These fire alarm and protection drawings detail the fire safety system design for the 9th Floor Mental Health Renovation project at the Wilkes-Barre VA Medical Center. The comprehensive set of plans includes multiple detailed drawings covering fire alarm zones, device placement, sprinkler head locations, and hazard classifications across different sections of the floor. The drawings specify a wet pipe sprinkler system with different hazard classifications (light hazard, ordinary group 1 and 2 hazards), using sprinkler heads from Tyco with various finishes and temperature ratings. Key requirements include field verification of existing sprinkler zones, removal of existing equipment, coordination with other trades, and ensuring proper sprinkler head protection during construction. The system will be fed by two 6-inch standpipes (in Stair 5 and Stair 3) and designed to match smoke compartments and fire alarm zones per NFPA 13 2019 standards.

The drawings are part of a larger VA project (Project #693-19-106) set to renovate the 9th floor mental health area, with specific attention to fire safety infrastructure. The design includes precise specifications for sprinkler head positioning, mounting heights, and coverage across various rooms including group therapy spaces, patient areas, corridors, and utility rooms. Notable technical details include requirements for maintaining minimum 18-inch clearance below sprinkler deflectors, using flexible sprinkler hoses, and ensuring compatibility with existing campus systems. The documentation is prepared by Valhalla Engineering for the Department of Veterans Affairs, with the drawings dated 04/18/2023 and marked as 100% Construction Documents.

View the file

Other files

File Type Posted
36C24425B0018 0001.docx DOCX document
19a - RFI Responses 2.pdf PDF
19b - RFI Responses 3.pdf PDF
16 - Wilkes Barre PA Campus Site Plan Crane Locations.pdf PDF
21 - WD PA20250095 M4 03-21-2025.pdf PDF
19 - RFI Responses.pdf PDF
18a - Safety Health During Construction Policy 18S-15-346.pdf PDF
20 - Brand Name JA 9F MHU 20241804.pdf PDF
18 - Safety VA Directive 7715 Rev 092023.pdf PDF
22 - 852.219-75 MUST SIGN AND RETURN WITH BID.pdf PDF
36C24425B0018_4.docx DOCX document
17 - Noise and Vibration Control.pdf PDF
12a - ICRA Introductory Information and Instructions.pdf PDF
36C24425B0018_3.docx DOCX document
15 - M P Cut Sheets 693 19 106.pdf PDF
12b - G-009 ICRA.pdf PDF
13 - Structural Calcs 693 19 106 .pdf PDF
14 - Estimate - 693 19 106 M P Calcs.pdf PDF
11 - Drawing Revisions.pdf PDF
12c - 17-H4 ICRA.pdf PDF
12e - 01-A4 ICRA.pdf PDF
12d - 01-A3 ICRA.pdf PDF
12 - ICRA Memo.pdf PDF
36C24425B0018_2.docx DOCX document
09 - Drawings Mechanical.pdf PDF
07 - Drawings General V2.pdf PDF
10 - Drawings Electrical.pdf PDF
10a - 17-E43 Revisions 2024-05-30.pdf PDF
08 - Drawings Plumbing.pdf PDF
03 - Drawings Hazardous Materials.pdf PDF
36C24425B0018 IFB Solicitation.pdf PDF
05a - Drawings Architectural 2.pdf PDF
01c - 107316 Aluminum Canopy System.pdf PDF
01d - 220523 Gen Duty Valves Plumb Piping.pdf PDF
36C24425B0018_1.docx DOCX document
05b - Drawings Architectural 3.pdf PDF
02 - Drawings General V1.pdf PDF
05c - A15 Revisions 2024-05-30.pdf PDF
05 - Drawings Architectural 1.pdf PDF
04 - Drawings Structural.pdf PDF
01 - Specifications Project 693-19-106 .pdf PDF
01b - 087100 Door Hardware.pdf PDF
01a - 066116 Solid Surfacing Fabrication.pdf PDF
01e - 221100 Fac Water Distr.pdf PDF
36C24425B0018.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D E F G

C9-43

WOMEN'S

C9-C06

CORRIDOR

C9-49A

TOILET

C9-49

WOMEN'S BARIATRIC

C9-48

LAUNDRY

ST-1

STAIR

C9-62

ELEC

C9-66

GERIATRIC

C9-68A

TOILET

C9-66A

TOILET

C9-68

BARIATRIC

GERIATRIC

C9-70

CLEAN UTILITY

C9-72

DAY/TV

C9-71

GROUP THERAPY

C9-67

BARIATRIC

GERIATRIC

C9-67A

TOILET

C9-64

NURSE'S STATION

C9-52

SALLY PORT

C9-50

MEETING

C9-45

PATIENT

STORAGE

C9-C07

CORRIDOR

C9-44

WOMEN'S

C9-44A

TOILET

C9-41A

TOILET

C9-41

WOMEN'S

C9-55

MECHANICAL

C9-60

CONFERENCE

C9-54

ELEVATOR LOBBY

C9-61

WORKSTATIONS

C9-43A

TOILET

C9-42

STAFF TOILET

C9-53

ELEC

ST-5

STAIR

C9-58

ELECTRICAL

C9-63

ELEC

C9-51

HAC

C9-65

MED

C9-69

OFFICE

C9-46

LINEN

C9-C08

CORRIDOR

C9-40

MED

E-9

ELEVATOR

E-8

ELEVATOR

E-7

ELEVATOR

C9-56

CLEAN STORAGE

R E:

F

/ 0 1-

F3

R E:

F

/ 0 1-

F3

C9-57

HAC

C9-59

PREFUNCTION/

COLLABORATION

C9-47

OFFICE/ GROUP

ROOM

C9-47A

STORAGE

C9-C09

CORRIDOR

S3

LINEN

CHUTE

H J K L M N O P

C9-17

GROUP THERAPY

C9-18

MEN'S

C9-18A

TOILET

C9-20A

TOILET

C9-20

MEN'S

C9-25A

TOILET

C9-24A

TOILET

C9-25

ANTE ROOMC9-27

NURSE'S STATION

C9-41

WOMEN'S

C9-32

MECHANICAL

C9-31

TELECOM ROOM

C9-28

SALLY PORT

C9-33

STAFF TOILET

C9-35

NURSE'S LOUNGE

C9-36

MECH

ST-3

STAIR

C9-34A

ELEC

C9-34

ELEC

C9-30

ELEVATOR LOBBY

C9-23

ELEVATOR LOBBY

C9-21

SALLY PORT

C9-22

SERVING KITCHEN

C9-19

ELEC

C9-38

EXAM/ INTAKE

C9-26

LOBBY

C9-35A

LOCKERS

C9-29

INTERVIEW

C9-40

MED

C9-C01

CORRIDOR

C9-27A

NURSE'S

WORKROOM

E-5

ELEVATOR

E-6

ELEVATOR

E-4

ELEVATOR

E-3

ELEVATOR

E-2

ELEVATOR

E-1

ELEVATOR

C9-37

TEAMING/

COUNSELING

C9-24

MEN'S

R E:

F

/ 0 1-

F2

R E:

F

/ 0 1-

F4 R

E:

F

/ 0

1- F4

R E:

F

/ 0 1-

F2

C9-25B

SECLUSION ROOM

C9-35B

CLOSET

C9-39

HEAD NURSE

OFFICE

C9-C05

CORRIDOR

C9-C03

CORRIDOR

C9-16

DINING/ ACTIVITIES

Q R S T U V

C9-02

HAC

C9-04A

TOILET

C9-04

MEN'S

ST-2

STAIR

C9-09

ELEC

C9-11

QUIET ROOM

C9-C01

CORRIDOR

C9-13

SOILED UTILITY

C9-15A

TOILET

C9-15

MEN'S BARIATRIC

C9-14

MEN'S

C9-14A

TOILET

C9-12A

TOILET

C9-12

MEN'S C9-08

MEN'S BARIATRIC

C9-08A

TOILET

C9-07

OFFICE

C9-05

TOILET

C9-03

GROUP

COUNSELING ROOM

C9-C02

CORRIDOR

C9-06

MECHANICAL

C9-06A

ELEC

C9-01

EAST SUNROOM

ROOF BELOW

C9-10

LAUNDRY

R E:

F

/ 0 1-

F3 R

E:

F

/ 0

1- F3

S1

SHAFT

S2

SOILED LINEN

CHUTE

SMOKE

COMPARTMENT #1

SMOKE

COMPARTMENT #2

SMOKE

COMPARTMENT #3

FIRE

ALARM

PANEL

CAT 6

SBUSS(NETWORK) 120VAC

MAIN

SIMPLEX

(EXISTING)

FIRE ALARM RISER DIAGRAM - TYPICAL

LEVEL 2

LEVEL 1

THRU LEVEL 9

LEVEL 9

THRU ROOF

SCOPE OF WORK

GENERAL NOTES

PROJECT SCOPE NARRATIVE

THIS IS A MULTI-PHASE PROJECT. AREAS OF THE 9TH FLOOR WILL REMAIN

ACTIVE WHILE AREAS ARE REMODELED. REPLACE ALL FIRE ALARM DEVICES

WITH NEW.

SYSTEM TYPE: ADDRESSABLE VOICE EVACUATION FIRE ALARM SYSTEM

PROJECT SHEET NOTES:

1. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY EQUIPMENT & FIELD DEVICES.

EXACT ROUTING OF CONDUITS TO BE DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE RECORD DRAWINGS.

2. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING APPROVAL FOR ALL NECESSARY

ADJUSTMENTS IN CIRCUITING AS REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT

AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED CHANGE. ALL CHANGES SHALL BE

CLEARLY INDICATED ON THE RECORD DRAWINGS.

3. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT THE JOB SITE AND SHALL BE

USED FOR INSTALLATION.

4. THE POWER CIRCUIT TO THE FACP AND TO THE FIRE ALARM POWER SUPPLIES SHALL BE ON A DEDICATED 120V, 20A BRANCH CIRCUIT BREAKER, AND SHALL HAVE A RED MARKING, LOCK-ON PROVISION AND SHALL BE IDENTIFIED AS "LIFE SAFETY BRANCH CIRCUIT." THE LOCATION OF THE CIRCUIT DISCONNECT MEANS (CIRCUIT BREAKER) SHALL BE PERMANENTLY IDENTIFIED AT THE FIRE

ALARM CONTROL UNIT.

5. DO NOT APPLY POWER EXCEPT IN THE PRESENCE OF A FACTORY TRAINED SIMPLEX TECHNICAL

REPRESENTATIVE.

6. ANY SMOKE DETECTOR HEAD INSTALLED BEFORE THE BUILDING IS CLEANED AND ACCEPTED SHALL

BE COVERED TO PROTECT FROM DUST. ANY FALSE ALARMS DUE TO DIRT CONTAMINATED HEADS

SHALL BE THE RESPONSIBILITY OF THE FIRE ALARM INSTALLER.

7. PROJECT WILL MAINTAIN THE FIRE RESISTANCE INTEGRITY OF ALL WALL, CEILING, AND ROOF

ASSEMBLIES ANY TIME THAT WORK IS NOT ACTIVELY BEING PERFORMED.

8. INSTALLATION OF DEVICES SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

POWER LIMITED AND NON-POWER LIMITED FIELD WIRING MUST BE INSTALLED WITHIN THE FACP

ENCLOSURE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NEC.

9. ALL WIRING SHALL BE INSTALLED ACCORDING TO 2020 NFPA 70 (NEC).

10. FIRE ALARM CIRCUITS SHALL BE IDENTIFIED IN ACCORDANCE WITH APPROPRIATE SECTION OF NEC

760. MARK ALL FIRE ALARM WIRES IN ACCORDANCE WITH NEC 760 SECTIONS FOR POWER LIMITED

AND NON-POWER LIMITED WIRE.

11. FIRE ALARM CABLE SHALL BE INSTALLED IN (RED) 34" EMT CONDUIT RACEWAYS.

12. FIRE ALARM CABLE INSTALLED IN UNDERGROUND CONDUIT OR OTHER WET LOCATIONS SHALL BE UL

LISTED FOR WET LOCATIONS.

13. FIRE ALARM CIRCUITS EXTENDING BEYOND ONE BUILDING AND RUN OUTDOOR SHALL BE INSTALLED

IN ACCORDANCE WITH NFPA 70 ARTICLES 760, 770, 725 AND 800 WHERE APPLICABLE.

14. ALL WIRING, INCLUDING SHIELDS MUST BE DRY AND FREE OF SHORTS AND GROUNDS.

15. ALL SHIELDED WIRE MUST HAVE SHIELD CONTINUITY AT FULL LENGTH OF THE WIRE.

16. ONLY SYSTEM WIRING CAN BE RUN IN THE SAME CONDUIT.

17. 120VAC IS NOT PERMITTED IN THE SAME CONDUIT WITH LOW VOLTAGE WIRING.

18. MAINTAIN 40 PERCENT CONDUIT FILL RATIO AS PER NEC REQUIREMENTS.

A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT

SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.

B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE

LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL

OBSTRUCTIONS.

C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT

SPECIFICATIONS.

D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE

BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER

SURVIVABILITY IS ADDRESSED IN THE DESIGN.

E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH

THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE

DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE

RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL

DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR

APPROVALS.

F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING

CAMPUS SYSTEM EQUIPMENT.

G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY

EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE

DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO

SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON

THE RECORD DRAWINGS.

H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING

APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS

REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT

AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED

CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE

RECORD DRAWINGS.

I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT

THE JOB SITE AND SHALL BE USED FOR INSTALLATION.

K. REFERENCE SHEET 01-I7 FOR PHASING.

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-2050

WWW.VERITASFIRE.COM

48" MAX.

80" MIN.

TO BOTTOM OF

STROBE LENS

42" MIN.

DETECTOR

ACCEPTABLE

HERE

12" MAX.

TOP OF

DETECTOR

ACCEPTABLE

HERE

4" MIN.

WALL MOUNTED

SMOKE DETECTORS

STROBE

UNITS

96" MAX.

TO TOP OF

STROBE LENS

6" MIN.

DOOR

CEILING

FINISHED

FLOOR

WALL

TYPICAL DEVICE MOUNTING HEIGHTS

TOP OF APPLIANCE

90" MINIMUM

AUDIBLE

APPLIANCES

4"

MIN.

MANUAL PULL

STATIONS

(DIMENSIONS

TO HANDLE)

FIRE

CEILING

STROBE

UNITS

MAXIXIUM HEIGHT

FOR STROBE IS 30'

DERATING OF

CANDELA OCCURS

BETWEEN 10 TO 20

FEET THEN AGAIN

BETWEEN 20 AND 30

FEET. SEE 2019 NFPA

72 TABLE 18.5.5.5.1(b)

STROBE

NOT TO SCALE

NOTE: RISER DOES NOT DEPICT THE ACTUAL DEVICE COUNTS. REFERENCE ONLY

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

FIRE ALARM ZONES

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:13

A M

01-F1

FIRE ALARM GENERAL NOTES RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

XX

04/18/2023 KM GW

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 01 of 05 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

C9-43

WOMEN'S

C9-C06

CORRIDOR

C9-49A

TOILET

C9-49

WOMEN'S BARIATRIC

C9-48

LAUNDRY

ST-1

STAIR

C9-62

ELEC

C9-66

GERIATRIC

C9-68A

TOILET

C9-66A

TOILET

C9-68

BARIATRIC

GERIATRIC

C9-70

CLEAN UTILITY

C9-72

DAY/TV

C9-71

GROUP THERAPY

C9-67

BARIATRIC

GERIATRIC

C9-67A

TOILET

C9-64

NURSE'S STATION

C9-52

SALLY PORT

C9-50

MEETING

C9-45

PATIENT

STORAGE

C9-C07

CORRIDOR

C9-44

WOMEN'S

C9-44A

TOILET

C9-41A

TOILET

C9-41

WOMEN'S

C9-55

MECHANICAL

C9-60

CONFERENCE

C9-54

ELEVATOR LOBBY

C9-61

WORKSTATIONS

C9-43A

TOILET

C9-42

STAFF TOILET

C9-53

ELEC

ST-5

STAIR

C9-58

ELECTRICAL

C9-63

ELEC

C9-51

HAC

C9-65

MED

C9-69

OFFICE

C9-46

LINEN

C9-C08

CORRIDOR

C9-40

MED

E-9

ELEVATOR

E-8

ELEVATOR

E-7

ELEVATOR

C9-56

CLEAN STORAGE

R E:

F

/ 0 1-

F3

R E:

F

/ 0 1-

F3

C9-57

HAC

C9-59

PREFUNCTION/

COLLABORATION

C9-47

OFFICE/ GROUP

ROOM

C9-47A

STORAGE

C9-C09

CORRIDOR

S3

LINEN

CHUTE

FIRE ALARM

TRANSPONDER PANEL

LCD ANNUNCIATOR

SMOKE DETECTOR

HEAT DETECTOR

PULL STATION

MONITOR MODULE

SPEAKER/STROBE (CEILING)

CEILING SPEAKER

DOOR HOLDER

VALVE TAMPER SWITCH

STROBE (CEILING)

PULL STATION(UNLOCKED)

(TAMPER GUARD-LOCKED)

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-2050

WWW.VERITASFIRE.COM

00KEYNOTES

DEVICE LEGEND:

A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT

SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.

B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE

LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL

OBSTRUCTIONS.

C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT

SPECIFICATIONS.

D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE

BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER

SURVIVABILITY IS ADDRESSED IN THE DESIGN.

E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH

THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE

DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE

RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL

DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR

APPROVALS.

F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING

CAMPUS SYSTEM EQUIPMENT.

G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY

EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE

DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO

SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON

THE RECORD DRAWINGS.

H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING

APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS

REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT

AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED

CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE

RECORD DRAWINGS.

I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT

THE JOB SITE AND SHALL BE USED FOR INSTALLATION.

K. REFERENCE SHEET 01-I7 FOR PHASING.

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:18

A M

01-F2

FIRE ALARM PLAN - 9TH FLOOR -

WEST

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM GW

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 02 of 05 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

9TH FLOOR FIRE ALARM PLAN - WESTF1

H J K L M N O P

C9-17

GROUP THERAPY

C9-18

MEN'S

C9-18A

TOILET

C9-20A

TOILET

C9-20

MEN'S

C9-25A

TOILET

C9-24A

TOILET

C9-25

ANTE ROOMC9-27

NURSE'S STATION

C9-32

MECHANICAL

C9-31

TELECOM ROOM

C9-28

SALLY PORT

C9-33

STAFF TOILET

C9-35

NURSE'S LOUNGE

C9-36

MECH

ST-3

STAIR

C9-34A

ELEC

C9-34

ELEC

C9-30

ELEVATOR LOBBY

C9-23

ELEVATOR LOBBY

C9-21

SALLY PORT

C9-22

SERVING KITCHEN

C9-19

ELEC

C9-38

EXAM/ INTAKE

C9-26

LOBBY

C9-35A

LOCKERS

C9-29

INTERVIEW

C9-C01

CORRIDOR

C9-27A

NURSE'S

WORKROOM

E-5

ELEVATOR

E-6

ELEVATOR

E-4

ELEVATOR

E-3

ELEVATOR

E-2

ELEVATOR

E-1

ELEVATOR

C9-37

TEAMING/

COUNSELING

C9-24

MEN'S

R E:

F

/ 0 1-

F2

R E:

F

/ 0 1-

F4 R

E:

F

/ 0

1- F4

R E:

F

/ 0 1-

F2

C9-25B

SECLUSION ROOM

C9-35B

CLOSET

C9-39

HEAD NURSE

OFFICE

C9-C05

CORRIDOR

C9-C03

CORRIDOR

C9-16

DINING/ ACTIVITIES

FIRE ALARM

TRANSPONDER PANEL

LCD ANNUNCIATOR

SMOKE DETECTOR

HEAT DETECTOR

PULL STATION

MONITOR MODULE

SPEAKER/STROBE (CEILING)

CEILING SPEAKER

DOOR HOLDER

VALVE TAMPER SWITCH

STROBE (CEILING)

PULL STATION(UNLOCKED)

(TAMPER GUARD-LOCKED)

3/16" = 1'-0"

9TH FLOOR FIRE ALARM PLAN - CENTERF1

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-2050

WWW.VERITASFIRE.COM

DEVICE LEGEND:

A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT

SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.

B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE

LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL

OBSTRUCTIONS.

C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT

SPECIFICATIONS.

D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE

BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER

SURVIVABILITY IS ADDRESSED IN THE DESIGN.

E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH

THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE

DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE

RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL

DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR

APPROVALS.

F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING

CAMPUS SYSTEM EQUIPMENT.

G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY

EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE

DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO

SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON

THE RECORD DRAWINGS.

H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING

APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS

REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT

AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED

CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE

RECORD DRAWINGS.

I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT

THE JOB SITE AND SHALL BE USED FOR INSTALLATION.

K. REFERENCE SHEET 01-I7 FOR PHASING.

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:23

A M

01-F3

FIRE ALARM PLAN - 9TH FLOOR -

CENTER

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM GW

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 03 of 05 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

9TH FLOOR FIRE ALARM PLAN - CENTERF1

Q R S T U V

C9-02

HAC

C9-04A

TOILET

C9-04

MEN'S

ST-2

STAIR

C9-09

ELEC

C9-11

QUIET ROOM

C9-C01

CORRIDOR

C9-13

SOILED UTILITY

C9-15A

TOILET

C9-15

MEN'S BARIATRIC

C9-14

MEN'S

C9-14A

TOILET

C9-12A

TOILET

C9-12

MEN'S C9-08

MEN'S BARIATRIC

C9-08A

TOILET

C9-07

OFFICE

C9-05

TOILET

C9-03

GROUP

COUNSELING ROOM

C9-C02

CORRIDOR

C9-06

MECHANICAL

C9-06A

ELEC

C9-01

EAST SUNROOM

ROOF BELOW

C9-10

LAUNDRY

R E:

F

/ 0 1-

F3 R

E:

F

/ 0

1- F3

S1

SHAFT

S2

SOILED LINEN

CHUTE

FIRE ALARM

TRANSPONDER PANEL

LCD ANNUNCIATOR

SMOKE DETECTOR

HEAT DETECTOR

PULL STATION

MONITOR MODULE

SPEAKER/STROBE (CEILING)

CEILING SPEAKER

DOOR HOLDER

VALVE TAMPER SWITCH

STROBE (CEILING)

PULL STATION(UNLOCKED)

(TAMPER GUARD-LOCKED)

P

C9-17

GROUP THERAPY

C9-C01

CORRIDOR

R E:

F

/ 0 1-

F4 R

E:

F

/ 0

1- F4

Q R S T U V

C9-02

HAC

C9-04A

TOILET

C9-04

MEN'S

ST-2

STAIR

C9-09

ELEC

C9-11

QUIET ROOM

C9-C01

CORRIDOR

C9-13

SOILED UTILITY

C9-15A

TOILET

C9-15

MEN'S BARIATRIC

C9-14

MEN'S

C9-14A

TOILET

C9-12A

TOILET

C9-12

MEN'S C9-08

MEN'S BARIATRIC

C9-08A

TOILET

C9-07

OFFICE

C9-05

TOILET

C9-03

GROUP

COUNSELING ROOM

C9-C02

CORRIDOR

C9-06

MECHANICAL

C9-06A

ELEC

C9-01

EAST SUNROOM

ROOF BELOW

C9-10

LAUNDRY

R E:

F

/ 0 1-

F3 R

E:

F

/ 0

1- F3

S1

SHAFT

S2

SOILED LINEN

CHUTE

3/16" = 1'-0"

9TH FLOOR FIRE ALARM PLAN - EASTF1

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-2050

WWW.VERITASFIRE.COM

A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT

SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.

B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE

LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL

OBSTRUCTIONS.

C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT

SPECIFICATIONS.

D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE

BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER

SURVIVABILITY IS ADDRESSED IN THE DESIGN.

E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH

THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE

DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE

RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL

DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR

APPROVALS.

F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING

CAMPUS SYSTEM EQUIPMENT.

G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY

EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE

DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO

SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON

THE RECORD DRAWINGS.

H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING

APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS

REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT

AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED

CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE

RECORD DRAWINGS.

I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT

THE JOB SITE AND SHALL BE USED FOR INSTALLATION.

K. REFERENCE SHEET 01-I7 FOR PHASING.

00KEYNOTES

DEVICE LEGEND:

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:26

A M

01-F4

FIRE ALARM PLAN - 9TH FLOOR -

EAST

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM GW

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 04 of 05 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

9TH FLOOR FIRE ALARM PLAN - EASTF1

T

T

T

T

T

T

T

T

T

DN

W X Y Z

L1-111

CONFERENCE

L1-103

OPEN OFFICE

L1-110

OFFICE

L1-109

OFFICE

L1-108

OFFICE

L1-107

OFFICE

L1-105

TOILET

L1-104

COPY/LOCKERS

L1-102

SECRETARY

L1-112

MECH

L1-100

STORAGE

L1-100G

TOILET

L1-100H

OFFICE

L1-100A

ELECL1-102A

CLOSET

L1-100J

LOADING DOCK

L1-100F

LOCKERS

L1-106

TOILET

100 SF

L1-100E

TELECOM ROOM

FIRE ALARM

TRANSPONDER PANEL

LCD ANNUNCIATOR

SMOKE DETECTOR

HEAT DETECTOR

PULL STATION

MONITOR MODULE

SPEAKER/STROBE (CEILING)

CEILING SPEAKER

DOOR HOLDER

VALVE TAMPER SWITCH

STROBE (CEILING)

PULL STATION(UNLOCKED)

(TAMPER GUARD-LOCKED)

3/16" = 1'-0"

WAREHOUSE FIRE ALARM PLANF4

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-2050

WWW.VERITASFIRE.COM

DEVICE LEGEND:

A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT

SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.

B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE

LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL

OBSTRUCTIONS.

C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT

SPECIFICATIONS.

D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE

BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER

SURVIVABILITY IS ADDRESSED IN THE DESIGN.

E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH

THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE

DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE

RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL

DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR

APPROVALS.

F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING

CAMPUS SYSTEM EQUIPMENT.

G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY

EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE

DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO

SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON

THE RECORD DRAWINGS.

H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING

APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS

REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT

AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED

CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE

RECORD DRAWINGS.

I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT

THE JOB SITE AND SHALL BE USED FOR INSTALLATION.

K. REFERENCE SHEET 01-I7 FOR PHASING.

Pl an

N or th Tr ue N or th

BASEMENT

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

17-F5

FIRE ALARM PLAN - WAREHOUSE RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM GW

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 05 of 05 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

WAREHOUSE FIRE ALARM PLANF4

SPRINKLER HEAD

FLEXIBLE ARM-OVER

CEILING

TILE

T-BAR BRACKET "B"

12"12"

12"12"

PLAN VIEW

SPRINKLER HEAD POSITION AT ACOUSTIC

CEILING TILES

2'x4' TILE

2'x2' TILE

ORDINARY GROUP 1

HAZARD

.15 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

LIGHT HAZARD

.10 GPM / 1500 SQ. FT

100 GPM HOSE

WET SYSTEM

ORDINARY GROUP 2

HAZARD

.20 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

SYM POSITION FINISH TEMP K NPT MFG. MODEL#

PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB

UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB

SEMI-RECESSED - QR

UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B

EXPOSED - QR

*OR EQUIVALENT *

PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC

A B C D E F G

C9-43

WOMEN'S

C9-C06

CORRIDOR

C9-49A

TOILET

C9-49

WOMEN'S BARIATRIC

C9-48

LAUNDRY

ST-1

STAIR

C9-62

ELEC

C9-66

GERIATRIC

C9-68A

TOILET

C9-66A

TOILET

C9-68

BARIATRIC

GERIATRIC

C9-70

CLEAN UTILITY

C9-72

DAY/TV

C9-71

GROUP THERAPY

C9-67

BARIATRIC

GERIATRIC

C9-67A

TOILET

C9-64

NURSE'S STATION

C9-52

SALLY PORT

C9-50

MEETING

C9-45

PATIENT

STORAGE

C9-C07

CORRIDOR

C9-44

WOMEN'S

C9-44A

TOILET

C9-41A

TOILET

C9-41

WOMEN'S

C9-55

MECHANICAL

C9-60

CONFERENCE

C9-54

ELEVATOR LOBBY

C9-61

WORKSTATIONS

C9-43A

TOILET

C9-42

STAFF TOILET

C9-53

ELEC

ST-5

STAIR

C9-58

ELECTRICAL

C9-63

ELEC

C9-51

HAC

C9-65

MED

C9-69

OFFICE

C9-46

LINEN

C9-C08

CORRIDOR

C9-40

MED

ROOF BELOW

E-9

ELEVATOR

E-8

ELEVATOR

E-7

ELEVATOR

C9-56

CLEAN STORAGE

R E:

F

/ 0 1-

F8

R E:

F

/ 0 1-

F8

C9-57

HAC

C9-59

PREFUNCTION/

COLLABORATION

C9-47

OFFICE/ GROUP

ROOM

C9-47A

STORAGE

C9-C09

CORRIDOR

S3

LINEN

CHUTE

H J K L M N O P

C9-17

GROUP THERAPY

C9-18

MEN'S

C9-18A

TOILET

C9-20A

TOILET

C9-20

MEN'S

C9-25A

TOILET

C9-24A

TOILET

C9-25

ANTE ROOMC9-27

NURSE'S STATION

C9-41

WOMEN'S

C9-32

MECHANICAL

C9-31

TELECOM ROOM

C9-28

SALLY PORT

C9-33

STAFF TOILET

C9-35

NURSE'S LOUNGE

C9-36

MECH

ST-3

STAIR

C9-34A

ELECC9-34

ELEC

C9-30

ELEVATOR LOBBY

C9-23

ELEVATOR LOBBY

C9-21

SALLY PORT

C9-22

SERVING KITCHEN

C9-19

ELEC

C9-38

EXAM/ INTAKE

C9-26

LOBBY

C9-35A

LOCKERS

C9-29

INTERVIEW

C9-40

MED

C9-C01

CORRIDOR

C9-27A

NURSE'S

WORKROOM

E-5

ELEVATOR

E-6

ELEVATOR

E-4

ELEVATOR

E-3

ELEVATOR

E-2

ELEVATOR

E-1

ELEVATOR

C9-37

TEAMING/

COUNSELING

C9-24

MEN'S

R E:

F

/ 0 1-

F7

R E:

F

/ 0 1-

F9 R

E:

F

/ 0

1- F9

R E:

F

/ 0 1-

F7

C9-25B

SECLUSION ROOM

C9-35B

CLOSET

C9-39

HEAD NURSE

OFFICE

C9-C05

CORRIDOR

C9-C03

CORRIDOR

C9-16

DINING/ ACTIVITIES

Q R S T U V

C9-02

HAC

C9-04A

TOILET

C9-04

MEN'S

ST-2

STAIR

C9-09

ELEC

C9-11

QUIET ROOM

C9-C01

CORRIDOR

C9-13

SOILED UTILITY

C9-15A

TOILET

C9-15

MEN'S BARIATRIC

C9-14

MEN'S

C9-14A

TOILET

C9-12A

TOILET

C9-12

MEN'S C9-08

MEN'S BARIATRIC

C9-08A

TOILET

C9-07

OFFICE

C9-05

TOILET

C9-03

GROUP

COUNSELING ROOM

C9-C02

CORRIDOR

C9-06

MECHANICAL

C9-06A

ELEC

C9-01

EAST SUNROOM

ROOF BELOW

C9-10

LAUNDRY

R E:

F

/ 0 1-

F8 R

E:

F

/ 0

1- F8

S1

SHAFT

S2

SOILED LINEN

CHUTE

SMOKE

COMPARTMENT #1

SMOKE

COMPARTMENT #2

SMOKE

COMPARTMENT #3

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:27

A M

01-F6

FIRE PROTECTION GENERAL

NOTES

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

XX

04/18/2023 KM BE

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 01 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

SPRINKLER HEAD POSITION

SPRINKLER HAZARD

FIRE PROTECTION DESIGN INFORMATION

MINIMUM SPRINKLER WATER SUPPLY REQUIREMENTS

1500 SQ.FT. x .15 GPM/SQ.FT + PRESS BALANCE ` = 300 GPM

INSIDE AND OUTSIDE HOSE STREAM = 250 GPM

TOTAL WATER DEMAND = 550 GPM

HYDRAULIC CALCULATIONS SHALL BE BASED ON A CURRENT FIRE HYDRANT

FLOW TEST. REMOTE AREA REDUCTION IS ALLOWED PER VA GUIDELINES

ALL THREAD ROD

TOP BEAM CLAMP

MAXIMUM DISTANCE BETWEEN HANGERS

HANGER RING

HANGER DETAIL

1" 1-1/4" 1-1/2" 2"NOMINAL PIPE

STEEL PIPE

THREADED LIGHTWALL

STEEL PIPE EXCEPT

THREADED LIGHTWALL 12-0

12-0

12-0

12-0

15-0

12-0 12-0

15-0

4"

N/A

15-0

2-1/2"

15-0

N/A

3"

15-0

N/A

HANGER DETAIL

FIRE PUMP TEST RESULTS

DATES FLOWED - 07/27/2021

PERFORMED BY: JOHNSON CONTROLS

SPRINKLER HEAD LEGEND SPRINKLER FLEX HEAD

SYMBOL LEGEND

SYSTEM RISER

SHEET NOTEX

CONTROL VALVE

SCOPE OF WORK

PROVIDE A WET PIPE SPRINKLER SYSTEM INTO THE 9TH FLOOR OF THE EXISTING BUILDING. THE SCOPE INCLUDES REMOVAL / DEMO OF ALL EXISTING FIRE SPRINKLER PIPING, HEADS, HANGERS AND EQUIPMENT ASSOCIATED WITH THE SPRINKLER SYSTEM BACK TO STANDPIPE PIPE CONNECTION IN STAIRS 3 AND 5. WET

PIPE SYSTEMS SHALL MATCH ALL SMOKE COMPARTMENTS PER DESIGN DOCUMENTS.

GENERAL NOTES

1. DESIGN SHALL BE BASED ON LIGHT/ORDINARY HAZARD OCCUPANCY PER NFPA 13 2019 AND VA FIRE

PROTECTION DESIGN MANUAL, 8TH EDITION - JUNE 2021

2. WATER SUPPLY SHALL BE VERIFIED BY INSTALLING CONTRACTOR. WATER FLOW SHALL BE WITHIN 12

MONTHS OF INSTALLATION.

3. FIRE SUPPRESSION SYSTEM TO BE HYDRAULICALLY CALCULATED BASED ON NFPA 13, WITH A SAFETY

FACTOR MUST BE INCLUDED BY CALCULATING THE DEMAND TO A POINT NO GREATER THAN 10%

BELOW THE AVAILABLE WATER SUPPLY CURVE. OR, A TEN PERCENT SAFETY FACTOR MUST BE

PROVIDED (SUBTRACT 10% FROM THE AVAILABLE WATER SUPPLY CURVE) FOR EACH SPRINKLER

DEMAND INCLUDING THE REQUIRED HOSE STREAMS.

4. THE COMBINED REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS ARE APPLICABLE TO THE

DESIGN AND INSTALLATION OF THIS SYSTEM.

5. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF

A COMPLETE AND PROPERLY FUNCTIONING FIRE SPRINKLER SYSTEM.

6. THE EQUIPMENT SPECIFIED ON THE DRAWINGS HAS BEEN SELECTED AS THE BASIS FOR DESIGN. THE USE OF REVIEWED OR SPECIFIED EQUALS SHALL BE COORDINATED BY THE CONTRACTOR FOR SPACE

REQUIREMENTS, EQUIPMENT DIMENSIONS AND PERFORMANCE.

7. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL DESIGN, ARRANGEMENT AND EXTENT OF

THE SYSTEMS. DO NOT SCALE DRAWINGS NOR USE AS SHOP DRAWINGS. WHERE ALTERNATE

ROUTING, OFFSETS AND TRANSITIONS ARE REQUIRED FOR THE COORDINATION OF ALL WORK, THE

CONTRACTOR SHALL MAKE CHANGES WITHOUT ADDITIONAL COSTS.

8. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW EQUIPMENT AND

PIPING WITH ALL OTHER TRADES PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND SYSTEM

INSTALLATION, SO AS NOT TO INTERFERE WITH THE ROUTING OF NEW DUCTWORK, PLUMBING,

PIPING, ETC. CONTRACTOR SHALL REVIEW ALL PROJECT DOCUMENTS INCLUDING, BUT NOT LIMITED

TO, THE FOLLOWING: ARCHITECTURAL, ELECTRICAL, MECHANICAL, STRUCTURAL, SITE/CIVIL

DOCUMENTS FOR THE COORDINATION OF THE SPRINKLER SYSTEM DESIGN AND INSTALLATION.

9. SEAL ALL PENETRATIONS THROUGH FIRE-RESISTANCE RATED WALLS, CEILINGS AND FLOORS WITH UL LISTED ASSEMBLIES AS REQUIRED TO MAINTAIN THE INTEGRITY OF THE FIRE-RESISTANCE RATING.

10. PROVIDE ALL FITTINGS, RISER NIPPLES, ARM-OVERS, HANGERS, ETC. TO MAINTAIN CONFORMANCE WITH APPLICABLE STANDARDS AND TO POSITION THE SPRINKLER HEADS IN THE PROPER LOCATIONS.

11. THE FIRE SPRINKLER CONTRACTOR SHALL SECURE THE SITE FLOW TEST INFORMATION AND

DOCUMENTATION FROM THE LOCAL WATER DEPARTMENT PRIOR TO THE DESIGN OF THE FIRE

SPRINKLER SYSTEM. THE WATER FLOW TEST SHALL BE NO OLDER THAN ONE YEAR FROM THE DATE

OF SYSTEM INSTALLATION.

12. SPRINKLERS SHALL BE SPACED PER NFPA 13 REGARDING OBSTRUCTIONS, BEAM POCKETS, HVAC

DUCTWORK, PENETRATIONS AND ANY OTHER CLEARANCE RELATED ITEMS. CONTRACTOR SHALL

VERIFY ALL SPACING AND OBSTRUCTIONS PRIOR TO INSTALLATION.

13. INSTALL SPRINKLERS IN THE CENTER OR QUARTER POINT OF CEILING TILES, WHERE APPLICABLE.

14. SPRINKLER CONTRACTOR TO COORDINATE SPRINKLER HEAD FINISHES WITH OWNER PRIOR TO THE

PURCHASE AND INSTALLATION OF SPRINKLERS.

15. FIRE SPRINKLER SHOP DRAWINGS SHALL LOCATE AND DESCRIBE GUIDES, ANCHORS AND HANGERS FOR ALL PIPING. FIRE SPRINKLER SHOP DRAWINGS TO PROVIDE PROTECTION FOR UNDERNEATH

DUCTWORK AND OTHER OBSTRUCTIONS AS NEEDED.

16. FIRE SPRINKLER SHOP DRAWINGS SHALL PROVIDE DIMENSIONALLY LOCATED PIPE MAINS AND BRANCH LINES TO FACILITIES STRUCTURE SUCH AS COLUMN LINES, WALLS, RECOGNIZED BENCH

MARKS, ETC.

17. ALL SPRINKLER HEADS INSTALLED SHALL BE NEW.

18. PROVIDE FIELD COORDINATION OF PIPING AND SPRINKLER HEAD INSTALLATIONS WITH EXISTING

DUCTWORK, LIGHTS, SMOKE DETECTORS, DIFFUSERS, ETC.

19. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO

PURCHASE OF ANY MATERIALS AND THE COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL

NOTIFY THE ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION.

20. COORDINATE ANY REQUIRED SPRINKLER SYSTEM RISER SHUTDOWNS THAT OCCUR DURING

CONSTRUCTION WITH ARCHITECT, OWNER, AND AHJ PRIOR TO PERIOD OF SHUTDOWN.

21. PHASE COORDINATION WILL FOLLOWING SHEETS 01-I7.

22. 3.12 CHUTES: LINEN CHUTES AND WASTE CHUTES MUST COMPLY WITH THE PROVISIONS IN NFPA 82

FOR LIMITED ACCESS GRAVITY CHUTES.

CODE ANALYSIS

SPRINKLER SYSTEM TYPE: WET

NFPA 13: 2019

VA FIRE PROTECTION DESIGN MANUAL, 8TH EDITION

SPRINKLER SYMBOL LEGEND

FLOW SWITCH

TAMPER SWITCH

ITT-A-C 750SPLIT CASE

UNKNOWN N/AINLINE

MANUFACTURER MODEL GPMTYPE HEAD IMP MOTOR HP RPM VOLT/PH/HZ WEIGHT

CLARKE DETROIT

N/A

MAKE

N/A

N/A N/A N/A

110/NA/NA

208-460/3/60

N/A N/A

FIRE PUMP

JOCKEY PUMP

EXISTING FIRE PUMP RATING

N/A

2500/PDFP

*TEST RESULTS AS OF 7/27/2021

POWER TYPE

DIESEL DRIVEN

ELECTRIC

CONTROLLER - FIRETROL

FIRE PUMP JOCKEY PUMP

START

STOP

FIRE SPRINKLER ZONES

FIRE PROTECTION DESIGN INFORMATION

MINIMUM SPRINKLER WATER SUPPLY REQUIREMENTS

1500 SQ.FT. x .10 GPM/SQ.FT + PRESS BALANCE = 180 GPM

INSIDE AND OUTSIDE HOSE STREAM = 100 GPM

TOTAL WATER DEMAND = 280 GPM

HYDRAULIC CALCULATIONS SHALL BE BASED ON A CURRENT FIRE HYDRANT

FLOW TEST. REMOTE AREA REDUCTION IS ALLOWED PER VA GUIDELINES

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-3300

WWW.VERITASFIRE.COM

C9-43

WOMEN'S

C9-C06

CORRIDOR

C9-49A

TOILET

C9-49

WOMEN'S BARIATRIC

C9-48

LAUNDRY

ST-1

STAIR

C9-62

ELEC

C9-66

GERIATRIC

C9-68A

TOILET

C9-66A

TOILET

C9-68

BARIATRIC

GERIATRIC

C9-70

CLEAN UTILITY

C9-72

DAY/TV

C9-71

GROUP THERAPY

C9-67

BARIATRIC

GERIATRIC

C9-67A

TOILET

C9-64

NURSE'S STATION

C9-52

SALLY PORT

C9-50

MEETING

C9-45

PATIENT

STORAGE

C9-C07

CORRIDOR

C9-44

WOMEN'S

C9-44A

TOILET

C9-41A

TOILET

C9-41

WOMEN'S

C9-55

MECHANICAL

C9-60

CONFERENCE

C9-54

ELEVATOR LOBBY

C9-61

WORKSTATIONS

C9-43A

TOILET

C9-42

STAFF TOILET

C9-53

ELEC

ST-5

STAIR

C9-58

ELECTRICAL

C9-63

ELEC

C9-51

HAC

C9-65

MED

C9-69

OFFICE

C9-46

LINEN

C9-C08

CORRIDOR

C9-40

MED

ROOF BELOW

E-9

ELEVATOR

E-8

ELEVATOR

E-7

ELEVATOR

C9-56

CLEAN STORAGE

R E:

F

/ 0 1-

F8

R E:

F

/ 0 1-

F8

C9-57

HAC

C9-59

PREFUNCTION/

COLLABORATION

C9-47

OFFICE/ GROUP

ROOM

C9-47A

STORAGE

C9-C09

CORRIDOR

S3

LINEN

CHUTE

H

C9-27

NURSE'S STATION

C9-41

WOMEN'S

C9-38

EXAM/ INTAKE

C9-26

LOBBY

C9-40

MED

C9-27A

NURSE'S

WORKROOM

R E:

F

/ 0 1-

F7

R E:

F

/ 0 1-

F7

C9-39

HEAD NURSE

OFFICE

C9-C05

CORRIDOR

ORDINARY GROUP 1

HAZARD

.15 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

LIGHT HAZARD

.10 GPM / 1500 SQ. FT

100 GPM HOSE

WET SYSTEM

ORDINARY GROUP 2

HAZARD

.20 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

HAZARD PLAN - 9TH FLOOR - WEST 100% CONSTRUCTION

DOCUMENTS

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:31

A M

01-F7

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM BEVEG 19.25 DWG 02 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL

3/16" = 1'-0"

9TH FLOOR HAZARD PLAN - WESTF1

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

SPRINKLER HAZARD

A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES

WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.

B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED

SPRINKLER EQUIPMENT TO BE REMOVED

C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL

RATINGS.

D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)

E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT

SPECIFICATIONS.

F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE

WITH PROJECT SPECIFICATIONS.

G. COORDINATION WITH OTHER TRADES SHALL BE DONE.

H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"

BELOW DEFLECTOR.

I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION

TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.

J. REFERENCE GI SHEETS FOR PHASING

K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

H J K L M N O P

C9-17

GROUP THERAPY

C9-18

MEN'S

C9-18A

TOILET

C9-20A

TOILET

C9-20

MEN'S

C9-25A

TOILET

C9-24A

TOILET

C9-25

ANTE ROOMC9-27

NURSE'S STATION

C9-32

MECHANICAL

C9-31

TELECOM ROOM

C9-28

SALLY PORT

C9-33

STAFF TOILET

C9-35

NURSE'S LOUNGE

C9-36

MECH

ST-3

STAIR

C9-34A

ELECC9-34

ELEC

C9-30

ELEVATOR LOBBY

C9-23

ELEVATOR LOBBY

C9-21

SALLY PORT

C9-22

SERVING KITCHEN

C9-19

ELEC

C9-38

EXAM/ INTAKE

C9-26

LOBBY

C9-35A

LOCKERS

C9-29

INTERVIEW

C9-C01

CORRIDOR

C9-27A

NURSE'S

WORKROOM

E-5

ELEVATOR

E-6

ELEVATOR

E-4

ELEVATOR

E-3

ELEVATOR

E-2

ELEVATOR

E-1

ELEVATOR

C9-37

TEAMING/

COUNSELING

C9-24

MEN'S

R E:

F

/ 0 1-

F7

R E:

F

/ 0 1-

F9 R

E:

F

/ 0

1- F9

C9-25B

SECLUSION ROOM

C9-35B

CLOSET

C9-39

HEAD NURSE

OFFICE

C9-C05

CORRIDOR

C9-C03

CORRIDOR

C9-16

DINING/ ACTIVITIES

R E:

F

/ 0 1-

F8 R

E:

F

/ 0

1- F8

ORDINARY GROUP 1

HAZARD

.15 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

LIGHT HAZARD

.10 GPM / 1500 SQ. FT

100 GPM HOSE

WET SYSTEM

ORDINARY GROUP 2

HAZARD

.20 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:35

A M

01-F8

HAZARD PLAN - 9TH FLOOR -

CENTER

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM BE

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 03 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL

3/16" = 1'-0"

9TH FLOOR HAZARD PLAN - CENTERF1

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

SPRINKLER HAZARD

A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES

WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.

B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED

SPRINKLER EQUIPMENT TO BE REMOVED

C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL

RATINGS.

D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)

E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT

SPECIFICATIONS.

F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE

WITH PROJECT SPECIFICATIONS.

G. COORDINATION WITH OTHER TRADES SHALL BE DONE.

H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"

BELOW DEFLECTOR.

I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION

TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.

J. REFERENCE GI SHEETS FOR PHASING

K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

ORDINARY GROUP 1

HAZARD

.15 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

LIGHT HAZARD

.10 GPM / 1500 SQ. FT

100 GPM HOSE

WET SYSTEM

ORDINARY GROUP 2

HAZARD

.20 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

Q R S T U V

C9-02

HAC

C9-04A

TOILET

C9-04

MEN'S

ST-2

STAIR

C9-09

ELEC

C9-11

QUIET ROOM

C9-C01

CORRIDOR

C9-13

SOILED UTILITY

C9-15A

TOILET

C9-15

MEN'S BARIATRIC

C9-14

MEN'S

C9-14A

TOILET

C9-12A

TOILET

C9-12

MEN'S C9-08

MEN'S BARIATRIC

C9-08A

TOILET

C9-07

OFFICE

C9-05

TOILET

C9-03

GROUP

COUNSELING ROOM

C9-C02

CORRIDOR

C9-06

MECHANICAL

C9-06A

ELEC

C9-01

EAST SUNROOM

ROOF BELOW

C9-10

LAUNDRY

R E:

F

/ 0 1-

F8 R

E:

F

/ 0

1- F8

S1

SHAFT

S2

SOILED LINEN

CHUTE

SPRINKLER HAZARD

A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES

WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.

B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED

SPRINKLER EQUIPMENT TO BE REMOVED

C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL

RATINGS.

D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)

E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT

SPECIFICATIONS.

F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE

WITH PROJECT SPECIFICATIONS.

G. COORDINATION WITH OTHER TRADES SHALL BE DONE.

H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"

BELOW DEFLECTOR.

I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION

TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.

J. REFERENCE GI SHEETS FOR PHASING

K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:38

A M

01-F9

HAZARD PLAN - 9TH FLOOR - EAST RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM BE

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 04 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL

3/16" = 1'-0"

9TH FLOOR HAZARD PLAN - EASTF1

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

ORDINARY GROUP 1

HAZARD

.15 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

LIGHT HAZARD

.10 GPM / 1500 SQ. FT

100 GPM HOSE

WET SYSTEM

ORDINARY GROUP 2

HAZARD

.20 GPM / 1500 SQ. FT

250 GPM HOSE

WET SYSTEM

DN

W X Y Z

L1-111

CONFERENCE

L1-103

OPEN OFFICE

L1-110

OFFICE

L1-109

OFFICE

L1-108

OFFICE

L1-107

OFFICE

L1-105

TOILET

L1-104

COPY/LOCKERS

L1-102

SECRETARY

L1-112

MECH

L1-100

STORAGE

L1-100G

TOILET

L1-100H

OFFICE

L1-100A

ELECL1-102A

CLOSET

L1-100J

LOADING DOCK

L1-100F

LOCKERS

L1-106

TOILET

100 SF

L1-100E

TELECOM ROOM

Pl an

N or th Tr ue N or th

BASEMENT

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:01

A M

17-F10

HAZARD PLAN - WAREHOUSE RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM BE

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 05 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL

3/16" = 1'-0"

WAREHOUSE HAZARD PLANF4

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

SPRINKLER HAZARD

A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES

WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.

B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED

SPRINKLER EQUIPMENT TO BE REMOVED

C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL

RATINGS.

D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)

E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT

SPECIFICATIONS.

F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE

WITH PROJECT SPECIFICATIONS.

G. COORDINATION WITH OTHER TRADES SHALL BE DONE.

H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"

BELOW DEFLECTOR.

I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION

TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.

J. REFERENCE GI SHEETS FOR PHASING

K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

C9-72

DAY/TV

C9-71

GROUP THERAPY

C9-67

BARIATRIC

GERIATRIC

C9-70

CLEAN UTILITY

C9-69

OFFICE C9-68

BARIATRIC

GERIATRIC C9-66

GERIATRIC

C9-49

WOMEN'S BARIATRIC

C9-43

WOMEN'S

C9-40

MED

C9-41

WOMEN'S

C9-44

WOMEN'S

C9-C07

CORRIDOR

C9-46

LINEN

C9-45

PATIENT STORAGE

C9-50

MEETING

C9-52

SALLY PORT

C9-64

NURSE'S STATION

C9-65

MED

C9-C08

CORRIDOR

C9-C06

CORRIDOR

C9-61

WORKSTATIONS

C9-60

CONFERENCE

C9-54

ELEVATOR LOBBY

C9-55

MECHANICAL

ST-1

STAIR

ST-5

STAIR

C9-58

ELECTRICAL

C9-53

ELEC

C9-48

LAUNDRY

C9-49A

TOILET

C9-63

ELEC

C9-62

ELEC C9-51

HAC

C9-67A

TOILET

C9-68A

TOILET

C9-66A

TOILET

C9-42

STAFF TOILET

C9-43A

TOILET

C9-41A

TOILET

C9-44A

TOILET

E-9

ELEVATOR

E-8

ELEVATOR

E-7

ELEVATOR

C9-56

CLEAN STORAGE

R E:

F

/ 0 1-

F1

R E:

F

/ 0 1-

F1

C9-C09

CORRIDOR

C9-57

HAC

C9-59

PREFUNCTION/

COLLABORATION

C9-47A

STORAGE

C9-47

OFFICE/ GROUP

ROOM

R E:

F

/ 0 1-

F1

C9-39

HEAD NURSE

OFFICE

C9-C05

CORRIDOR

R E:

F

/ 0 1-

F1

SYM POSITION FINISH TEMP K NPT MFG. MODEL#

PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB

UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB

SEMI-RECESSED - QR

UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B

EXPOSED - QR

*OR EQUIVALENT *

PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:45

A M

01-F11

FIRE PROTECTION PLAN - 9TH

FLOOR - WEST

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM BE

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 06 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

9TH FLOOR FIRE PROTECTION PLAN - WESTF1

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

1. EXISTING 6" SPRINKLER STANDPIPE.

2. EXISTING 2-1/2" CONTROL VALVES TO FEED 1980'S BUILDINGS

ADDITION.

3. PROVIDE NEW CONTROL ZONE ASSEMBLY FOR SMOKE

COMPARTMENT

4. VERIFY EXISTING LINEN CHUTES ARE PROTECTED PER NFPA 13

A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES

WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.

B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED

SPRINKLER EQUIPMENT TO BE REMOVED

C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL

RATINGS.

D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)

E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT

SPECIFICATIONS.

F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE

WITH PROJECT SPECIFICATIONS.

G. COORDINATION WITH OTHER TRADES SHALL BE DONE.

H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"

BELOW DEFLECTOR.

I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION

TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.

J. REFERENCE GI SHEETS FOR PHASING

K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.

L. REFERENCE ARCHITECTURAL SHEETS AE125 - AE128 FOR CEILING

ELEVATION.

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-3300

WWW.VERITASFIRE.COM

SPRINKLER HEAD LEGEND

1 2 x3 x3

H J K L M N O P

C9-27

NURSE'S STATION

C9-27A

NURSE'S

WORKROOM

C9-25

ANTE ROOM

C9-24

MEN'S

C9-20

MEN'S

C9-18

MEN'S

C9-17

GROUP THERAPY

C9-16

DINING/ ACTIVITIES

C9-22

SERVING KITCHEN

C9-21

SALLY PORT

C9-23

ELEVATOR LOBBY

C9-30

ELEVATOR LOBBY

C9-31

TELECOM ROOM

C9-32

MECHANICAL

C9-28

SALLY PORT

C9-29

INTERVIEW

C9-33

STAFF TOILET

C9-35

NURSE'S LOUNGE

C9-35A

LOCKERS

C9-36

MECH

C9-26

LOBBY

C9-38

EXAM/ INTAKE

C9-19

ELEC

ST-3

STAIR

C9-25A

TOILET

C9-24A

TOILET

C9-18A

TOILET

C9-20A

TOILET

C9-34

ELEC C9-34A

ELEC

E-4

ELEVATOR

E-3

ELEVATOR

E-2

ELEVATOR

E-1

ELEVATOR

E-5

ELEVATOR

E-6

ELEVATOR

C9-37

TEAMING/

COUNSELING

R E:

F

/ 0 1-

F1

R E:

F

/ 0 1-

F1

R E:

F

/ 0 1-

F1

C9-39

HEAD NURSE

OFFICE

C9-C05

CORRIDOR

C9-25B

SECLUSION ROOM

C9-C03

CORRIDOR

C9-C04

CORRIDOR

C9-35B

CLOSET

C9-C01

CORRIDOR

R E:

F

/ 0 1-

F1

SYM POSITION FINISH TEMP K NPT MFG. MODEL#

PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB

UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB

SEMI-RECESSED - QR

UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B

EXPOSED - QR

*OR EQUIVALENT *

PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:52

A M

01-F12

FIRE PROTECTION PLAN - 9TH

FLOOR - CENTER

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM BE

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 07 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

9TH FLOOR FIRE PROTECTION PLAN - CENTERF1

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

1. EXISTING 6" SPRINKLER STANDPIPE.

2. EXISTING 2-1/2" CONTROL VALVES AND SYSTEM DRAIN TO FEED 9TH

FLOOR

3. VERIFY EXISTING LINEN CHUTES ARE PROTECTED PER NFPA 13

4. PROVIDE HEAD GUARDS ON ALL UPRIGHT SPRINKLERS

5. SYSTEMS SHALL BE DESIGNED TO MATCH SMOKE BARRIERS, SMOKE

COMPARTMENTS, AND FIRE ALARM ZONES.

6. STAIR 3 SHALL FEED SMOKE COMPARTMENTS 2 AND 3 WITH NEW

CONTROL VALVE ASSEMBLIES

1 2

A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES

WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.

B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED

SPRINKLER EQUIPMENT TO BE REMOVED

C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL

RATINGS.

D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)

E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT

SPECIFICATIONS.

F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE

WITH PROJECT SPECIFICATIONS.

G. COORDINATION WITH OTHER TRADES SHALL BE DONE.

H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"

BELOW DEFLECTOR.

I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION

TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.

J. REFERENCE GI SHEETS FOR PHASING

K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.

L. REFERENCE ARCHITECTURAL SHEETS AE125 - AE128 FOR CEILING

ELEVATION.

SPRINKLER HEAD LEGEND

6 6

12364 W. ALAMEDA PKWY.

SUITE #135

LAKEWOOD CO 80228

(303) 985-3300

WWW.VERITASFIRE.COM

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

R E:

F

/ 0 1-

F1

R E:

F

/ 0 1-

F1

Q R S T U V

C9-15

MEN'S BARIATRIC

C9-11

QUIET ROOM

C9-04

MEN'S

C9-03

GROUP

COUNSELING ROOM

C9-C02

CORRIDOR

C9-05

TOILET

C9-08

MEN'S BARIATRICC9-12

MEN'S

C9-14

MEN'S

C9-C01

CORRIDOR

C9-13

SOILED UTILITY

C9-01

EAST SUNROOM

C9-02

HAC

C9-07

OFFICE

C9-06

MECHANICAL

ST-2

STAIR

C9-15A

TOILET

C9-09

ELEC

C9-04A

TOILET

C9-08A

TOILET

C9-12A

TOILET

C9-14A

TOILET

C9-10

LAUNDRY

R E:

F

/ 0 1-

F1

R E:

F

/ 0 1-

F1

C9-06A

ELEC

C9-00

COURTYARD

SYM POSITION FINISH TEMP K NPT MFG. MODEL#

PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB

UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB

SEMI-RECESSED - QR

UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B

EXPOSED - QR

*OR EQUIVALENT *

PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/5 /20

6:

:56

A M

01-F13

FIRE PROTECTION PLAN - 9TH

FLOOR - EAST

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 KM BE

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 08 of 09 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

9TH FLOOR FIRE PROTECTION PLAN - EASTF1

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES

WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.

B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED

SPRINKLER EQUIPMENT TO BE REMOVED

C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL

RATINGS.

D. FLOOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .