This document is a Demolition Plan drawing for the 9th Floor West renovation at the Wilkes-Barre VA Medical Center, dated 04/18/2023. The architectural drawing (01-A3) shows a detailed floor plan with demolition areas marked in hatched gray, indicating comprehensive interior renovation work for a mental health facility.

The drawing includes specific Infection Control Risk Assessment (ICRA) implementation notes, such as installing floor-to-ceiling walls with 2x4 framing, 5/8" drywall on both sides, a 36" steel door with specific hardware requirements, 6-mil plastic sheeting at exit doors, and an electronic negative air monitor. The project is part of VA project #693-19-106, located at 1111 East End Blvd, Wilkes-Barre, PA, with Valhalla Engineering as the consulting firm. The drawing is part of a set of 53 total construction documents at the 100% completion stage.

View the file

Other files

File Type Posted
36C24425B0018 0001.docx DOCX document
19a - RFI Responses 2.pdf PDF
19b - RFI Responses 3.pdf PDF
16 - Wilkes Barre PA Campus Site Plan Crane Locations.pdf PDF
21 - WD PA20250095 M4 03-21-2025.pdf PDF
19 - RFI Responses.pdf PDF
18a - Safety Health During Construction Policy 18S-15-346.pdf PDF
20 - Brand Name JA 9F MHU 20241804.pdf PDF
18 - Safety VA Directive 7715 Rev 092023.pdf PDF
22 - 852.219-75 MUST SIGN AND RETURN WITH BID.pdf PDF
36C24425B0018_4.docx DOCX document
17 - Noise and Vibration Control.pdf PDF
12a - ICRA Introductory Information and Instructions.pdf PDF
36C24425B0018_3.docx DOCX document
15 - M P Cut Sheets 693 19 106.pdf PDF
12b - G-009 ICRA.pdf PDF
13 - Structural Calcs 693 19 106 .pdf PDF
14 - Estimate - 693 19 106 M P Calcs.pdf PDF
11 - Drawing Revisions.pdf PDF
12c - 17-H4 ICRA.pdf PDF
12e - 01-A4 ICRA.pdf PDF
12 - ICRA Memo.pdf PDF
36C24425B0018_2.docx DOCX document
09 - Drawings Mechanical.pdf PDF
07 - Drawings General V2.pdf PDF
10 - Drawings Electrical.pdf PDF
06 - Drawings Fire Alarm and Protection.pdf PDF
10a - 17-E43 Revisions 2024-05-30.pdf PDF
08 - Drawings Plumbing.pdf PDF
03 - Drawings Hazardous Materials.pdf PDF
36C24425B0018 IFB Solicitation.pdf PDF
05a - Drawings Architectural 2.pdf PDF
01c - 107316 Aluminum Canopy System.pdf PDF
01d - 220523 Gen Duty Valves Plumb Piping.pdf PDF
36C24425B0018_1.docx DOCX document
05b - Drawings Architectural 3.pdf PDF
02 - Drawings General V1.pdf PDF
05c - A15 Revisions 2024-05-30.pdf PDF
05 - Drawings Architectural 1.pdf PDF
04 - Drawings Structural.pdf PDF
01 - Specifications Project 693-19-106 .pdf PDF
01b - 087100 Door Hardware.pdf PDF
01a - 066116 Solid Surfacing Fabrication.pdf PDF
01e - 221100 Fac Water Distr.pdf PDF
36C24425B0018.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.

B.

C.

REFER TO STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL

DRAWINGS FOR MORE DEMOLITION INFORMATION.

REFER TO SHEET 01-I3 FOR ADDITIONAL GENERAL NOTES THAT ARE

APPLICABLE.

REMOVE ALL FLOOR FINISHES AND CEILINGS IN AREA OF DEMOLITION

UP

A B C D E F G

14F7 01-A10

F1 01-A10

F4 01-A10

2 2

R E:

F

/ 0 1-

A4

R E:

F

/ 0 1-

A4

DEMO LEGEND

EXISTING LINE TYPE

DEMOLISHED LINE TYPE

DEMOLISHED AREA

Pl an

N or th Tr ue N or th

BLDG 01

7'- 6"

5'

1"

5'

5'

3/3

2"

1'

8'

1/1

6"

1'

1/3 2"

1'

1"

1"

1"

0'

1"

1"

9" 6"

3"

3"

1' 1'-

6" 1'

6"

1 1 /2"

1'

2' 1'

6"

1"

1' 3'

2' 1'

3/4

1'

4' 2'

1'

1/2

1' 6'

4' 2'

3/8

1'

8' 4'

3/1

6"

1' 8'

4' 2'

1/4

1'

8' 4'

1/8

1'

00KEYNOTES

KEY PLAN

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C:

\R ev it 2

2\1

9.2 5_

AR

CH

_R

_z mi lle r4

NR

TZ

.rv t

4/2 1/2

3 9

:12 :33

A M

01-A3

DEMOLITION PLAN - 9TH FLOOR -

WEST

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 DR ZAM

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 03 of 53 FI

NA

L

DR

AW

IN

GS

S

UB

MI

TT

AL 3/16" = 1'-0"

9TH FLOOR DEMOLITION PLAN - WESTF1

1 Install ICRA wall from floor to ceiling 2x4, 58 drywall each side, taped and painted. 36" steel door and jambs. with gasket around jamb with door sweep.door closer, Yale lock 522 core, walk off sticky mat in front of the door

2 6 mil plastic at exit doors with Zipper

3 Electronic negative air monitor mounted outside the door

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text HEPA Negative air unit shall be vented out the window.

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .