36C25018B0795-0005000.docx
DOCX document 26 KB Posted
- Attached to
- Construct Clinical and Admin Building 506-329 Federal contract opportunity
- Solicitation number
- 36C25018B0795
About this file
36C25018B0795 0005 36C25018B0795 0005.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0795-0004000.docx | DOCX document | |
| 36C25018B0795-0003000.docx | DOCX document | |
| 36C25018B0795-0003001.xlsx | XLSX spreadsheet | |
| 36C25018B0795-0002000.docx | DOCX document | |
| 36C25018B0795-0001002.pdf | ||
| 36C25018B0795-0001000.docx | DOCX document | |
| 36C25018B0795-0001001.pdf | ||
| 36C25018B0795-011.pdf | ||
| 36C25018B0795-019.pdf | ||
| 36C25018B0795-017.pdf | ||
| 36C25018B0795-021.pdf | ||
| 36C25018B0795-013.pdf | ||
| 36C25018B0795-009.docx | DOCX document | |
| 36C25018B0795-012.pdf | ||
| 36C25018B0795-007.docx | DOCX document | |
| 36C25018B0795-016.pdf | ||
| 36C25018B0795-010.pdf | ||
| 36C25018B0795-008.docx | DOCX document | |
| 36C25018B0795-020.pdf | ||
| 36C25018B0795-015.pdf | ||
| 36C25018B0795-018.pdf | ||
| 36C25018B0795-022.docx | DOCX document | |
| 36C25018B0795-014.pdf | ||
| 36C25018B0795-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25018B0795 0005
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 09-24-2018 506-18-3-5970-0039 506-329 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 24 Frank Lloyd Wright Dr.
Lobby M Suite M2200 Ann Arbor MI 48105 36C250 Department of Veterans Affair Network Contracting Office 10 24 Frank Lloyd Wright Dr.
Lobby M Suite N2200 Ann Arbor MI 48105 To all Offerors/Bidders
36C25018B0795 08-08-2018
X X X
The purpose of this Amendment is to issue Request for Information (RFI) and responses. Please see continuation page.
All Amendments shall be Acknowledged by offeror on this solicitation or maybe found non-responsive.
Bid opening location is unchanged.
Darrell T. Maxwell Contracting Officer
NCO1015L3-77169
RFI Responses RFI 007 References: Spec Section 25 10 10
| What does the Advanced Utility Metering System pertain to? We are not aware that there is such a metering system on this hospital campus. Is this to be a new system and where does it tie into? We can find no drawing references to this system and to where it goes to or what it is. |
| Response: For this project all you need to know is as follows: |
| Provide advanced meters as already called for in the drawings and specifications. These meters will have to be tied into the VA network. i.e. Tie your meters into a local data port. You are to work with the COR such that VA OIT assigned that port to the proper VLAN etc. Your meters will be required to communicate on BacNet |
This will be the extend of this projects requirement for the advanced metering system.
Once your meters are on our network, we route all of the data to an existing server. VA will then reconfigure our dashboards etc. to accept the new meters and begin to present and record the data.
RFI 008 References: None
On sheet SC110 on Colum line 7 the drawings do not show a footing below the grade beam. Detail 4/SC300 also doesn’t show a footing below the grade beam. Are the drawing correct with no footing below the grade beam wall?
Response: There is no drawing sheet SC110, we believe the question references SC-100 and SC-300. The drawings are correct, no footing is required below the grade wall on column line 7.
End of Amendment 0005