This document is a Request for Information (RFI) Response detailing electrical system and design clarifications for the Wilkes-Barre VA Medical Center's 9th Floor Mental Health Renovation project. The RFI contains 5 specific technical inquiries and corresponding responses addressing electrical equipment, panel configurations, lighting fixtures, and distribution systems. Key technical details include:

The responses confirm existing electrical infrastructure will largely remain in place, with some modifications such as adding new panels in the 9th floor west electrical room, two new panels in the IT room, and additional panels in the warehouse. The electrical design will utilize existing panels for distribution, with specific notes about relocating branch circuit panelboards and creating new circuit distributions for receptacles and HVAC units. The responses provide technical clarifications about bus duct tap switches, panel locations, and lighting control configurations, helping to resolve potential ambiguities in the project's electrical design drawings.

View the file

Other files

File Type Posted
36C24425B0018 0001.docx DOCX document
19b - RFI Responses 3.pdf PDF
16 - Wilkes Barre PA Campus Site Plan Crane Locations.pdf PDF
21 - WD PA20250095 M4 03-21-2025.pdf PDF
19 - RFI Responses.pdf PDF
18a - Safety Health During Construction Policy 18S-15-346.pdf PDF
20 - Brand Name JA 9F MHU 20241804.pdf PDF
18 - Safety VA Directive 7715 Rev 092023.pdf PDF
22 - 852.219-75 MUST SIGN AND RETURN WITH BID.pdf PDF
36C24425B0018_4.docx DOCX document
17 - Noise and Vibration Control.pdf PDF
12a - ICRA Introductory Information and Instructions.pdf PDF
36C24425B0018_3.docx DOCX document
15 - M P Cut Sheets 693 19 106.pdf PDF
12b - G-009 ICRA.pdf PDF
13 - Structural Calcs 693 19 106 .pdf PDF
14 - Estimate - 693 19 106 M P Calcs.pdf PDF
11 - Drawing Revisions.pdf PDF
12c - 17-H4 ICRA.pdf PDF
12e - 01-A4 ICRA.pdf PDF
12d - 01-A3 ICRA.pdf PDF
12 - ICRA Memo.pdf PDF
36C24425B0018_2.docx DOCX document
09 - Drawings Mechanical.pdf PDF
07 - Drawings General V2.pdf PDF
10 - Drawings Electrical.pdf PDF
06 - Drawings Fire Alarm and Protection.pdf PDF
10a - 17-E43 Revisions 2024-05-30.pdf PDF
08 - Drawings Plumbing.pdf PDF
03 - Drawings Hazardous Materials.pdf PDF
36C24425B0018 IFB Solicitation.pdf PDF
05a - Drawings Architectural 2.pdf PDF
01c - 107316 Aluminum Canopy System.pdf PDF
01d - 220523 Gen Duty Valves Plumb Piping.pdf PDF
36C24425B0018_1.docx DOCX document
05b - Drawings Architectural 3.pdf PDF
02 - Drawings General V1.pdf PDF
05c - A15 Revisions 2024-05-30.pdf PDF
05 - Drawings Architectural 1.pdf PDF
04 - Drawings Structural.pdf PDF
01 - Specifications Project 693-19-106 .pdf PDF
01b - 087100 Door Hardware.pdf PDF
01a - 066116 Solid Surfacing Fabrication.pdf PDF
01e - 221100 Fac Water Distr.pdf PDF
36C24425B0018.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Request for Information Response

Can the product specification for the breakers required in switchboard A&B (make & type) feeding panels WHP-2, IT-17-1 and IT-17-2 as shown on drawing 01-E39 be provided.

Please refer to specifications package for electrical specification requirements related to breaker requirements. Refer to drawings for breaker amperage sizes. Current breakers on SWBD AB are Westinghouse make.

121 The following light fixture types are not on the project schedule: B11, B12, B21 & B22.

Change the light fixture types in the Light Fixture Schedule as follows: Change N11 to B11; N12 to B12;

N21 to B21; and N22 to B22.

REF DWG. 01-E20: There are none of the following lighting control power pack symbols on any drawing. Please locate for takeoff

All the lighting control devices (relays) are located in lighting control panels. (Reference example below)

REF DWG 01-E35: Note 1 on drawing 01-E35 shows a feeder from existing ATS, in BOLD, with a note: "FOR CONT. SEE DWG 01-E22" Apparently this is not the correct reference.

1- Please indicate the correct drawing reference. (Is the correct reference 01-E36?) Plan reference for each of the indicated ATS's would be helpful as well.

2- Is there an actual new feeder from ATS 1 to the existing 400amp bus duct NODE 220 end tap box? Feeder Size?

Relocation of ATS, where?

3- Same questions for ATS 3 & ATS 7 4- Is transformer T7 (DWG Ref 01-E36) new or existing? Size? Location?

5- Are there 3 breakers in the MDP (450A, 400A & 600A) existing or new.

There is no intent to change any of the ATSs. The drawings are for reference only in regard to the ATSs.

The For Cont can be ignored as it was part of an existing VA set of drawings and showed normal feed to ATSs. Since there will be no work required this can be ignored.

REF DWG 01-E37: 1- Existing panels EECR9A & EELS9 are shown in BOLD being fed from 2 separate existing bus ducts from apparently new bus duct tap switches along with new feeders, is this correct?

1- Is the transformer fed from EECR9A relocated? Re-fed?

2- Is panel EECR9B relocated? Re-fed?

3- Please indicate bus duct manufacturer, model # and year of installation.

4- DWG 01-E36: Are the bus end tap boxes for NODEs 80 & 100 existing to be re-used and are the bus tap switches feeding panels SPP9, SPP9B, SLP (& ELP9 existing or new) 5- DWG 01-E35: Are the bus tap switches feeding panels SELS9, EECR9A, EELS9 & SECR9A existing or new?

The bus duct, bus duct tap switches, and panels EECR9A and EELS9 are all existing equipment. the transformer fed from EECR9A is NOT relocated. Panel EECR9B is NOT relocated.

The electrical design for lighting and power utilizes the existing panels for distribution. There is no work associated with existing panels except as provided by specific key notes. An additional panel will be required on the 9th floor in the west electrical room to accommodate new circuit needs. Two new panels are required for the IT room. An additional panel will also be required in the warehouse to accommodate new circuit needs. Two new panels will be needed in the new IT room in the warehouse. The Warehouse electrical design will involve relocation of an existing branch circuit panelboard and new distribution to the receptacles and HVAC units in the remodeled area.

REF DWG 01-E37: There are 2 panel SLP9s shown, one on DWG 01-E37 & one on DWG 01-E36. Is this an error? Please advise.

One sheet is the SLD & one is the Riser Diagram. This is not an error. Use either drawing to locate relevant panels to their floors. The drawings are reference drawings that were provided by the VA. For this panel the contractor can use the panel schedule shown as an existing panel to be reused.