The provided file is a set of mechanical engineering drawings for the Wilkes-Barre VA Medical Center's 9th Floor Mental Health Renovation project (Project #693-19-106). The comprehensive 34-page technical document includes detailed mechanical plans, equipment schedules, piping layouts, control instrumentation diagrams, and typical mechanical system installation details for HVAC, plumbing, and steam systems.

Key technical elements include renovations to mechanical systems on the 9th floor and warehouse areas, involving air handling units (AHUs), terminal units, exhaust fans, steam traps, clean steam generators, split system air conditioners, and associated ductwork and piping. The drawings specify equipment like Trane air handling units, Mitsubishi split systems, and Greenheck exhaust fans, with specific technical requirements for installation, control sequences, and system performance. The project involves comprehensive mechanical system upgrades with a focus on precise environmental control for a mental health facility, including detailed specifications for air distribution, temperature regulation, and system integration.

View the file

Other files

File Type Posted
36C24425B0018 0001.docx DOCX document
19a - RFI Responses 2.pdf PDF
19b - RFI Responses 3.pdf PDF
16 - Wilkes Barre PA Campus Site Plan Crane Locations.pdf PDF
21 - WD PA20250095 M4 03-21-2025.pdf PDF
19 - RFI Responses.pdf PDF
18a - Safety Health During Construction Policy 18S-15-346.pdf PDF
20 - Brand Name JA 9F MHU 20241804.pdf PDF
18 - Safety VA Directive 7715 Rev 092023.pdf PDF
22 - 852.219-75 MUST SIGN AND RETURN WITH BID.pdf PDF
36C24425B0018_4.docx DOCX document
17 - Noise and Vibration Control.pdf PDF
12a - ICRA Introductory Information and Instructions.pdf PDF
36C24425B0018_3.docx DOCX document
15 - M P Cut Sheets 693 19 106.pdf PDF
12b - G-009 ICRA.pdf PDF
13 - Structural Calcs 693 19 106 .pdf PDF
14 - Estimate - 693 19 106 M P Calcs.pdf PDF
11 - Drawing Revisions.pdf PDF
12c - 17-H4 ICRA.pdf PDF
12e - 01-A4 ICRA.pdf PDF
12d - 01-A3 ICRA.pdf PDF
12 - ICRA Memo.pdf PDF
36C24425B0018_2.docx DOCX document
07 - Drawings General V2.pdf PDF
10 - Drawings Electrical.pdf PDF
06 - Drawings Fire Alarm and Protection.pdf PDF
10a - 17-E43 Revisions 2024-05-30.pdf PDF
08 - Drawings Plumbing.pdf PDF
03 - Drawings Hazardous Materials.pdf PDF
36C24425B0018 IFB Solicitation.pdf PDF
05a - Drawings Architectural 2.pdf PDF
01c - 107316 Aluminum Canopy System.pdf PDF
01d - 220523 Gen Duty Valves Plumb Piping.pdf PDF
36C24425B0018_1.docx DOCX document
05b - Drawings Architectural 3.pdf PDF
02 - Drawings General V1.pdf PDF
05c - A15 Revisions 2024-05-30.pdf PDF
05 - Drawings Architectural 1.pdf PDF
04 - Drawings Structural.pdf PDF
01 - Specifications Project 693-19-106 .pdf PDF
01b - 087100 Door Hardware.pdf PDF
01a - 066116 Solid Surfacing Fabrication.pdf PDF
01e - 221100 Fac Water Distr.pdf PDF
36C24425B0018.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA OF WORK

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\R ev it

\1 9.

_A

R C

H _R

_z m ill er 4N

R T

Z .r vt 4/

/2

4:

:4

P M

01-12

COVER - VOLUME 2 RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

01 & 17

04/18/2023 DR ZAM

100% CONSTRUCTION

DOCUMENTS

VEG 19.25

WILKES-BARRE VA MEDICAL CENTER

1111 EAST END BLVD, WILKES-BARRE, PA 18711

VAMC PROJECT #: 693-19-106

RENOVATE 9TH FLOOR MENTAL HEALTH

DWG 01 of 01 F

IN

A L

D R

A W

IN

G

S S

U B

M

IT

T A

L

SHEET

NUMBER SHEET NAME

GENERAL

01-12 COVER - VOLUME 2

PLUMBING

01-P1 PLUMBING ABBREVIATIONS, SYMBOLS, & LEGENDS

01-P2 EQUIPMENT & FIXTURE SCHEDULES

01-P3 DEMOLITION PLAN - 8TH FLOOR WEST

01-P4 DEMOLITION PLAN - 8TH FLOOR CENTER

01-P5 DEMOLITION PLAN - 8TH FLOOR EAST

01-P6 DEMOLITION PLAN - 9TH FLOOR WEST

01-P7 DEMOLITION PLAN - 9TH FLOOR CENTER

01-P8 DEMOLITION PLAN - 9TH FLOOR EAST

17-P9 DEMOLITION PLAN - WAREHOUSE

01-P10 DOMESTIC WATER PLAN - 9TH FLOOR WEST

01-P11 DOMESTIC WATER PLAN - 9TH FLOOR CENTER

01-P12 DOMESTIC WATER PLAN - 9TH FLOOR EAST

17-P13 DOMESTIC WATER PLAN - WAREHOUSE

01-P14 DOMESTIC WATER ISOMETRIC

01-P15 DRAIN-WASTE-VENT PLAN - 8TH FLOOR WEST

01-P16 DRAIN-WASTE-VENT PLAN - 8TH FLOOR CENTER

01-P17 DRAIN-WASTE-VENT PLAN - 8TH FLOOR EAST

01-P18 DRAIN-WASTE-VENT PLAN - 9TH FLOOR WEST

01-P19 DRAIN-WASTE-VENT PLAN - 9TH FLOOR CENTER

01-P20 DRAIN-WASTE-VENT PLAN - 9TH FLOOR EAST

17-P21 DRAIN-WASTE-VENT PLAN - WAREHOUSE

01-P22 DRAIN-WASTE-VENT ISOMETRIC

01-P23 ENLARGED DOMESTIC PLANS

01-P24 ENLARGED DOMESTIC PLANS

MECHANICAL

01-M1 MECHANICAL ABBREVIATIONS & NOTES

01-M2 MECHANICAL SYMBOLS

17-M3 EQUIPMENT SCHEDULES - WAREHOUSE

01-M4 EQUIPMENT SCHEDULES - 9TH FLOOR

01-M5 EQUIPMENT SCHEDULES - 9TH FLOOR

01-M6 DEMOLITION PLAN - 9TH FLOOR WEST

01-M7 DEMOLITION PLAN - 9TH FLOOR CENTER

01-M8 DEMOLITION PLAN - 9TH FLOOR EAST

17-M9 DEMOLITION PLAN - WAREHOUSE

01-M10 HVAC PLAN - 9TH FLOOR WEST

01-M11 HVAC PLAN - 9TH FLOOR CENTER

01-M12 HVAC PLAN - 9TH FLOOR EAST

17-M13 HVAC PLAN - WAREHOUSE

17-M14 HVAC PLAN - WAREHOUSE ROOF

01-M15 PIPING PLAN - 9TH FLOOR WEST

01-M16 PIPING PLAN - 9TH FLOOR CENTER

01-M17 PIPING PLAN - 9TH FLOOR EAST

17-M18 PIPING PLAN - WAREHOUSE

17-M19 PIPING PLAN - WAREHOUSE ROOF

01-M20 CONTROLS & INSTRUMENTATION PLAN - 9TH FLOOR WEST

01-M21 CONTROLS & INSTRUMENTATION PLAN - 9TH FLOOR CENTER

01-M22 CONTROLS & INSTRUMENTATION PLAN - 9TH FLOOR EAST

17-M23 CONTROLS & INSTRUMENTATION PLAN - WAREHOUSE

17-M24 CONTROLS & INSTRUMENTATION PLAN - WAREHOUSE ROOF

01-M25 CONTROLS & INSTRUMENTATION DETAILS

01-M26 CONTROLS & INSTRUMENTATION DETAILS

01-M27 CONTROLS & INSTRUMENTATION DETAILS

01-M28 ENLARGED SECTIONS - 9TH FLOOR

01-M29 TYPICAL PATIENT ROOM - 9TH FLOOR

01-M30 ENLARGED PLANS - 9TH FLOOR

01-M31 ENLARGED PLANS - 9TH FLOOR ROOF

01-M32 TYPICAL DETAILS

01-M33 TYPICAL DETAILS

01-M34 TYPICAL DETAILS

SHEET INDEX - VOLUME 2 OF 2RENDERED IMAGEAREA OF WORK

N o rt h

9TH FLOOR

WAREHOUSE

SHEET

NUMBER SHEET NAME

ELECTRICAL

01-E1 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES

01-E2 ELECTRICAL SYMBOLS

01-E3 DEMOLITION PLAN - 9TH FLOOR WEST

01-E4 DEMOLITION PLAN - 9TH FLOOR CENTER

01-E5 DEMOLITION PLAN - 9TH FLOOR EAST

17-E6 DEMOLITION PLAN - WAREHOUSE

01-E7 DEMOLITION RCP - 9TH FLOOR WEST

01-E8 DEMOLITION RCP - 9TH FLOOR CENTER

01-E9 DEMOLITION RCP - 9TH FLOOR EAST

17-E10 DEMOLITION RCP - WAREHOUSE

01-E11 LIGHTING RCP - 9TH FLOOR WEST

01-E12 LIGHTING RCP - 9TH FLOOR CENTER

01-E13 LIGHTING RCP - 9TH FLOOR EAST

17-E14 LIGHTING RCP - WAREHOUSE

01-E15 LIGHTING CONTROL RCP - 9TH FLOOR WEST

01-E16 LIGHTING CONTROL RCP - 9TH FLOOR CENTER

01-E17 LIGHTING CONTROL RCP - 9TH FLOOR EAST

17-E18 LIGHTING CONTROL RCP - WAREHOUSE

01-E19 LIGHTING FIXTURE SCHEDULES

01-E20 LIGHTING CONTROL SCHEDULES

01-E21 LIGHTING CONTROL PANEL SCHEDULES

01-E22 DIGITAL LOW VOLTAGE LIGHTING CONTROL WIRING DIAGRAMS

01-E23 ANALOG LINE VOLTAGE LIGHTING CONTROL WIRING DIAGRAMS

01-E24 NETWORKED LIGHTING CONTROL DETAILS

01-E25 POWER PLAN - 9TH FLOOR WEST

01-E26 POWER PLAN - 9TH FLOOR CENTER

01-E27 POWER PLAN - 9TH FLOOR EAST

17-E28 POWER PLAN - WAREHOUSE

17-E29 POWER PLAN - WAREHOUSE ROOF

01-E30 EQUIPMENT SCHEDULE

01-E31 PANEL SCHEDULES - 9TH FLOOR

01-E32 PANEL SCHEDULES - 9TH FLOOR

01-E33 PANEL SCHEDULES - 9TH FLOOR

17-E34 PANEL SCHEDULES - WAREHOUSE

01-E35 SINGLE LINE DIAGRAM EMERGENCY

01-E36 SINGLE LINE DIAGRAM NORMAL

01-E37 ELECTRICAL RISER DIAGRAM

01-E38 SINGLE LINE DIAGRAM

01-E39 ONE-LINE DIAGRAM

01-E40 TELECOM PLAN - 9TH FLOOR WEST

01-E41 TELECOM PLAN - 9TH FLOOR CENTER

01-E42 TELECOM PLAN - 9TH FLOOR EAST

17-E43 TELECOM PLAN - WAREHOUSE

01-E44 NURSE CALL PLAN - 9TH FLOOR WEST

01-E45 NURSE CALL PLAN - 9TH FLOOR CENTER

01-E46 NURSE CALL PLAN - 9TH FLOOR EAST

01-E47 SECURITY PLAN - 9TH FLOOR WEST

01-E48 SECURITY PLAN - 9TH FLOOR CENTER

01-E49 SECURITY PLAN - 9TH FLOOR EAST

17-E50 SECURITY PLAN - WAREHOUSE

01-E51 ENLARGED TELECOM TR ROOM

17-E52 ENLARGED TELECOM TR ROOM - WAREHOUSE

01-E53 TELECOM DETAILS

01-E54 TYPICAL DETAILS

01-E55 TYPICAL DETAILS

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

ZMiller Image

HVAC GENERAL NOTES

A. PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED

IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING. REF

SPECIFICATION 23 05 11.

B. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN

OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS IN INCHES UNO.

REF SPECIFICATION 23 31 00.

C. REFER TO ARCHITECTURAL CEILING PLANS FOR CEILING TYPES IN EACH

SPACE. MINIMUM 24"X24" ACCESS PANELS ARE REQUIRED IN HARD CEILINGS

FOR VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, AND SO FORTH.

COORDINATE FINAL LOCATIONS IN THE FIELD FOR BEST ACCESS. REF

SPECIFICATION 08 31 13.

D. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT

SYSTEM, TERMINAL UNITS, FILTERS, COILS, AND SO FORTH.

E. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT,

SEE EQUIPMENT DETAILS AND RESPECTIVE SPECIFICATIONS.

F. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE

MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

G. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE

INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 7" ABOVE FINISHED

FLOOR.

H. PRESSURES LISTED ARE GAGE PRESSURE UNLESS NOTED OTHERWISE.

I. CONTROL SYSTEM EQUIPMENT SHALL BE COMPATIBLE WITH EXISTING

BUILDING MANAGEMENT SYSTEM CONTROLS. EXTEND EXISTING CONTROL

SYSTEM TO INCLUDE CONTROLS AND SEQUENCES SHOWN. REF

SPECIFICATION 23 09 23.

J. COORDINATE EXISTING FIRE SPRINKLER HEADS AND LIGHTS WITH DUCTS

AND DIFFUSERS.

K. IN THE FOLLOWING SPACES, THE USE OF FLEXIBLE DUCT IS PROHIBITED:

a. PATIENT ROOMS

b. ISOLATION ROOMS

c. CLEAN ROOMS

d. CLINICAL LABORATORIES

L. SUBMIT COMPLETE CONSOLIDATED AND COORDINATED SHOP DRAWINGS

FOR NEW SYSTEMS, AND FOR EXISTING SYSTEMS THAT ARE IN THE SAME

AREAS. DO NOT INSTALL EQUIPMENT FOUNDATIONS, EQUIPMENT, OR PIPING

UNTIL COORDINATION/SHOP DRAWINGS HAVE BEEN APPROVED. REF

SPECIFICATION 01 33 23 AND 22 05 11.

GENERAL NOTES

A. PROVIDE AN INFECTION CONTROL RISK ASSESSMENT BARRIER AROUND

THE PROJECT AREA CONSISTENT WITH THE CONTRACTOR'S PHASING PLAN

AS APPROVED BY THE VHA.

MECHANICAL ASCE 7-16 NONSTRUCTURAL SEISMIC

RESTRAINT AND ANCHORAGE NOTES

PROVIDE AND DESIGN SEISMIC BRACING FOR MECHANICAL EQUIPMENT, PIPING

AND DUCTWORK IN ACCORDANCE WITH SPECIFICATION SECTIONS 13 05 41

SEISMIC RESTRAINT REQUIREMENTS FOR NONSTRUCTURAL COMPONENTS AND

23 05 41 NOISE AND VIBRATION CONTROL.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\J D ez m an \D oc um en ts

\1 9.

_M

E C

H -P

LU

M

_R

_J D ez m an .rv t 4/

/2

1:

:3

P M

01-M1

MECHANICAL ABBREVIATIONS &

NOTES

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

01 & 17

04/18/2023 MB RT

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 1 of 34 F

IN

A L

D R

A W

IN

G

S U

B M

IT

T

A L

A

A/E ARCHITECT / ENGINEER

AAV AUTOMATIC AIR VENT

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER, MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AHU AIR HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND

AIR CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

B

B BOILER

BAS BUILDING AUTOMATION SYSTEM

BASC BUILDING AUTOMATION SYSTEM CONTRACTOR

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT EXCHANGER

BLDG BUILDING

BOD BASIS OF DESIGN

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BT BLOWOFF TANK

BTC BLOWOFF TANK CONTROL VALVE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

BP

BP BOOSTER PUMP

C

CAP CAPACITY

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CUBIC FEET

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CI CAST IRON

CKT CIRCUIT

CLG COOLING

CM CARBON MONOXIDE

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CTRL CONTROL

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CUP CENTRAL UTILITY PLANT

CV CONSTANT VOLUME

CV CONTROL VALVE

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO COOLING TOWER)

CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)

D

D DAMPER

DB DECIBEL

DBT DRY BULB TEMPERATURE

DCW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROLS

DEG DEGREES

MECHANICAL ABBREVIATIONS

DEMO DEMOLISH

DF DIFFUSER

DI DEIONIZED WATER

DIA DIAMETER

DN DOWN

DP DEW POINT TEMPERATURE

DP DIFFERENTIAL PRESSURE

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

E

E EXISTING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EAT-DB ENTERING AIR TEMPERATURE DRY BULB

EC ELECTRONICALLY COMMUTATED

ECC ENGINEERING CONTROL CENTER

ECM ELECTRONICALLY COMMUTATED MOTOR

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ERW ENERGY RECOVERY WHEEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

F

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/S FIRE SMOKE DAMPER

FA FIRE ALARM

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FOHX FUEL OIL HEAT EXCHANGER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WG FEET WATER GAUGE

FT-LB FOOT-POUND

FTR FINNED TUBE RADIATION

FV FACE VELOCITY

G

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GHW GLYCOL HEATING WATER

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

GWB GYPSUM WALL BOARD

H

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HR HOUR

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTG HEATING

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVD HOISTWAY VENT DAMPER

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING WATER PUMP

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

HZ HERTZ

I

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCHES OF WATER COLUMN

IN WG INCHES OF WATER, GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IU INDUCTION UNIT

