This is a complete set of 100% construction documents for the Palmetto National Guard Armory renovation project (DMA CFMO #224004) prepared by Renker Eich Park Architects for the State of Florida, Department of Military Affairs, located at 1107 14th Avenue West, Palmetto, Florida 34221. The project encompasses comprehensive renovation work on the existing 17,142-gross-square-foot, one-story Readiness Center, including mechanical equipment replacement, plumbing fixture upgrades, electrical system improvements, interior and exterior finishes, structural repairs, ADA enhancements, and environmental remediation. The scope of work is divided into a base bid and eight alternate bid items (ABI #1 through ABI #8), ranging from parking area and stormwater mitigation to LED lighting upgrades, exterior facade refinishing, impact glazing replacement at clerestory and first-floor levels, new security fencing, parking lot mill and overlay, and dehumidification system installation. The non-mandatory pre-bid meeting and site visit is scheduled for May 20, 2026, at 10:00 AM, with bidder questions due by May 28, 2026, at 12:00 PM, a final addendum publication on June 2, 2026, and sealed bids due June 10, 2026, at 2:00 PM at the Robert F. Ensslin National Guard Armory in St. Augustine, Florida. The contract will be awarded to the lowest responsive and responsible bidder; the estimated construction cost is $2,173,045.00.
Bid security of five percent of the total bid is required in the form of a bid bond or certified check, with performance and labor and material payment bonds mandatory within ten days of contract award. Prequalification is required for Level Five contracts exceeding $500,000.00, requiring documentation including a Florida State Contractor License, corporate charter, proof of an active office within 300 road miles, project manager and superintendent resumes, a list of projects completed within the previous 36 months, proof of successful completion of at least two similar projects within the prior five years, MyFloridaMarketplace vendor registration, and a letter of bonding capacity. The project must comply with the 2023 Florida Building Code, 8th Edition; the 2023 Florida Fire Prevention Code, 8th Edition; and all local Authority Having Jurisdiction requirements. The facility must remain occupied throughout the construction period, requiring full coordination with the unit and provision of temporary shower facilities during drill weeks. Environmental surveys documenting asbestos and lead contamination are included in Addendum #2, and any work interfacing with contaminated materials must follow the report recommendations and applicable abatement standards. Contractors must obtain all necessary building, plumbing, electrical, and other system permits, except for State Fire Marshal permits which the owner will obtain; contractors must register with MyFloridaMarketplace and submit a Substitute Form W-9 prior to contract execution, and obtain proof of insurance within ten days of contract award.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL, PLUMBING ENGINEER
BAL ENGINEERING, INC.
154A Whitaker Road Lutz, Florida 33549
(t) 813.333.2103 Web: www.BALEngineering.com Email: bryant_lyle@BALEngineering.com
ELECTRICAL ENGINEER
MPS ENGINEERING, INC.
240 Pine Avenue North Oldsmar, Florida 34677
(t) 813.855.2721 Web: www.MPSENG.com Email: edwolanin@MPSENG.com
CIVIL ENGINEER
HAMILTON ENGINEERING & SURVEYING, LLC.
3409 W. Lemon Street, Tampa, Florida 33609
(t) 813.601.1849 Web: www.hamiltonengineering.us Email: lucasc@hamiltonengineering.us
A. ALTERNATE BID ITEM NO. 1: PARKING AREA - STORMWATER MITIGATION,
ASPHALT MILLING AND RESURFACE . CONNECT MAIN ARMORY ROOF DRAINS TO
UNDERGROUND STORM DRAIN SYSTEM.
B. ALTERNATE BID ITEM NO. 2: UPGRADE MAIN ARMORY BUILDING INTERIOR AND
EXTERIOR LIGHTING TO LED TO INCLUDE UNIT SIGN AND FLAGPOLE.
C. ALTERNATE BID ITEM NO. 3: REFINISH AND REPAINT COMPLETE EXTERIOR
STUCCO / BRICK FACADE WITH UP TO 4 COLOR SCHEME. INCLUDE THE PAIINTING
OF ALL EXTERIOR HM DOORS AND FRAMES IINCLUDING ALL INSIDE AND OUTSIDE
FACES.
D. ALTERNATE BID ITEM NO. 4: COMPLETE GLAZING REPLACEMENT OF
ALL EXISTING LAMINATED IMPACT GLAZING IN EXISTING ALUMINUM WINDOW
FRAME SYSTEMS AT THE EXTERIOR CLERESTORY LEVEL.
E. ALTERNATE BID ITEM NO. 5: COMPLETE GLAZING REPLACEMENT OF ALL
EXISTING LAMINATED IMPACT GLAZING IN EXISTING ALUMINUM WINDOW FRAME
SYSTEMS AT ALL THE EXTERIOR 1ST FLOOR LEVEL GLAZED OPENINGS. NEW
EXTERIOR FIXED WINDOWS & IMPACT GLAZING FOR KITCHEN ONLY.
F. ALTERNATE BID ITEM NO. 6: PROVIDE NEW 20'-0" WIDE (K-8 FORCE
PROTECTION) FENCE SYSTEM) DOUBLE SWING GATE WITH MANUAL FUNCTION TO
SOUTH SIDE OF POV PARKING. EXISTING DEAD MAN ANCHOR LAYOUT TO BE RE-
CONFIGURED FOR NEW GATE. COMPLETE FUNCTIONAL INSTALLATION REQUIRED.
G. ALTERNATE BID ITEM NO. 7: PROVIDE MILL AND OVERLAY OF THE NORTH &
EAST POV PARKING LOT AS INDICATED IN THE ATTACHED CIVIL DRAWINGS.
H. ALTERNATE BID ITEM NO. 8: PROVIDE NEW DEHUMIDIFIER AND MECHANICAL
AIR INSTALLED INTO THE TO THE EXISTING VAULT ROOM # 110 & #111.
LOCATION OF WORK
REPA Project No.:
DATE:
PALMETTO ESP RENOVATION
1107 14TH AVE W, PALMETTO, FL 34221
1910.09
MARCH 30, 2026
DMA CFMO # 224004
100% CONSTRUCTION DOCUMENTS
-- COVER
I CIVIL
C1.1 CIVIL COVER SHEET
C2.1 GENERAL CONSTRUCTION NOTES
C3.1 DEMOLITION PLAN
C4.1 SITE PLAN
C5.1 GRADING & DRAINAGE PLAN
C6.1 DETAILS
II ARCHITECTURAL
GA1.0 GENERAL ARCHITECTURAL
SA1.1 ARCHITECTURAL SITE PLAN
LS1.0 LIFE SAFETY PLAN
DSA1.1 EXISTING / DEMO SITE PLAN
DA1.1 EXISTING / DEMO FLOOR PLAN
DA1.2 EXISTING / DEMO CLERESTORY PLAN
DA4.1 EXISTING / DEMO ROOF PLAN
DA7.1 DEMO REFLECTED CEILING PLAN
A1.1 PROPOSED FLOOR PLAN
A1.2 PROPOSED CLERESTORY PLAN
A3.1 BUILDING EXTERIOR ELEVATIONS
A3.2 BUILDING EXTERIOR ELEVATIONS
A4.1 PROPOSED ROOF PLAN
A6.1 ENLARGED LATRINES & SHOWERS
A6.2 ENLARGED FRONT SIGN & FLAG POLE - FLOOR
PLANS, ELEVATIONS, & DETAILS
A7.1 REFLECTED CEILING PLAN
A8.1 DOOR AND WINDOW SCHEDULE, ELEVATION, &
DETAILS
A8.2 SECTIONS & DETAILS
A8.3 SECTIONS & DETAILS - TYPICAL FE7
CHAIN-LINK SECURITY FENCE
A8.4 SECTIONS & DETAILS - TYPICAL FE7
CHAIN-LINK SECURITY GATE
A8.5 SECTIONS & DETAILS - TYPICAL K-8 FENCE &
GATE AND DETAILS
A8.6 SECTIONS & DETAILS - TYPICAL K-8 FENCE &
GATE AND DETAILS
A8.7 SECTIONS & DETAILS - TYPICAL K-8 FENCE &
GATE AND DETAILS
A8.8 SECTIONS & DETAILS - TYPICAL K-8 FENCE &
GATE AND DETAILS
A8.9 SECTIONS & DETAILS - TYPICAL K-8 FENCE &
GATE AND DETAILS
A8.10 SECTIONS & DETAILS - TYPICAL K-8 FENCE &
GATE AND DETAILS
A8.11 SECTIONS & DETAILS - TYPICAL K-8 FENCE &
GATE AND DETAILS
WEB: WWW.REPARCH.COM / EMAIL: RHEADLAND@REPARCH.COM / CELL: (727) 212-8730
LIC. AA C001447 1609 Dr. Martin Luther King Jr. Street North • St. Petersburg, Florida • 33704-4203 • (727-821-2986)
ALTERNATE BID ITEMS ABI WORK LIST
IV MECHANICAL
M0.1 NOTES, LEGENDS, AND SCHEDULES
M0.2 SCHEDULES
M0.3 DETAILS
M0.4 DETAILS
M1.1 GROUND FLOOR MECHANICAL DEMOLITION
PLAN
M1.2 ROOF AND HIGH CEILING MECHANICAL
DEMOLITION PLAN
M2.1 GROUND FLOOR MECHANICAL RENOVATION
PLAN
M2.2 ROOF AND HIGH CEILING MECHANICAL
RENOVATION PLAN
V PLUMBING
P0.1 NOTES, LEGENDS, AND SCHEDULES
P0.2 DETAILS
P1.1 GROUND FLOOR PLUMBING DEMOLITION PLAN
P2.1 GROUND FLOOR PLUMBING RENOVATION PLAN
VI ELECTRICAL
E0.1 SYMBOLS LIST, DETAILS & NOTES
E0.2 PANEL SCHEDULES & RISER DIAGRAM
E1.1 ELECTRICAL SITE PLAN
E2.1 GROUND FLOOR DEMOLITION LIGHTING PLAN
E2.2 CLERESTORY FLOOR DEMOLITION LIGHTING
PLAN
E2.3 GROUND FLOOR DEMOLTION POWER PLAN
E2.4 CLERESTORY FLOOR DEMOLITION POWER
PLAN
E2.6 GROUND FLOOR- DEMOLTION FIRE ALARM
PLAN
E3.1 GROUND FLOOR PROPOSED LIGHTING PLAN
E3.2 CLERESTORY FLOOR PROPOSED LIGHTING
PLAN
E4.1 GROUND FLOOR PROPOSED POWER PLAN
E4.2 CLERESTORY FLOOR PROPOSED POWER PLAN
E5.1 GROUND FLOOR- PROPOSED FIRE ALARM
PLAN
INDEX OF DRAWINGS
CITY OF PALMETTO
Application # TBD Permit # TBD
601 17TH STYREET WEST, PALMETTO, FL, 34221
PHONE: (941) 721-2166
STATE FIRE MARSHALL
Application #: TBD SFM Permit #: TBD
INSPECTOR / SOUTH-WEST REGION
MR. CODY KELLY
EMAIL : Cody.Kelly@myfloridacfo.com
PHONE : (850) 413 - 3740
PERMIT REVIEW AGENCIES
STATEMENT OF COMPLIANCE:
TO THE BEST OF MY
KNOWLEDGE, THESE DRAWINGS
AND THE PROJECT MANUAL ARE
COMPLETE AND COMPLY WITH
THE FLORIDA BUILDING CODE.
FLORIDA BUILDING CODE (FBC)
8TH EDITION (2023)
FLORIDA FIRE PREVENTION
CODE 8TH EDITION (2023)
FLORIDA PRODUCT APPROVAL
PRODUCT
CATEGORY
SUB
CATEGORY
MANUFACTURER - BASIS OF
DESIGN
FL PRODUCT
APPROVAL NO.
PANEL WALLS WALL
LOUVER
GREENHECK FAN
CORPORATION
FL 16785.1-R5
WINDOWS FIXED WINCO WINDOW COMPANY -
MODEL #3250 FIXED
FL29634.1-R2
LOCATION MAP N
MAIN NATIONAL GUARD ARMORY BUILDING
1 06-17-26 ADDENDUM 02
1'
0.6h0.6h
0.6h
0.6h
0.2h h
13FT
0.6h
SF
COMPONENTS AND CLADDING DESIGN
EFFECTIVE WIND
AREA:
WALL
ZONES
ROOF
ZONES
POS
-113.7
-83.5
-63.2
NEG
ROOF SLOPE:
EXPOSURE CATEGORY C / MEAN ROOF HEIGHT =
22FT
FLAT
16.1
PRESSURES SHOWN ARE BASED ON NOMINAL WIND
SPEEDFOR ULTIMATE WIND PRESSURES DIVIDE BY
.6:
Pu = Pn / .6
ASD - NOMINAL WIND PRESSURES (PSF)
Vu = Vn / .6
RISK CATEGORY IV / WIND SPEED V(ult) 165 MPH
(ULTIMATE)
V(asd) 128 MPH (NOMINAL)
-53.2
39.7 -43.1
BASED ON 2023 FBC 8TH EDITION & ASCE
7-22
END ZONE WIDTH (a) IS ALL PERIMETER EDGES, HIPS, RIDGES
AND
CORNERS.(a) = .6h
(a) =
13FT
39.7
16.1
16.1
1' -36.316.1
FLAT ROOFS
A1.1
TYP
A1.1
1 Ref
R ef
1 Ref
R ef
Name Elevation
A1.1
TYP
1i
S#
N
1 DRAWING TITLE
1/8" = 1'-0"A1.1
A1.1
TYP
DRAWING TITLE
VIEW SCALE
SECTION NUMBER
LOCATION SHEET
DETAIL NUMBER
LOCATION SHEET
DETAIL NUMBER
LOCATION SHEET
ELEVATION NUMBER
LOCATION SHEET
ELEVATION MARKDOOR TAG
SPECIFIC NOTE
PARTITION TYPE
STOREFRONT TYPE
1t WINDOW / LOUVER TYPE
?00
CIVIL: PARKING AREA - RESEAL AND RESTRIPE THE NORTH & EAST POV PARKING LOT AS INDICATED IN THE ATTACHED
CIVIL DRAWINGS.
MECHANICAL: IN-KIND OR BETTER REPLACEMENT OF ALL SELECT MECHANICAL EQUIPMENT INCLUDING EXHAUST FANS
/ MAKEUP AIR ETC.
LATRINES - REPLACE EXHAUST AIR / FIXTURE REFRESH / NEW TRENCH DRAINS IN SHOWERS.
ELECTRICAL: PROVIDE SUPPORT FOR HVAC EQUIPMENT IN-KIND REPLACEMENT.
REPLACE STARTERS IN ALL EXHAUST FAN REPLACEMENT SOW.
INTERIOR ELECTRICAL OUTLETS - PROVIDE NEW FACEPLATES ONLY.
EXTERIOR ELECTRICAL OUTLETS - GFI / REPLACE RECEPTACLES AND WEATHERPROOF ENCLOSURES WHERE EXISTING
ARE BROKEN. COLOR MATCH EXISTING.
COMM ROOM 109 - NEW (HOFFMAN) FLOOR MOUNTED DATA CABINET PURCHASED / INSTALLED BY CONTRACTOR.
NEW FIRE ALARM SYSTEM.
PLUMBING: REPLACE EXTERIOR HOSE BIBS CONFIRM FUNCTIONALITY.
PROVIDE NEW FLUSH VALVES & FAUCETS AT ALL EXISTING PLUMBING FIXTURES - REFRESH.
ARCHITECTURAL: ROOM 107B MENS /105 WOMENS LATRINES - INSTALL FUNCTIONAL ADA SHOWER SEATS - POSTIVELY
RE-ATTACH TO WALL AND PROVIDE FULL FUNCTION.
PROVIDE IN MEN'S SHOWER AREA NEW OVERHEAD BRACED HDPE SHOWER PARTITIONS INCLUDING CURTAIN RAIL AND
CURTAINS TO MATCH EXISTING IN WOMEN'S SHOWER.
UNIT SIGN - RENOVATE / PATCH STUCCO REFINISH AND REPAINT.
FLAG POLE - PROVIDE CONCRETE BASE FOR UPLIGHTING INSTALLATION / 10' DIA 6"THK CONCRETE SLAB. PROTECT EXISTING MEMORIAL STRUCTURE. IF ABI #4 & #5 ARE NOT SELECTED, PROVIDE THE FOLLOWING ON THE BASE BID.
WINDOWS / WATERPROOFING - RE-CAULK - WET SEAL PERIMETER OF ALL WINDOW FRAMES TO STUCCO FACE IN ADDITION TO WET SEALING GLAZING TO WINDOW FRAME AS REQUIRED. EXISTING WINDOW AND GLAZING SYSTEMS TO
REMAIN / TINT GLAZING AT DRILL HALL CLERESTORY LEVEL.
ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT WITH TRAFFIC YELLOW EPOXY / INCLUDING @ 10 BAY STORAGE
BUILDING.
SIGNAGE - EXISTING TO REMAIN / PROTECT.
ROOM FINISHES: ACOUSTICAL PANEL CEILING TILES - 100% APC TILE REPLACEMENT IN DRILL HALL 131 ONLY GRID TO REMAIN / OLD DRILL HALL TILE TO BE USED TO REPLACE OLD SOILED TILE IN REMAINDER OF BUILDING.
ALL EXISTING WINDOWS TO REMAIN - NEW ROLLER SHADES / 100% BLACKOUT FUNTION.
ROOM 101 ENTRY VESTIBULE - PROVIDE NEW WAINSCOT AT WALL FINISH TO MATCH RECRUITERS OFFICE / CLEAN, WAX, AND BURNISH EXIST. TERRAZZO FLOOR FINISH.
ROOM 102 / 103 RECRUITERS OFFICE - INTERIOR PAINTING ONLY. INSTALL MISSING WAINSCOT AND CHAIR RAIL.
MAIL / COPY ROOM 108 - EPOXY FLOORING / BASE.
MAIL / COPY ROOM 108 - AT EAST WALL: REMOVE AND DISPOSE OF ALL 4" STUD AND WALL FINISHES FOR THIS WALL TO THE FOLLOWING CONSTRAINTS. REMOVE 10'-0" WIDTH OF WALL CENTERED ON THE CORROSION AND 10'-0" HIGH FROM BOTTOM TRACK TO TOP TRACK. EXISTING 4" STUD WALL HAS FINISHES ON 1 SIDE ONLY. COORDINATE AND PROVIDE ELECTRICAL OUTLET REMOVAL AND SALVAGE ALL COMPONENTS FOR REINSTALLATION FOR DEMOLISHED PORTION OF THE WALL. / PROVIDE AND INSTALL NEW 4" GALV. STUDS WALL SYSTEM @ 16" O.C. WITH MRGWB PAINTED FINISH. NEW STUD WALL APPROX 10'-0" WIDE CENTERED ON THE CORRODED AREA. PROVIDE NEW FULL HEIGHT WALL WITH NEW TOP AND BOTTOM TRACK. PROVIDE NEW MRGWB PAINTED FINISH FOR THE REMAINING FULL LENGTH OF THE WALL
APPROX. 23'-0" IN WIDTH X 2'-0" HIGH.
ROOM 109 MECH/ELECTRICAL/COMM - NEW EPOXY FLOOR / BASE.
VAULT ROOM 110/111 - NEW EPOXY FLOOR / BASE.
EQUIPMENT AREAS ROOM 112/113 - NEW EPOXY FLOOR / BASE.
TABLES & CHAIRS ROOM 114 - NEW EPOXY FLOOR / BASE.
VESTIBULE VENDING ROOM 115 - CLEAN, WAX, AND BURNISH EXIST. TERRAZZO FLOOR FINISH.
MECH 1 / ROOM 116 - REPAINT / SEALED COCRETE W/ / BASE.
OFFICE 1 - ROOM 117 - REPAINT / LVT & BASE TO REMAIN / PROTECT.
OFFICE 2 - ROOM 118 - REPAINT / LVT & BASE TO REMAIN / PROTECT.
TRAINING ROOM 2 - ROOM 119 - REPAINT / VCT & BASE TO REMAIN / PROTECT. INSTALL RAF OVER EXIST. VCT.
TRAINING ROOM 1 - ROOM 120 - REPAINT / VCT & BASE TO REMAIN / PROTECT. INSTALL RAF OVER EXIST. VCT.
MECH 2 / ROOM 121 - REPAINT / VCT & BASE TO REMAIN / PROTECT.
COMM/1ST SG OFFICE / ROOM 122 / 123 - REPAINT / LVT & BASE TO REMAIN / PROTECT.
ROOM 124 MESS KITCHEN - CLEAN RESEAL GROUT @ EXISTING QUARRY TILE.
ROOM 125 MESS PORCH - NEW SCREEN ENCLOSURE.
BATTRY OFFICE AREA ROOM 126 - 130 - REPAINT / LVT & BASE TO REMAIN / PROTECT.
ROOM 131 DRILL HALL - CLEAN & SEAL EXIST. TERRAZZO FLOOR FINISH.
DOOR HARDWARE: - PROVIDE NEW WEATHER SEALS ON ALL EXTERIOR DOORS.
PROJECT DESCRIPTION: RENOVATION OF THE EXISTING
PALMETTO NATIONAL GUARD ARMORY
EXISTING FLOOR PLAN GSF: 17,142 GSF
NO NEW ADDITIONAL AREAS
TOTAL GROSS SQUARE FEET: 17,142 GSF
OCCUPANT LOAD CALCULATIONS: TOTAL OCCUPANTS: 597
(SEE LIFE SAFETY FOR DETAILS ON FBC TABLE 1004.5 AND NFPA 101:7.3.1.2)
OCCUPANCY CLASSIFICATION / CONSTRUCTION TYPE:
CLASSIFICATION OF WORK: EXISTING BUILDING -
ALTERATION LEVEL 1
OCCUPANCY CLASSIFICATION: B - BUSINESS / A-3 ASSEMBLY
CONSTRUCTION TYPE: TYPE IIB (UNPROTECTED)
(NON - SPRINKLERED)
PROJECT HEIGHT: EXISTING- 25' HIGH +/-
NUMBER OF STORIES: 1 STORY
AUTOMATIC SPRINKLERS: NON - SPRINKLERED
FIRE ALARM SYSTEM: YES - NEW PROVIDED
FLOOR CALCULATIONS:
OCCUPANCY CLASSIFICATION: B - BUSINESS
EGRESS - MAX. ALLOWABLE 163' - 2" ≤ 200' - 0" MAX. ALLOWABLE
TRAVEL DISTANCE: PER TABLE 1017.2 FBC 2023
FBC SECTION 1005 & FLORIDA FIRE PREVENTION CODE: CHAPTER 10
DOORS. 2 INCHES PER OCCUPANT (597 x 0.2)= 119.4" REQUIRED /
312" EXIST. PROVIDED
CORRIDOR 44 ” MINIMUM CLEAR REQUIRED / 48" EXIST. PROVIDED
61" MIN. CLR. EXIST. PROVIDED
EXIT DOORS 32 ” CLEAR MIN. OPENING WIDTH REQUIRED /
(2) 36" EXIST. PROVIDED
(2) 72" EXIST. PROVIDED
(1) 96" EXIST. PROVIDED
FBC TABLE 1006.3.2.
MIN. NUMBER OF EXITS OR ACCESS TO EXITS PER STORY:
501 - 1,000 = 3
OCC. LOAD 5 EXISTING EXITS
FCB TABLE 1017.2. EXIT ACCESS TRAVEL DISTANCE:
A - 200' WITHOUT SPRINKLER SYSTEM
B - 200' WITHOUT SPRINKLER SYSTEM
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:2
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
GA1.0
GENERAL
ARCHITECTURAL
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
ARCHITECTURAL ABBREVIATIONS DRAWING LEGEND
AB ANCHOR BOLT
ACOUST ACOUSTICAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APC ACOUSTIC PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTICAL TILE
BD BOARD
BFE BASE FLOOD ELEVATION
BLDG BUILDING
BM BEAM
BOT BOTTOM
BUR BUILT-UP ROOFING
C.F.C.I. CONTRACTOR FURNISHED
AND CONTRACTOR
INSTALLED
CAB CABINET
CG CORNER GUARD
CI CAST IRON
CJ CONTROL JOINT
CL CLEAR
CLO CLOSET
CMU CONCRETE MASONRY UNIT
CNT COUNTER
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DWG DRAWING
EB EXPANSION BOLT
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
FC FURRING CHANNEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR
FR FIRE RATED
GA GUAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED
CEMENT
GFRG GLASS FIBER REINFORCED
GYPSUM
GL GLASS
GR GRADE
GWB GYPSUM WALLBOARD
GYP GYPSUM
HB HOSE BIB
HT HEIGHT
HVAC HEATING, VENTILATING, & AIR
CONDITIONING
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
DIMENSION NOTES
1 ALL DOOR FRAME OPENINGS IN MASONRY SHALL BE 3'-4" MO UNO
2 ALL DIMENSION STRINGS SHALL BE TO FACE OF WALL STRUCTURE
(IE CMU, MTL STUD FRAMING)
3 DIMENSION STRINGS NOTED AS CLEAR SHALL BE TO FACE OF
FINISHED WALL OR PARTITION (IE FACE OF GWB, PLASTER, OR TILE)
4 DOOR JAMB RETURNS IN MASONRY WALLS TO HINGE SIDE SHALL BE
8" NOM UNO
5 DOOR JAMB RETURNS IN MTL FRAMING WALLS TO HINGE SIDE
SHALL BE 4" NOM UNO
JT JOINT
KIT KITCHEN
KW KILOWATT
L LENGTH
LAM LAMINATE
LAV LAVATORY
LF LINEAR FEET
LKR LOCKER
LL LEAD LINED
MCJ MASONRY CONTROL JOINT
MFD MANUFACTURED
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MORROR
MISC MISCELLANEOUS
MLDG MOLDING
MO MASONRY OPENING
MR MOISTURE RESISTANT
MRGWB MOISTURE-RESISTANT
GYPSUM WALL BOARD
MT METAL THRESHOLD
MTD MOUNTED
MTL METAL
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PLWD PLYWOOD
PNT PAINT
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RADIUS
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
REC RECEPTACLE
REF REFRIGERATOR
REG REGLET
REINF REINFORCED
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
SCHD SCHEDULE
SCRN SCREEN
SEC SECTION
SH SHELF
SHT SHEET
SIM SIMILAR
SP SPACE
SPECS SPECIFICATIONS
SS STAINLESS STEEL
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
TB TOGGLE BOLT
TC TOILET COMPARTMENT
TEL TELEPHONE
TEMP TEMPERATURE
TPD TOILET PAPER DISPENSER
TYP TYPICAL
UC UNDERCOUNTER
UTIL UTILITY
VB VINYL BASE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VWC VINYL WALLCOVERING
W WIDTH
W/ WITH
WC WATER CLOSET
WD WOOD
WP WEATHER PROOF
WWF WELDED WIRE FABRIC
SCOPE OF WORK - BASE BID
NOTE: REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE
ALTERNATE BID ITEMS SCOPE OF WORK.
APPLICABLE CODES
2023 FLORIDA BUILDING CODE - BUILDING
2023 FLORIDA BUILDING CODE - EXISTING BUILDING
2023 FLORIDA BUILDING CODE - MECHANICAL
2023 FLORIDA BUILDING CODE - PLUMBING
2023 FLORIDA BUILDING CODE - FUEL GAS
2023 FLORIDA BUILDING CODE - TEST PROTOCOLS
2023 FLORIDA BUILDING CODE - ENERGY
2023 FLORIDA BUILDING CODE - ACCESSIBILITY
2020 NFPA 70 NATIONAL ELECTRICAL CODE
2023 FLORIDA FIRE PREVENTION CODE, 8th EDITION
BUILDING CODE SUMMARY
1 06-17-26 ADDENDUM 02
GENERAL PROJECT NOTES
A ISOLATE ALL DISSIMILAR MATERIALS, TYP.
B SEALERS TO BE COMPATIBLE WHERE IN CONTACT W/ ONE ANOTHER AND OTHER
MATERIALS.
C CONTRACTOR SHALL HAVE PORTABLE FIRE EXTINGUISHER ON SITE AND AVAILABLE AT
ALL TIMES.
D CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO PERFORM THEIR PROJECT.
E DO NOT SCALE DRAWINGS, IF DIMENSIONS ARE IN QUESTION THE CONTRACTOR SHALL
BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT PRIOR TO
CONTINUATION OF WORK.
F USER GROUP TO RELOCATE ALL NON-FIXED EQUIPMENT PRIOR TO CONTRACTORS
NOTICE TO PROCEED.
G CONTRACTOR TO BE RESPONSIBLE FOR RELOCATION/ STORAGE/ RE-INSTALLATION OF
ALL FIXED EQUIPMENT. CONSULT WITH OWNER REGARDING AVAILABILITY OF ON-SITE
STORAGE.
H CONTRACTOR TO PROVIDE DETAILED SPECIFIC WORK PLAN WITH COMPLETE
DURATION PRIOR TO STARTING ANY WORK. PRIOR TO CONTRACTORS NTP.
I ALL NEW MECHANICAL UNITS TO BE PROVIDED WITH REQUIRED REFRIDGERANT FOR
FULL EFFECTIVE OPERATION.
J ANY UTILITY OUTAGE THAT EXCEEEDS 2 HOURS, CONTRACTOR IS TO PROVIDE FULL
PROVISION TO MAINTAIN OPERATIONS AT ALL TIMES.
K ALL EXISTING CONDITIONS ARE TO BE REVIEWED BY THE CONTRACTOR AND
ACCOUNTED WITH REGARD TO THE CONTRACT SCOPE OF WORK.
L ARMORY IS TO BE OCCUPIED THROUGHOUT THE CONSTRUCTION PERIOD, FULL
COORIDNATION WITH THE UNIT IS REQUIREMNED FOR THE COMPLETE DURATION OF
THE WORK.
M COORDINATE FOR TEMPORARY SHOWER FACILITIES / LATRINES DURING DRILL WEEK.
COORDIATE WITH CFMO PM & UNIT.
x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
S
S
SSS
WV
WV
WV
WV
H Y D
WV
x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxx
UC
U-
O N E
S T O R Y
B
LO
C K
C H U R C H
ONE STORY
BLOCK AND WOOD
BUILDING
ONE STORY
BLOCK
BUILDING
LOT 1LOT 2LOT 3LOT 4LOT 5
LOT 6
LOT 7LOT 8LOT 1LOT 2LOT 3
LOT 12 LOT 13
LOT 14
LOT 9 LOT 10
LOT 11 LOT 12
LOT 15
LOT 16
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5 LOT 6
LOT 7
(NOT INCLUDED)
LOT 4 LOT 3 LOT 2 LOT 1
LOT 11 LOT 12 LOT 13 LOT 14
14"OAK
28"OAK
48"OAK
48"OAK
4-24"OAKS
2-14"OAKS
1-20"OAK
1-15"OAK
48"OAK
12"OAK
10"OAK
20"OAK
26"OAK
18"OAK
30"OAK
60"OAK
48"TWIN OAK
4-14"OAKS
1-12"OAK
2-18"OAKS
2-20"OAKS
48"OAK
30"OAK
52"OAK
30"OAK
48"OAK
48"OAK 24"OAK 14"OAK
38"TWIN OAK
CLUSTER OF OAKS
CLUSTER OF
TREES
8"PALM
24"OAK
18"OAK
30"OAK
8"PALM
10"PALM
8"PALM
8"PALM
E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E X11.5'
X11 .4'
X11.3'
X11 .1'
X10 .2'
X1 0.
9'
X10.9'
X1 1.
4'
X10 .7'
X11 .4'X12
.2'
X11 .2'X1
1.2
X10 .3'
X10 .6'
X9.7
X10 .5'
X11 .2'
X10 .9'
X12.6'
X10.8'
X10.9'
X10 .5'
X1 1.3
X11.5'
X1 1.4
X10 .2'
X12.2'
X10 .4'
X12 .5' X10
.66
X .5
X10 .6'
X11 .0'
X11.2'
X10 .8' X10
.5' X12
.0' X12
.0'
X12 .1'
X11 .2'
X12.4'
X12 .4'
X11 .6'
X11 .5'
X11 .7'
X11 .7'
X 11.5
X11.6'
X11.4'
X11 .4'
X11.3'
X11 .2'
X11 .3'
X11 .5'
X12.
1'
X12 .2'
X11.9' X11.7'
X .8
X11.7'
X12.0
X11.7'
X11.9'
X12.0'
X12 .2'
X12 .8'
X12 .2'
X11 .4'
X11 .2'
X11 .1'
X12 .3'
X12 .6'
X1 2.
8'X1
1.
3' X
.4
X12 .4' X1
2.
4'
X12 .7'
X12 .3'
X1 2.
6'
X1 2.
5'
X1 2.
1'
X12 .1'
X1 1.4
'X1 1.6
X1 1.9
X1 1.6
X1 1.7
X1 1.8
X1 1.7
X1 1.7
X11
.8'
X1 1.4
X1 1.6
X1 0.9
X1 1.0
X .5
X1 1.7
X1 1.1
X1 1.7
X1 1.4
X1 1.3
X1 1.5
X1 1.7
X1 1.5
X1 1.9
X1 1.6
X .5
X1 1.6
'X .5 ' X11.4' X1
1.4
X1 1.6
X1 1.3
X1 1.9
X1 1.4
X1 1.8
X1 2.0
X1 1.8
X1 2.5
X1 2.3
' X1 2.3
X1 2.6
X12.5'
X .4
X1 2.6
X11.5'
X1 2.3
X1 1.8
X .6
X1 2.8
X1 2.5
X1 1.8
X1 2.2
X .3
X1 2.6
'X .8
X .0
X1 1.4
X1 1.6
X1 1.5
X11
.9'
X1 2.0
X1 2.2
X1 2.3
X12.8'
X1 2.
0'
X1 1.8
X1 1.0
X1 0.9
X11.2'
X1 1.3
X11.2'
X1 1.2
X11.4'
X11 .3'
X10 .2'
X10.3'
X10 .2'
X1 0.
3'
X10 .2'
X10 .4'
X .5
X10 .6'
X10 .4'X1
0.
6'
X11 .0'X12
.1'
X10 .7' X
.1 ' X11
.8'
X11 .4'
X11 .4'
X12 .0'
X12 .2'
X12 .0'X11
.6' X10
.7' X10
.4' X10
.4'
X9 .0'X10
.5' X10
.4'
X9 .1'
X9 .5'
X9 .7'
X10 .6'
X11 .3'X11
.2'X11 .2'
X11 .1'
X11 .0'
X10 .6'
X10 .2'
X10 .7'
X11 .1' X9
.8'
X10 .5'
X10 .4'
X10 .8'
X10 .4'
X10 .5'
X10 .7'
X11 .7'
X11 .8'
X12 .8'
X11 .8'
X11 .1'
X1 1.5
X1 1.4
X1 2.
0'
X11.3'
X1 1.3
X1 1.1
X1 0.8
X1 1.8
X1 1.6
X1 0.6
X1 2.1
X1 2.5
X1 2.4
X1 1.0
X1 1.3
X1 1.3
X1 1.7
X1 1.1
X1 1.0
X1 0.
8'
X1 0.
6'
X1 0.
6'
X1 0.
9'
X .0
X1 1.0
X1 1.6
WM
FIELD BOOK , PAGE (SEE FILE)
DATE OF FIELD SURVEY: 04/29/06
REVISED: 12/21/06, ADDED MORE TOPO AND LOCATION
16' ALLEY (VACATED)
SPEAR AVENUE 50' WIDE (VACATED)
LE
E
S T R E E T
W
ID
E
(V A C A T E D
(20' WIDE PAVEMENT) (50' R/W)
(2 W
ID
E
P A V E M E N T (4 R W P
POINT OF COMMENCEMENT
SE CORNER OF NE 1/4 OF
SECTION 15-34-17, MANATEE
COUNTY, FLORIDA.
N O R T H
.9 1' (D
WEST 33.00'(D)
WEST 473.00'(D)
S O U T H
.7 (D )N
O R T H
.7 (D
EAST(ASSUMED) 473.00'+/-(D) 473.07'(M)
POINT OF BEGINNING
33' WEST & 175.91'
NORTH OF SE
CORNER OF NE 1/4
OF SECTION
15-34-17
S. BOUNDARY LINE OF
LOT 1, BLOCK 8, ALSO
BEING THE NORTH
BOUNDARY LINE OF A
PLATTED ALLEY
SOUTH BOUNDARY LINE OF
LOT 1, BLOCK 7
S. RIGHT OF WAY LINE OF
12th STREET
S 89°59'53" W 473.09'(M)
N
'2 W
.6 M
S
'2 E
.6 '(M
N
'0 W
.9 M
CONC. PIPE
END SECTION
24.3'
.2
150.3'
150.3'
.2
.3
CONC.
PAD
CONC.
PAD
C O N C R E T E
ASPHALT ROAD
ASPHALT DRIVEWAY
C O N C R E T E
S
ID
E W A
LK
12" HDP PIPE
INV.=9.14'
PAD
CONC.
SHED
18'
7.
6'
C O N C R E T E
S
ID
E W A
LK
12" RCP PIPE
END SECTION
CONC. PIPE
INV.=10.0'
6' CHAINLINK FENCE
6' CHAINLINK FENCE
C H A
IN
LI
N K
F E N C E
ONE STORY
CHP BUILDING
FINISHED FLOOR
ELEVATION = 12.92'
ELEVATION = 11.95'
FINISHED FLOOR
METAL BUILDING
ONE STORY
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.05'
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.42'
.0
.9
80.1'
80.1'
.2
.0
130.2'
130.1'
WM
PROPANE
TANK
MW
MW
C H A
IN
LI
N K F
EN
C E
LIGHT
P
LA
T T E D
R W
(PLATTED ALLEY)
POND
TOE OF SLOPE
TOP OF SLOPE
CONC. TRANSFORMER
PAD
FOUND I/R
(LB613)
FOUND I/R
(LB613)
CHAINLINK FENCE
CHAINLINK FENCE
TENNIS COURT
"R C P
D.R.A.
INV.=9.03'
INV.=9.14'
TO
P
O F D .R .A
BARRY AVENUE(P) 12tH STREET WEST(F)
H A R L E E
S T R E E T (P th
A V E N U E
W E S T (F
WM
GFI
DN
DN
X X
XX X
METAL ROOFING
SYSTEM
CONCRETE
SLAB
NEW LIME ROCK
BASE / GRAVEL
CHAIN-LINK FE-7
FENCE SYSTEM.
PROPERTY LINE
PR
O
PE
R
TY
L
IN
E
PROPERTY LINE
EXISTING 1 STORY
NATIONAL GUARD
ARMORY BUILDING
F.F.E.= 12.94
EXISTING STORAGE BUILDING
F.F = 25.67
PR
O
PE
R
TY
L
IN
E
EXIST MOTOR POOL
STORAGE BLDG.
EXIST.
MAINTENANCE
BAY
12" CONC.
CURB TYP.
WATER TANK
CONC.
PAD PARKING AREA
ASPHALT
ASPHALT
CROSS W
ALK
PA
R
K
IN
G A
R
EA
CONC.
PAD
CONC.
PAD
EXIST
DUMPSTER
PA
R
K
IN
G A
R
EA
FLAG
POLE UNIT
SIGN
A6.2
A6.2
ABI #01
EXIST.
SHED
NEW.
CONC.
RAMP
ABI #01
ABI
#01
TYP
TYP
3 ABI #01
ABI #01
TYP
TYP
TYP
TYP
TYP
ABI
#02
TYP
TYP
TYP
TYP
ABI #03
ABI #03
ABI#06 14
ABI #07
ABI
#07
ABI#0617
ABI
#01
4'
0"
ABI
#07
ABI #01
20' - 0"
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:3
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
SA1.1
ARCHITECTURAL
SITE PLAN
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
GENERAL SITE NOTES
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE ALTERNATE BID ITEMS SCOPE OF WORK.
B ROOF SYSTEM TO REMAIN AND TO PROTECT TO ENSURE THE WARRANTY IS NOT VOIDED AND THE LIGHTNING
PROTECTION MASTER LABEL CERTIFICATE IS NOT COMPROMISED. GC TO COORDINATE ALL WORK ON THE ROOF
WITH THE ROOFING SUBCONTRACTOR.
C REFERENCE ENVIRONMENTAL REPORT IN ADDENDUM # 2 FOR ENVIRONMENTAL SURVEYS OF ASBESTOS AND LEAD FOR THIS BUILDING. ANY WORK THAT INTERFACES WITH CONTAMINATED MATERIALS AS OUTLINED IN THE ENVIRONMENTAL SURVEYS SHALL BE PERFORMED PER THE RECOMMENDATIONS IN THE REPORT AND FOLLOW
ALL APPLICABLE STANDARDS FOR ABATEMENT AND REMEDIATION.
D ALL ARCHITECTURAL, CIVIL, MECHANICAL, PLUMBING, AND ELECTIRICAL WORK IS TO COMPLY WITH THE FBC
REQUIREMENTS AND ALL AUTHORITIES HAVING JURISDICTION.
E COORDINATE FULL SCOPE OF WORK W/ CIVIL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS.
F VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS FOR THE PROPOSED SCOPE OF WORK. NOTIFY ARCHITECT
OF ANY DISCREPANCIES.
G AT LOCATIONS WHERE SYSTEMS AND ACCESSORIES HAVE BEEN REMOVED, PATCH AND REPAIR TO BE FLUSH
AND MATCH ADJACENT FINISHES.
H COORDINATE ALL SITE ACCESS & LAY DOWN AREA W/ OWNER.
I SECURE ALL EXTERIOR OPENINGS IN THE BUILDING ENVELOPE AT THE END OF WORK EACH DAY.
J PROTECT EXISTING EXFILTRATION SYSTEM FROM ALL LOADING.
SPECIFIC NOTES
1 IF ABI #01 IS SELECTED: NEW ASPHALT OVER NEW STORM DRAIN TO THE POND. REFER TO CIVIL DRAWINGS FOR
COMPLETE SCOPE OF WORK.
2 IF ABI #01 IS SELECTED: RESURFACE & RE-STRIPE POV PARKING LOT. PROVIDE NEW REINFORCED CONCRETE AS
REQUIRED. REFER TO CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK.
3 IF ABI #01 IS SELECTED: DOWNSPOUTS - CONNECT ALL DOWNSPOUTS TO UNDERGROUND CIVIL. RE-GRADE RE-SOD AROUND ALL DOWNSPOUT AREAS FOLLOWING CIVIL CONNECTION. REFER TO CIVIL DRAWINGS FOR
COMPLETE SCOPE OF WORK.
4 NEW CONDENSING UNIT ON EXISTING 6" CONC. MECH. SUPPORT PADS. REFER TO MECHANICAL DRAWINGS FOR
COMPLETE SCOPE OF WORK.
5 IF ABI #01 IS SELECTED: PREPARE AREA FOR NEW CONDENSATE CONNECTION TO NEW STORM. REFER TO MECHANICAL / CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK . REMOVE DRYWELL FROM SCOPE OF WORK IF ABI IS SELECTED. / IF ABI #01 IS NOT SELECTED: PROVIDE NEW DRYWELL. REFER TO MECHANICAL DRAWINGS.
6 IF ABI #02 IS SELECTED: NEW LED EXTERIOR LIGHTING FIXTURES. INCLUDING STORAGE BUILDING / UNIT SIGN / FLAG POLE / AND BUILDING MOUNTED FIXTURES. REFER TO ELECTRICAL DRAWINGS FOR COMPLETE SCOPE OF
WORK.
7 NEW RECEPTACLES AND WEATHERPROOF ENCLOSURES AT ALL EXTERIOR ELECTRICAL OUTLETS - GFI. REFER
TO ELECTRICAL DRAWINGS FOR COMPLETE SCOPE OF WORK.
8 NEW EXTERIOR HOSE BIBS. VERIFY TOTAL QUANTITY IN FIELD. REFER TO PLUMBING DRAWINGS.
9 RENOVATED UNIT SIGN. REFER TO A6.2 SHEET FOR COMPLETE SCOPE OF WORK.
10 RENOVATED LED FLAG POLE LIGHT FIXTURE AND CONCRETE SLAB. FLAG POLE AND FOUNDATION TO REMAIN / PROTECT. REFER TO A6.2 SHEET FOR COMPLETE SCOPE OF WORK. PROTECT EXISTING MEMORIAL STONE.
11 ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT WITH TRAFFIC YELLOW EPOXY / INCLUDING @ 10 BAY
STORAGE BUILDING.
12 EXISTING FE-7 FENCE SYSTEM / GATES TO REMAIN. PROTECT. TYP.
13 IF ABI #03 IS SELECTED: REFINISH AND REPAINT COMPLETE EXTERIOR STUCCO FACADE INCLUDING BRICK FACADE, AND THE PAIINTING OF ALL EXTERIOR HM DOORS AND FRAMES IINCLUDING ALL INSIDE AND OUTSIDE
FACES. ETC. / 4 COLOR SCHEME MAX. REFER TO EXTERIOR ELEVATIONS.
14 IF ABI #06 IS SELECTED: PROVIDE NEW 20'-0" WIDE (K-8 FORCE PROTECTION FENCE SYSTEM) DOUBLE SWING GATE WITH MANUAL FUNCTION TO SOUTH SIDE OF POV PARKING. EXISTING DEAD MAN ANCHOR LAYOUT TO BE
RE-CONFIGURED FOR NEW GATE. COMPLETE FUNCTIONAL INSTALLATION REQUIRED.
15 IF ABI #07 IS SELECTED: PROVIDE MILL AND OVERLAY OF THE NORTH & EAST POV PARKING LOT AS INDICATED IN
THE ATTACHED CIVIL DRAWINGS.
16 IF ABI #06 IS SELECTED: PROVIDE NEW 4'W X 6'H SINGLE SWING FE-7 GATE. REFER TO A8.3 & A8.4 FOR TYPICAL FE-7 CHAIN-LINK FENCE & GATE DETAILS. REFER TO CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK.
17 EXISTING CU UNIT TO REMAIN. COORD. WITH MECHANICAL DRAWINGS.
SITE PLAN LEGEND
N
1" = 30'-0"SA1.1
1 ARCHITECTURAL SITE PLAN
1 06-17-26 ADDENDUM 02
x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
S
S
SSS
WV
WV
WV
WV
H Y D
WV
x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxx
UC
U-
O N E
S T O R Y
B
LO
C K
C H U R C H
ONE STORY
BLOCK AND WOOD
BUILDING
ONE STORY
BLOCK
BUILDING
LOT 1LOT 2LOT 3LOT 4LOT 5
LOT 6
LOT 7LOT 8LOT 1LOT 2LOT 3
LOT 12 LOT 13
LOT 14
LOT 9 LOT 10
LOT 11 LOT 12
LOT 15
LOT 16
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5 LOT 6
LOT 7
(NOT INCLUDED)
LOT 4 LOT 3 LOT 2 LOT 1
LOT 11 LOT 12 LOT 13 LOT 14
14"OAK
28"OAK
48"OAK
48"OAK
4-24"OAKS
2-14"OAKS
1-20"OAK
1-15"OAK
48"OAK
12"OAK
10"OAK
20"OAK
26"OAK
18"OAK
30"OAK
60"OAK
48"TWIN OAK
4-14"OAKS
1-12"OAK
2-18"OAKS
2-20"OAKS
48"OAK
30"OAK
52"OAK
30"OAK
48"OAK
48"OAK 24"OAK 14"OAK
38"TWIN OAK
CLUSTER OF OAKS
CLUSTER OF
TREES
8"PALM
24"OAK
18"OAK
30"OAK
8"PALM
10"PALM
8"PALM
8"PALM
E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E X11.5'
X11 .4'
X11.3'
X11 .1'
X10 .2'
X1 0.
9'
X10.9'
X1 1.
4'
X10 .7'
X11 .4'X12
.2'
X11 .2'X1
1.2
X10 .3'
X10 .6'
X9.7
X10 .5'
X11 .2'
X10 .9'
X12.6'
X10.8'
X10.9'
X10 .5'
X1 1.3
X11.5'
X1 1.4
X10 .2'
X12.2'
X10 .4'
X12 .5' X10
.66
X .5
X10 .6'
X11 .0'
X11.2'
X10 .8' X10
.5' X12
.0' X12
.0'
X12 .1'
X11 .2'
X12.4'
X12 .4'
X11 .6'
X11 .5'
X11 .7'
X11 .7'
X 11.5
X11.6'
X11.4'
X11 .4'
X11.3'
X11 .2'
X11 .3'
X11 .5'
X12.
1'
X12 .2'
X11.9' X11.7'
X .8
X11.7'
X12.0
X11.7'
X11.9'
X12.0'
X12 .2'
X12 .8'
X12 .2'
X11 .4'
X11 .2'
X11 .1'
X12 .3'
X12 .6'
X1 2.
8'X1
1.
3' X
.4
X12 .4' X1
2.
4'
X12 .7'
X12 .3'
X1 2.
6'
X1 2.
5'
X1 2.
1'
X12 .1'
X1 1.4
'X1 1.6
X1 1.9
X1 1.6
X1 1.7
X1 1.8
X1 1.7
X1 1.7
X11
.8'
X1 1.4
X1 1.6
X1 0.9
X1 1.0
X .5
X1 1.7
X1 1.1
X1 1.7
X1 1.4
X1 1.3
X1 1.5
X1 1.7
X1 1.5
X1 1.9
X1 1.6
X .5
X1 1.6
'X .5 ' X11.4' X1
1.4
X1 1.6
X1 1.3
X1 1.9
X1 1.4
X1 1.8
X1 2.0
X1 1.8
X1 2.5
X1 2.3
' X1 2.3
X1 2.6
X12.5'
X .4
X1 2.6
X11.5'
X1 2.3
X1 1.8
X .6
X1 2.8
X1 2.5
X1 1.8
X1 2.2
X .3
X1 2.6
'X .8
X .0
X1 1.4
X1 1.6
X1 1.5
X11
.9'
X1 2.0
X1 2.2
X1 2.3
X12.8'
X1 2.
0'
X1 1.8
X1 1.0
X1 0.9
X11.2'
X1 1.3
X11.2'
X1 1.2
X11.4'
X11 .3'
X10 .2'
X10.3'
X10 .2'
X1 0.
3'
X10 .2'
X10 .4'
X .5
X10 .6'
X10 .4'X1
0.
6'
X11 .0'X12
.1'
X10 .7' X
.1 ' X11
.8'
X11 .4'
X11 .4'
X12 .0'
X12 .2'
X12 .0'X11
.6' X10
.7' X10
.4' X10
.4'
X9 .0'X10
.5' X10
.4'
X9 .1'
X9 .5'
X9 .7'
X10 .6'
X11 .3'X11
.2'X11 .2'
X11 .1'
X11 .0'
X10 .6'
X10 .2'
X10 .7'
X11 .1' X9
.8'
X10 .5'
X10 .4'
X10 .8'
X10 .4'
X10 .5'
X10 .7'
X11 .7'
X11 .8'
X12 .8'
X11 .8'
X11 .1'
X1 1.5
X1 1.4
X1 2.
0'
X11.3'
X1 1.3
X1 1.1
X1 0.8
X1 1.8
X1 1.6
X1 0.6
X1 2.1
X1 2.5
X1 2.4
X1 1.0
X1 1.3
X1 1.3
X1 1.7
X1 1.1
X1 1.0
X1 0.
8'
X1 0.
6'
X1 0.
6'
X1 0.
9'
X .0
X1 1.0
X1 1.6
WM
FIELD BOOK , PAGE (SEE FILE)
DATE OF FIELD SURVEY: 04/29/06
REVISED: 12/21/06, ADDED MORE TOPO AND LOCATION
16' ALLEY (VACATED)
SPEAR AVENUE 50' WIDE (VACATED)
LE
E
S T R E E T
W
ID
E
(V A C A T E D
(20' WIDE PAVEMENT) (50' R/W)
(2 W
ID
E
P A V E M E N T (4 R W P
POINT OF COMMENCEMENT
SE CORNER OF NE 1/4 OF
SECTION 15-34-17, MANATEE
COUNTY, FLORIDA.
N O R T H
.9 1' (D
WEST 33.00'(D)
WEST 473.00'(D)
S O U T H
.7 (D )N
O R T H
.7 (D
EAST(ASSUMED) 473.00'+/-(D) 473.07'(M)
POINT OF BEGINNING
33' WEST & 175.91'
NORTH OF SE
CORNER OF NE 1/4
OF SECTION
15-34-17
S. BOUNDARY LINE OF
LOT 1, BLOCK 8, ALSO
BEING THE NORTH
BOUNDARY LINE OF A
PLATTED ALLEY
SOUTH BOUNDARY LINE OF
LOT 1, BLOCK 7
S. RIGHT OF WAY LINE OF
12th STREET
S 89°59'53" W 473.09'(M)
N
'2 W
.6 M
S
'2 E
.6 '(M
N
'0 W
.9 M
CONC. PIPE
END SECTION
24.3'
.2
150.3'
150.3'
.2
.3
CONC.
PAD
CONC.
PAD
C O N C R E T E
ASPHALT ROAD
ASPHALT DRIVEWAY
12" HDP PIPE
INV.=9.14'
PAD
CONC.
SHED
18'
7.
6'
C O N C R E T E
S
ID
E W A
LK
12" RCP PIPE
END SECTION
CONC. PIPE
INV.=10.0'
6' CHAINLINK FENCE
6' CHAINLINK FENCE
C H A
IN
LI
N K
F E N C E
ONE STORY
CHP BUILDING
FINISHED FLOOR
ELEVATION = 12.92'
ELEVATION = 11.95'
FINISHED FLOOR
METAL BUILDING
ONE STORY
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.05'
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.42'
.0
.9
80.1'
80.1'
.2
.0
130.2'
130.1'
WM
PROPANE
TANK
MW
MW
C H A
IN
LI
N K F
EN
C E
LIGHT
P
LA
T T E D
R W
(PLATTED ALLEY)
POND
TOE OF SLOPE
TOP OF SLOPE
CONC. TRANSFORMER
PAD
FOUND I/R
(LB613)
FOUND I/R
(LB613)
CHAINLINK FENCE
CHAINLINK FENCE
TENNIS COURT
"R C P
D.R.A.
INV.=9.03'
INV.=9.14'
TO
P
O F D .R .A
BARRY AVENUE(P) 12tH STREET WEST(F)
H A R L E E
S T R E E T (P th
A V E N U E
W E S T (F
WM
GFI
DN
X X
XX X
PROPERTY LINE
PR
O
PE
R
TY
L
IN
E
PROPERTY LINE
EXISTING 1 STORY
NATIONAL GUARD
ARMORY BUILDING
F.F.E.= 12.94
EXISTING STORAGE BUILDING
F.F = 25.67
PR
O
PE
R
TY
L
IN
E
EXIST MOTOR POOL
STORAGE BLDG.
EXIST.
MAINTENANCE
BAY
A6.2
A6.2
6" CONC.
CURB TYP.
WATER TANK
CONC.
PAD PARKING AREA
DEMO
ASPHALT
ASPHALT DRIVEWAY
DEMO
ASPHALT
CROSS W
ALK
PA
R
K
IN
G A
R
EA
PA
R
K
IN
G A
R
EA
CONC.
PAD
CONC.
PAD
EXIST
DUMPSTER
PA
R
K
IN
G A
R
EA
FLAG
POLE
UNIT SIGN
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
ABI #01
ABI #01
ABI #01
ABI #01
ABI #01
ABI #03
ABI #03
ABI#06
20' - 0"
ABI #07
ABI #07
ABI
#02
ABI#06
ABI #01
DEMO
RAMP
ITEM TO BE REMOVED
AND DISPOSED OF
EXISTING CONCRETE / ASPHALT OR
SURFACE TO BE DEMOLISHED DOWN
TO CLEAN SUBSTRATE AS REQUIRED.
EXISTING TREE
TO BE REMOVED
N
1" = 30'-0"DSA1.1
1 EXISTING / DEMO SITE PLAN
DEMOLITION SITE PLAN LEGEND
DEMO SPECIFIC NOTES
1 IF ABI #01 IS SELECTED: ASPHALT TO BE REMOVED TO INSTALL STORM DRAIN TO THE POND. REFER TO
CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK.
2 IF ABI #01 IS SELECTED: EXIST. POV PARKING LOT TO BE RESURFACED & RE-STRIPED. REFER TO CIVIL
DRAWINGS FOR COMPLETE SCOPE OF WORK.
3 IF ABI #01 IS SELECTED: EXISTING DOWNSPOUTS - CONNECT ALL DOWNSPOUTS TO UNDERGROUND CIVIL.
RE-GRADE RE-SOD AROUND ALL DOWNSPOUT AREAS FOLLOWING CIVIL CONNECTION. REFER TO CIVIL
DRAWINGS FOR COMPLETE SCOPE OF WORK.
4 EXISTING CONDENSING UNIT TO BE REMOVED & DISPOSED OF. EXISTING CONC. MECH. SUPPORT PADS TO
REMAIN. REFER TO MECHANICAL DRAWINGS FOR COMPLETE SCOPE OF WORK.
5 IF ABI #01 IS SELECTED: PREPARE AREA FOR NEW CONDENSATE CONNECTION TO NEW STORM. REFER TO MECHANICAL / CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK . REMOVE DRYWELL FROM SCOPE OF WORK IF ABI IS SELECTED. / IF ABI #01 IS NOT SELECTED: PROVIDE NEW DRYWELL. REFER TO MECHANICAL
DRAWINGS.
6 IF ABI #02 IS SELECTED: ALL EXTERIOR LIGHTING TO BE UPGRADE TO LED INCLUDING STORAGE BUILDING / UNIT SIGN / FLAG POLE / AND BUILDING MOUNTED FIXTURES. REFER TO ELECTRICAL DRAWINGS FOR
COMPLETE SCOPE OF WORK.
7 REPLACE RECEPTACLES AND WEATHERPROOF ENCLOSURES AT ALL EXTERIOR ELECTRICAL OUTLETS -
GFI. REFER TO ELECTRICAL DRAWINGS FOR COMPLETE SCOPE OF WORK.
8 REMOVE ALL EXISTING EXTERIOR HOSE BIBS, CONFIRM FUNCTIONALITY. PREPARE FOR NEW
REPLACEMENT.
9 EXISTING UNIT SIGN TO BE RENOVATED. REFER TO A6.2 SHEET FOR COMPLETE SCOPE OF WORK.
10 DEMO EXIST. FLAG POLE LIGHT FIXTURE AND CONCRETE SLAB ONLY. FLAG POLE AND FOUNDATION TO REMAIN / PROTECT. REFER TO A6.2 SHEET FOR COMPLETE SCOPE OF WORK. PROTECT EXISTING
MEMORIAL STONE.
11 ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT WITH TRAFFIC YELLOW EPOXY / INCLUDING @ 10 BAY
STORAGE BUILDING.
12 EXISTING FE-7 FENCE SYSTEM / GATES TO REMAIN. PROTECT. TYP.
13 IF ABI #03 IS SELECTED: REMOVE ALL LANDSCAPING UP AGAINST THE MAIN ARMORY BUILDING ON THE NORTH & EAST FACADESS OF THE EXISTING BUILDING. REMOVE EARTH GRADE TO THE TOP OF THE EXISTING FOOTING @ BUILDING PERIMETER. PREPARE AREA AND SURFACES FOR REFINISH / REPAINT
STUCCO FINISH SYSTEM @ ENTIRELY PERIMETER OF ARMORY BUILDING. - TYP.
14 IF ABI #06 IS SELECTED: EXISTING DEAD MAN ANCHOR LAYOUT TO BE RE-CONFIGURED FOR NEW GATE 20'-0" WIDE (K-8 FORCE PROTECTION FENCE SYSTEM). REFER TO CIVIL DRAWINGS FOR COMPLETE SCOPE
OF WORK.
15 IF ABI #07 IS SELECTED: PREPARE NORTH & EAST POV PARKING LOT FOR NEW MILL AND OVERLAY AS
INDICATED IN THE ATTACHED CIVIL DRAWINGS.
16 IF ABI #06 IS SELECTED: REMOVE PORTION 4'+/- OF EXISTING FE-7 FENCE SYSTEM FOR NEW 4' SWING
GATE. REFER TO CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK.
17 EXISTING CU UNIT TO REMAIN. COORD. WITH MECHANICAL DRAWINGS.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:3
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
DSA1.1
EXISTING / DEMO
SITE PLAN
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
GENERAL SITE DEMOLITION NOTES
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE ALTERNATE BID ITEMS SCOPE OF WORK.
B GAF MOD BIT ROOF SYSTEM TO REMAIN AND TO PROTECT. GC TO COORDINATE ALL WORK ON THE ROOF
WITH THE ROOFING SUBCONTRACTOR RF LUSA & SONS SHEET METAL INC. AS TO NOT VOID EXIST. ROOF GUARANTEE # G2024-0001391-001-001 / 25 YEAR NDL ROOF GUARANTEE / GUARANTEE EXPIRATION DATE :
4.15.2049 / ROOF SPECIFICATION I0325HGPFR. UPON COMPLETION THE WORK. GC TO PROVIDE MFGR
LETTER INDICATING THE WARRANTY IS STILL INTACT.
C REFERENCE ENVIRONMENTAL REPORT IN ADDENDUM # 2 FOR ENVIRONMENTAL SURVEYS OF ASBESTOS AND LEAD FOR THIS BUILDING. ANY WORK THAT INTERFACES WITH CONTAMINATED MATERIALS AS OUTLINED IN THE ENVIRONMENTAL SURVEYS SHALL BE PERFORMED PER THE RECOMMENDATIONS IN
THE REPORT AND FOLLOW ALL APPLICABLE STANDARDS FOR ABATEMENT AND REMEDIATION.
D COORDINATE FULL SCOPE OF DEMOLITION WORK W/ CIVIL, MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS
E EXISTING CONSTRUCTION: WALLS, CEILINGS, WINDOWS, FLOORING, EQUIPMENT, ETC. NOT DESIGNATED
FOR DEMOLITION SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE PROJECT.
F CLEAN UP ON A DAILY BASIS TO MAINTAIN A SAFE AND OPERABLE FACILITY. COORDIANTE WITH GC
SUPPLIED LOCATIONS OF WASTE BINS AND DUMPSTERS, AS REQUIRED FOR THE WORK.
G THE OWNER HAS FIRST RIGHT OF REFUSAL OF ANY FURNITURE, FIXTURES AND EQUIPMENT SLATED FOR
DEMOLITION.
H PROTECT EXISTING EXFILTRATION SYSTEM FROM ALL LOADING.
I REMOVE ALL ABANDONED DEVICES INCLUDING ALL SURFACE MOUNTED CABLE & COAX FROM BUILDING
FACADE. COORD. W/ OWNER.
1 06-17-26 ADDENDUM 02
FE
FE
FE
FE
FD
FD
FD
FD
REF
FE
FP
S S
G
FI
GFI
GFI
S
FP
G
FI
FE
FP
DN
X XX X X X
A
B
D
E
F
G
H
I
1 2 3 4 5 6
C
HOOD / RANGE
VE
N
D
CU1
CU2A CU2B CU5
18' - 0"
9'
6"
CU3
CU4
CU
CU
VE
N
D
ENTRY
VESTIBULE
RECRUITER
OFFICE
RECRUITER
CLST.
WOMENS
VEST
WOMENS
LATRINE
105A
WOMENS
CHANGING
105B
WOMENS
SHOWER106
MENS
VEST
MENS LATRINE
107A
MENS
CHANGING
107B
MENS SHOWER
MAIL / COPY
ROOM
MECH/ ELECT.
COMMUNICATIONS
VAULT
VAULT
SUPPLY AREA
MECH RM
EQUIPMENT
AREA
TABLES/
CHAIRS
VESTIBULE
VENDING
MECHANICAL
EXECUTIVE
OFFICER 118
MAIL ROOM
TRAINING
ROOM 1
GYM
MECHANICAL 1
PLT LDR'S
OFFICE
PLT SGT.
OFFICE
KITCHEN MESS
PORCH
OFFICE 3
COMMANDER
READINESS
NCO
TRAINING NCO
BTRY STAFF
DRILL HALL
9' - 4"
7'
2"
118A
VESTIBULE
7' - 9"
3'
6"
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
A6.1
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
12TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
V.
I.F
0"
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
ABI #03
ABI #01
ABI #03
ABI
#01
ABI #01
ABI #01
ABI #01
ABI #01 ABI #01
ABI #01
ABI #01
ABI #01
ABI #01
ABI #01
ADF
WB
WB
WB
28ABI #05
ABI
#05
TYP
ABI #01
28 28
ABI #05 ABI #05
ABI #05
ABI
#05
ABI
#05
ABI #05
ABI #05
ABI #05
ABI #05
TYP
EXISTING FLOOR FINISH TO BE DEMOLISHED
DOWN TO CLEAN SUBSTRATE AS REQUIRED.
EXISTING TO BE DEMOLISHED
EXISTING DOOR & FRAME TO REMAIN.
PROTECT.
EXISTING DOOR & FRAME TO BE
REMOVED & DISPOSED OF.
EXISTING CONCRETE TO BE DEMOLISHED
DOWN TO CLEAN SUBSTRATE AS REQUIRED.
EXISTING WALL / PARTITION TO REMAIN
EXISTING 2HR RATED FIRE PARTITION
TO REMAIN
DB
EXISTING DISPLAY BOARD TO REMAIN.
PROTECT.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:4
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
DA1.1
EXISTING / DEMO
FLOOR PLAN
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE
ALTERNATE BID ITEMS SCOPE OF WORK.
B GAF MOD BIT ROOF SYSTEM TO REMAIN AND TO PROTECT. GC
TO COORDINATE ALL WORK ON THE ROOF WITH THE ROOFING
SUBCONTRACTOR RF LUSA & SONS SHEET METAL INC. AS TO
NOT VOID EXIST. ROOF GUARANTEE # G2024-0001391-001-001 /
25 YEAR NDL ROOF GUARANTEE / GUARANTEE EXPIRATION
DATE : 4.15.2049 / ROOF SPECIFICATION I0325HGPFR. UPON
COMPLETION THE WORK. GC TO PROVIDE MFGR LETTER
INDICATING THE WARRANTY IS STILL INTACT.
C REFERENCE ENVIRONMENTAL REPORT IN ADDENDUM # 2 FOR
ENVIRONMENTAL SURVEYS OF ASBESTOS AND LEAD FOR THIS
BUILDING. ANY WORK THAT INTERFACES WITH CONTAMINATED
MATERIALS AS OUTLINED IN THE ENVIRONMENTAL SURVEYS
SHALL BE PERFORMED PER THE RECOMMENDATIONS IN THE
REPORT AND FOLLOW ALL APPLICABLE STANDARDS FOR
ABATEMENT AND REMEDIATION.
N 1/8" = 1'-0"DA1.1
1 EXISTING / DEMO FLOOR PLAN
DEMOLITION PLAN LEGEND ABI #1
ABI #3
DEMO SPECIFIC NOTES
1 IF ABI #08 IS SELECTED: VAULT ROOMS 110 / 111: REPLACE LARGE
DEHUMIDIFIER LEFT SIDE. ADD NEW MECHANICAL. INSTALL NEW
HUMIDISTAT CONTROLLER. REFER TO MECHANICAL & ELECTRICAL
DRAWINGS FOR COMPLETE SCOPE OF WORK.
2 NOT IN USE.
3 REPAIR NON WORKING INTERIOR ELECTRICAL OUTLETS. & REPLACE
ONLY BROKEN INTERIOR ELECTRICAL OUTLETS FACEPLATES. COLOR
MATCH EXISTING. REFER TO ELECTRICAL DRAWINGS FOR COMPLETE
SCOPE OF WORK.
4 COMM ROOM 109: REMOVE & REPLACE EXISTING DATA CABINET. REFER
TO ELECTRICAL DRAWINGS FOR COMPLETE SCOPE OF WORK. COORD.
ALL WORK WITH G6.
5 REPLACE EXISTING FIRE ALARM SYSTEM WITH NEW FIRE ALARM WITH
MASS NOTIFICATION SYSTEM. REFER TO ELECTRICAL DRAWINGS FOR
COMPLETE SCOPE OF WORK.
6 DEMO ALL EXISTING VALVES AND FAUCETS AT ALL EXISTING PLUMBING
FIXTURES. REFER TO A6.1 SHEET FOR COMPLETE SCOPE OF WORK.
7 EXISTING LOUVERS TO BE REMOVED AND DISPOSED OF. PREPARE
OPENING FOR NEW LOUVER. REFER TO MECHANICAL DRAWINGS FOR
COMPLETE SCOPE OF WORK.
8 PREPARE ALL EXISTING SURFACES FOR ROOM FINISHES - NEW PAINTED
WALLS, DOOR ENTRYWAYS AND HARD CEILINGS THROUGHOUT.
9 ROOM 107B/105B MENS /WOMENS LAT.: REMOVE AND DISPOSE OF EXIST.
ADA SHOWER SEAT. REFER TO A6.1 SHEET FOR COMPLETE SCOPE OF
WORK.
10 IF ABI #05 IS NOT SELECTED: AT FIRST FLOOR LEVEL EXISTING WINDOW
AND GLAZING SYSTEMS TO REMAIN. REMOVE ALL EXTERIOR & INTERIOR
GLAZING DRY SEALS AND PERIMETER FRAME / STUCCO / CONCRETE
SEALS.-TYP. PREPARE TO WET SEAL ALL PERIMETER FRAMES TO
STUCCO CONCRETE FACE, AND ALL EXISTING GLAZING TO THE EXISTING
FRAME INTERIOR & EXTERIOR. - TYP.
11 VAULT ROOM 110 / 111: EXISTING GUN RACKS & LOCKERS. TO REMAIN.
FULLY COORDINATE REMOVAL / REINSTALLATION AND PHASING WITH
UNIT FOR COMPLETION OF FINISHES.
12 REMOVE AND DISPOSE OF ALL EXISTING ROLLER SHADES AT FIRST
FLOOR WINDOW OPENING. PREPARE AREA FOR NEW ROLLER SHADES
SCOPE OF WORK.
13 ROOM 101 ENTRY VESTIBULE: PREPARE WALL FOR NEW WALL FINISH TO
MATCH RECRUITERS OFFICE. REFER TO NEW SCOPE OF WORK FOR
FINISH MATERIAL DETAILS.
14 CLEAN, REFINISH AND SEAL EXIST. TERRAZZO FLOOR FINISH. DO NOT
GRIND AGGREGATE FOR COMPLETE REFINISH.
15 ROOM 124 KITCHEN MESS: CLEAN, RESEAL, & GROUT ALL EXISTING
QUARRY TILE FLOORING AND BASE.
16 ROOM 125 MESS PORCH: REMOVE AND DISPOSE OF EXISTING SCREEN
ENCLOSURE SYSTEM IN ITS ENTIRETY. PREPARE AREA FOR NEW
SCREEN ENCLOSURE SYSTEM.
17 ALL EXISTING WALL MURALS / LOGOS TO REMAIN. PROTECT AND FULLY
MASK W/ CRAFT PAPER & MASKING TAPE AT THE PERIMETER EDGES AS
REQUIRED FOR COMPLETE PROTECTION.
18 EXISTING CONDENSING UNIT TO BE REMOVED & DISPOSED OF. EXISTING
CONC. MECH. SUPPORT PADS TO REMAIN. REFER TO MECHANICAL
DRAWINGS FOR COMPLETE SCOPE OF WORK.
19 IF ABI #01 IS SELECTED: PREPARE AREA FOR NEW CONDENSATE
CONNECTION TO NEW STORM. REFER TO MECHANICAL / CIVIL
DRAWINGS FOR COMPLETE SCOPE OF WORK . REMOVE DRYWELL FROM
SCOPE OF WORK IF ABI IS SELECTED. / IF ABI #01 IS NOT SELECTED:
PROVIDE NEW DRYWELL. REFER TO MECHANICAL DRAWINGS.
20 IF ABI #03 IS SELECTED: REMOVE ALL LANDSCAPING UP AGAINST THE
MAIN ARMORY BUILDING ON THE NORTH & EAST FACADESS OF THE
EXISTING BUILDING. REMOVE EARTH GRADE TO THE TOP OF THE
EXISTING FOOTING @ BUILDING PERIMETER. PREPARE AREA AND
SURFACES FOR REFINISH / REPAINT STUCCO FINISH SYSTEM @
ENTIRELY PERIMETER OF ARMORY BUILDING. - TYP.
21 IF ABI #01 IS SELECTED: EXISTING DOWNSPOUTS - CONNECT ALL
DOWNSPOUTS TO UNDERGROUND CIVIL. RE-GRADE RE-SOD AROUND
ALL DOWNSPOUT AREAS FOLLOWING CIVIL CONNECTION. REFER TO
CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK.
22 ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT WITH TRAFFIC
YELLOW EPOXY / INCLUDING @ 10 BAY STORAGE BUILDING.
23 PREPARE EXISTING EXTERIOR ENTRY VESTIBULE CONCRETE FLOOR FOR
NEW EPOXY -PAINT FINISH. EXISTING WALK-OFF MATT TO BE REMOVE
AND STORE TEMPORARILY DURING RENOVATION SCOPE OF WORK. - TYP.
24 PROTECT WALL PLAQUE FOR PAINTING SCOPE OF WORK. FULLY MASK
W/ CRAFT PAPER & MASKING TAPE AT THE PERIMETER EDGES AS
REQUIRED FOR COMPLETE PROTECTION.
25 EXISTING WALL DISPLAY BOARD TO BE REMOVE AND STORE
TEMPORARILY FOR PAINTING SCOPE OF WORK. TYP.
26 SAWCUT & REMOVE EXISTING SHOWER TRENCH DRAIN SYSTEMS. REFER
TO SHEET A6.1 AND PLUMBING DRAWINGS FOR COMPLETE SCOPE OF
WORK.
27 REMOVE AND DISPOSE OF ALL 4" STUD AND WALL FINISHES FOR THIS
WALL TO THE FOLLOWING CONSTRAINTS. REMOVE 10'-0" WIDTH OF WALL
CENTERED ON THE CORROSION AND 10'-0" HIGH FROM BOTTOM TRACK
TO TOP TRACK. EXISTING 4" STUD WALL HAS FINISHES ON 1 SIDE ONLY.
COORDINATE AND PROVIDE ELECTRICAL OUTLET REMOVAL AND
SALVAGE ALL COMPONENTS FOR REINSTALLATION FOR DEMOLISHED
PORTION OF THE WALL.
28 IF ABI #05 IS SELECTED: COMPLETE GLAZING REPLACEMENT OF ALL
EXISTING LAMINATED IMPACT GLAZING IN EXISTING ALUMINUM WINDOW
FRAME SYSTEMS AT ALL THE EXTERIOR 1ST FLOOR LEVEL GLAZED
OPENINGS. NEW EXTERIOR FIXED WINDOWS & IMPACT GLAZING FOR
KITCHEN ONLY. REFER TO A8.1 DRAWING FOR COMPLETE SCOPE OF
WORK.
29 EXISTING CU UNIT TO REMAIN. COORD. WITH MECHANICAL DRAWINGS.
1 06-17-26 ADDENDUM 02
D COORDINATE FULL SCOPE OF DEMOLITION WORK W/ CIVIL,
MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS
E EXISTING CONSTRUCTION: WALLS, CEILINGS, WINDOWS,
FLOORING, EQUIPMENT, ETC. NOT DESIGNATED FOR
DEMOLITION SHALL BE PROTECTED THROUGHOUT THE
DURATION OF THE PROJECT.
F CLEAN UP ON A DAILY BASIS TO MAINTAIN A SAFE AND
OPERABLE FACILITY. COORDIANTE WITH GC SUPPLIED
LOCATIONS OF WASTE BINS AND DUMPSTERS, AS REQUIRED
FOR THE WORK.
G THE OWNER HAS FIRST RIGHT OF REFUSAL OF ANY FURNITURE,
FIXTURES AND EQUIPMENT SLATED FOR DEMOLITION.
GENERAL DEMOLITON NOTES
ABI #5
EXISTING FLOOR FINISH TO BE DEMOLISHED
DOWN TO CLEAN SUBSTRATE AS REQUIRED.
EXISTING TO BE DEMOLISHED
EXISTING DOOR & FRAME TO REMAIN.
PROTECT.
EXISTING DOOR & FRAME TO BE
REMOVED & DISPOSED OF.
EXISTING CONCRETE TO BE DEMOLISHED
DOWN TO CLEAN SUBSTRATE AS REQUIRED.
EXISTING WALL / PARTITION TO REMAIN
EXISTING 2HR RATED FIRE PARTITION
TO REMAIN
DB
EXISTING DISPLAY BOARD TO REMAIN.
PROTECT.
A
B
D
E
F
G
H
I
1 2 3 4 5 6
C
TYP
TYP
TYP
TYP
TYP
TYP
V.
I.F
0'
6"
V.I.F.
70' - 6" +/-
1/ 4"
1'
-0
1/4" / 1'-0"
1/4" / 1'-0"
1/ 4"
1'
-0
1/4" / 1'-0"
1/ 4"
1'
-0
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
ABI #04
3 3
ABI #04
ABI #04 ABI #04
ABI #04
ABI #04
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:4
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
DA1.2
EXISTING / DEMO
CLERESTORY PLAN
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
DEMOLITION PLAN LEGEND
DEMO SPECIFIC NOTES
1 IF ABI #04 IS NOT SELECTED: AT DRILL HALL CLERESTORY LEVEL EXISTING WINDOW AND GLAZING SYSTEMS TO REMAIN
/ TINT GLAZING AT DRILL HALL CLERESTORY LEVEL ONLY. REMOVE ALL EXTERIOR & INTERIOR GLAZING DRY SEALS AND PERIMETER FRAME / STUCCO / CONCRETE SEALS.-TYP. PREPARE TO WET SEAL ALL PERIMETER FRAMES TO STUCCO CONCRETE FACE, AND ALL EXISTING GLAZING TO THE EXISTING FRAME INTERIOR & EXTERIOR. - TYP.
2 IF ABI #01 IS SELECTED: EXISTING DOWNSPOUTS - CONNECT ALL DOWNSPOUTS TO UNDERGROUND CIVIL. RE-GRADE RE-SOD AROUND ALL DOWNSPOUT AREAS FOLLOWING CIVIL CONNECTION. REFER TO CIVIL DRAWINGS FOR COMPLETE
SCOPE OF WORK. REMOVE EXISTING DRYWELLS.
3 IF ABI #04 IS SELECTED: REMOVE EXISTING DAMAGED IMPACT GLAZING PANELS AT THE CLERESTORY LEVEL, AND
PREPARE FOR NEW IMPACT GLAZING. PROFILES.
N 1/8" = 1'-0"DA1.2
1 EXISTING/ DEMO CLERESTORY PLAN
ABI #1
1 06-17-26 ADDENDUM 02
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE
ALTERNATE BID ITEMS SCOPE OF WORK.
B GAF MOD BIT ROOF SYSTEM TO REMAIN AND TO PROTECT. GC
TO COORDINATE ALL WORK ON THE ROOF WITH THE ROOFING
SUBCONTRACTOR RF LUSA & SONS SHEET METAL INC. AS TO
NOT VOID EXIST. ROOF GUARANTEE # G2024-0001391-001-001 /
25 YEAR NDL ROOF GUARANTEE / GUARANTEE EXPIRATION
DATE : 4.15.2049 / ROOF SPECIFICATION I0325HGPFR. UPON
COMPLETION THE WORK. GC TO PROVIDE MFGR LETTER
INDICATING THE WARRANTY IS STILL INTACT.
C REFERENCE ENVIRONMENTAL REPORT IN ADDENDUM # 2 FOR
ENVIRONMENTAL SURVEYS OF ASBESTOS AND LEAD FOR THIS
BUILDING. ANY WORK THAT INTERFACES WITH CONTAMINATED
MATERIALS AS OUTLINED IN THE ENVIRONMENTAL SURVEYS
SHALL BE PERFORMED PER THE RECOMMENDATIONS IN THE
REPORT AND FOLLOW ALL APPLICABLE STANDARDS FOR
ABATEMENT AND REMEDIATION.
D COORDINATE FULL SCOPE OF DEMOLITION WORK W/ CIVIL,
MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS
E EXISTING CONSTRUCTION: WALLS, CEILINGS, WINDOWS,
FLOORING, EQUIPMENT, ETC. NOT DESIGNATED FOR
DEMOLITION SHALL BE PROTECTED THROUGHOUT THE
DURATION OF THE PROJECT.
F CLEAN UP ON A DAILY BASIS TO MAINTAIN A SAFE AND
OPERABLE FACILITY. COORDIANTE WITH GC SUPPLIED
LOCATIONS OF WASTE BINS AND DUMPSTERS, AS REQUIRED
FOR THE WORK.
G THE OWNER HAS FIRST RIGHT OF REFUSAL OF ANY FURNITURE,
FIXTURES AND EQUIPMENT SLATED FOR DEMOLITION.
GENERAL DEMOLITON NOTES
ABI #4
EXISTING TO BE DEMOLISHED
EE
F
G
H
I
C
UPPER LEVEL ROOF PLAN
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
1TYP
TYP
TYP
E.T.R.
E.T.R.
E.T.R.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:5
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
DA4.1
EXISTING / DEMO
ROOF PLAN
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
DEMOLITION ROOF LEGEND
N 1/8" = 1'-0"DA4.1
1 EXISTING / DEMO ROOF PLAN
DEMO SPECIFIC NOTES
1 IF ABI #01 IS SELECTED: EXISTING DOWNSPOUTS - CONNECT ALL DOWNSPOUTS TO
UNDERGROUND CIVIL. RE-GRADE RE-SOD AROUND ALL DOWNSPOUT AREAS FOLLOWING
CIVIL CONNECTION. REFER TO CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK.
2 MECHANICAL EQUIPMENT TO BE REMOVED & DISPOSED OF. CURB TO REMAIN. REFER TO
MECHANICAL DRAWINGS FOR COMPLETE SCOPE OF WORK.
3 COORDINATE AND PROVIDE ACCESS FOR INSTALLATION FOR NEW ROOF PENETRATION FOR
NEW 8 X 4 RELIEF DUCT. PROVIDE NEW STRUCTURAL STEEL SUPPORT PER DETAIL 2/A4.1.
PROVIDE NEW UN-INSULATED CURB PER DETAIL 3/A4.1. (ATTACH PER FLORIDA PRODUCT
APPROVAL REQUIREMENTS.) EXISTING 12" STEAL JOINTS ARE @ 4' O.C. - TYP. COORDINATE
WITH MECHANICAL DRAWINGS FOR ALL REQUIREMENTS.
ABI #1
1 06-17-26 ADDENDUM 02
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE
ALTERNATE BID ITEMS SCOPE OF WORK.
B GAF MOD BIT ROOF SYSTEM TO REMAIN AND TO PROTECT. GC
TO COORDINATE ALL WORK ON THE ROOF WITH THE ROOFING
SUBCONTRACTOR RF LUSA & SONS SHEET METAL INC. AS TO
NOT VOID EXIST. ROOF GUARANTEE # G2024-0001391-001-001 /
25 YEAR NDL ROOF GUARANTEE / GUARANTEE EXPIRATION
DATE : 4.15.2049 / ROOF SPECIFICATION I0325HGPFR. UPON
COMPLETION THE WORK. GC TO PROVIDE MFGR LETTER
INDICATING THE WARRANTY IS STILL INTACT.
C REFERENCE ENVIRONMENTAL REPORT IN ADDENDUM # 2 FOR
ENVIRONMENTAL SURVEYS OF ASBESTOS AND LEAD FOR THIS
BUILDING. ANY WORK THAT INTERFACES WITH CONTAMINATED
MATERIALS AS OUTLINED IN THE ENVIRONMENTAL SURVEYS
SHALL BE PERFORMED PER THE RECOMMENDATIONS IN THE
REPORT AND FOLLOW ALL APPLICABLE STANDARDS FOR
ABATEMENT AND REMEDIATION.
D COORDINATE FULL SCOPE OF DEMOLITION WORK W/ CIVIL,
MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS
E EXISTING CONSTRUCTION: WALLS, CEILINGS, WINDOWS,
FLOORING, EQUIPMENT, ETC. NOT DESIGNATED FOR
DEMOLITION SHALL BE PROTECTED THROUGHOUT THE
DURATION OF THE PROJECT.
F CLEAN UP ON A DAILY BASIS TO MAINTAIN A SAFE AND
OPERABLE FACILITY. COORDIANTE WITH GC SUPPLIED
LOCATIONS OF WASTE BINS AND DUMPSTERS, AS REQUIRED
FOR THE WORK.
G THE OWNER HAS FIRST RIGHT OF REFUSAL OF ANY FURNITURE,
FIXTURES AND EQUIPMENT SLATED FOR DEMOLITION.
GENERAL DEMOLITON NOTES
SD
SD
SD
SD
O S
WAP
SD
S
S
A
B
D
E
F
G
H
I
1 2 3 4 5 6
C
14' - 10"
8' - 0"
7' - 10"
7' - 4"
7' - 4" 7' - 4"
7' - 4" 7' - 4"
7' - 4"
7' - 11"
7' - 11"7' - 11"
8' - 0"
7' - 9"
8' - 0"
7' - 8" 7' - 8"
7' - 10"
7' - 10"
7' - 10"
7' - 8"
8' - 0"
8' - 0"
8' - 0"
8' - 4"
7' - 11"
8' - 0"
7' - 4"
8' - 0"
7' - 3"
8' - 0"
7' - 4"
7' - 2" 7' - 2"
7' - 4"
7' - 4"
7' - 4"
8' - 0"7' - 4"
ENTRY
VESTIBULE
RECRUITER
OFFICE
RECRUITER
CLST.104
WOMENS
VEST
WOMENS
LATRINE
105A
WOMENS
CHANGING
105B
WOMENS
SHOWER106
MENS
VEST
MENS LATRINE
107A
MENS
CHANGING
107B
MENS SHOWER
MAIL / COPY
ROOM
MECH/ ELECT.
COMMUNICATIONS
VAULT
VAULT
SUPPLY AREA
MECH RM
EQUIPMENT
AREA
TABLES/
CHAIRS
VESTIBULE
VENDING
MECHANICAL
EXECUTIVE
OFFICER
MAIL ROOM
TRAINING
ROOM 1
GYM
MECHANICAL 1
PLT LDR'S
OFFICE
PLT SGT.
OFFICE
KITCHEN MESS
PORCH
OFFICE 3
COMMANDER
READINESS
NCO
TRAINING NCO
BTRY STAFF
DRILL HALL
AP AP AP
7' - 2"
8' - 8"
9' - 7"
9' - 7"
HOOD
118A
VESTIBULE
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
EXISTING 2x4 LIGHT FIXTURE TO BE
REM…