36C25018B0795-011.pdf
PDF 10 MB Posted
- Attached to
- Construct Clinical and Admin Building 506-329 Federal contract opportunity
- Solicitation number
- 36C25018B0795
About this file
36C25018B0795 506-329 VA Ann Arbor Admin Bldg BID DWGS REVISED_Part1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0795-0005000.docx | DOCX document | |
| 36C25018B0795-0004000.docx | DOCX document | |
| 36C25018B0795-0003000.docx | DOCX document | |
| 36C25018B0795-0003001.xlsx | XLSX spreadsheet | |
| 36C25018B0795-0002000.docx | DOCX document | |
| 36C25018B0795-0001002.pdf | ||
| 36C25018B0795-0001000.docx | DOCX document | |
| 36C25018B0795-0001001.pdf | ||
| 36C25018B0795-019.pdf | ||
| 36C25018B0795-017.pdf | ||
| 36C25018B0795-021.pdf | ||
| 36C25018B0795-013.pdf | ||
| 36C25018B0795-009.docx | DOCX document | |
| 36C25018B0795-012.pdf | ||
| 36C25018B0795-007.docx | DOCX document | |
| 36C25018B0795-016.pdf | ||
| 36C25018B0795-010.pdf | ||
| 36C25018B0795-008.docx | DOCX document | |
| 36C25018B0795-020.pdf | ||
| 36C25018B0795-015.pdf | ||
| 36C25018B0795-018.pdf | ||
| 36C25018B0795-022.docx | DOCX document | |
| 36C25018B0795-014.pdf | ||
| 36C25018B0795-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :0
P
M
Scale:
GI001
COVER, DRAWING INDEX
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
US DEPARTMENT OF VETERANS AFFAIRS
VA MEDICAL CENTER, ANN ARBOR, MICHIGAN
Project Number: 506-329
CLINICAL & ADMINISTRATIVE BUILDING
1 148
CAMPUS MAP
N
VICINITY MAP
NPROJECT LOCATION
PROJECT LOCATION
ELECTRICAL
E000 ELECTRICAL SYMBOLS, LEGEND AND NOTES
E001 SCHEDULES AND NOTES
ES100 SITE PLAN - TELECOMMUNICATIONS AND ELECTRICAL
NEW WORK
EG110 FIRST FLOOR GROUNDING PLAN
ESD100 SITE PLAN - TELECOMMUNICATIONS AND ELECTRICAL
DEMOLITION
ED100 CRAWL SPACE PLAN - DEMOLITION
EL100 BASEMENT LIGHTING PLAN
EL110 FIRST FLOOR LIGHTING PLAN
EL120 SECOND FLOOR LIGHTING PLAN
EL130 THIRD FLOOR LIGHTING PLAN
EP100 BASEMENT POWER PLAN
EP110 FIRST FLOOR POWER PLAN
EP120 SECOND FLOOR POWER PLAN
EP130 THIRD FLOOR POWER PLAN
EP140 ROOF POWER PLAN
EP502 ELECTRICAL DETAILS
EP501 ELECTRICAL DETAILS
EP601 ELECTRICAL RISER DIAGRAM - DEMOLITION AND NEW
WORK
EP620 PANEL SCHEDULES
EP621 PANEL SCHEDULES
MECHANICAL
MH001 HVAC SYMBOLS AND ABBREVIATIONS
MH100 HVAC BASEMENT PLAN
MH110 HVAC FIRST FLOOR PLAN
MH120 HVAC SECOND FLOOR PLAN
MH130 HVAC THIRD FLOOR PLAN
MH140 HVAC ROOF PLAN
MH150 MECHANICAL SCHEDULES
MH151 MECHANICAL SCHEDULES
MH152 MECHANICAL SCHEDULES
MH153 HVAC RISER DIAGRAMS
MH501 HVAC DETAILS
MH502 HVAC SEQUENCE OF OPERATIONS
MP100 PIPING BASEMENT PLAN
MP110 PIPING FIRST FLOOR PLAN
MP120 PIPING SECOND FLOOR PLAN
MP130 PIPING THIRD FLOOR PLAN
MP500 MECHANICAL PIPING DETAILS
STRUCTURAL
SC001 STRUCTURAL CONCRETE GENERAL NOTES
SC002 SPECIAL INSPECTION SCHEDULES
SC100 FOUNDATION PLAN
SC300 FOUNDATION SECTIONS
SC301 FOUNDATION SECTIONS
SC302 PIER DETAILS
SC500 TYPICAL FOUNDATION DETAILS
SS001 STRUCTURAL STEEL GENERAL NOTES
SS110 FIRST FLOOR FRAMING PLAN
SS120 SECOND FLOOR FRAMING PLAN
SS130 THIRD FLOOR FRAMING PLAN
SS140 ROOF FRAMING PLAN
SS200 BRACE BAY ELEVATIONS & DETAILS
SS300 FRAMING SECTIONS
SS301 FRAMING SECTIONS
SS500 TYPICAL FRAMING DETAILS
SS600 COLUMN SCHEDULE
PLUMBING
PL001 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
PL100 PLUMBING BASEMENT PLAN
PL110 PLUMBING FIRST FLOOR PLAN
PL120 PLUMBING SECOND FLOOR PLAN
PL130 PLUMBING THIRD FLOOR PLAN
PL200 PLUMBING PIPING PARTIAL PLANS
PL300 PLUMBING PIPING RISER DIAGRAMS
PL301 PLUMBING PIPING RISER DIAGRAMS
PL302 PLUMBING PIPING RISER DIAGRAMS
PL400 PLUMBING DETAILS
PL500 PLUMBING SCHEDULES
FIRE PROTECTION
FP001 FIRE PROTECTION GENERAL NOTES AND DETAILS
FP100 FIRE PROTECTION BASEMENT PLAN
FP101 FIRE PROTECTION FIRST FLOOR PLAN
FP102 FIRE PROTECTION SECOND FLOOR PLAN
FP103 FIRE PROTECTION THIRD FLOOR PLAN
ARCHITECTURAL
AD100 DEMOLITION PLAN
AE100 BASEMENT FLOOR PLAN
AE110 FIRST FLOOR PLAN
AE120 SECOND FLOOR PLAN
AE130 THIRD FLOOR PLAN
AE140 ROOF PLAN
AE150 BASEMENT REFLECTED CEILING PLAN
AE151 FIRST FLOOR REFLECTED CEILING PLAN
AE152 SECOND FLOOR REFLECTED CEILING PLAN
AE153 THIRD FLOOR REFLECTED CEILING PLAN
AE160 ENLARGED FLOOR PLANS
AE200 EXTERIOR ELEVATIONS
AE201 EXTERIOR ELEVATIONS
AE300 BUILDING SECTIONS
AE310 WALL SECTIONS
AE311 WALL SECTIONS
AE314 EXTERIOR DETAILS
AE315 EXTERIOR DETAILS
AE316 EXTERIOR DETAILS
AE317 EXTERIOR DETAILS
AE318 EXTERIOR DETAILS
AE400 ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE401 ENLARGED STAIR PLANS, SECTIONS AND DETAILS
AE402 ENLARGED ELEVATOR PLANS, SECTIONS AND
DETAILS
AE403 ELEVATOR DETAILS
AE460 INTERIOR ELEVATIONS
AE510 EXTERIOR PLAN DETAILS
AE511 EXTERIOR PLAN DETAILS
AE512 EXTERIOR PLAN DETAILS
AE513 PLAN DETAILS
AE520 ROOF DETAILS
AE540 PARTITION SCHEDULE AND DETAILS
AE541 DETAILS
AE560 CASEWORK
AE600 DOOR SCHEDULE AND DETAILS
AE810 FIRST FLOOR DEDUCT ALTERNATE 7 PLAN
AE820 SECOND FLOOR DEDUCT ALTERNATE 7 PLAN
AE830 THIRD FLOOR DEDUCT ALTERNATE 7 PLAN
AE851 FIRST FLOOR REFLECTED CEILING DEDUCT
ALTERNATE 7 PLAN
AE852 SECOND FLOOR REFLECTED CEILING DEDUCT
ALTERNATE 7 PLAN
AE853 THIRD FLOOR REFLECTED CEILING DEDUCT
ALTERNATE 7 PLAN
AE863 THIRD FLOOR DEDUCT ALTERNATE 8 PLAN
AE873 THIRD FLOOR REFLECTED CEILING DEDUCT
ALTERNATE 8 PLAN
INTERIORS
IN100 OVERALL BASEMENT FLOOR DISTRIBUTION PLAN
IN110 OVERALL FIRST FLOOR DISTRIBUTION PLAN
IN120 OVERALL SECOND FLOOR DISTRIBUTION PLAN
IN130 OVERALL THIRD FLOOR DISTRIBUTION PLAN
IN200 OVERALL BASEMENT FLOOR F.F.E. PLAN
IN210 OVERALL FIRST FLOOR F.F.E. PLAN
IN220 OVERALL SECOND FLOOR F.F.E. PLAN
IN230 OVERALL THIRD FLOOR F.F.E. PLAN
IN650 ROOM FINISH SCHEDULE & SIGNAGE SCHEDULE
GENERAL
GI001 COVER, DRAWING INDEX
GI002 DEPARTMENTAL SPACE USE PLAN
GI003 LIFE SAFETY PLANS
HAZARDOUS MATERIALS
HA100 ASBESTOS ABATEMENT
DRAWING INDEX DRAWING INDEX DRAWING INDEX DRAWING INDEX
CIVIL
CS100 DEMOLITION PLAN
CS200 GEOMETRIC PLAN
CS300 GRADING PLAN
CS400 UTILITY PLAN
CS500 CONSTRUCTION STAGING PLAN
CS600 GENERAL NOTES & SITE DETAILS
LP100 LANDSCAPE PLAN
TELECOM
ET001 TELECOMMUNICATIONS SYMBOLS LEGEND
ET100 TELECOMMUNICATIONS - BASEMENT FLOOR PLAN
ET110 TELECOMMUNICATIONS - FIRST FLOOR PLAN
ET120 TELECOMMUNICATIONS - SECOND FLOOR PLAN
ET130 TELECOMMUNICATIONS - THIRD FLOOR PLAN
ET140 FLOOR PLANS FOR BUILDINGS 1W, 2, 3 & 15
ET601 TELECOMMUNICATIONS RISER PLAN
EY100 FIRE ALARM / SECURITY - BASEMENT FLOOR PLAN
EY110 FIRE ALARM / SECURITY - FIRST FLOOR PLAN
EY120 FIRE ALARM / SECURITY - SECOND FLOOR PLAN
EY130 FIRE ALARM / SECURITY - THIRD FLOOR PLAN
EY601 FIRE ALARM / SECURITY RISER DIAGRAM
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
MH101-BD HVAC BASEMENT PLAN - BID DEDUCT ALTERNATE
MH131-BD HVAC THIRD FLOOR PLAN - BID DEDUCT ALTERNATE
MH141-BD HVAC ROOF PLAN - BID DEDUCT ALTERNATE
856 SF
MECHANICAL
251 SF
SPRINKLERS
124 SF
IT
153 SF
ELECTRICAL
362 SF
HAC
CORRIDOR
001STAIRS
S-1
ELEVATOR
E-1
CORRIDOR
C O
R R
ID
O
R
ELEV.