IV INLET VANES

K

KEA KITCHEN EXHAUST AIR

KW KILOWATT

KWH KILOWATT HOURS

L

LAT LEAVING AIR TEMPERATURE

LAT-DB LEAVING AIR TEMPERATURE DRY BULB

LB POUND

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LLHX LIQUID TO LIQUID HEAT EXCHANGER

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKEUP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM CIRCUIT AMPACITY

MEP MECHANICAL ELECTRICAL PLUMBING

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MOCP MAXIMUM OVERCURRENT PROTECTION

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MRI MAGNETIC RESONANCE IMAGING UNIT

MTD MEAN TEMPERATURE DIFFERENCE

MUA MAKEUP AIR

MV MECHANICAL VENT

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

N

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOW METER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPS NOMINAL PIPE SIZE

NPSH NET POSITIVE SUCTION HEAD

NPSHA NPSH AVAILABLE

NTS NOT TO SCALE

O

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OAL OUTSIDE AIR LOUVER

OD OUTER DIAMETER

OFM OIL FLOWMETER

OH OVER HEAD

OR OPERATING ROOM

P

P PUMP

P&ID PROCESS & INSTRUMENTATION DIAGRAM

P/T PRESSURE/TEMPERATURE

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAUGE

PGW PROPYLENE GLYCOL-WATER SOLUTION

PH PHASE

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRESS PRESSURE

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH, ABSOLUTE

PSIG POUNDS PER SQUARE INCH, GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

Q

QTY QUANTITY

R

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCP RADIANT CEILING PANEL

RD REFRIGERANT DISCHARGE

REA RELIEF AIR

REF REFERENCE OR REFER TO

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOFTOP UNIT

RV RELIEF VALVE

S

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SIM SIMILAR

SOO SEQUENCE OF OPERATION

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND DISTRIBUTION

SPP SINGLE POINT POWER

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT

SQ IN SQUARE INCHES

SR SUPPLY AIR REGISTER

SSHX STEAM TO STEAM HEAT EXCHANGER

SSR SOLID SEPARATOR

SST STAINLESS STEEL

ST STEAM TRAP

SUH STEAM UNIT HEATER

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

T

T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE

TAB TESTING, ADJUSTING, AND BALANCING

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TWU THRU-WALL UNIT

U

UC UNIT COOLER

UCT UNDERCUT

UF UNDER FLOOR

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

UNO UNLESS NOTED OTHERWISE

V

V VALVE

VAC VOLTAGE ALTERNATING CURRENT

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

W

W WASTE

WAG WASTE ANESTHESIA GAS

WB WET BULB

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCPU WATER COOLED HEAT PUMPS

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

X

XP EXPLOSION-PROOF

Y

YR YEAR

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

04/20/2023

T

TT

M

MT

PT

TT

FT

IT

CT

SD

PDT

TSL

HS

M

LC

LT

PDS

TSH

EPT

AT

CO2

AT

CO

AT

OC

BASCP

VFD

PSH

PSL

26-SF 3

26-TU-1-1

H4

H7

A

BDD

FD

VD

N

1/24

F/S DPR

AV

MV

RH

SCH

SH

TH

PS

RC

WB

CSH

SS

VR

CTPS

CTPD

FWPS

FWPD

CF

FWS

BWS

CBD

BO

TC

A

OFL

HW

SW

CW

FOR

FOS

LPG(I)

NG(I)

NG

HPS

HPR

MPS

MPR

LPS

LPR

PC

HWS

HWR

GHS

GHR

V

SWS

SWR

CWR

CHR

GCR

RL

RS

RHG

CWS

CHS

GCS

MW

D

GRR

GRS

D

R

FC

10x8

M

DETAIL REFERENCE

DRAWING NUMBER WHERE SHOWN

SECTION REFERENCE

TYPICAL UNIT NUMBER

BUILDING NUMBER WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NUMBER 3 IN BUILDING NUMBER 26

EQUIPMENT ABBREVIATION (EG SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NUMBER 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NUMBER 1

DRAWING NUMBER WHERE DRAWN

BUILDING NUMBER WHERE EQUIPMENT IS LOCATED

* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY STANDARD PRACTICE SP-58

TEST PLUG (P/T PORT)

AUTOMATIC AIR VENT

MANUAL AIR VENT

QUICK-COUPLE HOSE CONNECTOR

CONNECT TO EXISTING

LIMIT OF DEMOLITION

AIR SEPARATOR

EXISTING DUCT TO BE REMOVED

LOUVER (REF SPECIFICATION 08 90 00)

FLEXIBLE DUCTWORK (INSULATED)

DUCT WITH SOUND LINING

MANUAL VOLUME DAMPER

FIRE DAMPER

BACK DRAFT DAMPER

COMBINATION FIRE/SMOKE DAMPER

AUTOMATIC CONTROL DAMPER

2'x2' RADIANT CEILING PANEL

2'x4' RADIANT CEILING PANEL

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

SQUARE 1-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

SUPPLY REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING

REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER

OR GRILLE (WALL TYPE)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

(REF TYPICAL DETAILS SHEETS)

CONNECT NEW DUCT TO EXISTING DUCT

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

LIMIT OF DEMOLITION

FLEXIBLE CONNECTION, EQUIPMENT,

VIBRATION, OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS, INCHES):

WIDTH x DEPTH (RECTANGULAR)

WIDTH / DEPTH (FLAT OVAL)

DIAMETER Ø (ROUND)

EXISTING DUCT TO REMAIN

GENERIC VALVE (REF SPEC FOR TYPE)

GLOBE VALVE

3/4" HOSE ADAPTER

CHECK VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE PIPE CONNECTOR

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

CONTROL VALVE

CONTROL BUTTERFLY VALVE

THREE-WAY CONTROL VALVE

PRESSURE REGULATING (IE REDUCING) VALVE

PRESSURE SAFETY VALVE / RELIEF VALVE

WATER FLOW BALANCE VALVE

GATE VALVE WITH GLOBE-VALVED BYPASS

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

WATER LEVEL CONTROLLER

FLOW METER

ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT

ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER -

WALL MOUNT

TEMPERATURE TRANSMITTER

TEMPERATURE TRANSMITTER, AVERAGING ELEMENT

MOISTURE (HUMIDITY) TRANSMITTER

PRESSURE TRANSMITTER

FLOW TRANSMITTER

CURRENT TRANSMITTER

CONDUCTIVITY TRANSMITTER

SMOKE DETECTOR

PRESSURE DIFFERENTIAL TRANSMITTER

PRESSURE DIFFERENTIAL SWITCH

HAND SWITCH (HAND-OFF-AUTO SWITCH)

VALVE OR DAMPER ACTUATOR

TEMPERATURE SWITCH, LOW (FREEZESTAT)

TEMPERATURE SWITCH, HIGH

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SWITCH HIGH

PRESSURE SWITCH LOW

ELECTRONIC TO PNEUMATIC TRANSDUCER

CARBON DIOXIDE TRANSMITTER

CARBON MONOXIDE TRANSMITTER

OCCUPANCY SENSOR

BAS CONTROL PANEL*

VARIABLE SPEED MOTOR CONTROLLER

CONTROLS SYMBOLS

GENERAL SYMBOLS AND TAGS

HVAC SYMBOLS PIPING SYMBOLSPIPING SYMBOLSHVAC SYMBOLS

FLOOR-SUPPORTED PIPE STAND

RISER CLAMP (TYPE 42)*

WALL BRACKET (TYPE 31, 32, 33)*

CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*

SLIDING SUPPORTS (TYPE 35)*

TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT

TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)

HOT WATER

ROLLER-TYPE HANGER

VARIABLE SPRING-TYPE HANGER (TYPE 51)*

SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*

CLEVIS-TYPE HANGER

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HIGH PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

LOW PRESSURE STEAM CONDENSATE RETURN

CONDENSATE PUMP DISCHARGE

HEATING WATER SUPPLY

HEATING WATER RETURN

GLYCOL-WATER HEATING SUPPLY

GLYCOL-WATER HEATING RETURN

SOLAR WATER SUPPLY

SOLAR WATER RETURN

REFRIGERANT LIQUID

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

CONDENSER WATER SUPPLY (FROM TOWER)

CONDENSER WATER RETURN (TO TOWER)

CHILLED WATER SUPPLY

CHILLED WATER RETURN

GLYCOL-WATER CHILLED SUPPLY

GLYCOL-WATER CHILLED RETURN

MAKE-UP WATER

DRAIN LINE

VENT LINE

GLYCOL-WATER RUN AROUND SUPPLY

GLYCOL-WATER RUN AROUND RETURN

FEEDWATER PUMP DISCHARGE

FEEDWATER PUMP SUCTION

CONDENSATE TRANSFER PUMP DISCHARGE

CONDENSATE TRANSFER PUMP SUCTION

VACUUM CONDENSATE RETURN

TUBE CLEANER WATER SUPPLY

BOILER BLOWOFF

CONTINUOUS BLOWDOWN

BOILER WATER SAMPLE

FEEDWATER SAMPLE (FROM DEAERATOR)

CHEMICAL FEED

OVERFLOW

COMPRESSED AIR

NATURAL GAS MAIN FUEL

NATURAL GAS IGNITER FUEL

LIQUEFIED PETROLEUM GAS IGNITER FUEL

FUEL OIL SUPPLY

FUEL OIL RETURN

COLD WATER (CITY WATER)

SOFTENED WATER

THERMOMETER

PRESSURE GAGE

FLOW ELEMENT

SIGHT GLASS

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

FLOAT & THERMOSTATIC TRAP SET

INCLUDING PIPING ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

POINT OF CHANGE IN DUCT CONSTRUCTION BY STATIC

PRESSURE CLASS. THE NUMBER ASSIGNS PRESSURE

CLASS (IN OF WATER) WHICH WILL ACCOMMODATE

MAXIMUM OPERATING PRESSURE IN THE DUCT

SUBSECTION. THE SYMBOL CONTINUES THE

ASSIGNMENT UNTIL THE DUCT TERMINATES OR

ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.

LC

FE

DEMOLISHED EQUIPMENT (SHAPE VARIES, REF:

SYMBOLS, TAGS, & NOTES)

(E) EXISTING COMPONENT

(X) DEMOLISHED COMPONENT

PIPE TO BE DEMOLISHED

MS MOISTURE (HUMIDITY) SWITCH

FSH FLOW SWITCH HYDRONIC

DS DOOR SWITCH

PR PILOT RELAY

MOTOR STARTER

WELDED STAINLESS STEEL DUCT

PROVIDE FLEXIBLE SHAFT WRAP A MINIMUM OF 10 FT ON

BOTH SIDES OF FIRE BARRIER PENETRATIONS. THE FIRE

RESISTIVE RATING OF THE WRAP SHALL BE EQUIVALENT TO

THAT OF THE BARRIER PENETRATED. WRAP ENTIRETY OF

RISERS WITHIN SHAFTS SHARED WITH ENVIRONMENTAL AIR

DUCTS.

AIR DEVICE MARK

AIR DEVICE CFM1,200

SD-1

GUIDE

WM WATER FLOW METER

SENSOR WELL / O-LET

NEW PIPING

EXISTING PIPING

MV MECHANICAL VENT LINE

CD CONDENSATE DRAIN LINE

AFMD AIR FLOW MEASUREMENT DEVICE

PUMP TRAP SET INCLUDING PIPING

ACCESSORIES SEE DETAIL

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

DUCT-MOUNTED COIL (HOT WATER

OR STEAM COIL)

DUCT-MOUNTED COIL (ELECTRIC)

SDPR

SMOKE DAMPER

## GENERAL EQUIPMENT FURNISHED BY OTHERS; REF

EQUIPMENT SCHEDULES SHEET FOR CONNECTION

SCHEDULE

DOUBLE-LINED VALVE

(REFER TO SPECS FOR TYPE)

# ##-M##

DETAIL

SHEET

EQUIPMENT APPLICABLE P&ID, SOO, &

POINT LIST REFERENCE

NEW EQUIPMENT (SHAPE VARIES, REF: SYMBOLS, TAGS,

& NOTES. SCHEDULED ITEMS ARE NEW UNO)

SD DUCT SMOKE DETECTOR, UL268A. PROVIDE PER

NFPA 90A AND SPECIFICATION 28 31 00.

COORDINATE WITH FA CONTRACTOR.

* CONTROL PANELS, WHERE INDICATED ON PLANS, ARE INTENDED FOR

GENERAL PRELIMINARY COORDINATION ONLY. PROVIDE FINAL

CONTROLLER & PANEL TYPES, QUANTITIES, & ASSOCIATED UTILITIES (EG

POWER & DATA) TO ACHIEVE CONTROLS & INSTRUMENTATION DETAIL

SHEET SERIES REQUIREMENTS IN ACCORDANCE WITH SPECIFICATION 23

09 23. SUBMIT COORDINATED SHOP DRAWINGS INDICATING PROPOSED

FINAL PANEL LOCATIONS FOR VHA COR REVIEW AND APPROVAL.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\J D ez m an \D oc um en ts

\1 9.

_M

E C

H -P

LU

M

_R

_J D ez m an .rv t 4/

/2

1:

:3

P M

01-M2

MECHANICAL SYMBOLS RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

01 & 17

04/18/2023 MB RT

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 2 of 34 F

IN

A L

D R

A W

IN

G

S U

B M

IT

T

A L

A. PROVIDE SCHEDULED BASIS OF DESIGN OR APPROVED EQUAL. REFER TO

SPECIFICATIONS 01 33 23 AND 23 05 11 FOR FURTHER REQUIREMENTS.

B. SELECT EQUIPMENT FOR SCHEDULED PERFORMANCE AT 890 FT ELEVATION.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 82 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

2. FOR PUMP TRAPS, SCHEDULED

INLET PRESSURE IS MOTIVE

PRESSURE AND DP IS MOTIVE

MINUS BACK PRESSURE.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 36 00.

2. PROVIDE WITH FACTORY SOUND

ATTENUATOR.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 81 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTIONS 23 73 00 AND 23 74 13.

2. PROVIDE WITH 36" CURBED COIL

CONNECTION DOGHOUSES

MATCHING AHU CASING SPEC.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 81 00.

2. UNITS SHALL OPERATE

CONTINUOUSLY VIA INTERNAL

CONTROLS TO MAINTAIN ROOMS

SETPOINT TEMPERATURE OF 75°F

(ADJ).

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 34 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 82 16.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 40 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

2. PROVIDE PACKAGE WITH FACTORY

STEAM TRAPS. CAPACITY IS PER

MODULE.

3. PROVIDE OUTDOOR MODEL CSG

WITH FREEZE PROTECTION

PACKAGE.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 31 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\J D ez m an \D oc um en ts

\1 9.

_M

E C

H -P

LU

M

_R

_J D ez m an .rv t 4/

/2

1:

:4

P M

17-M3

EQUIPMENT SCHEDULES -

WAREHOUSE

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 MB RT

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 3 of 34 F

IN

A L

D R

A W

IN

G

S U

B M

IT

T

A L

STEAM UNIT HEATER (SUH) SCHEDULE

MARK DESCRIPTION AREA SERVED

STEAM COIL

(MBH)

STEAM

PRESSURE

(PSIG)

CONDENSATE

LOAD (LB/HR)

HEATING

(CFM)

HEATING COIL

EAT (°F)

HEATING COIL

LAT (°F)

MOTOR HP

ELECTRICAL DATA

BOD MFR AND

MODEL

REMARKS

VAC PH MCA MOCP

17-SUH-1 HORIZONTAL L1-100 STORAGE 47 2 49 630 70 100 1/12 115 1 1.7 15 MODINE HSB 47 1

17-SUH-2 HORIZONTAL L1-100 STORAGE 33 2 34 630 70 100 1/25 115 1 1.6 15 MODINE HSB 33 1

17-SUH-3 HORIZONTAL L1-100 STORAGE 24 2 25 370 70 100 1/60 115 1 1.6 15 MODINE HSB 24 1

17-SUH-4 HORIZONTAL L1-100 STORAGE 24 2 25 370 70 100 1/60 115 1 1.6 15 MODINE HSB 24 1

17-SUH-5 HORIZONTAL L1-112 MECH 18 2 19 340 70 100 1/60 115 1 0.8 15 MODINE HSB 18 1

TERMINAL UNIT (TU) SCHEDULE

MARK TYPE

MAX

CFM

MIN

CFM

MAX

TOTAL

APD

(IN WG)

REHEAT COIL

SINGLE POINT

ELECTRICAL

BOD MFR AND

MODEL

REMARKS

SOURCE

HTG

CFM

EAT

(°F)

LAT

(°F) MBH

EWT

(°F) GPM

WPD

(FT WG) VAC PH

MAX

LOAD

17-TU-01A SINGLE DUCT 510 340 1 0% GLYCOL 350 55 91.1 12.6 180 0.6 0.1 120 1 15 VA TITUS DESV 08 1,2

17-TU-01B SINGLE DUCT 1110 1070 1 0% GLYCOL 1090 55 85.0 35.1 180 1.1 0.14 120 1 15 VA TITUS DESV 10 1,2

17-TU-02 SINGLE DUCT 830 200 1 0% GLYCOL 210 55 88.2 7.5 180 0.5 0.2 120 1 15 VA TITUS DESV 08 1,2

17-TU-03 SINGLE DUCT 60 60 1 0% GLYCOL 60 55 104.1 1.7 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

17-TU-04 SINGLE DUCT 60 60 1 0% GLYCOL 60 55 104.1 1.6 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

17-TU-05 SINGLE DUCT 60 60 1 0% GLYCOL 60 55 104.1 1.6 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

17-TU-06 SINGLE DUCT 60 60 1 0% GLYCOL 60 55 104.1 1.6 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

17-TU-07 SINGLE DUCT 560 270 1 0% GLYCOL 320 55 85.0 10.3 180 0.7 0.26 120 1 15 VA TITUS DESV 08 1,2

17-TU-08 SINGLE DUCT 700 10 1 0% GLYCOL 140 55 89.8 5.1 180 0.5 0.1 120 1 15 VA TITUS DESV 08 1,2

SPLIT SYSTEM AIR CONDITIONER INDOOR UNIT (IDU) SCHEDULE

MARK LOCATION AREA SERVED TYPE

SUPPLY

CFM

OA

CFM

ESP

(IN WG)

COOLING REQUIREMENTS ELECTRICAL REQUIREMENTS

BOD MFR AND

MODELSOURCE

SEN

MBH

TOTAL

MBH

EAT-

DB

(°F)

EAT-

WB

(°F)

LAT-

DB

(°F)

LAT-

WB

(°F)

FAN

MOTOR

(WATTS)

VAC PH MCA

SPEED

CONTROL

17-IDU-2 BUILDING 17

L1-100E TELECOM

RM

HIGH WALL

DUCTLESS

770 0 0.5 17-ODU-2 24.0 24.0 79 61 55 50 -- 208 1 1.0 ECM

MITSUBISHI TPK

SERIES

SPLIT SYSTEM AIR CONDITIONER OUTDOOR UNIT (ODU) SCHEDULE

MARK

INDOOR

UNIT

SERVED STAGES

COOLING REQUIREMENTS ELECTRICAL DATA

BOD MFR AND MODEL REMARKS

MAX CAPACITY

(MBH) MIN EER / SEER

AMBIENT TEMP

(MAX / MIN)

(°F) VAC PH MCA MOCP

17-ODU-2 17-IDU-2 1 36 16 115 / -40 208 1 25 31

MITSUBISHI TRU

SERIES

1,2

CLEAN STEAM GENERATOR (CSG) SCHEDULE

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR SERVICE TYPE

SOURCE OF

MAKEUP

WATER CONDITIONS PRODUCED

STEAM FLOW

(LBS/HR)

PRODUCED

STEAM PRESS

(PSIG)

STEAM PRESSURE CONTROL

VALVE

(LBS/HR)

BASIS OF DESIGN OR

APPROVED EQUAL

REMARKS

FLOW (GPM) EWT (°F)

ENT CONTROL

VALVE (PSIG)

ENT HEAT

EXCHANGER (PSIG)

17-CSG-1 BLDG 17 ROOF BLDG 17 SUPPLY AIR HUMIDIFICATION

STEAM TO

STEAM

DCW 0.3 68 100 15 30 22 60 NORTEC SETC - MODEL 100 1, 2, 3

STEAM TRAP (ST) SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

CAPACITY AT

MIN DP

(LB/HR)

MIN DP

(PSIG)

MIN INLET

PRESSURE

(PSIG) TRAP TYPE

BOD MFR AND

MODEL

REMARKS

17-ST-5

BLDG 17

ROOF

17-AHU-1 PREHEAT

COIL

575 0.25 3 F&T ARMSTRONG 1811 1

AIR COOLED CONDENSING UNIT (ACCU) SCHEDULE

MARK LOCATION TYPE

COOLING REQUIREMENTS ELECTRICAL DATA

BOD MFR AND MODEL REMARKSMAX CAPACITY

(MBH)

MIN EER / SEER

AMBIENT TEMP

(°F)

VAC PH MCA MOCP

17-ACCU-1

BLDG 17

ROOF

SCROLL 240 9.8 / 13 105 208 3 110 125 TRANE TTA240 1, 2, 3, 4, 5, 6

NOTE: REFER TO 9TH FLOOR AIR DEVICE SCHEDULE ON 01-M4.

AIR HANDLING UNIT (AHU) SUMMARY SCHEDULE

MARK LOCATION

AREA AND/OR BLDG

SERVED

SUPPLY

AIRFLOW

(CFM)

OUTSIDE

AIRFLOW

(CFM)

SUPPLY

FAN

RETURN

FAN

EXHAUST

FAN

PRE-

FILTER

AFTER-

FILTER

HEAT

RECOVERY

PREHEAT

COIL

COOLING

COIL

REHEAT

COIL

HUMIDIFIER

MAXIMUM PHYSICAL CONSTRAINTS SINGLE POINT POWER

BOD MFR AND

MODEL

REMARKSOVERALL

HEIGHT

OVERALL

LENGTH

OVERALL

WIDTH

OVERALL

WEIGHT (LB)

VAC PH MCA MOCP

17-AHU-01 WAREHOUSE ROOF 17 5010 910 17-SF-1 - - 17-PF-1 - - 17-HC-1 17-CC-1 - 17-H-1 47.7" 66.5" 274.4" 4334 208 3 32 50 TRANE CSAA012 1,2

AHU SUPPLY FAN SCHEDULE

MARK

TOTAL

AIRFLOW

(CFM)

ESP

(IN WG)

TYPE

FAN

QTY

VFD

ELECTRICAL DATA (TOTAL ARRAY UNO)

REMARKSMOTOR HP

(EACH)

VAC PH MCA MOCP

17-SF-1 5010 1.5 DIRECT DRIVE 1 YES 7.5 SPP SPP SPP SPP 1,2

AHU COOLING COIL SCHEDULE

MARK

AIRFLOW

(CFM)

MAX FV

(FPM)

APD

(IN WG)

EAT-DB

(°F)

EAT-WB

(°F)

LAT-DB

(°F)

LAT-WB

(°F)

SEN

MBH

TOTAL

MBH

DIRECT EXPANSION (DX)

REMARKS

REFRIGERANT

PAIRED

CONDENSING UNIT

17-CC-1 5010 414 0.581 80.0 67.0 53.0 52.0 149 232 R-410A 17-ACCU-01 1

AHU PREHEAT COIL SCHEDULE

MARK

HEATING

AIRFLOW

(CFM)

MAX FV

(FPM)

APD

(IN WG)

EAT-DB

(°F)

LAT-DB

(°F)

MIN

CAPACITY

(MBH)

STEAM

PSIG ENT

CNTRL VALVE

PSIG ENT

COIL

STEAM FLOW

(LB/H)

17-HC-1 3250 450 0.11 40 65 90 30 22 95

AHU PRE-FILTER SCHEDULE

MARK

MERV

RATING

AIRFLOW

(CFM)

MAX

FINAL APD

(IN WG)

THICKNESS

(IN)

FILTER/RACK

TYPE

REMARKS

17-PF-1 7+11 5010 1.5 2 CARTRIDGE 1

SOUND ATTENUATING DEVICE (SAD) SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

TYPE

AIRFLOW

(CFM)

MAX APD

(IN WG)

INLET

SIZE

(IN)

LENGTH

(IN)

OCTAVE BAND DYNAMIC INSERTION LOSS (DB)

BOD MFR AND

MODEL

REMARKS

63 125 250 500 1000 2000 4000 8000

17-SAD-1 L1-103 OPEN OFFICE 17-AHU-1 RETURN STRAIGHT 3450 0.89 40 96 15 15 25 28 33 20 13 11 PRICE RSP SERIES 1

0 100% CONSTRUCTION DOCUMENTS 04/18/2023

AHU HUMIDIFIER SCHEDULE

MARK TYPE

DESIGN HUMIDIFICATION

AIRFLOW

(CFM)

EA-DP

(°F)

LA-DP

(°F)

STEAM

SOURCE

PSIG ENT

CONTROL VALVE

PSIG ENT

COIL

STEAM

LOAD (LB/H)

17-H-1 DISPERSION TUBE 5010 34.7 44.6 17-CSG-1 15 15 64.4

B. SELECT EQUIPMENT FOR SCHEDULED PERFORMANCE AT 890 FT ELEVATION.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTIONS 23 73 00 AND 23 74 13.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 36 00.

2. PROVIDE WITH FACTORY SOUND

ATTENUATOR.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 34 00.

2. PROVIDE WITH A BACKDRAFT

DAMPER.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 37 00.

2. MATCH RUN-OUT TO NECK SIZE

UNLESS OTHERWISE TAGGED.

3. BLACK SHADED CELLS INDICATE

NECK SIZES NOT APPLICABLE TO

GIVEN AIR DEVICE.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 34 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 82 16.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 40 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 37 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 81 00.

2. UNITS SHALL OPERATE

CONTINUOUSLY VIA INTERNAL

CONTROLS TO MAINTAIN ROOMS

SETPOINT TEMPERATURE OF 75°F

(ADJ).

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\J D ez m an \D oc um en ts

\1 9.

_M

E C

H -P

LU

M

_R

_J D ez m an .rv t 4/

/2

1:

:4

P M

01-M4

EQUIPMENT SCHEDULES - 9TH

FLOOR

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 MB RT

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 4 of 34 F

IN

A L

D R

A W

IN

G

S U

B M

IT

T

A L

TERMINAL UNIT (TU) SCHEDULE

MARK TYPE

MAX

CFM

MIN

CFM

MAX

TOTAL

APD

(IN WG)

REHEAT COIL

SINGLE POINT

ELECTRICAL

BOD MFR AND

MODEL

REMARKS

SOURCE

HTG

CFM

EAT

(°F)

LAT

(°F) MBH

EWT

(°F) GPM

WPD

(FT WG) VAC PH

MAX

LOAD

1-TU-12-1A SINGLE DUCT 410 240 1 0% GLYCOL 240 55 85.0 7.7 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-1B SINGLE DUCT 410 240 1 0% GLYCOL 240 55 85.0 7.7 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-2 SINGLE DUCT 320 200 1 0% GLYCOL 200 55 90.3 7.6 180 1.9 1.39 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-3 SINGLE DUCT 180 130 1 0% GLYCOL 130 55 86.9 4.5 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-4 SINGLE DUCT 320 200 1 0% GLYCOL 200 55 85.0 6.5 180 0.5 0.13 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-5 SINGLE DUCT 520 280 1 0% GLYCOL 280 55 85.0 9.0 180 0.7 0.31 120 1 15 VA TITUS DESV 08 1,2

1-TU-12-6 SINGLE DUCT 250 80 1 0% GLYCOL 90 55 94.6 3.8 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-7 SINGLE DUCT 310 80 1 0% GLYCOL 90 55 94.6 3.8 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-8 SINGLE DUCT 390 250 1 0% GLYCOL 250 55 85.0 8.1 180 0.5 0.11 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-9 SINGLE DUCT 330 270 1 0% GLYCOL 270 55 85.0 8.7 180 0.5 0.14 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-10 SINGLE DUCT 260 240 1 0% GLYCOL 240 55 85.0 7.7 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-11 SINGLE DUCT 600 580 1 0% GLYCOL 600 55 85.0 19.3 180 0.5 0.19 120 1 15 VA TITUS DESV 08 1,2

1-TU-12-12 SINGLE DUCT 350 270 1 0% GLYCOL 270 55 85.0 8.7 180 0.5 0.14 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-13 SINGLE DUCT 390 290 1 0% GLYCOL 290 55 85.0 9.4 180 0.5 0.15 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-14 SINGLE DUCT 310 300 1 0% GLYCOL 300 55 85.0 9.7 180 0.5 0.15 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-15 SINGLE DUCT 280 270 1 0% GLYCOL 270 55 85.0 8.7 180 0.5 0.1 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-16 SINGLE DUCT 270 130 1 0% GLYCOL 130 55 90.3 3.5 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-17 SINGLE DUCT 120 90 1 0% GLYCOL 100 55 92.3 4 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-12-18 SINGLE DUCT 190 100 1 0% GLYCOL 110 55 90.3 4.2 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-12-19A SINGLE DUCT 380 210 1 0% GLYCOL 220 55 85.0 7.1 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-19B SINGLE DUCT 380 210 1 0% GLYCOL 220 55 85.0 7.1 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-20 SINGLE DUCT 910 270 1 0% GLYCOL 380 55 112.5 13.6 180 1.9 0.39 120 1 15 VA TITUS DESV 06 1,2

1-TU-12-21 SINGLE DUCT 310 110 1 0% GLYCOL 180 55 88.1 6.4 180 0.7 0.2 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-1 SINGLE DUCT 400 130 1 0% GLYCOL 110 55 86.9 4.5 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-2 SINGLE DUCT 340 90 1 0% GLYCOL 110 55 90.3 4.2 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-3 SINGLE DUCT 990 360 1 0% GLYCOL 420 55 85.0 13.5 180 0.7 0.07 120 1 15 VA TITUS DESV 10 1,2

1-TU-13-4 SINGLE DUCT 540 200 1 0% GLYCOL 220 55 85.0 7.1 180 0.5 0.12 120 1 15 VA TITUS DESV 08 1,2

1-TU-13-5 SINGLE DUCT 750 500 1 0% GLYCOL 500 55 85.0 16.1 180 0.5 0.11 120 1 15 VA TITUS DESV 08 1,2

1-TU-13-6 SINGLE DUCT 390 290 1 0% GLYCOL 290 55 85.0 9.4 180 0.6 0.15 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-7 SINGLE DUCT 370 280 1 0% GLYCOL 280 55 85.0 9.0 180 0.5 0.15 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-8 SINGLE DUCT 370 270 1 0% GLYCOL 270 55 85.0 8.7 180 0.5 0.13 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-9 SINGLE DUCT 450 210 1 0% GLYCOL 210 55 85.0 6.8 180 0.5 0.12 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-10 SINGLE DUCT 400 280 1 0% GLYCOL 280 55 85.0 9.0 180 0.5 0.15 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-11A SINGLE DUCT 760 760 1 0% GLYCOL 780 55 85.0 15.4 180 0.9 0.12 120 1 15 VA TITUS DESV 09 1,2

1-TU-13-11B SINGLE DUCT 240 110 1 0% GLYCOL 110 55 85.0 2.5 180 0.5 0.12 120 1 15 VA TITUS DESV 09 1,2

1-TU-13-11C SINGLE DUCT 760 760 1 0% GLYCOL 780 55 85.0 15.4 180 0.9 0.12 120 1 15 VA TITUS DESV 09 1,2

1-TU-13-12 SINGLE DUCT 440 90 1 0% GLYCOL 110 55 90.3 4.2 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-13 SINGLE DUCT 440 280 1 0% GLYCOL 280 55 85.0 9.0 180 0.7 0.21 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-14 SINGLE DUCT 830 410 1 0% GLYCOL 410 55 87.4 14.3 180 0.6 0.1 120 1 15 VA TITUS DESV 08 1,2

1-TU-13-15 SINGLE DUCT 660 410 1 0% GLYCOL 410 55 87.4 14.3 180 0.6 0.1 120 1 15 VA TITUS DESV 08 1,2

1-TU-13-16 SINGLE DUCT 160 130 1 0% GLYCOL 130 55 86.9 4.5 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-13-17 SINGLE DUCT 120 120 1 0% GLYCOL 120 55 88.5 4.3 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-13-18 SINGLE DUCT 100 60 1 0% GLYCOL 60 55 104.1 3.2 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-13-19 SINGLE DUCT 320 310 1 0% GLYCOL 310 55 85.0 9.9 180 0.5 0.12 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-20 SINGLE DUCT 290 280 1 0% GLYCOL 280 55 85.0 9.0 180 0.5 0.13 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-21 SINGLE DUCT 300 300 1 0% GLYCOL 300 55 85.0 9.7 180 0.6 0.15 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-22 SINGLE DUCT 1000 280 1 0% GLYCOL 280 55 85 9 180 0.6 0.07 120 1 15 VA TITUS DESV 09 1,2

1-TU-13-23 SINGLE DUCT 660 140 1 0% GLYCOL 140 55 89.8 5.2 180 0.5 0.1 120 1 15 VA TITUS DESV 08 1,2

1-TU-13-24 SINGLE DUCT 190 160 1 0% GLYCOL 160 55 85.0 5.2 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-13-25 SINGLE DUCT 290 260 1 0% GLYCOL 280 55 85.0 9.0 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-26 SINGLE DUCT 350 10 1 0% GLYCOL 10 55 147.6 1 180 0.5 0.07 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-27 SINGLE DUCT 190 110 1 0% GLYCOL 110 55 90.3 4.2 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-13-28 SINGLE DUCT 110 110 1 0% GLYCOL 110 55 90.3 4.2 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-13-29 SINGLE DUCT 310 80 1 0% GLYCOL 80 55 97.3 3.6 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-30 SINGLE DUCT 1390 460 1 0% GLYCOL 470 55 85.0 15.2 180 0.6 0.09 120 1 15 VA TITUS DESV 12 1,2

1-TU-13-31 SINGLE DUCT 120 120 1 0% GLYCOL 120 55 88.5 4.3 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

1-TU-13-32 SINGLE DUCT 360 110 1 0% GLYCOL 110 55 94.6 3.8 180 0.5 0.08 120 1 15 VA TITUS DESV 06 1,2

1-TU-13-33 SINGLE DUCT 140 120 1 0% GLYCOL 120 55 88.5 4.3 180 0.5 0.08 120 1 15 VA TITUS DESV 04 1,2

EXHAUST FAN (EF) AND RETURN FAN (RF) SCHEDULE

MARK LOCATION AREA SERVED

AIRFLOW

(CFM)

ESP

(IN WG)

FAN MOTOR

BAS

CONTROLS BOD MFR AND MODEL REMARKSTYPE DRIVE RPM

ELECTRICAL SPEED

CONTROLHP VAC PH MCA MOCP

1-EF-1 C9-06 MECHANICAL 9TH FLOOR 760 0.5 DOWNBLAST DIRECT 1039 1/4 115 1 7.25 15 EC START/STOP GREENHECK GB-120 1

1-EF-2 C9-06 MECHANICAL 9TH FLOOR 410 0.5 DOWNBLAST DIRECT 1501 1/10 115 1 1.8 15 EC START/STOP GREENHECK G-090-VG 1

1-EF-3 C9-04A TOILET 9TH FLOOR 1150 0.5 IN-LINE DIRECT 860 1/4 115 1 7.25 15 EC START/STOP GREENHECK SQ-160 1,2

1-EF-5 C9-29 INTERVIEW 9TH FLOOR 2070 0.5 IN-LINE DIRECT 967 3/4 115 1 12.5 20 EC START/STOP GREENHECK SQ-160-VG 1,2

1-EF-6 C9-67A TOILET 9TH FLOOR 450 0.5 IN-LINE DIRECT 1322 1/4 115 1 4.25 15 EC START/STOP GREENHECK SQ-99-VG 1,2

1-EF-7 C9-70 CU 9TH FLOOR 840 0.5 IN-LINE DIRECT 1140 1/6 115 1 5.5 15 EC START/STOP GREENHECK SQ-120 1,2

1-EF-8 C9-70 CU 9TH FLOOR 610 0.5 IN-LINE DIRECT 1140 1/6 115 1 5.5 15 EC START/STOP GREENHECK SQ-120 1,2

1-RF-12 C9-55 MECHANICAL 9TH FLOOR 5480 2.6 IN-LINE DIRECT 3044 7.5 208 3 30.25 50 VFD - REMOTE START/STOP GREENHECK AX-54-190-0415 1

1-RF-13 C9-06 MECHANICAL 9TH FLOOR 9460 2.6 IN-LINE DIRECT 2429 10 208 3 38.5 60 VFD - REMOTE START/STOP GREENHECK AX-72-190-0615 1

AIR DEVICE SCHEDULE

MARK TYPE DESCRIPTION MOUNTING

PANEL / FRAME

SIZE

NECK SIZE MAX CFM

MAX NC MAX APD

BOD MFR AND

MODEL REMARKS

6Ø 6X6

8Ø 8X8

10Ø 10X10

12Ø 12X12

14Ø 14X14

E1-A EXHAUST - EGG CRATE GRILLE SURFACE / LAY-IN 24"X24" 100 225 350 525 776 13 0.1 TITUS 50F / 50R 1,2,3

E1-C EXHAUST - EGG CRATE GRILLE SURFACE / LAY-IN 12"X12" 100 225 350 525 725 13 0.1 TITUS 50F / 50R 1,2,3

E6-A EXHAUST - SECURITY GRILLE SURFACE / LAY-IN 12"X12" 100 225 350 525 725 13 0.1 TITUS SG-SD 1,2,3

E6-B EXHAUST - SECURITY GRILLE SURFACE / LAY-IN 24"X24" 100 225 350 525 725 13 0.1 TITUS SG-SD 1,2,3

R1-A RETURN - EGG CRATE GRILLE SURFACE / LAY-IN 24"X24" 100 225 350 525 725 13 0.1 TITUS 50F / 50R 1,2,3

R1-B EXHAUST - EGG CRATE GRILLE SURFACE / LAY-IN 12"X12" 100 225 350 525 725 13 0.1 TITUS 50F / 50R 1,2,3

R6-A RETURN - SECURITY GRILLE SURFACE / SIDEWALL 18"X8" 100 200 350 525 730 13 0.1 TITUS SG-SD 1,2,3

R6-B RETURN - SECURITY GRILLE SURFACE / SIDEWALL 12"X8" 100 200 350 525 730 13 0.1 TITUS SG-SD 1,2,3

R6-C RETURN - SECURITY GRILLE SURFACE / SIDEWALL 18"X6" 100 200 350 525 730 13 0.1 TITUS SG-SD 1,2,3

R6-D RETURN - SECURITY GRILLE SURFACE / LAY-IN 12"X12" 100 225 350 525 725 13 0.1 TITUS SG-SD 1,2,3

R6-E RETURN - STANDARD WALL TYPE SURFACE / DUCT 24"X10" 100 200 350 525 730 25 0.1 PRICE 90 SERIES 1,2,3

S1-A SUPPLY - SQUARE CONE LOUVER SURFACE / LAY-IN 24"X24" 145 200 325 450 640 22 0.1 TITUS TMS 1,2,3

S1-B SUPPLY - SQUARE CONE LOUVER SURFACE / LAY-IN 12"X12" 135 350 -1 -1 -1 17 0.1 TITUS TMS 1,2,3

S4-D SUPPLY - SLOT DIFFUSER/PLENUM SURFACE / LAY-IN 48"L, 2X1" SLOT 160 300 400 -1 -1 25 0.15 TITUS FL 1,2,3

S6-A SUPPLY - SECURITY GRILLE SURFACE / DUCT 12"X8" 100 200 350 525 730 25 0.1 TITUS SG-SD 1,2,3

S6-B SUPPLY - SECURITY GRILLE SURFACE / DUCT 18"X6" 100 200 350 525 730 25 0.1 TITUS SG-SD 1,2,3

S6-C SUPPLY - SECURITY GRILLE SURFACE / DUCT 9"X9" 100 200 350 525 730 25 0.1 TITUS SG-SD 1,2,3

S6-D SUPPLY - SECURITY GRILLE SURFACE / LAY-IN 12"X12" 135 200 -1 -1 -1 17 0.1 TITUS SG-SD 1,2,3

S6-E SUPPLY - SECURITY GRILLE SURFACE / LAY-IN 24"X24" 145 200 325 450 640 22 0.1 TITUS SG-SD 1,2,3

SPLIT SYSTEM AIR CONDITIONER OUTDOOR UNIT (ODU) SCHEDULE

MARK

INDOOR

UNIT

SERVED STAGES

COOLING REQUIREMENTS ELECTRICAL DATA

BOD MFR AND MODEL REMARKS

MAX CAPACITY

(MBH) MIN EER / SEER

AMBIENT TEMP

(MAX / MIN)

(°F) VAC PH MCA MOCP

1-ODU-1 1-IDU-1 1 36 16 115 / -40 208 1 25 31

MITSUBISHI TRU

SERIES

1,2

SPLIT SYSTEM AIR CONDITIONER INDOOR UNIT (IDU) SCHEDULE

MARK LOCATION AREA SERVED TYPE

SUPPLY

CFM

OA

CFM

ESP

(IN WG)

COOLING REQUIREMENTS ELECTRICAL REQUIREMENTS

BOD MFR AND

MODELSOURCE

SEN

MBH

TOTAL

MBH

EAT-

DB

(°F)

EAT-

WB

(°F)

LAT-

DB

(°F)

LAT-

WB

(°F)

FAN

MOTOR

(WATTS)

VAC PH MCA

SPEED

CONTROL

1-IDU-1 BUILDING 1 C9-31 TELECOM RM

HIGH WALL

DUCTLESS

770 0 0.5 17-ODU-1 34.0 34.0 79 61 55 50 -- 208 1 1.0 ECM

MITSUBISHI TPK

SERIES

LOUVER SCHEDULE

MARK SERVICE TYPE CFM

SIZE (W X H X D)

IN MATERIAL

BLADE

ORIENTATION

PRESSURE DROP

(IN WG)

FACE AREA VELOCITY

(FT/MIN)

FREE AREA

BOD MFR AND MODEL OR

APPROVED EQUAL REMARKS

LVR-1 EXHAUST 840 42 x 16 x 4 ALUMINUM HORIZONTAL 0.03 460 1.8 GREENHECK ESD-435-42x16 1

LVR-2 EXHAUST 450 30 X 20 X 4 ALUMINUM HORIZONTAL 0.02 337 1.3 GREENHECK EDJ-401-24X20 1

LVR-3 EXHAUST 2070 48 X 20 X 6 ALUMINUM HORIZONTAL 0.06 592 3.5 GREENHECK ESJ-602-40X26 1

LVR-4 EXHAUST 1150 36 X 20 X 6 ALUMINUM HORIZONTAL 0.02 346 3.3 GREENHECK ESD-635-36X20 1

LVR-5 EXHAUST 610 28 x 16 x 4 ALUMINUM HORIZONTAL 0.04 518 1.2 GREENHECK ESD-435-28X16 1

AIR HANDLING UNIT (AHU) SUMMARY SCHEDULE

MARK LOCATION

AREA AND/OR BLDG

SERVED

SUPPLY

AIRFLOW

(CFM)

OUTSIDE

AIRFLOW

(CFM)

SUPPLY

FAN

RETURN

FAN

EXHAUST

FAN

PRE-

FILTER

AFTER-

FILTER

HEAT

RECOVERY

PREHEAT

COIL

COOLING

COIL

REHEAT

COIL

HUMIDIFIER

MAXIMUM PHYSICAL CONSTRAINTS SINGLE POINT POWER

BOD MFR AND

MODEL

REMARKSOVERALL

HEIGHT

OVERALL

LENGTH

OVERALL

WIDTH

OVERALL

WEIGHT (LB)

VAC PH MCA MOCP

1-AHU-12 C9-55 MECHANICAL 9TH FLOOR WEST 6000 6000 SF-12 RF-12 - PF-12 AF-12 - PHC-12 CC-12 - H-12 41.5 246 72 3492 460 3 17.5 30 TRANE CSAA014 1

1-AHU-13 C9-06 MECHANICAL 9TH FLOOR EAST 12150 12150 SF-13 RF-13 - PF-13 AF-13 - PHC-13 CC-13 - H-13 61.5 270 93.5 5816 460 3 50 90 TRANE CSAA030 1

AHU SUPPLY FAN SCHEDULE

MARK

TOTAL

AIRFLOW

(CFM)

ESP

(IN WG)

TYPE

FAN

QTY

VFD

ELECTRICAL DATA (TOTAL ARRAY UNO)

REMARKSMOTOR HP

(EACH)

VAC PH MCA MOCP

SF-12 6000 2.2 DIRECT DRIVE 1 YES 10 SPP SPP SPP SPP 1

SF-13 12150 2.8 DIRECT DRIVE 2 YES 15 SPP SPP SPP SPP 1

AHU AFTER-FILTER SCHEDULE

MARK

MERV

RATING

AIRFLOW

(CFM)

MAX

FINAL APD

(IN WG)

THICKNESS

(IN)

FILTER/RACK

TYPE

AF-12 14 6000 2.0 12 CARTRIDGE

AF-13 14 12150 2.0 12 CARTRIDGE

AHU PRE-FILTER SCHEDULE

MARK

MERV

RATING

AIRFLOW

(CFM)

MAX

FINAL APD

(IN WG)

THICKNESS

(IN)

FILTER/RACK

TYPE

PF-12 7+11 6000 1.5 2 CARTRIDGE

PF-13 7+11 12150 1.5 2 CARTRIDGE

AHU COOLING COIL SCHEDULE

MARK

AIRFLOW

(CFM)

MAX FV

(FPM)

APD

(IN WG)

EAT-DB

(°F)

EAT-WB

(°F)

LAT-DB

(°F)

LAT-WB

(°F)

SEN

MBH

TOTAL

MBH

CHILLED WATER (CHW)

GLYCOL

EWT

(°F)

LWT

(°F)

FLOW

(GPM)

WPD

(FT WG)

CC-12 6000 450 1.08 89.3 71.9 51.0 50.9 254.0 398.5 0 45.0 60.0 53 10.39

CC-13 12150 450 0.93 89.3 71.9 51.0 50.9 514.5 806.7 0 45.0 62.0 95 16.94

AHU PREHEAT COIL SCHEDULE

MARK

HEATING

AIRFLOW

(CFM)

MAX FV

(FPM)

APD

(IN WG)

EAT-DB

(°F)

LAT-DB

(°F)

MIN

CAPACITY

(MBH)

STEAM

PSIG ENT

CNTRL VALVE

PSIG ENT

COIL

STEAM FLOW

(LB/H)

PHC-12 6000 642 0.29 4.4 56.8 343.9 30 22 368

PHC-13 12150 702 0.34 4.4 54.5 666.3 30 22 712

AHU HUMIDIFIER SCHEDULE

MARK TYPE

DESIGN HUMIDIFICATION

AIRFLOW

(CFM)

EA-DP

(°F)

LA-DP

(°F)

STEAM

SOURCE

PSIG ENT

CONTROL VALVE

PSIG ENT

COIL

STEAM

LOAD (LB/H)

H-12 DISPERSION TUBE 6000 34.7 44.6 1-CSG-12 15 15 77.5

H-13 DISPERSION TUBE 12150 34.7 44.6 1-CSG-13 15 15 261.1

B. SELECT EQUIPMENT FOR SCHEDULED PERFORMANCE AT 890 FT ELEVATION.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

2. PROVIDE PACKAGE WITH FACTORY

STEAM TRAPS. CAPACITY IS PER

MODULE.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 22 13.

2. FOR PUMP TRAPS, SCHEDULED

INLET PRESSURE IS MOTIVE

PRESSURE AND DP IS MOTIVE

MINUS BACK PRESSURE.

SCHEDULE GENERAL NOTES:

A. REFER ALSO TO SPECIFICATION

SECTION 23 40 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 31 00.

REMARKS:

1. REFER ALSO TO SPECIFICATION

SECTION 23 37 00.

7' -6

5'

1"

5'

3/

8'

1/

1/

1"

0'

1"

0'

1"

0'

0'

1"

0'

1"

0'

9" 6"

3"

3"

1' -6

1'

6"

1/

2"

2' 1'

6"

1"

3' 2'

1'

3/ 4"

4'

2' 1'

1/

2"

6' 4'

2'

3/ 8"

8'

4'

3/

8' 4'

2'

1/ 4"

8'

4'

1/ 8"

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\J D ez m an \D oc um en ts

\1 9.

_M

E C

H -P

LU

M

_R

_J D ez m an .rv t 4/

/2

1:

:4

P M

01-M5

EQUIPMENT SCHEDULES - 9TH

FLOOR

RENOVATE 9TH FLOOR MENTAL

HEALTH

1111 EAST END BLVD, WILKES-BARRE, PA 18711

693-19-106

04/18/2023 MB RT

100% CONSTRUCTION

DOCUMENTS

VEG 19.25 DWG 5 of 34 F

IN

A L

D R

A W

IN

G

S U

B M

IT

T

A L

HEPA FILTER (HEPA) SCHEDULE

MARK LOCATION AIRFLOW (CFM) HEPA EFFICIENCY

APD (IN W.C.)

HOUSING TYPE

CARTRIDGE CARTRIDGE MFGR

AND MODEL

HOUSING MFGR AND

MODEL

BASE DIMENSION

(LxWxH)

REMARKS

INITIAL DIRTY # SIZE

1-HEPA-12

C9-55

MECHANICAL

6000 99.97% 0.74 2.0

SIDE ACCESS / NON-BAG

IN, BAG OUT

4 24 X 24 X 11.5 MEGACEL I EFRM H14

AAF FLANDERS

KG1-2H2W-2GGF-304-D3

36.25 X 55 X 68 -

1-HEPA-13

C9-06

MECHANICAL

12150 99.97% 0.80 2.0

SIDE ACCESS / NON-BAG

IN, BAG OUT

9 24 X 24 X 11.5 MEGACEL I EFRM H14

AAF FLANDERS

KG1-3H3W-2GGF-304-D3

36.25 X 79 X 98 -

STEAM TRAP (ST) SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

CAPACITY AT

MIN DP

(LB/HR)

MIN DP

(PSIG)

MIN INLET

PRESSURE

(PSIG) TRAP TYPE

BOD MFR AND

MODEL

REMARKS

1-ST-1

C9-55

MECHANICAL

AHU-13 PREHEAT COIL 2023 0.25 3 F&T ARMSTRONG CS6,-8 1

1-ST-2

C9-06

MECHANICAL

AHU-12 PREHEAT COIL 1045 0.25 3 F&T ARMSTRONG CS4,-5 1

CLEAN STEAM GENERATOR (CSG) SCHEDULE

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE

TYPE

SOURCE OF

MAKEUP

WATER CONDITIONS PRODUCED

STEAM FLOW

(LBS/HR)

PRODUCED

STEAM PRESS

(PSIG)

STEAM PRESSURE CONTROL

VALVE

(LBS/HR)

BASIS OF DESIGN OR

APPROVED EQUAL

REMARKS

FLOW (GPM) EWT (°F)

ENT CONTROL

VALVE (PSIG)

ENT HEAT

EXCHANGER (PSIG)

1-CSG-12

C9-55

MECHANICAL

9TH FLOOR

WEST

SUPPLY AIR

HUMIDIFICATION

STEAM TO

STEAM

DCW 0.3 68 100 15 30 22 100 NORTEC SETC - MODEL 100 1,2

1-CSG-13

C9-06

MECHANICAL

9TH FLOOR

EAST

SUPPLY AIR

HUMIDIFICATION

STEAM TO

STEAM

DCW 0.3 68 262 15 30 22 275 NORTEC SETC - MODEL 375 1,2

SOUND ATTENUATING DEVICE (SAD) SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

TYPE

AIRFLOW

(CFM)

MAX APD

(IN WG)

INLET

SIZE

(IN)

LENGTH

(IN)

OCTAVE BAND DYNAMIC INSERTION LOSS (DB)

BOD MFR AND

MODEL

REMARKS

63 125 250 500 1000 2000 4000 8000

1-SAD-12-1 C9-55 MECHANICAL 1-AHU-12 RETURN STRAIGHT 3450 0.50 44 60 11 10 18 23 23 15 10 6 PRICE RSP SERIES 1

1-SAD-13-1 C9-06 MECHANICAL 1-AHU-13 RETURN STRAIGHT 9460 0.66 54 48 11 10 19 22 19 13 10 8 PRICE RSP SERIES 1

GRAVITY HOOD (GH) SCHEDULE

MARK LOCATION

SYSTEM AND/OR

SERVICE

TYPE APPLICATION THROAT SIZE AIRFLOW (CFM)

MAX APD

(WG)

DAMPER TYPE BASIS OF DESIGN REMARKS

1-GH-1 C9-60 ROOF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .