26-25-728 Attachment 13 FieldAuthorizationForm.pdf

PDF 425 KB Posted

Attached to
RFQ-RFP Phase 1: GC/CM BC - Bellevue College Parking Garage Update - Bellevue College
Solicitation number
2025-728
Issued by
King County, Washington

About this file

This document is a Construction Field Authorization (FA) form used by the Department of Enterprise Services (DES) Facilities Division within Washington State to authorize changes to construction contracts. The form is designed for public works construction projects, including the Bellevue College Parking Garage Update project. The FA process enables contractors to request modifications to contract scope, cost, and schedule through a structured authorization procedure that requires documentation of the reason for change, such as design omissions, design errors, code requirements, latent conditions, value engineering, or agency requests. The form accommodates three cost determination methods: fixed price, unit price, and time and material approaches. Authorization for changes requires sequential approval from the contractor, the Owner's Representative, the FPS Project Manager, the Architect/Engineer, FPS Management (for changes exceeding $50,000 or affecting contract time), and funding verification by the agency before a Notice to Proceed can be issued.

All work authorized through an FA cannot be paid until the authorization is formally incorporated into a Change Order by DES in accordance with the General Conditions. For time and material authorizations, contractors must submit daily timesheets within two working days identifying workers by name, trade, firm, date, and hours worked, with all materials, equipment, and job-related costs supported by detailed invoices. Subcontractors performing onsite work, regardless of tier, must follow the same documentation and itemization requirements as the primary contractor. The form requires the contractor to notify the Owner and Owner's Representative promptly if proposed costs or time may be exceeded. The proposed not-to-exceed maximum cost excludes Washington State Sales Tax (WSST), and any changes in contract time must be supported by an updated Critical Path Method (CPM) schedule. Final cost and time verification involves multiple approval layers to ensure compliance with project funding and contractual obligations.

View the file

Other files

File Type Posted
30-25-728 Attachment 17 FinalAcceptanceChecklistForm.pdf PDF
24-25-728 Attachment 11 RetainageBondForm.pdf PDF
19-25-728 Attachment 05 CostResponsibilityMatrix.pdf PDF
25-25-728 Attachment 12 ChangeOrderProposalForm.pdf PDF
20-25-728 Attachment 07 ApprenticeUtilizationPlanForm.pdf PDF
27-25-728 Attachment 14 TeamChangeMemo.pdf PDF
1-25-728 Article 00 InstructionsToProposers.pdf PDF
13-25-728 Article 14 Definitions.pdf PDF
17-25-728 Attachment 03 FinalProposalForm.pdf PDF
7-25-728 Article 08 QualityControlAssurance.pdf PDF
11-25-728 Article 12 ScheduleManagement.pdf PDF
3-25-728 Article 03 ModificationsToWashingtonStateGeneralConditions.pdf PDF
6-25-728 Article 07 ApprenticeshipRequirements.pdf PDF
12-25-728 Article 13 SubstantialCompletion-ProjectCloseout.pdf PDF
28-25-728 Attachment 15 WageTheftForm.pdf PDF
23-25-728 Attachment 10 RCWsRelevantToGCCM.pdf PDF
22-25-728 Attachment 09 Ph2ProtestProcedures.pdf PDF
5-25-728 Article 06 ElementsOfTotalContractCost.pdf PDF
10-25-728 Article 11 ContractChanges.pdf PDF
4-25-728 Article 05 PreconstructionServices.pdf PDF
14-25-728 Attachment 00 ProposerContactForm.pdf PDF
8-25-728 Article 09 CoordinationAndMeetings.pdf PDF
21-25-728 Attachment 08 Ph1ProtestProcedures.pdf PDF
9-25-728 Article 10 Budget.pdf PDF
16-25-728 Attachment 02 RequestForFinalProposal.pdf PDF
15-25-728 Attachment 01 AdvertisementForGCCM.pdf PDF
18-25-728 Attachment 04 PerformanceEvaluationQuestionnaire(GCCM).pdf PDF
2-25-728 Article 01 GeneralConditions.pdf PDF
29-25-728 Attachment 16 CertificateOfSubstantialCompletion.pdf PDF
31-25-728 RFQ-RFP.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No.

TO: (CONTRACTOR)

REASON FOR CHANGE: DESIGN OMISSIONS AGENCY VALUE ENGINEERINGDESIGN ERRORS

CODE REQUIRMENTS LATENT CONDITIONS ALTERNATIVE PUBLIC WORKS - CONSTRUCTION

NAME ORGANIZATION

Cost data required by one of the following methods in accordance with the General and Supplemental Conditions.

FIXED PRICE §7.02B

UNIT PRICE §7.02C (WHEN APPROVED)

TIME & MATERIAL §7.02D

(Owner's Rep)

Cost Data Required by: (Date)

NO CHANGE $

INCREASE Proposed Not-To-Exceed Maximum Cost (excluding WSST) DECREASE Proposed Time (Days)

PROPOSED BY CONTRACTOR DATE

AUTHORIZED BY FPS PROJECT MANAGER DATEAPPROVED BY A/E

DATE AUTHORIZED BY FPS MANAGEMENT

(> $50k / Change of Contract Time)

DATE

CHANGE IN CONTRACT SUM:

NO CHANGE

INCREASE

DECREASE

CHANGE IN CONTRACT TIME: (Attach CPM Schedule)

NO CHANGE

INCREASE OF:

DECREASE CALENDAR DAYS

CONTRACTOR SIGNATURE DATE

DATE

A/E DATE FPS COST VERIFICATION DATE

FUNDING VERIFICATION BY AGENCY DATE FPS MANAGEMENT (> $50k / Change of Contract Time) DATE FORM DES-EA-001 (Revision 9-19-2025) CG

FI

N

A L

A

PP

R O

VA

L

PR

O

JE

C

T

FI

N A

L C

O

ST

T

IM

E }

TO THE CONTRACT SUM COST OF:

DOLLARS $

PR

O

PO

SE

D C

O

ST

Payment for work authorized by this FA will not be made prior to incorporation of this FA into an authorized Change Order to the Contract by the Department of Enterprise Services, in conformance with GC 7.02A.N

O

TI

C E

TO

P

R O

C

EE

D C

O

ST

D A

TA

C

O

LL

EC

TI

O N

D

ES

C R

IP

TI

O N

O F

C H

A N

G E

IN

W

O R

K

FA Substantiation shall conform to GC 7.02.B, C, & D. Time & Material FA’s shall include submittal of daily time-sheets within 2 working days for Owner’s review. Time-sheets shall identify workers assigned to the work by name, trade, firm, date and hours worked. Materials, equipment, and other job-related costs shall be supported by detailed invoices. Subcontractors performing Work onsite; regardless of tier, shall be calculated and itemized in the same manner as prescribed for Contractor.

METHOD OF MEASUREMENT

REQUEST DATE:

EXPLANATION:

CHANGE ORIGINATED BY

FPS PROJECT MANAGER

Proposal reviewed and accepted, Notice To Proceed given herein:

Final cost and time have been reviewed, verified and accepted by:

FA No.

AGENCY

Contractor agrees to perform the work described above within the Proposed Not-To-Exceed Maximum Cost, and Time. Contractor shall promptly Notify the Owner and Owner’s Representative in accordance with GC 7.02 or 7.03 if Cost or Time may be exceeded.

FACILITIES DIVISION

FACILITY PROFESSIONAL SERVICES (FPS)

CONSTRUCTION FIELD AUTHORIZATION (FA) PROJECT TITLE

FPS MANAGEMENT APPROVAL OF CHANGE IN CONTRACT TIME

(INITIALS & DATE)

When authorized by E&AS, you are directed to proceed with work as described below and/or detailed on the attachments referred hereto:

FUNDING VERIFICATION BY AGENCY

NO CHANGE

INCREASE

DECREASE

TIME COST

FA BLANK

AGENCY:
Contract No:
PROJECT TITLE:
FA No:
REQUEST DATE:
METHOD OF MEASUREMENT:
Proposed Time Days:
PROPOSED BY CONTRACTOR:
DATE_2:
DATE_3:
DATE_4:
CALENDAR DAYS:
SCOPE OF WORK:
EXPLANATION:
CHANGE ORIGINATED BY:
CONTRACTOR:
OWNERS REP:
DATE:
Proposed Not To Exceed Maximum Cost excluding WSST:
FINAL COST:
AGENCY FINAL:
DATE_PM:
DATE_CM:
DATE_MGMT:
DATE_A/E:
DATE_AGENCY:
Check Box LATENT CONDITIONS: Off
Check Box DECREASE TIME: Off
DATE APM:
INITIALS APM:
DATE APM (NTP):
Check Box1: Off
AE FINAL:
FPS PROJECT MANAGER FINAL:
FPS COST VERIFICATION FINAL:
FPS MANAGEMENT FINAL:
FUNDING VERIFIED BY AGENCY (NTP):
APPROVED BY AE (NTP):
AUTHORIZED BY FPS PROJECT MANANGER (NTP):
APM NTP (NTP >$50K):
ORGANIZATION (CHANGE ORIGIN):
Proposed Cost = No Change: Off
Proposed Cost = Increase: Off
Proposed Cost = Decrease: Off
PROPOSED TIME - NO CHANGE: Off
PROPOSED TIME - INCREASE: Off
PROPOSED TIME - DECREASE: Off
DESIGN ERROR: Off
CODE REQUIRMENTS: Off
OMMISSIONS: Off
ALTERNATIVE PUBLIC WORKS: Off
VALUE ENGINEERING: Off
AGENCY REQUEST: Off
UNIT PRICE: Off
TIME & MATERIAL: Off
FINAL COST - NO CHANGE: Off
FINAL COST - INCREASE: Off
FINAL COST - DECREASE COST: Off
FINAL - NO CHANGE TIME: Off
FINAL - INCREASE TIME: Off
DATE_CONTRACTOR:
CONTRACTOR TIME & COST FINAL:
DATE-CONT_PROPOSAL:
FINAL TIME: