This is a Single Source Justification form for a Simplified Acquisition Procedure (SAP) under the Simplified Acquisition Threshold (SAT) of $250,000.

The Department of Veterans Affairs, VISN 07, Ralph H. Johnson VA Medical Center requires fire protection and fire alarm system equipment for a facility upgrade. The acquisition includes Ruskin Fire-Smoke Dampers and actuators, along with fire sprinkler assemblies in two types: Type D upright sprinkler heads (Tyco TY3151, Reliable Model G, Viking QR VK300/VK350 Brass Upright, or Victaulic Model V27 Upright) and Type A semi-recessed ordinary coverage sprinkler heads (Tyco TY3251, Reliable Model FI Head & Model G-FI Escutcheon, Viking QR VK302/VK352 Pendent, or Victaulic Model 34). The estimated total cost is not disclosed in the available document. The justification cites FAR 6.302-1, asserting that only one responsible source exists because the specified equipment is necessary to ensure compatibility with the existing Gamewell FCI fire alarm control panel system and to maintain Factory Mutual and Underwriter's Laboratory certifications. The systems must function as a unified, cohesive assembly tested and certified together to comply with NFPA standards and the VA Fire Protection Design Manual. No market research was conducted due to these compatibility requirements. The Contracting Officer, Kenyon Dulaney, certified the justification on May 20, 2026, and must document price reasonableness using the S19 Open Market Award Documentation Form.

View the file

Other files

File Type Posted
36C24726B0003 0005.docx DOCX document
36C24726B0003 0004.docx DOCX document
36C24726B0003 0003.docx DOCX document
Attachment 20 534-CSI-714 Brand Name J A Takeform Signs.pdf PDF
36C24726B0003 0002.docx DOCX document
Attachment 19 Site Visit Contractor Sign-In sheet.pdf PDF
Attachment 10 RFI Questions Responses.pdf PDF
Attachment 15 1-AE105R1.pdf PDF
36C24726B0003 0001.docx DOCX document
Attachment 17 283100-R1.pdf PDF
Attachment 08 534-CSI-714 Brand Name J A Rauland Nurse Call.pdf PDF
Attachment 18 26-0604-Addendum 1 Narrative.pdf PDF
Attachment 07 534-CSI-714 Brand Name J A Gamewell FCI.pdf PDF
Attachment 16 088000-R1.pdf PDF
Attachment 09 534-CSI-714 Brand Name J A Siemens Desigo.pdf PDF
Attachment 14 1-AD012R1.pdf PDF
Attachment 12 Siemens Drawings REV 0 2314509R0 534-CSI-714 Cathlab.pdf PDF
Attachment 13 takeform signage supplement for CathLab2.pdf PDF
Attachment 11 ICRA 534-CSI-714 Cathlab 1 Site Prep TAVRS R1.pdf PDF
S02 36C24726B0003_1.pdf PDF
Attachment 01 534-CSI-714 Specifications.pdf PDF
Attachment 02 534-CSI-714 Bid Drawings - REV 3-27-26.pdf PDF
Attachment 04 Limitations on Subcontracting.pdf PDF
Attachment 03 Wage Determination.pdf PDF
Attachment 05 Experience Modification Rate Form.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

Revision: 01 Effective Date: 11/15/2024 Page 1 of 2 Acquisition ID#:

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards IAW FAR 13.106-1 For

Over Micro-Purchase Threshold but Not Exceeding the SAT ($250K)

Acquisition Plan Action ID:

1. Contracting Activity: Department of Veterans Affairs, VISN 07, Ralph H. Johnson VA Medical Center

2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount:

The Ralph. H Johnson VAMC has a requirement to utilize specific products for basis of design. The requested brands for fire sprinklers and dampers are necessary to meet requirements and interface with existing hospital equipment. This equipment must be installed to maintain Factory Mutual/Underwriter’s Laboratory requirements for a unified system built and tested together. The fire dampers must integrate with the Gamewell FCI fire alarm control panel system to function properly and continue manufacturer certification that the fire alarm system will work as intended and per NFPA and VA Fire Protection Design Manual requirements.

Basis of design to be Ruskin Fire-Smoke Dampers and actuators and fire sprinkler assemblies as follows:

Type D upright sprinkler heads where Type D, defined as one of the following:

1. Tyco TY3151

2. Reliable Model G

3. Viking QR VK300 / VK350 Brass Upright

4. Victaulic Model V27 Upright

Type A semi-recessed ordinary coverage sprinkler heads where Type A, defined as one of the following:

1. Tyco TY3251

2. Reliable Model FI Head & Model G-FI Escutcheon

3. Viking QR VK302 / VK352 Pendent

4. Victaulic Model 34

The total cost for the above items is estimated to be approximately $

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements per FAR 6.302-1. The listed supplies described are the only materials that can ensure compatibility with the existing fire protection and fire alarm systems that are in place. These systems must be uniform as that is how they are tested by the manufacturer and certified by national testing bodies

36C247-26-AP-2508

VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

Revision: 01 Effective Date: 11/15/2024 Page 2 of 2 Acquisition ID#:

(Factory Mutual and Underwriter Laboratories). In order to maintain certifications that these systems meet code and VA design manual requirements, particular equipment must be installed to maintain certifications that the system will function properly and save life and property when activated.

4. Description of market research conducted and results or statement why it was not conducted:

Market research was not conducted because the supplies listed are necessary to form a unified, cohesive, and compliant fire protection and fire alarm system.

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Note: COs are required to make a determination of price reasonableness IAW FAR 13.106-3. See the

S19 Open Market (FAR13) Award Documentation Form with Abstract to document price reasonableness.

Name Date Title

2026-05-20T14:20:52-0400
KENYON DULANEY

File details come from the government source that posted it. Updated .