MAC.
RM.
108 SF
EXAM
110 SF
EXAM
99 SF
PHYS /
PROV
99 SF
HR
PROCESS
96 SF
HR
BENEFITS
SPECIALIST
97 SF
HR
SPECIALIST
OFFICER
98 SF
HR
SPECIALIST
OFFICER
151 SF
HR
CHIEF
OFFICER
123 SF
ASSIST
HR
CHIEF
OFFICER
1024 SF
OPEN
OFFICE
100 SF
HR
PROCESS
BENEFITS
104 SF
HR
RECRUITMENT
105 SF
HR
SPECIALIST
OFFICER
177 SF
WOMEN'S
TOILET
171 SF
MEN'S
TOILET
73 SF
OWC
73 SF
RECORDS
STORAGE
85 SF
TREATMENT
AREA
47 SF
HAC
45 SF
IT
44 SF
ELECTRICAL
159 SF
CORRIDOR
270 SF
ELEVATOR
LOBBY
2011 SF
OPEN
OFFICE
99 SF
HR
BENEFIT
RA/FMLA
100 SF
WAITING
115 78 SF
P.I.V.
80 SF
P.I.V
116 SF
VESTIBULE
112 SF
OPEN
OFFICE
43 SF
TLT
STAIRS
S-2
STAIRS
S-1 ELEVATOR
E-1
CORRIDOR
CORRIDOR
28 SF
COFFEE
36 SF
VESTIBULE
83 SF
WAITING
CORRIDOR
1053 SF
OPEN
OFFICE
2220 SF
OPEN
OFFICE
107 SF
CODING
SUPERVISOR
OFFICE
107 SF
ADMINISTRATIVE
OFFICER
177 SF
WOMEN'S
TOILET
36 SF
VESTIBULE
171 SF
MEN'S
TOILET
47 SF
HAC
45 SF
IT
44 SF
ELECTRICAL
CORRIDOR
246 SF
ELEVATOR
LOBBY
STAIRS
S-1
453 SF
OPEN
OFFICE
445 SF
OPEN
OFFICE
96 SF
MED
RECORDS
SUPERVISOR
96 SF
NON-VA
CARE
SUPV
101 SF
RECORD
MANAGER
OFFICER
103 SF
SCANNING
SUPV
98 SF
ASST
CHIEF
MAS
OFF
151 SF
CHIEF
MAS
OFFICER
123 SF
HBU
SUPRVISOR
STAIRS
S-2
197 SF
CONF.
ROOM
ELEVATOR
E-1
28 SF
COFFEE
151 SF
CFO
227 79 SF
INTERNAL
AUDITOR
112 SF
ACCOUNTING
SUPERVISOR
98 SF
ASSISTANT
CHIEF
134 SF
CHIEF
444 SF
OPEN
OFFICE
123 SF
AFO
CORRIDOR
394 SF
OPEN
OFFICE
54 SF
UNISEX
RR
257 SF
ELEVATOR
LOBBY
STAIRS
S-1
150 SF
BREAK
ROOM
137 SF
CORRIDOR
197 SF
CONFERENCE
ROOM
44 SF
ELECTRICAL
45 SF
IT
47 SF
HAC
171 SF
MEN'S
TOILET
36 SF
VESTIBULE
177 SF
WOMEN'S
TOILET
222107 SF
PAYROLL
SUPERVISOR
107 SF
MCA
PROGRAM
OFFICE
1058 SF
OPEN
OFFICE
28 SF
COFFEE
STAIRS
S-2
2099 SF
OPEN
OFFICE
ELEVATOR
E-1
SPACE USE LEGEND
BUSINESS OFFICE
EMPLOYEE HEALTH
FINANCE
HUMAN RESOURCES
PROSTHETICS PURCHASING
SHARED / SUPPORT AREAS
SHARED - UTILITY
AREA SCHEDULE
NAME AREA
FIRST FLOOR 7,583 SF
SECOND FLOOR 7,473 SF
7,473 SFTHIRD FLOOR
TOTAL 22,529 SF
BASEMENT 2,935 SF
LEGEND
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :1
P
M
Scale: 1/8" = 1'-0"
GI002
DEPARTMENTAL SPACE USE PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
2 148
SCALE: 1/8" = 1'-0"GI002
C1 BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"GI002
C5 FIRST FLOOR PLAN
SCALE: 1/8" = 1'-0"GI002
F5 THIRD FLOOR PLAN
SCALE: 1/8" = 1'-0"GI002
F1 SECOND FLOOR PLAN
N N
NN
ROOM
NAME
100 SF PROPOSED SQUARE FOOTAGE
WORK STATIONS PRIVATE OFFICES
-BUSINESS OFFICE 43 9
-EMPLOYEE HEALTH 3 2
-FINANCE 29 5
-HUMAN RESOURCES 29 11
-PROTHETICS 12 2
PURCHASING
DEPARTMENT OFFICE AND
WORK STATION COUNT
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
96 SF
HR
BENEFITS
SPECIALIST
99 SF
PHYS /
PROV
108 SF
EXAM
110 SF
EXAM
73 SF
RECORDS
STORAGE
112 SF
OPEN
OFFICE
43 SF
TLT
85 SF
TREATMENT
AREA
14099 SF
HR
PROCESS
73 SF
OWC
105 SF
HR
SPECIALIST
OFFICER
98 SF
HR
SPECIALIST
OFFICER
151 SF
HR
CHIEF
OFFICER
123 SF
ASSIST
HR
CHIEF
OFFICER
1024 SF
OPEN
OFFICE
104 SF
HR
RECRUITMENT
100 SF
HR
PROCESS
BENEFITS
177 SF
WOMEN'S
TOILET
171 SF
MEN'S
TOILET
36 SF
VESTIBULE
2011 SF
OPEN
OFFICE
47 SF
HAC
45 SF
IT
44 SF
ELECTRICAL
CORRIDOR
270 SF
ELEVATOR
LOBBY
80 SF
P.I.V
78 SF
P.I.V.
100 SF
WAITING
99 SF
HR
BENEFIT
RA/FMLA
116 SF
VESTIBULE
STAIRS
S-1 ELEVATOR
E-1
CORRIDOR
CORRIDOR
STAIRS
S-2
FEC
FEC
F E
C
97 SF
HR
SPECIALIST
OFFICER
STAIR DOOR
.03
0.2
STAIR DOOR
.03
0.2
DOOR
0.2
7583 SQUARE FEET
OCCUPANT LOAD 1/100 GROSS = 76 PERSONS (TABLE 1004.1.2, IBC)
132 LF
REMOTENESS 105 LF
(30' MIN.)
MIDPOINT 76 LF TRAVEL
DISTANCE EACH
DIRECTION
MIDPOINT 85 LF TRAVEL
DISTANCE EACH DIRECTION
SS
S
2-HR UL. DESIGN
NO. U905
2-HR UL.
DESIGN
NO. U430
2-HR UL. DESIGN
NO. U404
2-HR UL. DESIGN
NO. U404
2-HR SPRAY-ON
FIREPROOFING
ABOVE UL. DESIGN
NO. D902
2-HR UL. DESIGN
NO. U438
2-HR UL.
DESIGN
NO. U905
1-HR UL.
DESIGN
NO. U430
S
S S
S
S S
SSS
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
SSS
S
2 HOUR RATED
ASSEMBLY
S S
ELEVATOR
E-1
STAIRS
S-1
362 SF
HAC
CORRIDOR
153 SF
ELECTRICAL
108 SF
ELEV.
MAC.
RM.
124 SF
IT
251 SF
SPRINKLERS
856 SF
MECHANICAL
CORRIDOR
CORRIDOR
STAIR DOOR
.03
0.2
FEC
2935 SQUARE FEET
OCCUPANT LOAD 1/300 GROSS = 10 PERSONS (TABLE 1004.1.2 IBC)
2-HR UL.
DESIGN
NO. U438
2-HR UL.
DESIGN
NO. U905
2-HR UL.
DESIGN
NO. U905
2-HR SPRAY-ON
FIREPROOFING
ABOVE UL.
DESIGN NO. D902
(SHADED)
2-HR UL.
DESIGN
NO. U419
74'-6" MAX TRAVEL
DISTANCE
2-HR CEILING
UL. DESIGN
NO. U438
S
S S
S SS S
S
S
SS
S
S
S1
151 SF
CFO
79 SF
INTERNAL
AUDITOR
134 SF
CHIEF
54 SF
UNISEX
RR
STAIRS
S-1
123 SF
AFO
45 SF
IT
47 SF
HAC
44 SF
ELECTRICAL
257 SF
ELEVATOR
LOBBY
ELEVATOR
E-1
107 SF
PAYROLL
SUPERVISOR
107 SF
MCA
PROGRAM
OFFICE
177 SF
WOMEN'S
TOILET
222 171 SF
MEN'S
TOILET
98 SF
ASSISTANT
CHIEF
112 SF
ACCOUNTING
SUPERVISOR
150 SF
BREAK
ROOM
197 SF
CONFERENCE
ROOM
STAIRS
S-2
28 SF
COFFEE
36 SF
VESTIBULE
2099 SF
OPEN
OFFICE
CORRIDOR
1058 SF
OPEN
OFFICE
444 SF
OPEN
OFFICE
CORRIDOR
F E
C
FEC
FEC
CG
CG
CG 394 SF
OPEN
OFFICE
STAIR DOOR
.03
0.2
STAIR DOOR
.03
0.2
7473 SQUARE FEET
OCCUPANT LOAD 1/100 GROSS = 75 PERSONS (TABLE 1002.1.1, IBC)
132 LF
REMOTENESS 88 LF
(30' MIN.)
MIDPOINT 67 LF TRAVEL
DISTANCE EACH
DIRECTION
MIDPOINT 75 LF TRAVEL
DISTANCE EACH DIRECTION
2-HR UL.
DESIGN NO.
U905
1-HR UL.
DESIGN
NO. U430
2-HR UL. DESIGN
NO. U438
2-HR UL.
DESIGN
NO. U905
S S
S
S S
SS S
SS
S
S
S
S
S
S
S
S
S
S
S
S
151 SF
CHIEF
MAS
OFFICER
98 SF
ASST
CHIEF
MAS
OFF
103 SF
SCANNING
SUPV
101 SF
RECORD
MANAGER
OFFICER
96 SF
NON-VA
CARE
SUPV
96 SF
MED
RECORDS
SUPERVISOR
445 SF
OPEN
OFFICE
453 SF
OPEN
OFFICE
246 SF
ELEVATOR
LOBBY
197 SF
CONF.
ROOM
CORRIDOR
2220 SF
OPEN
OFFICE
171 SF
MEN'S
TOILET
177 SF
WOMEN'S
TOILET
36 SF
VESTIBULE
107 SF
CODING
SUPERVISOR
OFFICE
107 SF
ADMINISTRATIVE
OFFICER
1053 SF
OPEN
OFFICE
123 SF
HBU
SUPRVISOR
ELEVATOR
E-1
STAIRS
S-1
STAIRS
S-2
CORRIDOR
FEC
F E
C
FEC
STAIR DOOR
.03
0.2
STAIR DOOR
.03
0.2
7473 SQUARE FEET
OCCUPANT LOAD 1/100 GROSS = 75 PERSONS (TABLE 1002.1.2, IBC)
132 LF
REMOTENESS 88 LF
(30' MIN.)
MIDPOINT 66 LF TRAVEL
DISTANCE EACH
DIRECTION
MIDPOINT 75 LF TRAVEL
DISTANCE EACH DIRECTION
2-HR UL.
DESIGN
NO.U905
2-HR SPRAY-ON
FIREPROOFING
ABOVE UL. DESIGN
NO. P714
2-HR SPRAY-ON
FIREPROOFING ABOVE UL.
DESIGN NO. P714
2-HR UL.
DESIGN
NO.U905
1-HR SPRAY-
ON
FIREPROOFING
ABOVE UL.
DESIGN NO.
P714
1 HR UL. DESIGN
NO. U430
2-HR UL DESIGN
NO. 438
S S
S
S S
SSSS
SS
S
S
S
S
S
S
S
S
S
S
S
NEW 3 STORY BUILDING
PROJECT: VA CLINICAL AND ADMINISTRATIVE BUILDING
SSOE GROUP #: 015-01361-00
OCCUPANCY: BUSINESS
NUMBER OF STORIES: THREE (3) PLUS A BASEMENT
CONSTRUCTION CLASS: II B
OWNER: VETERANS HEALTH ADMINISTRATION
SECTION 1 PREVAILING CODES
LIFE SAFETY CODE: NFPA-101 2015 EDITION
BUILDING CODE: CC INTERNATIONAL BUILDING CODE -
2015 EDITION
MECHANICAL CODE: CC INTERNATIONAL MECHANICAL
CODE - 2015 EDITION
PLUMBING CODE: ICC INTERNATIONAL PLUMBING
CODE - 2015 EDITION
ELECTRICAL CODE: NATIONAL ELECTRIC CODE - 2014
EDITION
ENERGY: ASHRAE 90.1 - 2007 EDITION
ACCESSIBILITY: ABAAS
FIRE CODE: NFPA-1 2015 EDITION
SECTION 2 BASIC BUILDING INFORMATION
INCIDENTAL USES: NONE
FIRE PROTECTION: THE BUILDING WILL BE FULLY
SPRINKLERED, IN COMPLIANCE WITH
NFPA-13
LIFE SAFETY INFORMATION
ELEMENT SUPPORTING: FIRE RATING UL ASSEMBLY
BEARING
WALLS
FLOOR
ROOF
COLUMNS FLOOR
ROOF
SLAB/
BEAMS
FLOOR
ROOF
FLOOR/CEILING
ASSEMBLIES
ROOF/CEILING
ASSEMBLIES
NON-BEARING
WALLS
0EXTERIOR
OR INTERIOR
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
HEIGHT AND AREA LIMITATIONS:
NFPA-101 2015 NO REQUIREMENT
IBC TABLE 504.3, 504.4 ALLOWABLE HEIGHT: 4 STORIES, 74 FEET
IBC TABLE 506.2 ALLOWABLE AREA: 69,000 SQUARE
FEET
ACTUAL HEIGHT: 3 STORIES
THE HIGHEST OCCUPIED FLOOR IS APPROXIMATELY 30 FEET ABOVE GRADE. THE
BUILDING IS NOT CLASSIFIED AS HIGH-RISE CONSTRUCTION
FLOOR AREA
FIRST FLOOR: 7,583 SQUARE FEET
SECOND FLOOR: 7,473 SQUARE FEET
THIRD FLOOR: 7,473 SQUARE FEET
BASEMENT 2,935 SQUARE FEET
TOTAL: 22,529 SQUARE FEET (25,464 SF
INCLUDING BASEMENT)
SECTION 3 OCCUPANT LOAD (TABLE 1004.1.2 IBC)
APPROXIMATE OCCUPANT LOAD:
MAXIMUM FLOOR AREA (THIRD FLOOR): 7,493 SF X 1 PERSON/100 SF (BUSINESSS
USE) = 75 PEOPLE
SECTION 4 EXITS
EXITS REQUIRED BASED ON OCCUPANT LOAD:
FOR OCCUPANT LOADS LESS THAN 50: 1
FOR OCCUPANT LOADS BETWEEN 50 AND 500: 2
FOR OCCUPAND LOADS BETWEEN 501 AND 1000: 3
NUMBER OF EXITS REQUIRED PER FLOOR: 2
EXIT CAPACITY:
ALLOWABLE EXIT CAPACITY FOR EGRESS COMPONENTS NFPA-101 TABLE 7.3.3.1
DOORS: .2 INCHES PER OCCUPANT
CORRIDORS: .2 INCHES PER OCCUPANT
STAIRS: .3 INCHES PER OCCUPANT
STAIR CAPACITY AND APPORTIONED OCCUPANT LOAD
STAIR EACH OCC REQUIRED
FLOOR LOAD WIDTH124
75/2= 37.5 .3
165 75/2= 37.5 .3
11.25 INCHES
11.25 INCHES
ALL STAIRS SHALL BE 44 INCH MAXIMUM WIDTH PER NFPA-101 TABLE 7.2.2.2.1.2 (B)
SECTION 5 EXIT ACCESS AND TRAVEL DISTANCE:
WITH APPROVED AUTOMATIC SPRINKLER SYSTEM
TRAVEL DISTANCE TO EXITS: 300 FEET (NFPA-101 38.2.6.3)
COMMON PATH OF TRAVEL: 100 FEET (NFPA-101 38.2.5.3.1)
MAXIMUM DEAD END CORRIDOR: 50 FEET(NFAP-101 38.2.5.2.1)
1-HR RATED WALL
LEGEND
2-HR FIRE/SMOKE RATED
WALL
STAIR
.03
COMMON PATH
OF TRAVEL
FEC FIRE EXTINGUISHER
CABINET
ELEMENT
ELEMENT WIDTH
OCCUPANCY WIDTH FACTOR
MAX. ELEMENT CAPACITY
SPRAYED ON FIREPROOFING
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
P
M
Scale: 1/8" = 1'-0"
GI003
LIFE SAFETY PLANS
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
3 148
SCALE: 1/8" = 1'-0"GI003
C4 FIRST FLOOR LIFE SAFETY PLAN
SCALE: 1/8" = 1'-0"GI003
C1 BASEMENT FLOOR LIFE SAFETY PLAN
SCALE: 1/8" = 1'-0"GI003
F1 SECOND FLOOR LIFE SAFETY PLAN
SCALE: 1/8" = 1'-0"GI003
F4 THIRD FLOOR LIFE SAFETY PLAN
ROOM
NAME
100 SF PROPOSED SQUARE FOOTAGE
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
P
M
Scale:
HA100
ASBESTOS ABATEMENT
506-329CLINICAL & ADMINISTRATIVE
BUILDING
-04-12-18
4 148 N
NOT TO SCALENOT TO SCALE
N
NOTE: THE INFORMATION ABOVE MAY VARY BY 10%
44265 Plymouth Oaks Blvd, Plymouth, MI 48170 T 734-455-8600
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
EXISTING PARKING GARAGE
BLDG. #3
BUILDING #4
BUILDING
T-3
BLDG
#15
BM#2
BM #1
ELEV~812.33
FULLER ROAD
E13298954.06
N287517.41
TRAV. PT. #4
E13299113.35
N287480.73
TRAV. PT. #5
E13299133.83
N287575.28
TRAV. PT. #3
SEE NOTE 2 THIS SHEET
SEE NOTE 3, THIS SHEET
DEMOLITION SCHEDULE:
REMOVE ASPHALT PAVEMENT
SAWCUT LINE
REMOVE EXISTING BUILDING & CAP
UTILITIES AS REQUIRED. REFER TO ARCH.
PLANS FOR ADDITIONAL INFORMATION
REMOVE CURB AND GUTTER
REMOVE EX. TREE/BUSH/LANDSCAPING
REMOVE WOODEN DECK
REMOVE CONCRETE PAVEMENT
3 RELOCATE EXISTING A/C UNIT
PLUG, ABANDON & FILL WITH GROUT
NOTE
1. REFER TO ELECTRICAL SITE PLAN FOR ALL
UNDERGROUND ELECTRICAL WORK.
2. PROTECT SAWCUT EDGE DURING CONSTRUCTION.
IT BECOMES THE "FORM" FOR THE NEW CURB AND
WE HAVE NO NO ASPHALT ON PROJECT FOR
DAMAGE REPAIR.
3. LOCATION OF SANITARY AND WATERLINE SERVICE
TO BUILDING T-3 IS UNKNOWN. CONTRACTOR SHALL
FIELD VERIFY TAP LOCATIONS AND ABANDON PER
LEGIONNAIRES REQUIREMENTS
RELOCATE SIGN AS REQUIRED TO
FACILITATE CONSTRUCTION
CAP GEOTHERMAL WELL AS REQUIRED
TO FACILITATE CONSTRUCTION
12 REMOVE PAVEMENT STRIPING
REMOVE, SALVAGE & RESET BRICK AS
REQUIRED TO FACILITATE CONSTRUCTION
REMOVE & RESET H/C SIGN IN
CONCRETE WALK
15 REMOVE CB
16 REMOVE SANITARY SEWER
PROTECT EXISTING STRUCTURE/UTILITY
TO REMAIN
REMOVE WATERLINE SERVICE IN
ACCORDANCE WITH LEGIONNAIRES
GUIDELINES
D A
T E
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
C A u t o d e s k R e v i t A
S
S O
E
O p t r v t
A
M
506-329
CLINICAL & ADMINISTRATIVE
BUILDING
1050 Wilshire Drive, Suite 260
Troy, MI 48084
T 248-643-6222
SSOE, Inc.
PROJECT #: 015-01361-00
DEMOLITION PLAN
01-18-2017 WOLF
GRAPHIC SCALE : 1" =
10' 20' 30'
10'
0'
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
Know what's below.
before you dig.Call
R
SCALE:
DEMOLITION PLAN
1" = 10'
CS100
HARTMAN
Scale: As indicated
BIDS SUBMISSION 01-20-17
PHASE I
BIDS SUBMISSION_REVISED 04-12-18
BIDS SUBMISSION_REVISED
FULLY SPRINKLERED
PROPOSED BUILDING
PIV
GM
WV
BM#2
BM #1
ELEV~812.33
FULLER ROAD
E13298954.06
N287517.41
TRAV. PT. #4
E13299113.35
N287480.73
TRAV. PT. #5
E13299133.83
N287575.28
TRAV. PT. #3
D6
CS600
B6
CS600
B6
CS600
B4
CS600
B6
CS600
D6
CS600
T Y
P
15'
6'
7'
5'
5'
TYP
19'
N 287454.77
E 13299000.84
N 287454.59
E 13298995.76
N 287482.94
E 13298999.83
N 287557.53
E 13298992.04
N 287552.72
E 13298997.26
N 287495.07
E 13299125.06
N 287485.49
E 13299125.54
EXTERIOR STEPS
RE: STRUCTURAL DWGS
N 287584.59
E 13298990.53
EXTERIOR ENTRANCE
RE: STRUCTURAL DWGS
7'
TYP
18'
EXISTING BRICK
REMOVED AND RESET
AS REQUIRED
22.00'
N 287520.47
E 13299125.43
N 287570.06
E 13299121.85
N 287550.13
E 13299125.31
31'
TYP
ALTERNATE NO. 2
N 287493.98
E 13299022.67
N 287498.24
E 13299111.40
N 287494.33
E 13299109.44
N 287490.13
E 13299025.10
B8
CS600
F8
CS600
F2
CS600
F8
CS600
D A
T E
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
C A u t o d e s k R e v i t A
S
S O
E
O p t r v t
A
M
506-329
CLINICAL & ADMINISTRATIVE
BUILDING
1050 Wilshire Drive, Suite 260
Troy, MI 48084
T 248-643-6222
SSOE, Inc.
PROJECT #: 015-01361-00
GEOMETRIC PLAN
03-30-2018
CIVIL LEGEND
DESCRIPTION PROPOSED EXISTING
BUILDING
STORM SEWER
SANITARY SEWER
POTABLE WATER
NATURAL GAS
BELOW GROUND ELECTRICAL LINE
MAJOR CONTOUR LINE
MINOR CONTOUR LINE
ELEVATION
BENCH MARK
CATCH BASIN
MANHOLE/JUNCTION BOX
CLEANOUT
FIRE HYDRANT
POST INDICATOR VALVE
VALVE
LIGHT POLE
TREE
ST
S
W
G
E
00.00
ABBREVIATIONS
LETTERS DESCRIPTION
CB CATCH BASIN
CO CLEAN OUT
DS DOWN SPOUT
FFE FINISHED FLOOR ELEVATION
GP GUIDE POST
IE INVERT ELEVATION
LF LINEAR FEET
MH MANHOLE
PIV POST INDICATOR VALVE
RIM RIM ELEVATION
SAN SANITARY
STM STORM
TE TOP ELEVATION
TYP TYPICAL
SCHEMATIC DESIGN SUBMISSION 01-13-16
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
PAVEMENT MARKINGS AND SIGNAGE KEY:
4" WIDE SOLID LINE, ADA BLUE
4" WIDE SOLID LINE, WHITE
ACCESSIBLE PARKING SIGN IN SIDEWALK
4" WIDE TRANSVERSE LINE, ADA BLUE
SEE DETAIL F4/CS-700
4" WIDE TRANSVERSE LINE, WHITE
ACCESSIBLE PARKING SPACE SYMBOL
SEE DETAIL D4/CS-700
LAYOUT NOTES:
1. CONTROL TRAVERSE POINTS ARE SET IRON PINS BY THE
SURVEYOR.
2. DIMENSIONS ARE TO EDGE OF PAVEMENT, FACE OF CURB,
OR CENTERLINE OF SITE FEATURE, WHERE APPLICABLE,
UNLESS OTHERWISE NOTED.
3. 5' WIDE WALK AND ADJACENT CONCRETE TO BE JOINTED
5' X 5'. 6' WIDE WALK AND ADJACENT CONCRETE TO BE
JOINTS 6'X6'
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
WOLF
CS200
HARTMAN
FIBER OPTIC
GRAPHIC SCALE : 1" =
10' 20' 30'
10'
0'
Know what's below.
before you dig.Call
R
SCALE:
GEOMETRIC PLAN
1" = 10'
GM GAS METER
WV WATER VALVE
PARKING LOT UNDERGROUND ELECTRIC
Scale: As indicated
BIDS SUBMISSION 01-20-17
PHASE II
BIDS SUBMISSION_REVISED 04-12-18
BLDG
#15
BM#2
BM #1
ELEV~812.33
FULLER ROAD
E13298954.06
N287517.41
TRAV. PT. #4
E13299113.35
N287480.73
TRAV. PT. #5
E13299133.83
N287575.28
TRAV. PT. #3
PROPOSED BUILDING
PIV
GM
815.50
815.30
815.66
815.86
815.95±
FFE 816.00
811.95
812.55
812.25
815.98
815.25
812.72±
2%
M A
X
815.05
815.88
815.78
815.98
815.98
WV
815.70
815.97±
815.60
5%
M A
X 2%
M A
X
5%
M A
X
812.50±
812.35
812.35
812.72
812.00
SEE STRUCTURAL DWGS.
FOR STAIRS
SILT FENCE
(DURING
CONSTRUCTION)
BM #1
TOP OF ROUND CONCRETE BASE TO LIGHT
POLE, SOUTH SIDE 13' EAST OF HYDRANT,
NW CORNER OF EMPLOYEE LOT
ELEVATION = 812.33
815.98
D A
T E
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
C A u t o d e s k R e v i t A
S
S O
E
O p t r v t
A
M
506-329
CLINICAL & ADMINISTRATIVE
BUILDING
1050 Wilshire Drive, Suite 260
Troy, MI 48084
T 248-643-6222
SSOE, Inc.
PROJECT #: 015-01361-00
GRADING PLAN
01-17-2017
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
WOLF
CS300
HARTMAN
GRAPHIC SCALE : 1" =
10' 20' 30'
10'
0'
Know what's below.
before you dig.Call
R
SCALE:
GRADING PLAN
1" = 10'
Scale: As indicated
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
BLDG
#15
BM#2
BM #1
ELEV~812.33
FULLER ROAD
PROPOSED BUILDING
W
F
P
PIV
10"x6" TAPPING
SLEEVE
6" SAN @ BLDG.
RE: PLMB. DWG
FIRE PROTECTION
RISER @ BLDG.
SEE DETAIL B2 ON
SHT. CS600
GM
FIBER OPTIC CONN.
RE: ELECTRIC PLANS
W
W
W
W
10"x3" TAPPING
SLEEVE & VALVE
S
T
G
G
G
G
G
G
G
8" ST@ BLDG.
IE 810.00
RE: PLMB. DWG
WV
S
T
S
T
IE 8" NE 809.44
REMOVE
68'~4" GAS
8'~1" GAS
D A
T E
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
C A u t o d e s k R e v i t A
S
S O
E
O p t r v t
A
M
506-329
CLINICAL & ADMINISTRATIVE
BUILDING
1050 Wilshire Drive, Suite 260
Troy, MI 48084
T 248-643-6222
SSOE, Inc.
PROJECT #: 015-01361-00
UTILITY PLAN
01-17-2017
DESIGN DEVELOPMENT SUBMISSION 1 04-19-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
WOLF
CS400
HARTMAN
GRAPHIC SCALE : 1" =
10' 20' 30'
10'
0'
Know what's below.
before you dig.Call
R
SCALE:
UTILITY PLAN
1" = 10'
Scale: As indicated
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
PIV
GM
WV
SILT FENCE
(DURING
CONSTRUCTION)
BM#2
BM #1
ELEV~812.33
FULLER ROAD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TEMPORARY WALKING
PATH EXISTING
BRICK SURFACE
15' WIDE
ACCESS
GATE
X
X
TEMPORARY
CONSTRUCTION
FENCE
CONSTRUCTION
LAYDOWN AREA
BLOCK OUT LINES
FOR CONSTRUCTION
NOTE:
THE GC CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY DAMAGE TO THE EXISTING PARKING
LOT AS A RESULT OF CONSTRUCTION.
D A
T E
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
C A u t o d e s k R e v i t A
S
S O
E
O p t r v t
A
M
506-329
CLINICAL & ADMINISTRATIVE
BUILDING
1050 Wilshire Drive, Suite 260
Troy, MI 48084
T 248-643-6222
SSOE, Inc.
PROJECT #: 015-01361-00
CONSTRUCTION STAGING PLAN
01-17-2017
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
WOLF
CS500
HARTMAN
GRAPHIC SCALE : 1" =
10' 20' 30'
10'
0'
Know what's below.
before you dig.Call
R
SCALE:
CONSTRUCTION STAGING PLAN
1" = 10'
Scale: As indicated
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
1 CONTRACTION JOINTS SPACE TO BE EQUAL TO SIDEWALK WIDTH
2 EXPANSION JOINTS 25' O/C
3 ALL JOINTS SEALED PER SPEC
4,000 PSI CONCRETE
COMPACTED SUBGRADE (PER SPECS)
M
I N
1'-6"6"
FINISHED GRADE
4"
2" RADIUS (SEE NOTE)
1":1'
NOTE: STANDARD CURB SHAPE OF THE STATE IN WHICH
THE PROJECT IS LOCATED MAY BE SUBSTITUTED.
COMPACTED
SUBGRADE
COMPACTED
AGGREGATE BASE
1/8" TOOLED
JOINT
4,000 PSI
CONCRETE
WALK
1. REFER TO JOINTING PLAN FOR JOINT SPACING.
2. REFER TO SIDEWALK DETAIL FOR CONCRETE SIDEWALK SECTION.
NOTES:
1. SIDEWALK EXPANSION JOINTS AT 25'-O.C.
TOP OF SIDEWALK
FILL WITH JOINT
SEALER 1" DEEP
D
NOTES:
3" MIN
12" MAX
3" MIN
12" MAX
PIPE
OD
COMPACTED #67 STONE
(ASTM D448) IN 4" LAYERS
B E
D D
I N
G B
A C
K F
I L
L
EXCAVATED MATERIALS
SUITABLE FOR
COMPACTION BY
TESTING LABORATORY
LAID IN 8" LOOSE LIFTS
AND COMPACTED AS
SPECIFIED
FINISHED GRADE
BACKFILL FOR
PIPING IN
OTHER AREAS
BACKFILL FOR
PIPING UNDER
PAV'T
COMPOSITE SECTION
FINISH PAVEMENT
BACKFILL TO EXTEND
TO UNDERSIDE OF SLAB
OR BOTTOM OF BASE
COURSE FOR PAVEMENT
#67 STONE (ASTM
D448) IN 4" LAYERS
SIDE OF TRENCH
IF ADEQUATELY
BRACED TO MEET
SAFETY CODES AND
REGULATIONS
B E
D D
I N
G
I N
I T
I A
L
B A
C K
F I L
L
F I N
A L
B A
C K
F I L
L
OPEN
6" MIN. THICKNESS
CONCRETE BASE
PROVIDE CLEARANCE FOR
BOLT REMOVAL
POST INDICATOR
AND OPERATOR
FINISHED GRADE
VALVE
LOCK-TYPE WRENCH
BOTTOM OF
TRENCH
12" MIN.
PIV PAINTED BLUE
NOTES:
52"
R
STANDARD UNIVERSAL
ACCESSIBLE SYMBOL
BACKGROUND SQUARE
PAINTED LIGHT BLUE
1. ALL HANDICAP SYMBOL LINE WIDTH TO BE 4".
PAINTED WHITE
FINISHED GRADE
SLOPE TO DRAIN (TYPICAL)
3000 PSI CONCRETE
BASE, MINIMUM
12"
MUTCD CODE R7-8
8" DIAMETER
POST EMBEDDED IN CONCRETE
GALVANIZED STEEL U-CHANNEL
SCALE:
POST INDICATOR & VALVE (PIV)
NONECS200
B4
SCALE:
CONCRETE SIDEWALK
NONECS200
B6
SCALE:
ACCESSIBLE PARKING
SPACE SYMBOL
NONECS200
D4
SCALE:
SIDEWALK CONTROL JOINT
NONECS200
D6
SCALE:
PIPE BEDDING AND BACKFILL
NONECS200
D8
SCALE:
SWALE SECTION
NONECS200
F2
SCALE:
RESERVED PARKING SIGN DETAIL
NONECS200
F4
SCALE:
SIDEWALK EXPANSION JOINT
NONECS200
F6
SCALE:
CONCRETE CURB AND GUTTER
NONECS200
F8
SEE PLAN
EXIST. GRADE
SOD
SEED & MULCH (TYP.)
EXIST. GRADE
L
C SWALE
4:1 MAX
SEE PLAN
4:1 MAX
NOTES
FRONT VIEW
CROSS SECTION
FENCE POST DRIVEN 16"
MINIMUM INTO GROUND
UNDISTURBED GROUND
FENCE POST SECTION 20"
MINIMUM ABOVE GROUND
F
L
O
W
FILTER CLOTH
SECTION B
SECTION A
A
B
JOINING TWO ADJACENT
SILT FENCE SECTIONS
TOP VIEW
STAPLE
SECTION B
STAPLE
POSTS
SECTION A
F
L
O
W
36" MIN. FENCE POSTS DRIVEN
16" MINIMUM INTO GROUND
HEIGHT OF FILTER CLOTH TO
BE 16" MIN. ABOVE GROUND
EXTEND FILTER CLOTH
8" MIN. BELOW GRADE
F
L
O
W
10' MAX. CENTER TO CENTER
INSPECTION AND MAINTENANCE:
FILTER FABRIC FENCES AND FILTER BARRIERS SHALL BE INSPECTED DAILY FOR GAPS,
TEARS AND BULGING AND AFTER EACH SIGNIFICANT STORM (1/2" IN 24 HOURS) AND REPAIR
AS REQUIRED. ALL REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT SHALL BE REMOVED
WHEN IT REACHES 1/2± HEIGHT OF THE FENCE (8 INCHES MAXIMUM). FILTER FABRIC FENCES
SHALL BE REPLACED WHEN THE FENCE IS NO LONGER DETAINING WATER FOR
SEDIMENTATION.
SCALE:
SILT FENCE
(DURING CONSTRUCTION)
NONECS200
D2
1. WHEN TWO SECTIONS OF FILTER CLOTH ARE JOINED TOGETHER, THEY SHALL BE
OVER-LAPPED, FOLDED AND STAPLED TO PREVENT SEDIMENT BYPASS.
2. FILTER CLOTH TO BE FASTENED SECURELY TO EVERY 24" AT TOP AND MID SECTION.
3. ACCUMULATED SEDIMENT MUST BE REMOVED WHEN IT REACHES 50% HEIGHT OF THE FABRIC.
4. WOOD POSTS: 2"x2" HARDWOOD WITH MIN. CROSS SECTIONAL AREA OF 3 SQ. IN.
5. FILTER CLOTH: FILTER X, MIRAFI 100X, STABILINKA OR APPROVED EQUAL CONFORMING TO
CLASS F FABRIC (USDA, SCS).
6. REMOVE SILT FENCE AFTER SITE HAS BEEN STABILIZED
EXPANSION JOINT
RAMP
SLOPE 1:12
MAXIMUM
FLUSH WITH PAVEMENT
LANDING TO BE
PAVEMENT AS NECESSARY
SAW CUT, REMOVE
AND REPLACE ASPHALT
PROPOSED
EXPANSION JOINT
4" CONC. SIDEWALK
5' X 5.5'
MAXIMUM
1:50
SLOPE 1:12
RAMP
MAXIMUM
PLAN
EXPANSION JOINT
CURBS
TAPER CONCRETE
SIDEWALK
SUB-GRADE
COMPACTED
PROPOSED
SECTION
BROOM FINISH
LANDING
SCALE:
HANDICAP RAMP
NONECS200
B8
CONCRETE CURB
STONE
4" CRUSHED
" EXPANSION JOINT
M
I N
PIPE SLEEVE
GRADE
FINISH GRADE ELEV.
INSIDE BUILDING WALL
BLIND FLANGE
FINISH FLOOR
PROVIDE PIPE
SLEEVE
WATERPROOF
EXPANSION MATERIAL
3/4" DIA.
RESTRAINT RODS
DUCTILE IRON SPRINKLER
RISER SUPPLY, SEE PLAN
FOR SIZE
CONCRETE THRUST BLOCK
FLANGED
CONNECTION
JOINT (TYP.)
D I
C
L A
D.I.CLASS 52
WALL
FIRE SPRINKLER MAIN
3/4" DIA.
RESTRAINT RODS
SEE FIRE PROTECTION PLANS
S I T
E
C O
N T
R A
C T
O R
F I R
E
P
R O
T E
C T
I O
N
C O
N T
R A
C T
O R
COORDINATE DISTANCE
FROM FACE OF WALL WITH
FIRE PROTECTION CONTRACTOR
PRIOR TO INSTALLATION
SCALE:
FIRE RISER INLET CONNECTION
NONECS400
B2
D A
T E
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
C A u t o d e s k R e v i t A
S
S O
E
O p t r v t
A
M
506-329
CLINICAL & ADMINISTRATIVE
BUILDING
1050 Wilshire Drive, Suite 260
Troy, MI 48084
T 248-643-6222
SSOE, Inc.
PROJECT #: 015-01361-00
GENERAL NOTES & SITE DETAILS
01-17-2017
GENERAL NOTES:
1. ALL WORK AND MATERIALS SHALL CONFORM TO VA STANDARDS AND TO THE 2012 STANDARDS SPECIFICATIONS FOR CONSTRUCTION OF THE
MICHIGAN DEPARTMENT OF TRANSPORTATION AND THE LATEST ASSOCIATED SUPPLEMENTS AND REVISIONS, AND IN COMPLIANCE WITH ALL
APPLICABLE NATIONAL, STATE, AND LOCAL STANDARDS AND REGULATIONS, UNLESS NOTED OTHERWISE.
2. THE TOPOGRAPHIC SURVEY WAS PERFORMED BY WOLVERINE ENGINEERS & SURVEYORS, INC. ON JANUARY 11, 2016.
3. THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. IT IS BELIEVED THAT THEY ARE ESSENTIALLY CORRECT, BUT SSOE GROUP DOES NOT GUARANTEE THEIR ACCURACY OR COMPLETENESS. THE EXACT LOCATION OF EXISTING UTILITIES SHALL BE THE
CONTRACTOR'S RESPONSIBILITY.
4. THE CONTRACTOR AT ALL TIMES SHALL FOLLOW ALL STATE AND LOCAL SAFETY REQUIREMENTS DURING CONSTRUCTION OF THIS PROJECT.
SPECIAL CARE SHALL BE TAKEN DURING ALL TRENCHING OPERATIONS. SHEETING AND BRACING, CRIBBING, ETC., MUST BE INSTALLED AS
REQUIRED TO PROVIDE MAXIMUM SAFETY TO THE CONTRACTOR'S WORKERS IN FULL COMPLIANCE WITH OSHA REGULATIONS.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, TYPE & MATERIAL, SUPPORT, PROTECTION AND RESTORATION OF ALL
EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THESE PLANS OR NOT. THE CONTRACTOR SHALL EXPOSE OR LOCATE ALL
UTILITIES OR STRUCTURES WITHIN THE ALIGNMENT OF PROPOSED NEW CONSTRUCTION AT LEAST 1 WEEK PRIOR TO CONSTRUCTION TO
VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL CALL 811, 48 HOURS PRIOR TO
CONSTRUCTION AND SHALL NOTIFY ALL UTILITY COMPANIES AT LEAST 48 HOURS PRIOR TO WORK IN THE VICINITY OF THEIR UNDERGROUND
LINES. A VA REPRESENTATIVE SHALL BE ON-SITE WHEN EXPOSING ANY UTILITIES.
6. THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE AND ENGINEER IMMEDIATELY OF ANY DISCREPANCIES FOUND DURING HIS
INVESTIGATION OF THE EXISTING UTILITIES AND TOPOGRAPHY AND/OR DURING HIS CONSTRUCTION PHASE.
7. ALL REMOVALS NECESSARY TO ACCOMPLISH THE NEW WORK ARE TO BE CONSIDERED PART OF THE CONTRACT AND INCLUDED IN IT'S BIDDING, WHETHER SPECIFIED, SHOWN ON THE DRAWINGS OR NOT. A CAREFUL INSPECTION OF THE PREMISES PRIOR TO BIDDING SHALL BE MADE BY
EACH BIDDER.
8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES IN ACCORDANCE WITH VA REQUIREMENTS.
9. ALL DISTURBED AREAS NOT DESIGNATED TO RECEIVE A FINISHED SURFACE SHALL BE SEEDED AND MULCHED ON A MINIMUM OF 4" TOPSOIL.
SEED, MULCH AND FERTILIZE ALL DISTURBED TOPSOIL AREAS. CONTRACTOR SHALL WATER, FERTILIZE AND RESEED AREAS AS NECESSARY
UNTIL OF A MINIMUM OF 70% GROWTH DENSITY IS ACHIEVED.
10. CONTRACTOR SHALL KEEP EXISTING STREETS, ROADS AND DRIVES CLEAR OF DIRT, DEBRIS AND EQUIPMENT. STREET AND FOOT TRAFFIC
SHALL BE MAINTAINED AT ALL TIMES. CONTRACTOR SHALL USE TRAFFIC CONTROL DEVICES AS NECESSARY PER MDOT SPECIFICATIONS.
11. ANY DAMAGE TO STRUCTURES WITHIN THE CITY RIGHT-OF-WAY DURING THE DEMOLITION AND CONSTRUCTION PHASE OF THE PROJECT SHALL
BE REPAIRED PER THE VA OR MDOT CONSTRUCTION STANDARDS.
12. THE CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS AS NECESSARY FOR NEW CONSTRUCTION.
13. ALL ORGANIC MATERIAL AND POOR SOIL SHALL BE REMOVED FROM THE PROJECT SITE AS DIRECTED BY OWNER'S REPRESENTATIVE.
14. TOPSOIL SHALL BE STRIPPED TO IT'S ENTIRE DEPTH, AS ENCOUNTERED, FROM ALL AREAS TO RECEIVE NEW CONSTRUCTION. ALL EXCESS
TOPSOIL AND EXCAVATED MATERIALS SHALL BE REMOVED FROM THE SITE.
15. SOLID, SANITARY AND TOXIC WASTE MUST BE DISPOSED OF IN A PROPER MANNER IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS. IT IS PROHIBITED TO BURN, BURY, OR POUR OUT ANY SOLVENTS, PAINTS, STAINS, GASOLINE, DIESEL FUEL, USED MOTOR OIL, HYDRAULIC FLUID, ANTIFREEZE, CEMENT CURING COMPOUNDS AND OTHER SUCH TOXIC OR HAZARDOUS WASTES. WASH OUT OF CONCRETE
TRUCKS SHALL OCCUR IN A DIKED, DESIGNATED AREA WHERE THE WASTEWATER CAN BE COLLECTED AND DISPOSED OF PROPERLY WHEN IT
HARDENS. STORAGE TANKS SHALL BE LOCATED IN DIKED AREAS AWAY FROM ANY DRAINAGE CHANNELS. THE DIKED AREA SHALL CONTAIN A
VOLUME 110% OF THE LARGEST TANK.
16. PROTECT EXISTING BUILDINGS, TREES, UTILITIES AND STRUCTURES TO REMAIN AS NECESSARY. THE CONTRACTOR IS RESPONSIBLE FOR ANY
DAMAGE TO EXISTING CONSTRUCTION RESULTING FROM OR CAUSED BY NEW CONSTRUCTION.
17. COORDINATE ALL BUILDING UTILITY CONNECTION LOCATIONS AND SIZES WITH BUILDING CONTRACTOR.
SITE LAYOUT NOTES:
1. SEE ARCHITECTURAL DRAWINGS FOR ALL BUILDING DIMENSIONS.
2. ALL DIMENSIONS ARE TO FACE OF BUILDING FOUNDATION, EDGE OF PAVEMENT, OR FACE OF CURB WHERE APPLICABLE.
GRADING NOTES:
1. ARCHITECTURAL FINISHED FLOOR ELEVATION +100.00 EQUALS SITE ELEVATION 816.00
2. UNLESS NOTED OTHERWISE, THE TOP OF EXISTING MANHOLE, CATCH BASIN OR OTHER UTILITY STRUCTURES AFFECTED BY NEW
CONSTRUCTION SHALL BE ADJUSTED, AS NECESSARY, TO BE FLUSH WITH PROPOSED GRADE AND/OR PROVIDE POSITIVE DRAINAGE.
3. UNLESS NOTED OTHERWISE ON PLANS, CONTRACTOR SHALL CUT OR FILL, AS NECESSARY, TO PROVIDE A SMOOTH TRANSITION BETWEEN
EXISTING AND PROPOSED GRADES. ALL CUT AND/OR FILL SLOPES SHALL BE A MAXIMUM OF 4 HORIZONTAL TO 1 VERTICAL (4H:1V). FINISHED
GRADING SHALL BE DONE TO PREVENT PONDING WITHIN THE PROJECT AREA AND ADJOINING AREAS, AND MAINTAIN POSITIVE DRAINAGE TO
THE NEAREST DRAINAGE FEATURE.
4. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING POSITIVE DRAINAGE TO THE NEAREST DRAINAGE FEATURE AT ALL TIMES, NO PONDING WILL
BE PERMITTED.
5. IN PAVEMENT AREAS POSITIVE DRAINAGE MAY BE ACCOMPLISHED BY ADDING COMPACTED AGGREGATE TO THE CATCH BASIN RIM ELEVATION, THEN RE-EXCAVATING FOR ASPHALT INSTALLATION. CONTRACTOR SHALL KEEP THE BASE MATERIAL AT OPTIMUM MOISTURE LEVEL AND THE
SPECIFIED COMPACTION.
UTILITY NOTES:
STORM DRAINAGE NOTES
1. FOR PROTECTION OF UNDERGROUND UTILITIES, CALL 811 A MINIMUM OF 48 HOURS PRIOR TO EXCAVATING.
2. ALL MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH CONSTRUCTION STANDARDS OF VA AND THE 2012 STANDARDS
SPECIFICATIONS FOR CONSTRUCTION OF THE MICHIGAN DEPARTMENT OF TRANSPORTATION. IN ADDITION, ALL WORK SHALL BE IN COMPLIANCE
WITH ALL APPLICABLE FEDERAL AND STATE STANDARDS AND REGULATIONS.
3. CONTRACTOR SHALL IDENTIFY AND SPOT DIG POTENTIAL CONFLICTING UTILITIES WITHIN PROPOSED NEW UTILITY ALIGNMENTS PRIOR TO
INITIATING CONSTRUCTION/INSTALLATION.
4. EXISTING DRAIN PIPING BENEATH PAVEMENT EDGES SHALL BE EXTENDED AS NECESSARY TO RECONNECT OUTFALL TO NEW STORM DRAINAGE
WHERE AFFECTED BY NEW WORK.
5. STORM CONNECTIONS TO THE DOWNSPOUTS ARE TO BE DONE BY THE SITE CONTRACTOR.
6. STORM SEWER PIPING SHALL BE THE FOLLOWING:
6"-15": PVC, ASTM D3034, SDR35 WITH PREMIUM JOINTS CONFORMING TO ASTM D3212. ALL GASKETS FOR PVC SHALL BE WATER TIGHT AND
MEET THE REQUIREMENTS OF ASTM F477.
7. PROVIDE A WATERTIGHT CONNECTION AT ALL NEW MANHOLE STRUCTURES BY USING A KOR-N-SEAL BOOT CONNECTION. IF EXISTING
STRUCTURES CAN NOT BE CORE DRILLED A WATERSTOP AND NON-SHRINKING GROUT MAY BE USED.
8. INSTALL ALL STORM SEWER PIPING IN ACCORDANCE WITH MANUFACTURERS REQUIREMENTS AND SPECIFICATIONS.
SOIL EROSION CONTROL NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING, INSTALLING AND MAINTAINING ALL EROSION AND SEDIMENT CONTROL MEASURES IN
ACCORDANCE WITH THE VA REQUIREMENTS.
2. SOIL EROSION AND SEDIMENTATION BEST MANAGEMENT PRACTICE (BMP) MEASURES SHALL BE INSTALLED PRIOR TO THE START OF ANY
CONSTRUCTION AND SHALL BE MAINTAINED AT ALL TIMES UNTIL CONSTRUCTION HAS BEEN COMPLETED, INCLUDING ALL GRASS BEING WELL
ESTABLISHED AND/OR PERMANENT EROSION AND SEDIMENTATION BMP MEASURES ARE IN PLACE. ALL BMP MEASURES SHALL BE INSTALLED TO
THE SATISFACTION OF VA. VA MAY REQUIRE WORK TO BE STOPPED AND THE STORM DRAINAGE OUTLET TO BE PLUGGED, IF CONDITIONS
BECOME UNSATISFACTORY.
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
WOLF
CS600
HARTMAN
WATERLINE FIRE PROTECTION NOTES:
1. CONTRACTOR SHALL COORDINATE ALL WORK AND WATER MAIN INSTALLATION WITH THE VA PRIOR TO INSTALLATION
2. ALL WATER LINES AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE VA STANDARDS.
3. THE SPECIFICATIONS OF THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN WATER WORKS ASSOCIATION (AWWA) AND THE
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) HEREIN REFERRED TO, UNLESS OTHERWISE NOTED, SHALL BE THE LATEST
SPECIFICATIONS OF THE RESPECTIVE ORGANIZATIONS.
4. ALL PIPE, VALVES AND FITTINGS FOR FIRE SERVICES SHALL BE UL/FM APPROVED.
5. ALL PIPE AND FITTINGS SHALL CONFORM TO AWWA C-151, CLASS 52 AND HAVE A CEMENT MORTAR LINING, CONFORMING TO ANSI-A21.4
(AWWA C104) AND A BITUMINOUS OUTSIDE COATING PER AWWA C110 AND ENCASED IN A POLYETHYLENE TUBE PER AWWA C105.
6. VALVE BOXES SHALL BE THREE (3) PIECE ADJUSTABLE SCREW TYPE, WITH A 5-1/4 INCH SHAFT, WITH CAST IRON FULL FLANGE RING AND LID.
7. GATE VALVES 12" AND SMALLER SHALL BE LIMITED TO VALVES MADE BY AMERICAN DARLING, KENNEDY, MUELLER, U.S. PIPE OR CLOW VALVE
COMPANIES MEETING AWWA SPECIFICATION C509.
8. CONTRACTOR TO PROVIDE ALL JOINT RESTRAINTS AND THRUST BLOCKS IN ACCORDANCE WITH THE CURRENT EDITION OF NFPA 13.
9. INSTALLATION AND PRESSURE TESTING SHALL BE AS PER AWWA C-600. DISINFECTION SHALL MEET OR EXCEED AWWA C-651. NO DEVIATIONS
FROM THE ABOVE SPECIFICATIONS WILL BE PERMITTED.
Scale: As indicated
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
GM
FULLER ROAD
3 - EVERLOW YEW
SPACE 4' ON CENTER
1- AUTUMN BRILLIANCE SERVICEBERRY CLUMP
19 - GRO-LO FRAGRANT SUMAC
SPACE 4.5' ON CENTER
21 - KARL FOERSTER REED GRASS
SPACE 3' ON CENTER
10 - BAILEY'S COMPACT AMERICAN CRANBERRYBUSH VIBURNUM
SPACE 4' ON CENTER
4- GRO-LO FRAGRANT SUMAC
SPACE 4.5' ON CENTER
7 - KARL FOERSTER REED GRASS
SPACE 3' ON CENTER
1 - DARK GREEN ARBORVITAE
8 - CORAL DRIFT ROSE
SPACE 30"+/- ON CENTER
12 - HAPPY RETURNS DAYLILY
SPACE 18"+/- ON CENTER
4 - HAMELN DWARF FOUNTAIN GRASS
SPACE 24"+/- ON CENTER
BED LINE
(TYPICAL)
MULCH ENTIRE BED
(TYPICAL)
MULCH ENTIRE BED (TYPICAL)
MULCH ENTIRE BED (TYPICAL)
MULCH ENTIRE BED (TYPICAL)
BED LINE (TYPICAL)
PLANT LIST
QTY. / BOTANICAL NAME / COMMON NAME / SIZE / ROOT / SPACING
1 AMELANCHIER GRANDIFLORA "AUTUMN BRILLIANCE" (P.P.5717)
AUTUMN BRILLIANCE SERVICEBERRY, 12' HT. CLUMP FORM, B&B
28 CALAMAGROSTIS X ACUTIFOLIA "KARL FOERSTER"
KARL FOERSTER REED GRASS,CLUMP NO.3 CONTAINER
12 HEMEROCALLIS "HAPPY RETURNS"
HAPPY RETURNS DAYLILY, CLUMP NO.1 CONT.
4 PENNISETUM ALOPECURIDES "HAMELN"
HAMELN DWARF FOUNTAIN GRASS, CLUMP NO.2 CONT.
8 ROSA "CORAL DRIFT" ("MEIDRIFORA" P.P. 19148)
CORAL DRIFT ROSE, 15" SPD., NO.3 CONT.
23 RHUS AROMATICA "GRO-LOW"
GRO-LOW FRAGRANT SUMAC, 24" SPD., NO.3 CONT.
3 TAXUS X MEDIA "EVERLOW"
EVERLOW YEW, 24" SPD., B&B
1 THUJA OCCIDENTALIS "NIGRA"
DARK GREEN ARBORVITAE, 8' HT., B&B
10 VIBURNUM TRILOBUM COMPACTUM "BAILEY'S"
BAILEY'S COMPACT AMERICAN CRANBERRYBUSH VIBURNUM, 30" HT., FULL, B&B
LANDSCAPE NOTES
1. CONTRACTOR SHALL CALL 811-72 HOURS PRIOR TO PLANTING
OPERATIONS AND SHALL NOTIFY ALL UTILITY COMPANIES AT LEAST 48
HOURS PRIOR TO WORK IN THE VICINITY OF THEIR UNDERGROUND LINES.
REFER TO CIVIL DRAWINGS FOR UNDERGROUND AND ABOVE GRADE
UTILITY INFORMATION. CONTRACTOR SHALL MAKE MINOR FIELD
ADJUSTMENTS IN PLANT LOCATIONS AS NECESSARY TO COORDINATE
WITH UNDERGROUND UTILITIES AND/OR EXISTING SITE CONDITIONS.
2. CONTRACTOR SHALL COORDINATE TREE AND SHRUB INSTALLATIONS,
AND LAWN SEEDING OPERATIONS WITH SITE CONSTRUCTION
OPERATIONS PRIOR TO COMMENCEMENT OF WORK.
3. SUBSTITUTIONS IN PLANT SIZE, GENUS, SPECIES, OR CULTIVAR SHALL
BE REVIEWED AND APPROVED BY THE ARCHITECT PRIOR TO
INSTALLATION. CONTRACTOR IS RESPONSIBLE FOR PLANT QUANTITIES AS
INDICATED ON THE LANDSCAPE PLANS. PLANT QUANTITIES LISTED IN
PLANT LIST ARE FOR GENERAL REFERENCE ONLY.
5. ALL SITE AREAS DISTURBED BY CONSTRUCTION OPERATIONS, NOT
DESIGNATED AS PLANTING BEDS OR HARD SURFACE SHALL BE SEEDED
AND MULCHED PER SPECIFICATIONS AND AS NOTED.
6. REFER TO SPECIFICATIONS FOR SEEDING AND PLANTING MATERIALS,
INSTALLATION, AND WARRANTIES.
7. MULCH ENTIRE PLANTING BEDS 3" MINIMUM DEPTH OF SHREDDED
HARDWOOD MULCH.
8. ALL PLANT MATERIALS SHALL HAVE NURSERY INSTALLED WATERPROOF
LABELS IDENTIFYING THE SIZE, GENUS, SPECIES, CULTIVAR AND COMMON
NAME OF EACH TREE OR SHRUB. LABELS SHALL BE REMOVED BY THE
CONTRACTOR AFTER FINAL ACCEPTANCE BY THE OWNER'S
REPRESENTATIVE.
PLANTING PIT WIDTH =
2 X ROOT BALL WIDTH
FOLD DOWN OR REMOVE TOP 1/2 OF BURLAP
3" DEPTH SHREDDED HARDWOOD MULCH.
OR REMOVE CONTAINER. DISPOSE OF ALL
MATERIALS.
GRADE
TOP OF BALL TO BE 1" ABOVE EXISTING GRADE
UNDISTURBED SOIL OR COMPACTED FILL
SLOPE PLANTING PIT TO EDGE
BASE OF SHRUB.
LEAVE 3" CIRCLE OF BARE SOIL AROUND
3"
BACKFILL WITH SPECIFIED PLANTING SOIL
PLANTING PIT WIDTH
3 x ROOT BALL =
UNDISTURBED SOIL OR COMPACTED FILL
GRADE
ROOT BALL. DISPOSE OF ALL MATERIAL.
REMOVE ALL OF BURLAP OR WIRE BASKET FROM
SCARIFY SIDES OF PLANTING PIT
ALL NON BIO-DEGRADABLE MATERIALS.
GENTLY TAMP SOIL AS NEEDED. DISPOSE OF
SETTLE SOIL AND REMOVE AIR POCKETS.
WITH PLANTING MIXTURE. USE WATER TO
CENTER ROOT BALL IN PLANTING PIT. BACKFILL
SLOPE PLANTING PIT TO EDGE
TOP OF ROOT BALL TO BE 2" ABOVE FINISHED GRADE
TRUNK OF TREE.
LEAVE 3" CIRCLE OF BARE SOIL AROUND
3" DEPTH SHREDDED HARDWOOD MULCH.
NURSERY TAGS AND/OR LABELS AFTER FINAL
STRING FROM TREE TRUNK AND CROWN. REMOVE
REMOVE NURSERY APPLIED TREE WRAP, TAPE OR
PRUNE DEAD OR BROKEN BRANCHES ONLY.
DO NOT PRUNE TERMINAL LEADER OR BRANCH TIPS.
BACKFILL WITH SPECIFIED PLANTING SOIL
4"
REMOVE NURSERY APPLIED TAGS AND/OR LABELS
AFTER FINAL ACCEPTANCE BY OWNERS REPRESENTATIVE
ACCEPTANCE BY OWNERS REPRESENTATIVE.
D A
T E
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of
Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
C A u t o d e s k R e v i t A
S
S O
E
O p t r v t
A
M
506-329
CLINICAL & ADMINISTRATIVE
BUILDING
1050 Wilshire Drive, Suite 260
Troy, MI 48084
T 248-643-6222
SSOE, Inc.
PROJECT #: 015-01361-00
11-15-2016
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
SMYKOWSKIWOLF
LP100
GRAPHIC SCALE : 1" =
10' 20' 30'
10'
0'
Know what's below.
before you dig.Call
R
SCALE:
LANDSCAPE PLAN
1" = 10'
BIDS SUBMISSION_REVISED
FULLY SPRINKLERED
Scale: As indicated
1. DESIGN, DETAILING, AND CONSTRUCTION OF REINFORCED CONCRETE SHALL CONFORM TO THE FOLLOWING
PUBLICATION UNLESS NOTED OTHERWISE.
- BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318-14)
- DETAILS AND DETAILING OF CONCRETE REINFORCEMENT (ACI 315-99)
- SPECIFICATION OF STRUCTURAL CONCRETE FOR BUILDINGS (ACI 301-10)
- GUIDE FOR CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI-302.1R-04)
- ACI 305.1-06 SPECIFICATION FOR HOT WEATHER CONCRETING
- ACI 306.1-90 SPECIFICATION FOR COLD WEATHER CONCRETING
- ACI 347-04 RECOMMENDED PRACTICE FOR CONCRETE FORMWORK
2. UNLESS OTHERWISE NOTED, CONCRETE SHALL BE NORMAL WEIGHT AND SHALL DEVELOP 28 DAY
COMPRESSIVE STRENGTH AS FOLLOWS:
FOOTINGS, PIERS, GRADE BEAMS, RETAINING WALLS, EXTERIOR PADS, GRADE WALLS, PITS, BASEMENT WALLS = 4500 PSI
MUD MATS = 1500 PSI
INTERIOR SLAB ON GRADE AND ELEVATED FLOOR SLABS = 4000 PSI
MIX DESIGN REQUIREMENTS:
- PORTLAND CEMENT, ASTM C150 TYPE 1
- 3/4" MAXIMUM SIZE AGGREGATE
- FINE AND COARSE AGGREGATE PER ASTM C33
- POTABLE WATER
- AIR ENTRAINMENT 4% TO 6%, ASTM C260 (EXTERIOR AND FOUNDATION CONCRETE ONLY)
- MAX WATER / CEMENT RATIO = 0.45
- 5" SLUMP +/- 1" (BEFORE ADDITION OF PLASTICIZER OR WATER REDUCING ADMIXTURE)
- CRYSTALLINE WATERPROOFING ADMIXTURE (EXTERIOR AND FOUNDATION CONCRETE ONLY)
- WATER REDUCING ADMIXTURES (ASTM C494) AND FLY ASH MAY BE ADDED AT CONTRACTOR'S OPTION
- ADMIXTURES CONTAINING CHLORIDE ARE NOT PERMITTED
- PROVIDE HISTORIC DATA FOR PROPOSED MIX DESIGN AS NOTED IN ACI 318
3. REINFORCING SHALL BE DEFORMED BARS CONFORMING TO ASTM A615 AND SHALL HAVE A MINIMUM YIELD STRENGTH OF 60 KSI.
4. ALL WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185 GRADE 80 (Fy=80 KSI)
5. CONCRETE EXPOSED TO WEATHER OR FREEZING SHALL BE AIR-ENTRAINED. ANY CONCRETE CAST DURING COLD WEATHER SHALL BE
CONSIDERED AS CONCRETE EXPOSED TO WEATHER AND FREEZING.
6. UNLESS OTHERWISE SHOWN, PROVIDE FOLLOWING COVER FOR REINFORCING STEEL:
CONCRETE CAST AGAINST, PERMANENTLY EXPOSED TO EARTH 3"
CONCRETE EXPOSED TO EARTH OR WEATHER:
#6 TO #11 BARS 2"
#5 BAR AND SMALLER 1 1/2"
CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND 1 1/2"
7. PROVIDE SMOOTH FORMED FINISH ON EXPOSED CONCRETE U.N.O. ON ARCHITECTURAL DRAWINGS. ALL EXTERIOR SLABS
SHALL HAVE A BROOM FINISH U.N.O.
8. CONSULT WITH THE OWNER REPRESENTATIVE FOR APPROVAL OF EXCAVATIONS WHEN CONDITIONS SUCH AS BUT NOT LIMITED TO , POOR SOIL, WATER, OBSTRUCTIONS, PIPING, ADJACENT SEWERS, AND EXISTING FOOTINGS
ARE ENCOUNTERED.
9. BEFORE PLACING CONCRETE, REFER TO OTHER TRADE DRAWINGS AND COORDINATE THE LOCATION AND SIZE OF ITEMS SUCH AS, BUT NOT LIMITED TO OPENINGS, PIPING, CONDUITS, DRAINS, AND EMBEDDED ITEMS.
10. PLACE ADDITIONAL BARS (2-#5 MINIMUM) AROUND OPENINGS LARGER THAN 1 FOOT SQUARE (OR DIAMETER).
EXTEND BARS A MINIMUM OF 24 INCHES BEYOND OPENING U.N.O.
11. PROVIDE VERTICAL DOWELS FROM FOOTINGS TO PIERS AND FROM WALL FOUNDATIONS TO WALLS OF SAME SIZE AND SPACING AS VERTICAL REINFORCING AND OFFSET SPLICE AS REQUIRED. PROVIDE CORNER BARS AT PIT WALLS, RETAINING WALLS, AND GRADE WALL TO MATCH HORIZONTAL BAR REINFORCING SIZE AND SPACING.
12. CHAMFER ALL EXPOSED CONCRETE CORNERS 3/4 INCH x 45 DEGREES, UNLESS NOTED OTHERWISE.
13. REINFORCING BAR DEVELOPMENT LENGTH, LD AND SPLICE LENGTH AS SHOWN IN TABLE UNLESS NOTED OTHERWISE.
CONCRETE GENERAL NOTES:
13. COMPRESSION DEVELOPMENT LENGTH SHALL BE 22 BAR DIAMETERS AND COMPRESSION LAP SPLICE LENGTH SHALL BE 30 BAR DIAMETERS.
14. ANCHOR BOLTS SHALL BE SET PLUMB AND VERTICAL. CONTRACTOR SHALL EMPLOY A LICENSED PROFESSIONAL SURVEYOR TO PROVIDE A DETAILED SURVEY OF BOTH THE ANCHOR BOLT LAYOUT AND THE FINAL ANCHOR BOLT LOCATIONS. CONTRACTOR RESPONSIBLE FOR SETTING ANCHOR BOLTS SHALL BE RESPONSIBLE FOR ALL COSTS RELATED TO REQUIRED MODIFICATIONS DUE TO MISPLACED ANCHOR BOLTS. STEEL CONTRACTOR IS RESPONSIBLE FOR SUPPLYING AND FOUNDATION CONTRACTOR FOR SETTING THE ANCHOR BOLTS.
15. FOUNDATION CONTRACTOR IS RESPONSIBLE FOR KEEPING FOUNDATION EXCAVATIONS DEWATERED AFTER EACH RAIN AND SNOW EVENT AND KEEPING THE ANCHOR BOLTS CLEAN AND PROTECTED, UNTIL HANDOVER TO THE STRUCTURAL STEEL CONTRACTOR. STRUCTURAL STEEL CONTRACTOR IS RESPONSIBLE FOR KEEPING THE FOUNDATION EXCAVATIONS DEWATERED AFTER EACH RAIN AND SNOW EVENT AND KEEPING
THE ANCHOR BOLTS CLEAN AND PROTECTED, UNTIL HANDOVER TO THE GENERAL CONTRACTOR.
16. ALL ELEVATIONS SHOWN ON DESIGN DRAWINGS ARE REFERENCED TO FINISH FIRST FLOOR ELEVATION 816'-0".
17. REFER TO SPECIFICATIONS FOR FLOOR FLATNESS AND LEVELNESS REQUIREMENTS.
18. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL POUR SEQUENCES AND CONSTRUCTION PROCEDURES.
19. CONTRACTOR IS RESPONSIBLE FOR THE DESIGN, INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL FORMWORK AND SHORING.
20.…