20074.AST5.IS.STI.12.20.pdf
PDF 4 MB Posted
- Attached to
- Z2NA--AMENDMENT 0003 POST RFI ANSWERS AND DOCUMENTS REQUESTED MARTINSBURG VAMC 36C24526Q0341
- Solicitation number
- 36C24526Q0341
About this file
This document is an in-service inspection report for aboveground storage tank (AST) AST 5 located at the VA Medical Center in Martinsburg, West Virginia, conducted on December 2, 2020 by inspector Ryan Peterson (API Certification No. 80187, STI Certification No. AC 44269). The tank is a 10,000-gallon rectangular concrete vault design manufactured by Convault Inc. in 2008, constructed to UL-142 specification, and stores E-85 Ethanol. The inspection was performed in accordance with West Virginia Code Chapter 22, Article 30, and Steel Tank Institute SP-001 (6th edition) standards to satisfy required annual and three-year inspection intervals and to evaluate mechanical integrity and fitness for continued service.
The inspection results determined the tank is fit for continued service. The concrete vault foundation and containment structure are in satisfactory condition with no cracking or spalling observed. Tank nozzles are mechanically sound with appropriate valves and instrumentation for venting, though coating failure with surface oxidation (rust) was noted on external nozzles and piping. The tank is equipped with digital level transmitting capabilities, high-level alarms, leak detection, and flow monitoring systems, all in satisfactory condition. Ultrasonic thickness measurements could not be performed due to the tank's concrete vault configuration; however, thickness measurements are recommended during the next scheduled internal inspection to determine corrosion rate and establish future inspection intervals. The single recommendation is to clean and recoat nozzles as needed to protect against environmental corrosion. The next external inspection is due by December 2, 2023, while internal and ultrasonic thickness inspections are to be site-tracked.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Medical Center Martinsburg, WV
Report No.: 20074.AST5.IS.STI.12.20
Inspector : Ryan Peterson
Employer :
Inspection Date : 12/02/2020
IN-SERVICE
Inspection Report For
AST 5
E-85 Ethanol
A Standard STI inspection was completed on Tank AST 5 in the VA Medical Center facility located at Martinsburg, WV on 12/02/2020 to meet the required 3 year and annual inspection set fourth in the West Virginia Code:
CHAPTER 22. ENVIRONMENTAL RESOURCES.ARTICLE 30. The inspection was conducted in accordance with client and state regulated criterion for NDE which included visual examinations. The tank was built to UL-142 specification for AST tanks for storing E-85 Ethanol. This inspection was conducted in accordance with requirements standards established by W.Va. Code 22-30 and the steel tank institute SP-001 6th edition . The following is a detailed report of the inspection including findings and recommendations.
Inspector Signature API Certification No. 80187 STI Certification No. AC 44269
Jayfish Media Group, LLC
TABLE OF CONTENTS
1.0 EXECUTIVE SUMMARY
2.0 VESSEL DATA
3.0 INSPECTION RESULTS
3.1 Foundation
3.2 Shell
3.3 Nozzles
3.4 Roof
3.5 Floor
3.6 Ancillary Equipment
3.7 Other
4.0 RECOMMENDATIONS
4.1 Foundation
4.2 Shell
4.3 Nozzles
4.4 Roof
4.5 Floor
4.6 Ancillary Equipment
4.7 Other
4.8 Next Inspections
5.0 ULTRASONIC THICKNESS (UT) MEASUREMENTS
5.1 Results Summary
5.2 Recommendations
APPENDICIES APPENDIX A Inspection Checklist
APPENDIX B Inspection Photographs
APPENDIX C Certifications
1.0 EXECUTIVE SUMMARY
A Standard STI inspection was completed on Tank AST 5 in the VA Medical Center facility located at Martinsburg, WV on 12/02/2020 to meet the required annual and 3 year and annual inspection interval set fourth in the West Virginia Code: CHAPTER 22. ENVIRONMENTAL RESOURCES.ARTICLE 30, and to collect data in order to evaluate the mechanical integrity and fitness for continued service of the tank.
The tank is of a rectangular concrete vault design found to meet or exceed the minimum code requirements of STI SP-001 and the West Virginia code and regulations. This tank is of a UL-142 constructed concrete vault design, due to the configuration and design, no thickness measurements were taken on the tank or nozzles. These thickness measurements should be taken during the next scheduled internal inspection to determine corrosion rate and next inspection intervals. The visual inspection concluded that this concrete vault style tank is fit for continued service.
Tank external nozzles and piping have coating failure present. The tanks nozzles and piping should be cleaned and re-coated as needed to ensure protection against environmental corrosion.
Please refer to the results and recommendation sections of this report for other minor discrepancies and recommendations that were identified during the course of this inspection.
Required Next Inspections per State Regulations :
Annual UT Thickness: Site Tracked External: 12/02/2023 Internal: Site Tracked
2.0 TANK DATA
Equip. ID: AST 5 Product: E-85 Ethanol
City/State: Martinsburg, WV Gallons: 10,000
Client: VA Medical Center Specific Gravity: 0.8
State ID: 002-00000188 Fill Height (ft): 9.0
Inspection Date: 12/02/2020 Corr. Allow.(Ca): 0.000
Type Inspection: IN-SERVICE Joint Eff.: 1
Test Methods: Visual Plate Spec: Unknown
Manufacturer: Convault Inc. Roof/Head 1 t (inch): 0.188
Year Built: 2008 Bttm/Head 2 t (inch): 0.188
Const. Code: UL-142 Course 1 t (inch): 0.188
Diameter/Width(ft): 8.0
Height (ft): 9.0
Length(ft): 23.0
Shell Const:
Roof Type: Flat
Foundation: Concrete Pad
Insulation Type: None
Insul.Tk.(in):
3.0 INSPECTION RESULTS
The following results are the summarization of a field checklist that was utilized during the inspection of AST 5
3.1 Foundation:
3.1.1 The foundation is constructed of a concrete pad. The containment structure is of a concrete vault design and appears to meet the capacity requirements recommended by NFPA 30.
3.2 Shell:
3.2.1 The tank is e ncased within the secondary concrete vault. The outer concrete vault is free of cracking and spalling and found to be in satisfactory condition.
3.3 Nozzles:
3.3.1 Tank nozzles appear to be in satisfactory mechanical condition with the appropriate required valves and instrumentation for venting.
3.4 Roof:
3.4.1 Tank is contained within the concrete vault. The tank outer concrete vault appears to be in satisfactory condition.
3.5 Floor:
3.5.1 Tank is contained within the concrete vault. The tank outer concrete vault appears to be in satisfactory condition.
3.6 Ancillary Equipment:
3.6.1 Tank is equipped with digital transmitting capabilities for tracking : high level alarm, level gauge, leak detection and flow.
3.7 Other:
3.7.1 The tank is equipped with the proper ventilation system and required valves as per code regulations, all found to be in satisfactory condition.
4.0 RECOMMENDATIONS
4.1 Foundation:
4.1.1 None
4.2 Shell:
4.2.1 None
4.3 Nozzles:
4.3.1 Clean and recoat nozzles as needed.
4.4 Roof:
4.4.1 None
4.5 Floor:
4.5.1 None
4.6 Ancillary Equipment:
4.6.1 None
4.7 Other:
4.7.1 None
4.8 Next Inspections:
4.8.2 Next External inspection is due by: 12/02/2023
4.8.1 Next internal inspection is due by: Site Tracked
4.8.3 Next UT inspection is due by: Site Tracked
5.0 ULTRASONIC THICKNESS (UT) MEASUREMENTS
5.1 Results Summary:
5.1.1 UT examination was unable to be performed at this time due to the tanks configuration.
5.2 Recommendations:
5.2.1 Thickness measurements should be taken during next scheduled internal inspection to determine corrosion rate and inspection intervals.
APPENDIX A
Inspection Checklist
1) STI Checklist
AST INSPECTION CHECKLIST(S)
Inspector: Ryan Peterson
Cert No: 80187
Company:
VA Medical
Center Tank: AST 5 Report No:
20074.AST5.IS.S
TI.12.20
Date: 12/02/2020
STEEL TANK INSTITUTE SP001 INSPECTION CHECKLIST
TANK CONFIGURATION: TANK HAS CRDM? AST CATEGORY
AST in contact with ground no 2 or 3
Elevated tank with spill control and with no part of AST in contact with ground yes 1
Vertical tank with RPB and spill control yes 1
Vertical tank with double bottom and spill control yes 1
Vertical tank with RPB under tank and spill control yes 1
Double-wall AST yes 1
AST with secondary containment dike/berm No 1
TANK ID AFFIXED TO TANK: YES PRODUCT:_E-85 Ethanol___________
NAMEPLATE: YES READABLE: YES AST CATEGORY 1__________
MFG: Convault Inc.____ CAPACITY:_10,000 Gallons_ YR Built: January 2008_ CODE: UL- 142__
DOT LABEL: YES GROUND: YES
TYPE: DW REC CONCERTE VAULT: YES
CONTAINMENT CONDITION: CONCRETE Satisfactory
SPOTTED COATING FAILURE W/ SURFACE O2 (RUST): NA
CRACKS IN CONTAINMENT BASIN: NO WALLS: NO
FOUNDATION CONDITION: CONCRETE PAD Satisfactory
CRACKS IN CONCRETE / ASPHALT: NO
SHELL &HEADS CONDITION: NA ACCESSIBLE: NO
SPOTTED COATING FAILURE W/ SURFACE O2 (RUST): NA
NOZZLE CONDITION: CS Satisfactory
SPOTTED COATING FAILURE W/ SURFACE O2 (RUST): YES
ANTI-SYPHON VALVE REQUIRED: YES PRESENT: YES
SHEAR VALVE REQUIRED: YES PRESENT: YES
EXPANSION VALVE REQUIRED NO INSTALLED CORRECTLY NA
FILL BASIN REQUIRED: YES PRESENT: YES
ISOLATION VALVE REQUIRED: YES PRESENT: YES
LEVEL IND. TYPE: Clock Gauge , Digital Indicator
HIGH LEVEL ALARM -OR- PUMP HIGH LEVEL CUTOUT SWITCH: YES
PRESS/TEMP INDICATORS: Digital HAS CERT STICKER: NA
GLASS BROKE : NO
ACCESS: STEPS
SPOTTED COATING FAILURE W/ SURFACE O2 (RUST): NO
NORMAL VENT EMERGENCY VENT
SIZE 2” 6”
CAPACITY 20,200 CFH 246,130 CFH
MAKE Universal Valve Co. Universal Valve Co.
HEIGHT 16’ 8’
VENT TO OUTSIDE YES YES
APPENDIX B
Inspection Photographs
1) Photo Files
REPORT-20074.AST5.IS.STI.12.20 INSPECTION PHOTOGRAPHS
Tank ID Label
NFPA Diamond
Tank Data Plate
Tank Grounding Cable
Tank Concrete Foundation in Satisfactory Condition
Tank Concrete Vault in Satisfactory Condition
Concrete Vault Bottom
Tank Pumping Station in Satisfactory Condition
Tank Gauge System
Tank Fill Basin
Tank Access Stairs in Satisfactory Condition
General View of Tank Vault Roof
Tank Emergency Vent
Level Gauges in Satisfactory Condition
APPENDIX C
NDE Records and Certifications
1) Annual Inspection Certification
2) STI Certification
3) API 653 Certification
ANNUAL INSPECTION CERTIFICATION
Aboveground Storage Tank
Is Fit for Service
V.7.22.2016
☐ I am a qualified individual as described in WV CSR 47‐63‐5.2 and I have performed a tank evaluation on the above AST system. I certify the tank system meets applicable standards established by WV CSR 47‐63.
☐ I am the tank owner, operator, or qualified representative of the tank owner or operator, and have performed a tank evaluation on the above AST system. I certify there is no obvious change to the tank system that would cause this tank to become not‐fit for service since it was certified by a PE, API or STI inspector on
_______________________ (date). This certification meets the requirements set in WV CSR 47‐63‐5.2.b.3 to certify annual inspections in intervening years between the evaluations required by a PE, API or STI inspector.
In accordance with the WV CSR 47‐63‐5.2, I have documented all deficiencies and/or changes in the tank system found during the inspection, in writing, and provided my recommendations, including a proposed schedule, for abating the deficiencies and submitted them with this form.
I certify that I have personally examined and/or am familiar with the inspection performed on the AST system listed above, including its associated equipment, leak detection system and secondary containment structure, and that based on my direct knowledge that the AST listed above is Fit for Service.
Signature of Certifying Individual Date Signed
P.E. Registration #, STI Certification # or Registration/Certification Expiration Date API
Certification # (if applicable) (if applicable)
AST Facility Name
Address
City, State, Zip
Tank Owner Name
Telephone Number
Email Address
Certifying Individual
Address
City, State, Zip
Telephone Number
Email Address
Facility’s/Owner’s Tank ID
DEP Issued Tank Label
DEP Determined Tank Level Level 1 tank ☐ Level 2 tank ☐
| AST Facility Name: Veterans Affairs Medical Center |
| Address: 510 Butler Avenuew |
| City State Zip: Martinsburg, WV 25405 |
| Tank Owner Name: Veterans Affairs Medical Center |
| Telephone Number: (304) 263-0811 x 3412 |
| Email Address: Robert.Moore10@va.gov |
| Certifying Individual: Ryan Peterson - STI, API 653 |
| Address_2: 498 Meckley Drive |
| City State Zip_2: State College, PA 16803 |
| Telephone Number_2: (814) 237-0144 |
| Email Address_2: jayfishcontracting@gmail.com |
| FacilitysOwners Tank ID: AST 5 |
| DEP Issued Tank Label: 002-00000188 |
| Check Box1: Yes |
| Check Box12: Yes |
| Check Box11: Off |
| Check Box13: Off |
| certify annual inspections in intervening years between the evaluations required by a PE API or STI inspector: |
| Date Signed: 12/2/2020 |
| PE Registration STI Certification or: STI # AC 44269 API 653 # 80187 |
| RegistrationCertification Expiration Date API: STI - May 10th, 2023 / API 653 March 31st 2021 |
File details come from the government source that posted it. Updated .