36C25018B0795-0002000.docx
DOCX document 26 KB Posted
- Attached to
- Construct Clinical and Admin Building 506-329 Federal contract opportunity
- Solicitation number
- 36C25018B0795
About this file
36C25018B0795 0002 36C25018B0795 0002.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0795-0005000.docx | DOCX document | |
| 36C25018B0795-0004000.docx | DOCX document | |
| 36C25018B0795-0003001.xlsx | XLSX spreadsheet | |
| 36C25018B0795-0003000.docx | DOCX document | |
| 36C25018B0795-0001001.pdf | ||
| 36C25018B0795-0001000.docx | DOCX document | |
| 36C25018B0795-0001002.pdf | ||
| 36C25018B0795-012.pdf | ||
| 36C25018B0795-007.docx | DOCX document | |
| 36C25018B0795-016.pdf | ||
| 36C25018B0795-015.pdf | ||
| 36C25018B0795-018.pdf | ||
| 36C25018B0795-022.docx | DOCX document | |
| 36C25018B0795-014.pdf | ||
| 36C25018B0795-010.pdf | ||
| 36C25018B0795-008.docx | DOCX document | |
| 36C25018B0795-020.pdf | ||
| 36C25018B0795-011.pdf | ||
| 36C25018B0795-019.pdf | ||
| 36C25018B0795-017.pdf | ||
| 36C25018B0795-021.pdf | ||
| 36C25018B0795-013.pdf | ||
| 36C25018B0795-009.docx | DOCX document | |
| 36C25018B0795-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25018B0795 0002
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 09-07-2018 506-18-3-5970-0039 506-329 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Dr.
Lobby M Suite M2200 Ann Arbor MI 48105 35C250 Department of Veterans Affair Network Contracting Office 10 24 Frank Lloyd Wright Dr.
Lobby M Suite M2200 Ann Arbor MI 48105 To all Offerors/Bidders
36C25018B0795 08-08-2018
X X X
The purpose of this Amendment is to issue Request for Information (RFI) and responses. Please see continuation page.
Adding a site walk on September 11, 2018 (Tuesday) at 10:00 am local time. Participatns will meet in Ann Arbor VAMC, Bldg. 3, Basement Conference Room, Ann Arbor, MI.
All Amendments shall be Acknowledged by offeror on this solicitation or maybe found non-responsive.
Bid opening location is unchanged, NCO 10 Office, Ann Arbor, MI.
Darrell T. Maxwell Contracting Officer
NCO1015L3-77169
RFI Responses RFI 004 References: SPEC #07 42 13.13 Formed Metal Walls Panels
| 1. This is regarding the ACM panels. The drawings show the ACM panels are attached to ½” plywood. There is not enough holding or grip strength for the ACM system to be attached solely to this thin of plywood, we would need additional sub framing that would need to be fastened back to the studs in order to make sure the panels are secured. The most cost-effective methods is to use 5/8” or ¾” plywood so additional framework will be needed. |
| Response: Use 5/8” plywood. 6” CFMF at 16” O.C. as shown on drawings is adequate to support the backing and the ACM panels. The continuous z-clip carrying the panels would be attached to the sheathing at increments recommended by panel fabricator, spanning the load across the width of the backing and multiple studs. No additional framing is needed. |
RFI 005 References: None
| 1. Request for another site visit. |
| Response: A site walk will be offered September 11, 2018 (Tuesday) at 10:00am local time. Participants will meet at Ann Arbor VAMC, Bldg. 3, Basement Conference Room, Ann Arbor, MI. |
End of Amendment