36C24919R0012 S02-Price Schedule (Proj 596-332) FY2019.xlsx

View the file

Other files

File Type Posted
36C24919R0012-0009000.docx DOCX document
36C24919R0012-0009001.pdf PDF
36C24919R0012-0008002.pdf PDF
36C24919R0012-0008006.pdf PDF
36C24919R0012-0008003.pdf PDF
36C24919R0012-0008001.pdf PDF
36C24919R0012-0008005.pdf PDF
36C24919R0012-0008004.pdf PDF
36C24919R0012-0008000.docx DOCX document
36C24919R0012-0007003.pdf PDF
36C24919R0012-0007002.pdf PDF
36C24919R0012-0007001.pdf PDF
36C24919R0012-0007000.docx DOCX document
36C24919R0012-0006000.docx DOCX document
36C24919R0012-0005001.pdf PDF
36C24919R0012-0005000.docx DOCX document
36C24919R0012-0004002.pdf PDF
36C24919R0012-0004000.docx DOCX document
36C24919R0012-0004001.pdf PDF
36C24919R0012-0003002.pdf PDF
36C24919R0012-0003000.docx DOCX document
36C24919R0012-0003001.pdf PDF
36C24919R0012-0002020.pdf PDF
36C24919R0012-0002000.docx DOCX document
36C24919R0012-0002011.pdf PDF
36C24919R0012-0002012.pdf PDF
36C24919R0012-0002004.pdf PDF
36C24919R0012-0002007.pdf PDF
36C24919R0012-0002005.pdf PDF
36C24919R0012-0002015.pdf PDF
36C24919R0012-0002016.pdf PDF
36C24919R0012-0002009.pdf PDF
36C24919R0012-0002001.pdf PDF
36C24919R0012-0002006.pdf PDF
36C24919R0012-0002010.pdf PDF
36C24919R0012-0002002.pdf PDF
36C24919R0012-0002013.pdf PDF
36C24919R0012-0002018.pdf PDF
36C24919R0012-0002017.pdf PDF
36C24919R0012-0002014.pdf PDF
36C24919R0012-0002008.pdf PDF
36C24919R0012-0002019.pdf PDF
36C24919R0012-0002003.pdf PDF
36C24919R0012-0001001.pdf PDF
36C24919R0012-0001000.docx DOCX document
36C24919R0012-020.pdf PDF
36C24919R0012-025.pdf PDF
36C24919R0012-018.pdf PDF
36C24919R0012-021.pdf PDF
36C24919R0012-033.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer-Breakdown

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation and expert supervision necessary for project #596-332, construct continuing care facilities-phase 1 at the Lexington VA Medical Center located at 2250 Leestown Road, Lexington, Kentucky 40511 in accordance with the statement of work, project specifications and drawings. Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction along with certain other items.

The period of performance for the work in the base offer 480 calendar days from receipt of notice to proceed.

***to address us fish and wildlife requirements on endangered bats nesting in the bark of trees, the removal of trees shall be restricted to the months of October through March unless a bat survey is conducted, and the trees are certified free of nesting bats prior to the tree removal. *** ***the contractor will need to provide a site map showing the location of new emission sources, summary of emission factors (so2, n2o, no3, co2, co, ch4, voc and lead) for each emissions emitting unit, safety data sheets for each fuel source, obtain a U.S. EPA certificate of conformity for each generator from the manufacturer, obtain in conjunction with the VA a KY state fire marshal plan & specification approval letter. It is also the expectation that the contractor will assist the Lexington VA Medical Center by providing the necessary information to complete the required forms to request a permit revision. At a minimum the following forms will be submitted will include the following: dep7007a – combustion engine, dep7007j – volatile liquid storage and dep7007n – emissions and stacks. ***

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"MINOR PROJECT 596-322 &"-,Bold"CONSTRUCT CONTINUING CARE FACILITIES -PHASE 1 &"-,Bold"LEXINGTON VA MEDICAL CENTER

Deduct Alternate 1

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Deduct Alternate 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
A. Deduct Alternate No. 1: All work in Base Offer, except delete all work as specified in Deduct Alternate No. 1. Deduct Alternate No. 1 includes the following items as shown in the drawings:

a. Omit connecting canopy structure between the buildings and canopy extension to the parking area. Omit all the steel structure, cladding, foundations, and electrical lighting connected to canopy. Sidewalk to remain. In lieu of the integrated patient healthcare casework, provide suspended manufactured plastic casework with solid surface countertop and backsplash. Omit paving and base at the parking spaces remote from the sidewalks accessing the buildings. Provide seeded area in place of the paving, matching the adjacent seeded areas to include topsoil as required.

The period of performance for the work in alternate deduct #1 is 460 calendar days from receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"MINOR PROJECT 596-332&"-,Bold"CONSTRUCT CONTINUING CARE FACILITIES-PHASE 1
&"-,Bold"LEXINGTON VA MEDICAL CENTER

Deduct Alternate 2

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Deduct Alternate 2INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
B. Deduct Alternate No 2: All work in Base Offer, except delete all work as specified in Deduct Alternate No. 1 and Deduct Alternate No. 2. Deduct Alternate No. 2 includes the following items as shown in the drawings:

a. Utilize standard 3-tab shingles as specified in lieu of dimensional shingles.

The period of performance for the work as specified in alternate deduct #2 is 460 calendar days from receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"MINOR PROJECT 596-322 &"-,Bold"CONSTRUCT CONTINUING CARE FACILITIES-PHASE 1 &"-,Bold"LEXINGTON VA MEDICAL CENTER

Deduct Alternate (3)

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Deduct Alternate 2INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
C. Deduct Alternate No. 3: All work in Base Offer, except delete all work as specified in Deduct Alternate No. 1, Deduct Alternate No. 2, and Deduct Alternate No. 3. Deduct Alternate No. 3 includes the following items as shown in the drawings:

a. Substitute heavy duty asphalt for heavy duty concrete paving where indicated on the site plan except at the pad adjacent to the oxygen tank indicated on CS101.

The period of performance for the work in alternate deduct #3 is 460 calendar days from the receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"MINOR PROJECT 596-332 &"-,Bold"CONSTRUCT CONTINUING CARE FACILITIES-PHASE 1 &"-,Bold"LEXINGTON VA MEDICAL CENTER

File details come from the government source that posted it.