These fire alarm and protection drawings detail the fire safety system design for the 9th Floor Mental Health Renovation project at the Wilkes-Barre VA Medical Center. The comprehensive set of plans includes multiple detailed drawings covering fire alarm zones, device placement, sprinkler head locations, and hazard classifications across different sections of the floor. The drawings specify a wet pipe sprinkler system with different hazard classifications (light hazard, ordinary group 1 and 2 hazards), using sprinkler heads from Tyco with various finishes and temperature ratings. Key requirements include field verification of existing sprinkler zones, removal of existing equipment, coordination with other trades, and ensuring proper sprinkler head protection during construction. The system will be fed by two 6-inch standpipes (in Stair 5 and Stair 3) and designed to match smoke compartments and fire alarm zones per NFPA 13 2019 standards.
The drawings are part of a larger VA project (Project #693-19-106) set to renovate the 9th floor mental health area, with specific attention to fire safety infrastructure. The design includes precise specifications for sprinkler head positioning, mounting heights, and coverage across various rooms including group therapy spaces, patient areas, corridors, and utility rooms. Notable technical details include requirements for maintaining minimum 18-inch clearance below sprinkler deflectors, using flexible sprinkler hoses, and ensuring compatibility with existing campus systems. The documentation is prepared by Valhalla Engineering for the Department of Veterans Affairs, with the drawings dated 04/18/2023 and marked as 100% Construction Documents.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F G
C9-43
WOMEN'S
C9-C06
CORRIDOR
C9-49A
TOILET
C9-49
WOMEN'S BARIATRIC
C9-48
LAUNDRY
ST-1
STAIR
C9-62
ELEC
C9-66
GERIATRIC
C9-68A
TOILET
C9-66A
TOILET
C9-68
BARIATRIC
GERIATRIC
C9-70
CLEAN UTILITY
C9-72
DAY/TV
C9-71
GROUP THERAPY
C9-67
BARIATRIC
GERIATRIC
C9-67A
TOILET
C9-64
NURSE'S STATION
C9-52
SALLY PORT
C9-50
MEETING
C9-45
PATIENT
STORAGE
C9-C07
CORRIDOR
C9-44
WOMEN'S
C9-44A
TOILET
C9-41A
TOILET
C9-41
WOMEN'S
C9-55
MECHANICAL
C9-60
CONFERENCE
C9-54
ELEVATOR LOBBY
C9-61
WORKSTATIONS
C9-43A
TOILET
C9-42
STAFF TOILET
C9-53
ELEC
ST-5
STAIR
C9-58
ELECTRICAL
C9-63
ELEC
C9-51
HAC
C9-65
MED
C9-69
OFFICE
C9-46
LINEN
C9-C08
CORRIDOR
C9-40
MED
E-9
ELEVATOR
E-8
ELEVATOR
E-7
ELEVATOR
C9-56
CLEAN STORAGE
R E:
F
/ 0 1-
F3
R E:
F
/ 0 1-
F3
C9-57
HAC
C9-59
PREFUNCTION/
COLLABORATION
C9-47
OFFICE/ GROUP
ROOM
C9-47A
STORAGE
C9-C09
CORRIDOR
S3
LINEN
CHUTE
H J K L M N O P
C9-17
GROUP THERAPY
C9-18
MEN'S
C9-18A
TOILET
C9-20A
TOILET
C9-20
MEN'S
C9-25A
TOILET
C9-24A
TOILET
C9-25
ANTE ROOMC9-27
NURSE'S STATION
C9-41
WOMEN'S
C9-32
MECHANICAL
C9-31
TELECOM ROOM
C9-28
SALLY PORT
C9-33
STAFF TOILET
C9-35
NURSE'S LOUNGE
C9-36
MECH
ST-3
STAIR
C9-34A
ELEC
C9-34
ELEC
C9-30
ELEVATOR LOBBY
C9-23
ELEVATOR LOBBY
C9-21
SALLY PORT
C9-22
SERVING KITCHEN
C9-19
ELEC
C9-38
EXAM/ INTAKE
C9-26
LOBBY
C9-35A
LOCKERS
C9-29
INTERVIEW
C9-40
MED
C9-C01
CORRIDOR
C9-27A
NURSE'S
WORKROOM
E-5
ELEVATOR
E-6
ELEVATOR
E-4
ELEVATOR
E-3
ELEVATOR
E-2
ELEVATOR
E-1
ELEVATOR
C9-37
TEAMING/
COUNSELING
C9-24
MEN'S
R E:
F
/ 0 1-
F2
R E:
F
/ 0 1-
F4 R
E:
F
/ 0
1- F4
R E:
F
/ 0 1-
F2
C9-25B
SECLUSION ROOM
C9-35B
CLOSET
C9-39
HEAD NURSE
OFFICE
C9-C05
CORRIDOR
C9-C03
CORRIDOR
C9-16
DINING/ ACTIVITIES
Q R S T U V
C9-02
HAC
C9-04A
TOILET
C9-04
MEN'S
ST-2
STAIR
C9-09
ELEC
C9-11
QUIET ROOM
C9-C01
CORRIDOR
C9-13
SOILED UTILITY
C9-15A
TOILET
C9-15
MEN'S BARIATRIC
C9-14
MEN'S
C9-14A
TOILET
C9-12A
TOILET
C9-12
MEN'S C9-08
MEN'S BARIATRIC
C9-08A
TOILET
C9-07
OFFICE
C9-05
TOILET
C9-03
GROUP
COUNSELING ROOM
C9-C02
CORRIDOR
C9-06
MECHANICAL
C9-06A
ELEC
C9-01
EAST SUNROOM
ROOF BELOW
C9-10
LAUNDRY
R E:
F
/ 0 1-
F3 R
E:
F
/ 0
1- F3
S1
SHAFT
S2
SOILED LINEN
CHUTE
SMOKE
COMPARTMENT #1
SMOKE
COMPARTMENT #2
SMOKE
COMPARTMENT #3
FIRE
ALARM
PANEL
CAT 6
SBUSS(NETWORK) 120VAC
MAIN
SIMPLEX
(EXISTING)
FIRE ALARM RISER DIAGRAM - TYPICAL
LEVEL 2
LEVEL 1
THRU LEVEL 9
LEVEL 9
THRU ROOF
SCOPE OF WORK
GENERAL NOTES
PROJECT SCOPE NARRATIVE
THIS IS A MULTI-PHASE PROJECT. AREAS OF THE 9TH FLOOR WILL REMAIN
ACTIVE WHILE AREAS ARE REMODELED. REPLACE ALL FIRE ALARM DEVICES
WITH NEW.
SYSTEM TYPE: ADDRESSABLE VOICE EVACUATION FIRE ALARM SYSTEM
PROJECT SHEET NOTES:
1. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY EQUIPMENT & FIELD DEVICES.
EXACT ROUTING OF CONDUITS TO BE DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE RECORD DRAWINGS.
2. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING APPROVAL FOR ALL NECESSARY
ADJUSTMENTS IN CIRCUITING AS REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT
AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED CHANGE. ALL CHANGES SHALL BE
CLEARLY INDICATED ON THE RECORD DRAWINGS.
3. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT THE JOB SITE AND SHALL BE
USED FOR INSTALLATION.
4. THE POWER CIRCUIT TO THE FACP AND TO THE FIRE ALARM POWER SUPPLIES SHALL BE ON A DEDICATED 120V, 20A BRANCH CIRCUIT BREAKER, AND SHALL HAVE A RED MARKING, LOCK-ON PROVISION AND SHALL BE IDENTIFIED AS "LIFE SAFETY BRANCH CIRCUIT." THE LOCATION OF THE CIRCUIT DISCONNECT MEANS (CIRCUIT BREAKER) SHALL BE PERMANENTLY IDENTIFIED AT THE FIRE
ALARM CONTROL UNIT.
5. DO NOT APPLY POWER EXCEPT IN THE PRESENCE OF A FACTORY TRAINED SIMPLEX TECHNICAL
REPRESENTATIVE.
6. ANY SMOKE DETECTOR HEAD INSTALLED BEFORE THE BUILDING IS CLEANED AND ACCEPTED SHALL
BE COVERED TO PROTECT FROM DUST. ANY FALSE ALARMS DUE TO DIRT CONTAMINATED HEADS
SHALL BE THE RESPONSIBILITY OF THE FIRE ALARM INSTALLER.
7. PROJECT WILL MAINTAIN THE FIRE RESISTANCE INTEGRITY OF ALL WALL, CEILING, AND ROOF
ASSEMBLIES ANY TIME THAT WORK IS NOT ACTIVELY BEING PERFORMED.
8. INSTALLATION OF DEVICES SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
POWER LIMITED AND NON-POWER LIMITED FIELD WIRING MUST BE INSTALLED WITHIN THE FACP
ENCLOSURE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NEC.
9. ALL WIRING SHALL BE INSTALLED ACCORDING TO 2020 NFPA 70 (NEC).
10. FIRE ALARM CIRCUITS SHALL BE IDENTIFIED IN ACCORDANCE WITH APPROPRIATE SECTION OF NEC
760. MARK ALL FIRE ALARM WIRES IN ACCORDANCE WITH NEC 760 SECTIONS FOR POWER LIMITED
AND NON-POWER LIMITED WIRE.
11. FIRE ALARM CABLE SHALL BE INSTALLED IN (RED) 34" EMT CONDUIT RACEWAYS.
12. FIRE ALARM CABLE INSTALLED IN UNDERGROUND CONDUIT OR OTHER WET LOCATIONS SHALL BE UL
LISTED FOR WET LOCATIONS.
13. FIRE ALARM CIRCUITS EXTENDING BEYOND ONE BUILDING AND RUN OUTDOOR SHALL BE INSTALLED
IN ACCORDANCE WITH NFPA 70 ARTICLES 760, 770, 725 AND 800 WHERE APPLICABLE.
14. ALL WIRING, INCLUDING SHIELDS MUST BE DRY AND FREE OF SHORTS AND GROUNDS.
15. ALL SHIELDED WIRE MUST HAVE SHIELD CONTINUITY AT FULL LENGTH OF THE WIRE.
16. ONLY SYSTEM WIRING CAN BE RUN IN THE SAME CONDUIT.
17. 120VAC IS NOT PERMITTED IN THE SAME CONDUIT WITH LOW VOLTAGE WIRING.
18. MAINTAIN 40 PERCENT CONDUIT FILL RATIO AS PER NEC REQUIREMENTS.
A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT
SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.
B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE
LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL
OBSTRUCTIONS.
C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT
SPECIFICATIONS.
D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE
BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER
SURVIVABILITY IS ADDRESSED IN THE DESIGN.
E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH
THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE
DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE
RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL
DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR
APPROVALS.
F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING
CAMPUS SYSTEM EQUIPMENT.
G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY
EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE
DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO
SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON
THE RECORD DRAWINGS.
H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING
APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS
REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT
AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED
CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE
RECORD DRAWINGS.
I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT
THE JOB SITE AND SHALL BE USED FOR INSTALLATION.
K. REFERENCE SHEET 01-I7 FOR PHASING.
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
48" MAX.
80" MIN.
TO BOTTOM OF
STROBE LENS
42" MIN.
DETECTOR
ACCEPTABLE
HERE
12" MAX.
TOP OF
DETECTOR
ACCEPTABLE
HERE
4" MIN.
WALL MOUNTED
SMOKE DETECTORS
STROBE
UNITS
96" MAX.
TO TOP OF
STROBE LENS
6" MIN.
DOOR
CEILING
FINISHED
FLOOR
WALL
TYPICAL DEVICE MOUNTING HEIGHTS
TOP OF APPLIANCE
90" MINIMUM
AUDIBLE
APPLIANCES
4"
MIN.
MANUAL PULL
STATIONS
(DIMENSIONS
TO HANDLE)
FIRE
CEILING
STROBE
UNITS
MAXIXIUM HEIGHT
FOR STROBE IS 30'
DERATING OF
CANDELA OCCURS
BETWEEN 10 TO 20
FEET THEN AGAIN
BETWEEN 20 AND 30
FEET. SEE 2019 NFPA
72 TABLE 18.5.5.5.1(b)
STROBE
NOT TO SCALE
NOTE: RISER DOES NOT DEPICT THE ACTUAL DEVICE COUNTS. REFERENCE ONLY
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
FIRE ALARM ZONES
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:13
A M
01-F1
FIRE ALARM GENERAL NOTES RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
XX
04/18/2023 KM GW
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 01 of 05 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
C9-43
WOMEN'S
C9-C06
CORRIDOR
C9-49A
TOILET
C9-49
WOMEN'S BARIATRIC
C9-48
LAUNDRY
ST-1
STAIR
C9-62
ELEC
C9-66
GERIATRIC
C9-68A
TOILET
C9-66A
TOILET
C9-68
BARIATRIC
GERIATRIC
C9-70
CLEAN UTILITY
C9-72
DAY/TV
C9-71
GROUP THERAPY
C9-67
BARIATRIC
GERIATRIC
C9-67A
TOILET
C9-64
NURSE'S STATION
C9-52
SALLY PORT
C9-50
MEETING
C9-45
PATIENT
STORAGE
C9-C07
CORRIDOR
C9-44
WOMEN'S
C9-44A
TOILET
C9-41A
TOILET
C9-41
WOMEN'S
C9-55
MECHANICAL
C9-60
CONFERENCE
C9-54
ELEVATOR LOBBY
C9-61
WORKSTATIONS
C9-43A
TOILET
C9-42
STAFF TOILET
C9-53
ELEC
ST-5
STAIR
C9-58
ELECTRICAL
C9-63
ELEC
C9-51
HAC
C9-65
MED
C9-69
OFFICE
C9-46
LINEN
C9-C08
CORRIDOR
C9-40
MED
E-9
ELEVATOR
E-8
ELEVATOR
E-7
ELEVATOR
C9-56
CLEAN STORAGE
R E:
F
/ 0 1-
F3
R E:
F
/ 0 1-
F3
C9-57
HAC
C9-59
PREFUNCTION/
COLLABORATION
C9-47
OFFICE/ GROUP
ROOM
C9-47A
STORAGE
C9-C09
CORRIDOR
S3
LINEN
CHUTE
FIRE ALARM
TRANSPONDER PANEL
LCD ANNUNCIATOR
SMOKE DETECTOR
HEAT DETECTOR
PULL STATION
MONITOR MODULE
SPEAKER/STROBE (CEILING)
CEILING SPEAKER
DOOR HOLDER
VALVE TAMPER SWITCH
STROBE (CEILING)
PULL STATION(UNLOCKED)
(TAMPER GUARD-LOCKED)
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
00KEYNOTES
DEVICE LEGEND:
A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT
SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.
B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE
LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL
OBSTRUCTIONS.
C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT
SPECIFICATIONS.
