This is a Second Floor Demolition Plan for a Cardiac Cath Lab Remodel project at VA Charleston Health Care System, dated March 12, 2026, prepared by Moon Tree, LLC (Architect) and Bowman Foster & Associates, Inc. (Fire Protection Engineer). The plan is scaled at 1/4" = 1'-0" and includes amendment drawing 1-AD012R1, effective June 4, 2026.

The demolition work encompasses selective removal of interior building components across the second floor cardiac catheterization laboratory area. Key demolition activities include: removal of partition sections, doors, frames, and hardware; removal of existing plumbing fixtures, medical gas shut-off valves, and casework; removal of vinyl and sheet flooring with base and adhesive to bare substrate; removal of lay-in ceiling systems, gypsum board, and lead-lined gypsum board; removal of wall coverings, wainscoting, and wall-mounted equipment holders; and removal of ceiling tiles for access to complete work above and below floor slabs. Critical project requirements include execution of all demolition work under negative pressure with HEPA filtration, coordination with mechanical, electrical, plumbing, and fire protection trades, verification of as-built conditions, protection of existing finishes not designated for demolition, maintenance of existing sprinkler system functionality, and contractor accountability for repair of any damage caused to non-demolition areas. Work completion requires inspection by the Safety Officer and Infection Control Coordinator and thorough cleaning by Environmental Management Services prior to barrier removal. The contractor must coordinate salvage of specific items and temporary storage locations with the Veterans Affairs Medical Center.

View the file

Other files

File Type Posted
36C24726B0003 0005.docx DOCX document
36C24726B0003 0004.docx DOCX document
36C24726B0003 0003.docx DOCX document
Attachment 20 534-CSI-714 Brand Name J A Takeform Signs.pdf PDF
36C24726B0003 0002.docx DOCX document
Attachment 19 Site Visit Contractor Sign-In sheet.pdf PDF
Attachment 10 RFI Questions Responses.pdf PDF
Attachment 08 534-CSI-714 Brand Name J A Rauland Nurse Call.pdf PDF
Attachment 18 26-0604-Addendum 1 Narrative.pdf PDF
Attachment 15 1-AE105R1.pdf PDF
Attachment 17 283100-R1.pdf PDF
Attachment 16 088000-R1.pdf PDF
Attachment 09 534-CSI-714 Brand Name J A Siemens Desigo.pdf PDF
Attachment 07 534-CSI-714 Brand Name J A Gamewell FCI.pdf PDF
36C24726B0003 0001.docx DOCX document
Attachment 13 takeform signage supplement for CathLab2.pdf PDF
Attachment 12 Siemens Drawings REV 0 2314509R0 534-CSI-714 Cathlab.pdf PDF
Attachment 11 ICRA 534-CSI-714 Cathlab 1 Site Prep TAVRS R1.pdf PDF
Attachment 06 534-CSI-714 Brand Name J A Fire Sprinkler Dampers.pdf PDF
S02 36C24726B0003_1.pdf PDF
Attachment 02 534-CSI-714 Bid Drawings - REV 3-27-26.pdf PDF
Attachment 01 534-CSI-714 Specifications.pdf PDF
Attachment 05 Experience Modification Rate Form.pdf PDF
Attachment 04 Limitations on Subcontracting.pdf PDF
Attachment 03 Wage Determination.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT

SITE

CARDIAC CATH LAB 2

AA223

CARDIAC CATH LAB

CONTROL

AA223A

PRE-POST DOCUMENTATION

AA219

CARDIAC CATH 2 MECH RM

AA223B

RESPIRATOR STORAGE

AA239

PSC ROOM

XAA243A

STERILE STORAGE

AA239A

SOILED UTILITY

AA237A

CARDIAC CATH LAB 1

AA205

TOILET

AA208

AA209

INFO MGMT ELECTRONICS

AA203

CARDIOLOGY OFFICE

AA218

CARDIOLOGY OFFICE

AA220

PHYSICIAN'S OFFICE

AA222

PHYSICIAN'S OFFICE

AA224

GAS STORAGE

AA225

FELLOWS OFFICE

AA226

TECH OFFICE

AA218A

CLEAN SUPPLY

AA214

CARDIOLOGY CONFERENCE

ROOM

AA213 CARDIOLOGY OFFICE

AA212

CARDIOLOGY NURSE

MANGER

AA211

WAITING AREA

AA237

CATH EQUIPMENT ROOM

AA243

STAFF BREAK ROOM

AA245

WARD SUPPLY

AA

WORK ROOM

AA217

SOILED UTILITY

AA205A

SCRUB AREA

AA215

D1

D1

D2

1 1/2"

R.O.

3'-4"

D2

D3

D4

D4D4

D4 D4

D4

D4

D4

D5

D3

STRESS ROOM

AA204A

EKG CARDIAC STRESS TEST ROOM

AA206

PATIENT HOLDING

AA207

11.5 12.510.5 13.59.5

A

CC

BB

AA

A8

D3

D6

D6

D6

D6

D6 D6

D3

D3

D7

D7

H O

LD

D1

D8

D8

D9

D9

D9

D9

D1

3' -1

1/

2" 5'

-2

D10

D9

D11

D11

D8

D2

D2 3'-4"

D2

CLEAN LINEN

AA216

D18

D18

D17

D16

D16

D22

1. ALL EXISTING WALL DIMENSIONS ARE TO FINISH FACE, UNLESS OTHERWISE NOTED

2. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF AS-BUILT CONDITIONS, AND NOTIFY THE

ARCHITECT IN WRITING OF ANY DISCREPANCIES. ALL INFORMATION SHOWN ON THE CONSTRUCTION

DOCUMENTS IS BASED ON FIELD OBSERVATIONS AND/OR THE ORIGINAL CONSTRUCTION

DOCUMENTS OF THE FACILITY.

3. DEMOLITION AND CONSTRUCTION WORK MUST BE DONE UNDER NEGATIVE PRESSURE UTILIZING

HEPA FILTRATION UNITS. SEE INFECTION CONTROL NOTES.

4. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT OT AREA HAS BEEN

INSPECTED BY THE SAVAHCS SAFETY OFFICER AND INFECTION CONTROL COORDINATOR AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICES

5. THE CONTRACTOR SHALL PROVIDE PROTECTIVE COVERING FOR EXISTING FLOOR, WALL AND

CEILING FINISHES IN EXISTING AREAS NOT DESIGNATED FOR DEMOLITION OR NEW CONSTRUCTION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE CAUSED BY HIS

WORK OR ANY SUBCONTRACTOR.

6. CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH ALL TRADES, FOR ITEMS SHOWN TO BE

REMOVED ON THIS PLAN AS WELL AS DEMOLITION PLANS FOR OTHER TRADES IN THIS SET.

GENERAL CONTRACTOR SHALL ALSO COORDINATE WITH ALL TRADES THE REMOVAL,

REINSTALLATION, AND/OR REWORKING OF THE EXISTING FINISHES AS REQUIRED FOR THE ROUTING

OF EXISTING/NEW SERVICES INTO THE PROJECT AREA.

7. THE FINISH FACE OF MATERIAL OF NEW PARTITIONS SHALL ALIGN ON BOTH SIDES OF THE PARTITION WITH THE FACE OF THE MATERIALS ON EXISTING COLUMNS, WALLS, OR PARTITIONS, UNLESS NOTED OTHERWISE.

8. NO WORK TO BE DONE IN "NOT IN SCOPE" AREAS HATCHED GRAY IN PLANS, HOWEVER WORK MIGHT NEED TO BE PERFORMED IN CEILING OR EXISTING CHASES THROUGHOUT BUILDING. REFERENCE

MECHANICAL AND ELECTRICAL DRAWINGS FOR EXTENT OF WORK. COORDINATE ACCESS TO

ROOMS OUTSIDE OF SCOPE WITH OWNER.

9. REFER TO GI-100 FOR ICRA CONSTRUCTION DETAILS AND ADDITIONAL ICRA INFORMATION.

10. PRIOR TO THE START OF DEMOLITION, CONTRACTOR SHALL WALK THE SPACE WITH THE C.O.R. TO

IDENTIFY ANY ITEMS TO BE REMOVED BY THE GC AND TURNED OVER TO THE GOVERNMENT.

11. ANY ITEMS DAMAGED BY THE CONTRACTOR OR BY PERSONS UNDER THE SUPERVISION OF THE

CONTRACTOR THAT ARE NOT INDICATED TO BE REMOVED OR DEMOLISHED SHALL BE

REPAIRED/REPLACED TO LIKE NEW CONDITION AT CONTRACTOR'S EXPENSE.

12. SEE SPECIFICATION 024100-DEMOLITION AND MEP DRAWINGS FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

13. GENERAL CONTRACTOR SHALL PROVIDE CONSTRUCTION AND WARNING SIGNS AS PER THE

SPECIFICATIONS AND DETAILS SHOWN IN THIS SET.

14. CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATERTIGHT STATE THROUGHOUT CONSTRUCTION. ROOF WORK SHALL NOT BE LEFT EXPOSED OR SUBJECT TO ROOF DRAINAGE INTO

OPENINGS OR AREAS LEFT OPEN.

15. EXISTING SPRINKLER SYSTEM SHALL REMAIN LIVE AND FUNCTIONAL DURING ALL PHASES OF

CONSTRUCTION EXCEPT FOR DURATION OF MINOR SPRINKLER WORK INDICATED ON THESE

DRAWINGS. CONTRACTOR SHALL TAKE GREAT CARE TO NOT DAMAGE ANY EXISTING HEADS OR

PIPING. COORDINATE WORK WITH FIRE PROTECTION DRAWINGS.

16. REMOVE AND STORE ALL EXISTING EQUIPMENT AS REQUIRED FOR NEW CONSTRUCTION.

COORDINATE TEMPORARY STORAGE LOCATION WITH VAMC.

GENERAL DEMOLITION NOTES

EXISTING DOOR & FRAME TO BE

DEMOLISHED IN ITS ENTIRETY

DEMOLITION FLOOR PLAN LEGEND

EXISTING PARITION TO BE

DEMOLISHED IN ITS ENTIRETY

EXISTING DOOR & FRAME TO

REMAIN, PROTECT.

EXISTING CASEWORK TO BE

DEMOLISHED

AREA NOT HATCHED INDICATES

REMOVAL OF ALL ITEMS

INCLUDING, BUT NOT LIMITED TO

PARTITIONS, WALL COVERINGS, ALL

FINISH MATERIALS, WALL BASE AND

ASSOCIATED ADHESIVES AND

MASTICS, FLOOR DRAINS, DOORS,

FRAMES, WALL PROTECTION,

MILLWORK, CASEWORK, BENCHES,

SHELVING, AND STANDARDS, WALL-

MOUNTED BOARDS, WHITEBOARDS,

BULLETIN BOARDS, LIGHT

FIXTURES, GYPSUM BOARD,

CEILINGS AND SOFFITS,

SUSPENDED CEILING SYSTEMS,

DIFFUSERS, GRILLES, PLUMBING

FIXTURES, TOILET ACCESSORIES.

COORDINATE DUCTWORK,

ELECTRICAL AND ALL MEDICAL GAS

SYSTEM REMOVALS WITH MEP

ENGINEER. COORDINATE WITH COR

FOR THE ITEMS THAT REQUIRE

SALVAGING AND SALVAGE.

EXISTING WALLS TO REMAIN

NOTE: ALL SYMBOLS MAY NOT BE USED

AREA TO REMAIN NOT IN

CONTRACT

AREA OF LIMITED REMOVAL:

SEE PLAN NOTES

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

CONSULTANTS:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT:

U.S. Department of Veteran Affairs

MOON TREE, LLC

1808 Deep Creek Rd Oklahoma City, OK 73131

(405) 509-5254

STRUCTURAL / CIVIL

ENGINEER

MOON TREE, LLC

1808 DEEP CREEK ROAD

OKLAHOMA CITY, OK 73131

(405) 509-5254

MECHANICAL / ELECTRICAL /

PLUMBING / TECHNICAL ENGINEER

FIRE PROTECTION

ENGINEER

F U

L L

Y S

P R

IN

K

L E

R E

D

BOWMAN FOSTER & ASSOCIATES, INC

6353 CENTER DRIVE, #101

NORFOLK, VA 23502

(757) 466-7400

/4

/2

:1

:0

A

M

1 Addendum #1 6/04/2026 AD012R1

SECOND FLOOR DEMOLITION PLAN

JDA

9 57

DW

PROJECT SUBMISSION PHASE: 100% CONTRACT DOCS FOR BIDDING

CARDIAC CATH LAB REMODEL

03/12/2026

534-CSI-714

VA CHARLESTON HEALTH CARE

109 BEE STREET

CHARLESTON, SC 29401 1-

Scale: 1/4" = 1'-0" 1F

SECOND FLOOR - DEMOLITION PLAN

DEMOLITION KEYNOTES

D1 REMOVE EXISTING SECTION OF PARTITION TO EXTENT INDICATED AS REQUIRED FOR NEW WORK.

D2 REMOVE EXISTING SECTION OF HANDRAIL AND BUMPER RAILS AS INDICATED FOR NEW WORK.

D3 REMOVE EXISTING PLUMBING FIXTURE AND RELATED ACCESSORIES. SEE PLUMBING FOR

ADDITIONAL INFORMATION.

D4 REMOVE EXISTING DOOR, FRAME AND RELATED HARDWARE.

D5 REMOVE DRINKING FOUNTAIN, SERVICES AND RELATED ACCESSORIES. SALVAGE FOR

REINSTALLATION. SEE PLUMBING FOR ADDITIONAL INFORMATION

D6 REMOVE EXISTING CASEWORK IN IT'S ENTIRETY.

D7 REMOVE EXISTING EQUIPMENT AND RELATED ACCESSORIES IN THIER ENTIRETY (BASE PLATES, RAILS, WIRING, RACEWAYS, ETC.)

D8 REMOVE EXISTING VCT FLOORING, VINYL BASE AND ADHESIVE TO BARE SUBSTRATE.

D9 REMOVE EXISTING SHEET VINYL FLOORING, VINYL BASE AND ADHESIVE TO BARE SUBSTRATE.

D10 EXISTING MED GAS SHUT VALVES OFF TO BE REMOVED FOR RELOCATION.

D11 REMOVE EXISTING WALL MOUNTED LEAD APRON HOLDER, STORE FOR RELOCATION. SEE NEW WORK

FOR ADDITIONAL INFORMATION

D12 .REMOVE EXISTING LAY IN CEILING, LIGHTING, CEILING DEVICES AND MEDICAL EQUIPMENT SUPPORT

SYSTEM. SEE M.E.P. DRAWINSG FOR ADDITIONAL INFORMATION

D13 REMOVE EXISTING LAY IN CEILING, LIGHTING AND CEILING DEVICES. SEE M.E.P. DRAWINSG FOR

ADDITIONAL INFORMATION.

D14 REMOVE EXISTING SOFFIT.

D15 REMOVE EXISTING GYPSUM CEILING , LIGHTING AND CEILING DEVICES. SEE M.E.P. DRAWINGS FOR

ADDITIONAL INFORMATION.

D16 REMOVE EXISTING CEILING TILES FOR ACCESS TO COMPLETE SCOPE OF WORK ABOVE FIRST FLOOR CEILING AND BELOW SECOND FLOOR SLAB OR ABOVE SECOND FLOOR CEILING BELOW THIRD FLOOR

SLAB. COORDINATE WITH NEW WORK.

D17 REMOVE EXISTING WALLCOVERING. PREP FOR NEW PAINTED FINISH.

D18 REMOVE EXISTING LAYER OF NON LEAD LINED GYSPUM BOARD. PREP FOR NEW LEAD LINED GYSPUM

BOARD

D20 REMOVE EXISTING LAY IN CEILING TILES, DEVICES, AND GRID AS REQUIRED FOR NEW DOORS.

D21 REMOVE EXISTING BULKHEAD AS REQUIRED FOR NEW DOORS.

D22 REMOVE EXISTING WAINSCOT. PREP WALLS FOR NEW PAINTED FINISH

AMENDMENT DRAWING

Sheets
AD012R1 - SECOND FLOOR DEMOLITION PLAN