36C25018B0795-018.pdf

PDF 6 MB Posted

Attached to
Construct Clinical and Admin Building 506-329 Federal contract opportunity
Solicitation number
36C25018B0795
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0795 506-329 VA Ann Arbor Admin Bldg BID DWGS REVISED_Part8.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct Clinical and Admin Building 506-329, newest first.
File Type Posted
36C25018B0795-0005000.docx DOCX document
36C25018B0795-0004000.docx DOCX document
36C25018B0795-0003001.xlsx XLSX spreadsheet
36C25018B0795-0003000.docx DOCX document
36C25018B0795-0002000.docx DOCX document
36C25018B0795-0001000.docx DOCX document
36C25018B0795-0001001.pdf PDF
36C25018B0795-0001002.pdf PDF
36C25018B0795-010.pdf PDF
36C25018B0795-008.docx DOCX document
36C25018B0795-020.pdf PDF
36C25018B0795-015.pdf PDF
36C25018B0795-022.docx DOCX document
36C25018B0795-014.pdf PDF
36C25018B0795-011.pdf PDF
36C25018B0795-019.pdf PDF
36C25018B0795-017.pdf PDF
36C25018B0795-021.pdf PDF
36C25018B0795-013.pdf PDF
36C25018B0795-009.docx DOCX document
36C25018B0795-012.pdf PDF
36C25018B0795-007.docx DOCX document
36C25018B0795-016.pdf PDF
36C25018B0795-000.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5.45.4

STAIRS

S-2

MEN'S TOILET

HAC

IT

ELECTRICAL

STAIRS

S-1

ELEVATOR

E-1

P.I.V

P.I.V.

4" SLEEVES (QUANTITY AS REQUIRED)

12" BASKET TRAY

12"W X 4"D

BOCT= 9' - 8 1/2"

12"W X 4"D

BOCT= 9' - 8 1/2"

12"W X 4"D

BOCT= 9' - 8 1/2"

WATERFALL

5 5

5 5

W

5555555

5555555

OPEN OFFICE

WAP

WAP

WAPWAP

WAP

WAP 6

WAP

W

W

HR CHIEF OFFICER

HR SPECIALIST OFFICER

HR SPECIALIST OFFICER

HR BENEFITS

SPECIALIST

OWC

PHYS / PROV

EXAM

RECORDS STORAGE

136 OPEN OFFICE

WAITING

VESTIBULE

ELEVATOR LOBBY

TREATMENT AREA

TLT

EXAM

HR PROCESS

HR SPECIALIST OFFICER

CORRIDOR

OPEN OFFICE

ASSIST HR CHIEF

OFFICER

HR RECRUITMENT

HR PROCESS BENEFITS

WOMEN'S TOILET

OPEN OFFICE

HR BENEFIT RA/FMLA

WAITING

CORRIDOR

12"W X 4"D

BOCT= 9' - 10"

12"W X 4"D

BOCT= 10' - 9 3/4"

12"W X 4"D

BOCT= 9' - 11 1/2"

12"W X 4"D

BOCT= 9' - 8 25/32"

ELEVATION CHANGE

ELEVATION CHANGE

ELEVATION CHANGE

A

A

B

B

C

C

D

D

6 6

5 5

3 3

2 2

H

HE

E

4.2

4 4

J

J

2.8

4.8

G

G

5.4

KF

F

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:2

A

M

ET110

TELECOMMUNICATIONS - FIRST FLOOR

PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

R.BRYANT04-12-18

139 148

SCALE: 3/16" = 1'-0"

FIRST FLOOR TECHNOLOGY PLAN

GENERAL NOTES

A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,

MOUNTING INFORMATION AND GENERAL NOTES.

B COVER ALL WALLS WITH 3/4" FIRE RATED PLYWOOD IN

IT ROOMS.

C ALL OF THE HORIZONTAL DATA CABLING WILL EXTEND

FROM THE WORK AREA OUTLETS THROUGH THE IT

ROOM AND BE TERMINATED ON A RACK MOUNT PATCH

PANEL IN THE BASEMENT IT ROOM.

N

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

BIDS SUBMISSION 01-20-17

BIDS SUBMISSION_REVISED 04-12-18

S-2

ELECTRICAL

IT

HAC

MEN'S TOILET

OPEN OFFICE

AFO

CFO

INTERNAL AUDITOR

ASSISTANT CHIEF

230 CHIEF

UNISEX RR

STAIRS

S-1

ELEVATOR

E-1

4" SLEEVES

(QUANTITY AS

REQUIRED)

12" BASKET TRAY

12"W X 4"D

BOCT= 9' - 9"

WATERFALL

12"W X 4"D

BOCT= 10' - 0"

W

222 2

5 5

5 5

2 2 2 2 2 2

W

VESTIBULE

OPEN OFFICE

CORRIDOR

OPEN OFFICE

OPEN OFFICE

WAP

WAP

WAP

WAP

NOTE 1

WAP6

WAP6

WAP

W

BREAK ROOM

CORRIDOR

MCA PROGRAM OFFICE

PAYROLL SUPERVISOR

WOMEN'S TOILET

222 ELEVATOR LOBBY

CORRIDOR

CONFERENCE ROOM

OPEN OFFICE

OPEN OFFICE

ACCOUNTING

SUPERVISOR

12"W X 4"D

BOCT= 9' - 9"

12"W X 4"D

BOCT= 10' - 0"

12"W X 4"D

BOCT= 9' - 9"

12"W X 4"D

BOCT= 9' - 9"

12"W X 4"D

BOCT= 9' - 9"

12"W X 4"D

BOCT= 10' - 0"

12"W X 4"D

BOCT= 9' - 9"

ELEVATION CHANGE

ELEVATION CHANGE

A

A

B

B

C

C

D

D

6 6

5 5

3 3

2 2

H

HE

E

4.2

4 4

J

J

2.8

4.8

G

G

5.4

KF

F

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:3

A

M

ET120

TELECOMMUNICATIONS - SECOND

FLOOR PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

R.BRYANT04-12-18

140 148

SCALE: 3/16" = 1'-0"

SECOND FLOOR TECHNOLOGY PLAN

GENERAL NOTES

A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,

MOUNTING INFORMATION AND GENERAL NOTES.

B COVER ALL WALLS WITH 3/4" FIRE RATED PLYWOOD IN

IT ROOMS.

C ALL OF THE HORIZONTAL DATA CABLING WILL EXTEND

FROM THE WORK AREA OUTLETS THROUGH THE IT

ROOM AND BE TERMINATED ON A RACK MOUNT PATCH

PANEL IN THE BASEMENT IT ROOM.

N

PLAN NOTES - ET120

1. INSTALL AN HDMI CABLE BETWEEN THE TV AND THE

PC LOCATION IN THE NORTHWEST CORNER OF THE

ROOM.

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

S-2

HBU SUPRVISOR

CHIEF MAS OFFICER

ASST CHIEF MAS OFF

SCANNING SUPV

RECORD MANAGER

OFFICER

NON-VA CARE SUPV

MED RECORDS

SUPERVISOR

MEN'S TOILET

VESTIBULE

HAC

IT

ELECTRICAL

ELEVATOR

E-1

STAIRS

S-1

12"W X 4"D

BOCT= 9' - 9"

12"W X 4"D

BOCT= 9' - 9"

12"W X 4"D

BOCT= 9' - 9"

12"W X 4"D

BOCT= 9' - 9"

4" SLEEVES

(QUANTITY AS

REQUIRED)

12" BASKET TRAY

WATERFALL

222222

5 5

5 5

W

6 6

OPEN OFFICE

OPEN OFFICE

WAP

WAP

WAP

WAP

NOTE 1

WAP

WAP

WAP

W

2 2

OPEN OFFICE

ADMINISTRATIVE

OFFICER

CODING SUPERVISOR

OFFICE

OPEN OFFICE

CONF. ROOM

CORRIDOR

ELEVATOR LOBBY

A

A

B

B

C

C

D

D

6 6

5 5

3 3

2 2

H

HE

E

4.2

4 4

J

J

2.8

4.8

G

G

5.4

KF

F

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:4

A

M

ET130

TELECOMMUNICATIONS - THIRD FLOOR

PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

R.BRYANT04-12-18

141 148

SCALE: 3/16" = 1'-0"

THIRD FLOOR TECHNOLOGY PLAN

GENERAL NOTES

A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,

MOUNTING INFORMATION AND GENERAL NOTES.

B COVER ALL WALLS WITH 3/4" FIRE RATED PLYWOOD IN

IT ROOMS.

C ALL OF THE HORIZONTAL DATA CABLING WILL EXTEND

FROM THE WORK AREA OUTLETS THROUGH THE IT

ROOM AND BE TERMINATED ON A RACK MOUNT PATCH

PANEL IN THE BASEMENT IT ROOM.

N

PLAN NOTES - ET130

1. INSTALL AN HDMI CABLE BETWEEN THE TV AND THE

PC LOCATION IN THE NORTHWEST CORNER OF THE

ROOM.

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:4

A

M

ET601

TELECOMMUNICATIONS RISER PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

R.BRYANT04-12-18

143 148

BASEMENT FLOOR

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

PAGING RISER DIAGRAM

SCALE: NOT TO SCALE

1. ALL CEILING SPEAKERS SHALL BE TAPPED AT 2 WATTS.

NOTES:

SCALE: 6" = 1'-0"

TELECOMMUNICATIONS RISER DIAGRAM

SCALE: NOT TO SCALE

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

T ectonic Cop yright 2007

F A

P

F

CR

RTM

AOM

DC ES

AOM

AOM AOM

RTM

DCES

CR

FS

TS

AIM

AIM

TS AIM

AOM AIMAOMAOMAOM

AIM

RT

RT

RT

RT

FS TS TS TS TS

AIM AIM AIM AIM

DC

AIM

AOM

AOM

RT

A

A

B

B

C

C

D

D

5 5

3 3

2 2

H

HE

E

4 4

J

J

G

G

MECHANICAL

HAC

CORRIDOR

STAIRS

S-1

CORRIDOR

ELEVATOR

E-1

ELEV. MAC. RM.

ELECTRICAL

IT

UNIT SHUT DOWN

RETURN

SUPPLY

SECURITY SYSTEM

RACK

MOUNTED AT BOTTOM

OF SHAFT

UNIT SHUT DOWN

PRIMARY RECALL

ALTERNATE RECALL

SHUNT TRIP

SHUNT TRIP POWER MONITOR

FIRE HAT

SPRINKLERS

A

A

B

B

C

C

D

D

5 5

3 3

2 2

H

HE

E

4.2

4 4

J

J

2.8

4.8

G

G

5.4

KF

F

NOTE 1NOTE 2

NOTE 3

NOTE 3 NOTE 3 NOTE 3

CORRIDOR

NOTE 4

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:4

A

M

EY100

FIRE ALARM / SECURITY - BASEMENT

FLOOR PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

M.SMITH04-12-18

144 148

SCALE: 3/16" = 1'-0"

FIRE ALARM / SECURITY - BASEMENT FLOOR PLAN

GENERAL NOTES

A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,

MOUNTING INFORMATION AND GENERAL NOTES.

B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM

N

PLAN NOTES - EY100

1. MONITOR MODULE FOR HIGH WATER LEVEL ALARM.

FIRE ALARM CONTRACTOR TO COORDINATE WITH

THE PLUMBING CONTRACTOR FOR THE EXACT

LOCATION OF THE DRY CONTACT TO MONITOR FOR

THIS ALARM.

2. SECURITY CONTRACTOR TO PROVIDE A

SURFACE MOUNT CONTACT FOR THE OVERHEAD

DOOR. COORDINATE WITH VA SECURITY ON HOW

THIS SHOULD REPORT TO THE MONITORING

STATION.

3. DUCT SMOKE DETECTOR AND CONTROL RELAY

FOR FIRE SMOKE DAMPER.

4. INSTALL HEAT DETECTOR WITHIN 24" OF SPRINKLER HEAD.

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

REF. REF.

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007

Tectonic Copyright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007T ectonic Cop yright 2007

FAA

F

F

CR

CR

CR

CR

CR

RTM

ESDC

RTM

ES

DC

DC

ESDC

ES

DC

RTM

ES

DC

C

C

CR

DC ES

AOM

AOM

TS

FSAIM

AIM

RT RT

TS

AIM

RTDEPT

RTD

EPT

RTD

EPT

CR

RTM

DCES

ES

RTE

CR

CR

RTE

CR

ES

DC

RTM

AOM

AOM

A

A

B

B

C

C

D

D

5 5

3 3

2 2

H

HE

E

4 4

J

J

G

G

5.45.4

STAIRS

S-2

MEN'S TOILET

HAC

IT

ELECTRICAL

STAIRS

S-1

ELEVATOR

E-1

P.I.V

P.I.V.

SECURITY

SYSTEM RACK

IP

MP

IP

MP

NOTE 2

WP

NOTE 1

NOTE 1

NOTE 1

NOTE 3

NOTE 3

OPEN OFFICE

WP

OPEN OFFICE

RECORDS STORAGE

EXAM

PHYS / PROV

OWC

HR BENEFITS

SPECIALIST

HR SPECIALIST OFFICER

HR SPECIALIST OFFICER

HR CHIEF OFFICER

ASSIST HR CHIEF

OFFICER

CORRIDOR

HR SPECIALIST OFFICER

HR RECRUITMENT

HR PROCESS BENEFITS

HR PROCESS

EXAM

TLT

TREATMENT AREA

WOMEN'S TOILET

VESTIBULE

WAITING

ELEVATOR LOBBY

CORRIDOR

WAITING

HR BENEFIT RA/FMLA

OPEN OFFICE

A

A

B

B

C

C

D

D

6 6

5 5

3 3

2 2

H

HE

E

4.2

4 4

J

J

2.8

4.8

G

G

5.4

KF

F

NOTE 4

NOTE 5

NOTE 6

NOTE 5

WP

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:4

A

M

EY110

FIRE ALARM / SECURITY - FIRST FLOOR

PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

M.SMITH04-12-18

145 148

SCALE: 3/16" = 1'-0"

FIRE ALARM / SECURITY - FIRST FLOOR PLAN

GENERAL NOTES

A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,

MOUNTING INFORMATION AND GENERAL NOTES.

B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM

N

PLAN NOTES - EY110

1. GENERAL CONTRACTOR SHALL PROVIDE A REQUEST

TO EXIT DEVICE IN THE DOOR HANDLE. REQUEST TO

EXIT CABLE SHALL BE ROUTED THROUGH THE DOOR.

GENERAL CONTRACTOR SHALL PREPARE DOOR AND

FRAME FOR CABLE INSTALLATION.

2. WEATHERPROOF HORN STROBE TO ACTIVATE ON

WATERFLOW ALARM ONLY.

3. THE GENERAL CONTRACTOR IS TO PROVIDE A

BUTTON FOR RELEASING THE ELEVATOR LOBBY

DOOR. THE SECURITY CONTRACTOR IS TO PROVIDE

THE NECESSARY CABLE AND PROGRAMMING OF THE

ACCESS CONTROL SYSTEM SO THAT WHEN THE

BUTTON IS ACTIVATED THE DOOR MAY BE OPENED

BY A VISITOR.

4. CONTRACTOR TO PROGRAM DOOR TO BE UNLOCKED

DURNING BUSINESS HOURS. COORDINATE EXACT

HOURS WITH OWNER'S REPRESENTATIVE.

5. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR

FIRE SMOKE DAMPER.

6. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR

SMOKE DAMPER.

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16 ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

F

F

DC

CR

CR

CR

RTM

ES

RTM

DC

ES

RTD

DC

ES

C

C

AOM

AOM

RTM

DCES

CR

RT RT

TS

TS

AIM

AIM

RTM

CR

RTE

EPT

AOM

DC

ES

A

A

B

B

C

C

D

D

5 5

3 3

2 2

H

HE

E

4 4

J

J

G

G

STAIRS

S-2

ELECTRICAL

IT

HAC

MEN'S TOILET

OPEN OFFICE

AFO

CFO

INTERNAL AUDITOR

ASSISTANT CHIEF

230 CHIEF

UNISEX RR

STAIRS

S-1

ELEVATOR

E-1

SECURITY SYSTEM

RACK

IP

MP

IP

MP

NOTE 1

OPEN OFFICE

OPEN OFFICE

CONFERENCE ROOM

ELEVATOR LOBBY

CORRIDOR

BREAK ROOM

MCA PROGRAM OFFICE

PAYROLL SUPERVISOR

WOMEN'S TOILET

OPEN OFFICE

ACCOUNTING

SUPERVISOR

A

A

B

B

C

C

D

D

6 6

5 5

3 3

2 2

H

HE

E

4.2

4 4

J

J

2.8

4.8

G

G

5.4

KF

F

NOTE 2

NOTE 2

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:4

A

M

EY120

FIRE ALARM / SECURITY - SECOND

FLOOR PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

M.SMITH04-12-18

143 148

SCALE: 3/16" = 1'-0"

FIRE ALARM / SECURITY - SECOND FLOOR PLAN

GENERAL NOTES

A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,

MOUNTING INFORMATION AND GENERAL NOTES.

B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM

N

PLAN NOTES

1. THE GENERAL CONTRACTOR IS TO PROVIDE A

BUTTON FOR RELEASING THE ELEVATOR LOBBY

DOOR. THE SECURITY CONTRACTOR IS TO PROVIDE

THE NECESSARY CABLE AND PROGRAMMING OF

THE ACCESS CONTROL SYSTEM SO THAT WHEN

THE BUTTON IS ACTIVATED THE DOOR MAY BE

OPENED BY A VISITOR.

2. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR

FIRE SMOKE DAMPER.

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16 ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

F

F

RTM

RTM

CR

CR

CR

ES

DC

DC

ES

C

C

P

P P

P

RTM

CR

DC ES

RTRT

AOM

AOM

TSAIM

TSAIM

RTD

EPT

DC

RTE

AOM

DC

ES

A

A

B

B

C

C

D

D

5 5

3 3

2 2

H

HE

E

4 4

J

J

G

G

STAIRS

S-2

HBU SUPRVISOR

CHIEF MAS OFFICER

ASST CHIEF MAS OFF

SCANNING SUPV

RECORD MANAGER

OFFICER

NON-VA CARE SUPV

MED RECORDS

SUPERVISOR

MEN'S TOILET

VESTIBULE

304 HAC

IT

ELECTRICAL

ELEVATOR

E-1

STAIRS

S-1

SECURITY

SYSTEM

RACK

IP

MP

IP

MP

IP

MP

WP

IP

MP

WP

IP

MP

WP

IP

MP

WP

MOUNT CAMERA AT

ROOF LEVEL

MOUNT CAMERA AT

ROOF LEVEL

MOUNT CAMERA AT

ROOF LEVEL

MOUNT CAMERA AT

ROOF LEVEL

NOTE 1

NOTE 3

NOTE 2

OPEN OFFICE

OPEN OFFICE

OPEN OFFICE

CONF. ROOM

CORRIDOR

ELEVATOR LOBBY

OPEN OFFICE

ADMINISTRATIVE

OFFICER

CODING SUPERVISOR

OFFICE

WOMEN'S TOILET

A

A

B

B

C

C

D

D

6 6

5 5

3 3

2 2

H

HE

E

4.2

4 4

J

J

2.8

4.8

G

G

5.4

KF

F

NOTE 4

NOTE 4

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:4

A

M

EY130

FIRE ALARM / SECURITY - THIRD FLOOR

PLAN

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

M.SMITH04-12-18

147 148

SCALE: 3/16" = 1'-0"

FIRE ALARM / SECURITY - THIRD FLOOR PLAN

GENERAL NOTES

A SEE DRAWING ET001 FOR SYMBOL SCHEDULE,

MOUNTING INFORMATION AND GENERAL NOTES.

B SEE DRAWING EY601FOR SYSTEM RISER DIAGRAM

N

PLAN NOTES

1. GENERAL CONTRACTOR SHALL PROVIDE A

REQUEST TO EXIT DEVICE IN THE DOOR HANDLE.

REQUEST TO EXIT CABLE SHALL BE ROUTED

THROUGH THE DOOR. GENERAL CONTRACTOR

SHALL PREPARE DOOR AND FRAME FOR

CABLE INSTALLATION.

2. THE GENERAL CONTRACTOR IS TO PROVIDE A

BUTTON FOR RELEASING THE ELEVATOR LOBBY

DOOR. THE SECURITY CONTRACTOR IS TO PROVIDE

THE NECESSARY CABLE AND PROGRAMMING OF

THE ACCESS CONTROL SYSTEM SO THAT WHEN

THE BUTTON IS ACTIVATED THE DOOR MAY BE

OPENED BY A VISITOR.

3. SECURITY CONTRACTOR TO PROVIDE A SURFACE

MOUNT CONTACT FOR THE ROOF HATCH.

COORDINATE WITH VA SECURITY ON HOW THIS

SHOULD REPORT TO THE MONITORING STATION.

4. DUCT SMOKE DETECTOR AND CONTROL RELAY FOR

FIRE SMOKE DAMPER.

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

AIM

AOM AOM AOM

LOCAL

SPEAKER &

STROBES

EOL

(1) PR #12, TW, SHLD

ADDRESSABLE FIRE

ALARM CONTROL PANEL

TAMPER

SWITCH

(TYPICAL)

FS

(1) PR #16, TW, SHLD &

(1) PR #14,TW, SHLD (POWER)

HVAC UNIT

HVAC

SHUTDOWN

(1) 1PR #16,

TW, SHLD

(1) PR #16, TW, SHLD

(1) PR#16, TW, SHLD

TS

(1) PR #16, TW, SHLD

(TYPICAL TO EACH

MONITORED DEVICE

TSFS

FLOW SWITCH

(TYPICAL)

ADDRESSABLE

INPUT MODULE

(TYPICAL)

ADDRESSABLE

OUTPUT MODULE

(TYPICAL)

REMOTE

POWER

SUPPLY

DEDICATED

120VAC

CIRCUIT

MINIMIZE

QUANTITY

(1) PR #12,

TW, SHLD

REMOTE

SPEAKERS &

STROBES

F

SYSTEM CONNECTION

TO THE EXISTING

CAMPUS FIRE ALARM

NETWORK.

EOL

EOL

DEDICATED

120VAC

CIRCUIT

(1) PR #16,

TW, SHLD

EOL

EOL

(1) PR #16, TW, SHLD

EOL

EOL

EOL EOL EOL

FS TS

AIM AIM AIM

EOL

AIM AIM

F

F F

AT MAIN FIRE

DEPARTMENT

ENTRANCES

FIRE ALARM

ANNUNCIATOR

FAA

CABLE AS REQUIRED

BY THE SYSTEM

MANUFACTURER

AOM

AOM

RT RT

FIRE ALARM SYSTEM GENERAL NOTES:

1. SEE SHEET ET001 FOR SYMBOL SCHEDULE AND GENERAL NOTES.

2. INSTALLATION SHALL BE DONE IN STRICT ACCORDANCE WITH ALL PERTINENT CODES, REGULATIONS, RULES, AND LAWS OF THE

AUTHORITY, AND LOCAL JURISDICTION, AS WELL AS PER PLANS AND SPECIFICATIONS.

3. THE CONTRACTOR SHALL FURNISH ALL LABOR, SERVICES AND MATERIALS NECESSARY TO INSTALL A COMPLETE, AND FUNCTIONAL

FIRE ALARM SYSTEM AND BE LICENSED IN THE JURISDICTION FOR FIRE ALARM SYSTEM INSTALLATION. PROVIDE NICET LEVEL TWO

MINIMUM CERTIFICATION FOR INSTALLATION TEAMS AND COMMISSIONING TECHNICIANS. THE SYSTEM SHALL BE COMPLETELY

COMPATIBLE WITH AND CONNECTED TO THE EXISTING CAMPUS FIRE ALARM NETWORK.

4. THE CONTRACTOR SHALL HAVE SUCCESSFULLY INSTALLED A SIMILAR FIRE DETECTION SYSTEM AND SIGNALING CONTROL

COMPONENTS ON A PREVIOUS PROJECT OF COMPARABLE SIZE AND COMPLEXITY.

5. ALL EQUIPMENT AND COMPONENTS SHALL BE THE MANUFACTURER'S CURRENT MODEL. ALL SYSTEM COMPONENTS SHALL BE

CATALOGED PRODUCTS OF A SINGLE SUPPLIER. ALL PRODUCTS SHALL BE LISTED BY THE MANUFACTURER FOR THEIR INTENDED

PURPOSE.

6. EACH FIRE ALARM AUTOMATIC OR MANUAL INITIATING DEVICE SHALL BE A SINGLE ADDRESSABLE POINT.

7. MONITORING OF ALL FIRE PUMP CONTROLLERS, POST INDICATOR VALVES, SECTIONAL CONTROL VALVES, SPRINKLER FLOW

SWITCHES, AND SPRINKLER VALVE TAMPER SWITCHES SHALL BE PROVIDED. PROVIDE EXTERIOR NOTIFICATION APPLIANCES AT

THE LOCATION OF ALL SUPPRESSION SYSTEM RISERS.

8. THE FIRE ALARM VENDOR SHALL PROVIDE MONITORING OF ALL CODE REQUIRED SYSTEMS INCLUDING ALARM, TROUBLE, AND

SUPERVISORY SIGNALS.

9. ADDRESSABLE DUCT SMOKE DETECTORS SHALL BE INSTALLED IN ALL AIR HANDLER UNITS AS REQUIRED BY CODE, IN A LOCATION

ACCESSIBLE FOR CLEANING AND TESTING, IN A LOCATION APPROVED BY THE HVAC UNIT MANUFACTURERS AND IN A LOCATION

APPROVED BY THE AHJ. DUCT SMOKE DETECTORS SHALL BE WIRED TO SHUT OFF POWER TO LOCAL AIR HANDLING EQUIPMENT.

MOUNT SO THAT THE DEVICE IS ACCESSIBLE. VERIFY PLACEMENT WITH MECHANICAL TRADES AND OWNER. BOTH ENDS OF THE

SAMPLING TUBE SHALL BE SECURED, AND THE SUPPLY TUBE END CAPPED. PROVIDE DUCT SMOKE DETECTORS AT ALL SMOKE

DAMPERS CONFIGURED TO CLOSE THE DAMPER UPON ACTIVATION AND CONNECTED TO THE BUILDING FIRE ALARM SYSTEM.

10. INCOMING 120VAC 60HZ POWER SHALL BE DEDICATED AND EQUIPPED WITH ADDITIONAL SURGE SUPPRESSION SEPARATE FROM

THE FIRE ALARM PANEL. PROVIDE A LOCKING BREAKER FOR ALL 120VAC POWER FEEDS TO FIRE ALARM EQUIPMENT AND LABEL IN

RED TEXT AS "FIRE ALARM SYSTEM".

11. WHERE MORE THAN TWO STROBES ARE IN THE SAME LINE OF SIGHT, OR IN THE SAME ROOM, THE STROBES SHALL FLASH IN

SYNCHRONIZATION. ALL STROBES SHALL BE PLACED 80" TO 96" AFF FROM THE BOTTOM OF THE LENS .

12. LOCATE SMOKE DETECTORS AND HEAT DETECTORS SO AS TO BE ACCESSIBLE FOR TESTING AND MAINTENANCE. VERIFY LOCATION

WITH OWNER PRIOR TO INSTALLATION .

13. CONTRACTOR SHALL INSTALL THE NUMBER OF TRANSPONDER PANELS REQUIRED FOR THE ENTIRE FACILITY BASED ON THE MOST

ECONOMICAL DESIGN .

14. PROVIDE AND INSTALL HARDWARE INTERFACE BETWEEN FIRE ALARM PANEL AND ACCESS CONTROL DOORS TO PROVIDE FOR

UNLOCKING AND DOOR RELEASE IN THE EVENT OF A FIRE ALARM .

15. PROVIDE FOR 20% EXPANSION ON ALL ADDRESSABLE LOOPS, VISUAL CIRCUITS, AUDIBLE CIRCUITS, POWER SUPPLIES, AMPLIFIERS, BATTERIES, AND INTERNAL PANEL EXPANSION .

16. PROVIDE AND INSTALL THE REQUIRED INPUT AND OUTPUT CONNECTIONS TO ANCILLARY SYSTEMS. THIS INCLUDES BUT IS NOT

LIMITED TO SHUTTING OFF ANY/ALL SOUND MAKING SYSTEMS, PAGING SYSTEMS AND BACKGROUND MUSIC SYSTEMS IN THE EVENT

OF AN ALARM CONDITION .

17. ALL EXTERIOR UNDERGROUND WIRING WILL BE RATED AND LISTED FOR OUTDOOR USE AND BE CAPABLE OF BEING SUBMERGED

UNDER WATER, SURGE PROTECTION SHALL BE INSTALLED AT EACH END OF ALL EXTERIOR MONITORED DEVICES.

18. ALL FIRE ALARM CABLE WILL BE FIRE ALARM LISTED FOR INTENDED USE AND SHALL HAVE ITS LISTING ON THE OUTER JACKET. ALL

FIRE ALARM CABLE SHALL HAVE AN OUTER JACKET THAT IS RED IN COLOR. THIS INCLUDES ALL CABLING USED FOR ANY FIRE ALARM

DEVICE(S) INCLUDING PIV'S, SCV'S, FLOW SWITCHES, OR ANY OTHER MONITORED POINT CONNECTED TO THE FIRE ALARM SYSTEM.

ALL FIRE ALARM CABLE SHALL BE INSTALLED IN CONDUIT FROM DEVICE UP TO THE CEILING SPACE INCLUDING IN WALL

INSTALLATIONS. CABLING IN THE CEILING SPACE SHALL BE INSTALLED IN CABLE TRAY OR IN J-HOOKS.

19. FIRE ALARM SYSTEM RISER DIAGRAM IS REPRESENTATIVE AND CONCEPTUAL ONLY. CABLES ARE SHOWN AS EXAMPLE ONLY. RISER

DIAGRAM IS PROVIDED FOR A BASIC SYSTEM OUTLINE AND ZONING AID. FURNISH AND INSTALL ALL EQUIPMENT, CABLE AND

DEVICES REQUIRED TO MEET THE INTENT OF THE SPECIFICATIONS. PROVIDE CABLE PER MANUFACTURER AND CIRCUIT

REQUIREMENTS. ALL DEVICES NOT SHOWN.

20. PROVIDE CONDUCTORS POWER SUPPLIES AND WIRE GAUGE NECESSARY TO SUPPLY EACH STROBE WITH 110cd PER DEVICE AND

EACH SPEAKER WITH 2w.

21. ALL CABLES SHALL BE SHIELDED UNLESS MANUFACTURER CAN PROVE THAT SIGNALING, POWER, AND AUDIO WILL NOT BE

AFFECTED BY EMI AND OTHER INTERFERENCE. IT SHALL BE THIS CONTRACTOR'S RESPONSIBILITY TO MAINTAIN PROPER

SEPARATION FROM OTHER CABLES AT ALL TIMES. ALL CABLES AND FIBER WILL BE IN CONDUIT OR CABLE TRAY.

22. PROVIDE MINIMUM 15db ABOVE AMBIENT FIRE ALARM AUDIBLE NOTIFICATION SIGNAL FOR ALL AREAS.

23. INCLUDE AUDIBLE/VISUAL ALARM NOTIFICATION EXTERIOR TO THE BUILDING AT EACH SPRINKLER RISER LOCATION.

24. FIELD LOCATE NOTIFICATION APPLIANCE POWER SUPPLIES AS REQUIRED TO SERVE STROBES. PROVIDE DEDICATED 120V POWER

TO ALL STROBE POWER SUPPLIES. NOTIFICATION APPLIANCE CIRCUITS SHALL NOT BE T-TAPPED. POWER SUPPLY BATTERY

BACK-UP SHALL MATCH THAT OF THE MAIN FIRE ALARM CONTROL PANEL.

25. COORDINATE ALL WORK WITH THE FIRE PROTECTION CONTRACTOR. MONITOR ALL TAMPER AND FLOW SWITCHES. AS WELL AS

SUPPRESSION SYSTEMS OR DRY PIPE SYSTEMS. COORDINATE EXACT QUANTITY AND LOCATIONS WITH FIRE PROTECTION

CONTRACTOR.

26. LOCATE THE ALARM ANNUNCIATOR PANELS AT THE LOCATIONS INDICATED ON THE PLANS OR BY OWNER.

27. PROVIDE AND INSTALL A FIRE ALARM MANUAL PULL STATION WITH 5'-0" OF EVERY EGRESS DOOR AND SO THAT THE MAXIMUM

TRAVEL DISTANCE TO A MANUAL PULL STATION DOES NOT EXCEED 200'-0".

28. PROVIDED SUFFICIENT EMERGENCY BATTERY BACKUP TO PROVIDE ALL FIRE ALARM EQUIPMENT 24 HOURS OF STAND BY POWER

FOLLOWED BY 15 MINUTES OF ALARM.

29. THE FIRE ALARM SYSTEM SHALL MONITOR ANY/ALL EMERGENCY BACKUP GENERATORS.

30. SMOKE AND HEAT DETECTORS SHALL BE NO CLOSER THAN 3'-0" FROM ANY HVAC DIFFUSER OR RETURN AIR GRILL.

31. PROVIDE AND INSTALL AN EMERGENCY RESPONDER RADIO COVERAGE SYSTEM IN ALL BUILDINGS AS REQUIRED BY THE

INTERNATIONAL FIRE CODE SECTION 510. COORDINATE RADIO FREQUENCIES AND REQUIREMENT WITH THE LOCAL AHJ.

BASEMENT

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

FIBER PANEL

COPPER PANEL

MANAGED SWITCH

UPS

ACCESS CONTROL

CONTROLLER AND

POWER SUPPLY

FIBER PANEL

COPPER PANEL

MANAGED SWITCH

UPS

ACCESS CONTROL

CONTROLLER AND

POWER SUPPLY

FIBER PANEL

COPPER PANEL

MANAGED SWITCH

UPS

ACCESS CONTROL

CONTROLLER AND

POWER SUPPLY

FIBER PANEL

COPPER PANEL

CCTV MANAGED SWITCH

UPS

DVR

RAID

ACCESS CONTROL

SERVER

CCTV SYSTEM

SERVER

ACCESS CONTROL

CONTROLLER AND

POWER SUPPLY

TO CAMPUS SECURITY SYSTEM

CAT-6 TO EACH BASEMENT CCTV SYSTEM

CAMERA

CAT-6 TO EACH 1ST FL CCTV SYSTEM CAMERA

CAT-6 TO EACH 2ND FL CCTV SYSTEM CAMERA

CAT-6 TO EACH 3RD FL CCTV SYSTEM CAMERA

SECURITY RACK

SECURITY RACK

SECURITY RACK

SECURITY RACK

ACCESS CONTROL

WORKSTATION

120VAC

120VAC

120VAC

120VAC

120VAC

120VAC

120VAC

120VAC

120VAC

120VAC

CCTV SYSTEM

WORKSTATION

120VAC

120VAC

CABLES TO 3RD

FL DOORS

AND/OR

ADDITIONAL

CONTROLLERS

CABLES TO 2ND

FL DOORS

AND/OR

ADDITIONAL

CONTROLLERS

CABLES TO 1ST FL

DOORS AND/OR

ADDITIONAL

CONTROLLERS

CABLES TO

BASEMENT

DOORS AND/OR

ADDITIONAL

CONTROLLERS

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

T

S

S O

E .r v t

/9

/2

:3

:5

A

M

EY601

FIRE ALARM / SECURITY RISER

DIAGRAM

J.ROOSEN

506-329CLINCAL & ADMINISTRATIVE

BUILDING

M.SMITH04-12-18

148 148

SCALE: NOT TO SCALE

FIRE ALARM RISER DIAGRAM

SCALE: NOT TO SCALE

SECURITY RISER DIAGRAM

DESIGN DEVELOPMENT SUBMISSION 1 04-19-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

506.329.GI001 - COVER, DRAWING INDEX
Sheets
AD100 - DEMOLITION PLAN
AE100 - BASEMENT FLOOR PLAN
AE110 - FIRST FLOOR PLAN
AE120 - SECOND FLOOR PLAN
AE130 - THIRD FLOOR PLAN
AE140 - ROOF PLAN
AE150 - BASEMENT REFLECTED CEILING PLAN
AE151 - FIRST FLOOR REFLECTED CEILING PLAN
AE152 - SECOND FLOOR REFLECTED CEILING PLAN
AE153 - THIRD FLOOR REFLECTED CEILING PLAN
AE160 - ENLARGED FLOOR PLANS
AE200 - EXTERIOR ELEVATIONS
AE201 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE310 - WALL SECTIONS
AE311 - WALL SECTIONS
AE314 - EXTERIOR DETAILS
AE315 - EXTERIOR DETAILS
AE316 - EXTERIOR DETAILS
AE317 - EXTERIOR DETAILS
AE318 - EXTERIOR DETAILS
AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS
AE403 - ELEVATOR DETAILS
AE460 - INTERIOR ELEVATIONS
AE510 - EXTERIOR PLAN DETAILS
AE511 - EXTERIOR PLAN DETAILS
AE512 - EXTERIOR PLAN DETAILS
AE513 - PLAN DETAILS
AE520 - ROOF DETAILS
AE540 - PARTITION SCHEDULE AND DETAILS
AE541 - DETAILS
AE560 - CASEWORK
AE600 - DOOR SCHEDULE AND DETAILS
AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN
AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN
GI001 - COVER, DRAWING INDEX
GI002 - DEPARTMENTAL SPACE USE PLAN
GI003 - LIFE SAFETY PLANS
HA100 - ASBESTOS ABATEMENT
IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN
IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN
IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN
IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN
IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN
IN210 - OVERALL FIRST FLOOR F.F.E. PLAN
IN220 - OVERALL SECOND FLOOR F.F.E. PLAN
IN230 - OVERALL THIRD FLOOR F.F.E. PLAN
IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE
506.329.GI002 - DEPARTMENTAL SPACE USE PLAN
Sheets
AD100 - DEMOLITION PLAN
AE100 - BASEMENT FLOOR PLAN
AE110 - FIRST FLOOR PLAN
AE120 - SECOND FLOOR PLAN
AE130 - THIRD FLOOR PLAN
AE140 - ROOF PLAN
AE150 - BASEMENT REFLECTED CEILING PLAN
AE151 - FIRST FLOOR REFLECTED CEILING PLAN
AE152 - SECOND FLOOR REFLECTED CEILING PLAN
AE153 - THIRD FLOOR REFLECTED CEILING PLAN
AE160 - ENLARGED FLOOR PLANS
AE200 - EXTERIOR ELEVATIONS
AE201 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE310 - WALL SECTIONS
AE311 - WALL SECTIONS
AE314 - EXTERIOR DETAILS
AE315 - EXTERIOR DETAILS
AE316 - EXTERIOR DETAILS
AE317 - EXTERIOR DETAILS
AE318 - EXTERIOR DETAILS
AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS
AE403 - ELEVATOR DETAILS
AE460 - INTERIOR ELEVATIONS
AE510 - EXTERIOR PLAN DETAILS
AE511 - EXTERIOR PLAN DETAILS
AE512 - EXTERIOR PLAN DETAILS
AE513 - PLAN DETAILS
AE520 - ROOF DETAILS
AE540 - PARTITION SCHEDULE AND DETAILS
AE541 - DETAILS
AE560 - CASEWORK
AE600 - DOOR SCHEDULE AND DETAILS
AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN
AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN
GI001 - COVER, DRAWING INDEX
GI002 - DEPARTMENTAL SPACE USE PLAN
GI003 - LIFE SAFETY PLANS
HA100 - ASBESTOS ABATEMENT
IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN
IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN
IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN
IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN
IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN
IN210 - OVERALL FIRST FLOOR F.F.E. PLAN
IN220 - OVERALL SECOND FLOOR F.F.E. PLAN
IN230 - OVERALL THIRD FLOOR F.F.E. PLAN
IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE
506.329.GI003 - LIFE SAFETY PLANS
Sheets
AD100 - DEMOLITION PLAN
AE100 - BASEMENT FLOOR PLAN
AE110 - FIRST FLOOR PLAN
AE120 - SECOND FLOOR PLAN
AE130 - THIRD FLOOR PLAN
AE140 - ROOF PLAN
AE150 - BASEMENT REFLECTED CEILING PLAN
AE151 - FIRST FLOOR REFLECTED CEILING PLAN
AE152 - SECOND FLOOR REFLECTED CEILING PLAN
AE153 - THIRD FLOOR REFLECTED CEILING PLAN
AE160 - ENLARGED FLOOR PLANS
AE200 - EXTERIOR ELEVATIONS
AE201 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE310 - WALL SECTIONS
AE311 - WALL SECTIONS
AE314 - EXTERIOR DETAILS
AE315 - EXTERIOR DETAILS
AE316 - EXTERIOR DETAILS
AE317 - EXTERIOR DETAILS
AE318 - EXTERIOR DETAILS
AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS
AE403 - ELEVATOR DETAILS
AE460 - INTERIOR ELEVATIONS
AE510 - EXTERIOR PLAN DETAILS
AE511 - EXTERIOR PLAN DETAILS
AE512 - EXTERIOR PLAN DETAILS
AE513 - PLAN DETAILS
AE520 - ROOF DETAILS
AE540 - PARTITION SCHEDULE AND DETAILS
AE541 - DETAILS
AE560 - CASEWORK
AE600 - DOOR SCHEDULE AND DETAILS
AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN
AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN
GI001 - COVER, DRAWING INDEX
GI002 - DEPARTMENTAL SPACE USE PLAN
GI003 - LIFE SAFETY PLANS
HA100 - ASBESTOS ABATEMENT
IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN
IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN
IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN
IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN
IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN
IN210 - OVERALL FIRST FLOOR F.F.E. PLAN
IN220 - OVERALL SECOND FLOOR F.F.E. PLAN
IN230 - OVERALL THIRD FLOOR F.F.E. PLAN
IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE
506.329.HA100 - ASBESTOS ABATEMENT
Sheets
AD100 - DEMOLITION PLAN
AE100 - BASEMENT FLOOR PLAN
AE110 - FIRST FLOOR PLAN
AE120 - SECOND FLOOR PLAN
AE130 - THIRD FLOOR PLAN
AE140 - ROOF PLAN
AE150 - BASEMENT REFLECTED CEILING PLAN
AE151 - FIRST FLOOR REFLECTED CEILING PLAN
AE152 - SECOND FLOOR REFLECTED CEILING PLAN
AE153 - THIRD FLOOR REFLECTED CEILING PLAN
AE160 - ENLARGED FLOOR PLANS
AE200 - EXTERIOR ELEVATIONS
AE201 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE310 - WALL SECTIONS
AE311 - WALL SECTIONS
AE314 - EXTERIOR DETAILS
AE315 - EXTERIOR DETAILS
AE316 - EXTERIOR DETAILS
AE317 - EXTERIOR DETAILS
AE318 - EXTERIOR DETAILS
AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS
AE403 - ELEVATOR DETAILS
AE460 - INTERIOR ELEVATIONS
AE510 - EXTERIOR PLAN DETAILS
AE511 - EXTERIOR PLAN DETAILS
AE512 - EXTERIOR PLAN DETAILS
AE513 - PLAN DETAILS
AE520 - ROOF DETAILS
AE540 - PARTITION SCHEDULE AND DETAILS
AE541 - DETAILS
AE560 - CASEWORK
AE600 - DOOR SCHEDULE AND DETAILS
AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN
AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN
GI001 - COVER, DRAWING INDEX
GI002 - DEPARTMENTAL SPACE USE PLAN
GI003 - LIFE SAFETY PLANS
HA100 - ASBESTOS ABATEMENT
IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN
IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN
IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN
IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN
IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN
IN210 - OVERALL FIRST FLOOR F.F.E. PLAN
IN220 - OVERALL SECOND FLOOR F.F.E. PLAN
IN230 - OVERALL THIRD FLOOR F.F.E. PLAN
IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SC002 - SPECIAL INSPECTION SCHEDULES
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SC100 - FOUNDATION PLAN
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SC300 - FOUNDATION SECTIONS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SC301 - FOUNDATION SECTIONS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SC302 - PIER DETAILS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SC500 - TYPICAL FOUNDATION DETAILS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS001 - STRUCTURAL STEEL GENERAL NOTES
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS110 - FIRST FLOOR FRAMING PLAN
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS120 - SECOND FLOOR FRAMING PLAN
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS130 - THIRD FLOOR FRAMING PLAN
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS140 - ROOF FRAMING PLAN
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS200 - BRACE BAY ELEVATIONS & DETAILS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS300 - FRAMING SECTIONS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS301 - FRAMING SECTIONS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS500 - TYPICAL FRAMING DETAILS
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
SS600 - COLUMN SCHEDULE
Sheets
SC001 - STRUCTURAL CONCRETE GENERAL NOTES
SC002 - SPECIAL INSPECTION SCHEDULES
SC100 - FOUNDATION PLAN
SC300 - FOUNDATION SECTIONS
SC301 - FOUNDATION SECTIONS
SC302 - PIER DETAILS
SC500 - TYPICAL FOUNDATION DETAILS
SS001 - STRUCTURAL STEEL GENERAL NOTES
SS110 - FIRST FLOOR FRAMING PLAN
SS120 - SECOND FLOOR FRAMING PLAN
SS130 - THIRD FLOOR FRAMING PLAN
SS140 - ROOF FRAMING PLAN
SS200 - BRACE BAY ELEVATIONS & DETAILS
SS300 - FRAMING SECTIONS
SS301 - FRAMING SECTIONS
SS500 - TYPICAL FRAMING DETAILS
SS600 - COLUMN SCHEDULE
506.329.AD100 - DEMOLITION PLAN
Sheets
AD100 - DEMOLITION PLAN
AE100 - BASEMENT FLOOR PLAN
AE110 - FIRST FLOOR PLAN
AE120 - SECOND FLOOR PLAN
AE130 - THIRD FLOOR PLAN
AE140 - ROOF PLAN
AE150 - BASEMENT REFLECTED CEILING PLAN
AE151 - FIRST FLOOR REFLECTED CEILING PLAN
AE152 - SECOND FLOOR REFLECTED CEILING PLAN
AE153 - THIRD FLOOR REFLECTED CEILING PLAN
AE160 - ENLARGED FLOOR PLANS
AE200 - EXTERIOR ELEVATIONS
AE201 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE310 - WALL SECTIONS
AE311 - WALL SECTIONS
AE314 - EXTERIOR DETAILS
AE315 - EXTERIOR DETAILS
AE316 - EXTERIOR DETAILS
AE317 - EXTERIOR DETAILS
AE318 - EXTERIOR DETAILS
AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS
AE403 - ELEVATOR DETAILS
AE460 - INTERIOR ELEVATIONS
AE510 - EXTERIOR PLAN DETAILS
AE511 - EXTERIOR PLAN DETAILS
AE512 - EXTERIOR PLAN DETAILS
AE513 - PLAN DETAILS
AE520 - ROOF DETAILS
AE540 - PARTITION SCHEDULE AND DETAILS
AE541 - DETAILS
AE560 - CASEWORK
AE600 - DOOR SCHEDULE AND DETAILS
AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN
AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN
GI001 - COVER, DRAWING INDEX
GI002 - DEPARTMENTAL SPACE USE PLAN
GI003 - LIFE SAFETY PLANS
HA100 - ASBESTOS ABATEMENT
IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN
IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN
IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN
IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN
IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN
IN210 - OVERALL FIRST FLOOR F.F.E. PLAN
IN220 - OVERALL SECOND FLOOR F.F.E. PLAN
IN230 - OVERALL THIRD FLOOR F.F.E. PLAN
IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE
506.329.AE100 - BASEMENT FLOOR PLAN
Sheets
AD100 - DEMOLITION PLAN
AE100 - BASEMENT FLOOR PLAN
AE110 - FIRST FLOOR PLAN
AE120 - SECOND FLOOR PLAN
AE130 - THIRD FLOOR PLAN
AE140 - ROOF PLAN
AE150 - BASEMENT REFLECTED CEILING PLAN
AE151 - FIRST FLOOR REFLECTED CEILING PLAN
AE152 - SECOND FLOOR REFLECTED CEILING PLAN
AE153 - THIRD FLOOR REFLECTED CEILING PLAN
AE160 - ENLARGED FLOOR PLANS
AE200 - EXTERIOR ELEVATIONS
AE201 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE310 - WALL SECTIONS
AE311 - WALL SECTIONS
AE314 - EXTERIOR DETAILS
AE315 - EXTERIOR DETAILS
AE316 - EXTERIOR DETAILS
AE317 - EXTERIOR DETAILS
AE318 - EXTERIOR DETAILS
AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS
AE403 - ELEVATOR DETAILS
AE460 - INTERIOR ELEVATIONS
AE510 - EXTERIOR PLAN DETAILS
AE511 - EXTERIOR PLAN DETAILS
AE512 - EXTERIOR PLAN DETAILS
AE513 - PLAN DETAILS
AE520 - ROOF DETAILS
AE540 - PARTITION SCHEDULE AND DETAILS
AE541 - DETAILS
AE560 - CASEWORK
AE600 - DOOR SCHEDULE AND DETAILS
AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN
AE873 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 8 PLAN
GI001 - COVER, DRAWING INDEX
GI002 - DEPARTMENTAL SPACE USE PLAN
GI003 - LIFE SAFETY PLANS
HA100 - ASBESTOS ABATEMENT
IN100 - OVERALL BASEMENT FLOOR DISTRIBUTION PLAN
IN110 - OVERALL FIRST FLOOR DISTRIBUTION PLAN
IN120 - OVERALL SECOND FLOOR DISTRIBUTION PLAN
IN130 - OVERALL THIRD FLOOR DISTRIBUTION PLAN
IN200 - OVERALL BASEMENT FLOOR F.F.E. PLAN
IN210 - OVERALL FIRST FLOOR F.F.E. PLAN
IN220 - OVERALL SECOND FLOOR F.F.E. PLAN
IN230 - OVERALL THIRD FLOOR F.F.E. PLAN
IN650 - ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE
506.329.AE110 - FIRST FLOOR PLAN
Sheets
AD100 - DEMOLITION PLAN
AE100 - BASEMENT FLOOR PLAN
AE110 - FIRST FLOOR PLAN
AE120 - SECOND FLOOR PLAN
AE130 - THIRD FLOOR PLAN
AE140 - ROOF PLAN
AE150 - BASEMENT REFLECTED CEILING PLAN
AE151 - FIRST FLOOR REFLECTED CEILING PLAN
AE152 - SECOND FLOOR REFLECTED CEILING PLAN
AE153 - THIRD FLOOR REFLECTED CEILING PLAN
AE160 - ENLARGED FLOOR PLANS
AE200 - EXTERIOR ELEVATIONS
AE201 - EXTERIOR ELEVATIONS
AE300 - BUILDING SECTIONS
AE310 - WALL SECTIONS
AE311 - WALL SECTIONS
AE314 - EXTERIOR DETAILS
AE315 - EXTERIOR DETAILS
AE316 - EXTERIOR DETAILS
AE317 - EXTERIOR DETAILS
AE318 - EXTERIOR DETAILS
AE400 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 - ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 - ENLARGED ELEVATOR PLANS, SECTIONS AND DETAILS
AE403 - ELEVATOR DETAILS
AE460 - INTERIOR ELEVATIONS
AE510 - EXTERIOR PLAN DETAILS
AE511 - EXTERIOR PLAN DETAILS
AE512 - EXTERIOR PLAN DETAILS
AE513 - PLAN DETAILS
AE520 - ROOF DETAILS
AE540 - PARTITION SCHEDULE AND DETAILS
AE541 - DETAILS
AE560 - CASEWORK
AE600 - DOOR SCHEDULE AND DETAILS
AE810 - FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 - SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 - THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 - FIRST FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE852 - SECOND FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE853 - THIRD FLOOR REFLECTED CEILING DEDUCT ALTERNATE 7 PLAN
AE863 - THIRD FLOOR DEDUCT ALTERNATE 8 PLAN