D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE
BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER
SURVIVABILITY IS ADDRESSED IN THE DESIGN.
E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH
THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE
DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE
RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL
DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR
APPROVALS.
F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING
CAMPUS SYSTEM EQUIPMENT.
G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY
EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE
DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO
SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON
THE RECORD DRAWINGS.
H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING
APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS
REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT
AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED
CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE
RECORD DRAWINGS.
I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT
THE JOB SITE AND SHALL BE USED FOR INSTALLATION.
K. REFERENCE SHEET 01-I7 FOR PHASING.
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:18
A M
01-F2
FIRE ALARM PLAN - 9TH FLOOR -
WEST
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM GW
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 02 of 05 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL 3/16" = 1'-0"
9TH FLOOR FIRE ALARM PLAN - WESTF1
H J K L M N O P
C9-17
GROUP THERAPY
C9-18
MEN'S
C9-18A
TOILET
C9-20A
TOILET
C9-20
MEN'S
C9-25A
TOILET
C9-24A
TOILET
C9-25
ANTE ROOMC9-27
NURSE'S STATION
C9-32
MECHANICAL
C9-31
TELECOM ROOM
C9-28
SALLY PORT
C9-33
STAFF TOILET
C9-35
NURSE'S LOUNGE
C9-36
MECH
ST-3
STAIR
C9-34A
ELEC
C9-34
ELEC
C9-30
ELEVATOR LOBBY
C9-23
ELEVATOR LOBBY
C9-21
SALLY PORT
C9-22
SERVING KITCHEN
C9-19
ELEC
C9-38
EXAM/ INTAKE
C9-26
LOBBY
C9-35A
LOCKERS
C9-29
INTERVIEW
C9-C01
CORRIDOR
C9-27A
NURSE'S
WORKROOM
E-5
ELEVATOR
E-6
ELEVATOR
E-4
ELEVATOR
E-3
ELEVATOR
E-2
ELEVATOR
E-1
ELEVATOR
C9-37
TEAMING/
COUNSELING
C9-24
MEN'S
R E:
F
/ 0 1-
F2
R E:
F
/ 0 1-
F4 R
E:
F
/ 0
1- F4
R E:
F
/ 0 1-
F2
C9-25B
SECLUSION ROOM
C9-35B
CLOSET
C9-39
HEAD NURSE
OFFICE
C9-C05
CORRIDOR
C9-C03
CORRIDOR
C9-16
DINING/ ACTIVITIES
FIRE ALARM
TRANSPONDER PANEL
LCD ANNUNCIATOR
SMOKE DETECTOR
HEAT DETECTOR
PULL STATION
MONITOR MODULE
SPEAKER/STROBE (CEILING)
CEILING SPEAKER
DOOR HOLDER
VALVE TAMPER SWITCH
STROBE (CEILING)
PULL STATION(UNLOCKED)
(TAMPER GUARD-LOCKED)
3/16" = 1'-0"
9TH FLOOR FIRE ALARM PLAN - CENTERF1
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
DEVICE LEGEND:
A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT
SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.
B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE
LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL
OBSTRUCTIONS.
C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT
SPECIFICATIONS.
D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE
BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER
SURVIVABILITY IS ADDRESSED IN THE DESIGN.
E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH
THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE
DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE
RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL
DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR
APPROVALS.
F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING
CAMPUS SYSTEM EQUIPMENT.
G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY
EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE
DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO
SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON
THE RECORD DRAWINGS.
H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING
APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS
REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT
AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED
CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE
RECORD DRAWINGS.
I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT
THE JOB SITE AND SHALL BE USED FOR INSTALLATION.
K. REFERENCE SHEET 01-I7 FOR PHASING.
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:23
A M
01-F3
FIRE ALARM PLAN - 9TH FLOOR -
CENTER
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM GW
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 03 of 05 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL 3/16" = 1'-0"
9TH FLOOR FIRE ALARM PLAN - CENTERF1
Q R S T U V
C9-02
HAC
C9-04A
TOILET
C9-04
MEN'S
ST-2
STAIR
C9-09
ELEC
C9-11
QUIET ROOM
C9-C01
CORRIDOR
C9-13
SOILED UTILITY
C9-15A
TOILET
C9-15
MEN'S BARIATRIC
C9-14
MEN'S
C9-14A
TOILET
C9-12A
TOILET
C9-12
MEN'S C9-08
MEN'S BARIATRIC
C9-08A
TOILET
C9-07
OFFICE
C9-05
TOILET
C9-03
GROUP
COUNSELING ROOM
C9-C02
CORRIDOR
C9-06
MECHANICAL
C9-06A
ELEC
C9-01
EAST SUNROOM
ROOF BELOW
C9-10
LAUNDRY
R E:
F
/ 0 1-
F3 R
E:
F
/ 0
1- F3
S1
SHAFT
S2
SOILED LINEN
CHUTE
FIRE ALARM
TRANSPONDER PANEL
LCD ANNUNCIATOR
SMOKE DETECTOR
HEAT DETECTOR
PULL STATION
MONITOR MODULE
SPEAKER/STROBE (CEILING)
CEILING SPEAKER
DOOR HOLDER
VALVE TAMPER SWITCH
STROBE (CEILING)
PULL STATION(UNLOCKED)
(TAMPER GUARD-LOCKED)
P
C9-17
GROUP THERAPY
C9-C01
CORRIDOR
R E:
F
/ 0 1-
F4 R
E:
F
/ 0
1- F4
Q R S T U V
C9-02
HAC
C9-04A
TOILET
C9-04
MEN'S
ST-2
STAIR
C9-09
ELEC
C9-11
QUIET ROOM
C9-C01
CORRIDOR
C9-13
SOILED UTILITY
C9-15A
TOILET
C9-15
MEN'S BARIATRIC
C9-14
MEN'S
C9-14A
TOILET
C9-12A
TOILET
C9-12
MEN'S C9-08
MEN'S BARIATRIC
C9-08A
TOILET
C9-07
OFFICE
C9-05
TOILET
C9-03
GROUP
COUNSELING ROOM
C9-C02
CORRIDOR
C9-06
MECHANICAL
C9-06A
ELEC
C9-01
EAST SUNROOM
ROOF BELOW
C9-10
LAUNDRY
R E:
F
/ 0 1-
F3 R
E:
F
/ 0
1- F3
S1
SHAFT
S2
SOILED LINEN
CHUTE
3/16" = 1'-0"
9TH FLOOR FIRE ALARM PLAN - EASTF1
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT
SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.
B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE
LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL
OBSTRUCTIONS.
C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT
SPECIFICATIONS.
D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE
BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER
SURVIVABILITY IS ADDRESSED IN THE DESIGN.
E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH
THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE
DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE
RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL
DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR
APPROVALS.
F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING
CAMPUS SYSTEM EQUIPMENT.
G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY
EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE
DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO
SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON
THE RECORD DRAWINGS.
H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING
APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS
REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT
AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED
CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE
RECORD DRAWINGS.
I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT
THE JOB SITE AND SHALL BE USED FOR INSTALLATION.
K. REFERENCE SHEET 01-I7 FOR PHASING.
00KEYNOTES
DEVICE LEGEND:
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:26
A M
01-F4
FIRE ALARM PLAN - 9TH FLOOR -
EAST
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM GW
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 04 of 05 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL 3/16" = 1'-0"
9TH FLOOR FIRE ALARM PLAN - EASTF1
T
T
T
T
T
T
T
T
T
DN
W X Y Z
L1-111
CONFERENCE
L1-103
OPEN OFFICE
L1-110
OFFICE
L1-109
OFFICE
L1-108
OFFICE
L1-107
OFFICE
L1-105
TOILET
L1-104
COPY/LOCKERS
L1-102
SECRETARY
L1-112
MECH
L1-100
STORAGE
L1-100G
TOILET
L1-100H
OFFICE
L1-100A
ELECL1-102A
CLOSET
L1-100J
LOADING DOCK
L1-100F
LOCKERS
L1-106
TOILET
100 SF
L1-100E
TELECOM ROOM
FIRE ALARM
TRANSPONDER PANEL
LCD ANNUNCIATOR
SMOKE DETECTOR
HEAT DETECTOR
PULL STATION
MONITOR MODULE
SPEAKER/STROBE (CEILING)
CEILING SPEAKER
DOOR HOLDER
VALVE TAMPER SWITCH
STROBE (CEILING)
PULL STATION(UNLOCKED)
(TAMPER GUARD-LOCKED)
3/16" = 1'-0"
WAREHOUSE FIRE ALARM PLANF4
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
DEVICE LEGEND:
A. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER PROJECT
SPECIFICATION 283100 AND THE MANUFACTURER'S INSTRUCTIONS.
B. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED UPON THE
LOCATION OF DIFFUSERS, LIGHTS, AND OTHER POTENTIAL
OBSTRUCTIONS.
C. ALL WIRING INSTALLATION SHALL CONFORM TO THE PROJECT
SPECIFICATIONS.
D. REFERENCE ARCHITECTURAL PLANS TO IDENTIFY ALL SMOKE
BARRIERS AND SMOKE COMPARTMENT ZONES SO THAT PROPER
SURVIVABILITY IS ADDRESSED IN THE DESIGN.
E. THE BIDDING CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH
THE COMPLEXITIES OF THIS BUILDING. THESE DRAWINGS ARE
DIAGRAMMATIC ONLY. THE AWARDED CONTRACTOR SHALL BE
RESPONSIBLE FOR PRODUCTION OF ALL DESIGN AND SUBMITTAL
DOCUMENTS AND OBTAINING ALL REQUIRED INFORMATION FOR
APPROVALS.
F. NEW EQUIPMENT TO MATCH AND BE COMPATIBLE WITH EXISTING
CAMPUS SYSTEM EQUIPMENT.
G. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY
EQUIPMENT & FIELD DEVICES. EXACT ROUTING OF CONDUITS TO BE
DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO
SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON
THE RECORD DRAWINGS.
H. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING
APPROVAL FOR ALL NECESSARY ADJUSTMENTS IN CIRCUITING AS
REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT
AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED
CHANGE. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE
RECORD DRAWINGS.
I. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT
THE JOB SITE AND SHALL BE USED FOR INSTALLATION.
K. REFERENCE SHEET 01-I7 FOR PHASING.
Pl an
N or th Tr ue N or th
BASEMENT
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
17-F5
FIRE ALARM PLAN - WAREHOUSE RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM GW
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 05 of 05 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL 3/16" = 1'-0"
WAREHOUSE FIRE ALARM PLANF4
SPRINKLER HEAD
FLEXIBLE ARM-OVER
CEILING
TILE
T-BAR BRACKET "B"
12"12"
12"12"
PLAN VIEW
SPRINKLER HEAD POSITION AT ACOUSTIC
CEILING TILES
2'x4' TILE
2'x2' TILE
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
SYM POSITION FINISH TEMP K NPT MFG. MODEL#
PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB
UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB
SEMI-RECESSED - QR
UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B
EXPOSED - QR
*OR EQUIVALENT *
PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC
A B C D E F G
C9-43
WOMEN'S
C9-C06
CORRIDOR
C9-49A
TOILET
C9-49
WOMEN'S BARIATRIC
C9-48
LAUNDRY
ST-1
STAIR
C9-62
ELEC
C9-66
GERIATRIC
C9-68A
TOILET
C9-66A
TOILET
C9-68
BARIATRIC
GERIATRIC
C9-70
CLEAN UTILITY
C9-72
DAY/TV
C9-71
GROUP THERAPY
C9-67
BARIATRIC
GERIATRIC
C9-67A
TOILET
C9-64
NURSE'S STATION
C9-52
SALLY PORT
C9-50
MEETING
C9-45
PATIENT
STORAGE
C9-C07
CORRIDOR
C9-44
WOMEN'S
C9-44A
TOILET
C9-41A
TOILET
C9-41
WOMEN'S
C9-55
MECHANICAL
C9-60
CONFERENCE
C9-54
ELEVATOR LOBBY
C9-61
WORKSTATIONS
C9-43A
TOILET
C9-42
STAFF TOILET
C9-53
ELEC
ST-5
STAIR
C9-58
ELECTRICAL
C9-63
ELEC
C9-51
HAC
C9-65
MED
C9-69
OFFICE
C9-46
LINEN
C9-C08
CORRIDOR
C9-40
MED
ROOF BELOW
E-9
ELEVATOR
E-8
ELEVATOR
E-7
ELEVATOR
C9-56
CLEAN STORAGE
R E:
F
/ 0 1-
F8
R E:
F
/ 0 1-
F8
C9-57
HAC
C9-59
PREFUNCTION/
COLLABORATION
C9-47
OFFICE/ GROUP
ROOM
C9-47A
STORAGE
C9-C09
CORRIDOR
S3
LINEN
CHUTE
H J K L M N O P
C9-17
GROUP THERAPY
C9-18
MEN'S
C9-18A
TOILET
C9-20A
TOILET
C9-20
MEN'S
C9-25A
TOILET
C9-24A
TOILET
C9-25
ANTE ROOMC9-27
NURSE'S STATION
C9-41
WOMEN'S
C9-32
MECHANICAL
C9-31
TELECOM ROOM
C9-28
SALLY PORT
C9-33
STAFF TOILET
C9-35
NURSE'S LOUNGE
C9-36
MECH
ST-3
STAIR
C9-34A
ELECC9-34
ELEC
C9-30
ELEVATOR LOBBY
C9-23
ELEVATOR LOBBY
C9-21
SALLY PORT
C9-22
SERVING KITCHEN
C9-19
ELEC
C9-38
EXAM/ INTAKE
C9-26
LOBBY
C9-35A
LOCKERS
C9-29
INTERVIEW
C9-40
MED
C9-C01
CORRIDOR
C9-27A
NURSE'S
WORKROOM
E-5
ELEVATOR
E-6
ELEVATOR
E-4
ELEVATOR
E-3
ELEVATOR
E-2
ELEVATOR
E-1
ELEVATOR
C9-37
TEAMING/
COUNSELING
C9-24
MEN'S
R E:
F
/ 0 1-
F7
R E:
F
/ 0 1-
F9 R
E:
F
/ 0
1- F9
R E:
F
/ 0 1-
F7
C9-25B
SECLUSION ROOM
C9-35B
CLOSET
C9-39
HEAD NURSE
OFFICE
C9-C05
CORRIDOR
C9-C03
CORRIDOR
C9-16
DINING/ ACTIVITIES
Q R S T U V
C9-02
HAC
C9-04A
TOILET
C9-04
MEN'S
ST-2
STAIR
C9-09
ELEC
C9-11
QUIET ROOM
C9-C01
CORRIDOR
C9-13
SOILED UTILITY
C9-15A
TOILET
C9-15
MEN'S BARIATRIC
C9-14
MEN'S
C9-14A
TOILET
C9-12A
TOILET
C9-12
MEN'S C9-08
MEN'S BARIATRIC
C9-08A
TOILET
C9-07
OFFICE
C9-05
TOILET
C9-03
GROUP
COUNSELING ROOM
C9-C02
CORRIDOR
C9-06
MECHANICAL
C9-06A
ELEC
C9-01
EAST SUNROOM
ROOF BELOW
C9-10
LAUNDRY
R E:
F
/ 0 1-
F8 R
E:
F
/ 0
1- F8
S1
SHAFT
S2
SOILED LINEN
CHUTE
SMOKE
COMPARTMENT #1
SMOKE
COMPARTMENT #2
SMOKE
COMPARTMENT #3
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:27
A M
01-F6
FIRE PROTECTION GENERAL
NOTES
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
XX
04/18/2023 KM BE
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 01 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
SPRINKLER HEAD POSITION
SPRINKLER HAZARD
FIRE PROTECTION DESIGN INFORMATION
MINIMUM SPRINKLER WATER SUPPLY REQUIREMENTS
1500 SQ.FT. x .15 GPM/SQ.FT + PRESS BALANCE ` = 300 GPM
INSIDE AND OUTSIDE HOSE STREAM = 250 GPM
TOTAL WATER DEMAND = 550 GPM
HYDRAULIC CALCULATIONS SHALL BE BASED ON A CURRENT FIRE HYDRANT
FLOW TEST. REMOTE AREA REDUCTION IS ALLOWED PER VA GUIDELINES
ALL THREAD ROD
TOP BEAM CLAMP
MAXIMUM DISTANCE BETWEEN HANGERS
HANGER RING
HANGER DETAIL
1" 1-1/4" 1-1/2" 2"NOMINAL PIPE
STEEL PIPE
THREADED LIGHTWALL
STEEL PIPE EXCEPT
THREADED LIGHTWALL 12-0
12-0
12-0
12-0
15-0
12-0 12-0
15-0
4"
N/A
15-0
2-1/2"
15-0
N/A
3"
15-0
N/A
HANGER DETAIL
FIRE PUMP TEST RESULTS
DATES FLOWED - 07/27/2021
PERFORMED BY: JOHNSON CONTROLS
SPRINKLER HEAD LEGEND SPRINKLER FLEX HEAD
SYMBOL LEGEND
SYSTEM RISER
SHEET NOTEX
CONTROL VALVE
SCOPE OF WORK
PROVIDE A WET PIPE SPRINKLER SYSTEM INTO THE 9TH FLOOR OF THE EXISTING BUILDING. THE SCOPE INCLUDES REMOVAL / DEMO OF ALL EXISTING FIRE SPRINKLER PIPING, HEADS, HANGERS AND EQUIPMENT ASSOCIATED WITH THE SPRINKLER SYSTEM BACK TO STANDPIPE PIPE CONNECTION IN STAIRS 3 AND 5. WET
PIPE SYSTEMS SHALL MATCH ALL SMOKE COMPARTMENTS PER DESIGN DOCUMENTS.
GENERAL NOTES
1. DESIGN SHALL BE BASED ON LIGHT/ORDINARY HAZARD OCCUPANCY PER NFPA 13 2019 AND VA FIRE
PROTECTION DESIGN MANUAL, 8TH EDITION - JUNE 2021
2. WATER SUPPLY SHALL BE VERIFIED BY INSTALLING CONTRACTOR. WATER FLOW SHALL BE WITHIN 12
MONTHS OF INSTALLATION.
3. FIRE SUPPRESSION SYSTEM TO BE HYDRAULICALLY CALCULATED BASED ON NFPA 13, WITH A SAFETY
FACTOR MUST BE INCLUDED BY CALCULATING THE DEMAND TO A POINT NO GREATER THAN 10%
BELOW THE AVAILABLE WATER SUPPLY CURVE. OR, A TEN PERCENT SAFETY FACTOR MUST BE
PROVIDED (SUBTRACT 10% FROM THE AVAILABLE WATER SUPPLY CURVE) FOR EACH SPRINKLER
DEMAND INCLUDING THE REQUIRED HOSE STREAMS.
4. THE COMBINED REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS ARE APPLICABLE TO THE
DESIGN AND INSTALLATION OF THIS SYSTEM.
5. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF
A COMPLETE AND PROPERLY FUNCTIONING FIRE SPRINKLER SYSTEM.
6. THE EQUIPMENT SPECIFIED ON THE DRAWINGS HAS BEEN SELECTED AS THE BASIS FOR DESIGN. THE USE OF REVIEWED OR SPECIFIED EQUALS SHALL BE COORDINATED BY THE CONTRACTOR FOR SPACE
REQUIREMENTS, EQUIPMENT DIMENSIONS AND PERFORMANCE.
7. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL DESIGN, ARRANGEMENT AND EXTENT OF
THE SYSTEMS. DO NOT SCALE DRAWINGS NOR USE AS SHOP DRAWINGS. WHERE ALTERNATE
ROUTING, OFFSETS AND TRANSITIONS ARE REQUIRED FOR THE COORDINATION OF ALL WORK, THE
CONTRACTOR SHALL MAKE CHANGES WITHOUT ADDITIONAL COSTS.
8. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW EQUIPMENT AND
PIPING WITH ALL OTHER TRADES PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND SYSTEM
INSTALLATION, SO AS NOT TO INTERFERE WITH THE ROUTING OF NEW DUCTWORK, PLUMBING,
PIPING, ETC. CONTRACTOR SHALL REVIEW ALL PROJECT DOCUMENTS INCLUDING, BUT NOT LIMITED
TO, THE FOLLOWING: ARCHITECTURAL, ELECTRICAL, MECHANICAL, STRUCTURAL, SITE/CIVIL
DOCUMENTS FOR THE COORDINATION OF THE SPRINKLER SYSTEM DESIGN AND INSTALLATION.
9. SEAL ALL PENETRATIONS THROUGH FIRE-RESISTANCE RATED WALLS, CEILINGS AND FLOORS WITH UL LISTED ASSEMBLIES AS REQUIRED TO MAINTAIN THE INTEGRITY OF THE FIRE-RESISTANCE RATING.
10. PROVIDE ALL FITTINGS, RISER NIPPLES, ARM-OVERS, HANGERS, ETC. TO MAINTAIN CONFORMANCE WITH APPLICABLE STANDARDS AND TO POSITION THE SPRINKLER HEADS IN THE PROPER LOCATIONS.
11. THE FIRE SPRINKLER CONTRACTOR SHALL SECURE THE SITE FLOW TEST INFORMATION AND
DOCUMENTATION FROM THE LOCAL WATER DEPARTMENT PRIOR TO THE DESIGN OF THE FIRE
SPRINKLER SYSTEM. THE WATER FLOW TEST SHALL BE NO OLDER THAN ONE YEAR FROM THE DATE
OF SYSTEM INSTALLATION.
12. SPRINKLERS SHALL BE SPACED PER NFPA 13 REGARDING OBSTRUCTIONS, BEAM POCKETS, HVAC
DUCTWORK, PENETRATIONS AND ANY OTHER CLEARANCE RELATED ITEMS. CONTRACTOR SHALL
VERIFY ALL SPACING AND OBSTRUCTIONS PRIOR TO INSTALLATION.
13. INSTALL SPRINKLERS IN THE CENTER OR QUARTER POINT OF CEILING TILES, WHERE APPLICABLE.
14. SPRINKLER CONTRACTOR TO COORDINATE SPRINKLER HEAD FINISHES WITH OWNER PRIOR TO THE
PURCHASE AND INSTALLATION OF SPRINKLERS.
