36C24919R0012 0008 S05-Amendment 8-Responses to Vendor Questions 03122019.pdf
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24919R0012 P0008 Amendment 8
1.) We could quote wall panels as well to save money, but the wall sheathing would have to be applied vertically for this to be possible, would this be acceptable?
Answer: No. See response for question #2 below.
2.) If wall panels are acceptable with vertical sheathing would OSB be an acceptable substitute for plywood? ( we have had so many delamination issues with plywood that we try to avoid it when possible).
Answer: No. OSB is not acceptable. Install in accordance to plans & specifications.
3.) On sheet CS101 there is a retaining wall with a rail depicted and the keynote 12 refers you to the structural drawings. The structural drawing has a detail 9/S-500 and it refers one to the architectural drawings. We cannot find any information for the construction of this rail in the drawings or the specifications. Can you provide a design for the metal railing above the retaining wall, i.e., material, diameter, verticals o.c., 2 rail system?
Answer: Fabricate 1-1/2 " Diameter steel pipe railings and posts with welded joints. In addition to the dead load design, railing assembly to support live load of 200 pounds per lineal foot applied laterally to rail and 500 pounds point load applied anywhere vertically to top of rail. All rail piping, components and fittings shall be hot-dipped galvanized G-90.7.
Splice Connectors to be steel welding collars.
Apply two (2) coats of MPI 119 (Exterior Latex, High Gloss (acrylic) to galvanized metal.
Finish color is white, submit color charts to VA COR and architect for selection. Install top of horizontal railing at 3’-6” and intermediate horizontal railing at 1’-9” above finish grade or sidewalk. Space posts for railings not over 6’-0” maximum on centers between end posts.
Weld fixed posts to galvanized, flange plate, and anchors to concrete retaining wall with expansion anchors. Provide anchors and flange plates required for connecting railings to structure. Anchor railing to structure with expansion anchors. Install components plumb and level, accurately fitted, free from distortion or defects. Shim and grout anchor plates as required.
4.) Refer to Dwg AE601 Door Schedule for exterior doors lists Door Hardware types (30
– 34) that not included in Spec Section 08 71 00 or 08 71 01 (these end at set #24 and only include the interior doors hardware sets). Can you provide the missing exterior door hardware sets ?
Answer: specification section included in this Amendment 8
5.) Refer to Spec 08 71 13.11 auto Door Operators (ADO) and the question above. Are there any auto door operators on this project? They are not listed on any door hardware schedule and may be missing along with the exterior door hardware sets (#30 thru #34)?
Answer: See response above
36C24919R0012 P0008 Amendment 8
6.) Is the controls contractor responsible for providing the dedicated fiber infrastructure required to connect to the existing “dedicated BAS network”, including trenching, conduit, fiber cable, landscaping repair, etc?
Answer: Provide 12 strand multi-mode fiber optic from building 17 to new CLC building 201 BAS and new CLC building 202 BAS, extend fiber from Ground B17 IT room to attic BAS, see drawings TS101, TS102 and T601 for more info.10
7 ) To what building should the new “dedicated BAS network” from the Continuing Care Facility be connected?
Answer: Same as above
8.) The Diagram show a detail with 300 pair telephone cable, 3-12 strand fiber & 2-14/2 shielded cable in a 4” conduit. The Sheet Key Note No. 10, call for a 50 pair telephone cable, 1-12 strand fiber & 2-14/2 shielded cable in a 4” conduit. As well, on Sheet TS102, the details on the sheet do not match note 8. Can you please clarify size and types of cables required to be installed?
References: Sheet T601 / Partial Local/Wide Area Riser Diagram / Sheet Key Notes No.’s 10a & 10b Sheet TS102 / Sheet Key Note No. 8
Answer: All rail piping, components and fittings shall be hot-dipped galvanized G-
90.7. Splice Connectors to be steel welding collars.
9.) Are any of the cables, referenced in this note to be removed, in use currently? If so, please specify which and if an outage is required.
Reference: Sheet TS102 / Sheet Key Note No. 17
Answer: Apply two (2) coats of MPI 119 (Exterior Latex, High Gloss (acrylic) to galvanized metal. Finish color is white, submit color charts to VA COR and architect for selection.
10.) Sheet TS102 Key Notes:
Install top of horizontal railing at 3’-6” and intermediate horizontal railing at 1’-9” above finish grade or sidewalk. Space posts for railings not over 6’-0” maximum on centers between end posts.
11.) Sheet T-601 Key Notes:
Weld fixed posts to galvanized, flange plate, and anchors to concrete retaining wall with expansion anchors. Provide anchors and flange plates required for connecting railings to structure. Anchor railing to structure with expansion anchors. Install components plumb and level, accurately fitted, free from distortion or defects. Shim and grout anchor plates as required.