224004 Palmetto REVAMP Addendum #4 Memo.pdf
PDF 194 KB Posted
- Attached to
- 224004 Palmetto Revamp
- Solicitation number
- ITB-15884
- Issued by
- St. Johns County, Florida
About this file
This is Addendum #4 to the Invitation to Bid (ITB) for Project 224004 Palmetto Revamp, issued by the Florida Department of Military Affairs, Construction & Facility Management Office (CFMO). The addendum modifies the original bidding documents for a full facility sustainment project at the Palmetto Readiness Center in St. Johns County, a 17,083-square-foot facility requiring comprehensive maintenance, repairs, and lifecycle replacement work including mechanical equipment replacement, HVAC upgrades, electrical and plumbing improvements, ADA enhancements, window re-caulking, painting, flooring replacement, and weather sealing. The addendum revises the bid opening date from July 2, 2026, to July 7, 2026, at 2:00 PM at Robert F. Ensslin National Guard Armory in St. Augustine. The document provides five material modifications (M1 through M5) to previously published answers to bidder's questions, referencing revised drawings dated June 17, 2026, including updates to the Scope of Work (P0.1), mechanical drawings (M0.1 and M1.1), civil/site drawings (C3.1, C4.1, and C5.1), and general arrangement sheets. Specifically, modifications clarify mechanical system requirements, remove ramp work and related activities from the High Maintenance Bay scope, and include reseal and restripe of parking areas as part of the base bid scope of work.
The addendum includes a final revision of the Answers to Bidder's Questions document dated June 19, 2026, as the sole attachment. Acknowledgement of this addendum is required in the revised bid proposal form. The estimated construction cost is $2,173,045.00, with bid security of five percent (5%) required. Contractors must be prequalified for Level Five contracts and possess a Florida State Contractor License, demonstrate an active office within 300 road miles of the project, provide project management resumes, document completion of at least two similar projects within five years, register with MyFloridaMarketplace, and provide letters of bonding capacity. Performance and labor and material payment bonds are mandatory, and all contractors must comply with the Florida Building Code, obtain required permits, secure proof of insurance within ten days of contract award, and register with MyFloridaMarketPlace prior to contract execution. The contract will be awarded to the lowest responsive and responsible bidder.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Army National Guard
Construction & Facility Management Office
ISSUED ADDENDUM
Rev. 11/2018
Date June 19, 2026
ADDENDUM Number 4
Project Number and Name 224004 Palmetto Revamp
Invitation to Bid Date May 04, 2026
Number of Attachments 1 REVISION #2 Bid Opening Date and Time
July 07, 2026 – 2:00 pm -RFE, St Augustine (Changed from July 02, 2026)
From: Department of Military Affairs, CFMO Contracting Office
This addendum and the listed attachments form a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in the Revised Bid Proposal form is required.
Answers to Questions (Q) / Clarifications (C) / Modifications (M)
M1. The following are changes to the published “224004 Palmetto REVAMP-Answers to Bidder’s Questions” #21 to read “SEE REVISED DRAWINGS P0.1 – SCOPE OF
WORK DATED 6.17.26
M2. The following are changes to the published “224004 Palmetto REVAMP-Answers to Bidder’s Questions” #22 to read “SEE REVISED DRAWING M0.1 DATED 6.17.2026.”
M3. The following are changes to the published “224004 Palmetto REVAMP-Answers to Bidder’s Questions” #23 to read “SEE REVISED DRAWING M1.1/NOTE #10 DATED 6.17.26.”
M.4 The following are changes to the published “224004 Palmetto REVAMP-Answers to Bidder’s Questions” #26 to read “SEE REVISED DRAWINGS C3.1 DATED
6.17.26/SEE REVISED GA 1.0 SHEET. INCLUDED THE RESEAL AND RESTRIPE OF
THE PARKING AREAS AS PART OF THE BASE BID SCOPE OF WORK.”
M.5 The following are changes to the published “224004 Palmetto REVAMP-Answers to Bidder’s Questions”#27 to read “SEE REVISED DRAWINGS C3.1,C4.1,&C5.1 DATED
6.17.26 / REMOVAL OF THE RAMP AND ALL OTHER WORK RELATED TO ABI#1
HAVE BEEN REMOVED FROM DSA.1.2 & SA1.2 SINCE THIS IS NOT PART OF THE
HIGH MAINTENANCE BAY SCOPE OF WORK. SEE REVISED DRAWINGS DSA 1.2
& SA 1.2.”
Attachment List
1. 224004 Palmetto REVAMP FINAL REV Answers to Bidder’s Questions 06.19.26
END OF ADDENDUM #4
File details come from the government source that posted it. Updated .