT MANUFACTURERS AND IN A LOCATION
APPROVED BY THE AHJ. DUCT SMOKE DETECTORS SHALL BE WIRED TO SHUT OFF POWER TO LOCAL AIR HANDLING EQUIPMENT.
MOUNT SO THAT THE DEVICE IS ACCESSIBLE. VERIFY PLACEMENT WITH MECHANICAL TRADES AND OWNER. BOTH ENDS OF THE
SAMPLING TUBE SHALL BE SECURED, AND THE SUPPLY TUBE END CAPPED. PROVIDE DUCT SMOKE DETECTORS AT ALL SMOKE
DAMPERS CONFIGURED TO CLOSE THE DAMPER UPON ACTIVATION AND CONNECTED TO THE BUILDING FIRE ALARM SYSTEM.
10. INCOMING 120VAC 60HZ POWER SHALL BE DEDICATED AND EQUIPPED WITH ADDITIONAL SURGE SUPPRESSION SEPARATE FROM
THE FIRE ALARM PANEL. PROVIDE A LOCKING BREAKER FOR ALL 120VAC POWER FEEDS TO FIRE ALARM EQUIPMENT AND LABEL IN
RED TEXT AS "FIRE ALARM SYSTEM".
11. WHERE MORE THAN TWO STROBES ARE IN THE SAME LINE OF SIGHT, OR IN THE SAME ROOM, THE STROBES SHALL FLASH IN
SYNCHRONIZATION. ALL STROBES SHALL BE PLACED 80" TO 96" AFF FROM THE BOTTOM OF THE LENS .
12. LOCATE SMOKE DETECTORS AND HEAT DETECTORS SO AS TO BE ACCESSIBLE FOR TESTING AND MAINTENANCE. VERIFY LOCATION
WITH OWNER PRIOR TO INSTALLATION .
13. CONTRACTOR SHALL INSTALL THE NUMBER OF TRANSPONDER PANELS REQUIRED FOR THE ENTIRE FACILITY BASED ON THE MOST
ECONOMICAL DESIGN .
14. PROVIDE AND INSTALL HARDWARE INTERFACE BETWEEN FIRE ALARM PANEL AND ACCESS CONTROL DOORS TO PROVIDE FOR
UNLOCKING AND DOOR RELEASE IN THE EVENT OF A FIRE ALARM .
15. PROVIDE FOR 20% EXPANSION ON ALL ADDRESSABLE LOOPS, VISUAL CIRCUITS, AUDIBLE CIRCUITS, POWER SUPPLIES, AMPLIFIERS, BATTERIES, AND INTERNAL PANEL EXPANSION .
16. PROVIDE AND INSTALL THE REQUIRED INPUT AND OUTPUT CONNECTIONS TO ANCILLARY SYSTEMS. THIS INCLUDES BUT IS NOT
LIMITED TO SHUTTING OFF ANY/ALL SOUND MAKING SYSTEMS, PAGING SYSTEMS AND BACKGROUND MUSIC SYSTEMS IN THE EVENT
OF AN ALARM CONDITION .
17. ALL EXTERIOR UNDERGROUND WIRING WILL BE RATED AND LISTED FOR OUTDOOR USE AND BE CAPABLE OF BEING SUBMERGED
UNDER WATER, SURGE PROTECTION SHALL BE INSTALLED AT EACH END OF ALL EXTERIOR MONITORED DEVICES.
18. ALL FIRE ALARM CABLE WILL BE FIRE ALARM LISTED FOR INTENDED USE AND SHALL HAVE ITS LISTING ON THE OUTER JACKET. ALL
FIRE ALARM CABLE SHALL HAVE AN OUTER JACKET THAT IS RED IN COLOR. THIS INCLUDES ALL CABLING USED FOR ANY FIRE ALARM
DEVICE(S) INCLUDING PIV'S, SCV'S, FLOW SWITCHES, OR ANY OTHER MONITORED POINT CONNECTED TO THE FIRE ALARM SYSTEM.
ALL FIRE ALARM CABLE SHALL BE INSTALLED IN CONDUIT FROM DEVICE UP TO THE CEILING SPACE INCLUDING IN WALL
INSTALLATIONS. CABLING IN THE CEILING SPACE SHALL BE INSTALLED IN CABLE TRAY OR IN J-HOOKS.
19. FIRE ALARM SYSTEM RISER DIAGRAM IS REPRESENTATIVE AND CONCEPTUAL ONLY. CABLES ARE SHOWN AS EXAMPLE ONLY. RISER
DIAGRAM IS PROVIDED FOR A BASIC SYSTEM OUTLINE AND ZONING AID. FURNISH AND INSTALL ALL EQUIPMENT, CABLE AND
DEVICES REQUIRED TO MEET THE INTENT OF THE SPECIFICATIONS. PROVIDE CABLE PER MANUFACTURER AND CIRCUIT
REQUIREMENTS. ALL DEVICES NOT SHOWN.
20. PROVIDE CONDUCTORS POWER SUPPLIES AND WIRE GAUGE NECESSARY TO SUPPLY EACH STROBE WITH 110cd PER DEVICE AND
EACH SPEAKER WITH 2w.
21. ALL CABLES SHALL BE SHIELDED UNLESS MANUFACTURER CAN PROVE THAT SIGNALING, POWER, AND AUDIO WILL NOT BE
AFFECTED BY EMI AND OTHER INTERFERENCE. IT SHALL BE THIS CONTRACTOR'S RESPONSIBILITY TO MAINTAIN PROPER
SEPARATION FROM OTHER CABLES AT ALL TIMES. ALL CABLES AND FIBER WILL BE IN CONDUIT OR CABLE TRAY.
22. PROVIDE MINIMUM 15db ABOVE AMBIENT FIRE ALARM AUDIBLE NOTIFICATION SIGNAL FOR ALL AREAS.
23. INCLUDE AUDIBLE/VISUAL ALARM NOTIFICATION EXTERIOR TO THE BUILDING AT EACH SPRINKLER RISER LOCATION.
24. FIELD LOCATE NOTIFICATION APPLIANCE POWER SUPPLIES AS REQUIRED TO SERVE STROBES. PROVIDE DEDICATED 120V POWER
TO ALL STROBE POWER SUPPLIES. NOTIFICATION APPLIANCE CIRCUITS SHALL NOT BE T-TAPPED. POWER SUPPLY BATTERY
BACK-UP SHALL MATCH THAT OF THE MAIN FIRE ALARM CONTROL PANEL.
25. COORDINATE ALL WORK WITH THE FIRE PROTECTION CONTRACTOR. MONITOR ALL TAMPER AND FLOW SWITCHES. AS WELL AS
SUPPRESSION SYSTEMS OR DRY PIPE SYSTEMS. COORDINATE EXACT QUANTITY AND LOCATIONS WITH FIRE PROTECTION
CONTRACTOR.
26. LOCATE THE ALARM ANNUNCIATOR PANELS AT THE LOCATIONS INDICATED ON THE PLANS OR BY OWNER.
27. PROVIDE AND INSTALL A FIRE ALARM MANUAL PULL STATION WITH 5'-0" OF EVERY EGRESS DOOR AND SO THAT THE MAXIMUM
TRAVEL DISTANCE TO A MANUAL PULL STATION DOES NOT EXCEED 200'-0".
28. PROVIDED SUFFICIENT EMERGENCY BATTERY BACKUP TO PROVIDE ALL FIRE ALARM EQUIPMENT 24 HOURS OF STAND BY POWER
FOLLOWED BY 15 MINUTES OF ALARM.
29. THE FIRE ALARM SYSTEM SHALL MONITOR ANY/ALL EMERGENCY BACKUP GENERATORS.
30. SMOKE AND HEAT DETECTORS SHALL BE NO CLOSER THAN 3'-0" FROM ANY HVAC DIFFUSER OR RETURN AIR GRILL.
31. PROVIDE AND INSTALL AN EMERGENCY RESPONDER RADIO COVERAGE SYSTEM IN ALL BUILDINGS AS REQUIRED BY THE
INTERNATIONAL FIRE CODE SECTION 510. COORDINATE RADIO FREQUENCIES AND REQUIREMENT WITH THE LOCAL AHJ.
BASEMENT
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FIBER PANEL
COPPER PANEL
MANAGED SWITCH
UPS
ACCESS CONTROL
CONTROLLER AND
POWER SUPPLY
FIBER PANEL
COPPER PANEL
MANAGED SWITCH
UPS
ACCESS CONTROL
CONTROLLER AND
POWER SUPPLY
FIBER PANEL
COPPER PANEL
MANAGED SWITCH
UPS
ACCESS CONTROL
CONTROLLER AND
POWER SUPPLY
FIBER PANEL
COPPER PANEL
CCTV MANAGED SWITCH
UPS
DVR
RAID
ACCESS CONTROL
SERVER
CCTV SYSTEM
SERVER
ACCESS CONTROL
CONTROLLER AND
POWER SUPPLY
TO CAMPUS SECURITY SYSTEM
CAT-6 TO EACH BASEMENT CCTV SYSTEM
CAMERA
CAT-6 TO EACH 1ST FL CCTV SYSTEM CAMERA
CAT-6 TO EACH 2ND FL CCTV SYSTEM CAMERA
CAT-6 TO EACH 3RD FL CCTV SYSTEM CAMERA
SECURITY RACK
SECURITY RACK
SECURITY RACK
SECURITY RACK
ACCESS CONTROL
WORKSTATION
120VAC
120VAC
120VAC
120VAC
120VAC
120VAC
120VAC
120VAC
120VAC
120VAC
CCTV SYSTEM
WORKSTATION
120VAC
120VAC
CABLES TO 3RD
FL DOORS
AND/OR
ADDITIONAL
CONTROLLERS
CABLES TO 2ND
FL DOORS
AND/OR
ADDITIONAL
CONTROLLERS
CABLES TO 1ST FL
DOORS AND/OR
ADDITIONAL
CONTROLLERS
CABLES TO
BASEMENT
DOORS AND/OR
ADDITIONAL
CONTROLLERS
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
T
S
S O
E .r v t
/9
/2
:3
:5
A
M
EY601
FIRE ALARM / SECURITY RISER
DIAGRAM
J.ROOSEN
506-329CLINCAL & ADMINISTRATIVE
BUILDING
M.SMITH04-12-18
148 148
SCALE: NOT TO SCALE
FIRE ALARM RISER DIAGRAM
SCALE: NOT TO SCALE
SECURITY RISER DIAGRAM
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
| 506.329.GI001 - COVER, DRAWING INDEX |
| Sheets |
| AD100 - DEMOLITION PLAN |
| AE100 - BASEMENT FLOOR PLAN |
| AE110 - FIRST FLOOR PLAN |
| AE120 - SECOND FLOOR PLAN |
| AE130 - THIRD FLOOR PLAN |
| AE140 - ROOF PLAN |
| AE150 - BASEMENT REFLECTED CEILING PLAN |
| AE151 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE152 - SECOND FLOOR REFLECTED CEILING PLAN |
| AE153 - THIRD FLOOR REFLECTED CEILING PLAN |
| AE160 - ENLARGED FLOOR PLANS |
| AE200 - EXTERIOR ELEVATIONS |
| AE201 - EXTERIOR ELEVATIONS |
| AE300 - BUILDING SECTIONS |
| AE310 - WALL SECTIONS |
| AE311 - WALL SECTIONS |
| AE314 - EXTERIOR DETAILS |
| AE315 - EXTERIOR DETAILS |
| AE316 - EXTERIOR DETAILS |
| AE317 - EXTERIOR DETAILS |
| AE318 - EXTERIOR DETAILS |
| AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS |
| AE403 - ELEVATOR DETAILS |
| AE460 - INTERIOR ELEVATIONS |
| AE510 - EXTERIOR PLAN DETAILS |
| AE511 - EXTERIOR PLAN DETAILS |
| AE512 - EXTERIOR PLAN DETAILS |
| AE513 - PLAN DETAILS |
| AE520 - ROOF DETAILS |
| AE540 - PARTITION SCHEDULE AND DETAILS |
| AE541 - DETAILS |
| AE560 - CASEWORK |
| AE600 - DOOR SCHEDULE AND DETAILS |
| AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN |
| AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN |
| GI001 - COVER, DRAWING INDEX |
| GI002 - DEPARTMENTAL SPACE USE PLAN |
| GI003 - LIFE SAFETY PLANS |
| HA100 - ASBESTOS ABATEMENT |
| IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN |
| IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN |
| IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN |
| IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN |
| IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN |
| IN210 - OVERALL FIRST FLOOR F.F.E. PLAN |
| IN220 - OVERALL SECOND FLOOR F.F.E. PLAN |
| IN230 - OVERALL THIRD FLOOR F.F.E. PLAN |
| IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE |
| 506.329.GI002 - DEPARTMENTAL SPACE USE PLAN |
| Sheets |
| AD100 - DEMOLITION PLAN |
| AE100 - BASEMENT FLOOR PLAN |
| AE110 - FIRST FLOOR PLAN |
| AE120 - SECOND FLOOR PLAN |
| AE130 - THIRD FLOOR PLAN |
| AE140 - ROOF PLAN |
| AE150 - BASEMENT REFLECTED CEILING PLAN |
| AE151 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE152 - SECOND FLOOR REFLECTED CEILING PLAN |
| AE153 - THIRD FLOOR REFLECTED CEILING PLAN |
| AE160 - ENLARGED FLOOR PLANS |
| AE200 - EXTERIOR ELEVATIONS |
| AE201 - EXTERIOR ELEVATIONS |
| AE300 - BUILDING SECTIONS |
| AE310 - WALL SECTIONS |
| AE311 - WALL SECTIONS |
| AE314 - EXTERIOR DETAILS |
| AE315 - EXTERIOR DETAILS |
| AE316 - EXTERIOR DETAILS |
| AE317 - EXTERIOR DETAILS |
| AE318 - EXTERIOR DETAILS |
| AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS |
| AE403 - ELEVATOR DETAILS |
| AE460 - INTERIOR ELEVATIONS |
| AE510 - EXTERIOR PLAN DETAILS |
| AE511 - EXTERIOR PLAN DETAILS |
| AE512 - EXTERIOR PLAN DETAILS |
| AE513 - PLAN DETAILS |
| AE520 - ROOF DETAILS |
| AE540 - PARTITION SCHEDULE AND DETAILS |
| AE541 - DETAILS |
| AE560 - CASEWORK |
| AE600 - DOOR SCHEDULE AND DETAILS |
| AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN |
| AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN |
| GI001 - COVER, DRAWING INDEX |
| GI002 - DEPARTMENTAL SPACE USE PLAN |
| GI003 - LIFE SAFETY PLANS |
| HA100 - ASBESTOS ABATEMENT |
| IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN |
| IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN |
| IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN |
| IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN |
| IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN |
| IN210 - OVERALL FIRST FLOOR F.F.E. PLAN |
| IN220 - OVERALL SECOND FLOOR F.F.E. PLAN |
| IN230 - OVERALL THIRD FLOOR F.F.E. PLAN |
| IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE |
| 506.329.GI003 - LIFE SAFETY PLANS |
| Sheets |
| AD100 - DEMOLITION PLAN |
| AE100 - BASEMENT FLOOR PLAN |
| AE110 - FIRST FLOOR PLAN |
| AE120 - SECOND FLOOR PLAN |
| AE130 - THIRD FLOOR PLAN |
| AE140 - ROOF PLAN |
| AE150 - BASEMENT REFLECTED CEILING PLAN |
| AE151 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE152 - SECOND FLOOR REFLECTED CEILING PLAN |
| AE153 - THIRD FLOOR REFLECTED CEILING PLAN |
| AE160 - ENLARGED FLOOR PLANS |
| AE200 - EXTERIOR ELEVATIONS |
| AE201 - EXTERIOR ELEVATIONS |
| AE300 - BUILDING SECTIONS |
| AE310 - WALL SECTIONS |
| AE311 - WALL SECTIONS |
| AE314 - EXTERIOR DETAILS |
| AE315 - EXTERIOR DETAILS |
| AE316 - EXTERIOR DETAILS |
| AE317 - EXTERIOR DETAILS |
| AE318 - EXTERIOR DETAILS |
| AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS |
| AE403 - ELEVATOR DETAILS |
| AE460 - INTERIOR ELEVATIONS |
| AE510 - EXTERIOR PLAN DETAILS |
| AE511 - EXTERIOR PLAN DETAILS |
| AE512 - EXTERIOR PLAN DETAILS |
| AE513 - PLAN DETAILS |
| AE520 - ROOF DETAILS |
| AE540 - PARTITION SCHEDULE AND DETAILS |
| AE541 - DETAILS |
| AE560 - CASEWORK |
| AE600 - DOOR SCHEDULE AND DETAILS |
| AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN |
| AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN |
| GI001 - COVER, DRAWING INDEX |
| GI002 - DEPARTMENTAL SPACE USE PLAN |
| GI003 - LIFE SAFETY PLANS |
| HA100 - ASBESTOS ABATEMENT |
| IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN |
| IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN |
| IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN |
| IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN |
| IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN |
| IN210 - OVERALL FIRST FLOOR F.F.E. PLAN |
| IN220 - OVERALL SECOND FLOOR F.F.E. PLAN |
| IN230 - OVERALL THIRD FLOOR F.F.E. PLAN |
| IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE |
| 506.329.HA100 - ASBESTOS ABATEMENT |
| Sheets |
| AD100 - DEMOLITION PLAN |
| AE100 - BASEMENT FLOOR PLAN |
| AE110 - FIRST FLOOR PLAN |
| AE120 - SECOND FLOOR PLAN |
| AE130 - THIRD FLOOR PLAN |
| AE140 - ROOF PLAN |
| AE150 - BASEMENT REFLECTED CEILING PLAN |
| AE151 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE152 - SECOND FLOOR REFLECTED CEILING PLAN |
| AE153 - THIRD FLOOR REFLECTED CEILING PLAN |
| AE160 - ENLARGED FLOOR PLANS |
| AE200 - EXTERIOR ELEVATIONS |
| AE201 - EXTERIOR ELEVATIONS |
| AE300 - BUILDING SECTIONS |
| AE310 - WALL SECTIONS |
| AE311 - WALL SECTIONS |
| AE314 - EXTERIOR DETAILS |
| AE315 - EXTERIOR DETAILS |
| AE316 - EXTERIOR DETAILS |
| AE317 - EXTERIOR DETAILS |
| AE318 - EXTERIOR DETAILS |
| AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS |
| AE403 - ELEVATOR DETAILS |
| AE460 - INTERIOR ELEVATIONS |
| AE510 - EXTERIOR PLAN DETAILS |
| AE511 - EXTERIOR PLAN DETAILS |
| AE512 - EXTERIOR PLAN DETAILS |
| AE513 - PLAN DETAILS |
| AE520 - ROOF DETAILS |
| AE540 - PARTITION SCHEDULE AND DETAILS |
| AE541 - DETAILS |
| AE560 - CASEWORK |
| AE600 - DOOR SCHEDULE AND DETAILS |
| AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN |
| AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN |
| GI001 - COVER, DRAWING INDEX |
| GI002 - DEPARTMENTAL SPACE USE PLAN |
| GI003 - LIFE SAFETY PLANS |
| HA100 - ASBESTOS ABATEMENT |
| IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN |
| IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN |
| IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN |
| IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN |
| IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN |
| IN210 - OVERALL FIRST FLOOR F.F.E. PLAN |
| IN220 - OVERALL SECOND FLOOR F.F.E. PLAN |
| IN230 - OVERALL THIRD FLOOR F.F.E. PLAN |
| IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SC100 - FOUNDATION PLAN |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SC300 - FOUNDATION SECTIONS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SC301 - FOUNDATION SECTIONS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SC302 - PIER DETAILS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SC500 - TYPICAL FOUNDATION DETAILS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS110 - FIRST FLOOR FRAMING PLAN |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS120 - SECOND FLOOR FRAMING PLAN |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS130 - THIRD FLOOR FRAMING PLAN |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS140 - ROOF FRAMING PLAN |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS300 - FRAMING SECTIONS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS301 - FRAMING SECTIONS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS500 - TYPICAL FRAMING DETAILS |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| SS600 - COLUMN SCHEDULE |
| Sheets |
| SC001 - STRUCTURAL CONCRETE GENERAL NOTES |
| SC002 - SPECIAL INSPECTION SCHEDULES |
| SC100 - FOUNDATION PLAN |
| SC300 - FOUNDATION SECTIONS |
| SC301 - FOUNDATION SECTIONS |
| SC302 - PIER DETAILS |
| SC500 - TYPICAL FOUNDATION DETAILS |
| SS001 - STRUCTURAL STEEL GENERAL NOTES |
| SS110 - FIRST FLOOR FRAMING PLAN |
| SS120 - SECOND FLOOR FRAMING PLAN |
| SS130 - THIRD FLOOR FRAMING PLAN |
| SS140 - ROOF FRAMING PLAN |
| SS200 - BRACE BAY ELEVATIONS & DETAILS |
| SS300 - FRAMING SECTIONS |
| SS301 - FRAMING SECTIONS |
| SS500 - TYPICAL FRAMING DETAILS |
| SS600 - COLUMN SCHEDULE |
| 506.329.AD100 - DEMOLITION PLAN |
| Sheets |
| AD100 - DEMOLITION PLAN |
| AE100 - BASEMENT FLOOR PLAN |
| AE110 - FIRST FLOOR PLAN |
| AE120 - SECOND FLOOR PLAN |
| AE130 - THIRD FLOOR PLAN |
| AE140 - ROOF PLAN |
| AE150 - BASEMENT REFLECTED CEILING PLAN |
| AE151 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE152 - SECOND FLOOR REFLECTED CEILING PLAN |
| AE153 - THIRD FLOOR REFLECTED CEILING PLAN |
| AE160 - ENLARGED FLOOR PLANS |
| AE200 - EXTERIOR ELEVATIONS |
| AE201 - EXTERIOR ELEVATIONS |
| AE300 - BUILDING SECTIONS |
| AE310 - WALL SECTIONS |
| AE311 - WALL SECTIONS |
| AE314 - EXTERIOR DETAILS |
| AE315 - EXTERIOR DETAILS |
| AE316 - EXTERIOR DETAILS |
| AE317 - EXTERIOR DETAILS |
| AE318 - EXTERIOR DETAILS |
| AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS |
| AE403 - ELEVATOR DETAILS |
| AE460 - INTERIOR ELEVATIONS |
| AE510 - EXTERIOR PLAN DETAILS |
| AE511 - EXTERIOR PLAN DETAILS |
| AE512 - EXTERIOR PLAN DETAILS |
| AE513 - PLAN DETAILS |
| AE520 - ROOF DETAILS |
| AE540 - PARTITION SCHEDULE AND DETAILS |
| AE541 - DETAILS |
| AE560 - CASEWORK |
| AE600 - DOOR SCHEDULE AND DETAILS |
| AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN |
| AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN |
| GI001 - COVER, DRAWING INDEX |
| GI002 - DEPARTMENTAL SPACE USE PLAN |
| GI003 - LIFE SAFETY PLANS |
| HA100 - ASBESTOS ABATEMENT |
| IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN |
| IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN |
| IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN |
| IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN |
| IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN |
| IN210 - OVERALL FIRST FLOOR F.F.E. PLAN |
| IN220 - OVERALL SECOND FLOOR F.F.E. PLAN |
| IN230 - OVERALL THIRD FLOOR F.F.E. PLAN |
| IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE |
| 506.329.AE100 - BASEMENT FLOOR PLAN |
| Sheets |
| AD100 - DEMOLITION PLAN |
| AE100 - BASEMENT FLOOR PLAN |
| AE110 - FIRST FLOOR PLAN |
| AE120 - SECOND FLOOR PLAN |
| AE130 - THIRD FLOOR PLAN |
| AE140 - ROOF PLAN |
| AE150 - BASEMENT REFLECTED CEILING PLAN |
| AE151 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE152 - SECOND FLOOR REFLECTED CEILING PLAN |
| AE153 - THIRD FLOOR REFLECTED CEILING PLAN |
| AE160 - ENLARGED FLOOR PLANS |
| AE200 - EXTERIOR ELEVATIONS |
| AE201 - EXTERIOR ELEVATIONS |
| AE300 - BUILDING SECTIONS |
| AE310 - WALL SECTIONS |
| AE311 - WALL SECTIONS |
| AE314 - EXTERIOR DETAILS |
| AE315 - EXTERIOR DETAILS |
| AE316 - EXTERIOR DETAILS |
| AE317 - EXTERIOR DETAILS |
| AE318 - EXTERIOR DETAILS |
| AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS |
| AE403 - ELEVATOR DETAILS |
| AE460 - INTERIOR ELEVATIONS |
| AE510 - EXTERIOR PLAN DETAILS |
| AE511 - EXTERIOR PLAN DETAILS |
| AE512 - EXTERIOR PLAN DETAILS |
| AE513 - PLAN DETAILS |
| AE520 - ROOF DETAILS |
| AE540 - PARTITION SCHEDULE AND DETAILS |
| AE541 - DETAILS |
| AE560 - CASEWORK |
| AE600 - DOOR SCHEDULE AND DETAILS |
| AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN |
| AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN |
| GI001 - COVER, DRAWING INDEX |
| GI002 - DEPARTMENTAL SPACE USE PLAN |
| GI003 - LIFE SAFETY PLANS |
| HA100 - ASBESTOS ABATEMENT |
| IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN |
| IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN |
| IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN |
| IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN |
| IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN |
| IN210 - OVERALL FIRST FLOOR F.F.E. PLAN |
| IN220 - OVERALL SECOND FLOOR F.F.E. PLAN |
| IN230 - OVERALL THIRD FLOOR F.F.E. PLAN |
| IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE |
| 506.329.AE110 - FIRST FLOOR PLAN |
| Sheets |
| AD100 - DEMOLITION PLAN |
| AE100 - BASEMENT FLOOR PLAN |
| AE110 - FIRST FLOOR PLAN |
| AE120 - SECOND FLOOR PLAN |
| AE130 - THIRD FLOOR PLAN |
| AE140 - ROOF PLAN |
| AE150 - BASEMENT REFLECTED CEILING PLAN |
| AE151 - FIRST FLOOR REFLECTED CEILING PLAN |
| AE152 - SECOND FLOOR REFLECTED CEILING PLAN |
| AE153 - THIRD FLOOR REFLECTED CEILING PLAN |
| AE160 - ENLARGED FLOOR PLANS |
| AE200 - EXTERIOR ELEVATIONS |
| AE201 - EXTERIOR ELEVATIONS |
| AE300 - BUILDING SECTIONS |
| AE310 - WALL SECTIONS |
| AE311 - WALL SECTIONS |
| AE314 - EXTERIOR DETAILS |
| AE315 - EXTERIOR DETAILS |
| AE316 - EXTERIOR DETAILS |
| AE317 - EXTERIOR DETAILS |
| AE318 - EXTERIOR DETAILS |
| AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS |
| AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS |
| AE403 - ELEVATOR DETAILS |
| AE460 - INTERIOR ELEVATIONS |
| AE510 - EXTERIOR PLAN DETAILS |
| AE511 - EXTERIOR PLAN DETAILS |
| AE512 - EXTERIOR PLAN DETAILS |
| AE513 - PLAN DETAILS |
| AE520 - ROOF DETAILS |
| AE540 - PARTITION SCHEDULE AND DETAILS |
| AE541 - DETAILS |
| AE560 - CASEWORK |
| AE600 - DOOR SCHEDULE AND DETAILS |
| AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN |
| AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN |
| AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN |