36C25018B0795-013.pdf
PDF 9 MB Posted
- Attached to
- Construct Clinical and Admin Building 506-329 Federal contract opportunity
- Solicitation number
- 36C25018B0795
About this file
36C25018B0795 506-329 VA Ann Arbor Admin Bldg BID DWGS REVISED_Part3.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0795-0005000.docx | DOCX document | |
| 36C25018B0795-0004000.docx | DOCX document | |
| 36C25018B0795-0003001.xlsx | XLSX spreadsheet | |
| 36C25018B0795-0003000.docx | DOCX document | |
| 36C25018B0795-0002000.docx | DOCX document | |
| 36C25018B0795-0001001.pdf | ||
| 36C25018B0795-0001000.docx | DOCX document | |
| 36C25018B0795-0001002.pdf | ||
| 36C25018B0795-015.pdf | ||
| 36C25018B0795-018.pdf | ||
| 36C25018B0795-022.docx | DOCX document | |
| 36C25018B0795-014.pdf | ||
| 36C25018B0795-010.pdf | ||
| 36C25018B0795-008.docx | DOCX document | |
| 36C25018B0795-020.pdf | ||
| 36C25018B0795-011.pdf | ||
| 36C25018B0795-019.pdf | ||
| 36C25018B0795-017.pdf | ||
| 36C25018B0795-021.pdf | ||
| 36C25018B0795-009.docx | DOCX document | |
| 36C25018B0795-012.pdf | ||
| 36C25018B0795-007.docx | DOCX document | |
| 36C25018B0795-016.pdf | ||
| 36C25018B0795-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLUMN SCHEDULE
LOCATION SIZE BOTTOM BASE
PLATE ELEVATION
REMARKSBASE PLATE
DETAIL
1,C
1,D
2,A
2,E
2,H
2.8,G
2.8,J
3,A
3,C
3,D
3,E
4,D
4,E
4,H
4.2,J
4.8,K
5,A
5,C
5.4,K
6,C
6,D
6,F
6,K
7,A
7,B
W12x79
W12x79
W12x79
W12x79
W12x79
W12x79
W12x79
W12x79
W12x79
W12x53
W12x53
W12x53
W12x53
W12x40
W12x40
W12x40
W12x40
W12x40
W12x40
HSS4x4x1/4
HSS4x4x1/4
HSS4x4x1/4
W12x65
W12x65
W12x65
815'-2"
815'-2"
815'-2"
815'-2"
815'-6"
815'-2"
815'-2"
815'-6"
815'-2"
815'-2"
815'-2"
815'-6"
815'-2"
815'-2"
813'-2"
813'-2"
815'-2"
813'-2"
800'-2"
800'-2"
800'-2"
815'-6"
815'-6"
815'-6"
815'-6"
TYPE 'B'
TYPE 'B'
TYPE 'B'
TYPE 'B'
TYPE 'B'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'B'
TYPE 'B'
TYPE 'B'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'A'
TYPE 'C'
TYPE 'C'
TYPE 'C'
NOTE: SEE ROOF FRAMING PLAN ON DRAWING SS-140 FOR TOP OF STEEL ELEVATIONS.
6"
1/4
COL
C O
L
1 1/2" TYP
/2
T Y
P
TYPE 'C'
1/2" PL.
1 1/2" 4"
1 1/2"
/2
/2
/2
/2
C S
P L
IC
E L
(2) 3/8" PLATE
(1 EA SIDE OF WEB)
COLUMN REFER
TO PLAN & SCHED
2" 2" 1 1/4"
5 1/2"
1 1/4"
/2
/2
/2
/2
C S
P L
IC
E L
(2) SPLICE PLATE
(1 EA FLANGE) SPLICE
PLATE THICKNESS SHALL
MATCH FLANGE
THICKNESS
COLUMN REFER
TO PLAN & SCHED
8"
TYPICAL COLUMN SPLICE NOTES:
1. USE OF COLUMN SPLICE IS AT CONTRACTORS OPTION. CONTRACTOR SHALL SUBMIT PROPOSED
LOCATION(S) AND ELEVATION OF SPLICE TO ENGINEER PRIOR TO DETAILING.
2. ALL BOLTS SHOWN ARE 3/4"Ø A325, SLIP CRITICAL W/ CLASS "A" FAYING SURFACE.
3. NO OTHER CONNECTIONS OR ATTACHMENTS ARE PERMITTED TO BE MADE TO ANY SPLICE PLATE.
4. A 1/16" MAXIMUM GAP IS PERMITTED BETWEEN THE UPPER AND LOWER COLUMN SECTIONS AT
THE SPLICE. COLUMN ENDS SHALL BE MILLED TO BEAR AT SPLICE LOCATION.
4" 3" 3" 4"
2"x2"x1/4" WASHER
1 1/4"Ø HOLE
3/4"Ø ANCHOR ROD
5/16
TYP
W12 COLUMN
7" 7"
-2" GROUT PAD BELOW BASE PLATE
-PROVIDE 1/8" SEAL WELD BETWEEN
COLUMN & B.P. WHERE NO WELD IS SHOWN
5/16
TYP
TYPE A
4" 3" 3" 4"
3"x3"x3/8" WASHER
1 3/4"Ø HOLE
1"Ø ANCHOR ROD
5/16
TYP
W12 COLUMN
7" 7"
3/16
TYP
-2" GROUT PAD BELOW BASE PLATE
-PROVIDE 1/8" SEAL WELD BETWEEN
COLUMN & B.P. WHERE NO WELD IS SHOWN
5/16
TYP
3/16
TYP
TYPE B
1" PL. 1 1/4" PL.
T
Y P
E B
T
Y P
E A
C
G R
O U
T
B A
S E
P L A
T E
T H
IC
K
N E
S S
PLATE WASHER
3"x3"x1/2" TYP
BASE PLATE TYPE A & ANCHOR BOLT DETAIL
NO SCALE
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
S
S
S O
E .r v t
/9
/2
:5
:1
P
M
Scale: As indicated
SS600
COLUMN SCHEDULE
GV
506-329CLINICAL & ADMINISTRATIVE
BUILDING
JK04/15/2016
28 148
SCALE: 1 1/2" = 1'-0"
COLUMN SPLICE SECTION
SCALE: 1 1/2" = 1'-0"
COLUMN BASE PLATE DETAILS
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
8.
A.
B.
COVER AND PROTECT FURNISHINGS AND
EQUIPMENT THAT HAVE NOT BEEN
REMOVED.
DO NOT BLOCK ANY EXITS DURING
CONSTRUCTION OPERATIONS.
CONDUCT DEMOLITION OPERATIONS TO
PREVENT INJURY TO PEOPLE AND DAMAGE TO
ADJACENT BUILDING AREAS. ENSURE SAFE
PASSAGE OF PEOPLE AROUND SELECTIVE
DEMOLITION AREA.
10.
EXISTING CONSTRUCTION MAY CONTAIN ASBESTOS
CONTAMINATED PRODUCTS. MATERIALS THOUGHT
TO CONTAIN ASBESTOS MUST BE INSPECTED BY
AN EPA CERTIFIED INSPECTOR CAPABLE OF
SAMPLING FOR THE EXISTENCE OF ASBESTOS.
WORK SHALL BE DONE IN ACCORDANCE WITH THE
MOST CURRENT OSHA REGULATIONS AND
DISPOSED OF IN ACCORDANCE WITH CURRENT
EPA REGULATIONS.
11.
EXISTING CONSTRUCTION MAY CONTAIN LEAD
CONTAMINATED PRODUCTS. MATERIALS
THOUGHT TO CONTAIN LEAD MUST BE
INSPECTED BY AN EPA CERTIFIED INSPECTOR
CAPABLE OF SAMPLING FOR THE EXISTENCE OF
LEAD. WORK SHALL BE DONE IN ACCORDANCE
WITH THE MOST CURRENT OSHA/EPA
REGULATIONS AND DISPOSED OF
IN ACCORDANCE WITH CURRENT EPA
REGULATIONS.
GENERAL DEMOLITION NOTES
GENERAL DEMOLITION NOTES
PROVIDE DEMOLITION WORK SHOWN ON THE
DRAWINGS AND RELATED AND INCIDENTAL
DEMOLITION WORK REQUIRED TO COMPLETE
NEW CONSTRUCTION WORK.
REMOVE ENTIRE WALL ASSEMBLY INDICATED
TO BE DEMOLISHED, INCLUDING CONCEALED
ELEMENTS WITHIN PARTITIONS AND ABOVE-
CEILING CONSTRUCTION (UNO)
FIELD VERIFY EXISTING CONDITIONS, PRIOR
TO THE START OF DEMOLITION OPERATIONS.
BRING ANY DISCREPANCIES WHICH MAY
SIGNIFICANTLY AFFECT DEMOLITION OR NEW
CONSTRUCTION WORK TO THE ATTENTION OF
THE ARCHITECT FOR REVIEW.
PROTECT EXISTING CONSTRUCTION TO
REMAIN FROM DAMAGE DURING DEMOLITION
AND/OR NEW CONSTRUCTION OPERATIONS.
CONDUCT DEMOLITION OPERATIONS SO AS
TO MINIMIZE THE DEVELOPMENT AND SPREAD
OF DUST.
REMOVE DEMOLITION MATERIALS FROM SITE
PROMPTLY AND DISPOSE OF LEGALLY OFF
SITE.
MAINTAIN MEANS OF EGRESS, AND KEEP
FULLY SEPARATE FROM CONSTRUCTION
AREA, AT ALL TIMES.
COORDINATE TIMING AND HOURS OF DEMOLITION
OPERATIONS WITH OWNER'S SCHEDULE.
1.
2.
3.
4.
5.
9.
6.
7.
EXISTING TO REMAIN
LEGEND
REFER TO PHASING DRAWINGS FOR
ADDITIONAL GENERAL INFORMATION ON
THE SEQUENCE OF DEMOLITION WORK
TO BE COMPLETED.
EXTENTS OF DEMOLITION. COORDINATE EXTENT WITH
MECHANICAL, ELECTRICAL AND STRUCTURAL DRAWINGS
REFER TO HAZARDOUS ABATEMENT CONSULTANTS,
MECHANICAL , ELECTRICAL, PLUMBING FOR ADDITIONAL
DEMOLITION NOTES
THE ELECTRICAL CONTRACTOR SHALL
REMOVE AND STORE THE EXISTING (67) 2’X4’
AND (6) 2’X2’ LED LUMINAIRES FOR REUSE
DURING THE NEW CONSTRUCTION. THESE
LUMINAIRES SHALL BE INDIVIDUALLY
WRAPPED, BY THE ELECTRICAL
CONTRACTOR, FOR PROTECTION AGAINST
DAMAGE. ANY EXISTING DAMAGE TO THE
FIXTURES SHALL BE DOCUMENTED BY THE
ELECTRICAL CONTRACTOR AND THE VA COR
FOR THE PROJECT SHALL BE PROVIDED A
DETAILED SUMMARY AND AN OPPORTUNITY
TO REVIEW THE DAMAGE. ANY COSTS
ASSOCIATED WITH THE REPAIR OF DAMAGE
TO AN EXISTING LUMINAIRE THAT IS
DOCUMENTED AND REPORTED AS
INDICATED ABOVE SHALL BE THE
RESPONSIBILITY OF THE VA. ANY COSTS
ASSOCIATED WITH THE REPAIR OF DAMAGE
TO AN EXISTING LUMINAIRE THAT IS NOT
DOCUMENTED AND REPORTED AS
INDICATED ABOVE SHALL BE THE
RESPONSIBILITY OF THE ELECTRICAL
CONTRACTOR.
12.
COMMUNICATIONS CONTRACT SHALL DEMO
ALL ELECTRONIC COMMUNICATIONS
EQUIPMENT AND RACKS/CABINETS FROM ALL
IT ROOMS AS WELL AS WIRELESS ACCESS
POINTS AND CAMERAS FROM IN THE CEILING
AND ON THE OUTSIDE OF THE BUILDING AND
RETURN THEM TO THE VA – IT DEPARTMENT.
14.
DEMO ENTIRE BUILDING WITHIN THE EXTENT OF
DEMOLITION BOUNDARIES. REMOVE
UNDERGROUND STRUCTURE AND ELEMENTS
INCLUDING (BUT NOT LIMITED TO) FOOTING,
BASEMENT WALLS AND STRUCTURES, AND
UTILITY PLUMBING.
REFER TO SITE DEMOLITION DRAWING CS100 FOR
ADDITIONAL INFORMATION.
REFER TO FOLLOWING SPECIFICATION SECTIONS
FOR ADDITIONAL INFORMATION:
01 35 26 SAFETY REGULATIONS
01 74 19 CONSTRUCTION WASTE
MANAGEMENT
02 41 00 DEMOLITION
02 82 13.41 ASBESTOS ABATEMENT FOR
TOTAL DEMOLITION PROJECT
13.
15.
16.
5'-0"
EXTENT OF DEMOLITION
EXTENT OF DEMOLITION
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :1
P
M
Scale: As indicated
AD100
DEMOLITION PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
29 148
SCALE: 3/32" = 1'-0"AD100
F1 DEMOLITION PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
V A
R
IE
S
4'-4"
M.O.
3'-4"
7'-4"
M.O.
6'-4"
GENERAL NOTES:
1.
ALL WALLS EXTEND TO UNDERSIDE OF FLOOR/ROOF DECK
ABOVE UNLESS NOTED OTHERWISE.( WALLS EXTEND TO
BOTTOM OF TRUSS).
2.
ALLOW FOR 1/2" DEFLECTION WHERE WALL MEETS STRUCTURE
ABOVE. PROVIDE COMPRESSIBLE FILLER BETWEEN TOP OF
WALL AND STRUCTURE AT STANDARD WALL CONSTRUCTION AND
FIRESAFING AT RATED WALL CONSTRUCTION.
3.
4.
5.
6.
7.
9.
ALL DOORS AND EXTERIOR DOORS/STOOPS ARE DIMENSIONED
AS SHOWN BELOW UNLESS NOTED OR DIMENSIONED
OTHERWISE.
8.
EQUIPMENT ABBREVIATIONS:
BRACE INTERIOR PARTITIONS PER ANSI CRITERIA.
COORDINATE OPENINGS IN WALLS w/ OTHER TRADES AND SEAL.
SEAL ALL PENETRATIONS THROUGH WALL TYPICAL.
10.
11.
FLOOR ASSEMBLY TO BE SMOKE BARRIER (NFPA -101 8.6.1)
12.
PROVIDE BULLNOSE CORNER BLOCKS @ ALL EXPOSED OUTSIDE
CORNERS OF CMU WALLS AND PARTITIONS UNLESS NOTED
OTHERWISE - TYPICAL.
13.
THESE DRAWINGS SHOULD BE USED TO DETERMINE THE
DESIGN INTENT. THE CONTRACTOR SHALL FIELD VERIFY ALL
WORK AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF
ANY DISCREPANCIES IN THE DOCUMENTS BEFORE
PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES.
PROVIDE DRYWALL CONTROL JOINTS AT LOCATIONS INDICATED
ON DRAWINGS OR AT A MAXIMUM SPACING OF 30'-0" IN ANY
DIRECTION AND AT ALL JAMB STUDS AT ALL OPENINGS. - TYPICAL
14.
G.C. TO PROVIDE ALL BLOCKING IN WALLS FOR ALL BUILT-IN
CABINETS, COUNTERTOP SUPPORTS, GRAB BARS, ETC. PROVIDE
PLYWOOD BACKING FOR WALL MOUNTED ELECTRICAL, IT AND
TELEPHONE EQUIPMENT AS REQUIRED.
IN LOCATIONS WHERE DOORS ARE IN WALL ASSEMBLIES, HAVE
FURRED OUT DRYWALL WRAP BACK TO DOOR FRAME.
ALL WOOD BLOCKING AND BACKING SHALL BE FIRE RETARDANT
TREATED.
FEC - FIRE EXTINGUISHER CABINET & EXTINGUISHER
REF - REFRIGERATOR
EWC - ELECTRIC WATER COOLER
DO NOT SCALE DRAWINGS. WORK FROM DIMENSIONS SHOWN. IF
ADDITIONAL INFORMATION IS NEEDED, OR WHERE DRAWINGS OR
DRAWING SCALE APPEARS TO CONFLICT WITH INDICATED
DIMENSIONS, BRING TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
NEW WALL CONSTRUCTION
PLAN LEGEND
DOOR TAG - REFER TO AE600 FOR
DOOR SCHEDULE AND DETAILS
ROOM
NAME
12346
NEW ROOM NAME AND NUMBERS
WALL TYPE INDICATOR
INTERIOR WALLS ARE TYPE A U.N.O
RE: AE540 FOR WALL TYPE DETAILS
FIRE EXTINGUISHER CABINET
CG
CORNER GUARD
REFER TO D8/AE541 FOR DETAIL
WPX
WALL PROTECTION
1. COORDINATE SCHEDULE OF OVERALL CONSTRUCTION AND DAY -
TO- DAY CONSTRUCTION OPERATIONS WITH OWNER'S SCHEDULE
REQUIREMENTS.
2. DIMENSIONS ARE TO FINISH FACE OF WALL OR CASEWORK
UNLESS NOTED OTHERWISE (UNO).
3. FIELD VERIFY PROJECT CONDITIONS PRIOR TO THE START OF, AND
AS NEEDED DURING THE COURSE OF CONSTRUCTION. BRING
DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT
CONSTRUCTION TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
GENERAL CONSTRUCTION NOTES
FEC
EE
100 SF ROOM AREA
W.P.
WORK POINT
FD FLOOR DRAIN
RE: PLUMBING
A B C D
HE
4.2
5.4
JC4
AE300
F4
AE300
F8
AE402
F3
AE311
2.8
4.8
G
AE460 F1
856 SF
MECHANICAL
124 SF
IT
STAIRS
S-1 ELEVATOR
E-1
108 SF
ELEV.
MAC.
RM.
153 SF
ELECTRICAL
362 SF
HAC
CORRIDOR
CORRIDOR
CORRIDOR
MECHANICAL SHAFT
MECHANICAL
LOUVER
REFER TO
MECHANICAL FOR
ADDITIONAL
INFORMATION
STEEL LADDER
(PAINT)
4'-10"
MECHANICAL
SHAFT ABOVE
MECHANICAL
AREAWAY
FEC
MECHANICAL
EQUIPMENT
RE: MECHANICAL
ELEVATOR
EQUIPMENT
A
S1-B
13'-8" 17'-0" 32'-8" 23'-6"
4'-10"
7'-9"
HOUSEKEEPING
PAD
RE: STRUCTURAL
251 SF
SPRINKLERS
AE200
F1
AE200
F5
AE201
F1
AE201
F6
F3
AE402
F1
AE400
/4
/4
22'-4"
F
F
011B
5'-9"
K
D
D
D
5/8" GYPSUM BOARD
OVER 2 1/2" METAL
STUDS WITH 2"
MINERAL WOOL
INSULATION
TYPICAL ALONG
NORTH WALL
FD
STORM DRAIN CONNECT
TO SUMP PUMP
RE: PLUMBING
GYPSUM BOARD
ON 2 1/2" METAL
STUDS
42" GATE
(IBC 1023.8)
33'-9 1/4" 14'-5 3/4"
/4
/4
18'-4 1/4"
/2
98.00°
D6
AE511
B1
AE311
1'-6"
1'-6"
17'-1"
COLUMN PIERS
RE: STRUCTURAL
FOOTING
RE: STRUCTURAL
17'-8"
2'-2" 4'-10" 9'-0"
A
A
A
A
A
E
E E
HOUSEKEEPING
PAD
RE: STRUCTURAL
FD
FD
FD
2'-0"
1'-4"
1'-6"
1'-6"
D2
AE511
E1
E1
/2
1'-3"
1'-3"
3"
H O
L D
8.00°
E1
O F
F O
F C
O L L
IN
E
/8
1'-9"
W.P.
A
C
C
C
1'-0"
1'-6"
3 1/8"
A
HOUSEKEEPING PAD
COORDINATE SIZE
AND LOCATION WITH
TRANSFORMER.
RE: STRUCTURAL
FD
CONCRETE CURB
6"
6"
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :2
P
M
Scale: As indicated
AE100
BASEMENT FLOOR PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
30 148
N
SCALE: 3/16" = 1'-0"AE200
F2 BASEMENT FLOOR PLAN
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
104 SF
HR
RECRUITMENT
100 SF
HR
PROCESS
BENEFITS
110 SF
EXAM
96 SF
HR
BENEFITS
SPECIALIST
98 SF
HR
SPECIALIST
OFFICER
2011 SF
OPEN
OFFICE
STAIRS
S-1
116 SF
VESTIBULE
44 SF
ELECTRICAL
45 SF
IT
47 SF
HAC
99 SF
HR
BENEFIT
RA/FMLA
80 SF
P.I.V
151 SF
HR
CHIEF
OFFICER
123 SF
ASSIST
HR
CHIEF
OFFICER
73 SF
RECORDS
STORAGE
112 SF
OPEN
OFFICE
108 SF
EXAM
177 SF
WOMEN'S
TOILET
STAIRS
S-2
97 SF
HR
SPECIALIST
OFFICER
78 SF
P.I.V.
171 SF
MEN'S
TOILET
43 SF
TLT
105 SF
HR
SPECIALIST
OFFICER
F2
AE310
ELEVATOR
E-1
AE460
270 SF
ELEVATOR
LOBBY
A B C D
2 2
HE
4.2
5.4
J
28 SF
COFFEE
C4
AE300
F4
AE300
F6
AE402
159 SF
CORRIDOR
36 SF
VESTIBULE
1024 SF
OPEN
OFFICE
213 SF
CORRIDOR
168 SF
CORRIDOR
13'-8" 17'-0" 32'-8" 23'-6" 15'-10"
F1
AE310
C0
AE160
E4
AE160
B3
AE160
MECHANICAL SHAFT
CG CG CG CG
CG
CG
CG CG
F6
AE513
CG
1'-6"
E1
AE400
FEC
LINE OF CANOPY
ABOVE
MECHANICAL AREAWAY
BELOW
F1
AE513
F1
AE401
CG
F4
AE310
F3
AE311
100 SF
WAITING
COLUMN WRAPPED IN
METAL PANEL
2.8
4.8
G
CG
4'-10"
7'-9"
B
S1-1
S2-1A
S -1
B
122123 1
A
WORKING
POINT ORIGIN
1'-0" 5'-0" 2'-0" 5'-0" 1'-0"
1'-6"
M .O
M .O
M.O.
3'-4" 3'-4"
M.O.
3'-4" 5'-10"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 7'-2"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 1'-8" 5'-7"
FEC
F8
AE510
D1
CG
PROVIDE
BLOCKING FOR
ACRYLIC
ARTWORK BY VA.
COORDINATE
LOCATIONS WITH
OWNER.
CG
AE460
D8
AE460F2
F3
1'-6" 1'-10"
DD
ACCESS GATE
AE460
C2
F6
AE511
F2
AE310
F2
AE310
AE200
F1
AE200
F5
AE201
F1
AE201
F6
99 SF
PHYS /
PROV
13899 SF
HR
PROCESS
85 SF
TREATMENT
AREA
73 SF
OWC
AE460
E6
AE160
F6
AE310
F6
AE510
10'-8" 10'-7" 10'-5" 7'-5" 12'-5" 12'-4 3/4" 9'-4 1/2"
/2
11'-6 1/2" 11'-11 3/4" 12'-9 1/2"
/2
5'-11 1/2" 6'-2 1/2" 6'-1"
13'-8" 17'-0" 32'-8" 23'-6" 15'-10" 9'-11"
3'-8"
83 SF
WAITING
5'-6"
D1
101A
141A
F
/2
AE460
F0
AE460A1
1'-6"
1'-0" 5'-0" 2'-0" 5'-0" 1'-0"
4'-10"
9'-3"
B6
AE511
B8
AE511
K
1'-0"
14'-4"
F8
AE511
F2
AE511
8'-8 3/4"
A
A
A
A
A
A A
A
A
A
A
A
A
A
A C
A
AF
F
CG
CG
CG
C
A
A A
A
AA
C C
D
/4
REMOVABLE METAL GUARDRAIL
SS
BUILT IN
STORAGE
CABINETS
AE200D3
11'-3 1/4"
F1
AE510
SIM
/2
A
F
/4
E6
AE311
1'-2" 3'-4"
F8
AE511
SIM
F1
AE510
SIM
F8
AE511
SIM
10'-7 1/2"
/8
D3
AE513
ALIGN
3'-6"
E3
E3
D1
CG
CG
F1
AE511
3"
17'-5"
A
A
A
A
A
ALIGN
E2
L K
L
K
K L
L
K
F
F
TYPICAL
K
FD FD
CG
42" HIGH METAL GATE
(IBC 1023.8)
A
A
CG
CG
C3
AE512
CG
CG (4)
CORNERS
TYP
CG (4)
CORNERS
TYP
6'-9 1/2"
F1
AE513
100B
8.00°
W.P.
/8
F8
AE402
A
A
A
D
K
CG
CG CG CG
1'-6"
COORDINATE FINAL CHASE
SIZE WITH FIRE PROTECTION
C1
AE512
FD
F1
AE510
SIM
1'-6"
1'-0"
4'-0" 2'-0" 6'-0" 2'-0" 6'-0" 1'-0" 1'-0"
6'-0" 2'-0"
6'-0"
2'-0"
6'-0"
2'-6" 6'-5"
1'-4"
1'-6"
1'-2 3/8"
C
D3
AE510
D6
AE513
V A
R
IE
S
4'-4"
M.O.
3'-4"
7'-4"
M.O.
6'-4"
GENERAL NOTES:
1.
ALL WALLS EXTEND TO UNDERSIDE OF FLOOR/ROOF DECK
ABOVE UNLESS NOTED OTHERWISE.( WALLS EXTEND TO
BOTTOM OF TRUSS).
2.
ALLOW FOR 1/2" DEFLECTION WHERE WALL MEETS STRUCTURE
ABOVE. PROVIDE COMPRESSIBLE FILLER BETWEEN TOP OF
WALL AND STRUCTURE AT STANDARD WALL CONSTRUCTION AND
FIRESAFING AT RATED WALL CONSTRUCTION.
3.
4.
5.
6.
7.
9.
ALL DOORS AND EXTERIOR DOORS/STOOPS ARE DIMENSIONED
AS SHOWN BELOW UNLESS NOTED OR DIMENSIONED
OTHERWISE.
8.
EQUIPMENT ABBREVIATIONS:
BRACE INTERIOR PARTITIONS PER ANSI CRITERIA.
COORDINATE OPENINGS IN WALLS w/ OTHER TRADES AND SEAL.
SEAL ALL PENETRATIONS THROUGH WALL TYPICAL.
10.
11.
FLOOR ASSEMBLY TO BE SMOKE BARRIER (NFPA -101 8.6.1)
12.
PROVIDE BULLNOSE CORNER BLOCKS @ ALL EXPOSED OUTSIDE
CORNERS OF CMU WALLS AND PARTITIONS UNLESS NOTED
OTHERWISE - TYPICAL.
13.
THESE DRAWINGS SHOULD BE USED TO DETERMINE THE
DESIGN INTENT. THE CONTRACTOR SHALL FIELD VERIFY ALL
WORK AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF
ANY DISCREPANCIES IN THE DOCUMENTS BEFORE
PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES.
PROVIDE DRYWALL CONTROL JOINTS AT LOCATIONS INDICATED
ON DRAWINGS OR AT A MAXIMUM SPACING OF 30'-0" IN ANY
DIRECTION AND AT ALL JAMB STUDS AT ALL OPENINGS. - TYPICAL
14.
G.C. TO PROVIDE ALL BLOCKING IN WALLS FOR ALL BUILT-IN
CABINETS, COUNTERTOP SUPPORTS, GRAB BARS, ETC. PROVIDE
PLYWOOD BACKING FOR WALL MOUNTED ELECTRICAL, IT AND
TELEPHONE EQUIPMENT AS REQUIRED.
IN LOCATIONS WHERE DOORS ARE IN WALL ASSEMBLIES, HAVE
FURRED OUT DRYWALL WRAP BACK TO DOOR FRAME.
ALL WOOD BLOCKING AND BACKING SHALL BE FIRE RETARDANT
TREATED.
FEC - FIRE EXTINGUISHER CABINET & EXTINGUISHER
REF - REFRIGERATOR
EWC - ELECTRIC WATER COOLER
DO NOT SCALE DRAWINGS. WORK FROM DIMENSIONS SHOWN. IF
ADDITIONAL INFORMATION IS NEEDED, OR WHERE DRAWINGS OR
DRAWING SCALE APPEARS TO CONFLICT WITH INDICATED
DIMENSIONS, BRING TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
NEW WALL CONSTRUCTION
PLAN LEGEND
DOOR TAG - REFER TO AE600 FOR
DOOR SCHEDULE AND DETAILS
ROOM
NAME
12346
NEW ROOM NAME AND NUMBERS
WALL TYPE INDICATOR
INTERIOR WALLS ARE TYPE A U.N.O
RE: AE540 FOR WALL TYPE DETAILS
FIRE EXTINGUISHER CABINET
CG
CORNER GUARD
REFER TO D8/AE541 FOR DETAIL
WPX
WALL PROTECTION
1. COORDINATE SCHEDULE OF OVERALL CONSTRUCTION AND DAY -
TO- DAY CONSTRUCTION OPERATIONS WITH OWNER'S SCHEDULE
REQUIREMENTS.
2. DIMENSIONS ARE TO FINISH FACE OF WALL OR CASEWORK
UNLESS NOTED OTHERWISE (UNO).
3. FIELD VERIFY PROJECT CONDITIONS PRIOR TO THE START OF, AND
AS NEEDED DURING THE COURSE OF CONSTRUCTION. BRING
DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT
CONSTRUCTION TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
GENERAL CONSTRUCTION NOTES
FEC
EE
100 SF ROOM AREA
W.P.
WORK POINT
FD FLOOR DRAIN
RE: PLUMBING
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :2
P
M
Scale: As indicated
AE110
FIRST FLOOR PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
31 148
SCALE: 3/16" = 1'-0"AE110
F2 FIRST FLOOR PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
151 SF
CFO
79 SF
INTERNAL
AUDITOR
134 SF
CHIEF
54 SF
UNISEX
RR
STAIRS
S-1
123 SF
AFO
45 SF
IT
47 SF
HAC
44 SF
ELECTRICAL
257 SF
ELEVATOR
LOBBY
ELEVATOR
E-1
107 SF
PAYROLL
SUPERVISOR
107 SF
MCA
PROGRAM
OFFICE
177 SF
WOMEN'S
TOILET
171 SF
MEN'S
TOILET
98 SF
ASSISTANT
CHIEF
112 SF
ACCOUNTING
SUPERVISOR
150 SF
BREAK
ROOM
197 SF
CONFERENCE
ROOM
F2
AE310
STAIRS
S-2
A B C D
2 2
HE
4.2
5.4
J
28 SF
COFFEE
C4
AE300
F4
AE300
36 SF
VESTIBULE
2099 SF
OPEN
OFFICE
137 SF
CORRIDOR
1058 SF
OPEN
OFFICE
444 SF
OPEN
OFFICE
339 SF
CORRIDOR
F1
AE310
F8
AE402
D4
AE160
C0
AE160
MECHANICAL SHAFT
CG (4)
CORNERS
TYP
CGCG
CGCG
F1
AE513
CG
CG CG CG
CG
CG
CG
CG
C1
AE400
FEC
FEC
394 SF
OPEN
OFFICE
F3
AE401
F4
AE310
2.8
4.8
G
CG
CG
B
A
S1-2
S2-2
219 2
6FEC
13'-8" 17'-0" 32'-8" 23'-6" 15'-10"
M .O
M .O
5'-10"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 7'-2"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 1'-8" 5'-7" 2'-6" 6'-5"
1'-4" 1'-2 3/8"
1'-6"
1'-0"
4'-0" 2'-0" 6'-0" 2'-0" 6'-0" 1'-0" 1'-0"
6'-0" 2'-0" 6'-0" 2'-0" 6'-0"
VERIFY
2'-11 1/4" 1'-0" 5'-0" 2'-0" 5'-0"
1'-0"
1'-6"
1'-6"
4'-10"
7'-9"
1'-6"
1'-0"
5'-0" 2'-0" 5'-0" 1'-0"
CG
PROVIDE
BLOCKING FOR
ACRYLIC
ARTWORK BY VA.
COORDINATE
LOCATIONS WITH
OWNER
CG
AE460D7
AE460
F3
F2
F2
AE310
F2
AE310
AE200
F1
AE200
F5
AE201
F1
AE201
F6
F6
AE310
F8
AE510
SIM
8'-5" 10'-9"
ALIGN
/2
11'-6 1/2"
5'-11 1/2" 6'-2 1/2"
F2
AE513
F
13'-8" 17'-0" 32'-8" 23'-6" 15'-10" 9'-11"
1'-6"
K
14'-4"
1'-0"
F6
AE511
SIM
A
A
A
AA
A A
A
A
A
A
A
A
A
A A
AA
AA A
A
A
A
A
A
A
A
A
F2
AE511
SIM
F1
AE513
F8
AE511
SIM
F6
AE510
SIM
CG
CG
CG
CG
CG CG
CG
CG
1'-6"
1'-10" 3'-4" 3'-4" 3'-4"
F1
AE510
6'-1"
E6
AE311
F2
AE512
F1
AE510
SIM
F8
AE511
SIM F8
AE511
SIM
7'-7"
1'-2"
/2
E3 D
D
A
ROOF
SCUPPERSLOPE 1/4" PER
FOOT LOW
POINT
HIGH POINT
F
7 1/2"
12'-11 1/4"
ALIGN
/2 " 7
/4
/2 "2'-10 1/2"
8.00°
F
K
K
A
A
G
F
FD FD
L
L
CG (4)
CORNERS
TYP
3'-6"
8.00°
W.P.
/8
E4
AE160
8'-10 1/4"
AE460
C1
CG
CG CGCG
/2
FD
F1
AE510
SIM
E8
AE311
SIM
/8
" 1
F3
AE510
SIM
D8
AE510
OVERFLOW
SCUPPER
V A
R
IE
S
4'-4"
M.O.
3'-4"
7'-4"
M.O.
6'-4"
GENERAL NOTES:
1.
ALL WALLS EXTEND TO UNDERSIDE OF FLOOR/ROOF DECK
ABOVE UNLESS NOTED OTHERWISE.( WALLS EXTEND TO
BOTTOM OF TRUSS).
2.
ALLOW FOR 1/2" DEFLECTION WHERE WALL MEETS STRUCTURE
ABOVE. PROVIDE COMPRESSIBLE FILLER BETWEEN TOP OF
WALL AND STRUCTURE AT STANDARD WALL CONSTRUCTION AND
FIRESAFING AT RATED WALL CONSTRUCTION.
3.
4.
5.
6.
7.
9.
ALL DOORS AND EXTERIOR DOORS/STOOPS ARE DIMENSIONED
AS SHOWN BELOW UNLESS NOTED OR DIMENSIONED
OTHERWISE.
8.
EQUIPMENT ABBREVIATIONS:
BRACE INTERIOR PARTITIONS PER ANSI CRITERIA.
COORDINATE OPENINGS IN WALLS w/ OTHER TRADES AND SEAL.
SEAL ALL PENETRATIONS THROUGH WALL TYPICAL.
10.
11.
FLOOR ASSEMBLY TO BE SMOKE BARRIER (NFPA -101 8.6.1)
12.
PROVIDE BULLNOSE CORNER BLOCKS @ ALL EXPOSED OUTSIDE
CORNERS OF CMU WALLS AND PARTITIONS UNLESS NOTED
OTHERWISE - TYPICAL.
13.
THESE DRAWINGS SHOULD BE USED TO DETERMINE THE
DESIGN INTENT. THE CONTRACTOR SHALL FIELD VERIFY ALL
WORK AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF
ANY DISCREPANCIES IN THE DOCUMENTS BEFORE
PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES.
PROVIDE DRYWALL CONTROL JOINTS AT LOCATIONS INDICATED
ON DRAWINGS OR AT A MAXIMUM SPACING OF 30'-0" IN ANY
DIRECTION AND AT ALL JAMB STUDS AT ALL OPENINGS. - TYPICAL
14.
G.C. TO PROVIDE ALL BLOCKING IN WALLS FOR ALL BUILT-IN
CABINETS, COUNTERTOP SUPPORTS, GRAB BARS, ETC. PROVIDE
PLYWOOD BACKING FOR WALL MOUNTED ELECTRICAL, IT AND
TELEPHONE EQUIPMENT AS REQUIRED.
IN LOCATIONS WHERE DOORS ARE IN WALL ASSEMBLIES, HAVE
FURRED OUT DRYWALL WRAP BACK TO DOOR FRAME.
ALL WOOD BLOCKING AND BACKING SHALL BE FIRE RETARDANT
TREATED.
FEC - FIRE EXTINGUISHER CABINET & EXTINGUISHER
REF - REFRIGERATOR
EWC - ELECTRIC WATER COOLER
DO NOT SCALE DRAWINGS. WORK FROM DIMENSIONS SHOWN. IF
ADDITIONAL INFORMATION IS NEEDED, OR WHERE DRAWINGS OR
DRAWING SCALE APPEARS TO CONFLICT WITH INDICATED
DIMENSIONS, BRING TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
NEW WALL CONSTRUCTION
PLAN LEGEND
DOOR TAG - REFER TO AE600 FOR
DOOR SCHEDULE AND DETAILS
ROOM
NAME
12346
NEW ROOM NAME AND NUMBERS
WALL TYPE INDICATOR
INTERIOR WALLS ARE TYPE A U.N.O
RE: AE540 FOR WALL TYPE DETAILS
FIRE EXTINGUISHER CABINET
CG
CORNER GUARD
REFER TO D8/AE541 FOR DETAIL
WPX
WALL PROTECTION
1. COORDINATE SCHEDULE OF OVERALL CONSTRUCTION AND DAY -
TO- DAY CONSTRUCTION OPERATIONS WITH OWNER'S SCHEDULE
REQUIREMENTS.
2. DIMENSIONS ARE TO FINISH FACE OF WALL OR CASEWORK
UNLESS NOTED OTHERWISE (UNO).
3. FIELD VERIFY PROJECT CONDITIONS PRIOR TO THE START OF, AND
AS NEEDED DURING THE COURSE OF CONSTRUCTION. BRING
DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT
CONSTRUCTION TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
GENERAL CONSTRUCTION NOTES
FEC
EE
100 SF ROOM AREA
W.P.
WORK POINT
FD FLOOR DRAIN
RE: PLUMBING
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :3
P
M
Scale: As indicated
AE120
SECOND FLOOR PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
32 148
SCALE: 3/16" = 1'-0"AE120
F2 SECOND FLOOR PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
STAIRS
S-1
107 SF
CODING
SUPERVISOR
OFFICE
107 SF
ADMINISTRATIVE
OFFICER
177 SF
WOMEN'S
TOILET
322 171 SF
MEN'S
TOILET
47 SF
HAC
45 SF
IT
44 SF
ELECTRICAL
197 SF
CONF.
ROOM
246 SF
ELEVATOR
LOBBY
96 SF
MED
RECORDS
SUPERVISOR
96 SF
NON-VA
CARE
SUPV
101 SF
RECORD
MANAGER
OFFICER
103 SF
SCANNING
SUPV
151 SF
CHIEF
MAS
OFFICER
123 SF
HBU
SUPRVISOR
STAIRS
S-2
ELEVATOR
E-1
98 SF
ASST
CHIEF
MAS
OFF
F2
AE310
A B C D
HE
4.2
5.4
J
28 SF
COFFEE
C4
AE300
F4
AE300
36 SF
VESTIBULE
2220 SF
OPEN
OFFICE
1053 SF
OPEN
OFFICE
453 SF
OPEN
OFFICE
137 SF
CORRIDOR
445 SF
OPEN
OFFICE
311 SF
CORRIDOR
F1
AE310
F8
AE402
C0
AE160
MECHANICAL SHAFT
CG
F1
AE513
CG
CG (4)
CORNERS
TYP
CG CG
CG CG CG
CG
CG
CG
CG
U P
CG
B1
AE400
FEC
F5
AE401
F4
AE310
2.8
4.8
G
S2-3
319 3
S1-3
B
A
FEC
FEC
13'-8" 17'-0" 32'-8" 23'-6" 15'-10"1'-6"
1'-0" 5'-0" 2'-0" 5'-0"
1'-0"
1'-6" 1'-6"
1'-0"
4'-0" 2'-0" 6'-0" 2'-0" 6'-0" 1'-0" 1'-0"
6'-0" 2'-0" 6'-0"
10"
1'-2" 6'-0"
VERIFY
2'-11 1/4"
M .O
M .O
1'-6"
1'-10"
M.O.
3'-4" 3'-4"
M.O.
3'-4" 5'-10"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 8'-0"
M.O.
3'-4" 7'-2"
M.O.
3'-4" 8'-0"
M.O.
3'-4"
4'-10"
7'-9"
1'-6"
1'-0" 5'-0" 2'-0" 5'-0" 1'-0"
PROVIDE
BLOCKING FOR
ACRYLIC
ARTWORK BY VA.
COORDINATE
LOCATIONS WITH
OWNER.
AE460
F3
F2
AE460
C1
1'-8" 5'-7" 2'-6" 6'-5"
1'-4" 1'-2 3/8"
F2
AE310
F2
AE310
CG
AE200
F1
AE200
F5
AE201
F1
AE201
F6
F6
AE310
F8
AE510
SIM
5'-11 1/2" 6'-2 1/2"
/2
10'-7 3/4" 11'-2 1/2" 10'-11" 10'-4 3/4" 10'-6"
13'-8" 17'-0" 32'-8" 23'-6" 15'-10"
F
F2
AE513
1'-6"
K
14'-4"
A
A
A
A
A A A A A
A A
A
A
A
AA
A
A
D
D D
F
F2
AE511
SIM
F6
AE510
SIM
F1
AE513
F8
AE511
SIM
F6
AE511
SIM
A
A
A
8 1/4"
12'-11 1/4"
11'-1 3/4"
6'-1"
F1
AE510
SIM
F3
AE510
SIM
F8
AE511
SIM F8
AE511
SIM
/2
7 1/2"
ALIGNFG
F
K
K
L
L
A
FD FD
K
E3
8 1/4"
A
CG
CG
CG
CG (4)
CORNERS
TYP
3'-2"
W.P.
8.00°
A
CG
CG CG CG
FD
F1
AE510
SIM
E4
AE160
SIM
/8
ROOF LINE
BELOW
D1
AE510
V A
R
IE
S
4'-4"
M.O.
3'-4"
7'-4"
M.O.
6'-4"
GENERAL NOTES:
1.
ALL WALLS EXTEND TO UNDERSIDE OF FLOOR/ROOF DECK
ABOVE UNLESS NOTED OTHERWISE.( WALLS EXTEND TO
BOTTOM OF TRUSS).
2.
ALLOW FOR 1/2" DEFLECTION WHERE WALL MEETS STRUCTURE
ABOVE. PROVIDE COMPRESSIBLE FILLER BETWEEN TOP OF
WALL AND STRUCTURE AT STANDARD WALL CONSTRUCTION AND
FIRESAFING AT RATED WALL CONSTRUCTION.
3.
4.
5.
6.
7.
9.
ALL DOORS AND EXTERIOR DOORS/STOOPS ARE DIMENSIONED
AS SHOWN BELOW UNLESS NOTED OR DIMENSIONED
OTHERWISE.
8.
EQUIPMENT ABBREVIATIONS:
BRACE INTERIOR PARTITIONS PER ANSI CRITERIA.
COORDINATE OPENINGS IN WALLS w/ OTHER TRADES AND SEAL.
SEAL ALL PENETRATIONS THROUGH WALL TYPICAL.
10.
11.
FLOOR ASSEMBLY TO BE SMOKE BARRIER (NFPA -101 8.6.1)
12.
PROVIDE BULLNOSE CORNER BLOCKS @ ALL EXPOSED OUTSIDE
CORNERS OF CMU WALLS AND PARTITIONS UNLESS NOTED
OTHERWISE - TYPICAL.
13.
THESE DRAWINGS SHOULD BE USED TO DETERMINE THE
DESIGN INTENT. THE CONTRACTOR SHALL FIELD VERIFY ALL
WORK AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF
ANY DISCREPANCIES IN THE DOCUMENTS BEFORE
PROCEEDING. FAILURE TO DO SO WILL RESULT IN THE
CONTRACTOR TAKING FULL RESPONSIBILITY AND LIABILITY FOR
SAID DISCREPANCIES.
PROVIDE DRYWALL CONTROL JOINTS AT LOCATIONS INDICATED
ON DRAWINGS OR AT A MAXIMUM SPACING OF 30'-0" IN ANY
DIRECTION AND AT ALL JAMB STUDS AT ALL OPENINGS. - TYPICAL
14.
G.C. TO PROVIDE ALL BLOCKING IN WALLS FOR ALL BUILT-IN
CABINETS, COUNTERTOP SUPPORTS, GRAB BARS, ETC. PROVIDE
PLYWOOD BACKING FOR WALL MOUNTED ELECTRICAL, IT AND
TELEPHONE EQUIPMENT AS REQUIRED.
IN LOCATIONS WHERE DOORS ARE IN WALL ASSEMBLIES, HAVE
FURRED OUT DRYWALL WRAP BACK TO DOOR FRAME.
ALL WOOD BLOCKING AND BACKING SHALL BE FIRE RETARDANT
TREATED.
FEC - FIRE EXTINGUISHER CABINET & EXTINGUISHER
REF - REFRIGERATOR
EWC - ELECTRIC WATER COOLER
DO NOT SCALE DRAWINGS. WORK FROM DIMENSIONS SHOWN. IF
ADDITIONAL INFORMATION IS NEEDED, OR WHERE DRAWINGS OR
DRAWING SCALE APPEARS TO CONFLICT WITH INDICATED
DIMENSIONS, BRING TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
NEW WALL CONSTRUCTION
PLAN LEGEND
DOOR TAG - REFER TO AE600 FOR
DOOR SCHEDULE AND DETAILS
ROOM
NAME
12346
NEW ROOM NAME AND NUMBERS
WALL TYPE INDICATOR
INTERIOR WALLS ARE TYPE A U.N.O
RE: AE540 FOR WALL TYPE DETAILS
FIRE EXTINGUISHER CABINET
CG
CORNER GUARD
REFER TO D8/AE541 FOR DETAIL
WPX
WALL PROTECTION
1. COORDINATE SCHEDULE OF OVERALL CONSTRUCTION AND DAY -
TO- DAY CONSTRUCTION OPERATIONS WITH OWNER'S SCHEDULE
REQUIREMENTS.
2. DIMENSIONS ARE TO FINISH FACE OF WALL OR CASEWORK
UNLESS NOTED OTHERWISE (UNO).
3. FIELD VERIFY PROJECT CONDITIONS PRIOR TO THE START OF, AND
AS NEEDED DURING THE COURSE OF CONSTRUCTION. BRING
DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT
CONSTRUCTION TO THE ATTENTION OF THE ARCHITECT FOR
REVIEW.
GENERAL CONSTRUCTION NOTES
FEC
EE
100 SF ROOM AREA
W.P.
WORK POINT
FD FLOOR DRAIN
RE: PLUMBING
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :3
P
M
Scale: As indicated
AE130
THIRD FLOOR PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
33 148
SCALE: 3/16" = 1'-0"AE130
F2 THIRD FLOOR PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
ROOF DRAIN
RE: E3/AE520
OVERFLOW
ROOF DRAIN
RE: E3/AE520
OVERFLOW
ROOF DRAIN
RE: E3/AE520
ROOF DRAIN
RE: E3/AE520
F2
AE310
A B C D
HE
4.2
5.4
JC4
AE300
F4
AE300
F1
AE310
F8
AE402
ROOF HATCH
F4
AE310
B1
AE520
MECHANICAL
EQUIPMENT
RE: MECHANICAL
2.8
4.8
G
S L O
P E
/4
P
E R
F O
O T
S L O
P E
/4
P
E R
F O
O T
S L O
P E
/4
P
E R
F O
O T
S L O
P E
/4
P
E R
F O
O T
S L O
P E
/4
P
E R
F O
O T
S L O
P E
/4
P
E R
F O
O T
ROOFTOP VENTILATOR
RE: MECHANICAL
OUTDOOR CAMERA
RE: TELECOM
(TYPICAL)
F6
AE310
F
F
3'-5 1/4"
1'-0 1/4"
16'-0"
/4
/4
K
K
STRUCTURE LOW POINT
HIGH
POINT
HIGH
POINT
STRUCTURE LOW POINT
1'-4"
" 1
METAL COPING
SYSTEM (TYPICAL)
ELEVATOR
SHAFT ROOF
LINE OF ELEVATOR
SHAFT WALL
BELOW
WALK PADS
(TYPICAL)
1'-4"
1'-4" 1'-4"
1'-4"
1'-4"
HIGH
POINT
HIGH
POINT
8'-0 1/2"
ROOF SADDLE
RD ODRD OD
EXHAUST FAN
REFER TO MECHANICAL
ROOF PLAN NOTES
SLOPE
SLOPE INDUCED BY STRUCTURE
RE: STRUCTURAL
SLOPE INDUCED BY TAPERED INSULATION.
1/2" PER 1'-0" SLOPE
1. ALL PENETRATIONS SHOWN AND NOT SHOWN ON THIS
DRAWING TO BE FLASHED/SEALED.
2. ABBREVIATIONS:
VTR - VENT THRU ROOF
RD - ROOF DRAIN
OD - OVERFLOW DRAIN
3. REFER TO SHEET AE520 FOR TYPICAL ROOF DETAILS.
4. REFER TO MECHANICAL AND PLUMBING DRAWINGS FOR EXACT
LOCATIONS AND SIZES OF ROOF PENETRATIONS.
5. REFER TO WALL SECTIONS FOR TYPICAL PARAPET CONDITIONS.
6. PROVIDE TAPERED INSULATION SADDLES AT ALL ROOF
MOUNTED EQUIPMENT TO PROVIDE POSITIVE DRAINAGE TO
NEAREST ROOF DRAIN. SLOPE SADDLES MINIMUM 1/2" PER FOOT.
7. TAPERED INSULATION SHOWN SHADED AT ROOF SADDLES.
8. ROOF DRAIN LOCATIONS ARE DIAGRAMMATIC IN NATURE AND
ARE INTENDED TO BE INSTALLED AT THE LOW POINTS OF THE
STRUCTURE TO PROMOTE DRAINAGE.
9. ADJUST AREAS OF INSULATION IN THE FIELD WITH TAPERED
INSULATION AS NECESSARY TO FACILITATE POSITIVE
DRAINAGE WHERE COORDINATION OF DECK SLOPE AND ROOF
DRAIN LOCATION MAKES ADDITIONAL INSULATION NECESSARY.
10. PROVIDE SPLASHBLOCK AT ALL DOWNSPOUTS THAT
TERMINATE AT ROOF. CONNECT DOWNSPOUT TO UNDERGROUND
STORM SEWER. REFER TO CIVIL.
11. COORDINATE INSTALLATION FLASHING WITH
LIGHTNING PROTECTION SYSTEM.
ROOF PAD
EDGE ZONE
4'-0" FROM PARAPET WALL, TYPICAL
CORNER ZONE
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :4
P
M
Scale: 3/16" = 1'-0"
AE140
ROOF PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
DOEMER04-12-18
34 148
SCALE: 3/16" = 1'-0"AE140
F2 ROOF PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
A B C D
HE
4.2
5.4
J
MECHANICAL
CORRIDOR
SPRINKLERS
IT
ELECTRICAL
ELEV.
MAC.
RM.
CORRIDOR
CORRIDOR
STAIRS
S-1
HAC
012 ELEVATOR
E-1
MECHANICAL SHAFT
MECHANICAL
SHAFT ABOVE
2.8
4.8
G
EXP
EXP
EXP
EXP
EXP
EXP
F
F
K
K
STEEL
LADDER
(PAINT)
MECHANICAL
AREAWAY
LOUVER
13'-51/2"
FIRE RATED GYP.
BD. CEILING
S
S S
S S
S S
S
S
SS
S
S
S
LIGHTING FIXTURE - REFER TO
ELECTRICAL DRAWINGS
EXIT LIGHT - REFER TO
ELECTRICAL DRAWINGS
SUPPLY DIFFUSER - REFER TO
MECHANICAL DRAWINGS
RETURN GRILL - REFER TO
MECHANICAL DRAWINGS
2'x2' SUSPENDED ACOUSTICAL
PANEL CEILING SYSTEM
5/8" GYPSUM BOARD CEILING
ON 3 5/8" METAL STUDS
DESCRIPTIONSYMBOL
REFLECTED CEILING
PLAN LEGEND
1.
2.
3.
4.
5.
6.
EXPOSED TO STRUCTURE
ABOVE
CEILING HEIGHT AFF
CONTROL JOINT IN GYPSUM
BOARD CEILING.
CJ
RECESSED LIGHT - REFER TO
ELECTRICAL
1-HOUR FIRE RATED PARTITION
PAINT ALL EXPOSED CONDUIT, METAL DECK,
PIPES, STRUCTURAL AND MISC. STEEL AND
DUCTWORK. DO NOT PAINT PROCESS PIPING.
SEE MECHANICAL AND ELECTRICAL DRAWINGS
FOR CEILING FIXTURE INFORMATION AND
LOCATIONS OF CEILING FIXTURES OR DEVICES
NOT DEPICTED HERE.
CENTER CEILING GRID IN ROOM UNLESS
OTHERWISE INDICATED. MINIMUM 6" CEILING
TILE AROUND THE PERIMETER.
PROVIDE SEALANT JOINT AT GYPSUM SOFFIT
INTERSECTION WITH WALL, TYP.
BASEMENT SHALL HAVE EXPOSED CEILING
THROUGHOUT, TYPICAL
REFERENCE ELECTRICAL AND MECHANICAL
DRAWINGS FOR COMPLETE LIST OF SYMBOLS
NOT INCLUDED ABOVE.
REFLECTED CEILING PLAN
NOTES
RATED WALL LEGEND
EXP
9'-6"
S
SPEAKER STROBE
RE: TELECOM
PUBLIC ADDRESS SPEAKER
RE: TELECOM
SMOKE DETECTOR
RE: TELECOM
LIGHTING FIXTURE (CHAIN HUNG) -
REFER TO ELECTRICAL DRAWINGS
CUBICLE CURTAIN TRACK.
CURTAIN PROVIDED BY VA
2-HOUR FIRE/SMOKE RATED
PARTITION
LINEAR SUPPLY DIFFUSER REFER
TO MEACHANICAL DRAWINGS
EXHAUST GRILL - REFER TO
MECHANICAL DRAWINGS
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :4
P
M
Scale: 3/16" = 1'-0"
AE150
BASEMENT REFLECTED CEILING PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
35 148
SCALE: 3/16" = 1'-0"AE150
F2 BASEMENT REFLECTED CEILING PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
HR
PROCESS
BENEFITS
HR
RECRUITMENT
HR
SPECIALIST
OFFICER
EXAM
EXAM
PHYS /
PROV
HR
PROCESS
HR
BENEFITS
SPECIALIST
HR
SPECIALIST
OFFICER
HR
SPECIALIST
OFFICER
HR
CHIEF
OFFICER
STAIRS
S-1
ELEVATOR
LOBBY
VESTIBULE
TREATMENT
AREA
RECORDS
STORAGE
OWC
WAITING
HR
BENEFIT
RA/FMLA
P.I.V.
P.I.V
ELEVATOR
E-1
ELECTRICAL
IT
HAC
WOMEN'S
TOILET
MEN'S
TOILET
STAIRS
S-2
TLT
MECHANICAL SHAFT
OPEN
OFFICE
OPEN
OFFICE
CORRIDOR
OPEN
OFFICE
ASSIST
HR
CHIEF
OFFICER
CORRIDOR
CORRIDOR
COFFEE
VESTIBULE
104 2.8
4.8
G
EXP
EXP
9'-0"
10'-0"
9'-6"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0" 9'-0" 9'-0"
9'-0"
9'-6"
9'-6"
9'-6"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
CONTINUOUS
SOFFIT VENT
RE: E4/AE140
9'-6"
9'-6"
9'-0"
7'-0"
F1
AE541
8'-0"
10'-0"
EQ EQ
E Q
E Q
1'-6"
8'-0"
9'-0"
9'-6"
9'-0" F6
AE310
7'-0"
9'-6"
6'-8"
9'-6"
F
K
K
9'-0"
E6
AE311
6'-6"6'-6"
/4
/2
2'-5 1/2"
4'-11 1/2"
1'-0" 1'-0"
ALIGN
ALIGN
F4
AE541
1'-0"
F1
AE541
F1
AE541
F1
AE541
F1
AE541
ALIGN
F1
AE541
F1
AE541
F1
AE541
D1
AE541
F1
AE541
F1
AE541 E4
AE541
1'-6"
1'-4"+/- 1'-2"+/-
ALIGN
S
S S
S
S S
S
SS
S
S
S
S
S S
SS
S
S
S
SS
SS
SS
S
S S
S
S
S
S
S
SS
S
S
S
1'-8"
E Q
E Q
EQ EQ
/2
E8
AE311
S S
S
2'-3 1/2" 6'-0"
LIGHTING FIXTURE - REFER TO
ELECTRICAL DRAWINGS
EXIT LIGHT - REFER TO
ELECTRICAL DRAWINGS
SUPPLY DIFFUSER - REFER TO
MECHANICAL DRAWINGS
RETURN GRILL - REFER TO
MECHANICAL DRAWINGS
2'x2' SUSPENDED ACOUSTICAL
PANEL CEILING SYSTEM
5/8" GYPSUM BOARD CEILING
ON 3 5/8" METAL STUDS
DESCRIPTIONSYMBOL
REFLECTED CEILING
PLAN LEGEND
1.
2.
3.
4.
5.
6.
EXPOSED TO STRUCTURE
ABOVE
CEILING HEIGHT AFF
CONTROL JOINT IN GYPSUM
BOARD CEILING.
CJ
RECESSED LIGHT - REFER TO
ELECTRICAL
1-HOUR FIRE RATED PARTITION
PAINT ALL EXPOSED CONDUIT, METAL DECK,
PIPES, STRUCTURAL AND MISC. STEEL AND
DUCTWORK. DO NOT PAINT PROCESS PIPING.
SEE MECHANICAL AND ELECTRICAL DRAWINGS
FOR CEILING FIXTURE INFORMATION AND
LOCATIONS OF CEILING FIXTURES OR DEVICES
NOT DEPICTED HERE.
CENTER CEILING GRID IN ROOM UNLESS
OTHERWISE INDICATED. MINIMUM 6" CEILING
TILE AROUND THE PERIMETER.
PROVIDE SEALANT JOINT AT GYPSUM SOFFIT
INTERSECTION WITH WALL, TYP.
BASEMENT SHALL HAVE EXPOSED CEILING
THROUGHOUT, TYPICAL
REFERENCE ELECTRICAL AND MECHANICAL
DRAWINGS FOR COMPLETE LIST OF SYMBOLS
NOT INCLUDED ABOVE.
REFLECTED CEILING PLAN
NOTES
RATED WALL LEGEND
EXP
9'-6"
S
SPEAKER STROBE
RE: TELECOM
PUBLIC ADDRESS SPEAKER
RE: TELECOM
SMOKE DETECTOR
RE: TELECOM
LIGHTING FIXTURE (CHAIN HUNG) -
REFER TO ELECTRICAL DRAWINGS
CUBICLE CURTAIN TRACK.
CURTAIN PROVIDED BY VA
2-HOUR FIRE/SMOKE RATED
PARTITION
LINEAR SUPPLY DIFFUSER REFER
TO MEACHANICAL DRAWINGS
EXHAUST GRILL - REFER TO
MECHANICAL DRAWINGS
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :4
P
M
Scale: 3/16" = 1'-0"
AE151
FIRST FLOOR REFLECTED CEILING
PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
36 148
SCALE: 3/16" = 1'-0"AE151
F2 FIRST FLOOR REFLECTED CEILING PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
MCA
PROGRAM
OFFICE
PAYROLL
SUPERVISOR
WOMEN'S
TOILET
MEN'S
TOILET
STAIRS
S-1
UNISEX
RR
ELEVATOR
LOBBY
BREAK
ROOM
ELEVATOR
E-1
CONFERENCE
ROOM
ELECTRICAL
IT
HAC
CHIEF
ASSISTANT
CHIEF
ACCOUNTING
SUPERVISOR
INTERNAL
AUDITOR
CFO
AFO
STAIRS
S-2
MECHANICAL SHAFT
OPEN
OFFICE
CORRIDOR
OPEN
OFFICE
OPEN
OFFICE
CORRIDOR
OPEN
OFFICE
COFFEE
VESTIBULE
204 2.8
4.8
G
EXP
EXP
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"9'-0"
9'-0"
9'-0"
9'-0"
9'-6"
9'-0"
9'-6"
9'-0"
9'-6"
" 1
8'-0" 8'-0"EQ EQ
E Q
E Q
" F6
AE310
7'-0"
F
K
K
1'-6"
9'-6"
9'-6"
9'-6"
ALIGN
ALIGN
F1
AE541
F1
AE541
F1
AE541
F1
AE541
F1
AE541
F1
AE541
F1
AE541
D1
AE541
1'-6"
ALIGN
S S
S
S S
S
S S
SS
S
S
SSS
SS
S
S
SS
S
S
S
S
S
S
S
S
S
S
1'-8"
E Q
E Q
8'-0"
LIGHTING FIXTURE - REFER TO
ELECTRICAL DRAWINGS
EXIT LIGHT - REFER TO
ELECTRICAL DRAWINGS
SUPPLY DIFFUSER - REFER TO
MECHANICAL DRAWINGS
RETURN GRILL - REFER TO
MECHANICAL DRAWINGS
2'x2' SUSPENDED ACOUSTICAL
PANEL CEILING SYSTEM
5/8" GYPSUM BOARD CEILING
ON 3 5/8" METAL STUDS
DESCRIPTIONSYMBOL
REFLECTED CEILING
PLAN LEGEND
1.
2.
3.
4.
5.
6.
EXPOSED TO STRUCTURE
ABOVE
CEILING HEIGHT AFF
CONTROL JOINT IN GYPSUM
BOARD CEILING.
CJ
RECESSED LIGHT - REFER TO
ELECTRICAL
1-HOUR FIRE RATED PARTITION
PAINT ALL EXPOSED CONDUIT, METAL DECK,
PIPES, STRUCTURAL AND MISC. STEEL AND
DUCTWORK. DO NOT PAINT PROCESS PIPING.
SEE MECHANICAL AND ELECTRICAL DRAWINGS
FOR CEILING FIXTURE INFORMATION AND
LOCATIONS OF CEILING FIXTURES OR DEVICES
NOT DEPICTED HERE.
CENTER CEILING GRID IN ROOM UNLESS
OTHERWISE INDICATED. MINIMUM 6" CEILING
TILE AROUND THE PERIMETER.
PROVIDE SEALANT JOINT AT GYPSUM SOFFIT
INTERSECTION WITH WALL, TYP.
BASEMENT SHALL HAVE EXPOSED CEILING
THROUGHOUT, TYPICAL
REFERENCE ELECTRICAL AND MECHANICAL
DRAWINGS FOR COMPLETE LIST OF SYMBOLS
NOT INCLUDED ABOVE.
REFLECTED CEILING PLAN
NOTES
RATED WALL LEGEND
EXP
9'-6"
S
SPEAKER STROBE
RE: TELECOM
PUBLIC ADDRESS SPEAKER
RE: TELECOM
SMOKE DETECTOR
RE: TELECOM
LIGHTING FIXTURE (CHAIN HUNG) -
REFER TO ELECTRICAL DRAWINGS
CUBICLE CURTAIN TRACK.
CURTAIN PROVIDED BY VA
2-HOUR FIRE/SMOKE RATED
PARTITION
LINEAR SUPPLY DIFFUSER REFER
TO MEACHANICAL DRAWINGS
EXHAUST GRILL - REFER TO
MECHANICAL DRAWINGS
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :5
P
M
Scale: 3/16" = 1'-0"
AE152
SECOND FLOOR REFLECTED CEILING
PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
37 148
SCALE: 3/16" = 1'-0"AE152
F2 SECOND FLOOR REFLECTED CEILING PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
CHIEF
MAS
OFFICER
HBU
SUPRVISOR
STAIRS
S-2
ADMINISTRATIVE
OFFICER
CODING
SUPERVISOR
OFFICE
ASST
CHIEF
MAS
OFF
SCANNING
SUPV
RECORD
MANAGER
OFFICER
NON-VA
CARE
SUPV
MED
RECORDS
SUPERVISOR
CONF.
ROOM
ELEVATOR
LOBBY
HAC
IT
ELECTRICAL
STAIRS
S-1 ELEVATOR
E-1
MEN'S
TOILET
WOMEN'S
TOILET
MECHANICAL SHAFT
ROOF
HATCH
OPEN
OFFICE
CORRIDOR
OPEN
OFFICE
CORRIDOR
OPEN
OFFICE
OPEN
OFFICE
COFFEE
VESTIBULE
304 2.8
4.8
G
9'-0" 9'-0"
9'-0" 9'-0" 9'-0"
9'-6"
9'-0"
9'-0" 9'-0"
9'-0"
9'-0"
9'-0"
9'-6"
9'-0"
9'-6"
9'-6"
9'-0"
9'-6"
9'-6"
9'-6"
8'-0"8'-0"
EQ EQ
E Q
E Q
8'-0"
7'-0"
F
K
K
11'-8"
11'-7"
1'-6"
ALIGN ALIGN
F1
AE541
F1
AE541
F1
AE541
F1
AE541
F1
AE541
F1
AE541
FIRE RATED
CEILING
FIRE RATED CEILING
F1
AE541
D1
AE541
1'-6"
S S
S
S S
S
SSS
SS
S
S
S
S
S
S
S
S
S
S
S
1'-8"
E Q
E Q
LIGHTING FIXTURE - REFER TO
ELECTRICAL DRAWINGS
EXIT LIGHT - REFER TO
ELECTRICAL DRAWINGS
SUPPLY DIFFUSER - REFER TO
MECHANICAL DRAWINGS
RETURN GRILL - REFER TO
MECHANICAL DRAWINGS
2'x2' SUSPENDED ACOUSTICAL
PANEL CEILING SYSTEM
5/8" GYPSUM BOARD CEILING
ON 3 5/8" METAL STUDS
DESCRIPTIONSYMBOL
REFLECTED CEILING
PLAN LEGEND
1.
2.
3.
4.
5.
6.
EXPOSED TO STRUCTURE
ABOVE
CEILING HEIGHT AFF
CONTROL JOINT IN GYPSUM
BOARD CEILING.
CJ
RECESSED LIGHT - REFER TO
ELECTRICAL
1-HOUR FIRE RATED PARTITION
PAINT ALL EXPOSED CONDUIT, METAL DECK,
PIPES, STRUCTURAL AND MISC. STEEL AND
DUCTWORK. DO NOT PAINT PROCESS PIPING.
SEE MECHANICAL AND ELECTRICAL DRAWINGS
FOR CEILING FIXTURE INFORMATION AND
LOCATIONS OF CEILING FIXTURES OR DEVICES
NOT DEPICTED HERE.
CENTER CEILING GRID IN ROOM UNLESS
OTHERWISE INDICATED. MINIMUM 6" CEILING
TILE AROUND THE PERIMETER.
PROVIDE SEALANT JOINT AT GYPSUM SOFFIT
INTERSECTION WITH WALL, TYP.
BASEMENT SHALL HAVE EXPOSED CEILING
THROUGHOUT, TYPICAL
REFERENCE ELECTRICAL AND MECHANICAL
DRAWINGS FOR COMPLETE LIST OF SYMBOLS
NOT INCLUDED ABOVE.
REFLECTED CEILING PLAN
NOTES
RATED WALL LEGEND
EXP
9'-6"
S
SPEAKER STROBE
RE: TELECOM
PUBLIC ADDRESS SPEAKER
RE: TELECOM
SMOKE DETECTOR
RE: TELECOM
LIGHTING FIXTURE (CHAIN HUNG) -
REFER TO ELECTRICAL DRAWINGS
CUBICLE CURTAIN TRACK.
CURTAIN PROVIDED BY VA
2-HOUR FIRE/SMOKE RATED
PARTITION
LINEAR SUPPLY DIFFUSER REFER
TO MEACHANICAL DRAWINGS
EXHAUST GRILL - REFER TO
MECHANICAL DRAWINGS
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :0
P
M
Scale: 3/16" = 1'-0"
AE153
THIRD FLOOR REFLECTED CEILING
PLAN
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
38 148
SCALE: 3/16" = 1'-0"AE153
F2 THIRD FLOOR REFLECTED CEILING PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
NOTE 1: MOUNTING HEIGHTS SHOWN ARE PROPOSED FOR ALL ACCESSORIES AND FIXTURES
REQUIRED UNLESS OTHERWISE NOTED OR DIMENSIONED ON DRAWINGS FOR SPECIFIC
CONDITIONS.
PAPER TOWEL
DISPENSER ABOVE
COUNTERS
(B.F. DENOTES BARRIER
FREE REQUIREMENTS)
ELECTRIC
WATER
COOLER
SPOUT
HEIGHT
PAPER TOWEL
DISPENSER IN
BATH ROOMS
(B.F. MIN.)
2' - 6" (M
IN
(B .F
M A
X
1' - 3" (MIN.)
LINE OF WALL
ELEC. OUTLET
(SEE NOTE BELOW)
NOTE: ANY ELECT. OUTLET
NEAR SINKS IN B.F.. TOILET
ROOMS TO BE MOUNTED
33" TO 36" A.F.F. TO
LAVATORY
(B .F
M
A X
LINE OF OBSTRUCTION
MIRROR SIZE AS
SPECIFIED OR NOTED
BOTTOM OF
REFLECTING SURFACE
CLEAR TO 8" DEPTH MIN
ROBE
HOOK
(B .F
M
A X
TOILET
PAPER
HOLDER
1' - 0"
(MIN.)
3' - 6"
1 1/2"
1 1/2"
/2
7"-9" (TYP.)
FROM LIP OF
W.C. TO T.P.H
LINE OF WALL
39" - 41"
GRAB BAR
(MAX)
3' - 0"
SOAP
DISPENSER
HIGHEST
OPERABLE
PART
FIRE
EXTINGUISHER
CABINET
m m
B F
H A
N D
L E
H E
IG
H
T
BELOW BAR
TOILET PAPER
DISPENSER
GRAB BAR
3' - 0" 6"
(B .F
M
IN
/4
M A
X
TOILET ROOM NOTES:
1. PROVIDE WOOD BLOCKING IN GYPSUM BOARD PARTITIONS
AT WALL MOUNTED EQUIPMENT TYPICAL.
2. SLOP SINK TO HAVE 4'-0" FRP PANEL EACH WAY 4'-0" HIGH
WITH MOP HOLDER AND SHELF ABOVE.
AE460 D4
D
177 SF
WOMEN'S
TOILET
171 SF
MEN'S
TOILET
AE460D2
10'-0 1/4" 8'-8"
CGCG
CG
CG
CG
CG
6'-0 1/2" 5'-8" 7'-4 3/4"
EQ EQ
H1
K1
F1
L7
H1
L3
L2
K1
H1 A
DD
D
D D
A1
D1
AE513
/4
K1
L3H1
L7 H1
A
AA
A
A
A
A
A
A
E2
J
K
E1
E1
E1
E1
H2
H2
EWC
/2
L2
F1
F1
C1
C1
C1
C1
C1
AE460
F8
28 SF
COFFEE
CG CG
FEC
G
A A
A
H2 E1
5'-9 1/2"5'-4" A
AE460
F7
E
85 SF
TREATMENT
AREA
43 SF
TLT
CG
L3
H1
L7
F5
4'-1"
REF REF
REF
SPECIMEN
COUNTER
A A
C
C
L
E2
D
A
E2
5'-10 7/8" 10'-9 1/4"
E1 H2
E1
H2
PRIVACY CURTAIN TRACK.
CURTAIN BY VA, TYPICAL
L2
C1
E
54 SF
UNISEX
RR
CG
F1
L3
L2
H1
B1
L7
1'-7"
A A
A
E2
E1
H2
C1
AE460 D1
/4
A
A A
12'-4 3/4"
E1
110 SF
EXAM
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:3 :0
P
M
Scale: As indicated
AE160
ENLARGED FLOOR PLANS
IBARRA
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
39 148
SCALE: 3/8" = 1'-0"
TYPICAL MOUNTING HEIGHTS
SCALE: 3/8" = 1'-0"AE110
C0 ENLARGED TOILET ROOMS - TYPICAL
SCALE: 3/8" = 1'-0"AE110
E4 ENLARGED COFFEE STATION - TYPICAL
SCALE: 3/8" = 1'-0"AE110
B3 ENLARGED TREATMENT AREA - FIRST FLOOR
SCALE: 3/8" = 1'-0"AE120
D4 ENLARGED UNISEX RR - SECOND FLOOR
ACCESSORY SCHEDULE
KEY ITEM NAME
PROVIDED/
INSTALLED
B1 BABY CHANGING STATION GC/GC
C1 COAT HOOK GC/GC
E1 SOAP DISPENSER VA/GC
F1 FRAMED MIRROR GC/GC
H1 TOILET PARTITION MOUNTED TOILET TISSUE DISPENSER, DUAL-ROLL FOR TWO COMPARTMENT VA/GC
H2 WALL MOUNTED PAPER TOWEL DISPENSER VA/GC
K1 TOILET PARTITION MOUNTED FEMININE NAPKIN DISPOSAL VA/GC
L2 STAINLESS STEEL GRAB BAR 36" GC/GC
L3 STAINLESS STEEL GRAB BAR 42" GC/GC
L7 STAINLESS STEEL GRAB BAR 18" GC/GC
SCALE: 3/8" = 1'-0"AE110
E6 ENLARGED EXAM
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
FIRST FLOOR
816'-0"
SECOND FLOOR
829'-4"
THIRD FLOOR
842'-8"
T.O.S. LOW POINT
856'-0"
4.2
T.O.P
858'-10 1/2"
2.84.8
PREFINISHED ALUMINUM
COPING SYSTEM
COMPOSITE
METAL PANEL
SYSTEM
SPLIT FACE CMU ALUMINUM & GLASS
WINDOW (TYPICAL)
VISION GLAZING
(TYPICAL)
GRADE
RE: CIVIL
SGSG
CONTROL JOINT
S T
O R
E F
R O
N T
BOTTOM OF ELEV. PIT
797'-0"
D3
AE200
14'-8"
29'-4"
SGSG
SGSGSG
CONTROL
JOINT
FIRST FLOOR
816'-0"
SECOND FLOOR
829'-4"
THIRD FLOOR
842'-8"
T.O.S. LOW POINT
856'-0"
BASEMENT
801'-0"
F2
AE310
ABCDE
F1
AE310
T.O.P
858'-10 1/2"
F3
AE311
CJ
METAL GUARD
AND HAND RAIL
STEEL LADDER
(PAINT)
GRADE
RE: CIVIL
GRADE
RE: CIVIL
F
6" CURB
LOUVER
RE: MECHANICAL
3'-6"
OVERHEAD DOOR
RE: DOOR SCHEDULE
K
COMPOSITE
METAL PANEL
SYSTEM
VISION GLAZING
(TYPICAL)
BRICK REVEAL
(TYPICAL)
FACE BRICK
FACE BRICK 1
14'-0"
16" PAINTED CMU
PREFINISHED ALUMINUM
COPING SYSTEM
18'-8"17'-0"
SG SG SG SG SG SG
BUILDING ENVELOPE
LEGEND
CONTROL JOINT
RE: D5/AE541
CJ
FACE BRICK 1
MAIN COLOR - MATCH
EXISTING BUILDING 31
BRICK
FACE BRICK 2
ACCENT DARK
VISION GLAZING
CONCRETE (EXPOSED)
SAFETY GLAZINGSG
PREFINISHED ALUMINUM
COPING SYSTEM
COMPOSITE METAL
PANEL SYSTEM 1
COMPOSITE METAL
PANEL SYSTEM 2
SPLIT FACE CMU
1.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.