Exhibit G VA PAY FORM w Monthly checklist A0016.pdf

PDF 129 KB Posted

Attached to
Z2DA--VISN 1 Construction MATOC Federal contract opportunity
Solicitation number
36C24123R0073
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a payment request form and checklist for a construction contract with the Department of Veterans Affairs. The form requests payment for work completed under Contract No. 36C24123R0073 for the Z2DA Veterans Integrated Service Network 1 Construction MATOC. It requires the contractor to provide details of the original contract amount, increases or decreases authorized, amounts previously paid, the amount being requested, and the remaining contract balance. The contractor and construction representative must certify that prior payments to subcontractors have been made, the request does not withhold amounts owed to subcontractors, and final acceptance has not been given. The contracting officer's representative and contracting officer must also review and agree to the payment amount. The attached checklist outlines required monthly submittals for approval including daily reports, safety inspections, quality control documentation, schedules, waste manifests, as-builts, payrolls, and sustainability reports.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--VISN 1 Construction MATOC, newest first.
File Type Posted
SSJ Electronic Safety and Security_.pdf PDF
523-19-602 Seed Project Site Visit 2 Attendees.pdf PDF
WD MA20220001 Effective 10132023.pdf PDF
Amendment 0017 RFIs.pdf PDF
523 19 602 Drawings Pages 24 to 30 A0016.pdf PDF
523-19-602 523-19-602 Install Site Security Revised Specs A0016.pdf PDF
SSJ DDC BMS A0016.pdf PDF
523-19-602 Seed Project PCRA A0016.pdf PDF
Updated MATOC Solicitation Instructions.pdf PDF
Exhibit D Proposal Inquiry Form A0016.pdf PDF
Exhibit A Project Information Sheet for Contractors A0016.pdf PDF
523 19 602 Drawings Pages 10 to 18 A0016.pdf PDF
523 19 602 Drawings Pages 1 to 9 A0016.pdf PDF
523 19 602 Project Manual Part 2 A0016.pdf PDF
36C24123R0073 0016.pdf PDF
523-19-602 Seed Project Notice of Task Order Request for Proposal A0016.pdf PDF
Seed Project Parking Map A0016.PNG PNG image
Amendment 0016 RFIs.pdf PDF
36C24123R0073 0014.pdf PDF
36C24123R0073 0013.pdf PDF
36C24123R0073 0012.pdf PDF
36C24123R0073 0011.pdf PDF
WD MA20230001 Effective 09152023.pdf PDF
SSJ Electronic Safety and Security.pdf PDF
36C24123R0073 0010.pdf PDF
523-19-602 Revised Specs.pdf PDF
SSJ Lock Systems.pdf PDF
SSJ DDC BMS.pdf PDF
Seed RFIs Amendment 10.pdf PDF
36C24123R0073 0009.pdf PDF
S06 36C24123R0073 0006.pdf PDF
Amendment 5 MATOC RFIs.pdf PDF
Updated Exhibit B Past Performance Questionnaire.pdf PDF
Seed Project 523-19-602 Install Site Security Site Visit Sign In Sheet.pdf PDF
WD MA20230001 Effective 08112023.pdf PDF
36C24123R0073 0004.docx DOCX document
36C24123R0073 0003.pdf PDF
36C24123R0073 0002.pdf PDF
36C24123R0073 0001.pdf PDF
36C24123R0073 Solicitation.pdf PDF
523 19 602 Drawings Pages 10 to 18.pdf PDF
523 19 602 Drawings Pages 1 to 9.pdf PDF
523 19 602 Task Order RFP.pdf PDF
Exhibit F Price Schedule Sheet.pdf PDF
SPECIAL MATOC REQUIREMENTS.pdf PDF
GENERAL CONTRACT REQUIREMENTS SECTIONS 01000 01001 01300 01451 01700.pdf PDF
523 19 602 Project Manual Part 2.pdf PDF
Exhibit G VA PAY FORM w Monthly checklist.pdf PDF
Exhibit C Safety Questionnaire.pdf PDF
Exhibit B Past Performance Questionnaire.pdf PDF
Show all 50

Z2DA--VISN 1 Construction MATOC has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Pay Form

Contractor: ____________________________ Contract No.: ________________________

_____________________________ Project No.: ________________________

______________________________ Period Ending: ________________________

Request No.: _________________________

Date of Request: __________________________

Project Title: ______________________________________________________ ___________________

PROGRESS PAYMENT

Original Contract Amount: $________________________

Increases Authorized: $________________________

Decreases Authorized: $________________________

Current Contract Amount: $________________________

Activities Completed to Date: $________________________

Less Retainage: $________________________

Less Previous Payments: $________________________

Amount Recommended for Payment: $________________________

Contract Balance: $________________________

CERTIFICATION

I hereby certify, to the best of my knowledge and belief, that-

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.

NAME – SIGNATURE TITLE DATE

I have reviewed this payment request and agree that the Contractor is entitled to payment in the amount shown above.

Date

Date

Construction Representative

Contracting Officer’s Representative

Contracting Officer/Contract Specialist Date

Monthly Submittal Checklist Submittals required prior to pay request approval

Item Date Submitted

PM

Initial

COR /CO

Initial

Daily Production Reports 852.236-79

Daily Safety Inspection Reports 01 35 26 1.9A

Certified Safety Professional (CSP) Monthly Site Safety Inspection 01 35 26 1.9B Exposure Hours – 01 35 26 1.10.C

Quality Control Reports 01 45 00 3.9A

Updated Schedule – 013216.15 para 1.4.A

Waste Manifests – 017419 para 1.5.D

Monthly As-built Update – 01 00 00 1.14B, 01 00 00 1.15B

Weekly Certified Payrolls – FAR 52.222-8

Warranty Information – 010000 para 1.16.A

Sustainable Construction Progress Reports – 018113 para 1.5.F

COR/CO and PM may agree that a submittal is not applicable to the project or to the current month.

File details come from the government source that posted it. Updated .