Cast Iron Operational Alert VHA 121621.pdf

PDF 147 KB Posted

Attached to
Z1DA--NRM | 503-19-112 Replace Steam System Project (VA-24-00009779) Federal contract opportunity
Solicitation number
36C24424R0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This document is a VHA Operational Alert and Guidance regarding the discontinuation of the use of cast iron, ductile, or malleable fittings and components in high and medium pressure steam systems at VA facilities. It requires facilities to identify and replace any existing cast iron components, develop steam system start-up procedures, and program capital projects to replace cast iron fittings and components. The related federal contract opportunity is for the Replace Steam System project at the Altoona VA Medical Center. The solicitation will be issued as an RFP with a tier evaluation process for SDVOSB, VOSB, and other small business concerns. The contract will be a single, firm fixed-price contract with a 720-calendar day period of performance. The magnitude of construction cost is between $5,000,000 and $10,000,000. Interested parties must be registered in SAM and verified in the VA CVE to be eligible for award.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--NRM | 503-19-112 Replace Steam System Project (VA-24-00009779), newest first.
File Type Posted
36C24424R0001 0004 10-23-24.pdf PDF
36C24424R0001 0004_1 10-23-24.pdf PDF
SCHEDULE Line Item replace steam system w alternate 10-11-24.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation 36C24424R0001 10-11-24.pdf PDF
36C24424R0001 0003 10-11-24.pdf PDF
36C24424R0001 0003_1.pdf PDF
EXHIBIT E - Past Performance Questionnaire 36C24424R0001 _ Replace Steam System 10-11-24.pdf PDF
36C24424R0001 0002 10-8-24.pdf PDF
36C24424R0001 0002_1 10-8-2024.pdf PDF
PN 503-19-112 100PCT ACM Specs and Survey.pdf PDF
Bid RFIs 12.6.23 - 503-19-112 Replace Steam Project.pdf PDF
P03 Sole Source BNOE 503-19-112 Repalce Steam System.pdf PDF
VA Directive 1810.pdf PDF
Justification MPT-SAT 03-Trane Tracer Ensemble_Redacted.pdf PDF
Bid RFIs - 503-19-112 Replace Steam Project - Dec. 2023.pdf PDF
PN 503-19-112 100PCT Specifications.pdf PDF
General Decision Number PA20240002 08-16-2024.pdf PDF
Water Safety Plan Requirements 11.22.2021.pdf PDF
PN 503-19-112 100PCT Drawings.pdf PDF
Justification-MPT-SAT 01-Apollo Conbraco Ball Valves_Redacted.pdf PDF
Justification MPT-SAT-02-Bettwy Systems_Redacted.pdf PDF
Two Valve Isolation Per VA Directive 1810 Appendix A.pdf PDF
36C24424R0001_3.pdf PDF
36C24424R0001 0001 1-18-24.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation 36C24424R0001 _ Replace Steam System.pdf PDF
503-19-112 -CD- Drawings_Part2.pdf PDF
36C24424R0001_1 11-16-23.pdf PDF
Bid RFIs - 503-19-112 Replace Steam Project.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form 36C24424R0001 _ Replace Steam System.pdf PDF
EXHIBIT A - Past Performance Relevancy Questionnaire 36C24424R0001 _ Replace Steam System.pdf PDF
503-19-112 -CD- Drawings_Part3.pdf PDF
PM-Part808-405-6-Atch1-Limiting Sources Justification MPT-SAT 04 Viking Sprinkler Heads (s) 10-2-23_Redacted(s).pdf PDF
PM-Part808-405-6 - Atch1MPT-SAT 01-Apollo Conbraco Ball Valves (s) 10-2-23_Redacted (s).pdf PDF
PM-Part808-405-6 Atch1 Limiting Sources Justification MPT-SAT-02-Bettwy Systems (s) 10-2-23_Redacted(s).pdf PDF
EXHIBIT E - Past Performance Questionnaire 36C24424R0001 _ Replace Steam System.pdf PDF
PM-Part808-405-6 Atch1 Limiting Sources Justification MPT-SAT 03-Trane Tracer Ensemble (s) 10-2-23_Redacted (s).pdf PDF
503-19-112 -CD- Drawings_Part1.pdf PDF
503-19-112 - CD - Specifications.pdf PDF
36C24424R0001 12-8-23.pdf PDF
36C24424R0001_2.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA OPERATIONAL ALERT AND GUIDANCE DOCUMENT

FY2022 – 01

CAST IRON FITTINGS / VALVE HOUSING USE IN HIGH AND MEDIUM PRESSURE

STEAM DISTRIBUTION SYSTEMS

DECEMBER 14, 2022

BACKGROUND:

The VA has generally prohibited the use of cast iron fittings and pipe components (valves, steam traps, etc.) due to the risk of failure with shock loading. A recent incident involving the fatality of staff and contractors has heightened the concern with the continued use of this material on steam systems.

DISCUSSION:

Based on the brittle nature of cast iron and the two fatalities at a VA Medical Center, VHA Healthcare Engineering leadership has made the decision to discontinue the use of any cast iron, ductile, or malleable fittings and components in high and medium pressure steam systems, whether existing or new.

Facilities with cast iron components in their high-pressure and/or medium pressure system must develop a plan to identify and replace these fittings and components as soon as possible.

Facilities must always use due diligence to avoid any sudden pressure, temperature, or mechanical shocks to the steam distribution system, such as water hammer or energizing a steam system too quickly.

This guidance covers steam generation and distribution systems, or portions thereof, operating at a pressure of 15 pounds per square inch gauge (psig) or greater. Also included are distributions systems for hot water or other liquids at a temperature of greater than 257 degrees Fahrenheit.

AUTHORITY:

VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1).

REQUIREMENTS:

New construction, renovation, repair, replacement, or any other projects shall not use cast iron fittings, and components or malleable/ductile fittings anywhere in the high-pressure and medium pressure steam system (15 psi or above). All new construction must use only cast steel or forged steel fittings and components, in accordance with applicable VA Master Specifications.

Existing steam distribution systems at VA facilities constructed prior to this operational alert shall conduct a steam distribution system survey to document the locations and type of any cast iron and malleable iron fittings and components. The facility shall develop a risk assessment and interim safety measures pending replacements of all cast iron or malleable fittings with forged or cast steel fittings over time. To mitigate the risk of deleterious effects of water hammer and shock loading on the piping system each facility shall develop a detailed start-up procedure on bringing a steam system, or part of a steam system, back into service after it has been shut down for any reason. The procedure must also address action to be taken in response to any reported or observed water hammer. The purpose of the procedure is to mitigate the risk of effects of water hammer and shock loading on the piping system.

VISN’s shall ensure facilities develop and implement steam system start-up procedures within six months. VISN’s shall ensure facilities perform a steam distribution survey within one year of this notice and consolidate the results at the VISN level. Any required capital projects to replace cast iron fittings and components shall be programmed and prioritized in the FY2023 - FY2028 Strategic Capital Investment Plan.

VISN’s shall report any issues regarding compliance to the VHA Office of Healthcare Engineering.

FOR QUESTIONS OR ADDITIONAL INFORMATION:

Contact VHA Office of Healthcare Engineering at VHAHealthcareEng@va.gov mailto:VHAHealthcareEng@va.gov

File details come from the government source that posted it. Updated .