36C24919R0012 0002 Drawings - Structural Bid Docs.pdf
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MISCELLANEOUS SYMBOLS
NORTH ARROW GRIDLINES
EARTH
SECTION NUMBER
SHEET NUMBER
S101
S101
CALLOUT NUMBER
SHEET NUMBER
A
ELEVATION
REFERENCE
LIMIT OF EXTENT
CONTINUOUS EXTENT
C# COLUMN NOTATION
Z# PRECAST/ BRICK SUPPORT
L# LINTEL NOTATION
F ## COLUMN FOOTING NOTATION
GB ## GRADE BEAM NOTATION
P ## PIER NOTATION
B ## CONCRETE BEAM NOTATION
PB ## POST-TENSIONED CONCRETE
BEAM NOTATION
PC ## PILE CAP NOTATION
WF ## WALL FOOTING NOTATION
SHEAR WALL NOTATIONSW ##
BW ## BEARING WALL NOTATION
GRAVEL
Name
Elevation
WALL PIER NOTATIONWP ##
W ## WALL NOTATION
CONCRETE SYMBOLS
POST-TENSION TENDON
ANCHOR DEAD END
LOCATION
POST-TENSION TENDON
ANCHOR JACKING
LOCATION
REBAR
CHANGE OF SLAB
ELEVATION
SLOPING SLAB
CHANGE OF SLAB
THICKNESS
MECHANICAL COUPLER
REBAR SPLICE
LIMIT OF MEMBER OR
SPAN MARK
DIRECTION OF SPAN
OPENING
SELF-EXPANDING
WATERSTOP
CONTROL JOINT LOCATION
IN CONCRETE WALLS
REBAR TERMINATOR
INTENTIONALLY
ROUGHENED
CONSTRUCTION JOINT
TO 1/4" AMPLITUDE
WELDED WIRE FABRIC
PVC WATERSTOP
COLUMN CONTINUES
COLUMN TERMINATED
FORM-SAVER
SLAB ON GRADE MARKSOG#
CONNECTORS
HEADED STUD
CONNECTOR SECTION END/ALT VIEW
CAST-IN ANCHOR
ROD
POST-INSTALLED
MECHANICAL ANCHOR
BOLT
POST INSTALLED
ADHESIVE ANCHOR
WOOD SYMBOLS
NON-CONTINUOUS
BLOCKING
STUD/JOIST/
RAFTER
NAIL
LAG SCREW
COUNTERSUNK
SCREW / BOLT
WOOD I-JOIST
OPEN WEB WOOD
JOIST
PLYWOOD / OSB
HD# HOLDOWN
CONNECTOR
CONTRACTOR SHALL PROVIDE COORDINATION DRAWINGS IN THREE DIMENSIONAL
FORMAT PRIOR TO STARTING CONSTRUCTION.
ALTERNATE NOTES
ALTERNATE DEDUCT #1:
OMIT CONNECTING CANOPY STRUCTURE BETWEEN BUILDINGS AND CANOPY
EXTENSION TO PARKING AREA. OMIT ALL STEEL STRUCTURE, CLADDING,
FOUNDATION AND ELECTRICAL LIGHTING CONNECTED TO CANOPY. SIDEWALK
TO REMAIN. IN LIEU OF THE INTEGRATED PATIENT HEALTHCARE CASEWORK,
PROVIDE SUSPENDED MANUFACTURED PLASTIC CASEWORK WITH SOLID
SURFACE COUNTERTOP AND BACKSPLASH. ALL OTHER DESIGN ELEMENTS ARE
TO REMAIN THE SAME. OMIT PAVING AND BASE AT THE PARKING SPACES
REMOTE FROM THE SIDEWALKS ACCESSING THE BUILDINGS. PROVIDED
SEEDED AREA IN PLACE OF THE PAVING, MATCHING THE ADJACENT SEEDED
AREAS TO INCLUDE TOPSOIL AS REQUIRED.
THE PERIOD OF PERFORMANCE FOR THE WORK IN ALTERNATE DEDUCT #1 IS
460 CALENDAR DAYS FROM RECEIPT OF NOTICE TO PROCEED.
ALTERNATE DEDUCT #2:
UTILIZE STANDARD 3-TAB SHINGLES AS SPECIFIED IN LIEU OF DIMENSIONAL
SHINGLES.
THE PERIOD OF PERFORMANCE FOR THE WORK IN ALTERNATE DEDUCT #2 IS
460 CALENDAR DAYS FROM RECEIPT OF NOTICE TO PROCEED.
ALTERNATE DEDUCT #3:
SUBSTITUTE HEAVY DUTY ASPHALT FOR HEAVY DUTY CONCRETE WHERE
INDICATED ON THE SITE PLAN EXCEPT AT THE PAD ADJACENT TO THE OXYGEN
TANK INDICATED ON CS101.
THE PERIOD OF PERFORMANCE FOR THE WORK IN ALTERNATE DEDUCT #3 IS
460 CALENDAR DAYS FROM RECEIPT OF NOTICE TO PROCEED.
JST JOIST
JT JOINT
KB KNEE BRACE
KIP, K 1,000 POUNDS
KO KNOCK-OUT
KSI KIPS PER SQUARE INCH
L ANGLE OR LENGTH
LAB LABRATORY
LB POUND
LF LINEAL FOOT
LIN LINEAL, LINEAR
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONGIT LONGITUDINAL
LP LOW POINT
LSL LAMINATED STRAND LUMBER
LSLT LONG SLOTTED HOLE
LTWT LIGHT WEIGHT
LVL LAMINATED VENEER LUMBER
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MC MISCELLANEOUS CHANNEL
MECH MECHANICAL
MEMB MEMBRANE
MEP MECHANICAL/ ELECTRICAL/ PLUMBING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MULT MULTIPLE
N/A NOT APPLICABLE
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFD OVERFLOW DRAIN
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
OPPHD OPPOSITE HAND
ORIG ORIGINAL
OVS OVERSIZED HOLE
OWJ PRE-MANUFACTURED OPEN WEB JOIST
PC PRECAST CONCRETE
PEMB PRE-ENGINEERED METAL BUILDING
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUNDS PER LINEAL FOOT
PLYWD PLYWOOD
PREFAB PREFABRICATED
PRELIM PRELIMINARY
PREP PREPARATION, PREPARE
PROJ PROJECTION
PS PRESTRESSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT POST-TENSIONED
R RADIUS
RD ROOF DRAIN
REF REFERENCE
REINF REINFORCEMENT, REINFORCE
REQD REQUIRED
RO ROUGH OPENING
RTU ROOFTOP MECHANICAL UNIT
S SLOPE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SIM SIMILAR
SOG SLAB-ON-GRADE
SPA SPACES, SPACE
SPECS SPECIFICATIONS
SQ SQUARE
SS STAINLESS STEEL
SSLT SHORT SLOTTED HOLE
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUC STRUCTURAL
SYM SYMMETRICAL
T & B TOP AND BOTTOM
T/ TOP OF
T/GB TOP OF GRADE BEAM
TBS MECHANICAL TENSION BUTT SPLICE
TEMP TEMPERATURE
THRU THROUGH
TJI PREFABRICATED WOOD I-JOIST
TRANS TRANSVERSE
TYP TYPICAL
UL UNDERWRITERS' LABORATORY INC.
UNO UNLESS NOTED OTHERWISE
UT ULTRA-SONIC TEST
VERT VERTICAL
W WIDE FLANGE
W/ WITH
W/O WITHOUT
WD WOOD
WH WEEP HOLE
WP WORK POINT
WT WEIGHT, STRUCTURAL T
WWF WELDED WIRE FABRIC
XS EXTRA STRONG (PIPE)
XXS DOUBLE EXTRA STRONG (PIPE)
& AND
A/E ARCHITECT/ENGINEER
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADJ ADJACENT
AGGR AGGREGATE
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
APA AMERICAN PLYWOOD ASSOCIATION
APPROX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECTURAL
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
AWS AMERICAN WELDING SOCIETY
B/ BOTTOM OF
BAL BALANCE
BD BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BTWN BETWEEN
BU BUILT UP
C STANDARD CHANNEL
CANT CANTILEVER
CC CENTER TO CENTER
CF COLD FORMED
CG CENTER OF GRAVITY
CIP CAST-IN-PLACE
CJ CONTROL JOINT OR CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTERLINE
CLR CLEARANCE, CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CTR CENTER
CTRD CENTERED
CU FT CUBIC FEET
CU IN CUBIC INCH
CYD CUBIC YARD
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION, DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIAPH DIAPHRAGM
DIM DIMENSION
DN DOWN
DO DITTO
DP DEEP
DWG DRAWING
DWL DOWELS
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL, ELEV ELEVATION
ELEC ELECTRICAL
ENCL ENCLOSURE
ENGR ENGINEER
EOD EDGE OF DECK
EOJ EDGE OF JOIST
EOS EDGE OF SLAB
EQ EQUAL
EQPT EQUIPMENT
ES EACH SIDE
EW EACH WAY
EX EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FDN FOUNDATION
FIN FINISH
FLG FLANGE
FLR FLOOR
FS FAR SIDE
FT FEET
FTG FOOTING
FTGD FOOTING DRAIN
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GL GLUED LAMINATED TIMBER (GLULAM)
GRND GROUND
GT GIRDER TRUSS
HAS HEADED ANCHOR STUD
HORIZ HORIZONTAL
HP HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
HT HIP TRUSS
HVAC HEATING, VENTILATION, AIR CONDITIONING
ID INSIDE DIAMETER
IF INSIDE FACE
IN INCH
INCL INCLUDE
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
J/BRG JOIST BEARING
STRUCTURAL DRAWINGS ABBREVIATIONS
SHEET # SHEET NAME
S-001 ABBREVIATIONS AND SYMBOLS
S-002 GENERAL NOTES
S-003 SPECIAL INSPECTION REQUIREMENTS
S-004 LOAD MAPS
S-110 FOUNDATION PLAN BUILDING 201
S-111 MECHANICAL MEZZANINE AND LOW ROOF FRAMING PLAN BUILDING 201
S-112 ROOF TRUSS FRAMING PLAN BUILDING 201
S-120 FOUNDATION PLAN BUILDING 202
S-121 MECHANICAL MEZZANINE AND LOW ROOF FRAMING PLAN BUILDING 202
S-122 ROOF TRUSS FRAMING PLAN BUILDING 202
S-500 FOUNDATION TYPICAL DETAILS
S-501 FOUNDATION SECTIONS AND DETAILS
S-502 WOOD TYPICAL DETAILS
S-503 WOOD SECTIONS AND DETAILS
S-504 WOOD SECTIONS AND DETAILS
S-600 SCHEDULES
STRUCTURAL INDEX
26151
CORSON
DONALD G.
E
D
SNE
CI
L
Y K C U
TN
EKFO
E T A
S T
P R O F
ESS ION
R E E
NIGNELA
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
# 201
LEXINGTON VAMC, LEESTOWN DIVISION
2250 LEESTOWN ROAD
LEXINGTON, KY 40511
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Project Number Scale
15-584
CONSTRUCT CONTINUING
CARE FACILITES - PHASE 1
596-332AS INDICATED
FULLY SPRINKLERED
BID DOCUMENTS
E D
C B
A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
/1
/2
:4
:5
A
M
S-001
ABBREVIATIONS AND SYMBOLS
JAP KLM 1OCTOBER 18, 2018
FOUNDATIONS
FOUNDATION EXCAVATIONS AND SOIL RELATED WORK SHALL BE PERFORMED IN
ACCORDANCE WITH THE GEOTECHNICAL REPORT NUMBER LX160156 PREPARED
CONSULTING SERVICES INCORPORATED OF KENTUCKY DATED OCTOBER 6, 2016.
IF ACTUAL ALLOWABLE PRESSURES ARE FOUND TO BE LESS THAN THE ASSUMED VALUES,
THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY AND SHALL NOT PROCEED WITH
FOUNDATION CONSTRUCTION WITHOUT REVIEW BY THE COR.
DESIGN NET SOIL PRESSURE:
SPREAD FOOTINGS: 3000 PSF
CONTINUOUS WALL FOOTINGS: 3000 PSF
FOUNDATIONS AND SOILS RELATED WORK SHALL BE INSPECTED BY A LICENSED
GEOTECHNICAL ENGINEER. WRITTEN FIELD REPORTS SHALL BE FORWARDED TO THE COR
AS SOON AS THEY BECOME AVAILABLE.
FOUNDATION CONDITIONS NOTED DURING CONSTRUCTION, WHICH DIFFER FROM THOSE
DESCRIBED IN THE GEOTECHNICAL REPORT, SHALL BE REPORTED TO THE COR AND
GEOTECHNICAL ENGINEER BEFORE FURTHER CONSTRUCTION IS ATTEMPTED.
EXCAVATIONS FOR SPREAD FOOTINGS, COMBINED FOOTINGS, CONTINUOUS FOOTINGS AND
MAT FOUNDATIONS SHALL BE CLEANED AND HAND TAMPED TO UNIFORM SURFACE AND
SHALL BE PROTECTED AND MAINTAINED UNIFORM UNTIL CONCRETE IS PLACED.
INSULATION
ANY INSULATION SHOWN ON THE STRUCTURAL DRAWINGS IS FOR GENERAL VISUAL
REFERENCE ONLY, UNLESS NOTED OTHERWISE. SEE THE ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR EXACT LOCATION, PLACEMENT, THICKNESS AND MATERIAL
REQUIREMENTS.
DESIGN DATA
NEW STRUCTURES ON THESE DRAWINGS HAVE BEEN DESIGNED IN ACCORDANCE WITH
THE 2013 KENTUCKY BUILDING CODE.
WOOD TRUSS LOADS (IN ADDITION TO SELF-WEIGHT):
ROOF TRUSSES
TOP CHORD DEAD LOAD: SEE LOAD MAPS
TOP CHORD LIVE LOAD: SEE LOAD MAPS
BOTTOM CHORD DEAD LOAD: SEE LOAD MAPS
SNOW LOAD DESIGN DATA
GROUND SNOW LOAD (PG) = 15 PSF
SNOW EXPOSURE FACTOR (CE) = 1.0
THERMAL FACTOR (CT) = 1.0 FOR FLAT ROOFS
= 1.1 FOR SLOPED ROOFS
= 1.2 FOR CANOPIES
SNOW LOAD IMPORTANCE FACTOR (IS) = 1.1
LOW-SLOPE ROOF SNOW LOAD (PF) = 10.5 PSF
MINIMUM LOW-SLOPE ROOF SNOW LOAD (PM) = 15 PSF
(20 PSF MINIUMIM LIVE LOAD)
WIND LOAD DESIGN DATA
BASIC WIND SPEED (3-SECOND GUST) = 120 MPH
WIND EXPOSURE = C
WIND DESIGN PRESSURE (P) = VARIES WITH HEIGHT AND LOCATION
EARTHQUAKE DESIGN DATA
SHORT PERIOD SPECTRAL RESPONSE (SS) = 0.196
1-SECOND SPECTRAL RESPONSE (S1) = 0.092
SEISMIC IMPORTANCE FACTOR (IE) = 1.25
RISK CATEGORY = III
SITE CLASSIFICATION = D
SEISMIC DESIGN CATEGORY = C
SHORT PERIOD SPECTRAL RESPONSE (SDS) = 0.209
1-SECOND SPECTRAL RESPONSE (SD1) = 0.147
BASIC STRUCTURAL SYSTEM / SEISMIC RESISTING SYSTEM: BEARING WALLS /
LIGHT-FRAME (WOOD) WALLS SHEATHED WITH WOOD STRUCTURAL PANELS
ANALYSIS PROCEDURE UTILIZED = EQUIVALENT LATERAL FORCE PROCEDURE
RESPONSE MODIFICATION COEFFICIENT (R) = 6.5
SEISMIC RESPONSE COEFFICIENT (CS) = 0.04
26151
CORSON
DONALD G.
E
D
SNE
CI
L
Y K C U
TN
EKFO
E T A
S T
P R O F
ESS ION
R E E
NIGNELA
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
LEXINGTON VAMC, LEESTOWN DIVISION
2250 LEESTOWN ROAD
LEXINGTON, KY 40511
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Project Number Scale
15-584
CONSTRUCT CONTINUING
CARE FACILITES - PHASE 1
596-332AS INDICATED
FULLY SPRINKLERED
BID DOCUMENTS
E D
C B
A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
# 201 & 202
/1
/2
:3
:3
A
M
S-002
GENERAL NOTES
JAP KLM 2SEPTEMBER 16, 2018
GENERAL
STRUCTURES INDICATED ON THESE DRAWINGS HAVE BEEN DESIGNED FOR THE IN-
SERVICE LOADS ONLY. THE METHODS, MEANS, PROCEDURES, AND SEQUENCES OF
CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE
STRUCTURES ARE DESIGNED TO BE SELF-SUPPORTING AND STABLE AFTER
CONSTRUCTION IS COMPLETE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE TO ENSURE SAFETY OF
THE STRUCTURES AND RELATED COMPONENTS DURING CONSTRUCTION. THIS
INCLUDES THE ADDITION OF NECESSARY SHORING, SHEETING, TEMPORARY BRACING,
GUYS, TIEDOWNS, ETC.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT CONSTRUCTION LOADS DO
NOT EXCEED THE CAPACITY OF ANY STRUCTURAL ELEMENT AT THE TIME THE LOADS
ARE APPLIED, INCLUDING BUT NOT LIMITED TO: WEIGHTS OF MATERIALS, WEIGHTS OF
EQUIPMENT AND WORKERS, AND ALL LOADS APPLIED FROM TEMPORARY LIFTS,
HOISTS AND CRANES, ETC.
THE STRUCTURAL DRAWINGS AND SPECIFICATIONS SHALL BE USED IN CONJUNCTION
WITH THE DRAWINGS AND SPECIFICATIONS OF ALL OTHER DISCIPLINES, TRADES, AND
DELEGATED DESIGN ELEMENTS. THE CONTRACTOR IS RESPONSIBLE FOR
COORDINATION OF THE STRUCTURAL WORK WITH ALL OTHER APPLICABLE TRADES.
THE GENERAL NOTES ON THE DRAWINGS ARE TO BE USED IN CONJUNCTION WITH THE
FULL WRITTEN MATERIAL SPECIFICATIONS (IF ANY) FOR THE PROJECT.
IF A DISCREPANCY IS NOTED ON THE DRAWINGS, GENERAL NOTES, OR
SPECIFICATIONS, THE CONTRACTOR SHALL SUBMIT TO THE STRUCTURAL ENGINEER A
WRITTEN REQUEST FOR CLARIFICATION AND SHALL NOT PROCEED WITH THE
AFFECTED WORK WITHOUT DOCUMENTED RESOLUTION OF THE DISCREPANCY. ALL
COSTS RESULTING FROM THE CONTRACTOR IMPROPERLY PROCEEDING WITH THE
AFFECTED WORK PRIOR TO DOCUMENTED RESOLUTION OF THE DISCREPANCY,
INCLUDING COST OF REMOVAL AND REPLACEMENT OF NON-CONFORMING WORK,
SHALL BE BORNE BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
CONCRETE MIX DESIGN SUBMITTAL
THE CONTRACTOR SHALL SUBMIT FOR THE REVIEW OF THE COR A MIX DESIGN FOR
EACH PROPOSED CLASS OF CONCRETE. EACH MIX DESIGN SHALL BE IDENTIFIED BY A
MIX NUMBER OR OTHER UNIQUE IDENTIFICATION. THE CONTRACTOR SHALL NOT VARY
FROM THE MIX DESIGNS NOR USE ANY CONCRETE OTHER THAN THE APPROVED MIX
DESIGNS WITHOUT THE APPROVAL OF THE COR. MIX DESIGN SUBMITTALS SHALL
INCLUDE THE FOLLOWING INFORMATION:
1. MIX DESIGN NUMBER OR UNIQUE IDENTIFICATION AND INTENDED LOCATION OF
PLACEMENT.
2. CEMENT TYPE, PROPORTION AND NAME OF MANUFACTURER.
3. FLY ASH PROPORTION (WHEN USED), LABORATORY ANALYSIS CERTIFICATION, AND
NAME AND LOCATION OF SUPPLIER.
4. COURSE AGGREGATE PROPORTION, GRADATION REPORT, NAME AND LOCATION OF
SUPPLIER.
5. FINE AGGREGATE PROPORTION, GRADATION REPORT, NAME AND LOCATION OF
SUPPLIER.
6. MIXING WATER PROPORTION AND SOURCE.
7. DMIXTURE DOSAGES, PRODUCT NAME(S) AND MANUFACTURER NAME(S).
8. FIBER REINFORCEMENT DOSAGE (WHEN USED), PRODUCT NAME AND
MANUFACTURER NAME.
9. DESIGN 28-DAY COMPRESSIVE STRENGTH (F'C).
10. DESIGN SLUMP RANGE.
11. DESIGN AIR-ENTRAINMENT (FOR CONCRETE REQUIRING ENTRAINED AIR).
12. STATISTICAL ANALYSIS OF LABORATORY STRENGTH TEST DATA IN ACCORDANCE
WITH "STANDARD DEVIATION" DETERMINATION OUTLINED IN ACI 318.
PRODUCT DATA SUBMITTALS
THE CONTRACTOR SHALL SUBMIT FOR APPROVAL PRODUCT DATA FOR THE SPECIFIC
ITEMS LISTED BELOW. CONTRACTOR SHALL NOT USE PRODUCTS OTHER THAN THOSE
SUBMITTED WITHOUT THE APPROVAL OF THE COR.
SUBMIT HARD COPIES OR ELECTRONIC VERSIONS OF PRODUCT DATA. FOR HARD COPY
OPTION, SUBMIT A MINIMUM OF TWO COPIES OF PRODUCT DATA TO THE COR FOR
REVIEW (ONE COPY SHALL BE RETAINED BY THE COR). FOR ELECTRONIC OPTION,
SUBMIT PRODUCT DATA IN ADOBE PDF FORMAT.
1. CONCRETE CURING COMPOUND
2. CONCRETE JOINT SEALANT
3. EXPANSION ANCHORS
4. ADHESIVE ANCHORS
5. WATER STOPS
6. WOOD FRAMING DATA INCLUDING SPECIES AND GRADE TO BE USED FOR EACH
STRUCTURAL ELEMENT (STUDS, SILLS, TOP PLATES, HEADERS, SHEATHING, ETC.)
7. WOOD FRAMING CONNECTOR HARDWARE
8. LAMINATED VENEER LUMBER (LVL)
9. PARALLEL STRAND LUMBER (PSL)
10. VAPOR BARRIER
11. ENGINEERED WOOD PRODUCTS
CONCRETE
REINFORCED CONCRETE HAS BEEN DESIGNED IN ACCORDANCE WITH THE BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318) AND COMMENTARY (ACI 318R).
MIXING, TRANSPORTING, AND PLACING OF CONCRETE SHALL CONFORM TO THE LATEST
EDITION OF THE SPECIFICATIONS FOR STRUCTURAL CONCRETE (ACI 301). READY-MIXED
CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF ASTM C94. IN CASE OF A
DISCREPANCY, THE PLANS AND SPECIFICATIONS SHALL GOVERN.
CEMENT SHALL CONFORM TO ASTM C150, TYPE I, UNO.
FLY ASH SHALL CONFORM TO ASTM C618, CLASS C OR F.
NORMAL WEIGHT AGGREGATES SHALL CONFORM TO ASTM C33/C33M.
WATER-REDUCING ADMIXTURES SHALL CONFORM TO ASTM C494/C494M.
AIR-ENTRAINING ADMIXTURES SHALL CONFORM TO ASTM C260 AND SHALL BE CERTIFIED BY
THE MANUFACTURER TO BE COMPATIBLE WITH OTHER ADMIXTURES.
CALCIUM CHLORIDE ADMIXTURES OR ADMIXTURES CONTAINING MORE THAN 0.05 PERCENT
CHLORIDE IONS SHALL NOT BE USED.
IN COLD WEATHER CONDITIONS, MIXING, PLACING, FINISHING, CURING AND PROTECTION OF
CONCRETE SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF ACI 306R,
COLD WEATHER CONCRETING.
IN HOT WEATHER CONDITIONS, MIXING, PLACING, FINISHING, CURING AND PROTECTION OF
CONCRETE SHALL BE PERFORMED IN ACCORDANCE WITH THE
LATEST EDITION OF ACI 305R, HOT WEATHER CONCRETING.
USE OF CONSTRUCTION JOINTS AT LOCATIONS OTHER THAN THOSE INDICATED ON THE
DRAWINGS SHALL BE SUBMITTED TO THE COR FOR REVIEW.
SLUMP FOR PUMPED CONCRETE SHALL BE MEASURED AT POINT OF DISCHARGE.
NORMAL WEIGHT CONCRETE SHALL HAVE THE PROPERTIES AS INDICATED IN THE CONCRETE
MIX SCHEDULE AND SPECIFICATIONS.
WELDED WIRE FABRIC
WELDED WIRE FABRIC SHALL BE SMOOTH WIRE FABRIC CONFORMING TO ASTM A1064.
FABRIC SHALL BE SUPPLIED IN FLAT SHEETS AND LAPPED A MINIMUM OF ONE SPACE
PLUS 2 INCHES.
WELDED WIRE FABRIC SHALL BE PLACED AS FOLLOWS, UNLESS NOTED OTHERWISE:
SLABS ON GRADE: 2 INCHES DOWN FROM TOP OF SLAB.
CONCRETE TESTING
MAKE ONE SET OF TEST CYLINDERS IN ACCORDANCE WITH ASTM C31/C31M FOR EACH
DAY'S POUR AND FOR EACH 100 CUBIC YARDS FOR EACH TYPE OF CONCRETE PLACED.
EACH SET SHALL INCLUDE ONE SPECIMEN TESTED AT 7 DAYS, 2 SPECIMENS TESTED AT
28 DAYS (3 SPECIMENS TESTED AT 28 DAYS IF USING 4x8 CYLINDERS) AND ONE
SPECIMEN RETAINED IN RESERVE TO BE TESTED AT THE DIRECTION OF THE COR.
SPARE CYLINDER MAY BE DISCARDED 90 DAYS AFTER CASTING UNLESS DIRECTED
OTHERWISE BY THE COR. THIS SET OF TEST CYLINDERS SHALL BE PROTECTED
AGAINST FREEZING.
WHEN THE AMBIENT TEMPERATURE IS EXPECTED TO FALL BELOW 40 DEGREES DURING
THE COURSE OF A CONCRETE POUR OR SUBSEQUENT CURING PROCESS, AN
ADDITIONAL SET OF CONCRETE TEST CYLINDERS SHALL BE MADE AND TESTED. THESE
CYLINDERS SHALL BE STORED IMMEDIATELY ADJACENT TO, AND CURED UNDER THE
SAME CONDITIONS AS THE BUILDING CONCRETE. SPECIAL CURING BOXES ARE NOT
PERMITTED FOR THESE TEST CYLINDERS.
FORWARD COPIES OF TEST RESULTS TO THE ARCHITECT, COR, READY-MIX SUPPLIER
AND CONTRACTOR WITHIN 24 HOURS AFTER TESTING.
REINFORCING STEEL
REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A615 AND SHALL
HAVE A MINIMUM YIELD STRENGTH OF 60,000 PSI.
REINFORCING BAR DETAILING, FABRICATING, AND PLACING SHALL CONFORM TO THE
LATEST EDITION OF THE FOLLOWING STANDARDS: ACI 301, ACI 315, ACI 318, ACI DETAILING
MANUAL (SP66), AND CRSI MANUAL OF STANDARD PRACTICE.
THE CONTRACTOR SHALL PROVIDE BAR SUPPORTS AND SPACERS AS REQUIRED TO
MAINTAIN PROPER SUPPORT AND POSITIONING OF THE REINFORCING STEEL
THROUGHOUT CONCRETE PLACEMENT OPERATIONS. DESIGN OF THE SUPPORT SYSTEM
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
UNLESS A GREATER AMOUNT OF COVER IS INDICATED ON THE DRAWINGS, PROVIDE THE
FOLLOWING MINIMUM CONCRETE COVER OVER REINFORCEMENT AS FOLLOWS:
CONCRETE CAST AGAINST EARTH: 3 INCHES
FOUNDATION TOP REINFORCEMENT: 2 INCHES
FOUNDATION BOTTOM AND SIDE REINFORCEMENT: 3 INCHES
REINFORCING STEEL SHALL NOT BE TACK WELDED, WELDED, HEATED OR CUT UNLESS
INDICATED ON THE CONTRACT DOCUMENTS OR APPROVED BY THE COR.
WHERE LAP SPLICE LENGTHS ARE NOT SHOWN OR NOTED, PROVIDE A CLASS "B" LAP.
ALL 90 DEGREE AND 180 DEGREE BENDS SHOWN ON THE DRAWINGS SHALL BE
STANDARD HOOKS, UNLESS NOTED OTHERWISE.
PROVIDE CORNER BARS OF SAME SIZE AND SPACING AS HORIZONTAL BARS AT CORNERS
OF ALL WALLS AND GRADE BEAMS. LAP SPLICE CORNERS BARS WITH STRAIGHT BARS.
UNLESS OTHERWISE SHOWN OR NOTED, PROVIDE 2-#5 BARS (ONE EACH FACE) AROUND
UNFRAMED OPENINGS IN CONCRETE WALLS AND GRADE BEAMS. PLACE BARS PARALLEL
TO THE SIDES OF THE OPENING AND EXTEND 24" BEYOND CORNERS.
LAMINATED VENEER LUMBER (LVL)
MEMBERS SHALL BE MICROLLAM 1.9E, MANUFACTURED BY TRUS-
JOIST/WEYERHAEUSER, OR AN EQUIVALENT SUBSTITUTE APPROVED BY THE
COR, AND SHALL PROVIDE THE FOLLOWING DESIGN ALLOWABLE STRESSES:
BENDING (FB) 2600 PSI
HORIZONTAL SHEAR (FV) 285 PSI
MODULUS OF ELASTICITY (E) 1,900,000 PSI
PARALLEL STRAND LUMBER (PSL)
MEMBERS SHALL BE PARALLAM 2.0E, MANUFACTURED BY TRUS-
JOIST/WEYERHAEUSER, OR AN EQUIVALENT SUBSTITUTE APPROVED BY THE
COR, AND SHALL PROVIDE THE FOLLOWING DESIGN ALLOWABLE STRESSES:
BENDING (FB) 2900 PSI
HORIZONTAL SHEAR (FV) 290 PSI
MODULUS OF ELASTICITY (E) 2,000,000 PSI
STRUCTURAL WOOD
WOOD FRAMING SHOWN ON PLAN (INCLUDING BEARING WALLS, SHEAR WALLS,
HEADERS, WOOD COLUMNS, ETC) SUPPORTS THE INDICATED FLOOR.
HOLDOWNS SHOWN ON PLAN EXIST AT THE INDICATED FLOOR.
STRUCTURAL WOOD SHALL BE DETAILED, FABRICATED AND ERECTED IN
ACCORDANCE WITH THE LATEST EDITIONS OF THE TIMBER CONSTRUCTION
MANUAL BY THE AMERICAN INSTITUTE OF TIMBER CONSTRUCTION (AITC) AND
THE NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION BY THE
AMERICAN FOREST AND PAPER ASSOCIATION (AFPA).
STRUCTURAL WOOD FRAMING SHALL BE SPRUCE PINE FIR NO. 2 OR BETTER,
EXCEPT NON-BEARING WALL STUDS SHALL BE STUD GRADE SPRUCE PINE FIR
OR BETTER, UNLESS NOTED OTHERWISE.
TOP AND BOTTOM PLATE MATERIAL SHALL BE SPRUCE PINE FIR SELECT
STRUCTURAL. SILL PLATES BEARING ON CONCRETE OR MASONRY SHALL BE
PRESSURE-TREATED SPRUCE PINE FIR NO. 2 OR BETTER UNLESS NOTED
OTHERWISE.
NAILS AND OTHER WOOD FASTENINGS, UNLESS OTHERWISE NOTED, SHALL
CONFORM TO THE LATEST EDITION OF THE NATIONAL DESIGN SPECIFICATION
FOR WOOD CONSTRUCTION.
BOLTS AND LAG SCREWS IN CONNECTIONS OF WOOD MEMBERS SHALL
CONFORM TO ASTM A307, UNLESS NOTED OTHERWISE. STANDARD CUT
WASHERS SHALL BE USED BETWEEN THE WOOD AND BOLT HEAD AND THE
WOOD AND NUT.
JOIST HANGERS, HOLDOWNS, AND ALL OTHER WOOD CONNECTORS SHALL BE
MANUFACTURED BY SIMPSON STRONG-TIE COMPANY, OR AN EQUIVALENT
SUBSTITUTE APPROVED BY THE COR. INSTALL THE EXACT QUANTITY, SIZE,
MATERIAL, TYPE AND FINISH OF FASTENERS AS INDICATED IN THE CONNECTOR
MANUFACTURER'S PRODUCT DATA, UNLESS SPECIFICALLY SHOWN OR NOTED
OTHERWISE ON THE DRAWINGS.
ALL FASTENERS AND WOOD CONNECTORS IN CONTACT WITH PRESSURE-
TREATED WOOD SHALL BE HOT-DIP GALVANIZED UNLESS A MORE STRINGENT
REQUIREMENT IS NOTED ON THE DESIGN DOCUMENTS.
WOOD SHRINKAGE OF 0.5" IS EXPECTED AT THE TOP OF THE WOOD BUILDING.
COORDINATE GAPS/SEALS AT ALL OPENINGS AND TRANSITION POINTS TO
ENSURE PROPER PERFORMANCE.
PREFABRICATED WOOD TRUSSES
PREFABRICATED WOOD TRUSSES SHALL BE DESIGNED, DETAILED, FABRICATED
AND ERECTED IN ACCORDANCE WITH THE LATEST EDITIONS OF THE TIMBER
CONSTRUCTION MANUAL BY THE AMERICAN INSTITUTE OF TIMBER
CONSTRUCTION (AITC), THE NATIONAL DESIGN SPECIFICATION FOR WOOD
CONSTRUCTION BY THE AMERICAN FOREST AND PAPER ASSOCIATION (AFPA)
AND IN ACCORDANCE WITH THE NATIONAL DESIGN STANDARD FOR METAL
PLATE CONNECTED WOOD TRUSS CONSTRUCTION BY THE TRUSS PLATE
INSTITUTE (TPI).
TEMPORARY AND PERMANENT BRACING OF WOOD TRUSSES SHALL BE
DESIGNED AND INSTALLED IN ACCORDANCE WITH THE LATEST EDITIONS OF
THE TPI PUBLICATIONS BRACING OF WOODEN TRUSSES, SPECIFICATIONS FOR
TEMPORARY BRACING OF METAL PLATE CONNECTED WOOD TRUSSES, AND
BCSI 1-03 GUIDE TO GOOD PRACTICE FOR HANDLING, INSTALLING AND
BRACING OF METAL PLATE CONNECTED WOOD TRUSSES.
TRUSSES SHALL CONFORM TO THE GEOMETRY SHOWN ON THE DRAWINGS.
ALL OVERBUILD AREAS SHALL BE PART OF THE ENGINEERED TRUSS SYSTEM
AND SHALL BE DESIGNED AND DETAILED ON THE TRUSS SHOP DRAWINGS.
PREFABRICATED WOOD TRUSSES SHALL HAVE THE FOLLOWING MINIMUM
SIZES:
TOP CHORD 2x6 BOTTOM CHORD 2x8
MASTIC COATING
MASTIC COATING FOR PROTECTION OF INDICATED ITEMS SHALL BE
BITUMASTIC 50 COAL TAR MASTIC BY CARBOLINE OR EQUIVALENT SUBSTITUTE
APPROVED BY THE COR. INSTALL AT LOCATIONS INDICATED ON DRAWINGS.
UNLESS NOTED OTHERWISE, APPLY MASTIC TO A COATING THICKNESS OF 18
MILS. PROVIDE FULL COVERAGE OVER ITEMS INDICATED TO RECEIVE
COATING.
CONCRETE SLABS ON GRADE
SLABS ON GRADE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST EDITION
OF THE GUIDE FOR CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI 302.1R).
PLACE CONCRETE IN A MANNER SO AS TO PREVENT SEGREGATION OF THE MIX. DELAY
FLOATING AND TROWELING OPERATIONS UNTIL THE CONCRETE HAS LOST SURFACE
WATER SHEEN OR ALL FREE WATER. DO NOT SPRINKLE FREE CEMENT ON THE SLAB
SURFACE.
PROVIDE CURING OF CONCRETE SLABS ON GRADE AS REQUIRED TO ACCOMMODATE
FLOOR FINISHES AND FINISH MATERIALS PER THE ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS. REVIEW ALL FLOOR FINISH REQUIREMENTS PRIOR TO PLACEMENT OF
CONCRETE SLABS AND COORDINATE SLAB MIX, PLACEMENT AND CURING TO COMPLY
WITH FINISH FLOORING MATERIAL MANUFACTURER’S REQUIREMENTS.
CURING PROCEDURES SHALL COMPLY WITH ACI 302.1R AND USE OF CURING MATERIALS
SHALL BE APPLIED IN STRICT ACCORDANCE WITH MANUFACTURER’S REQUIREMENTS.
MOISTURE RETENTION COVERS, IF USED, SHALL BE APPLIED FLAT AND SMOOTH TO
RESULT IN A UNIFORM APPEARANCE AND MINIMIZE SURFACE MARKINGS AND BLEMISHES.
UNLESS NOTED OTHERWISE, OR UNLESS MORE STRINGENT REQUIREMENTS APPLY, CURE
SLABS ON GRADE AS FOLLOWS:
SLABS RECEIVING FLOOR COVERING MATERIALS: MOIST CURE A MINIMUM OF 7 DAYS
(OR, IF APPROVED BY FLOOR FINISH MATERIAL MANUFACTURER, USE ASTM C309,
TYPE 1, CLASS B, WATERBORNE, MEMBRANE-FORMING CURING COMPOUND,
DISSIPATING). REMOVAL OF CURING COMPOUND MATERIAL, IF REQUIRED FOR
PROPER INSTALLATION OF FLOOR FINISH MATERIALS, SHALL BE PERFORMED BY THE
CONCRETE CONTRACTOR.
PROVIDE SLABS ON GRADE WITH A SMOOTH TROWEL FINISH UNLESS NOTED
OTHERWISE.
CONTRACTOR SHALL REVIEW ALL REQUIRED FLOOR FINISH MATERIAL REQUIREMENTS
PRIOR TO PLACEMENT OF CONCRETE AND SHALL PROVIDE FLOOR SLAB FLATNESS AND
LEVELNESS MEETING THE FINISH MATERIAL SUPPLIER’S WRITTEN REQUIREMENTS.
FLATNESS AND LEVELNESS SHALL BE THE MORE STRINGENT OF THE FINISH MATERIAL
REQUIREMENTS AND THE FOLLOWING:
ALL SLABS, UNO:
OVERALL VALUES: FF=36 FL=20
LOCAL VALUES: FF=24 FL=15
CONTRACTOR SHALL PROVIDE ALL NECESSARY REPAIR, GRINDING AND/OR LEVELING OF
THE CONCRETE SLAB TO ACCOMMODATE ALL FLOOR FINISHES PRIOR TO INSTALLATION
OF THE FINISH MATERIALS WITH NO ADDITIONAL COST TO THE PROJECT.
THE MINIMUM LOCAL AREA SHALL BE ANY BAY DEFINED BY COLUMN LINES.
UNLESS SHOWN OR NOTED OTHERWISE, PROVIDE CONTROL OR CONSTRUCTION JOINTS
IN SLABS-ON-GRADE AT A MAXIMUM SPACING OF 36 TIMES THE SLAB THICKNESS.
PROVIDE JOINTS AT ALL COLUMN LOCATIONS. LOCATE JOINTS TO ELIMINATE RE-
ENTRANT CORNERS AND TO CREATE SQUARE OR RECTANGULAR SECTIONS WITH
MAXIMUM LONG SIDE TO SHORT SIDE RATIO OF 1.5 TO 1.
CONTROL JOINTS IN SLABS ON GRADE SHALL NOT RECEIVE JOINT FILLER MATERIAL
UNLESS NOTED OTHERWISE.
EXPANSION ANCHORS
EXPANSION ANCHORS SHALL BE HILTI “KWIK BOLT TZ” OR AN EQUIVALENT
SUBSTITUTE APPROVED BY THE COR, UNO.
ANCHOR FINISH SHALL BE CARBON STEEL FOR INTERIOR EXPOSURES AND AISI
316 STAINLESS STEEL FOR EXTERIOR AND BELOW GRADE EXPOSURES, UNO.
ANCHORS SHALL BE INSTALLED IN CONFORMANCE WITH THE MANUFACTURER'S
REQUIREMENTS BY INSTALLERS TRAINED BY THE MANUFACTURER’S
REPRESENTATIVE.
ANCHORS SHALL NOT BE INSTALLED IN CONCRETE OR MASONRY UNTIL IT HAS
ATTAINED ITS SPECIFIED MINIMUM 28 DAY COMPRESSIVE STRENGTH.
ADHESIVE ANCHORS FOR SOLID SUBSTRATES (THREADED ROD AND REBAR)
ADHESIVE ANCHORS FOR SOLID SUBSTRATES SHALL BE HILTI "HIT-HY 200" OR AN
EQUIVALENT SUBSTITUTE APPROVED BY THE COR, UNO.
THREADED ANCHORS SHALL BE ASTM A36 RODS FOR INTERIOR EXPOSURES AND
AISI 316 STAINLESS STEEL FOR EXTERIOR AND BELOW GRADE EXPOSURES, UNO.
ANCHORS SHALL BE INSTALLED IN CONFORMANCE WITH THE MANUFACTURER'S
REQUIREMENTS BY INSTALLERS TRAINED BY THE MANUFACTURER'S
REPRESENTATIVE.
ADHESIVE ANCHORS SHALL NOT BE INSTALLED IN CONCRETE OR MASONRY UNTIL IT
HAS ATTAINED ITS SPECIFIED MINIMUM 28 DAY COMPRESSIVE STRENGTH.
MINIMUM EMBEDMENT DEPTH SHALL BE 8 DIAMETERS UNLESS NOTED OTHERWISE.
BRICK/STONE VENEER
PROVIDE EXPANSION JOINTS IN ACCORDANCE WITH THE ARCHITECTURAL DRAWINGS
AND SPECIFICATIONS.
IF BRICK EXPANSION JOINT LOCATIONS ARE NOT INDICATED ON THE ARCHITECTURAL
DRAWINGS OR IN THE SPECIFICATIONS, SUBMIT PROPOSED EXPANSION JOINT
LOCATIONS TO THE ARCHITECT AND COR FOR REVIEW PRIOR TO CONSTRUCTION.
UNLESS INDICATED OTHERWISE, PROVIDE VERTICAL EXPANSION JOINTS AT 20'-0" OC
MAXIMUM. LOCATE JOINTS IN ACCORDANCE WITH BIA TECHNICAL NOTE 18A
"ACCOMMODATING EXPANSION OF BRICKWORK" AT OFFSETS, SETBACKS, WALL
INTERSECTIONS, CORNERS, CHANGES IN THICKNESS, CHANGES IN HEIGHT, OR
EDGES OF OPENINGS.
SEPARATION OF DISSIMILAR METALS
DISSIMILAR METALS SHALL BE ELECTRICALLY ISOLATED TO PREVENT
GALVANIC CORROSION VIA NON-CONDUCTIVE WASHERS, GASKETS, COATINGS,
OR EQUIVALENT SUBSTITUTE APPROVED BY THE COR, UNO.
PENETRATIONS AND EMBEDDED ITEMS
CONTRACTOR SHALL COORDINATE WITH ALL AFFECTED TRADES THE REQUIRED SIZES,
TYPES, AND LOCATIONS OF ALL EMBEDDED ITEMS IN, AND ALL PENETRATIONS
THROUGH, STRUCTURAL ELEMENTS PRIOR TO CONSTRUCTION.
NO PENETRATIONS THROUGH STRUCTURAL ELEMENTS, OTHER THAN THOSE SHOWN
ON THE STRUCTURAL DRAWINGS, SHALL BE MADE WITHOUT THE APPROVAL OF THE
COR.
NO ITEMS (INCLUDING, BUT NOT LIMITED TO, CONDUIT, PIPING, ETC.), OTHER THAN
THOSE SHOWN ON THE STRUCTURAL DRAWINGS, SHALL BE EMBEDDED IN
STRUCTURAL ELEMENTS WITHOUT THE APPROVAL OF THE COR.
ALL EMBEDDED ITEMS IN EXPOSED EXTERIOR CONCRETE SHALL BE GALVANIZED,
PLASTIC, OR EPOXY-COATED.
DELEGATED DESIGN
FOR ALL SUBMITTALS INDICATED AS "DELEGATED DESIGN," THE CONTRACTOR SHALL
ENGAGE A LICENSED PROFESSIONAL ENGINEER LICENSED IN THE STATE WHERE THE
PROJECT IS LOCATED TO DESIGN AND DETAIL THE ITEMS NOTED IN THE STRUCTURAL
SUBMITTALS AND SPECIFICATIONS AS A DELEGATED DESIGN.
THE SHOP DRAWINGS AND CALCULATIONS SHALL BE SUBMITTED FOR REVIEW AND
CONTAIN OR INDICATE THE FOLLOWING AT A MINIMUM:
1. PROFESSIONAL ENGINEER’S SEAL AND SIGNATURE RESPONSIBLE FOR THEIR
PREPARATION.
2. COMPLIANCE WITH THE PERFORMANCE REQUIREMENTS AND DESIGN CRITERIA
NOTED IN THE CONTRACT DOCUMENTS (DRAWINGS AND SPECIFICATIONS).
3. LOCATION, TYPE, MAGNITUDE AND DIRECTION OF ALL LOADS IMPOSED ON THE
BUILDING STRUCTURE
SUBMITTALS THAT DO NOT CONTAIN THE INFORMATION NOTED ABOVE WILL BE
REJECTED WITHOUT COMMENT.
THE COR’S REVIEW OF DELEGATED DESIGN SUBMITTALS WILL BE FOR GENERAL
CONFORMANCE WITH THE DESIGN LOADING, DESIGN INTENT AND LOADS IMPOSED.
SHOP DRAWING SUBMITTALS
THE CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS TO ENABLE HIM TO
FABRICATE, ERECT AND CONSTRUCT ALL PARTS OF THE WORK IN ACCORDANCE WITH
THE DRAWINGS AND SPECIFICATIONS. THESE SHOP DRAWINGS WILL BE REVIEWED FOR
GENERAL COMPLIANCE WITH THE DESIGN INTENT ONLY. THE CONTRACTOR IS
RESPONSIBLE FOR ALL DIMENSIONS, ACCURACY AND FIT OF WORK.
ALL SHOP DRAWINGS SHALL BE REVIEWED BY THE CONTRACTOR PRIOR TO SUBMITTAL
TO THE COR. DRAWINGS SUBMITTED WITHOUT CONTRACTOR'S REVIEW WILL BE
RETURNED UNCHECKED.
PROVIDE ALL SUBMITTALS IN ELECTRONIC PDF FORMAT.
SUBMIT SHOP DRAWINGS FOR EACH OF THE FOLLOWING ITEMS:
1. CONCRETE REINFORCEMENT
SUBMIT DELEGATED DESIGN SHOP DRAWINGS FOR EACH OF THE FOLLOWING ITEMS:
1. PREFABRICATED WOOD TRUSSES (INCLUDING DESIGN CALCULATIONS, FRAMING
LAYOUTS, MEMBER SIZES, MATERIALS AND CONFIGURATIONS AND REQUIRED
TEMPORARY AND PERMANENT BRACING)
WOOD STRUCTURAL PANELS (PLYWOOD AND OSB)
PANELS SHALL BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH THE LATEST
CRITERIA ESTABLISHED BY THE AMERICAN PLYWOOD ASSOCIATION (APA) INCLUDING THE
LATEST EDITION OF THE PLYWOOD DESIGN SPECIFICATION AND ITS SUPPLEMENTS.
PANELS SHALL BE IDENTIFIED WITH THE APPROPRIATE TRADEMARK OF THE APA AND SHALL
MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE U.S. PRODUCT STANDARD PS1
FOR STRUCTURAL PLYWOOD AND PS2 FOR ORIENTED STRAND BOARD (OSB).
PANELS SHALL BE INSTALLED WITH THE LONG DIMENSION (FACE GRAIN) ACROSS THE
SUPPORTS WITH PANELS CONTINUOUS OVER 2 OR MORE SUPPORTS.
STAGGER PANEL END JOINTS. END JOINTS SHALL ONLY OCCUR OVER A SUPPORT. UNLESS
RECOMMENDED OTHERWISE BY THE PANEL MANUFACTURER, PROVIDE A 1/8" GAP BETWEEN
PANEL ENDS AND EDGES. PANEL EDGES SHALL BE TONGUE-AND-GROOVE OR SUPPORTED
ON 2" (NOMINAL) LUMBER BLOCKING INSTALLED BETWEEN JOISTS.
VAPOR BARRIER
VAPOR BARRIER SYSTEM SHALL HAVE A PERMEANCE OF 0.01 PERMS OR LESS WHEN
TESTED IN ACCORDANCE WITH ASTM E1745 SECTION 7. INSTALL, SEAL, INSPECT AND
REPAIR IN STRICT CONFORMANCE TO THE MANUFACTURER’S WRITTEN REQUIREMENTS.
INSTALL VAPOR BARRIER ONLY AT LOCATIONS SPECIFICALLY INDICATED.
WATERSTOPS
SELF-EXPANDING STRIP WATER STOPS SHALL BE VOLCLAY WATERSTOP-RX 101
UNLESS NOTED OTHERWISE. INSTALL IN ACCORDANCE WITH MANUFACTURER'S
WRITTEN INSTRUCTIONS.
PVC WATERSTOPS
PROVIDE FACTORY MADE WATERSTOP FABRICATIONS FOR ALL CHANGES OF
DIRECTION, INTERSECTIONS, AND TRANSITIONS LEAVING ONLY STRAIGHT BUTT JOINT
SPLICES FOR THE FIELD.
SECURE WATERSTOP IN CORRECT POSITION USING HOG RINGS OR GROMMETS
SPACED AT 12 INCHES ON CENTER ALONG THE LENGTH OF THE WATERSTOP AND WIRE
TIE TO ADJACENT REINFORCING STEEL.
PROVIDE TEFLON COATED THERMOSTATICALLY CONTROLLED WATERSTOP SPLICING
IRONS FOR FIELD BUTT SPLICES.
FIELD BUTT SPLICES SHALL BE HEAT FUSED WELDED USING A TEFLON COATED
THERMOSTATICALLY CONTROLLED WATERSTOP SPLICING IRON AT APPROXIMATELY 380
DEGREES F. FOLLOW APPROVED MANUFACTURER RECOMMENDATIONS.
LAPPING OF WATERSTOP, USE OF ADHESIVES, OR SOLVENTS SHALL NOT BE ALLOWED.
SPECIAL INSPECTION SERVICES SCHEDULE - CONCRETE CONSTRUCTION
REFERENCED STANDARDS PER IBC, CHAPTER 17
VERIFICATION AND
INSPECTION TASK
TEST / INSPECTION DESCRIPTION OF TEST / INSPECTION
APPLICABLE TO
PROJECT (Y/N)
FREQUENCY
MATERIAL TESTING
QUALITY CONTROL
REINFORCING STEEL
CAST-IN-PLACE
BOLTS AND
ANCHOR RODS
CONCRETE MIX
DESIGN
FORMWORK
MATERIAL SAMPLING
AND TESTING
CONCRETE
PLACEMENT
CURING AND
PROTECTION
CONSTRUCTION
JOINTS
TEST
REFERENCE CAST-IN-PLACE CONCRETE SPECIFICATION FOR EXTENT OF TESTING
REQUIRED
INSPECTION VERIFY THAT QUALITY CONTROL TESTING IS PROVIDED IN ACCORDANCE WITH THE
PROJECT REQUIREMENTS.
INSPECTION
INSPECTION OF REINFORCING STEEL, INCLUDING PRESTRESSING TENDONS (WHEN
USED) AND PLACEMENT AS FOLLOWS:
VERIFY THAT REINFORCEMENT SURFACES ARE FREE OF EXCESS RUST OR OTHER
COATINGS THAT MAY ADVERSELY AFFECT BONDING CAPACITY. IF OILING OF FORMS
IS REQUIRED, VERIFY THAT IT IS APPLIED BEFORE REINFORCING IS PLACED.
VERIFY REINFORCING BARS FOR COMPLIANCE WITH CONTRACT DOCUMENTS AND
APPROVED SHOP DRAWINGS AS FOLLOWS:
MATERIAL GRADE, SIZE, QUANTITY, SPACING, AND LAYERING; BARS ARE
ADEQUATELY TIED AND SUPPORTED ON CHAIRS OR BOLSTERS; PROPER HOOK
TYPE AND LOCATION; SPLICE LOCATIONS AND REQUIRED LENGTH OF LAP;
PROPER CLEARANCE AND COVER REQUIREMENTS FROM CONCRETE SURFACES;
SUFFICIENT SPACING BETWEEN REINFORCEMENT FOR CONCRETE PLACEMENT;
VERIFY THAT UNSCHEDULED/ADDITIONAL REINFORCING BARS SHOWN ON
PLAN, IN DETAIL, OR SPECIFIED IN NOTES ARE PROVIDED AND ARE IN
COMPLIANCE WITH CONTRACT DOCUMENTS AND APPROVED SHOP DRAWINGS.
MECHANICAL SPLICES:
(TENSION AND/OR COMPRESSION) ON THE PROJECT. VERIFY COMPLIANCE
WITH SPECIFICATIONS AND CONFORMANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLATION. VERIFY THAT THE MANUFACTURER IS
PRESENT FOR THE FIRST INSTALLATION OF EACH TYPE OF SPLICE ON THE
PROJECT.
VERIFY THAT WELDED WIRE REINFORCEMENT IS COMPOSED OF FLAT SHEETS, HAS
PROPER WIRE GAUGE AND SPACING, IS PROPERLY SUPPORTED, AND IS PROPERLY
LAPPED.
INSPECT HEADED STUD SHEAR REINFORCEMENT TO ENSURE THAT IT CONFORMS
TO THE PROJECT REQUIREMENTS:
REVIEW TYPE AND SPACING; VERIFY THAT REINFORCING IS ADEQUATELY
SUPPORTED TO RESIST DISPLACEMENT OR SHIFTING DURING CONCRETE
PLACEMENT; VERIFY WELDING OF REINFORCEMENT IS PERFORMED ACCORDING
TO AWS REQUIREMENTS AND THAT IT IS INSPECTED BY THE TESTING
LABORATORY.
INSPECT BOLTS AND ANCHOR RODS TO BE CAST IN CONCRETE PRIOR TO PLACEMENT OF
CONCRETE FOR SIZE, QUANTITY, LOCATION, POSITION AND EMBEDMENT. INSPECT
DURING PLACEMENT FOR PROPER CONCRETE CONSOLIDATION AROUND BOLTS AND
ANCHORS.INSPECTION
BOLTS AND/OR ANCHOR RODS USED IN LATERAL FORCE RESISTING SYSTEM AT THE
FOLLOWING LOCATIONS: ALL SHEAR WALLS WHERE CAST-IN-PLACE BOLTS ARE USED
20% OF BOLTS AND/OR ANCHOR RODS USED ELSEWHERE.
INSPECTION
REVIEW AND BECOME FAMILIAR WITH THE MIX DESIGNS SPECIFIED ON THE
PROJECT. VERIFY MIX DESIGN PROVIDED BY THE CONTRACTOR IS CONSISTENT WITH
PROJECT SPECIFICATIONS AT LOCATION INDICATED. REVIEW CONCRETE BATCH
TICKETS TO PROPER MIX ID, TYPE OF CONCRETE AND STRENGTH FOR THE PLACEMENT
LOCATION. VERIFY THAT WATER ADDED AT SITE (IF PERMITTED), DOES NOT EXCEED
THAT ALLOWED BY THE MIX DESIGN.
INSPECTION OF
FORMED AREA
INSPECTION VERIFY THAT ALL DEBRIS AND FOREIGN MATTER HAVE BEEN REMOVED BEFORE
CONCRETE IS PLACED
INSPECTION
INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE
MEMBER BEING FORMED. VERIFY FORMWORK USED IN COMPLIANCE WITH THE
SPECIFICATIONS AND APPROVAL SHOP DRAWINGS (WHEN REQUIRED).
TEST
AT THE TIME FRESH CONCRETE IS SAMPLED TO FABRICATE SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE
TEMPERATURE OF THE CONCRETE
INSPECTION
INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION
TECHNIQUES AS FOLLOWS:
VERIFY THE CONCRETE IS NOT OVER 90 MINUTES OLD AT TIME OF PLACEMENT;
HOT-WEATHER OR COLD-WEATHER TECHNIQUES ARE BEING APPLIED AS
REQUIRED; CONCRETE BEING DEPOSITED IN UNIFORM, THAT THE VERTICAL DROP
DOES NOT EXCEED SIX FEET, AND THAT CONCRETE IS NOT PERMITTED TO DROP
FREELY OVER REINFORCEMENT CAUSING SEGREGATION; CONCRETE IS PROPERLY
VIBRATED; EMBEDDED ITEMS AND REINFORCING STEEL ARE NOT ADVERSELY
ALTERED DURING PLACEMENT. NOTE IF ANYTHING WAS DISPLACED OR
OTHERWISE ALTERED DURING PLACEMENT; VERIFY THAT THERE ARE NO COLD
JOINTS WITHIN THE AREA OF THE POUR
INSPECTION
VERIFY THE CURING PROCESS IS AS SPECIFIED IN THE CONTRACT DOCUMENTS AND
THAT ANY CURING COMPOUND USED IS APPLIED IN ACCORDANCE WITH
MANUFACTURER'S PRINTED APPLICATION INSTRUCTIONS.
INSPECTION
VERIFY THAT LOCATION OF VERTICAL AND HORIZONTAL CONSTRUCTION JOINTS FOR
COMPLIANCE WITH THE CONSTRUCTION JOINT LOCATION PLAN SUBMITTED BY THE
CONTRACTOR TO ENGINEER OF RECORD. VERIFY THAT REINFORCEMENT, DOWELS, KEYS,
AND BULKHEADS AT CONSTRUCTION JOINTS ARE IN CONFORMANCE WITH THE
CONTRACT DOCUMENTS.
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
PERIODIC
CONTINUOUS
PERIODIC
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
CONTINUOUS
PERIODIC
PERIODIC
CONTINUOUS
SPECIAL INSPECTION SERVICES SCHEDULE - SHALLOW FOUNDATIONS
REFERENCED STANDARDS PER IBC, CHAPTER 17
VERIFICATION AND
INSPECTION TASK
TEST / INSPECTION DESCRIPTION OF TEST / INSPECTION
APPLICABLE TO
PROJECT (Y/N)
FREQUENCY
CONCRETE
PLACEMENT
FOOTING SUBGRADE
FORMWORK
EARTH-FORMED
FOUNDATION
DIMENSIONS
REINFORCEMENT
CONCRETE
INSPECTION
THE INSPECTOR MUST BE PRESENT FULL TIME DURING THE ENTIRE PLACEMENT
OF THE FIRST 2 SHALLOW FOUNDATION CONCRETE POURS AND THEN MUST BE
PRESENT AT THE START OF 100% OF OTHER CONCRETE POURS.
INSPECTION
VERIFY APPROVAL OF THE FOOTING SUBGRADE PRIOR TO PLACEMENT OF FOUNDATION
CONCRETE.
INSPECTION
INSPECTION
EMBEDED ITEMS INSPECTION
INSPECTION
INSPECTION
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
VERIFY THAT FORMS ARE PLUMB AND STRAIGHT, BRACED AGAINST MOVEMENT, AND
LUBRICATED FOR REMOVAL.
FOR EARTH-FORMED FOUNDATIONS, VERIFY THAT EARTH FORMS ARE SUFFICIENTLY
UNIFORM TO ALLOW FOR PROPER DIMENSIONS AND REQUIRED CONCRETE COVER
OVER REINFORCEMENT.
VERIFY FOUNDATION DIMENSIONS.
VERIFY ANCHOR RODS AND/OR DOWELS ARE INSTALLED WITH THE EMBEDMENT AND
PROJECTED LENGTHS AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
VERIFY FOUNDATION REINFORCEMENT PRIOR TO PLACEMENT OF CONCRETE.
VERIFY CONCRETE PLACEMENT AS OUTLINED IN THIS INSPECTION PLAN.
INSPECTION
Y
Y
Y
Y
Y
Y
Y
Y
WOOD CONSTRUCTION SPECIAL INSPECTION REQUIREMENTS
CONNECTIONS FOR DIAPHRAGM
CHORDS, COLLECTORS, BRACING,
AND SHEAR WALL ANCHORAGE
AND HOLDOWNS
FASTENING OF DIAPHRAGM AND
SHEAR WALL SHEATHING WITH
EDGE NAILING < 4"
ALL CONNECTIONS VISUALLY INSPECTED
SPECIAL INSPECTION IS NOT REQUIRED WHEN FASTENER SPACING IS GREATER
THAN 4" ON CENTER FOR WOOD SHEAR WALLS, DIAPHRAGMS, NAILING,
BUILDING AND OTHER COMPONENTS IN THE SEISMIC FORCE-RESISTING SYSTEM.
REFERENCED STANDARDS PER IBC, CHAPTER 17
VERIFICATION AND
INSPECTION TASK
TEST / INSPECTION DESCRIPTION OF TEST / INSPECTION
APPLICABLE TO
PROJECT (Y/N)
FREQUENCY
INSPECTION
INSPECTION
PERIODIC
PERIODIC
Y
Y
SPECIAL INSPECTION SERVICES SCHEDULE - SOILS AND EARTHWORK
REFERENCED STANDARDS PER IBC, CHAPTER 17
VERIFICATION AND
INSPECTION TASK
TEST / INSPECTION DESCRIPTION OF TEST / INSPECTION
APPLICABLE TO
PROJECT (Y/N)
FREQUENCY
FOOTING SUBGRADE
COMPACTION OF
SOILS
CONTROLLED
STRUCTURAL FILL
FOOTING SUBGRADE
MATERIAL
EXCAVATION
USE OF PROPER
MATERIALS
OBSERVATION OF
SUBGRADE
TEST REFERENCE EARTHWORK SPECIFICATION FOR EXTENT OF TESTING REQUIRED
TEST REFERENCE EARTHWORK SPECIFICATION FOR EXTENT OF TESTING REQUIRED
TEST
INSPECTION
CLASSIFICATION OF
CONTROLLED FILL
INSPECTION
INSPECTION
INSPECTION
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
PERIODIC
CONTINUOUS
REFERENCE EARTHWORK SPECIFICATION FOR EXTENT OF TESTING REQUIRED
INSPECT SOILS BELOW FOUNDATIONS AND SLABS FOR ADEQUATE
COMPACTION AND BEARING CAPACITY PROPER TO PLACEMENT OF CONCRETE.
VERIFY EXCAVATIONS ARE EXTENDED TO THE PROPER DEPTH AND HAVE
REACHED PROPER MATERIAL.
1) INSPECT PLACEMENT, LIFT THICKNESS AND COMPACTION OF CONTROLLED FILL.
2) VERIFY EXTENT AND SLOPE OF FILL PLACEMENT.
VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING
PLACEMENT AND COMPACTION OF CONTROLLED FILL
PRIOR TO PLACEMENT OF CONTROLLED FILL, OBSERVE SUGBRADE AND VERIFY THAT
SITE HAS BEEN PREPARED PROPERLY
INSPECTION
Y
Y
Y
Y
Y
Y
Y
Y
SPECIAL INSPECTION
THE GENERAL CONTRACTOR SHALL EMPLOY INDEPENDENT AGENCY(IES) OR INDIVIDUAL(S) TO
PROVIDE SPECIAL INSPECTION FOR ITEMS AS INDICATED ON THE DRAWINGS.
SPECIAL INSPECTION IS A MANDATORY REQUIREMENT FOR VERIFYING CONFORMANCE OF THE
INDICATED CONSTRUCTION. SPECIAL INSPECTION IS REQUIRED IN ADDITION TO ALL MATERIAL
TESTS AND INSPECTIONS IDENTIFIED ELSEWHERE IN THE CONSTRUCTION DOCUMENTS.
THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON, WHO SHALL DEMONSTRATE
COMPETENCE, TO THE SATISFACTION OF THE BUILDING OFFICIAL AND THE COR, FOR
INSPECTION OF EACH PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING
SPECIAL INSPECTION.
“PERIODIC” SPECIAL INSPECTION IS DEFINED AS “THE PART-TIME OR INTERMITTENT
OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL
INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR IS BEING
PERFORMED AND AT THE COMPLETION OF THE WORK.”
“CONTINUOUS” SPECIAL INSPECTION IS DEFINED AS “THE FULL-TIME OBSERVATION OF WORK
REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN
THE AREA WHERE THE WORK IS BEING PERFORMED.”
SUBMIT TO THE COR FOR REVIEW A MINIMUM OF 14 DAYS PRIOR TO COMMENCEMENT OF
CONSTRUCTION OF ELEMENTS REQUIRING SPECIAL INSPECTION THE FOLLOWING:
1. NAME(S), ADDRESS(ES), TELEPHONE NUMBER(S), EMAIL ADDRESS(ES), AND STATEMENT(S)
OF QUALIFICATIONS OF ALL SPECIAL INSPECTOR(S) TO BE ENGAGED ON THE PROJECT.
2. A LISTING OF ALL ITEMS TO RECEIVE SPECIAL INSPECTION, DESIGNATION WHETHER
INSPECTIONS WILL BE CONTINUOUS OR PERIODIC AND THE NAME OF THE INDIVIDUAL THAT
WILL BE PERFORMING INSPECTION FOR EACH ITEM.
THE CONTRACTOR SHALL COORDINATE WITH THE SPECIAL INSPECTOR SUFFICIENTLY IN
ADVANCE OF WORK REQUIRING SPECIAL INSPECTION AND SHALL PROVIDE ACCESS TO THE
SITE AND TO THE CONSTRUCTION DOCUMENTS (CURRENT DRAWINGS AND SPECIFICATIONS)
FOR THE SPECIAL INSPECTOR CARRY OUT THE REQUIRED OPERATIONS.
THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK REQUIRING SPECIAL INSPECTION FOR
CONFORMANCE TO THE CONSTRUCTION DOCUMENTS. ALL NON-CONFORMING WORK SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN, IF
UNCORRECTED, TO THE IMMEDIATE ATTENTION OF THE OWNER OR OWNER’S AGENT AND COR.
THE SPECIAL INSPECTOR SHALL SUBMIT PERIODIC PROGRESS REPORTS TO THE OWNER OR
OWNER’S AGENT, CONTRACTOR AND COR IDENTIFYING ALL SPECIAL INSPECTION OPERATIONS
PERFORMED. REPORTS SHALL BE SUBMITTED NO MORE THAN 7 DAYS FOLLOWING EACH
SPECIAL INSPECTION OPERATION. REPORTS SHALL IDENTIFY THE ITEM(S) INSPECTED AND AN
INDICATION OF WHETHER THE INSPECTED ITEMS WERE IN CONFORMANCE WITH THE
CONSTRUCTION DOCUMENTS.
AT THE COMPLETION OF ALL WORK REQUIRING SPECIAL INSPECTION, THE SPECIAL INSPECTOR
SHALL SUBMIT A FINAL SIGNED REPORT TO THE OWNER OR OWNER’S AGENT, CONTRACTOR
AND COR STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS, TO THE BEST
OF THE SPECIAL INSPECTOR'S KNOWLEDGE, IN CONFORMANCE WITH THE CONSTRUCTION
DOCUMENTS.
FAILURE TO PERFORM SPECIAL INSPECTION FOR THE INDICATED CONSTRUCTION OR FAILURE
TO CORRECT NON-CONFORMING WORK SHALL CONSTITUTE A BASIS FOR REJECTION OF THE
WORK AND REMOVAL AND REPLACEMENT BY THE GENERAL CONTRACTOR AT NO ADDITIONAL
COST TO THE OWNER, INCLUDING, BUT NOT LIMITED TO:
1. THE COST OF REMOVAL AND REPLACEMENT OF ALL WORK FOR WHICH SPECIAL
INSPECTION WAS REQUIRED BUT NOT PERFORMED, INCLUDING THE COST OF TESTING AND
SPECIAL INSPECTION FOR THE REPLACEMENT WORK.
2. THE COST OF ALL RELATED WORK MADE NECESSARY BY THE REMOVAL AND
REPLACEMENT OF THE UNINSPECTED WORK PER ITEM 1 ABOVE.
3. THE COST FOR DESIGN PROFESSIONAL’S SERVICES RELATED TO ALL WORK FOR WHICH
SPECIAL INSPECTION WAS REQUIRED BUT NOT PERFORMED AND SERVICES RELATED TO
THE REPLACEMENT WORK.
PROVIDE SPECIAL INSPECTION FOR THE FOLLOWING CONSTRUCTION:
SOILS AND EARTHWORK
SHALLOW FOUNDATIONS
CONCRETE
WOOD FRAMING
SEE TABLES ON THE DRAWINGS FOR SPECIAL INSPECTION PROGRAM REQUIREMENTS.
26151
CORSON
DONALD G.
E
D
SNE
CI
L
Y K C U
TN
EKFO
E T A
S T
P R O F
ESS ION
R E E
NIGNELA
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
LEXINGTON VAMC, LEESTOWN DIVISION
2250 LEESTOWN ROAD
LEXINGTON, KY 40511
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Project Number Scale
15-584
CONSTRUCT CONTINUING
CARE FACILITES - PHASE 1
596-332AS INDICATED
FULLY SPRINKLERED
BID DOCUMENTS
E D
C B
A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
# 201 & 202
/1
/2
:3
:3
A
M
S-003
SPECIAL INSPECTION REQUIREMENTS
JAP KLM 3SEPTEMBER 16, 2018
NOTES:
1. LOADING DOES NOT INCLUDE TRUSS SELF WEIGHT. SEE UNIFORM LOAD
SCHEDULE FOR SUPERIMPOSED DEAD LOAD.
2. ANALYZE UNBALANCED LOAD IN EACH DIRECTION.
3. DESIGN FOR WORST CASE CONDITION.
4. "SL" INDICATES SNOW LOAD.
TRUSS BRG.
PER PLAN, TYP
PER ARCH
ROOF LL = 20 PSF
TOP CHORD
OR
SL = 4 PSF
TOP CHORD
SL = 13 PSF
TOP CHORD
SL = 40 PSF
TOP CHORD
9'-0"
SEE NOTE 2
W
PER PLAN
MARK
LOAD SCHEDULE
A
DESCRIPTION
SUPERIMPOSED DEAD LOAD
TOP
CHORD
BOTTOM
CHORD
SNOW LOAD / ROOF
LIVE LOAD
NOTES:
1. SUPERIMPOSED DEAD LOAD IS DEAD LOAD IN ADDITION TO THE SELF WEIGHT OF THE PRIMARY STRUCTURAL SYSTEM.
2. (NR) INDICATES NON-REDUCIBLE LIVE LOAD.
3. FOR SNOW LOADS DESIGN FOR WORST CASE OF UNIFORM SNOW OR SNOW DRIFT CONDITION.
4. POINT LOAD APPLIES TO BOTTOM CHORD OF TRUSS AND CAN APPLY ANYWHERE ALONG TRACK OF LIFT NOTED ON LIFT LOAD MAP.
B
C
D
TYPICAL
ROOF
20 PSF
22 PSF + 8 PSF
OVER-FRAMING
WHERE OCCURS
(NOTE 1)
20 PSF (MINIMUM UNIFORM)
SEE LOAD MAP (DRIFT + BALANCED)
MECH / ELEC /
STORAGE (LIGHT)
50 PSF (NR)23 PSF
(NOTE 1)
CATWALK 40 PSF
20 PSF
(NOTE 1)
E
PATIENT LIFT 600 LBS
(NOTE 4)
NA
BARIATRIC LIFT NA
1000 LBS
(NOTE 4)
7 PSF
LIVE LOAD
TOP
CHORD
BOTTOM
CHORD
22 PSF + 8 PSF
OVER-FRAMING
WHERE OCCURS
(NOTE 1)
20 PSF (MINIMUM UNIFORM)
SEE LOAD MAP (DRIFT + BALANCED)
22 PSF + 8 PSF
OVER-FRAMING
WHERE OCCURS
(NOTE 1)
20 PSF (MINIMUM UNIFORM)
SEE LOAD MAP (DRIFT + BALANCED)
20 PSF
20 PSF
1.1 1.4
1.A
1.D
1.F
A
B
C
D
TYP,
UNO
EE
2.12.4
2.A
2.D
2.F
A
B
C
D
EE
TYP,
UNO
COMPONENTS AND CLADDING PRESSURES
ROOFS
(GABLE/HIP SLOPES 7" TO 27")
NEGATIVE PRESSURES
(OUTWARD)
TRIB
AREA
(sft)
ZONE 1 ZONE 2 ZONE 3 OVERHANG ZONE 2
p max (psf) p max (psf) p max (psf) p max (psf)
-31.3
-29.8
-29.0
-28.4
-54.4
-50.1
-44.3
-40.0
-80.5
-74.7
-68.9
-63.1
-68.9
-68.9
-68.9
-68.9
NOTES:
1. REFERENCE ASCE 7-10, FIGURE 30.4-2B
2. FORCES SHOWN ARE NET ASD LOADS
OVERHANG ZONE 3
p max (psf)
-112.3
-102.2
-87.7
-77.6
ZONE 1 ZONE 2 ZONE 3 OVERHANG
ZONE 2
OVERHANG
ZONE 3
3' - 0"
6' - 0"
3' - 0"
0"
17' - 10"
8' - 11" 8' - 11"
8' - 11"
8' - 11"
8' - 11"
12' - 0" 12' - 0"
3' - 0"
8' - 11"
17' - 10" 17
0"
3' - 0"
6' - 0"
3' - 0"
17' - 10"
0"
8' - 11"8' - 11"
8' - 11"
8' - 11"
8' - 11"
12' - 0"12' - 0"
3' - 0"
8' - 11"
17' - 10"
0"
26151
CORSON
DONALD G.
E
D
SNE
CI
L
Y K C U
TN
EKFO
E T A
S T
P R O F
ESS ION
R E E
NIGNELA
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
LEXINGTON VAMC, LEESTOWN DIVISION
2250 LEESTOWN ROAD
LEXINGTON, KY 40511
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Project Number Scale
15-584
CONSTRUCT CONTINUING
CARE FACILITES - PHASE 1
596-332AS INDICATED
FULLY SPRINKLERED
BID DOCUMENTS
E D
C B
A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
# 201 & 202
/1
/2
:3
:3
A
M
S-004
LOAD MAPS
JAP KLM 4SEPTEMBER 16, 2018
N.T.S.S-004
TYPICAL LOADING DIAGRAM AT
SLOPED ROOFS
N.T.S.S-004
1 LIFT LOAD MAP BUILDING 201
N.T.S.S-004
2 LIFT LOAD MAP BUILDING 202
N.T.S.S-004
4 TRUSS UPLIFT MAP BUILDING 201
N.T.S.S-004
5 TRUSS UPLIFT MAP BUILDING 202
GENERAL PLAN NOTES:
1. REFERENCE TOP OF SLAB (T/SLAB) = 100'-0" UNO (U.S.G.S. 919.00)
2. TOP OF INTERIOR FOOTING ELEVATION = 98'-8" UNO.
3. TOP OF PERIMETER FOOTING ELEVATION = 98'-8" UNO.
4. ALL WALL FOOTINGS ARE WF24, UNO.
5. REFER TO STRUCTURAL GENERAL NOTES, LEGEND, SCHEDULES, TYPICAL DETAILS, AND SPECIAL INSPECTION REQUIREMENTS FOR ADDITIONAL INFORMATION.
6. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION AND DIMENSIONS.
7. PROVIDE REINFORCEMENT AT MID-DEPTH OF SLAB AT RE-ENTRANT CORNERS PER THE "TYPICAL ADDITIONAL SLAB REINFORCEMENT AT RE-ENTRANT CORNERS" DETAIL.
8. COORDINATE LOCATIONS OF PENETRATIONS AND ATTACHMENTS WITH MECHANICAL.
9. PLACE FOUNDATION CONCRETE MONOLITHICALLY OR PROVIDE KEYED CONSTRUCTION JOINT AND CONTINUOUS REINFORCEMENT.
10. GRID LINE DIMENSIONS ARE TO INSIDE FACE OF STUD, UNO. ALL OTHER DIMENSIONS ARE TO OUTSIDE FACE OF BRICK.
11. PROVIDE 15/32" APA RATED SHEATHING, EXPOSURE 1 ON EXTERIOR FACE OF ALL WALLS AT ENTIRE PERIMETER OF BUILDING (INCLUDING ABOVE AND BELOW WINDOWS
AND ABOVE DOOR OPENINGS) UNO. REFER TO TYPICAL SHEATHING FASTENING DETAIL FOR FURTHER INFORMATION.
12. HOLDOWN INDICATED BY "HD#" AT THE END OF EACH SHEAR WALL. SEE HOLDOWN SCHEDULE FOR MORE INFORMATION.
13. 4" DEPRESSED SLAB, SEE "TYPICAL SLAB ON GRADE STEP DETAIL"
N
1.1 1.2 1.3 1.4
1.A
1.B
1.C
1.D
117' - 11 1/4"
20' - 8 1/4" 76' - 9" 20' - 6"1' - 0 3/8"
/2
/8
/8
/4
/4
W F
T S
W F
T S
SOG1
26' - 4 5/8" 23' - 9 1/2" 26' - 6 7/8"
/8
/8
1' - 6 3/4"
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.