Canton OPC - Pre-Bid Conference questions and responses.pdf
PDF 69 KB Posted
- Solicitation number
- 36C10F26R0052
About this file
This is an RFI Tracker and Question and Answer document for RLP No. 36C10F26R0052, a lease acquisition for the Canton, Ohio OPC (Outpatient Primary Care) facility.
The document addresses thirteen offeror inquiries regarding proposal requirements and solicitation terms. Key clarifications include: Net of Utilities, Prospectus, and Swing Space requirements are not required per R100 Section 1.06; the OIT Data Center Narrative is not required for the Canton CBOC; backup generator requirements are addressed in L100 Section 3.35 and Lease Design Narrative Section 4.6. Regarding documentation limits, the Government declined requests to increase Factor 1 page limits from four pages and Factor 5 page limits from five pages, but approved Design and Construction Duration/CPM Schedules formatted at 11x17 ledger size. For Tenant Improvement Allowance (TIA) amortization, the Government clarified that per L100 Section 1.07 B, it may elect to amortize a portion of the TIA in rent as a lump sum payment or in combination with other payment methods. The Government declined a two-week extension request for initial offers, maintaining the original deadline. For cultural resources requirements, offerors must self-certify that no ground-disturbing activities will occur with initial offers, with the Lease Contracting Officer reviewing such certifications; a Cultural Resources Study Report is required for any proposed site involving new construction, build-to-suit, demolition, or significant ground-disturbing work.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI # Reference Document RFI Govt Response
Offeror Compliance Matrix - Exhibit 04. X - Lease Exhibit
- Net of Utilities [when applicable]
Is Net of Utilities required for this proposal? Will you provide the requirements for Net of Utilities?
This is not a requirement - refer to the R100 section 1.06 LIST OF RLP
DOCUMENTS (VA MAY 2026)
Offeror Compliance Matrix, Exhibit X - RLP Exhibit - Prospectus [when applicable], Is the Prospectus required for the proposal? Will you provide the Prospectus? The requirement for Prospectus is listed twice. Should it be included twice?
This is not a requirement - refer to the R100 section 1.06 LIST OF RLP
DOCUMENTS (VA MAY 2026)
Offeror Compliance Matrix, Exhibit X - RLP Exhibit - Swing Space [when applicable]
Is there a requirements for Swing Space? Will you provide the Swing Space requirements? The requirement for Swing Space is listed twice. Should it be included twice?
This is not a requirement - refer to the R100 section 1.06 LIST OF RLP
DOCUMENTS (VA MAY 2026)
Offeror Compliance Matrix, Exhibit 05. A.4.1 - Appendix A.4.1 - OIT Data Center Narrative [if applicable]
Is the OIT Data Center Narrative required for the Canton CBOC? Will you provide the OIT Data Center Narrative requirements?
This is not a requirement - refer to the R100 section 1.06 LIST OF RLP
DOCUMENTS (VA MAY 2026)
5 Is a backup generator required to service the facility?
Refer to Section 3.35 of the L100 and sections 4.6 of the Lease Design Narrative.
If a backup generator is required, will it power certain designated areas or the entire building?
Refer to Section 3.35 of the L100 and sections 4.6 of the Lease Design Narrative.
Factor 1 documentation requirements limit the number of pages to four (4). It is impossible to provide the quantity of information requested in Sections 4.03-C. -1-III
– A, B and C within 4 pages. We request a revised page limit of ten (10) pages to properly address this Factor.
The Government is not increasing page limits at this time.
Can the Design and Construction Duration / CPM Schedule be formatted for 11 x 17 ledger size and limited to 5 pages? Given the amount of detail and predecessors involved, the schedule will be much easier to read at this size
Yes, page size can be 11x17 ledger size.
Factor 5 documentation requirements limit the number of pages to five (5). Given the amount of information and data requested within this Factor, we respectfully request this page limit be increased to ten (10) pages
The Government is not increasing page limits at this time.
R100 Section 3.05 of the
RLP
Please confirm that per Section 3.05 of the RLP, that VA is not reserving the right to amortize any portion of the TI allowance or costs as rent
Refer to section 1.07 B of the L100 Rental Adjustment: Tenant Improvements
- The Government may elect to have a portion of the TIA amoritized in the rent in lieu of, or in combination of a lump sum payment.
CANTON, OH OPC - RLP No. 36C10F26R0052
RFI TRACKER
11 R100 RLP Section 3.03.B.4 please confirm that RLP Section 3.03.B.4. “The annual rent to amortize the Tenant Improvements” is not applicable
Refer to section 1.07 B of the L100 Rental Adjustment: Tenant Improvements
- The Government may elect to have a portion of the TIA amoritized in the rent in lieu of, or in combination of a lump sum payment.
Given the requirement for a Phase I ESA, NEPA and NHPA submittals with initial offers and the fact that the Labor Day holiday is the week before the due date, we respectfully request an extension of 2 weeks for initial offers, which would make the revised date for initial offers 9/28/26
The Government is not granting extensions.
R100 RLP Section 2.12 Cultural Resources Study
The second sentence provides for the ability of the government to waive the need for a cultural study for existing buildings with no associated ground disturbing ; we will only be disturbing ground that is already covered with an outbuilding and asphalt paving. Does this limited work make us eligible for a waiver? What data do you need from us to acquire a waiver? Can this be accomplished in advance of the submittal for the RLP?
Please self certify that no ground disturbing activities will occur with your initial offer which will be reviewed by the LCO. See section 2.12 Cultural Resources Study (VA FEB 2026) "A Cultural Resources Study Report is a required submittal with initial offers for any proposed site that involves new construction, build-to-suit, demolition, or other significant ground-disturbing work associated with this Lease Acquisition."