Exhibit E Base Offer Cost Breakdown A0016.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Z2DA--VISN 1 Construction MATOC
Solicitation number
36C24123R0073
Issued by

About this file

This document is a cost breakdown template for a base offer on a federal construction MATOC (Multiple Award Task Order Contract) solicitation. The template requires offerors to provide labor and material cost breakdowns by construction division for the base offer. Labor costs must be itemized by category and rate, while materials and equipment details must include item, rate, units, and total. The solicitation number is 36C24123R0073 for the Z2DA VISN 1 Construction MATOC through the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Offerors must also provide overhead, profit, and bond percentages to be applied to the division subtotals to calculate the total base offer cost. No actual costs are included in this template example.

View the file

Other files

File Type Posted
36C24123R0073 0018.pdf PDF
WD MA20230001 Effective 12082023.pdf PDF
523-19-602 Rev 1 AD100 AS101 AS102.pdf PDF
WD MA20220001 Effective 10132023.pdf PDF
SSJ Electronic Safety and Security_.pdf PDF
523-19-602 Seed Project Site Visit 2 Attendees.pdf PDF
36C24123R0073 0017.pdf PDF
Amendment 0017 RFIs.pdf PDF
Seed Project Parking Map A0016.PNG PNG image
Exhibit A Project Information Sheet for Contractors A0016.pdf PDF
Exhibit D Proposal Inquiry Form A0016.pdf PDF
SSJ Lock Systems A0016.pdf PDF
Amendment 0016 RFIs.pdf PDF
523-19-602 523-19-602 Install Site Security Revised Specs A0016.pdf PDF
SSJ Fire Alarm System A0016.pdf PDF
Exhibit B Past Performance Questionnaire A0016.pdf PDF
523 19 602 Drawings Pages 31 to 68 A0016.pdf PDF
Exhibit F Price Schedule Sheet A0016.pdf PDF
523-19-602 Seed ICRA JP Police Office A0016.pdf PDF
Updated MATOC Solicitation Instructions.pdf PDF
WD MA20230001 Effective 10202023 A0016.pdf PDF
SSJ DDC BMS A0016.pdf PDF
523-19-602 Seed Project PCRA A0016.pdf PDF
523 19 602 Drawings Pages 24 to 30 A0016.pdf PDF
Seed Project Original Site Visit Sign In Sheet August 9 2023 A0016.pdf PDF
GENERAL CONTRACT REQUIREMENTS SECTIONS 01000 01001 01300 01451 01700 A0016.pdf PDF
SSJ Electronic Safety and Security A0016.pdf PDF
523 19 602 Drawings Pages 19 to 23 A0016.pdf PDF
SPECIAL MATOC REQUIREMENTS A0016.pdf PDF
523 19 602 Project Manual Part 1 A0016.pdf PDF
Exhibit G VA PAY FORM w Monthly checklist A0016.pdf PDF
523 19 602 Drawings Pages 10 to 18 A0016.pdf PDF
523 19 602 Project Manual Part 2 A0016.pdf PDF
523 19 602 Drawings Pages 1 to 9 A0016.pdf PDF
36C24123R0073 0016.pdf PDF
523-19-602 Seed Project Notice of Task Order Request for Proposal A0016.pdf PDF
36C24123R0073 0015.pdf PDF
36C24123R0073 0014.pdf PDF
36C24123R0073 0013.pdf PDF
36C24123R0073 0012.pdf PDF
36C24123R0073 0011.pdf PDF
36C24123R0073 0010.pdf PDF
SSJ DDC BMS.pdf PDF
Seed RFIs Amendment 10.pdf PDF
SSJ Fire Alarm System.pdf PDF
MATOC RFIs Amendment 10.pdf PDF
SSJ Electronic Safety and Security.pdf PDF
WD MA20230001 Effective 09152023.pdf PDF
SSJ Lock Systems.pdf PDF
523-19-602 Revised Specs.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Labor Detail

Sample Example
DivisionLabor CategoryLabor RateHoursTotal
1Plumber$35.00123$4,305.00
1Laborer14.7570$1,032.50
$5,337.50

Materials and Equipment Details

Sample Example
DivisionItemRateUnitsTotal
1Pipe - 150'$1.50150$225.00
190 Degree Coupling$1.105$5.50
1Pump Rental - Hour$200.006$1,200.00
$1,430.50