36C25018B0795-015.pdf

PDF 10 MB Posted

Attached to
Construct Clinical and Admin Building 506-329 Federal contract opportunity
Solicitation number
36C25018B0795
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0795 506-329 VA Ann Arbor Admin Bldg BID DWGS REVISED_Part5.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct Clinical and Admin Building 506-329, newest first.
File Type Posted
36C25018B0795-0005000.docx DOCX document
36C25018B0795-0004000.docx DOCX document
36C25018B0795-0003000.docx DOCX document
36C25018B0795-0003001.xlsx XLSX spreadsheet
36C25018B0795-0002000.docx DOCX document
36C25018B0795-0001002.pdf PDF
36C25018B0795-0001000.docx DOCX document
36C25018B0795-0001001.pdf PDF
36C25018B0795-012.pdf PDF
36C25018B0795-007.docx DOCX document
36C25018B0795-016.pdf PDF
36C25018B0795-011.pdf PDF
36C25018B0795-019.pdf PDF
36C25018B0795-017.pdf PDF
36C25018B0795-021.pdf PDF
36C25018B0795-013.pdf PDF
36C25018B0795-009.docx DOCX document
36C25018B0795-010.pdf PDF
36C25018B0795-008.docx DOCX document
36C25018B0795-020.pdf PDF
36C25018B0795-018.pdf PDF
36C25018B0795-022.docx DOCX document
36C25018B0795-014.pdf PDF
36C25018B0795-000.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D

HE

4.2

5.4

J

2.8

4.8

GF

MECHANICAL SHAFT

FEC

FEC

K

K

J

J

J J J

J

J

J

J

J.B. POWER & DATA

TYP.

SYSTEM FURNITURE

FULL HEIGHT PANELS

(BY VA) TYP.

DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT

AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED

AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);

125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);

132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);

328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP

SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE

WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)

- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00

GENERAL REQUIREMENTS

ALTERNATE NO. 7

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :2

P

M

Scale: As indicated

AE810

FIRST FLOOR DEDUCT ALTERNATE 7

PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

64 148

SCALE: 3/16" = 1'-0"AE810

F4 FIRST FLOOR PLAN DEDUCT ALTERNATE 7

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

BIDS SUBMISSION 01-20-17

BIDS SUBMISSION_REVISED 04-12-18

HE

4.2

5.4

J

2.8

4.8

GF

SLOPE

1%

CG

CG

CG

FEC

FEC

CG

ALIGN

K

K

J

J

J

J

J

J

J.B. POWER & DATA

TYP.

SYSTEM FURNITURE

FULL HEIGHT PANELS

(BY VA) TYP.

J

DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT

AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED

AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);

125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);

132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);

328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP

SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE

WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)

- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00

GENERAL REQUIREMENTS

ALTERNATE NO. 7

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :2

P

M

Scale: As indicated

AE820

SECOND FLOOR DEDUCT ALTERNATE 7

PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

65 148

SCALE: 3/16" = 1'-0"AE820

F4 SECOND FLOOR PLAN DEDUCT ALTERNATE 7

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

HE

4.2

5.4

J

2.8

4.8

GF

F

FEC

K

K

J

J

J J

J

J

J.B. POWER & DATA

TYP.

SYSTEM FURNITURE

FULL HEIGHT PANELS

(BY VA) TYP.

J JJ

DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT

AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED

AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);

125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);

132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);

328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP

SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE

WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)

- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00

GENERAL REQUIREMENTS

ALTERNATE NO. 7

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :3

P

M

Scale: As indicated

AE830

THIRD FLOOR DEDUCT ALTERNATE 7

PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

66 148

SCALE: 3/16" = 1'-0"AE830

F4 THIRD FLOOR PLAN DEDUCT ALTERNATE 7

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

HE

4.2

5.4

J

2.8

4.8

G

F

F

MECHANICAL SHAFT

EXP

EXP

9'-0"

10'-0"

9'-6"

9'-0"

9'-0"

9'-0"

9'-0" 9'-0"

9'-6"

9'-6"

9'-0"

9'-0"

7'-0"

8'-0"

9'-6"

9'-0"

7'-0"

9'-6"

6'-8"

9'-6"

K

K

S

S S

S

S S

S

SS

S

S

S

S

S S

SS

S

S

S

SS

SS

SS

S

S S

S

S

S

S

S

SS

S

S

S

DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT

AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED

AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);

125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);

132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);

328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP

SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE

WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)

- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00

GENERAL REQUIREMENTS

ALTERNATE NO. 7

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :3

P

M

Scale: As indicated

AE851

FIRST FLOOR REFLECTED CEILING

DEDUCT ALTERNATE 7 PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

67 148

SCALE: 3/16" = 1'-0"AE851

F1 FIRST FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 7

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

HE

4.2

5.4

J

2.8

4.8

G

F

F

MECHANICAL SHAFT

EXP

EXP

9'-0"

9'-0"

9'-0" 9'-0"

9'-6"

9'-0"

9'-6"

9'-6"

8'-0" 8'-0"

7'-0"

K

K

1'-6"

1'-6"

S

S

S

S

S

S

DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT

AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED

AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);

125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);

132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);

328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP

SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE

WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)

- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00

GENERAL REQUIREMENTS

ALTERNATE NO. 7

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :4

P

M

Scale: As indicated

AE852

SECOND FLOOR REFLECTED CEILING

DEDUCT ALTERNATE 7 PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

68 148

SCALE: 3/16" = 1'-0"AE852

F1 SECOND FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 7

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

HE

4.2

5.4

J

2.8

4.8

G

F

F

MECHANICAL SHAFT

ROOF

HATCH

9'-6"

9'-0"

9'-0"9'-0"

9'-0"

9'-6"

EXP

EXP

8'-0"8'-0"

7'-0"

K

K

S S

S

S S

S

SSS

SS

S

S

S

S

S

S

S

S

S

S

S

DELETE INTERIOR WALLS (AND OR ASSOCIATED LABOR, MATERIAL, EQUIPMENT

AND SUPERVISION) IN THE FOLLOWING OFFICES (WITH WALLS DESIGNATED

AS N - NORTH, E-EAST, S-SOUTH, AND/OR W-WEST): 116 (S,W); 124 (S,W);

125 (N,S,W); 126 (N,S,W,); 127 (N,S,E); 128 (N,E); 129 (N,E,W); 131 (N,E,W);

132 (W,N,E); 223 (N,S,W); 224 (N,S,W); 226 (N,S,E); 227 (N,E); 230 (N,E,W) 231 (N,E,W); 234 (S,W); 323 (N,S,W); 324 (N,S,W,) 326 (N,E,S); 327 (N,E);

328 (N,E,W); 329 (N,E,W); 331 (N,E,W); 332 (N,E,W); 333 (N,E,W). PREP

SURFACES TO RECEIVE VA PROVIDED FULL HEIGHT SYSTEM FURNITURE

WALL PANELS. PROVIDE CONDUIT AND JUNCTION BOX (POWER AND DATA)

- ONE PER WORK STATION. REFER TO SPECIFICATION SECTION 01 00 00

GENERAL REQUIREMENTS

ALTERNATE NO. 7

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :4

P

M

Scale: As indicated

AE853

THIRD FLOOR REFLECTED CEILING

DEDUCT ALTERNATE 7 PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

69 148

SCALE: 3/16" = 1'-0"AE853

F4 THIRD FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 7

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

HE

4.2

5.4

J

2.8

4.8

G

K

K

FEC

PERFORM ALL WORK IN ALTERNATE 7, EXCEPT DELETE ALL LABOR,

MATERIAL, EQUIPMENT AND SUPERVISION RELATED TO 3RD FLOOR OFFICE

SUITE BUILD-OUT. PROVIDE 3RD FLOOR SPACE ROUGHED-IN FOR FUTURE

FINISHES. PROVIDE TEMPORARY LIGHTING IN ACCORDANCE WITH

NFPA 101 LIFE SAFETY CODE. PROVIDE A SHELL SPACE FIRE SPRINKLER

SYSTEM WITH UPRIGHT SPRINKLER HEADS ON 1" SPRIGS FOR FUTURE

SPACE FIT OUT. SPRINKLER HEADS SPACING SHALL NOT EXCEED

144 SQ. FT. SYSTEM SHALL BE IN COMPLIANCE WITH NFPA 13-2013, PROJECT

SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL.

REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS

ALTERNATE NO. 8

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :5

P

M

Scale: As indicated

AE863

THIRD FLOOR DEDUCT ALTERNATE 8

PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

70 148

SCALE: 3/16" = 1'-0"AE863

F1 THIRD FLOOR PLAN DEDUCT ALTERNATE 8

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

HE

4.2

5.4

J

2.8

4.8

G

F

F

K

K

MECHANICAL SHAFT

ROOF

HATCH

9'-6"

9'-0"

EXP

EXP

TEMPORARY LIGHTING

TYP.

1'-6"

1'-6"

S S

S

S S

S

SSS

SS

S

S

S

S

S

S

S

S

S

S

S

PERFORM ALL WORK IN ALTERNATE 7, EXCEPT DELETE ALL LABOR,

MATERIAL, EQUIPMENT AND SUPERVISION RELATED TO 3RD FLOOR OFFICE

SUITE BUILD-OUT. PROVIDE 3RD FLOOR SPACE ROUGHED-IN FOR FUTURE

FINISHES. PROVIDE TEMPORARY LIGHTING IN ACCORDANCE WITH

NFPA 101 LIFE SAFETY CODE. PROVIDE A SHELL SPACE FIRE SPRINKLER

SYSTEM WITH UPRIGHT SPRINKLER HEADS ON 1" SPRIGS FOR FUTURE

SPACE FIT OUT. SPRINKLER HEADS SPACING SHALL NOT EXCEED

144 SQ. FT. SYSTEM SHALL BE IN COMPLIANCE WITH NFPA 13-2013, PROJECT

SPECIFICATIONS AND VA FIRE PROTECTION DESIGN MANUAL.

REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS

ALTERNATE NO. 8

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :5

P

M

Scale: As indicated

AE873

THIRD FLOOR REFLECTED CEILING

DEDUCT ALTERNATE 8 PLAN

KUNKLE

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

71 148

SCALE: 3/16" = 1'-0"AE873

F1 THIRD FLOOR REFLECTED CEILING PLAN DEDUCT ALTERNATE 8

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

FLOOR PATTERN LEGEND

NOTES:

FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE

FINISH SCHEDULE.

CPT-4

LVT-1VCT-1

CPT-1 CPT-2

CT-1

CPT-3

CT-2

856 SF

MECHANICAL

300 SF

251 SF

SPRINKLERS

120 SF

124 SF

IT

100 SF

STAIRS

S-1

ELEVATOR

E-1

108 SF

ELEV.

MAC.

RM.

100 SF

153 SF

ELECTRICAL

200 SF

362 SF

HAC

56 SF

CORRIDOR

CORRIDOR

CORRIDOR

P-4, PAINT

SDT-1 TYP

RF-1

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :1

A

M

Scale: As indicated

IN100

OVERALL BASEMENT FLOOR

DISTRIBUTION PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

72 145

SCALE: 3/16" = 1'-0"

BASEMENT FLOOR PATTERN PLAN

N

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

HR

RECRUITMENT

HR

PROCESS

BENEFITS

EXAM

HR

PROCESS

HR

BENEFITS

SPECIALIST

HR

SPECIALIST

OFFICER

OPEN

OFFICE

STAIRS

S-1

VESTIBULE

ELECTRICAL

IT

HAC

WAITING

HR

BENEFIT

RA/FMLA

P.I.V

HR

CHIEF

OFFICER

ASSIST

HR

CHIEF

OFFICER

RECORDS

STORAGE

OPEN

OFFICE

PHYS /

PROV

EXAM

WOMEN'S

TOILET

STAIRS

S-2

HR

SPECIALIST

OFFICER

TREATMENT

AREA

OWC

P.I.V.

MEN'S

TOILET

TLT

HR

SPECIALIST

OFFICER

ELEVATOR

E-1

ELEVATOR

LOBBY

COFFEE

CORRIDOR

CORRIDOR

WAITING

P-2

P-2

P-2 P-2 P-2 P-2 P-2

P-7P-7

P-2

P-6

P-6

P-2

P-2

P-2

P-3

PAINT P-3 ON

ALL SIDES

PAINT P-3 ON

ALL SIDES

P-3 PAINT

ON ALL

SIDES P-3 PAINT

ON ALL

SIDES

P-3 PAINT

ON ALL

SIDES

P-4

P-4

P-6

P-6

P-6

P-6

P-2

P-2

P-2

P-7

P-3

VESTIBULE

OPEN

OFFICE

CORRIDOR

CORRIDOR

RF-1

RF-1

SDT-1

WCT-1

FULL

HEIGHT

WITH WCT-2

ACCENT BAND

2'-0"

4'-0"

TYP

6"

6'-0"

EQ

1'-0"

EQ

1'-0"

FLOOR PATTERN LEGEND

NOTES:

FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE

FINISH SCHEDULE.

CPT-4

LVT-1VCT-1

CPT-1 CPT-2

CT-1

CPT-3

CT-2

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :1

A

M

Scale: As indicated

IN110

OVERALL FIRST FLOOR DISTRIBUTION

PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

73 145

SCALE: 3/16" = 1'-0"

FIRST FLOOR PATTERN PLAN

N

FLOOR PATTERN LEGEND

FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE

FINISH SCHEDULE.

CPT-4

LVT-1VCT-1

CPT-1 CPT-2

CT-1

CPT-3

CT-2

CFO

INTERNAL

AUDITOR

CHIEF

54 SF

UNISEX

RR

50 SF

STAIRS

S-1

AFO

IT

HAC

218 ELECTRICAL

ELEVATOR

LOBBY

ELEVATOR

E-1

PAYROLL

SUPERVISOR

MCA

PROGRAM

OFFICE

WOMEN'S

TOILET

MEN'S

TOILET

OPEN

OFFICE

ASSISTANT

CHIEF

ACCOUNTING

SUPERVISOR

BREAK

ROOM

CONFERENCE

ROOM

STAIRS

S-2

COFFEE

RF-1

RF-1

P-6 P-3

P-3

P-6

P-6

P-2 P-2 P-2

P-2

P-7

P-4

P-3 PAINT

ON ALL

SIDES

PAINT ALL SIDES P-3

PAINT ALL

SIDES P-3

P-3, PAINT

ON ALL

SIDES

P-3

PAINT

ON ALL

SIDES

P-3

P-2

P-3

P-2

P-2

P-4

P-6

P-6

OPEN

OFFICE

CORRIDOR

OPEN

OFFICE

OPEN

OFFICE

CORRIDOR

VESTIBULE

2'-0"

SDT-1

WCT-1 FULL

HEIGHT WITH WCT-2

ACCENT BAND

WCT-1FULL

HEIGHT WITH WCT-2

ACCENT BAND

WCT-1 FULL

HEIGHT WITH

WCT-2 ACCENT

BAND

SEE IN120 FOR

SIM TYP DIMS

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :2

A

M

Scale: As indicated

IN120

OVERALL SECOND FLOOR

DISTRIBUTION PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

74 145

SCALE: 3/16" = 1'-0"

SECOND FLOOR PATTERN PLAN

N

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

STAIRS

S-1

CODING

SUPERVISOR

OFFICE

ADMINISTRATIVE

OFFICER

WOMEN'S

TOILET

VESTIBULE

MEN'S

TOILET

HAC

IT

ELECTRICAL

CONF.

ROOM

246 SF

ELEVATOR

LOBBY

240 SF

MED

RECORDS

SUPERVISOR

NON-VA

CARE

SUPV

RECORD

MANAGER

OFFICER

SCANNING

SUPV

CHIEF

MAS

OFFICER

HBU

SUPRVISOR

STAIRS

S-2

ELEVATOR

E-1

ASST

CHIEF

MAS

OFF

COFFEE

RF-1

RF-1

OPEN

OFFICE

OPEN

OFFICE

OPEN

OFFICE

OPEN

OFFICE

CORRIDOR

P-6

P-6

P-6

P-4

P-2

P-2 P-2 P-2

P-2 P-2 P-2 P-7

P-7

P-6

P-6

P-3

P-3

P-3

P-3

P-4

P-2

PAINT P-3 ALL SIDES

PAINT P-3 ALL SIDES

P-3 PAINT

ON ALL

SIDES

P-3

PAINT

ON ALL

SIDES

P-3 PAINT

ON ALL

SIDES

P-3

PAINT

ON ALL

SIDES

P-2

P-2

SDT-1

CORRIDOR

WCT-1 FULL

HEIGHT WITH WCT-2

ACCENT BAND

WCT-1FULL

HEIGHT WITH WCT-2

ACCENT BAND

SEE IN120 FOR

SIM TYP DIMS

FLOOR PATTERN LEGEND

NOTES:

FLOOR MATERIALS THAT ARE NOT SHOWN IN LEGEND ARE LABELED THE

FINISH SCHEDULE.

CPT-4

LVT-1VCT-1

CPT-1 CPT-2

CT-1

CPT-3

CT-2

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :2

A

M

Scale: As indicated

IN130

OVERALL THIRD FLOOR DISTRIBUTION

PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

75 145

SCALE: 3/16" = 1'-0"

THIRD FLOOR PATTERN PLAN

N

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

856 SF

MECHANICAL

300 SF

251 SF

SPRINKLERS

120 SF

124 SF

IT

100 SF

STAIRS

S-1

ELEVATOR

E-1

108 SF

ELEV.

MAC.

RM.

100 SF

153 SF

ELECTRICAL

200 SF

362 SF

HAC

56 SF

CORRIDOR

CORRIDOR

CORRIDOR

F.F.E. NOTES:

EQUIPMENT ABBREVIATIONS:

MW - MICROWAVE

REF - REFRIGERATOR

COF- COFFEE MAKER

PRINT- PRINTER/COPIER

TW - TALL WARDROBE CABINET

C - DESKTOP COMPUTER

ID- ID READER

FP- FINGER PRINT MACHINE

LT- LAPTOP

UPS- UPS UNDER DESK

LAM- LAMINATOR

SAFE- SAFE

CA- CAMERA ON TRIPOD

ET- EXAM TABLE

PS- PAPER SHREDDER

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :2

A

M

Scale: As indicated

IN200

OVERALL BASEMENT FLOOR F.F.E.

PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

76 145

SCALE: 3/16" = 1'-0"

BASEMENT F.F.E. PLAN

N

FOR REFERENCE ONLY

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

104 SF

HR

RECRUITMENT

100 SF

100 SF

HR

PROCESS

BENEFITS

100 SF

110 SF

EXAM

120 SF

99 SF

HR

PROCESS

100 SF

96 SF

HR

BENEFITS

SPECIALIST

100 SF98 SF

HR

SPECIALIST

OFFICER

100 SF

STAIRS

S-1

116 SF

VESTIBULE

100 SF

44 SF

ELECTRICAL

60 SF

45 SF

IT

56 SF

47 SF

HAC

56 SF

100 SF

WAITING

56 SF

99 SF

HR

BENEFIT

RA/FMLA

100 SF

80 SF

P.I.V

56 SF

151 SF

HR

CHIEF

OFFICER

150 SF

123 SF

ASSIST

HR

CHIEF

OFFICER

120 SF

73 SF

RECORDS

STORAGE

80 SF

99 SF

PHYS /

PROV

120 SF

108 SF

EXAM

120 SF

177 SF

WOMEN'S

TOILET

210 SF

STAIRS

S-2

97 SF

HR

SPECIALIST

OFFICER

100 SF

85 SF

TREATMENT

AREA

56 SF

73 SF

OWC

56 SF

78 SF

P.I.V.

56 SF

171 SF

MEN'S

TOILET

210 SF

43 SF

TLT

56 SF105 SF

HR

SPECIALIST

OFFICER

100 SF

PRINT

ELEVATOR

E-1

270 SF

ELEVATOR

LOBBY

240 SF

28 SF

COFFEE

56 SF

PRINT

CORRIDOR

1024 SF

OPEN

OFFICE

616 SF

2011 SF

OPEN

OFFICE

896 SF

36 SF

VESTIBULE

56 SF

159 SF

CORRIDOR

56 SF

112 SF

OPEN

OFFICE

112 SF

PRINT

/8

CORRIDOR

83 SF

WAITING

56 SF

PRINT

CUBICLE

CURTAIN TRACK

PRINT

CUBICLE

CURTAIN TRACK

PS

PS

PS

PS

PS

1A

1C1D1E 1B

1H1K1L 1J

1G1H1I 1F

1N1O1P 1M

1X

1Y

1Z

1AA

1T

1U

1V

1W

1Q

1R

1S

1BB

1CC 1DD

ET

ET

TW

REF

REF REF

CA

FP (2) & ID

LT

C

UPS & CAFE

LAM

UPS & CAFE

C

LAM

FP

MW & COF

F.F.E. NOTES:

EQUIPMENT ABBREVIATIONS:

MW - MICROWAVE

REF - REFRIGERATOR

COF- COFFEE MAKER

PRINT- PRINTER/COPIER

TW - TALL WARDROBE CABINET

C - DESKTOP COMPUTER

ID- ID READER

FP- FINGER PRINT MACHINE

LT- LAPTOP

UPS- UPS UNDER DESK

LAM- LAMINATOR

SAFE- SAFE

CA- CAMERA ON TRIPOD

ET- EXAM TABLE

PS- PAPER SHREDDER

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :2

A

M

Scale: As indicated

IN210

OVERALL FIRST FLOOR F.F.E. PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

77 145

SCALE: 3/16" = 1'-0"

FIRST FLOOR F.F.E. PLAN

FOR REFERENCE ONLY

N

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

151 SF

CFO

150 SF

79 SF

INTERNAL

AUDITOR

100 SF

134 SF

CHIEF

150 SF

54 SF

UNISEX

RR

50 SF

STAIRS

S-1

123 SF

AFO

120 SF

45 SF

IT

56 SF

47 SF

HAC

56 SF 44 SF

ELECTRICAL

60 SF

254 SF

ELEVATOR

LOBBY

240 SF

ELEVATOR

E-1

107 SF

PAYROLL

SUPERVISOR

100 SF

107 SF

MCA

PROGRAM

OFFICE

100 SF

177 SF

WOMEN'S

TOILET

210 SF

171 SF

MEN'S

TOILET

210 SF

98 SF

ASSISTANT

CHIEF

100 SF

112 SF

ACCOUNTING

SUPERVISOR

100 SF

150 SF

BREAK

ROOM

150 SF

197 SF

CONFERENCE

ROOM

500 SF

STAIRS

S-2

28 SF

COFFEE

56 SF

L E

K T

R

IE

V E

R S

2099 SF

OPEN

OFFICE

1064 SF

CORRIDOR

CORRIDOR

1058 SF

OPEN

OFFICE

560 SF

444 SF

OPEN

OFFICE

336 SF

394 SF

OPEN

OFFICE

336 SF

PS

PRINT

PS

PRINT

PRINT

PS

/4

EVACUATION

CHAIR. VA PROVIDED,

CONTRACTOR INSTALLED.

PROVIDE BLOCKING

2A

2C2D2F 2B2G2H2I 2E

2L2M2O 2K2P2Q2R 2N

2J

2S

2T

2V

2W

2X

2Y

2Z 2DD

2CC

2BB

2AA

2EE

2FF 2GG 2HH 2II 2JJ 2KK

2QQ2PP2OO2NN2MM2LL

MW

PS

PRINT

MW & COF

PS

PRINT

F.F.E. NOTES:

EQUIPMENT ABBREVIATIONS:

MW - MICROWAVE

REF - REFRIGERATOR

COF- COFFEE MAKER

PRINT- PRINTER/COPIER

TW - TALL WARDROBE CABINET

C - DESKTOP COMPUTER

ID- ID READER

FP- FINGER PRINT MACHINE

LT- LAPTOP

UPS- UPS UNDER DESK

LAM- LAMINATOR

SAFE- SAFE

CA- CAMERA ON TRIPOD

ET- EXAM TABLE

PS- PAPER SHREDDER

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :3

A

M

Scale: As indicated

IN220

OVERALL SECOND FLOOR F.F.E. PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

78 145

SCALE: 3/16" = 1'-0"

SECOND FLOOR PLAN

FOR REFERENCE ONLY

N

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

STAIRS

S-1

107 SF

CODING

SUPERVISOR

OFFICE

100 SF

107 SF

ADMINISTRATIVE

OFFICER

100 SF

177 SF

WOMEN'S

TOILET

210 SF

171 SF

MEN'S

TOILET

210 SF

47 SF

HAC

56 SF

45 SF

IT

56 SF

44 SF

ELECTRICAL

60 SF

197 SF

CONF.

ROOM

120 SF

246 SF

ELEVATOR

LOBBY

240 SF

96 SF

MED

RECORDS

SUPERVISOR

100 SF

96 SF

NON-VA

CARE

SUPV

100 SF

101 SF

RECORD

MANAGER

OFFICER

100 SF

103 SF

SCANNING

SUPV

100 SF

151 SF

CHIEF

MAS

OFFICER

150 SF

123 SF

HBU

SUPRVISOR

100 SF

STAIRS

S-2

ELEVATOR

E-1

98 SF

ASST

CHIEF

MAS

OFF

100 SF

PRINT

2220 SF

OPEN

OFFICE

1008 SF

36 SF

VESTIBULE

56 SF

445 SF

OPEN

OFFICE

280 SF

CORRIDOR

453 SF

OPEN

OFFICE

392 SF

1053 SF

OPEN

OFFICE

616 SF

CORRIDOR

PS

PS

PRINT

PS

PRINT

EVACUATION

CHAIR. VA PROVIDED,

CONTRACTOR INSTALLED.

PROVIDE BLOCKING

3A

3C3D3F 3B3G3H3I 3E

3M3O 3L3P3Q3R 3N

3J

3T

3V

3W

3X

3Y

3Z

3DD

3CC

3BB

3AA 3EE

3FF

3GG 3HH

3II

3JJ

3KK 3QQ3PP3OO3NN3MM3LL

3K3R

PRINT

28 SF

COFFEE

56 SF

MW & COF

PRINT

PS

PS

F.F.E. NOTES:

EQUIPMENT ABBREVIATIONS:

MW - MICROWAVE

REF - REFRIGERATOR

COF- COFFEE MAKER

PRINT- PRINTER/COPIER

TW - TALL WARDROBE CABINET

C - DESKTOP COMPUTER

ID- ID READER

FP- FINGER PRINT MACHINE

LT- LAPTOP

UPS- UPS UNDER DESK

LAM- LAMINATOR

SAFE- SAFE

CA- CAMERA ON TRIPOD

ET- EXAM TABLE

PS- PAPER SHREDDER

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :3

A

M

Scale: As indicated

IN230

OVERALL THIRD FLOOR F.F.E. PLAN

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

79 145

SCALE: 3/16" = 1'-0"

THIRD FLOOR PLAN

FOR REFERENCE ONLY

N

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

FINISH LEGEND

FLOORS BASE WALLS

CASEWORK

FINISH NOTES

CPT-1 (CARPET TILE)

MFR: TANDUS CENTIVA

PATTERN: RIVET 04219

COLOR: SPOTLIGHT 54211

INSTALLATION METHOD: QUATER TURNED

LVT-1 (LUXURY VINYL TILE)

MFR: SHAW CONTRACT HARD SURFACE

PATTERN: INTERVAL 0514V

COLOR: MORNING 13103

CT-1 MFR: CROSSVILLE 12X12 TILE

PATTERN: MAIN STREET

COLOR: CAFE CARMEL AV212

GROUT: TEC POWER GROUT COLOR SUMMER

WHEAT 982

RB-1 MFR: JOHNSONITE

PATTERN: 4" COVE BASE

COLOR: FAWN 80

CTB-1 COVE BASE

MFR: SCHLUTER SYSTEMS

PATTERN:COVE SHAPED PROFILE DILEX-AHKA

COORDINATE PIECE WITH TILE THICKNESS

COLOR:BRUSHED STAINLESS STEEL FINISH

GROUT:USE CORRESPONDING GROUT FOR

ADJACENT SPACE

P-1 (PAINT)

MFR: GRAHAM PAINT SYSTEM

COLOR: THISTLE GRAY 0197

VWC-1 (VINYL WALLCOVERING)

MFR: MDC WALLCOVERING

PATTERN: FINESSE #1422FN

COLOR: METEORITE

PL-1 (PLASTIC LAMINATE)

MFR: WILSONART

COLOR: AMBER CHERRY 7919K-78

SS-1 (SOLID SURFACE)

MFR: ZODIAQ

COLOR: SAVORY

CPT-2 (CARPET TILE)

MFR: TANDUS CENTIVA

PATTERN: INLINE 04122

COLOR: SPOTLIGHT 54211

INSTALLATION METHOD: QUARTER TURNED

CT-2 MFR: CROSSVILLE 6X18 TILE

PATTERN: MAIN STREET

COLOR: CAFE CARMEL AV212

GROUT: TEC POWER GROUT COLOR SUMMER

WHEAT 982

P-2 (PAINT)

MFR: GRAHAM PAINT SYSTEM

COLOR: THATCHED COTTAGE 0206 (TAUPE)

P-3 (PAINT)

MFR: GRAHAM PAINT SYSTEM

COLOR: TAN HIDE 0261 (WARM GOLD)

P-4 (PAINT)

MFR: GRAHAM PAINT SYSTEM

COLOR: DUBLOON 0890 (GOLD)

P-5 (PAINT) NOT USED

P-8 (PAINT)

MFR: GRAHAM PAINT SYSTEM

CEILING WHITE

1. IF NOTES ARE NOT DEFINED IN FINISH SCHEDULE, THEN THEY APPLY TO ALL AREAS.

2. DOOR FRAME PAINT (SEMI-GLOSS CERAMIC PAINT) TO MATCH ADJACENT WALL COLOR.

3. ELECTRICAL DEVICES AND COVER PLATE COLORS TO BE DETERMINED BY THE ARCHITECT.

4. PAINT TYP, UNLESS NOTED OTHERWISE TO BE SATIN/EGGSHELL FINISH.

5. PAINT IN ALL TOILET ROOMS AND TREATMENT AREAS TO BE SEMI-GLOSS PAINT. WALLS WHERE WALL TILE AND PAINT ARE DEFINED: WALL TILE TO BE 4FT ABOVE FINISHED FLOOR WITH PAINT ABOVE. WALLS WHERE WCT-1 AND WCT-2 ARE DEFINED: WCT-1 TO BE FULL HEIGHT WITH AN ACCENT BAND OF WCT-2

AFTER THE 9TH COURSING OF WCT-1.

6. PAINT NEW AND EXISTING GYPSUM BOARD CEILINGS PAINTED FLAT FINISH.

7. CUBICLE CURTAIN FABRIC TO BE MFR: ARC COM- MORI AC-33081 IN COLOR: SPRING #2 WITH MESH COLOR TO BE OFF-WHITE (CURTAIN BY OWNER)

TRACK BY GC.

8. TOILET PARTITIONS TO BE GENERAL PARTITIONS STAINLESS STEEL IN DIAMOND PATTERN FINISH.

9. HANDRAILS TO BE PAINTED P-3. STRINGERS TO BE BE PAINTED P-6.

10. FRP PANELS TO BE IN ALL ALL HAC ROOMS, COLOR: BEIGE (Desert Sand #102).

11. ARCHITECTURAL WOOD DOOR COLOR TO BE STAINED TO MATCH PL-1.

WCT-1 (WALL TILE)

MFR: AMERICAN OLEAN 6X6 TILE

PATTERN: BRIGHTS & MATTES

COLOR: MATTE CAPPUCINO 0009

GROUT: TEC POWER GROUT COLOR LIGHT

BUFF 945

WCT-2 (WALL TILE)

MFR: AMERICAN OLEAN

MFR: AMERICAN OLEAN 6X6 TILE

PATTERN: BRIGHTS & MATTES

COLOR: MATTE CAPPUCINO 0009

GROUT: TEC POWER GROUT COLOR LIGHT

BUFF 945

CORNER GUARDS

CG-1 CORNER GUARD

MFR: INPRO 150 CORNER GUARDS

SIZE: 3" WIDE / FULL HEIGHT

COLOR: BURPLAP 0252

APC-1 BEVELED TEGULAR LAY-IN 2'X2'

MFR: ARMSTRONG WORLD INDUSTRIES

PATTERN: ULTIMA #1911

GRID: 15/16" WHITE

VCT-1 (VINYL COMPOSITION TILE)

MFR: MANNINGTON COMMERCIAL

PATTERN: ESSENTIALS

COLOR: 133 ALMONDINE

RP-1 (RESIN PANEL)

MFR: 3-FORM

STYLE: BRONZE WEAVE

FINISH: SANDSTONE

SIZE: 1/2" GAUGE

WP-1 WALL PROTECTION

MFR: IN PRO RIGID PANEL

COLOR: BURPLAP 0252

CPT-4 (WALK-OFF CARPET)

MFR: SHAW CONTRACT

PATTERN: WELCOME II TILE 5T031

COLOR: BLACK CHOCOLATE 31751

GYP.BD. GYPSUM BOARD

C-1: ELEVATOR MANUFACTURER CEILING

SYSTEM. SEE SPEC 14-24-00

W-1: ELEVATOR MANUFACTURER WALL

SYSTEM. SEE SPEC 14-24-00

CPT-3 (CARPET TILE)

MFR: TANDUS CENTIVA

PATTERN: INLINE 04122

COLOR: SPOTLIGHT 54211

INSTALLATION METHOD: QUARTER TURNED

P-6 (PAINT)

MFR: GRAHAM PAINT SYSTEM

MATCH COLOR TO SHERWIN WILLIAMS

RUSKIN ROOM GREEN SW0042

P-7 (PAINT)

MFR: GRAHAM PAINT SYSTEM

COLOR: CYSTERN 0511 (LIGHT BLUE)

RF-1 (RUBBER FLOOR TILE)

MFR: JOHNSONITE

PATTERN: MICROTONE SPECKLED RUBBER

TILE AND ONE PEICE TREAD RISER SYSTEM

ON STAIRS (VIHTR) HAMMERED TREAD RISER

WITH VISUALLY IMPAIRED STRIP

TEXTURE: HAMMERED

COLOR: SILKWORM WB (HNSP-LE3)

CEILINGS

SDT-1 (STATIC DISSAPATIVE TILE)

MFR: ARMSTRONG

TYPE: EXCELON SDT

COLOR: MARBLE BEIGE 51950

GENERAL NOTE: FOR WALL PROTECTION

LOCATIONS SEE FLOOR PLANS

SCONC-1 SEALED CONCRETE

M A

X

3"

M

IN

1050 Wilshire Drive, Suite 260 Troy, MI 48084 T 248-643-6222

SSOE, Inc.

D A

T E

FULLY SPRINKLERED

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

VA ANN ARBOR MEDICAL CENTER CAMPUS

PROJECT #: 015-01361-00

BIDS SUBMISSION_REVISED

C A u to d e s k \R e v it \0

A

S

S O

E .r v t

/9

/2

:4 :3

A

M

Scale: As indicated

IN650

ROOM FINISH SCHEDULE & SIGNAGE

SCHEDULE

HROSKO

506-329CLINICAL & ADMINISTRATIVE

BUILDING

WHITE04-12-18

80 145

ROOM FINISH SCHEDULE

NO ROOM NAME

FLOOR

FINISH

BASE

FINISH

WALL FINISH CEILING CASEWORK

REMARKSNORTH EAST SOUTH WEST MATL FINISH HORIZONTAL VERTICAL

BASEMENT

001 CORRIDOR SCONC-1 RB-1 P-1 P-1 P-1 P-1 EXP P-8 -- --

002 CORRIDOR SCONC-1 RB-1 P-1 P-1 P-1 P-1 EXP P-8 -- --

003 CORRIDOR SCONC-1 RB-1 P-1 P-1 P-1 P-1 EXP P-8 -- --

004 ELEV. MAC. RM. VCT-1 RB-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY

(NO FINISH COAT)

005 ELECTRICAL VCT-1 RB-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY

(NO FINISH COAT)

006 IT SDT-1 RB-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY

(NO FINISH COAT)

007 SPRINKLERS SCONC-1 ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY

(NO FINISH COAT)

011 MECHANICAL SCONC-1 -- ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY

(NO FINISH COAT)

012 HAC SCONC-1 -- ** ** ** ** EXP -- -- -- **PRIME WALLS ONLY

(NO FINISH COAT), SEE

NOTE 10

E-1 ELEVATOR CPT-1 RB-1 W-1 W-1 W-1 W-1 C-1 -- -- --

S-1 STAIRS RF-1 RB-1 P-1 P-1 P-1 P-4 EXP/ GYP BD P-8 -- --

FIRST FLOOR

100 VESTIBULE CPT-4 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 -- --

101 ELEVATOR LOBBY CPT-4 RB-1 P-1, P-6 P-1, P-6 P-1 P-1 APC-1, GYP. BD P-8 -- --

102 CORRIDOR CPT-1 RB-1 P-1 P-1 P-6 P-1 APC-1, GYP. BD P-8 -- RP-1

103 OPEN OFFICE CPT-1, LVT-1 RB-1 P-1, P-3, P-7 P-1, P-3, P-7 P-1, P-3 P-3 APC-1, GYP. BD P-8 -- RP-1

104 VESTIBULE CT-1/CT-2 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 -- --

105 COFFEE LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1/GYP.BD. P-8 SS-1 PL-1

106 OPEN OFFICE CPT-1 RB-1 P-1, P-3 P-6, P-3 P-3, P-1 P-1, P-3 APC-1, GYP BD. P-8 --` --

107 CORRIDOR CPT-1 RB-1 P-6, P-3 P-1, P-6, P-3 P-7 P-1, P-3 APC-1, GYP. BD P-8 -- --

108 CORRIDOR LVT-1 RB-1 P-1 P-6 P-7, P-1 P-1, P-7 APC-1 -- -- PL-1

109 OPEN OFFICE LVT-1 RB-1 P-6 P-1, P-6 P-1 P-1 APC-1 -- -- --

113 P.I.V CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

114 P.I.V. CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

115 WAITING CPT-1 RB-1 P-7 P-1 P-1 P-1 APC-1, GYP. BD P-8 -- --

116 HR BENEFIT RA/FMLA CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP BD. P-8 -- --

117 ELECTRICAL VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

118 IT SDT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

119 HAC VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- -- NOTE 10

122 MEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 WCT-1, WCT-2 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5

123 WOMEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5

124 HR PROCESS BENEFITS CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

125 HR RECRUITMENT CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

126 HR SPECIALIST OFFICER CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

127 ASSIST HR CHIEF OFFICER CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD P-8 -- --

128 HR CHIEF OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --

129 HR SPECIALIST OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD P-8 -- --

131 HR SPECIALIST OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD. P-8 -- --

132 HR BENEFITS SPECIALIST CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD P-8 -- --

133 OWC CPT-1 RB-1 P-1 P-1 P-1 P-1, P-7 APC-1, GYP. BD P-8 -- --

134 EXAM LVT-1 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD P-8 SS-1 PL-1 NOTE 7, NOTE 5

135 EXAM LVT-1 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD. P-8 SS-1 PL-1 NOTE 7, NOTE 5

136 RECORDS STORAGE LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1, GYP. BD P-8 -- --

137 HR PROCESS CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1 -- -- --

138 PHYS / PROV LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

139 TLT CT-1 CTB-1 P-1 P-1 P-1 WCT-1, WCT-2 APC-1 -- -- -- NOTE 5

140 TREATMENT AREA LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1/GYP.BD. P-8 SS-1 PL-1 NOTE 5

141 WAITING LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

S-2 STAIRS RF-1 RB-1 P-1 P-1 P-4 P-1 EXP, GYP. BD P-8 -- --

SECOND FLOOR

201 ELEVATOR LOBBY CPT-4 RB-1 P-1, P-6 P-1, P-6 P-1 P-1 APC-1, GYP. BD P-8 -- --

202 CORRIDOR CPT-1 RB-1 P-1 P-1 P-6 P-1 APC-1, GYP. BD P-8 -- RP-1

203 OPEN OFFICE CPT-1, LVT-1 RB-1 P-1, P-3 P-1, P-3 P-1, P-3, P-7 P-7, P-3 APC-1, GYP. BD P-8 PL-1 RP-1, PL-1

204 VESTIBULE CT-1, CT-2 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 -- --

206 OPEN OFFICE CPT-1 RB-1 P-3, P-7, P-1 P-6, P-3 P-1, P-3 P-1, P-3 APC-1, GYP. BD. P-8 -- --

207 COFFEE LVT-1 RB-1 P-1 P-1 P-1 P-1 GYP.BD. P-8 SS-1 PL-1

208 CORRIDOR CPT-1 RB-1 P-3, P-6 P-1 P-1, P-3 P-1 APC-1 -- -- --

209 OPEN OFFICE CPT-1 RB-1 P-1, P-6 P-1, P-6 P-1 P-1 APC-1 -- -- --

210 OPEN OFFICE CPT-1 RB-1 P-1 P-1 P-1 P-3 APC-1 -- -- --

213 CONFERENCE ROOM CPT-2, CPT-3 RB-1 VWC-1 VWC-1 VWC-1 VWC-1 APC-1, GYP. BD P-8 -- --

216 ELECTRICAL VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

217 IT SDT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

218 HAC VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- -- NOTE 10

219 MEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 WCT-1, WCT-2 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5

222 WOMEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5

223 PAYROLL SUPERVISOR CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

224 MCA PROGRAM OFFICE CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

226 AFO CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD. P-8 -- --

227 CFO CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD. P-8 -- --

228 INTERNAL AUDITOR CPT-1 RB-1 P-1 P-3 P-1 P-1 APC-1, GYP. BD P-8 -- --

230 ASSISTANT CHIEF CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --

231 CHIEF CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP BD. P-8 -- --

232 UNISEX RR CT-1 CTB-1 P-1 P-1 WCT-1, WCT-2 P-1 APC-1, GYP BD P-8 SS-1 PL-1 NOTE 5

233 BREAK ROOM LVT-1 RB-1 P-1 P-1 P-1 P-1 APC-1, GYP. BD. P-8 SS-1 PL-1

234 ACCOUNTING SUPERVISOR CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD. P-8 -- --

THIRD FLOOR

301 ELEVATOR LOBBY CPT-4 RB-1 P-1, P-6 P-6, P-1 P-1 P-1 APC-1, GYP BD P-8 -- --

302 CORRIDOR CPT-1 RB-1 P-1 P-1 P-6 P-1 APC-1, GYP. BD P-8 -- RP-1

303 OPEN OFFICE CPT-1 RB-1 P-1, P-3 P-1, P-3 P-1, P-2, P-3 P-3, P-2 APC-1, GYP. BD P-8 PL-1 RP-1, PL-1

304 VESTIBULE CT-1, CT-2 RB-1 P-1 P-1 P-1 P-1 GYP. BD P-8 -- --

305 COFFEE LVT-1 RB-1 P-1 P-1 P-1 P-1 GYP. BD. P-8 SS-1 PL-1

306 OPEN OFFICE CPT-1 RB-1 P-3, P-1 P-6, P-3 P-3 P-1, P-3 APC-1, GYP. BD. P-8 -- --

307 CORRIDOR CPT-1 RB-1 P-3 P-1 P-7 P-3 APC-1 -- -- --

308 OPEN OFFICE CPT-1 RB-1 P-1, P-6 P-1, P-6 -- -- APC-1 -- -- --

309 OPEN OFFICE CPT-1 RB-1 P-1, P-6 P-1 P-1 P-7 APC-1 -- -- --

313 CONF. ROOM CPT-2, CPT-3 RB-1 VWC-1 VWC-1 VWC-1 VWC-1 APC-1 -- -- --

316 ELECTRICAL VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

317 IT SDT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- --

318 HAC VCT-1 RB-1 P-1 P-1 P-1 P-1 APC-1 -- -- -- NOTE 10

319 MEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 WCT-1, WCT-2 APC-1, GYP.BD. P-8 SS-1 PL-1 NOTE 5

322 WOMEN'S TOILET CT-1/CT-2 CTB-1 P-1/WCT-1, WCT-2 WCT-1, WCT-2 P-1/WCT-1 P-1/WCT-1 APC-1, GYP. BD P-8 SS-1 PL-1 NOTE 5

323 CODING SUPERVISOR OFFICE CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

324 ADMINISTRATIVE OFFICER CPT-3 RB-1 P-2 P-1 P-1 P-1 APC-1 -- -- --

326 HBU SUPRVISOR CPT-3 RB-1 P-1 P-1 P-2 P-1 APC-1, GYP. BD P-8 -- --

327 CHIEF MAS OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --

328 ASST CHIEF MAS OFF CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --

329 SCANNING SUPV CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD P-8 -- --

331 RECORD MANAGER OFFICER CPT-3 RB-1 P-1 P-2 P-1 P-1 APC-1, GYP. BD P-8 -- --

332 NON-VA CARE SUPV CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD. P-8 -- --

333 MED RECORDS SUPERVISOR CPT-3 RB-1 P-1 P-1 P-1 P-2 APC-1, GYP. BD. P-8 -- --

SIGNAGE SCHEDULE

NO ROOM NAME QTY SIGN TYPE SIGN TO READ

BASEMENT

001 CORRIDOR 1 TYPE C2a (FLR NUMBER/BUILDING NAME)

002 CORRIDOR -- --

003 CORRIDOR -- --

004 ELEV. MAC. RM. 1 TYPE A5 (RM NUMBER)

005 ELECTRICAL 1 TYPE A5 (RM NUMBER)

006 IT 1 TYPE A5 (RM NUMBER)

007 SPRINKLERS 1 TYPE A5 (RM NUMBER)

011 MECHANICAL 1 TYPE A5 (RM NUMBER)

012 HAC 1 TYPE A5 (RM NUMBER)

E-1 ELEVATOR 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT

USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT

ALL TIMES

S-1 STAIRS 1 TYPE B2/B4 EXIT/FIRE DOOR KEEP CLOSED AT ALL TIMES

FIRST FLOOR

100 VESTIBULE 3 OF EACH/1 OF

TYPE A5

TYPE G6 PUSH BUTTON TO OPEN DOORS/A5 TO READ EXIT

101 ELEVATOR LOBBY 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT

USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT

ALL TIMES

102 CORRIDOR 1 OF EACH TYPE A1.b/A12 (RM NUMBER)

103 OPEN OFFICE 16 TYPE A12 (RM NUMBER)

104 VESTIBULE 1 TYPE E12 RESTROOMS

105 COFFEE -- --

106 OPEN OFFICE 11 TYPE A12 (RM NUMBER)

107 CORRIDOR 1 TYPE L2.1 --

108 CORRIDOR 1 TYPE L2.1 --

109 OPEN OFFICE 2 TYPE A12 (RM NUMBER)

113 P.I.V 1 TYPE A12 (RM NUMBER)

114 P.I.V. 1 TYPE A12 (RM NUMBER)

115 WAITING 1 TYPE A12 (RM NUMBER)

116 HR BENEFIT RA/FMLA 1 TYPE A12 (RM NUMBER)

117 ELECTRICAL 1 TYPE A5 (RM NUMBER)

118 IT 1 TYPE A5 (RM NUMBER)

119 HAC 1 TYPE A5 (RM NUMBER)

122 MEN'S TOILET 1 TYPE A6 MEN'S RESTROOM

123 WOMEN'S TOILET 1 TYPE A6 WOMEN'S RESTROOM

124 HR PROCESS BENEFITS 1 TYPE A12 (RM NUMBER)

125 HR RECRUITMENT 1 TYPE A12 (RM NUMBER)

126 HR SPECIALIST OFFICER 1 TYPE A12 (RM NUMBER)

127 ASSIST HR CHIEF OFFICER 1 TYPE A12 (RM NUMBER)

128 HR CHIEF OFFICER 1 TYPE A12 (RM NUMBER)

129 HR SPECIALIST OFFICER 1 TYPE A12 (RM NUMBER)

131 HR SPECIALIST OFFICER 1 TYPE A12 (RM NUMBER)

132 HR BENEFITS SPECIALIST 1 TYPE A12 (RM NUMBER)

133 OWC 1 TYPE A12 (RM NUMBER)

134 EXAM 1 TYPE A12 (RM NUMBER)

135 EXAM 1 TYPE A12 (RM NUMBER)

136 RECORDS STORAGE 1 TYPE A5 (RM NUMBER)

137 HR PROCESS 1 TYPE A12 (RM NUMBER)

138 PHYS / PROV 1 TYPE A12 MEN'S RESTROOM

139 TLT 1 TYPE A6 RESTROOM

140 TREATMENT AREA 1 TYPE A12 (RM NUMBER)

141 WAITING 1 OF TYPE A1.b/2 OF

TYPE A12

TYPE A1.b/A12 (RM NUMBER)

S-2 STAIRS 3 OF EACH TYPE B2/B4 EXIT/FIRE DOOR KEEP CLOSED AT ALL TIMES

SECOND FLOOR

201 ELEVATOR LOBBY 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT

USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT

ALL TIMES

202 CORRIDOR 1 OF EACH TYPE A1.b/A12 (RM NUMBER)

203 OPEN OFFICE 16 TYPE A12 (RM NUMBER)

204 VESTIBULE 1 TYPE E12 RESTROOMS

206 OPEN OFFICE 10 TYPE A12 (RM NUMBER)

207 COFFEE -- --

208 CORRIDOR 1 TYPE L2.1 --

209 OPEN OFFICE 6 TYPE A12 (RM NUMBER)

210 OPEN OFFICE 4 TYPE A12 (RM NUMBER)

213 CONFERENCE ROOM 1 TYPE A2 (RM NUMBER)

216 ELECTRICAL 1 TYPE A5 (RM NUMBER)

217 IT 1 TYPE A5 (RM NUMBER)

218 HAC 1 TYPE A5 (RM NUMBER)

219 MEN'S TOILET 1 TYPE A6 MEN'S RESTROOM

222 WOMEN'S TOILET 1 TYPE A6 WOMEN'S RESTROOM

223 PAYROLL SUPERVISOR 1 TYPE A12 (RM NUMBER)

224 MCA PROGRAM OFFICE 1 TYPE A12 (RM NUMBER)

226 AFO 1 TYPE A12 (RM NUMBER)

227 CFO 1 TYPE A12 (RM NUMBER)

228 INTERNAL AUDITOR 1 TYPE A12 (RM NUMBER)

230 ASSISTANT CHIEF 1 TYPE A12 (RM NUMBER)

231 CHIEF 1 TYPE A12 (RM NUMBER)

232 UNISEX RR 1 OF EACH TYPE A6/TYPE E12 RESTROOM

233 BREAK ROOM 1 TYPE A12 (RM NUMBER)

234 ACCOUNTING SUPERVISOR 1 TYPE A12 (RM NUMBER)

THIRD FLOOR

301 ELEVATOR LOBBY 1 OF EACH TYPE L2.1/B3/B4/C2a (FLR NUMBER/BUILDING NAME) INCASE OF FIRE DO NOT

USE ELEVATORS USE STAIRS/ FIRE DOOR KEEP CLOSED AT

ALL TIMES

302 CORRIDOR 1 OF EACH TYPE A1.b/A12 (RM NUMBER)

303 OPEN OFFICE 19 TYPE A12 (RM NUMBER)

304 VESTIBULE 1 TYPE E12 RESTROOM

305 COFFEE -- ---

306 OPEN OFFICE 11 TYPE A12 (RM NUMBER)

307 CORRIDOR 1 TYPE L2.1 --

308 OPEN OFFICE 7 TYPE A12 (RM NUMBER)

309 OPEN OFFICE 5 TYPE A12 (RM NUMBER)

313 CONF. ROOM 1 TYPE A2 (RM NUMBER)

316 ELECTRICAL 1 TYPE A5 (RM NUMBER)

317 IT 1 TYPE A5 (RM NUMBER)

318 HAC 1 TYPE A5 (RM NUMBER)

319 MEN'S TOILET 1 TYPE A6 MEN'S RESTROOM

322 WOMEN'S TOILET 1 TYPE A6 WOMEN'S RESTROOM

323 CODING SUPERVISOR OFFICE 1 TYPE A12 (RM NUMBER)

324 ADMINISTRATIVE OFFICER 1 TYPE A12 (RM NUMBER)

326 HBU SUPRVISOR 1 TYPE A12 (RM NUMBER)

327 CHIEF MAS OFFICER 1 TYPE A12 (RM NUMBER)

328 ASST CHIEF MAS OFF 1 TYPE A12 (RM NUMBER)

329 SCANNING SUPV 1 TYPE A12 (RM NUMBER)

331 RECORD MANAGER OFFICER 1 TYPE A12 (RM NUMBER)

332 NON-VA CARE SUPV 1 TYPE A12 (RM NUMBER)

333 MED RECORDS SUPERVISOR 1 TYPE A12 (RM NUMBER)

SIGNAGE NOTES:

1. SEE TECHNICAL SPECIFICATIONS FOR SIGN TYPE INFORMATION.

2. IF SIGNS ARE ON GLASS, PROVIDE BACK PANEL FOR BACK SIDE.

3. PROVIDE PROPER ATTACHMENT DEVICES FOR ATTACHMENT TO

WORKSTATION PANELS.

SCALE: 1/2" = 1'-0"

SIGNAGE PLACEMENT DETAIL

DESIGN DEVELOPMENT SUBMISSION 1 04-15-16

DESIGN DEVELOPMENT SUBMISSION 2 06-10-16

95% CONSTRUCTION DOCUMENTS

SUBMISSION

11-15-16

1. FIRE PROTECTION CONTRACTOR SHALL FURNISH MATERIAL

AND EQUIPMENT AS REQUIRED FOR A COMPLIANT SPRINKLER

PROTECTION THROUGHOUT THE NEW BUILDING. DESIGN

SHALL BE IN COMPLIANCE WITH NFPA 13-2013 EDITION,

PROJECT SPECIFICATIONS SECTIONS: 21 13 13 & 21 08 00 AND VA

FIRE PROTECTION DESIGN MANUAL.

2. STANDPIPE SYSTEM SHALL BE BASED ON MANUAL WET CLASS 1

STANDPIPE DESIGN. STANDPIPE SHALL NOT BE SMALLER THAN 4"

IN SIZE. EACH FLOOR SPRINKLER CONNECTION SHALL BE

PROVIDED WITH SUPERVISED CONTROL VALVE, CHECK VALVE,

PRESSURE GAUGE, FLOW SWITCH AND COMBINATION TEST AND

DRAIN CONNECTION. 2-1/2" HOSE VALVE SHALL BE PROVIDED WITH

CAP AND CHAIN HAVING THREADS MATCHING CITY OF ANN ARBOR

FIRE DEPARTMENT REQUIREMENTS.

3. MANUAL WET STANDPIPE SHALL BE SIZED BASED ON A WATER

SUPPLY FROM A FIRE PUMPER TRUCK ABLE TO PROVIDE 1000 GPM

@ 150 PSI AT THE FIRE DEPARTMENT CONNECTION. STANDPIPE

SHALL NOT BE SMALLER THAN 4" IN SIZE. THE PRESSURE

REQUIREMENTS AT THE TOP OF THE MOST REMOTE STANDPIPE

SHALL BE 100 PSI WHILE FLOWING 500 GPM OUT OF THE REMOTE

STANDPIPE AND 250 GPM OUT OF THE SECOND STANDPIPE.

4. FIRE SPRINKLER SYSTEM SHALL BE DESIGNED FOR LIGHT

HAZARD COVERAGE THROUGHOUT WITH THE EXCEPTION OF

MECHANICAL, ELECTRICAL, STORAGE ROOMS, BASEMENT,

JANITOR CLOSET AND SIMILAR ROOMS HAVING OCCUPANCY

WITH HIGHER FIRE LOAD THAN LIGHT HAZARD OCCUPANCIES.

SUCH ROOMS SHALL BE COVERAGE SHALL BE BASED ON

ORDINARY GROUP 1.

5. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE TO SUBMIT A

COMPLETE SET OF SHOP DRAWINGS, HYDRAULIC

CALCULATIONS AND MATERIAL SUBMITTALS PRIOR TO PIPE

FABRICATION AND INSTALLATION IN COMPLIANCE WITH

SPECIFICATIONS SECTION 01 33 23.

6. FIRE PROTECTION CONTRACTOR SHALL BASE THE HYDRAULIC

CALCULATIONS ON A FLOW TEST CONDUCTED WITHIN 12

MONTHS OF THE SHOP DRAWING SUBMITTALS. REMOTE AREA CAN

BE REDUCED BY UP TO 40% AS ALLOWED BY NFPA #13-2013,

SECTION 11.2.3.2.3.1.

7. FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE TO

CO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.