36C24919R0012 0007 09 OVERALL UTILITY PLAN-uncertified.pdf
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
f m f m f m f m f m f m f m f m f m f m f m f m f m f m f m f m f m f m f m f m u n k exist sanitary mh tr:905.24 inv(ne):900.54 inv(s):900.46 exist sanitary mh tr:904.87 inv(n):899.60 inv(e):900.34 inv(w):899.54 exist sanitary mh tr:904.34 inv(e):898.94 inv(e):898.84 inv(w):898.83 exist sanitary mh tr:903.94 inv(n):899.44 inv(w):899.41 exist sanitary mh tr:908.74 inv(sw):905.47 inv(e):905.51 v c p v c p direction only p p p c i existing direction only tr:0.00 inv(s):920.08 exist sanitary mh tr:905.69 inv(w):900.49 inv(ne):901.98 inv(se):900.46 exist sanitary mh tr:905.07 inv(e):901.30 inv(nw):901.33 p p
12" v cp direction only p v c p direction only r c p direction only direction only p c c
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D
G
D p i e b n d s u n s u r o f l c a t i o n c p p
C O
M
COM
COM
C O
M
C O
M
COM
X
45° BEND
22.5° BEND
CONNECT CONCRETE
ENCASED DUCT BANK TO
EXISTING TRANSFORMER
(REFER TO ELECTRICAL PLANS)
REFER TO MEP
PLANS FOR
CONTINUATION
22.5° BEND
45° BEND
45° BEND
45°
BEND
45°
BEND
BUILDING #201
BUILDING #202
10" C900 PVC FIRE
PROTECTION
8" C900 PVC
DOMESTIC WATERLINE
CONNECT TO EXISTING FIRE PROTECTION AND
DOMESTIC WATER LOOPS (TAPPING SLEEVE AND
VALVE). CONTRACTOR SHALL FIELD VERIFY
DOMESTIC WATER AND FIRE PROTECTION LOOPS
WITH LOCAL UTILITY TO AVOID CROSS
CONTAMINATION PRIOR TO CONNECTION.
APPROXIMATE LOCATION GAS
SERVICE CONNECTION NEAR
OPPORTUNITY WAY. CONTRACTOR
SHALL COORDINATE CONNECTION
WITH UTILITY
4" GAS MAIN
(COORDINATE W/ LOCAL
UTILITY AND MEP PLANS)
4" GAS MAIN
(COORDINATE W/ LOCAL
UTILITY AND MEP PLANS)
22.5° BEND
CONTRACTOR SHALL PROTECT
EXISTING HEADWALL AND
EXISTING STONE RETAINING
WALLS. ANY IMPACTS TO THE
EXISTING STONE RETAINING
WALLS, PAVED CHANNEL,
AND/OR HEADWALL SHALL BE
REPAIRED TO MATCH EXISTING
CONDITIONS.
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
o n e e i g h t h n o t o n e q u a r t e r i n o t t h r e e e i g h t h s i n o t o n e h a l f i n o t t h r e e q u a r t e r s i n o t o n e i n o t o n e a d a l f i n c h e o t t h r e e i n c h e o t
LEXINGTON VAMC, LEESTOWN DIVISION
2250 LEESTOWN ROAD
LEXINGTON, KY 40511
Office of
Construction and Facilities
Management
CONSULTANTS: PROJECT MANAGER:
Project Number Scale
15-584
CONSTRUCT CONTINUING
CARE FACILITIES - PHASE 1
596-332
AS INDICATED
BID DOCUMENTS
E D
C B
A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
SEPTEMBER 16, 2018
# 201 & 202
ALRNRE
OVERALL UTILITY PLAN
NORTH
PROPOSED UTILITY LEGEND
Air Conditioner
Clean Out
Curb Inlet
Drainage Inlet
Drainage MH
Electric Box
Electric Handhole
Electric Meter Box
Electric MH
Flag
Gas Meter
Gas Valve
Guard Post
Guy Wire
Lid
Light Pole
Manhole
Post
Power Pole
Sanitary MH
Sign
Spigot
Stand Pipe
Telephone Handhole
Telephone MH
Telephone Pedestal
Transformer
Vent
Water Valve
EXISTING LEGEND
Fence
WATER LINE
GAS LINE (BY OTHERS, SHOWN FOR REFERENCE ONLY)G
W
GAS METER
ELECTRICAL TRANSFORMER (REFER TO MEP PLANS)
VALVE
WATER METER PIT
SANITARY SEWER LINE
MANHOLE
HYDRANT
SS
ELECTRIC LINEE
TELECOMMUNICATION, FIBER OPTICS, AND FIRE ALARMTC
CAUTION !!
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN
ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE ( including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others ) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE
OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND
EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING
UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR
PRIOR TO ANY AND ALL CONSTRUCTION.
GENERAL NOTES:
1. CONTRACTOR SHALL PROTECT AND NOT DESTROY THE
PROPERTY CORNER MONUMENTS DURING CONSTRUCTION.
2. CONTRACTOR TO VERIFY LOCATION, SIZE AND DEPTH OF
EXISTING UTILITIES PRIOR TO COMMENCING ANY
CONSTRUCTION. CONTACT ENGINEER IF VARIATION EXISTS.
3. SEE SHEET GI001 GENERAL NOTES FOR MORE INFORMATION.
BENCHMARK INFORMATION
Datum: NAVD 88 (Computed using GEOID12B from OPUS solution)
TBM 21
CHISELED “X” NORTHEAST BOLT FIRE HYDRANT LOCATED @ NORTHEAST QUAD OF AN
INTERSECTION & ±120' SOUTH OF THE SOUTHWEST CORNER OF BUILDING #117.
ELEV:925.67
TBM 23
CHISELED SQUARE ON NORTHEAST SIDE OF LIGHT POLE BASE LOCATED IN BETWEEN TWO
PARKING LOTS & ±100' SOUTHEAST OF BUILDING #122 & ±75' SOUTHEAST OF BUILDING #48.
ELEV:916.96
TBM 34
CHISELED SQUARE ON NORTHWEST SIDE OF LIGHT POLE #72 LOCATED INSIDE COURTYARD &
IN FRONT OF BUILDING #29.
ELEV:914.48
FIRE PROTECTION LINEFP
ELECTRICAL GENERATOR (REFER TO MEP PLANS)
ELECTRICAL PRIMARY SWITCH (REFER TO MEP PLANS)
BULK OXYGEN TANK (REFER TO MEP PLANS FOR
TANK INFORMATION)
WATER FITTINGS WITH CONCRETE THRUST BLOCKS
FIRE DEPARTMENT CONNECTION
ALTERNATE DEDUCT NOTES
ALTERNATE DEDUCT #1:
OMIT CONNECTING CANOPY STRUCTURE BETWEEN BUILDINGS AND CANOPY EXTENSION TO PARKING AREA.
OMIT ALL STEEL STRUCTURE, CLADDING, FOUNDATION AND ELECTRICAL LIGHTING CONNECTED TO CANOPY.
SIDEWALK TO REMAIN. IN LIEU OF THE INTEGRATED PATIENT HEALTHCARE CASEWORK, PROVIDE SUSPENDED
MANUFACTURED PLASTIC CASEWORK WITH SOLID SURFACE COUNTERTOP AND BACKSPLASH. ALL OTHER
DESIGN ELEMENTS ARE TO REMAIN THE SAME. OMIT PAVING AND BASE AT THE PARKING SPACES REMOTE
FROM THE SIDEWALKS ACCESSING THE BUILDINGS. PROVIDED SEEDED AREA IN PLACE OF THE PAVING, MATCHING THE ADJACENT SEEDED AREAS TO INCLUDE TOPSOIL AS REQUIRED.
THE PERIOD OF PERFORMANCE FOR THE WORK IN ALTERNATE DEDUCT #1 IS 460 CALENDAR DAYS FROM
RECEIPT OF NOTICE TO PROCEED.
ALTERNATE DEDUCT #2:
UTILIZE STANDARD 3-TAB SHINGLES AS SPECIFIED IN LIEU OF DIMENSIONAL SHINGLES.
THE PERIOD OF PERFORMANCE FOR THE WORK IN ALTERNATE DEDUCT #2 IS 460 CALENDAR DAYS FROM
RECEIPT OF NOTICE TO PROCEED.
ALTERNATE DEDUCT #3:
SUBSTITUTE HEAVY DUTY ASPHALT FOR HEAVY DUTY CONCRETE WHERE INDICATED ON THE SITE PLAN
EXCEPT AT THE PAD ADJACENT TO THE OXYGEN TANK INDICATED ON CS101.
THE PERIOD OF PERFORMANCE FOR THE WORK IN ALTERNATE DEDUCT #3 IS 460 CALENDAR DAYS FROM
RECEIPT OF NOTICE TO PROCEED.
SEPTEMBER 8, 2017OCTOBER 18, 2018
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ADDENDUM 004
AutoCAD SHX Text 03/07/2019
AutoCAD SHX Text
PHASE 1 OVERALL UTILITY PLAN
AutoCAD SHX Text
CU100
AutoCAD SHX Text
AutoCAD SHX Text 80'
AutoCAD SHX Text 0'
AutoCAD SHX Text 40'
AutoCAD SHX Text 20'
AutoCAD SHX Text 1" = 40'
AutoCAD SHX Text
AC
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text
EH
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text
GV
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text
TH
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
WM
AutoCAD SHX Text
GEN
AutoCAD SHX Text O 2
AutoCAD SHX Text S
AutoCAD SHX Text
| Sheets and Views |
| CU-100 |
File details come from the government source that posted it.