36C25018B0795-015.pdf
PDF 10 MB Posted
- Attached to
- Construct Clinical and Admin Building 506-329 Federal contract opportunity
- Solicitation number
- 36C25018B0795
About this file
36C25018B0795 506-329 VA Ann Arbor Admin Bldg BID DWGS REVISED_Part5.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0795-0005000.docx | DOCX document | |
| 36C25018B0795-0004000.docx | DOCX document | |
| 36C25018B0795-0003000.docx | DOCX document | |
| 36C25018B0795-0003001.xlsx | XLSX spreadsheet | |
| 36C25018B0795-0002000.docx | DOCX document | |
| 36C25018B0795-0001002.pdf | ||
| 36C25018B0795-0001000.docx | DOCX document | |
| 36C25018B0795-0001001.pdf | ||
| 36C25018B0795-012.pdf | ||
| 36C25018B0795-007.docx | DOCX document | |
| 36C25018B0795-016.pdf | ||
| 36C25018B0795-011.pdf | ||
| 36C25018B0795-019.pdf | ||
| 36C25018B0795-017.pdf | ||
| 36C25018B0795-021.pdf | ||
| 36C25018B0795-013.pdf | ||
| 36C25018B0795-009.docx | DOCX document | |
| 36C25018B0795-010.pdf | ||
| 36C25018B0795-008.docx | DOCX document | |
| 36C25018B0795-020.pdf | ||
| 36C25018B0795-018.pdf | ||
| 36C25018B0795-022.docx | DOCX document | |
| 36C25018B0795-014.pdf | ||
| 36C25018B0795-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D
HE
4.2
5.4
J
2.8
4.8
GF
MECHANICAL SHAFT
FEC
FEC
K
K
J
J
J J J
J
J
J
J
J.B. POWER & DATA
TYP.
SYSTEM FURNITURE
FULL HEIGHT PANELS
(BY VA) TYP.
DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT
AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED
AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);
125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);
132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);
328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP
SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE
WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)
- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00
GENERAL REQUIREMENTS
ALTERNATE NO. 7
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
P
M
Scale: As indicated
AE810
FIRST FLOOR DEDUCT ALTERNATE 7
PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
64 148
SCALE: 3/16" = 1'-0"AE810
F4 FIRST FLOOR PLAN DEDUCT ALTERNATE 7
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
BIDS SUBMISSION 01-20-17
BIDS SUBMISSION_REVISED 04-12-18
HE
4.2
5.4
J
2.8
4.8
GF
SLOPE
1%
CG
CG
CG
FEC
FEC
CG
ALIGN
K
K
J
J
J
J
J
J
J.B. POWER & DATA
TYP.
SYSTEM FURNITURE
FULL HEIGHT PANELS
(BY VA) TYP.
J
DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT
AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED
AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);
125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);
132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);
328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP
SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE
WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)
- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00
GENERAL REQUIREMENTS
ALTERNATE NO. 7
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
P
M
Scale: As indicated
AE820
SECOND FLOOR DEDUCT ALTERNATE 7
PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
65 148
SCALE: 3/16" = 1'-0"AE820
F4 SECOND FLOOR PLAN DEDUCT ALTERNATE 7
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
2.8
4.8
GF
F
FEC
K
K
J
J
J J
J
J
J.B. POWER & DATA
TYP.
SYSTEM FURNITURE
FULL HEIGHT PANELS
(BY VA) TYP.
J JJ
DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT
AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED
AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);
125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);
132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);
328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP
SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE
WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)
- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00
GENERAL REQUIREMENTS
ALTERNATE NO. 7
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :3
P
M
Scale: As indicated
AE830
THIRD FLOOR DEDUCT ALTERNATE 7
PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
66 148
SCALE: 3/16" = 1'-0"AE830
F4 THIRD FLOOR PLAN DEDUCT ALTERNATE 7
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
2.8
4.8
G
F
F
MECHANICAL SHAFT
EXP
EXP
9'-0"
10'-0"
9'-6"
9'-0"
9'-0"
9'-0"
9'-0" 9'-0"
9'-6"
9'-6"
9'-0"
9'-0"
7'-0"
8'-0"
9'-6"
9'-0"
7'-0"
9'-6"
6'-8"
9'-6"
K
K
S
S S
S
S S
S
SS
S
S
S
S
S S
SS
S
S
S
SS
SS
SS
S
S S
S
S
S
S
S
SS
S
S
S
DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT
AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED
AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);
125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);
132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);
328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP
SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE
WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)
- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00
GENERAL REQUIREMENTS
ALTERNATE NO. 7
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :3
P
M
Scale: As indicated
AE851
FIRST FLOOR REFLECTED CEILING
DEDUCT ALTERNATE 7 PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
67 148
SCALE: 3/16" = 1'-0"AE851
F1 FIRST FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 7
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
2.8
4.8
G
F
F
MECHANICAL SHAFT
EXP
EXP
9'-0"
9'-0"
9'-0" 9'-0"
9'-6"
9'-0"
9'-6"
9'-6"
8'-0" 8'-0"
7'-0"
K
K
1'-6"
1'-6"
S
S
S
S
S
S
DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT
AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED
AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);
125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);
132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);
328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP
SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE
WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)
- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00
GENERAL REQUIREMENTS
ALTERNATE NO. 7
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :4
P
M
Scale: As indicated
AE852
SECOND FLOOR REFLECTED CEILING
DEDUCT ALTERNATE 7 PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
68 148
SCALE: 3/16" = 1'-0"AE852
F1 SECOND FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 7
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
2.8
4.8
G
F
F
MECHANICAL SHAFT
ROOF
HATCH
9'-6"
9'-0"
9'-0"9'-0"
9'-0"
9'-6"
EXP
EXP
8'-0"8'-0"
7'-0"
K
K
S S
S
S S
S
SSS
SS
S
S
S
S
S
S
S
S
S
S
S
DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT
AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED
AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);
125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);
132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);
328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP
SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE
WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)
- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00
GENERAL REQUIREMENTS
ALTERNATE NO. 7
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :4
P
M
Scale: As indicated
AE853
THIRD FLOOR REFLECTED CEILING
DEDUCT ALTERNATE 7 PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
69 148
SCALE: 3/16" = 1'-0"AE853
F4 THIRD FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 7
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
2.8
4.8
G
K
K
FEC
PERFORM ALL WORK IN ALTERNATE 7, EXCEPT DELETE ALL LABOR,
MATERIAL, EQUIPMENT AND SUPERVISION RELATED TO 3RD FLOOR OFFICE
SUITE BUILD-OUT. PROVIDE 3RD FLOOR SPACE ROUGHED-IN FOR FUTURE
FINISHES. PROVIDE TEMPORARY LIGHTING IN ACCORDANCE WITH
NFPA 101 LIFE SAFETY CODE. PROVIDE A SHELL SPACE FIRE SPRINKLER
SYSTEM WITH UPRIGHT SPRINKLER HEADS ON 1" SPRIGS FOR FUTURE
SPACE FIT OUT. SPRINKLER HEADS SPACING SHALL NOT EXCEED
144 SQ. FT. SYSTEM SHALL BE IN COMPLIANCE WITH NFPA 13-2013, PROJECT
SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL.
REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS
ALTERNATE NO. 8
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :5
P
M
Scale: As indicated
AE863
THIRD FLOOR DEDUCT ALTERNATE 8
PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
70 148
SCALE: 3/16" = 1'-0"AE863
F1 THIRD FLOOR PLAN DEDUCT ALTERNATE 8
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HE
4.2
5.4
J
2.8
4.8
G
F
F
K
K
MECHANICAL SHAFT
ROOF
HATCH
9'-6"
9'-0"
EXP
EXP
TEMPORARY LIGHTING
TYP.
1'-6"
1'-6"
S S
S
S S
S
SSS
SS
S
S
S
S
S
S
S
S
S
S
S
PERFORM ALL WORK IN ALTERNATE 7, EXCEPT DELETE ALL LABOR,
MATERIAL, EQUIPMENT AND SUPERVISION RELATED TO 3RD FLOOR OFFICE
SUITE BUILD-OUT. PROVIDE 3RD FLOOR SPACE ROUGHED-IN FOR FUTURE
FINISHES. PROVIDE TEMPORARY LIGHTING IN ACCORDANCE WITH
NFPA 101 LIFE SAFETY CODE. PROVIDE A SHELL SPACE FIRE SPRINKLER
SYSTEM WITH UPRIGHT SPRINKLER HEADS ON 1" SPRIGS FOR FUTURE
SPACE FIT OUT. SPRINKLER HEADS SPACING SHALL NOT EXCEED
144 SQ. FT. SYSTEM SHALL BE IN COMPLIANCE WITH NFPA 13-2013, PROJECT
SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL.
REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS
ALTERNATE NO. 8
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :5
P
M
Scale: As indicated
AE873
THIRD FLOOR REFLECTED CEILING
DEDUCT ALTERNATE 8 PLAN
KUNKLE
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
71 148
SCALE: 3/16" = 1'-0"AE873
F1 THIRD FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 8
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
FLOOR PATTERN LEGEND
NOTES:
FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE
FINISH SCHEDULE.
CPT-4
LVT-1VCT-1
CPT-1 CPT-2
CT-1
CPT-3
CT-2
856 SF
MECHANICAL
300 SF
251 SF
SPRINKLERS
120 SF
124 SF
IT
100 SF
STAIRS
S-1
ELEVATOR
E-1
108 SF
ELEV.
MAC.
RM.
100 SF
153 SF
ELECTRICAL
200 SF
362 SF
HAC
56 SF
CORRIDOR
CORRIDOR
CORRIDOR
P-4, PAINT
SDT-1 TYP
RF-1
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :1
A
M
Scale: As indicated
IN100
OVERALL BASEMENT FLOOR
DISTRIBUTION PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
72 145
SCALE: 3/16" = 1'-0"
BASEMENT FLOOR PATTERN PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
HR
RECRUITMENT
HR
PROCESS
BENEFITS
EXAM
HR
PROCESS
HR
BENEFITS
SPECIALIST
HR
SPECIALIST
OFFICER
OPEN
OFFICE
STAIRS
S-1
VESTIBULE
ELECTRICAL
IT
HAC
WAITING
HR
BENEFIT
RA/FMLA
P.I.V
HR
CHIEF
OFFICER
ASSIST
HR
CHIEF
OFFICER
RECORDS
STORAGE
OPEN
OFFICE
PHYS /
PROV
EXAM
WOMEN'S
TOILET
STAIRS
S-2
HR
SPECIALIST
OFFICER
TREATMENT
AREA
OWC
P.I.V.
MEN'S
TOILET
TLT
HR
SPECIALIST
OFFICER
ELEVATOR
E-1
ELEVATOR
LOBBY
COFFEE
CORRIDOR
CORRIDOR
WAITING
P-2
P-2
P-2 P-2 P-2 P-2 P-2
P-7P-7
P-2
P-6
P-6
P-2
P-2
P-2
P-3
PAINT P-3 ON
ALL SIDES
PAINT P-3 ON
ALL SIDES
P-3 PAINT
ON ALL
SIDES P-3 PAINT
ON ALL
SIDES
P-3 PAINT
ON ALL
SIDES
P-4
P-4
P-6
P-6
P-6
P-6
P-2
P-2
P-2
P-7
P-3
VESTIBULE
OPEN
OFFICE
CORRIDOR
CORRIDOR
RF-1
RF-1
SDT-1
WCT-1
FULL
HEIGHT
WITH WCT-2
ACCENT BAND
2'-0"
4'-0"
TYP
6"
6'-0"
EQ
1'-0"
EQ
1'-0"
FLOOR PATTERN LEGEND
NOTES:
FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE
FINISH SCHEDULE.
CPT-4
LVT-1VCT-1
CPT-1 CPT-2
CT-1
CPT-3
CT-2
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :1
A
M
Scale: As indicated
IN110
OVERALL FIRST FLOOR DISTRIBUTION
PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
73 145
SCALE: 3/16" = 1'-0"
FIRST FLOOR PATTERN PLAN
N
FLOOR PATTERN LEGEND
FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE
FINISH SCHEDULE.
CPT-4
LVT-1VCT-1
CPT-1 CPT-2
CT-1
CPT-3
CT-2
CFO
INTERNAL
AUDITOR
CHIEF
54 SF
UNISEX
RR
50 SF
STAIRS
S-1
AFO
IT
HAC
218 ELECTRICAL
ELEVATOR
LOBBY
ELEVATOR
E-1
PAYROLL
SUPERVISOR
MCA
PROGRAM
OFFICE
WOMEN'S
TOILET
MEN'S
TOILET
OPEN
OFFICE
ASSISTANT
CHIEF
ACCOUNTING
SUPERVISOR
BREAK
ROOM
CONFERENCE
ROOM
STAIRS
S-2
COFFEE
RF-1
RF-1
P-6 P-3
P-3
P-6
P-6
P-2 P-2 P-2
P-2
P-7
P-4
P-3 PAINT
ON ALL
SIDES
PAINT ALL SIDES P-3
PAINT ALL
SIDES P-3
P-3, PAINT
ON ALL
SIDES
P-3
PAINT
ON ALL
SIDES
P-3
P-2
P-3
P-2
P-2
P-4
P-6
P-6
OPEN
OFFICE
CORRIDOR
OPEN
OFFICE
OPEN
OFFICE
CORRIDOR
VESTIBULE
2'-0"
SDT-1
WCT-1 FULL
HEIGHT WITH WCT-2
ACCENT BAND
WCT-1FULL
HEIGHT WITH WCT-2
ACCENT BAND
WCT-1 FULL
HEIGHT WITH
WCT-2 ACCENT
BAND
SEE IN120 FOR
SIM TYP DIMS
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
A
M
Scale: As indicated
IN120
OVERALL SECOND FLOOR
DISTRIBUTION PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
74 145
SCALE: 3/16" = 1'-0"
SECOND FLOOR PATTERN PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
STAIRS
S-1
CODING
SUPERVISOR
OFFICE
ADMINISTRATIVE
OFFICER
WOMEN'S
TOILET
VESTIBULE
MEN'S
TOILET
HAC
IT
ELECTRICAL
CONF.
ROOM
246 SF
ELEVATOR
LOBBY
240 SF
MED
RECORDS
SUPERVISOR
NON-VA
CARE
SUPV
RECORD
MANAGER
OFFICER
SCANNING
SUPV
CHIEF
MAS
OFFICER
HBU
SUPRVISOR
STAIRS
S-2
ELEVATOR
E-1
ASST
CHIEF
MAS
OFF
COFFEE
RF-1
RF-1
OPEN
OFFICE
OPEN
OFFICE
OPEN
OFFICE
OPEN
OFFICE
CORRIDOR
P-6
P-6
P-6
P-4
P-2
P-2 P-2 P-2
P-2 P-2 P-2 P-7
P-7
P-6
P-6
P-3
P-3
P-3
P-3
P-4
P-2
PAINT P-3 ALL SIDES
PAINT P-3 ALL SIDES
P-3 PAINT
ON ALL
SIDES
P-3
PAINT
ON ALL
SIDES
P-3 PAINT
ON ALL
SIDES
P-3
PAINT
ON ALL
SIDES
P-2
P-2
SDT-1
CORRIDOR
WCT-1 FULL
HEIGHT WITH WCT-2
ACCENT BAND
WCT-1FULL
HEIGHT WITH WCT-2
ACCENT BAND
SEE IN120 FOR
SIM TYP DIMS
FLOOR PATTERN LEGEND
NOTES:
FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE
FINISH SCHEDULE.
CPT-4
LVT-1VCT-1
CPT-1 CPT-2
CT-1
CPT-3
CT-2
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
A
M
Scale: As indicated
IN130
OVERALL THIRD FLOOR DISTRIBUTION
PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
75 145
SCALE: 3/16" = 1'-0"
THIRD FLOOR PATTERN PLAN
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
856 SF
MECHANICAL
300 SF
251 SF
SPRINKLERS
120 SF
124 SF
IT
100 SF
STAIRS
S-1
ELEVATOR
E-1
108 SF
ELEV.
MAC.
RM.
100 SF
153 SF
ELECTRICAL
200 SF
362 SF
HAC
56 SF
CORRIDOR
CORRIDOR
CORRIDOR
F.F.E. NOTES:
EQUIPMENT ABBREVIATIONS:
MW - MICROWAVE
REF - REFRIGERATOR
COF- COFFEE MAKER
PRINT- PRINTER/COPIER
TW - TALL WARDROBE CABINET
C - DESKTOP COMPUTER
ID- ID READER
FP- FINGER PRINT MACHINE
LT- LAPTOP
UPS- UPS UNDER DESK
LAM- LAMINATOR
SAFE- SAFE
CA- CAMERA ON TRIPOD
ET- EXAM TABLE
PS- PAPER SHREDDER
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
A
M
Scale: As indicated
IN200
OVERALL BASEMENT FLOOR F.F.E.
PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
76 145
SCALE: 3/16" = 1'-0"
BASEMENT F.F.E. PLAN
N
FOR REFERENCE ONLY
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
104 SF
HR
RECRUITMENT
100 SF
100 SF
HR
PROCESS
BENEFITS
100 SF
110 SF
EXAM
120 SF
99 SF
HR
PROCESS
100 SF
96 SF
HR
BENEFITS
SPECIALIST
100 SF98 SF
HR
SPECIALIST
OFFICER
100 SF
STAIRS
S-1
116 SF
VESTIBULE
100 SF
44 SF
ELECTRICAL
60 SF
45 SF
IT
56 SF
47 SF
HAC
56 SF
100 SF
WAITING
56 SF
99 SF
HR
BENEFIT
RA/FMLA
100 SF
80 SF
P.I.V
56 SF
151 SF
HR
CHIEF
OFFICER
150 SF
123 SF
ASSIST
HR
CHIEF
OFFICER
120 SF
73 SF
RECORDS
STORAGE
80 SF
99 SF
PHYS /
PROV
120 SF
108 SF
EXAM
120 SF
177 SF
WOMEN'S
TOILET
210 SF
STAIRS
S-2
97 SF
HR
SPECIALIST
OFFICER
100 SF
85 SF
TREATMENT
AREA
56 SF
73 SF
OWC
56 SF
78 SF
P.I.V.
56 SF
171 SF
MEN'S
TOILET
210 SF
43 SF
TLT
56 SF105 SF
HR
SPECIALIST
OFFICER
100 SF
ELEVATOR
E-1
270 SF
ELEVATOR
LOBBY
240 SF
28 SF
COFFEE
56 SF
CORRIDOR
1024 SF
OPEN
OFFICE
616 SF
2011 SF
OPEN
OFFICE
896 SF
36 SF
VESTIBULE
56 SF
159 SF
CORRIDOR
56 SF
112 SF
OPEN
OFFICE
112 SF
/8
CORRIDOR
83 SF
WAITING
56 SF
CUBICLE
CURTAIN TRACK
CUBICLE
CURTAIN TRACK
PS
PS
PS
PS
PS
1A
1C1D1E 1B
1H1K1L 1J
1G1H1I 1F
1N1O1P 1M
1X
1Y
1Z
1AA
1T
1U
1V
1W
1Q
1R
1S
1BB
1CC 1DD
ET
ET
TW
REF
REF REF
CA
FP (2) & ID
LT
C
UPS & CAFE
LAM
UPS & CAFE
C
LAM
FP
MW & COF
F.F.E. NOTES:
EQUIPMENT ABBREVIATIONS:
MW - MICROWAVE
REF - REFRIGERATOR
COF- COFFEE MAKER
PRINT- PRINTER/COPIER
TW - TALL WARDROBE CABINET
C - DESKTOP COMPUTER
ID- ID READER
FP- FINGER PRINT MACHINE
LT- LAPTOP
UPS- UPS UNDER DESK
LAM- LAMINATOR
SAFE- SAFE
CA- CAMERA ON TRIPOD
ET- EXAM TABLE
PS- PAPER SHREDDER
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :2
A
M
Scale: As indicated
IN210
OVERALL FIRST FLOOR F.F.E. PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
77 145
SCALE: 3/16" = 1'-0"
FIRST FLOOR F.F.E. PLAN
FOR REFERENCE ONLY
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
151 SF
CFO
150 SF
79 SF
INTERNAL
AUDITOR
100 SF
134 SF
CHIEF
150 SF
54 SF
UNISEX
RR
50 SF
STAIRS
S-1
123 SF
AFO
120 SF
45 SF
IT
56 SF
47 SF
HAC
56 SF 44 SF
ELECTRICAL
60 SF
254 SF
ELEVATOR
LOBBY
240 SF
ELEVATOR
E-1
107 SF
PAYROLL
SUPERVISOR
100 SF
107 SF
MCA
PROGRAM
OFFICE
100 SF
177 SF
WOMEN'S
TOILET
210 SF
171 SF
MEN'S
TOILET
210 SF
98 SF
ASSISTANT
CHIEF
100 SF
112 SF
ACCOUNTING
SUPERVISOR
100 SF
150 SF
BREAK
ROOM
150 SF
197 SF
CONFERENCE
ROOM
500 SF
STAIRS
S-2
28 SF
COFFEE
56 SF
L E
K T
R
IE
V E
R S
2099 SF
OPEN
OFFICE
1064 SF
CORRIDOR
CORRIDOR
1058 SF
OPEN
OFFICE
560 SF
444 SF
OPEN
OFFICE
336 SF
394 SF
OPEN
OFFICE
336 SF
PS
PS
PS
/4
EVACUATION
CHAIR. VA PROVIDED,
CONTRACTOR INSTALLED.
PROVIDE BLOCKING
2A
2C2D2F 2B2G2H2I 2E
2L2M2O 2K2P2Q2R 2N
2J
2S
2T
2V
2W
2X
2Y
2Z 2DD
2CC
2BB
2AA
2EE
2FF 2GG 2HH 2II 2JJ 2KK
2QQ2PP2OO2NN2MM2LL
MW
PS
MW & COF
PS
F.F.E. NOTES:
EQUIPMENT ABBREVIATIONS:
MW - MICROWAVE
REF - REFRIGERATOR
COF- COFFEE MAKER
PRINT- PRINTER/COPIER
TW - TALL WARDROBE CABINET
C - DESKTOP COMPUTER
ID- ID READER
FP- FINGER PRINT MACHINE
LT- LAPTOP
UPS- UPS UNDER DESK
LAM- LAMINATOR
SAFE- SAFE
CA- CAMERA ON TRIPOD
ET- EXAM TABLE
PS- PAPER SHREDDER
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :3
A
M
Scale: As indicated
IN220
OVERALL SECOND FLOOR F.F.E. PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
78 145
SCALE: 3/16" = 1'-0"
SECOND FLOOR PLAN
FOR REFERENCE ONLY
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
STAIRS
S-1
107 SF
CODING
SUPERVISOR
OFFICE
100 SF
107 SF
ADMINISTRATIVE
OFFICER
100 SF
177 SF
WOMEN'S
TOILET
210 SF
171 SF
MEN'S
TOILET
210 SF
47 SF
HAC
56 SF
45 SF
IT
56 SF
44 SF
ELECTRICAL
60 SF
197 SF
CONF.
ROOM
120 SF
246 SF
ELEVATOR
LOBBY
240 SF
96 SF
MED
RECORDS
SUPERVISOR
100 SF
96 SF
NON-VA
CARE
SUPV
100 SF
101 SF
RECORD
MANAGER
OFFICER
100 SF
103 SF
SCANNING
SUPV
100 SF
151 SF
CHIEF
MAS
OFFICER
150 SF
123 SF
HBU
SUPRVISOR
100 SF
STAIRS
S-2
ELEVATOR
E-1
98 SF
ASST
CHIEF
MAS
OFF
100 SF
2220 SF
OPEN
OFFICE
1008 SF
36 SF
VESTIBULE
56 SF
445 SF
OPEN
OFFICE
280 SF
CORRIDOR
453 SF
OPEN
OFFICE
392 SF
1053 SF
OPEN
OFFICE
616 SF
CORRIDOR
PS
PS
PS
EVACUATION
CHAIR. VA PROVIDED,
CONTRACTOR INSTALLED.
PROVIDE BLOCKING
3A
3C3D3F 3B3G3H3I 3E
3M3O 3L3P3Q3R 3N
3J
3T
3V
3W
3X
3Y
3Z
3DD
3CC
3BB
3AA 3EE
3FF
3GG 3HH
3II
3JJ
3KK 3QQ3PP3OO3NN3MM3LL
3K3R
28 SF
COFFEE
56 SF
MW & COF
PS
PS
F.F.E. NOTES:
EQUIPMENT ABBREVIATIONS:
MW - MICROWAVE
REF - REFRIGERATOR
COF- COFFEE MAKER
PRINT- PRINTER/COPIER
TW - TALL WARDROBE CABINET
C - DESKTOP COMPUTER
ID- ID READER
FP- FINGER PRINT MACHINE
LT- LAPTOP
UPS- UPS UNDER DESK
LAM- LAMINATOR
SAFE- SAFE
CA- CAMERA ON TRIPOD
ET- EXAM TABLE
PS- PAPER SHREDDER
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :3
A
M
Scale: As indicated
IN230
OVERALL THIRD FLOOR F.F.E. PLAN
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
79 145
SCALE: 3/16" = 1'-0"
THIRD FLOOR PLAN
FOR REFERENCE ONLY
N
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
FINISH LEGEND
FLOORS BASE WALLS
CASEWORK
FINISH NOTES
CPT-1 (CARPET TILE)
MFR: TANDUS CENTIVA
PATTERN: RIVET 04219
COLOR: SPOTLIGHT 54211
INSTALLATION METHOD: QUATER TURNED
LVT-1 (LUXURY VINYL TILE)
MFR: SHAW CONTRACT HARD SURFACE
PATTERN: INTERVAL 0514V
COLOR: MORNING 13103
CT-1 MFR: CROSSVILLE 12X12 TILE
PATTERN: MAIN STREET
COLOR: CAFE CARMEL AV212
GROUT: TEC POWER GROUT COLOR SUMMER
WHEAT 982
RB-1 MFR: JOHNSONITE
PATTERN: 4" COVE BASE
COLOR: FAWN 80
CTB-1 COVE BASE
MFR: SCHLUTER SYSTEMS
PATTERN:COVE SHAPED PROFILE DILEX-AHKA
COORDINATE PIECE WITH TILE THICKNESS
COLOR:BRUSHED STAINLESS STEEL FINISH
GROUT:USE CORRESPONDING GROUT FOR
ADJACENT SPACE
P-1 (PAINT)
MFR: GRAHAM PAINT SYSTEM
COLOR: THISTLE GRAY 0197
VWC-1 (VINYL WALLCOVERING)
MFR: MDC WALLCOVERING
PATTERN: FINESSE #1422FN
COLOR: METEORITE
PL-1 (PLASTIC LAMINATE)
MFR: WILSONART
COLOR: AMBER CHERRY 7919K-78
SS-1 (SOLID SURFACE)
MFR: ZODIAQ
COLOR: SAVORY
CPT-2 (CARPET TILE)
MFR: TANDUS CENTIVA
PATTERN: INLINE 04122
COLOR: SPOTLIGHT 54211
INSTALLATION METHOD: QUARTER TURNED
CT-2 MFR: CROSSVILLE 6X18 TILE
PATTERN: MAIN STREET
COLOR: CAFE CARMEL AV212
GROUT: TEC POWER GROUT COLOR SUMMER
WHEAT 982
P-2 (PAINT)
MFR: GRAHAM PAINT SYSTEM
COLOR: THATCHED COTTAGE 0206 (TAUPE)
P-3 (PAINT)
MFR: GRAHAM PAINT SYSTEM
COLOR: TAN HIDE 0261 (WARM GOLD)
P-4 (PAINT)
MFR: GRAHAM PAINT SYSTEM
COLOR: DUBLOON 0890 (GOLD)
P-5 (PAINT) NOT USED
P-8 (PAINT)
MFR: GRAHAM PAINT SYSTEM
CEILING WHITE
1. IF NOTES ARE NOT DEFINED IN FINISH SCHEDULE, THEN THEY APPLY TO ALL AREAS.
2. DOOR FRAME PAINT (SEMI-GLOSS CERAMIC PAINT) TO MATCH ADJACENT WALL COLOR.
3. ELECTRICAL DEVICES AND COVER PLATE COLORS TO BE DETERMINED BY THE ARCHITECT.
4. PAINT TYP, UNLESS NOTED OTHERWISE TO BE SATIN/EGGSHELL FINISH.
5. PAINT IN ALL TOILET ROOMS AND TREATMENT AREAS TO BE SEMI-GLOSS PAINT. WALLS WHERE WALL TILE AND PAINT ARE DEFINED: WALL TILE TO BE 4FT ABOVE FINISHED FLOOR WITH PAINT ABOVE. WALLS WHERE WCT-1 AND WCT-2 ARE DEFINED: WCT-1 TO BE FULL HEIGHT WITH AN ACCENT BAND OF WCT-2
AFTER THE 9TH COURSING OF WCT-1.
6. PAINT NEW AND EXISTING GYPSUM BOARD CEILINGS PAINTED FLAT FINISH.
7. CUBICLE CURTAIN FABRIC TO BE MFR: ARC COM- MORI AC-33081 IN COLOR: SPRING #2 WITH MESH COLOR TO BE OFF-WHITE (CURTAIN BY OWNER)
TRACK BY GC.
8. TOILET PARTITIONS TO BE GENERAL PARTITIONS STAINLESS STEEL IN DIAMOND PATTERN FINISH.
9. HANDRAILS TO BE PAINTED P-3. STRINGERS TO BE BE PAINTED P-6.
10. FRP PANELS TO BE IN ALL ALL HAC ROOMS, COLOR: BEIGE (Desert Sand #102).
11. ARCHITECTURAL WOOD DOOR COLOR TO BE STAINED TO MATCH PL-1.
WCT-1 (WALL TILE)
MFR: AMERICAN OLEAN 6X6 TILE
PATTERN: BRIGHTS & MATTES
COLOR: MATTE CAPPUCINO 0009
GROUT: TEC POWER GROUT COLOR LIGHT
BUFF 945
WCT-2 (WALL TILE)
MFR: AMERICAN OLEAN
MFR: AMERICAN OLEAN 6X6 TILE
PATTERN: BRIGHTS & MATTES
COLOR: MATTE CAPPUCINO 0009
GROUT: TEC POWER GROUT COLOR LIGHT
BUFF 945
CORNER GUARDS
CG-1 CORNER GUARD
MFR: INPRO 150 CORNER GUARDS
SIZE: 3" WIDE / FULL HEIGHT
COLOR: BURPLAP 0252
APC-1 BEVELED TEGULAR LAY-IN 2'X2'
MFR: ARMSTRONG WORLD INDUSTRIES
PATTERN: ULTIMA #1911
GRID: 15/16" WHITE
VCT-1 (VINYL COMPOSITION TILE)
MFR: MANNINGTON COMMERCIAL
PATTERN: ESSENTIALS
COLOR: 133 ALMONDINE
RP-1 (RESIN PANEL)
MFR: 3-FORM
STYLE: BRONZE WEAVE
FINISH: SANDSTONE
SIZE: 1/2" GAUGE
WP-1 WALL PROTECTION
MFR: IN PRO RIGID PANEL
COLOR: BURPLAP 0252
CPT-4 (WALK-OFF CARPET)
MFR: SHAW CONTRACT
PATTERN: WELCOME II TILE 5T031
COLOR: BLACK CHOCOLATE 31751
GYP.BD. GYPSUM BOARD
C-1: ELEVATOR MANUFACTURER CEILING
SYSTEM. SEE SPEC 14-24-00
W-1: ELEVATOR MANUFACTURER WALL
SYSTEM. SEE SPEC 14-24-00
CPT-3 (CARPET TILE)
MFR: TANDUS CENTIVA
PATTERN: INLINE 04122
COLOR: SPOTLIGHT 54211
INSTALLATION METHOD: QUARTER TURNED
P-6 (PAINT)
MFR: GRAHAM PAINT SYSTEM
MATCH COLOR TO SHERWIN WILLIAMS
RUSKIN ROOM GREEN SW0042
P-7 (PAINT)
MFR: GRAHAM PAINT SYSTEM
COLOR: CYSTERN 0511 (LIGHT BLUE)
RF-1 (RUBBER FLOOR TILE)
MFR: JOHNSONITE
PATTERN: MICROTONE SPECKLED RUBBER
TILE AND ONE PEICE TREAD RISER SYSTEM
ON STAIRS (VIHTR) HAMMERED TREAD RISER
WITH VISUALLY IMPAIRED STRIP
TEXTURE: HAMMERED
COLOR: SILKWORM WB (HNSP-LE3)
CEILINGS
SDT-1 (STATIC DISSAPATIVE TILE)
MFR: ARMSTRONG
TYPE: EXCELON SDT
COLOR: MARBLE BEIGE 51950
GENERAL NOTE: FOR WALL PROTECTION
LOCATIONS SEE FLOOR PLANS
SCONC-1 SEALED CONCRETE
M A
X
3"
M
IN
1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222
SSOE, Inc.
D A
T E
FULLY SPRINKLERED
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
VA ANN ARBOR MEDICAL CENTER CAMPUS
PROJECT #: 015-01361-00
BIDS SUBMISSION_REVISED
C A u to d e s k \R e v it \0
A
S
S O
E .r v t
/9
/2
:4 :3
A
M
Scale: As indicated
IN650
ROOM FINISH SCHEDULE & SIGNAGE
SCHEDULE
HROSKO
506-329CLINICAL & ADMINISTRATIVE
BUILDING
WHITE04-12-18
80 145
ROOM FINISH SCHEDULE
NO ROOM NAME
FLOOR
FINISH
BASE
FINISH
WALL FINISH CEILING CASEWORK
REMARKSNORTH EAST SOUTH WEST MATL FINISH HORIZONTAL VERTICAL
BASEMENT
001 CORRIDOR SCONC-1 RB-1 P-1 P-1 P-1 P-1 EXP P-8 -- --
002 CORRIDOR SCONC-1 RB-1 P-1 P-1 P-1 P-1 EXP P-8 -- --
003 CORRIDOR SCONC-1 RB-1 P-1 P-1 P-1 P-1 EXP P-8 -- --
004 ELEV. MAC. RM. VCT-1 RB-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY
(NO FINISH COAT)
005 ELECTRICAL VCT-1 RB-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY
(NO FINISH COAT)
006 IT SDT-1 RB-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY
(NO FINISH COAT)
007 SPRINKLERS SCONC-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY
(NO FINISH COAT)
011 MECHANICAL SCONC-1 -- ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY
(NO FINISH COAT)
012 HAC SCONC-1 -- ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY
(NO FINISH COAT), SEE
NOTE 10
E-1 ELEVATOR CPT-1 RB-1 W-1 W-1 W-1 W-1 C-1 -- -- --
S-1 STAIRS RF-1 RB-1 P-1 P-1 P-1 P-4 EXP/ GYP BD P-8 -- --
FIRST FLOOR
100 VESTIBULE CPT-4 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 -- --
101 ELEVATOR LOBBY CPT-4 RB-1 P-1, P-6 P-1, P-6 P-1 P-1 APC-1, GYP. BD P-8 -- --
102 CORRIDOR CPT-1 RB-1 P-1 P-1 P-6 P-1 APC-1, GYP. BD P-8 -- RP-1
103 OPEN OFFICE CPT-1, LVT-1 RB-1 P-1, P-3, P-7 P-1, P-3, P-7 P-1, P-3 P-3 APC-1, GYP. BD P-8 -- RP-1
104 VESTIBULE CT-1/CT-2 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 -- --
105 COFFEE LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1/GYP.BD. P-8 SS-1 PL-1
106 OPEN OFFICE CPT-1 RB-1 P-1, P-3 P-6, P-3 P-3, P-1 P-1, P-3 APC-1, GYP BD. P-8 --` --
107 CORRIDOR CPT-1 RB-1 P-6, P-3 P-1, P-6, P-3 P-7 P-1, P-3 APC-1, GYP. BD P-8 -- --
108 CORRIDOR LVT-1 RB-1 P-1 P-6 P-7, P-1 P-1, P-7 APC-1 -- -- PL-1
109 OPEN OFFICE LVT-1 RB-1 P-6 P-1, P-6 P-1 P-1 APC-1 -- -- --
113 P.I.V CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
114 P.I.V. CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
115 WAITING CPT-1 RB-1 P-7 P-1 P-1 P-1 APC-1, GYP. BD P-8 -- --
116 HR BENEFIT RA/FMLA CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP BD. P-8 -- --
117 ELECTRICAL VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
118 IT SDT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
119 HAC VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- -- NOTE 10
122 MEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 WCT-1, WCT-2 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5
123 WOMEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5
124 HR PROCESS BENEFITS CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
125 HR RECRUITMENT CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
126 HR SPECIALIST OFFICER CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
127 ASSIST HR CHIEF OFFICER CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD P-8 -- --
128 HR CHIEF OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --
129 HR SPECIALIST OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD P-8 -- --
131 HR SPECIALIST OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD. P-8 -- --
132 HR BENEFITS SPECIALIST CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD P-8 -- --
133 OWC CPT-1 RB-1 P-1 P-1 P-1 P-1, P-7 APC-1, GYP. BD P-8 -- --
134 EXAM LVT-1 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD P-8 SS-1 PL-1 NOTE 7, NOTE 5
135 EXAM LVT-1 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD. P-8 SS-1 PL-1 NOTE 7, NOTE 5
136 RECORDS STORAGE LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1, GYP. BD P-8 -- --
137 HR PROCESS CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1 -- -- --
138 PHYS / PROV LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
139 TLT CT-1 CTB-1 P-1 P-1 P-1 WCT-1, WCT-2 APC-1 -- -- -- NOTE 5
140 TREATMENT AREA LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1/GYP.BD. P-8 SS-1 PL-1 NOTE 5
141 WAITING LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
S-2 STAIRS RF-1 RB-1 P-1 P-1 P-4 P-1 EXP, GYP. BD P-8 -- --
SECOND FLOOR
201 ELEVATOR LOBBY CPT-4 RB-1 P-1, P-6 P-1, P-6 P-1 P-1 APC-1, GYP. BD P-8 -- --
202 CORRIDOR CPT-1 RB-1 P-1 P-1 P-6 P-1 APC-1, GYP. BD P-8 -- RP-1
203 OPEN OFFICE CPT-1, LVT-1 RB-1 P-1, P-3 P-1, P-3 P-1, P-3, P-7 P-7, P-3 APC-1, GYP. BD P-8 PL-1 RP-1, PL-1
204 VESTIBULE CT-1, CT-2 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 -- --
206 OPEN OFFICE CPT-1 RB-1 P-3, P-7, P-1 P-6, P-3 P-1, P-3 P-1, P-3 APC-1, GYP. BD. P-8 -- --
207 COFFEE LVT-1 RB-1 P-1 P-1 P-1 P-1 GYP.BD. P-8 SS-1 PL-1
208 CORRIDOR CPT-1 RB-1 P-3, P-6 P-1 P-1, P-3 P-1 APC-1 -- -- --
209 OPEN OFFICE CPT-1 RB-1 P-1, P-6 P-1, P-6 P-1 P-1 APC-1 -- -- --
210 OPEN OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 APC-1 -- -- --
213 CONFERENCE ROOM CPT-2, CPT-3 RB-1 VWC-1 VWC-1 VWC-1 VWC-1 APC-1, GYP. BD P-8 -- --
216 ELECTRICAL VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
217 IT SDT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
218 HAC VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- -- NOTE 10
219 MEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 WCT-1, WCT-2 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5
222 WOMEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5
223 PAYROLL SUPERVISOR CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
224 MCA PROGRAM OFFICE CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
226 AFO CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD. P-8 -- --
227 CFO CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD. P-8 -- --
228 INTERNAL AUDITOR CPT-1 RB-1 P-1 P-3 P-1 P-1 APC-1, GYP. BD P-8 -- --
230 ASSISTANT CHIEF CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --
231 CHIEF CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD. P-8 -- --
232 UNISEX RR CT-1 CTB-1 P-1 P-1 WCT-1, WCT-2 P-1 APC-1, GYP BD P-8 SS-1 PL-1 NOTE 5
233 BREAK ROOM LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1, GYP. BD. P-8 SS-1 PL-1
234 ACCOUNTING SUPERVISOR CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD. P-8 -- --
THIRD FLOOR
301 ELEVATOR LOBBY CPT-4 RB-1 P-1, P-6 P-6, P-1 P-1 P-1 APC-1, GYP BD P-8 -- --
302 CORRIDOR CPT-1 RB-1 P-1 P-1 P-6 P-1 APC-1, GYP. BD P-8 -- RP-1
303 OPEN OFFICE CPT-1 RB-1 P-1, P-3 P-1, P-3 P-1, P-2, P-3 P-3, P-2 APC-1, GYP. BD P-8 PL-1 RP-1, PL-1
304 VESTIBULE CT-1, CT-2 RB-1 P-1 P-1 P-1 P-1 GYP. BD P-8 -- --
305 COFFEE LVT-1 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 SS-1 PL-1
306 OPEN OFFICE CPT-1 RB-1 P-3, P-1 P-6, P-3 P-3 P-1, P-3 APC-1, GYP. BD. P-8 -- --
307 CORRIDOR CPT-1 RB-1 P-3 P-1 P-7 P-3 APC-1 -- -- --
308 OPEN OFFICE CPT-1 RB-1 P-1, P-6 P-1, P-6 -- -- APC-1 -- -- --
309 OPEN OFFICE CPT-1 RB-1 P-1, P-6 P-1 P-1 P-7 APC-1 -- -- --
313 CONF. ROOM CPT-2, CPT-3 RB-1 VWC-1 VWC-1 VWC-1 VWC-1 APC-1 -- -- --
316 ELECTRICAL VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
317 IT SDT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --
318 HAC VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- -- NOTE 10
319 MEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 WCT-1, WCT-2 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5
322 WOMEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 APC-1, GYP. BD P-8 SS-1 PL-1 NOTE 5
323 CODING SUPERVISOR OFFICE CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
324 ADMINISTRATIVE OFFICER CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --
326 HBU SUPRVISOR CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD P-8 -- --
327 CHIEF MAS OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --
328 ASST CHIEF MAS OFF CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --
329 SCANNING SUPV CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD P-8 -- --
331 RECORD MANAGER OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --
332 NON-VA CARE SUPV CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD. P-8 -- --
333 MED RECORDS SUPERVISOR CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD. P-8 -- --
SIGNAGE SCHEDULE
NO ROOM NAME QTY SIGN TYPE SIGN TO READ
BASEMENT
001 CORRIDOR 1 TYPE C2a (FLR NUMBER/BUILDING NAME)
002 CORRIDOR -- --
003 CORRIDOR -- --
004 ELEV. MAC. RM. 1 TYPE A5 (RM NUMBER)
005 ELECTRICAL 1 TYPE A5 (RM NUMBER)
006 IT 1 TYPE A5 (RM NUMBER)
007 SPRINKLERS 1 TYPE A5 (RM NUMBER)
011 MECHANICAL 1 TYPE A5 (RM NUMBER)
012 HAC 1 TYPE A5 (RM NUMBER)
E-1 ELEVATOR 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT
USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT
ALL TIMES
S-1 STAIRS 1 TYPE B2/B4 EXIT/FIRE DOOR KEEP CLOSED AT ALL TIMES
FIRST FLOOR
100 VESTIBULE 3 OF EACH/1 OF
TYPE A5
TYPE G6 PUSH BUTTON TO OPEN DOORS/A5 TO READ EXIT
101 ELEVATOR LOBBY 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT
USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT
ALL TIMES
102 CORRIDOR 1 OF EACH TYPE A1.b/A12 (RM NUMBER)
103 OPEN OFFICE 16 TYPE A12 (RM NUMBER)
104 VESTIBULE 1 TYPE E12 RESTROOMS
105 COFFEE -- --
106 OPEN OFFICE 11 TYPE A12 (RM NUMBER)
107 CORRIDOR 1 TYPE L2.1 --
108 CORRIDOR 1 TYPE L2.1 --
109 OPEN OFFICE 2 TYPE A12 (RM NUMBER)
113 P.I.V 1 TYPE A12 (RM NUMBER)
114 P.I.V. 1 TYPE A12 (RM NUMBER)
115 WAITING 1 TYPE A12 (RM NUMBER)
116 HR BENEFIT RA/FMLA 1 TYPE A12 (RM NUMBER)
117 ELECTRICAL 1 TYPE A5 (RM NUMBER)
118 IT 1 TYPE A5 (RM NUMBER)
119 HAC 1 TYPE A5 (RM NUMBER)
122 MEN'S TOILET 1 TYPE A6 MEN'S RESTROOM
123 WOMEN'S TOILET 1 TYPE A6 WOMEN'S RESTROOM
124 HR PROCESS BENEFITS 1 TYPE A12 (RM NUMBER)
125 HR RECRUITMENT 1 TYPE A12 (RM NUMBER)
126 HR SPECIALIST OFFICER 1 TYPE A12 (RM NUMBER)
127 ASSIST HR CHIEF OFFICER 1 TYPE A12 (RM NUMBER)
128 HR CHIEF OFFICER 1 TYPE A12 (RM NUMBER)
129 HR SPECIALIST OFFICER 1 TYPE A12 (RM NUMBER)
131 HR SPECIALIST OFFICER 1 TYPE A12 (RM NUMBER)
132 HR BENEFITS SPECIALIST 1 TYPE A12 (RM NUMBER)
133 OWC 1 TYPE A12 (RM NUMBER)
134 EXAM 1 TYPE A12 (RM NUMBER)
135 EXAM 1 TYPE A12 (RM NUMBER)
136 RECORDS STORAGE 1 TYPE A5 (RM NUMBER)
137 HR PROCESS 1 TYPE A12 (RM NUMBER)
138 PHYS / PROV 1 TYPE A12 MEN'S RESTROOM
139 TLT 1 TYPE A6 RESTROOM
140 TREATMENT AREA 1 TYPE A12 (RM NUMBER)
141 WAITING 1 OF TYPE A1.b/2 OF
TYPE A12
TYPE A1.b/A12 (RM NUMBER)
S-2 STAIRS 3 OF EACH TYPE B2/B4 EXIT/FIRE DOOR KEEP CLOSED AT ALL TIMES
SECOND FLOOR
201 ELEVATOR LOBBY 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT
USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT
ALL TIMES
202 CORRIDOR 1 OF EACH TYPE A1.b/A12 (RM NUMBER)
203 OPEN OFFICE 16 TYPE A12 (RM NUMBER)
204 VESTIBULE 1 TYPE E12 RESTROOMS
206 OPEN OFFICE 10 TYPE A12 (RM NUMBER)
207 COFFEE -- --
208 CORRIDOR 1 TYPE L2.1 --
209 OPEN OFFICE 6 TYPE A12 (RM NUMBER)
210 OPEN OFFICE 4 TYPE A12 (RM NUMBER)
213 CONFERENCE ROOM 1 TYPE A2 (RM NUMBER)
216 ELECTRICAL 1 TYPE A5 (RM NUMBER)
217 IT 1 TYPE A5 (RM NUMBER)
218 HAC 1 TYPE A5 (RM NUMBER)
219 MEN'S TOILET 1 TYPE A6 MEN'S RESTROOM
222 WOMEN'S TOILET 1 TYPE A6 WOMEN'S RESTROOM
223 PAYROLL SUPERVISOR 1 TYPE A12 (RM NUMBER)
224 MCA PROGRAM OFFICE 1 TYPE A12 (RM NUMBER)
226 AFO 1 TYPE A12 (RM NUMBER)
227 CFO 1 TYPE A12 (RM NUMBER)
228 INTERNAL AUDITOR 1 TYPE A12 (RM NUMBER)
230 ASSISTANT CHIEF 1 TYPE A12 (RM NUMBER)
231 CHIEF 1 TYPE A12 (RM NUMBER)
232 UNISEX RR 1 OF EACH TYPE A6/TYPE E12 RESTROOM
233 BREAK ROOM 1 TYPE A12 (RM NUMBER)
234 ACCOUNTING SUPERVISOR 1 TYPE A12 (RM NUMBER)
THIRD FLOOR
301 ELEVATOR LOBBY 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT
USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT
ALL TIMES
302 CORRIDOR 1 OF EACH TYPE A1.b/A12 (RM NUMBER)
303 OPEN OFFICE 19 TYPE A12 (RM NUMBER)
304 VESTIBULE 1 TYPE E12 RESTROOM
305 COFFEE -- ---
306 OPEN OFFICE 11 TYPE A12 (RM NUMBER)
307 CORRIDOR 1 TYPE L2.1 --
308 OPEN OFFICE 7 TYPE A12 (RM NUMBER)
309 OPEN OFFICE 5 TYPE A12 (RM NUMBER)
313 CONF. ROOM 1 TYPE A2 (RM NUMBER)
316 ELECTRICAL 1 TYPE A5 (RM NUMBER)
317 IT 1 TYPE A5 (RM NUMBER)
318 HAC 1 TYPE A5 (RM NUMBER)
319 MEN'S TOILET 1 TYPE A6 MEN'S RESTROOM
322 WOMEN'S TOILET 1 TYPE A6 WOMEN'S RESTROOM
323 CODING SUPERVISOR OFFICE 1 TYPE A12 (RM NUMBER)
324 ADMINISTRATIVE OFFICER 1 TYPE A12 (RM NUMBER)
326 HBU SUPRVISOR 1 TYPE A12 (RM NUMBER)
327 CHIEF MAS OFFICER 1 TYPE A12 (RM NUMBER)
328 ASST CHIEF MAS OFF 1 TYPE A12 (RM NUMBER)
329 SCANNING SUPV 1 TYPE A12 (RM NUMBER)
331 RECORD MANAGER OFFICER 1 TYPE A12 (RM NUMBER)
332 NON-VA CARE SUPV 1 TYPE A12 (RM NUMBER)
333 MED RECORDS SUPERVISOR 1 TYPE A12 (RM NUMBER)
SIGNAGE NOTES:
1. SEE TECHNICAL SPECIFICATIONS FOR SIGN TYPE INFORMATION.
2. IF SIGNS ARE ON GLASS, PROVIDE BACK PANEL FOR BACK SIDE.
3. PROVIDE PROPER ATTACHMENT DEVICES FOR ATTACHMENT TO
WORKSTATION PANELS.
SCALE: 1/2" = 1'-0"
SIGNAGE PLACEMENT DETAIL
DESIGN DEVELOPMENT SUBMISSION 1 04-15-16
DESIGN DEVELOPMENT SUBMISSION 2 06-10-16
95% CONSTRUCTION DOCUMENTS
SUBMISSION
11-15-16
1. FIRE PROTECTION CONTRACTOR SHALL FURNISH MATERIAL
AND EQUIPMENT AS REQUIRED FOR A COMPLIANT SPRINKLER
PROTECTION THROUGHOUT THE NEW BUILDING. DESIGN
SHALL BE IN COMPLIANCE WITH NFPA 13-2013 EDITION,
PROJECT SPECIFICATIONS SECTIONS: 21 13 13 & 21 08 00 AND VA
FIRE PROTECTION DESIGN MANUAL.
2. STANDPIPE SYSTEM SHALL BE BASED ON MANUAL WET CLASS 1
STANDPIPE DESIGN. STANDPIPE SHALL NOT BE SMALLER THAN 4"
IN SIZE. EACH FLOOR SPRINKLER CONNECTION SHALL BE
PROVIDED WITH SUPERVISED CONTROL VALVE, CHECK VALVE,
PRESSURE GAUGE, FLOW SWITCH AND COMBINATION TEST AND
DRAIN CONNECTION. 2-1/2" HOSE VALVE SHALL BE PROVIDED WITH
CAP AND CHAIN HAVING THREADS MATCHING CITY OF ANN ARBOR
FIRE DEPARTMENT REQUIREMENTS.
3. MANUAL WET STANDPIPE SHALL BE SIZED BASED ON A WATER
SUPPLY FROM A FIRE PUMPER TRUCK ABLE TO PROVIDE 1000 GPM
@ 150 PSI AT THE FIRE DEPARTMENT CONNECTION. STANDPIPE
SHALL NOT BE SMALLER THAN 4" IN SIZE. THE PRESSURE
REQUIREMENTS AT THE TOP OF THE MOST REMOTE STANDPIPE
SHALL BE 100 PSI WHILE FLOWING 500 GPM OUT OF THE REMOTE
STANDPIPE AND 250 GPM OUT OF THE SECOND STANDPIPE.
4. FIRE SPRINKLER SYSTEM SHALL BE DESIGNED FOR LIGHT
HAZARD COVERAGE THROUGHOUT WITH THE EXCEPTION OF
MECHANICAL, ELECTRICAL, STORAGE ROOMS, BASEMENT,
JANITOR CLOSET AND SIMILAR ROOMS HAVING OCCUPANCY
WITH HIGHER FIRE LOAD THAN LIGHT HAZARD OCCUPANCIES.
SUCH ROOMS SHALL BE COVERAGE SHALL BE BASED ON
ORDINARY GROUP 1.
5. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE TO SUBMIT A
COMPLETE SET OF SHOP DRAWINGS, HYDRAULIC
CALCULATIONS AND MATERIAL SUBMITTALS PRIOR TO PIPE
FABRICATION AND INSTALLATION IN COMPLIANCE WITH
SPECIFICATIONS SECTION 01 33 23.
6. FIRE PROTECTION CONTRACTOR SHALL BASE THE HYDRAULIC
CALCULATIONS ON A FLOW TEST CONDUCTED WITHIN 12
MONTHS OF THE SHOP DRAWING SUBMITTALS. REMOTE AREA CAN
BE REDUCED BY UP TO 40% AS ALLOWED BY NFPA #13-2013,
SECTION 11.2.3.2.3.1.
7. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE TO
CO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.