15. FIRE SPRINKLER SHOP DRAWINGS SHALL LOCATE AND DESCRIBE GUIDES, ANCHORS AND HANGERS FOR ALL PIPING. FIRE SPRINKLER SHOP DRAWINGS TO PROVIDE PROTECTION FOR UNDERNEATH
DUCTWORK AND OTHER OBSTRUCTIONS AS NEEDED.
16. FIRE SPRINKLER SHOP DRAWINGS SHALL PROVIDE DIMENSIONALLY LOCATED PIPE MAINS AND BRANCH LINES TO FACILITIES STRUCTURE SUCH AS COLUMN LINES, WALLS, RECOGNIZED BENCH
MARKS, ETC.
17. ALL SPRINKLER HEADS INSTALLED SHALL BE NEW.
18. PROVIDE FIELD COORDINATION OF PIPING AND SPRINKLER HEAD INSTALLATIONS WITH EXISTING
DUCTWORK, LIGHTS, SMOKE DETECTORS, DIFFUSERS, ETC.
19. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO
PURCHASE OF ANY MATERIALS AND THE COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL
NOTIFY THE ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION.
20. COORDINATE ANY REQUIRED SPRINKLER SYSTEM RISER SHUTDOWNS THAT OCCUR DURING
CONSTRUCTION WITH ARCHITECT, OWNER, AND AHJ PRIOR TO PERIOD OF SHUTDOWN.
21. PHASE COORDINATION WILL FOLLOWING SHEETS 01-I7.
22. 3.12 CHUTES: LINEN CHUTES AND WASTE CHUTES MUST COMPLY WITH THE PROVISIONS IN NFPA 82
FOR LIMITED ACCESS GRAVITY CHUTES.
CODE ANALYSIS
SPRINKLER SYSTEM TYPE: WET
NFPA 13: 2019
VA FIRE PROTECTION DESIGN MANUAL, 8TH EDITION
SPRINKLER SYMBOL LEGEND
FLOW SWITCH
TAMPER SWITCH
ITT-A-C 750SPLIT CASE
UNKNOWN N/AINLINE
MANUFACTURER MODEL GPMTYPE HEAD IMP MOTOR HP RPM VOLT/PH/HZ WEIGHT
CLARKE DETROIT
N/A
MAKE
N/A
N/A N/A N/A
110/NA/NA
208-460/3/60
N/A N/A
FIRE PUMP
JOCKEY PUMP
EXISTING FIRE PUMP RATING
N/A
2500/PDFP
*TEST RESULTS AS OF 7/27/2021
POWER TYPE
DIESEL DRIVEN
ELECTRIC
CONTROLLER - FIRETROL
FIRE PUMP JOCKEY PUMP
START
STOP
FIRE SPRINKLER ZONES
FIRE PROTECTION DESIGN INFORMATION
MINIMUM SPRINKLER WATER SUPPLY REQUIREMENTS
1500 SQ.FT. x .10 GPM/SQ.FT + PRESS BALANCE = 180 GPM
INSIDE AND OUTSIDE HOSE STREAM = 100 GPM
TOTAL WATER DEMAND = 280 GPM
HYDRAULIC CALCULATIONS SHALL BE BASED ON A CURRENT FIRE HYDRANT
FLOW TEST. REMOTE AREA REDUCTION IS ALLOWED PER VA GUIDELINES
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-3300
WWW.VERITASFIRE.COM
C9-43
WOMEN'S
C9-C06
CORRIDOR
C9-49A
TOILET
C9-49
WOMEN'S BARIATRIC
C9-48
LAUNDRY
ST-1
STAIR
C9-62
ELEC
C9-66
GERIATRIC
C9-68A
TOILET
C9-66A
TOILET
C9-68
BARIATRIC
GERIATRIC
C9-70
CLEAN UTILITY
C9-72
DAY/TV
C9-71
GROUP THERAPY
C9-67
BARIATRIC
GERIATRIC
C9-67A
TOILET
C9-64
NURSE'S STATION
C9-52
SALLY PORT
C9-50
MEETING
C9-45
PATIENT
STORAGE
C9-C07
CORRIDOR
C9-44
WOMEN'S
C9-44A
TOILET
C9-41A
TOILET
C9-41
WOMEN'S
C9-55
MECHANICAL
C9-60
CONFERENCE
C9-54
ELEVATOR LOBBY
C9-61
WORKSTATIONS
C9-43A
TOILET
C9-42
STAFF TOILET
C9-53
ELEC
ST-5
STAIR
C9-58
ELECTRICAL
C9-63
ELEC
C9-51
HAC
C9-65
MED
C9-69
OFFICE
C9-46
LINEN
C9-C08
CORRIDOR
C9-40
MED
ROOF BELOW
E-9
ELEVATOR
E-8
ELEVATOR
E-7
ELEVATOR
C9-56
CLEAN STORAGE
R E:
F
/ 0 1-
F8
R E:
F
/ 0 1-
F8
C9-57
HAC
C9-59
PREFUNCTION/
COLLABORATION
C9-47
OFFICE/ GROUP
ROOM
C9-47A
STORAGE
C9-C09
CORRIDOR
S3
LINEN
CHUTE
H
C9-27
NURSE'S STATION
C9-41
WOMEN'S
C9-38
EXAM/ INTAKE
C9-26
LOBBY
C9-40
MED
C9-27A
NURSE'S
WORKROOM
R E:
F
/ 0 1-
F7
R E:
F
/ 0 1-
F7
C9-39
HEAD NURSE
OFFICE
C9-C05
CORRIDOR
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
HAZARD PLAN - 9TH FLOOR - WEST 100% CONSTRUCTION
DOCUMENTS
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:31
A M
01-F7
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM BEVEG 19.25 DWG 02 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL
3/16" = 1'-0"
9TH FLOOR HAZARD PLAN - WESTF1
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
SPRINKLER HAZARD
A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES
WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.
B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED
SPRINKLER EQUIPMENT TO BE REMOVED
C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL
RATINGS.
D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)
E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT
SPECIFICATIONS.
F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
G. COORDINATION WITH OTHER TRADES SHALL BE DONE.
H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"
BELOW DEFLECTOR.
I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION
TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.
J. REFERENCE GI SHEETS FOR PHASING
K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
H J K L M N O P
C9-17
GROUP THERAPY
C9-18
MEN'S
C9-18A
TOILET
C9-20A
TOILET
C9-20
MEN'S
C9-25A
TOILET
C9-24A
TOILET
C9-25
ANTE ROOMC9-27
NURSE'S STATION
C9-32
MECHANICAL
C9-31
TELECOM ROOM
C9-28
SALLY PORT
C9-33
STAFF TOILET
C9-35
NURSE'S LOUNGE
C9-36
MECH
ST-3
STAIR
C9-34A
ELECC9-34
ELEC
C9-30
ELEVATOR LOBBY
C9-23
ELEVATOR LOBBY
C9-21
SALLY PORT
C9-22
SERVING KITCHEN
C9-19
ELEC
C9-38
EXAM/ INTAKE
C9-26
LOBBY
C9-35A
LOCKERS
C9-29
INTERVIEW
C9-C01
CORRIDOR
C9-27A
NURSE'S
WORKROOM
E-5
ELEVATOR
E-6
ELEVATOR
E-4
ELEVATOR
E-3
ELEVATOR
E-2
ELEVATOR
E-1
ELEVATOR
C9-37
TEAMING/
COUNSELING
C9-24
MEN'S
R E:
F
/ 0 1-
F7
R E:
F
/ 0 1-
F9 R
E:
F
/ 0
1- F9
C9-25B
SECLUSION ROOM
C9-35B
CLOSET
C9-39
HEAD NURSE
OFFICE
C9-C05
CORRIDOR
C9-C03
CORRIDOR
C9-16
DINING/ ACTIVITIES
R E:
F
/ 0 1-
F8 R
E:
F
/ 0
1- F8
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:35
A M
01-F8
HAZARD PLAN - 9TH FLOOR -
CENTER
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM BE
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 03 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL
3/16" = 1'-0"
9TH FLOOR HAZARD PLAN - CENTERF1
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
SPRINKLER HAZARD
A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES
WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.
B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED
SPRINKLER EQUIPMENT TO BE REMOVED
C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL
RATINGS.
D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)
E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT
SPECIFICATIONS.
F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
G. COORDINATION WITH OTHER TRADES SHALL BE DONE.
H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"
BELOW DEFLECTOR.
I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION
TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.
J. REFERENCE GI SHEETS FOR PHASING
K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
Q R S T U V
C9-02
HAC
C9-04A
TOILET
C9-04
MEN'S
ST-2
STAIR
C9-09
ELEC
C9-11
QUIET ROOM
C9-C01
CORRIDOR
C9-13
SOILED UTILITY
C9-15A
TOILET
C9-15
MEN'S BARIATRIC
C9-14
MEN'S
C9-14A
TOILET
C9-12A
TOILET
C9-12
MEN'S C9-08
MEN'S BARIATRIC
C9-08A
TOILET
C9-07
OFFICE
C9-05
TOILET
C9-03
GROUP
COUNSELING ROOM
C9-C02
CORRIDOR
C9-06
MECHANICAL
C9-06A
ELEC
C9-01
EAST SUNROOM
ROOF BELOW
C9-10
LAUNDRY
R E:
F
/ 0 1-
F8 R
E:
F
/ 0
1- F8
S1
SHAFT
S2
SOILED LINEN
CHUTE
SPRINKLER HAZARD
A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES
WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.
B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED
SPRINKLER EQUIPMENT TO BE REMOVED
C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL
RATINGS.
D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)
E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT
SPECIFICATIONS.
F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
G. COORDINATION WITH OTHER TRADES SHALL BE DONE.
H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"
BELOW DEFLECTOR.
I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION
TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.
J. REFERENCE GI SHEETS FOR PHASING
K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:38
A M
01-F9
HAZARD PLAN - 9TH FLOOR - EAST RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM BE
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 04 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL
3/16" = 1'-0"
9TH FLOOR HAZARD PLAN - EASTF1
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
DN
W X Y Z
L1-111
CONFERENCE
L1-103
OPEN OFFICE
L1-110
OFFICE
L1-109
OFFICE
L1-108
OFFICE
L1-107
OFFICE
L1-105
TOILET
L1-104
COPY/LOCKERS
L1-102
SECRETARY
L1-112
MECH
L1-100
STORAGE
L1-100G
TOILET
L1-100H
OFFICE
L1-100A
ELECL1-102A
CLOSET
L1-100J
LOADING DOCK
L1-100F
LOCKERS
L1-106
TOILET
100 SF
L1-100E
TELECOM ROOM
Pl an
N or th Tr ue N or th
BASEMENT
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:01
A M
17-F10
HAZARD PLAN - WAREHOUSE RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM BE
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 05 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL
3/16" = 1'-0"
WAREHOUSE HAZARD PLANF4
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
SPRINKLER HAZARD
A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES
WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.
B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED
SPRINKLER EQUIPMENT TO BE REMOVED
C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL
RATINGS.
D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)
E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT
SPECIFICATIONS.
F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
G. COORDINATION WITH OTHER TRADES SHALL BE DONE.
H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"
BELOW DEFLECTOR.
I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION
TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.
J. REFERENCE GI SHEETS FOR PHASING
K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
C9-72
DAY/TV
C9-71
GROUP THERAPY
C9-67
BARIATRIC
GERIATRIC
C9-70
CLEAN UTILITY
C9-69
OFFICE C9-68
BARIATRIC
GERIATRIC C9-66
GERIATRIC
C9-49
WOMEN'S BARIATRIC
C9-43
WOMEN'S
C9-40
MED
C9-41
WOMEN'S
C9-44
WOMEN'S
C9-C07
CORRIDOR
C9-46
LINEN
C9-45
PATIENT STORAGE
C9-50
MEETING
C9-52
SALLY PORT
C9-64
NURSE'S STATION
C9-65
MED
C9-C08
CORRIDOR
C9-C06
CORRIDOR
C9-61
WORKSTATIONS
C9-60
CONFERENCE
C9-54
ELEVATOR LOBBY
C9-55
MECHANICAL
ST-1
STAIR
ST-5
STAIR
C9-58
ELECTRICAL
C9-53
ELEC
C9-48
LAUNDRY
C9-49A
TOILET
C9-63
ELEC
C9-62
ELEC C9-51
HAC
C9-67A
TOILET
C9-68A
TOILET
C9-66A
TOILET
C9-42
STAFF TOILET
C9-43A
TOILET
C9-41A
TOILET
C9-44A
TOILET
E-9
ELEVATOR
E-8
ELEVATOR
E-7
ELEVATOR
C9-56
CLEAN STORAGE
R E:
F
/ 0 1-
F1
R E:
F
/ 0 1-
F1
C9-C09
CORRIDOR
C9-57
HAC
C9-59
PREFUNCTION/
COLLABORATION
C9-47A
STORAGE
C9-47
OFFICE/ GROUP
ROOM
R E:
F
/ 0 1-
F1
C9-39
HEAD NURSE
OFFICE
C9-C05
CORRIDOR
R E:
F
/ 0 1-
F1
SYM POSITION FINISH TEMP K NPT MFG. MODEL#
PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB
UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB
SEMI-RECESSED - QR
UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B
EXPOSED - QR
*OR EQUIVALENT *
PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:45
A M
01-F11
FIRE PROTECTION PLAN - 9TH
FLOOR - WEST
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM BE
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 06 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL 3/16" = 1'-0"
9TH FLOOR FIRE PROTECTION PLAN - WESTF1
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1. EXISTING 6" SPRINKLER STANDPIPE.
2. EXISTING 2-1/2" CONTROL VALVES TO FEED 1980'S BUILDINGS
ADDITION.
3. PROVIDE NEW CONTROL ZONE ASSEMBLY FOR SMOKE
COMPARTMENT
4. VERIFY EXISTING LINEN CHUTES ARE PROTECTED PER NFPA 13
A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES
WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.
B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED
SPRINKLER EQUIPMENT TO BE REMOVED
C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL
RATINGS.
D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)
E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT
SPECIFICATIONS.
F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
G. COORDINATION WITH OTHER TRADES SHALL BE DONE.
H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"
BELOW DEFLECTOR.
I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION
TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.
J. REFERENCE GI SHEETS FOR PHASING
K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.
L. REFERENCE ARCHITECTURAL SHEETS AE125 - AE128 FOR CEILING
ELEVATION.
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-3300
WWW.VERITASFIRE.COM
SPRINKLER HEAD LEGEND
1 2 x3 x3
H J K L M N O P
C9-27
NURSE'S STATION
C9-27A
NURSE'S
WORKROOM
C9-25
ANTE ROOM
C9-24
MEN'S
C9-20
MEN'S
C9-18
MEN'S
C9-17
GROUP THERAPY
C9-16
DINING/ ACTIVITIES
C9-22
SERVING KITCHEN
C9-21
SALLY PORT
C9-23
ELEVATOR LOBBY
C9-30
ELEVATOR LOBBY
C9-31
TELECOM ROOM
C9-32
MECHANICAL
C9-28
SALLY PORT
C9-29
INTERVIEW
C9-33
STAFF TOILET
C9-35
NURSE'S LOUNGE
C9-35A
LOCKERS
C9-36
MECH
C9-26
LOBBY
C9-38
EXAM/ INTAKE
C9-19
ELEC
ST-3
STAIR
C9-25A
TOILET
C9-24A
TOILET
C9-18A
TOILET
C9-20A
TOILET
C9-34
ELEC C9-34A
ELEC
E-4
ELEVATOR
E-3
ELEVATOR
E-2
ELEVATOR
E-1
ELEVATOR
E-5
ELEVATOR
E-6
ELEVATOR
C9-37
TEAMING/
COUNSELING
R E:
F
/ 0 1-
F1
R E:
F
/ 0 1-
F1
R E:
F
/ 0 1-
F1
C9-39
HEAD NURSE
OFFICE
C9-C05
CORRIDOR
C9-25B
SECLUSION ROOM
C9-C03
CORRIDOR
C9-C04
CORRIDOR
C9-35B
CLOSET
C9-C01
CORRIDOR
R E:
F
/ 0 1-
F1
SYM POSITION FINISH TEMP K NPT MFG. MODEL#
PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB
UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB
SEMI-RECESSED - QR
UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B
EXPOSED - QR
*OR EQUIVALENT *
PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:52
A M
01-F12
FIRE PROTECTION PLAN - 9TH
FLOOR - CENTER
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM BE
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 07 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL 3/16" = 1'-0"
9TH FLOOR FIRE PROTECTION PLAN - CENTERF1
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
1. EXISTING 6" SPRINKLER STANDPIPE.
2. EXISTING 2-1/2" CONTROL VALVES AND SYSTEM DRAIN TO FEED 9TH
FLOOR
3. VERIFY EXISTING LINEN CHUTES ARE PROTECTED PER NFPA 13
4. PROVIDE HEAD GUARDS ON ALL UPRIGHT SPRINKLERS
5. SYSTEMS SHALL BE DESIGNED TO MATCH SMOKE BARRIERS, SMOKE
COMPARTMENTS, AND FIRE ALARM ZONES.
6. STAIR 3 SHALL FEED SMOKE COMPARTMENTS 2 AND 3 WITH NEW
CONTROL VALVE ASSEMBLIES
1 2
A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES
WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.
B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED
SPRINKLER EQUIPMENT TO BE REMOVED
C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL
RATINGS.
D. FLOOR 9 IS FED BY 2 (TWO) 6" STANDPIPES (STAIR 5 AND STAIR 3)
E. DESIGN BASED ON LIGHT / ORDINARY HAZARD OCCUPANCY PER PROJECT
SPECIFICATIONS.
F. MATERIALS, FABRICATION AND INSTALLATION SHALL BE IN ACCORDANCE
WITH PROJECT SPECIFICATIONS.
G. COORDINATION WITH OTHER TRADES SHALL BE DONE.
H. LIGHTING AND STORAGE OBSTRUCTIONS SHALL BE A MINIMUM OF 18"
BELOW DEFLECTOR.
I. PROVIDE PROPER SPRINKLER HEAD PROTECTION DURING CONSTRUCTION
TO UNSURE EXISTING SPRINKLER HEADS ARE NOT DAMAGED.
J. REFERENCE GI SHEETS FOR PHASING
K. FLEXIBLE SPRINKLER HOSE MAY BE BE USED.
L. REFERENCE ARCHITECTURAL SHEETS AE125 - AE128 FOR CEILING
ELEVATION.
SPRINKLER HEAD LEGEND
6 6
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-3300
WWW.VERITASFIRE.COM
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
R E:
F
/ 0 1-
F1
R E:
F
/ 0 1-
F1
Q R S T U V
C9-15
MEN'S BARIATRIC
C9-11
QUIET ROOM
C9-04
MEN'S
C9-03
GROUP
COUNSELING ROOM
C9-C02
CORRIDOR
C9-05
TOILET
C9-08
MEN'S BARIATRICC9-12
MEN'S
C9-14
MEN'S
C9-C01
CORRIDOR
C9-13
SOILED UTILITY
C9-01
EAST SUNROOM
C9-02
HAC
C9-07
OFFICE
C9-06
MECHANICAL
ST-2
STAIR
C9-15A
TOILET
C9-09
ELEC
C9-04A
TOILET
C9-08A
TOILET
C9-12A
TOILET
C9-14A
TOILET
C9-10
LAUNDRY
R E:
F
/ 0 1-
F1
R E:
F
/ 0 1-
F1
C9-06A
ELEC
C9-00
COURTYARD
SYM POSITION FINISH TEMP K NPT MFG. MODEL#
PENDENT CHROME/WHITE 200 5.60 1/2" *TYCO* TY-FRB
UPRIGHT BRASS 200 5.60 1/2" *TYCO* TY-FRB
SEMI-RECESSED - QR
UPRIGHT BRASS 200 5.60 1/2" *TYCO* STANDARD RESPONSETY-B
EXPOSED - QR
*OR EQUIVALENT *
PENDENT CHROME/WHITE 165 5.60 1/2" *TYCO* RAVEN INSTITUTIONAL - QR/EC
C:
\R ev it 2
2\1
9.2 5_
AR
CH
_R
_z mi lle r4
NR
TZ
.rv t
4/5 /20
6:
:56
A M
01-F13
FIRE PROTECTION PLAN - 9TH
FLOOR - EAST
RENOVATE 9TH FLOOR MENTAL
HEALTH
1111 EAST END BLVD, WILKES-BARRE, PA 18711
693-19-106
04/18/2023 KM BE
100% CONSTRUCTION
DOCUMENTS
VEG 19.25 DWG 08 of 09 FI
NA
L
DR
AW
IN
GS
S
UB
MI
TT
AL 3/16" = 1'-0"
9TH FLOOR FIRE PROTECTION PLAN - EASTF1
0 100% CONSTRUCTION DOCUMENTS 04/18/2023
Pl an
N or th Tr ue N or th
BLDG 01
7'- 6"
5'
1"
5'
5'
3/3
2"
1'
8'
1/1
6"
1'
1/3 2"
1'
1"
1"
1"
0'
1"
1"
9" 6"
3"
3"
1' 1'-
6" 1'
6"
1 1 /2"
1'
2' 1'
6"
1"
1' 3'
2' 1'
3/4
1'
4' 2'
1'
1/2
1' 6'
4' 2'
3/8
1'
8' 4'
3/1
6"
1' 8'
4' 2'
1/4
1'
8' 4'
1/8
1'
00KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
A. FIELD VERIFICATION IS REQUIRED OF EXISTING SPRINKLER ZONES. ZONES
WILL BE REQUIRED TO MATCH ALARM ZONES / SMOKE ZONES.
B. ALL EXISTING EQUIPMENT, PIPING, VALVES, HANGERS, AND ASSOCIATED
SPRINKLER EQUIPMENT TO BE REMOVED
C. REFERENCE SHEET GI002 FOR WALL TYPES AND FIRE/SMOKE WALL
RATINGS.
D. FLOOR…