This document is a Request for Information (RFI) Response for the VA Medical Center's 9th Floor Mental Health Renovation project. The RFI addresses multiple technical and logistical questions from potential contractors, covering topics such as subcontractor requirements, proposal submission guidelines, site access, elevator usage, and project phasing. Key details include specifying major functional categories as general contracting, electrical, and mechanical, with the North American Industry Classification System (NAICS) Code 236220, and confirming that the 25-page limit applies to the Technical Capability section of the proposal. The responses provide clarification on site visit limitations, elevator access during different project phases, and contractor responsibilities for testing and installation.

View the file

Other files

File Type Posted
36C24425B0018 0001.docx DOCX document
19a - RFI Responses 2.pdf PDF
16 - Wilkes Barre PA Campus Site Plan Crane Locations.pdf PDF
21 - WD PA20250095 M4 03-21-2025.pdf PDF
19 - RFI Responses.pdf PDF
18a - Safety Health During Construction Policy 18S-15-346.pdf PDF
20 - Brand Name JA 9F MHU 20241804.pdf PDF
18 - Safety VA Directive 7715 Rev 092023.pdf PDF
22 - 852.219-75 MUST SIGN AND RETURN WITH BID.pdf PDF
36C24425B0018_4.docx DOCX document
17 - Noise and Vibration Control.pdf PDF
12a - ICRA Introductory Information and Instructions.pdf PDF
36C24425B0018_3.docx DOCX document
15 - M P Cut Sheets 693 19 106.pdf PDF
12b - G-009 ICRA.pdf PDF
13 - Structural Calcs 693 19 106 .pdf PDF
14 - Estimate - 693 19 106 M P Calcs.pdf PDF
11 - Drawing Revisions.pdf PDF
12c - 17-H4 ICRA.pdf PDF
12e - 01-A4 ICRA.pdf PDF
12d - 01-A3 ICRA.pdf PDF
12 - ICRA Memo.pdf PDF
36C24425B0018_2.docx DOCX document
09 - Drawings Mechanical.pdf PDF
07 - Drawings General V2.pdf PDF
10 - Drawings Electrical.pdf PDF
06 - Drawings Fire Alarm and Protection.pdf PDF
10a - 17-E43 Revisions 2024-05-30.pdf PDF
08 - Drawings Plumbing.pdf PDF
03 - Drawings Hazardous Materials.pdf PDF
36C24425B0018 IFB Solicitation.pdf PDF
05a - Drawings Architectural 2.pdf PDF
01c - 107316 Aluminum Canopy System.pdf PDF
01d - 220523 Gen Duty Valves Plumb Piping.pdf PDF
36C24425B0018_1.docx DOCX document
05b - Drawings Architectural 3.pdf PDF
02 - Drawings General V1.pdf PDF
05c - A15 Revisions 2024-05-30.pdf PDF
05 - Drawings Architectural 1.pdf PDF
04 - Drawings Structural.pdf PDF
01 - Specifications Project 693-19-106 .pdf PDF
01b - 087100 Door Hardware.pdf PDF
01a - 066116 Solid Surfacing Fabrication.pdf PDF
01e - 221100 Fac Water Distr.pdf PDF
36C24425B0018.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Request for Information Response

Exhibit C – Past Performance Relevancy Information Format, page 4, part 2, item A indicates, “As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:” Please provide a listing of Trades.

As a minimum, provide the name(s) of subcontractors to be utilized in the following areas: general contracting, electrical, and mechanical.

Solicitation page 14 of 63, Volume I – Past Performance, Submission Requirements indicates, “The document should be written to show the teams’ construction experience with respect to the major functional categories listed. See Exhibit C – Past Performance Relevancy Information.” Please provide a listing of major functional categories.

The major functional categories include general contracting, electrical, and mechanical. The North American Industry Classification System (NAICS) Code is 236220 - Commercial and Institutional Building Construction.

Does the 25 page limit indicated on Solicitation page 13 of 63 apply to the entire Volume I (Technical Capability and Past Performance)?

The 25 page limit applies to Technical Capability

129 Please clarify the numerical reference to Proposal Submission Volumes: I or 1, II or 2. The numerical references to proposal submission is Volumes 1 and 2.

Please confirm which Volume the following information should be placed:

Safety or Environmental Violations and Experience Modification Rate (page 9 of 63).

2.1 52.209-7 Information Regarding Responsibility Matters (page 15 of 63).

2.2 52.209-13 Violation of Arms Control Treaties or Agreements – Certification (page 17 of 63).

3.1 52.204-8 Annual Representations and Certifications (page 24 of 63). Please confirm which Volume the following information should be placed: Safety or Environmental Violations, 2.1, 2.2, 3.1

The outlined information should be included with the price proposal.

We were unable to access the 8th Floor space during the previous Prebid Meeting and Site Visit. Can arrangements be made to schedule a second site visit and walk-through? Please advise. With the current response deadline, the VA is not planning to schedule a second site visit.

132 Please confirm that the phasing will remain as shown on plan 01-18 Phasing Plan. As of right now, there are no plans on changing the phasing of the project.

133 What elevators can the Contractor use?

During Phases 2 and 2A, the Contractor shall use the service elevators. During Phase 3, the Contractor shall use the service elevator to a floor later designated by the VA.

134 Please confirm the courtyard and the service elevators on the 9th floor may be utilized for the duration of the project.

The service elevators shall be shared use with the medical center. There shall be 3 locations that a crane can temporarily set up do lifts, depending on accessibility of those locations (see drawings for location).

May the two lower roofs on the south side of the building be utilized for equipment, material and tool access to the 9th floor for the duration of the project?

No

136 Will there be staging, laydown, and temporary facilities areas available on site? There is a map of location for dumpster and storage trailers.

May the two lower roofs on the south side of the building be utilized for equipment, material and tool access to the 9th floor for the duration of the project?

No

Specification Section 09.05.16, Moisture Remediation System, how would the Contractor know to include unless there has been a moisture test taken for the Warehouse? I assume the 9th Floor should not need it given it’s not on grade. Please advise if the Contractor should include for the Warehouse.

It is the Contractor responsibility for testing after the project is awarded and shall follow the Spec section 09-05-16.

There was limited access to the 9th floor for the site visit. Are there valves in place at the branches coming off of the risers to isolate the 9th floor from the other floors?

No, the VA would need to have a shutdown.

140 Also are the branches at the risers sufficient in size or must new branch connections be installed? All contractors will need to install per drawings.