This is a technical specification section for low-voltage electrical power conductors and cables for electrical service upgrades at the Federal Bureau of Prisons facility in Baton Rouge, Louisiana. The specification is dated March 20, 2026, and is being executed by MCA, LLC through UNICOR, FPI.

The specification covers three primary product categories: copper building wire, metal-clad cable (Type MC), and connectors and splices. All copper building wire must comply with ASTM B3 and B8 standards and be listed and labeled per NFPA 70 by a qualified testing agency. Insulation types include Type THHN (UL 83 compliant) and Type THW (NEMA WC-70/ICEA S-95-658 and UL 83 compliant). Metal-clad cable must be UL 1569 compliant with copper conductors, bare ground conductors, steel interlocked armor, and PVC jacket. Connectors and splices must be one-piece seamless copper lugs with compression termination, designed to terminate the specified conductors. Installation requirements mandate copper conductors, solid for No. 10 AWG and smaller and stranded for No. 8 AWG and larger in feeders and branch circuits. Service entrance and exposed feeders require Type THW single conductors in raceway, while concealed feeders require Type THHN/THWN-2. All cables must be concealed in finished walls, ceilings, and floors unless otherwise indicated, with complete raceway installation prior to conductor pulling. Field quality control includes visual and electrical testing, insulation-resistance testing at 500 V(dc) for 300 V cable and 1000 V(dc) for 600 V cable, continuity testing, and infrared scanning of splices in conductors No. 3 AWG and larger after substantial completion, with a follow-up scan required 11 months thereafter.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Bureau of Prisons MCA, LLC

ELECTRICAL SERVICE UPGRADES BATON ROUGE, LOUISIANA

UNICOR, FPI March 20, 2026

SECTION 260519 – LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES,

TECHNICAL SPECIFICATIONS

SECTION 260519

LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Copper building wire.

2. Metal-clad cable, Type MC.

3. Connectors and splices.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Product Schedule: Indicate type, use, location, and termination locations.

1.3 INFORMATIONAL SUBMITTALS

A. Field quality-control reports.

PART 2 - PRODUCTS

2.1 COPPER BUILDING WIRE

A. Description: Flexible, insulated and uninsulated, drawn copper current-carrying conductor with an overall insulation layer or jacket, or both, rated 600 V or less.

B. Standards:

1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.

2. Conductor and Cable Marking: Comply with wire and cable marking according to UL's

"Wire and Cable Marking and Application Guide."

C. Conductors: Copper, complying with ASTM B3 for bare annealed copper and with ASTM B8 for stranded conductors.

Federal Bureau of Prisons MCA, LLC

UNICOR, FPI March 20, 2026

D. Conductor Insulation:

1. Type THHN: Comply with UL 83.

2. Type THW: Comply with NEMA WC-70/ICEA S-95-658 and UL 83.

2.2 METAL-CLAD CABLE, TYPE MC

A. Description: A factory assembly of one or more current-carrying insulated conductors in an overall metallic sheath.

B. Standards:

1. Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.

2. Comply with UL 1569.

3. Conductor and Cable Marking: Comply with wire and cable marking according to UL's

"Wire and Cable Marking and Application Guide."

C. Circuits:

1. Single circuit.

D. Conductors: Copper, complying with ASTM B3 for bare annealed copper and with ASTM B8 for stranded conductors.

E. Ground Conductor: Bare.

F. Conductor Insulation:

1. Type TFN/THHN/THWN-2: Comply with UL 83.

G. Armor: Steel, interlocked.

H. Jacket: PVC applied over armor.

2.3 CONNECTORS AND SPLICES

A. Description: Factory-fabricated connectors, splices, and lugs of size, ampacity rating, material, type, and class for application and service indicated; listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and use.

B. Jacketed Cable Connectors: For steel jacketed cables, zinc die-cast with set screws, designed to connect conductors specified in this Section.

C. Lugs: One piece, seamless, designed to terminate conductors specified in this Section.

1. Material: Copper.

2. Type: One hole with standard barrels.

3. Termination: Compression.

Federal Bureau of Prisons MCA, LLC

UNICOR, FPI March 20, 2026

PART 3 - EXECUTION

3.1 CONDUCTOR MATERIAL APPLICATIONS

A. Feeders:

1. Copper; solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

2. Copper for feeders smaller than No. 4 AWG; copper for feeders No. 4 AWG and larger.

Conductors must be solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

B. Branch Circuits:

1. Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

2. Copper. Solid for No. 12 AWG and smaller; stranded for No. 10 AWG and larger.

C. ASD Output Circuits Cable: Extra-flexible stranded for all sizes.

D. PV Circuits: Copper. Solid for No. 10 AWG and smaller; stranded for No. 8 AWG and larger.

3.2 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND

WIRING METHODS

A. Service Entrance: Type THW, single conductors in raceway.

B. Exposed Feeders: Type THW single conductors in raceway.

C. Feeders Concealed in Ceilings, Walls, Partitions, and Crawlspaces: Type THHN/THWN-2, single conductors in raceway.

D. Exposed Branch Circuits, Including in Crawlspaces: Type THW, single conductors in raceway.

E. Cord Drops and Portable Appliance Connections: Type SO, hard service cord with stainless steel, wire-mesh, strain relief device at terminations to suit application.

F. ASD Output Circuits: Type XHHW-2 in metal conduit.

G. PV Circuits, Type USE-2: For PV source circuits rated at 600 V or less.

H. PV Circuits, Type PV: For PV source circuits rated at 600 V.

3.3 INSTALLATION, GENERAL

A. Conceal cables in finished walls, ceilings, and floors unless otherwise indicated.

Federal Bureau of Prisons MCA, LLC

UNICOR, FPI March 20, 2026

B. Complete raceway installation between conductor and cable termination points according to

Section 260533 "Raceways and Boxes for Electrical Systems" prior to pulling conductors and cables.

C. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

D. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips, that will not damage cables or raceway.

E. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.

F. Support cables according to Section 260529 "Hangers and Supports for Electrical Systems."

3.4 CONNECTIONS

A. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in

UL 486A-486B.

B. Make splices, terminations, and taps that are compatible with conductor material.

C. Wiring at Outlets: Install conductor at each outlet, with at least 6 inch of slack.

3.5 IDENTIFICATION

A. Identify and color-code conductors and cables according to Section 260553 "Identification for

Electrical Systems."

B. Identify each spare conductor at each end with identity number and location of other end of conductor, and identify as spare conductor.

3.6 SLEEVE AND SLEEVE-SEAL INSTALLATION FOR ELECTRICAL PENETRATIONS

A. Install sleeves and sleeve seals at penetrations of exterior floor and wall assemblies. Comply with requirements in Section 260544 "Sleeves and Sleeve Seals for Electrical Raceways and

Cabling."

3.7 FIRESTOPPING

A. Apply firestopping to electrical penetrations of fire-rated floor and wall assemblies to restore original fire-resistance rating of assembly according to Section 078413 "Penetration

Firestopping."

Federal Bureau of Prisons MCA, LLC

UNICOR, FPI March 20, 2026

3.8 FIELD QUALITY CONTROL

A. Tests and Inspections:

1. After installing conductors and cables and before electrical circuitry has been energized, test service entrance and feeder conductors for compliance with requirements.

2. Perform each of the following visual and electrical tests:

a. Inspect exposed sections of conductor and cable for physical damage and correct connection according to the single-line diagram.

b. Test bolted connections for high resistance using one of the following:

1) A low-resistance ohmmeter.

2) Calibrated torque wrench.

3) Thermographic survey.

c. Inspect compression-applied connectors for correct cable match and indentation.

d. Inspect for correct identification.

e. Inspect cable jacket and condition.

f. Insulation-resistance test on each conductor for ground and adjacent conductors.

Apply a potential of 500 V(dc) for 300 V rated cable and 1000 V(dc) for 600 V rated cable for a one-minute duration.

g. Continuity test on each conductor and cable.

h. Uniform resistance of parallel conductors.

3. Initial Infrared Scanning: After Substantial Completion, but before Final Acceptance, perform an infrared scan of each splice in conductors No. 3 AWG and larger. Remove box and equipment covers so splices are accessible to portable scanner. Correct deficiencies determined during the scan.

a. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device.

b. Record of Infrared Scanning: Prepare a certified report that identifies switches checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action.

4. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan of each switch 11 months after date of Substantial Completion.

B. Cables will be considered defective if they do not pass tests and inspections.

C. Prepare test and inspection reports to record the following:

1. Procedures used.

2. Results that comply with requirements.

3. Results that do not comply with requirements, and corrective action taken to achieve compliance with requirements.