This document is a facility standardization guide for VA Leased Community-Based Outpatient Clinics (CBOCs) that provides layout templates and design principles for lease offerors.

The guide establishes the VA's facility standardization philosophy, which seeks to create familiar, functional, and efficient outpatient clinics nationwide while maintaining flexibility for adaptation to existing buildings and regional needs. The document includes four standard layout examples: Layout 1 (3 Patient Aligned Care Team [PACT] multi-specialty clinic, approximately 55,000 ABOA SF), Layout 2 (4 PACT multi-specialty clinic single-story, approximately 85,000 ABOA SF), Layout 3 (4 PACT multi-specialty clinic 2-story configuration), and Layout 4 (existing building example demonstrating adaptation of standardization principles to typical office building footprints). Key positioning principles include Mental Health Clinic maximizing natural lighting and adjacency to Primary Care; Physical Medicine and Rehabilitation positioned for natural lighting and adjacency to Prosthetics; and Pathology Laboratory and Imaging located in the "L" corner with easy access to Logistics. The document provides detailed functional area relationships and flow diagrams for Primary Care, Mental Health, Specialty Care, Pathology and Laboratory, Radiology, Eye Clinic, Audiology, PMR, Prosthetics, Dental, and Logistics services. An adjacency matrix in Appendix A defines spatial relationships between all service areas using a three-point scale (1 – Strong, 2 – Secondary, 3 – No Relationship). Offerors are required to follow the facility standardization philosophy while adapting project-specific programs for design to fit existing spaces and local constraints.

View the file

Other files

File Type Posted
Canton RLP Amendment No 02.pdf PDF
36C10F26R0052 0002.pdf PDF
Canton OH OPC 36C10F26R0052 - PreBid Conference- slide deck.pdf PDF
36C10F26R0052 0001.docx DOCX document
05A2 - Appendix A.2 Lease Design Narrative_LDN_RLP Amendment 0001.pdf PDF
Canton RLP Amendment No 01.pdf PDF
Canton OH Pre Bid Conference 36C10F26R0052 Transcript.pdf PDF
Canton OPC - Pre-Bid Conference questions and responses.pdf PDF
19 - 3517B General Clauses_April 2026.docx.pdf PDF
14 - Operations and Maintenance Plan Acknowledgement_FEB 2026.pdf PDF
05A1 Appendix A.1 Project Room Contents 6.18.2026.xlsx XLSX spreadsheet
05 - Agency Specific Requirements _ASR - Cover Page.pdf PDF
03 - Offeror Compliance Matrix_BVTO_FEB 2026.xlsx XLSX spreadsheet
00. No Proposal_Market Response Form_MAR 2026.docx DOCX document
00 Global RLP Template R100 - VA Version MAY 2026 Canton OH.pdf PDF
17 - Offering Entity Acknowledgement Form.pdf PDF
15 - GSA Form 12000 - Prelease FPLS Evaluation - Part A or Part B.docx DOCX document
08 - Attachment No. 1 to GSA Form 1364.xlsx XLSX spreadsheet
05B Appendix B - Lease Service Narrative_LSN_FEB 2026_04_13_2026.pdf PDF
05A5 VA Security Requirements_FSL Level II_ Oct 2024 Canton.pdf PDF
05A4-Appendix A.4_VA CBOC Info Transport Systems Specs.pdf PDF
05A3 Room_Data_Matrix_05_20_26.xlsx XLSX spreadsheet
05A2 Appendix A.2 Lease Design Narrative LDN.pdf PDF
05A Appendix A PFD_CANTON OPC - FY25 MID-LEVEL - 260420 FINAL.pdf PDF
04B - Lease Exhibit - New Construction_FEB 2026.pdf PDF
04 Global Lease Template L100 - VA Version_MAY 2026.pdf PDF
B - RLP Exhibit - Broker Project_MAY 2026.pdf PDF
21 DOL Stark County Wage Determination 1.19.26.pdf PDF
20 - VA Handbook 6500.6 - 3.12.10 FOR RLP.pdf PDF
18 - FAR 52.204-24 Representation Regarding Certain Telecom.pdf PDF
16 - Certification of Building Energy Performance.pdf PDF
13 - GSA Form 527 - Contractors Qualifications and Financial Info.pdf PDF
10 - Past Performance References Form for VA_REV. Nov 23.pdf PDF
06 - GSA Form 1217 - Lessors Annual Cost Statement.pdf PDF
01- 3516 Solicitation Provisions_Feb. 2025.pdf PDF
36C10F26R0052 Canton OH RLP Notice.pdf PDF
A- RLP Exhibit - New Construction_FEB 2026.pdf PDF
12 - SF 330 - Architect Engineer Qualifications.pdf PDF
11 - Past Performance Questionnaire Form for VA_REV. Nov 23.pdf PDF
09 - 10991 VA Vendor File Request Form 1-15-25.pdf PDF
07 - GSA Form 1364 Proposal to Lease Space.pdf PDF
05A7 Appendix A.7 VA Additional Security Requirements.pdf PDF
04A - Exhibit Lease - Broker Project _MAY 2026.pdf PDF
02- Pre-Bid Registration Form.docx DOCX document
36C10F26R0052.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 29, 2025

VA Leased CBOC Standard Layout

SECTION 1

INTRODUCTION

October 29, 2025 Section 1 - Page 1

1. Introduction

2. Standard Layout (New Construction)

3. Functional Areas and Relationships

4. Standard Layout (Existing Buildings – Tenant Buildout)

Appendix A: Standard Adjacency Matrix

SECTION 1

INTRODUCTION

October 29, 2025 Section 1 - Page 2

SECTION 1 - INTRODUCTION

1.1 The purpose of this Leased CBOC Standard Layout Guide is to provide the lease offeror with the VA’s facility standardization philosophy to be used in conjunction with the more detailed Prototypes for Standardized Design and Construction Community-Based Outpatient Clinics (referred to in this document as the CBOC Prototype Design Guide). With this layout guide and the prototype design guide, the offeror will be able to lay out the VA’s Program for Design (PFD) in the offered space for efficient use by the staff and Veterans. The offeror may also reference the VA Leasing Room Templates for typical rooms in a leased CBOC to gain an understanding of the typical room dimensions and equipment layouts. VA Leasing Room Templates can be viewed in the online VA Technical Information Library.

1.2 Project specific adjacency requirements may be in the Agency Specific Requirements Appendices) and shall requirements of this standard layout guide.

1.3 Facility Standardization Philosophy

The Department of Veterans Affairs (VA) seeks to create outpatient clinics that are familiar, functional, and efficient for Veterans and staff nationwide. This is achieved through standard design modules that allow for uniformity in clinic appearance and operations. However, recognizing the diverse realities of leased buildings and regional needs, the VA supports flexible implementation of these standards to best adapt to local constraints and opportunities.

Leased CBOCs are encouraged to maintain core spatial relationships and flow patterns, while adjusting layouts as necessary to fit within existing buildings.

SECTION 2

Standard Layout (New Construction)

Section 2 - Page 1

SECTION 2 – Standard Layout (New Construction)

2.1 The offeror shall develop their proposal following the facility standardization philosophy.

2.2 When the offer includes new construction the L-Shape prototype is the preferred layout per the CBOC Prototype Design Guide.

2.3 Layout 1 is a standard departmental layout guide for a 3 Patent Aligned Care Team (PACT) multi-specialty clinic following the L-Shape Prototype.

2.4 Layout 2 is a standard departmental layout guide for a 4 PACT multi-specialty clinic following the L-Shape Prototype.

2.5 The two layout guides uphold standardization principles while differing in size and offering varying or additional services.

2.6 The offeror shall adapt the project specific program for design and maintain standardization.

2.7 Typical standard layout concepts

2.7.1 The Mental Health Clinic is positioned to maximize natural lighting in the consultation and group rooms, preferably adjacent to the Primary Care Department.

2.7.2 Physical Medicine and Rehabilitation (PMR) is positioned to maximize natural lighting in the exercise area and preferably adjacent to Prosthetics.

2.7.3 Pathology Laboratory and Imaging is located in the corner of the “L” for easy access to Logistics.

2.7.4 Primary Care, Specialty Care, and Mental Health typically occupy most of the PACT wing.

2.7.5 Ancillary services can be added or removed and/or rearranged based on the specific PFD to the ancillary wing and keep standardization.

2.8 These typical standard layout concepts are illustrated in the following standard layout guides.

2.9 Layout 1 is roughly 55,000 ABOA SF.

Section 2 - Page 2

Layout 1: 3 PACT Multi-Specialty Standard Layout Guide

2.10 Layout 2 is roughly 85,000 ABOA SF, it typically represents the largest desired single-story footprint.

Layout 2: 4 PACT Multi-Specialty Standard Layout Guide (Single Story)

Section 2 - Page 3

2.11 Multi-Story clinic designs shall keep the facility standardization philosophy. Additionally, consider vertical alignment requirements for certain areas such as communication rooms.

2.12 Layout 3 is the standard layout guide for the same 4 PACT multi-specialty clinic in a 2-floor layout.

Layout 3: 4 PACT Multi-Specialty Standard Layout Guide (2-Story)

SECTION 3

FUNCTIONAL AREAS AND RELATIONSHIPS

Section 3 - Page 1

SECTION 3 – Functional Areas and Relationships

3.1. The following layouts illustrate the typical flow of each respective service. Each project’s specific PFD will likely differ from what is shown below; therefore, spaces may need to be added/deleted to maintain the general flow depicted. More detailed prototype layouts can be reviewed in the CBOC Prototype Design Guide and the specific design guide for each functional area.

3.1.1. Waiting/Reception/Lobby - Please see the attached Standard Adjacency Matrix detailing the spatial relationships with other services, along with guidance on building floors (if applicable)

3.1.1.1. The Main Entry Vestibule typically aligns with the Volunteer Alcove (Welcome/Info Desk).

3.1.1.2. Public Toilets and Vending shall be easily accessible to all waiting areas.

3.1.1.3. Reception areas (check-in) should be logically distributed. Single consolidated reception areas create extended wait times, while overly distributed reception areas can create staff coverage issues.

3.1.1.4. Convenient access points to the patient corridor and/or to the service shall be provided from the waiting areas.

(Access directly to the service.)

Section 3 - Page 2

3.1.2. Primary Care – See attached Adjacency Matrix for spatial relationships to other services as well as guidance on which floor (if multi-floor). See CBOC Prototype Design Guide for detailed PACT layouts.

3.1.3. Mental Health - Please see the attached Adjacency Matrix detailing the spatial relationships with other services, along with guidance on building floors (if applicable)

3.1.3.1. Group Therapy shall be at the front of the department and maximize natural light.

3.1.3.2. Exam rooms are typically located towards the front of the department.

3.1.3.3. Team Work Areas (workstations) shall be located towards the back of the department.

Section 3 - Page 3

3.1.4. Specialty Care - Please see the attached Adjacency Matrix detailing the spatial

3.1.4.1. Height and Weight Alcoves shall be at the front of the department.

3.1.4.2. Support rooms, storage, and Teamwork areas shall be at the back of the department.

3.1.5. Pathology and Laboratory- Please see the attached Adjacency Matrix detailing the spatial relationships with other services, along with guidance on building floors (if applicable)

3.1.5.1. Blood draw stations and specimen collection toilets shall be conveniently accessed from the waiting areas.

3.1.5.2. The laboratory and associated support space should be located in the back of the department with rear access route to logistics.

Section 3 - Page 4

3.1.6. Radiology - Please see the attached Adjacency Matrix detailing the spatial relationships with other services, along with guidance on building floors (if applicable)

3.1.7. Eye Clinic- Please see the attached Adjacency Matrix detailing the spatial relationships

3.1.7.1. Dispensing shall open to the waiting area.

3.1.7.2. Visual Field, Testing and Photo typically are required to be at the front of the clinic.

Section 3 - Page 5

3.1.8. Audiology - Please see the attached Adjacency Matrix detailing the spatial relationships

3.1.9. PMR - Please see the attached Adjacency Matrix detailing the spatial relationships with other services, along with guidance on building floors (if applicable)

Section 3 - Page 6

3.1.10. Prosthetics - Please see the attached Adjacency Matrix detailing the spatial relationships

3.1.11. Dental - Please see the attached Adjacency Matrix detailing the spatial relationships with other services, along with guidance on building floors (if applicable)

3.1.12. Logistics/EMS/BioMed - Please see the attached Adjacency Matrix detailing the spatial

SECTION 4

STANDARD LAYOUT GUIDE (EXISTING BUILDINGS – TENANT BUILDOUT)

Section 4 - Page 1

SECTION 4 – Standard Layout Guide (Existing Buildings – Tenant Buildout)

4.1 When existing space is considered, the offeror shall develop their proposal following the facility standardization philosophy.

4.2 Layout 4 is an example of how aspects of the facility standardization philosophy can be met in a typical office building footprint.

4.3 Unique solutions are expected and will be evaluated.

Layout 4: Existing Building Layout Example

Appendix A: Standard Adjacency Matrix

1 – Strong; 2 – Secondary; 3 – No Relationship

Adjacency Matrix

Waiting Primary

Care Mental Health

Specialty Care Pathology Radiology Optometry Audiology Prosthetics PMR Dental Pharmacy HBPC

Whole Health Police Vending Logistics

Waiting 1 1 2 1 1 1 1 1 2 1 1 3 2 1 1 3

Primary Care 1 1 1 2 2 3 3 2 3 3 2 3 3 2 3 2

Mental Health 1 1 3 3 3 3 3 3 3 3 2 3 3 1 3 2

Specialty Care 2 1 3 2 2 3 3 3 3 3 2 3 3 2 3 2

Pathology 1 2 3 2 3 3 3 3 3 3 3 3 3 2 3 1

Radiology 1 2 3 2 3 3 3 3 3 3 3 3 3 2 3 2

Optometry 1 3 3 3 3 3 3 3 3 3 3 3 3 2 3 2

Audiology 1 3 3 3 3 3 3 3 3 3 3 3 3 2 3 2

Prosthetics 1 2 3 2 3 3 3 3 1 3 3 3 3 2 3 2

PMR 2 3 3 3 3 3 3 3 1 3 3 3 3 2 3 2

Dental 1 3 3 3 3 3 3 3 3 3 3 3 3 2 3 2

Pharmacy 1 2 2 2 3 3 3 3 3 3 3 3 3 1 3 1

HBPC 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

Whole Health 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

Police 1 2 1 2 2 2 2 2 2 2 2 1 3 3 3 3

Vending 1 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3

Logistics 3 2 2 2 1 2 2 2 2 2 2 1 3 3 3 3

1. Introduction
3. Functional Areas and Relationships
SECTION 1 - INTRODUCTION
SECTION 2 – Standard Layout (New Construction)