224004 Palmetto 100% ADD 02 ARCH HIGH BAY.pdf
PDF 3 MB Posted
- Attached to
- 224004 Palmetto Revamp
- Solicitation number
- ITB-15884
- Issued by
- St. Johns County, Florida
About this file
Summary
This document is a 100% Construction Documents package for the Palmetto ESP Renovation project (DMA CFMO# 224004), prepared by Renker Eich Park Architects and dated March 30, 2026, for the State of Florida Department of Military Affairs. The project involves renovation of the existing High Bay Maintenance Shelter Building (900 gross square feet) at the Palmetto Readiness Center located at 1107 14th Avenue West, Palmetto, FL 34221. The work is classified as an alteration to an existing S-1 (moderate-hazard storage) occupancy, Type IIB (unprotected, non-sprinklered) construction, consisting of one story at 18 feet high. The base bid scope includes refinishing and repainting all exterior bollards with traffic yellow epoxy. Three alternate bid items are available: ABI #1 for civil work connecting downspouts to underground systems with re-grading and re-sodding; ABI #2 for upgrading high bay maintenance building lighting to LED with new wall and ceiling-mounted fixtures; and ABI #3 for refinishing and repainting the complete exterior high bay maintenance shelter with high performance painted finish in a maximum two-color scheme. The construction documents comply with the 2023 Florida Building Code (8th Edition), Florida Fire Prevention Code, 2020 NFPA 70 National Electrical Code, and applicable local authority having jurisdiction requirements. Design professionals include Mechanical/Plumbing Engineer BAL Engineering, Inc.; Electrical Engineer MPS Engineering, Inc.; and Civil Engineer Hamilton Engineering & Surveying, LLC. A non-mandatory pre-bid meeting and site visit is scheduled for May 20, 2026, at 10:00 AM, with sealed bids due June 10, 2026, at 2:00 PM. The facility remains occupied throughout construction, requiring full coordination with the National Guard unit.
The estimated construction cost is $2,173,045.00, with contractors required to submit bids on DMA Exhibit 4 and provide a Subcontractor List on Exhibit 5. Bid security of five percent (5%) of the total bid is mandatory in the form of a bid bond or certified check. Level Five prequalification is required for contractors submitting bids exceeding $500,000.00, including submission of a Florida State Contractor License, Corporate Charter Number, proof of an active office within 300 road miles of the project, resumes for Project Manager and Project Superintendent, project completion history from the previous thirty-six months, proof of successful completion of at least two similar projects within five years, MyFloridaMarketplace vendor registration, and a letter of bonding capacity. Performance and labor and material payment bonds are mandatory and must be provided within ten days of contract award and registered with the county. The contract will be awarded to the lowest responsive and responsible bidder. All contractors must obtain required building, plumbing, electrical, and other system permits and pay associated fees, except State Fire Marshal permits, which the owner will obtain. Contractors must register with MyFloridaMarketPlace and submit a Substitute Form W-9 to the Department of Financial Services prior to contract execution and provide proof of insurance within ten days of contract award. Participation by Minority Business Enterprises (MBE) and Veteran Owned companies is encouraged, with no set-asides specified. Contract documents are available at no cost from Renker Eich Park Architects (Richard Headland, 727-821-2986 Ext 208, rheadland@reparch.com).
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL, PLUMBING ENGINEER
BAL ENGINEERING, INC.
154A Whitaker Road Lutz, Florida 33549
(t) 813.333.2103 Web: www.BALEngineering.com Email: bryant_lyle@BALEngineering.com
ELECTRICAL ENGINEER
MPS ENGINEERING, INC.
240 Pine Avenue North Oldsmar, Florida 34677
(t) 813.855.2721 Web: www.MPSENG.com Email: edwolanin@MPSENG.com
CIVIL ENGINEER
HAMILTON ENGINEERING & SURVEYING, LLC.
3409 W. Lemon Street, Tampa, Florida 33609
(t) 813.601.1849 Web: www.hamiltonengineering.us Email: lucasc@hamiltonengineering.us
LOCATION OF WORK
B. ALTERNATE BID ITEM NO. 2: UPGRADE HIGH BAY MAINTENANCE BUILDING
LIGHTING TO LED.
C. ALTERNATE BID ITEM NO. 3: REFINISH AND REPAINT COMPLETE EXTERIOR
HIGH BAY MAINTENANCE SHELTER WITH HIGH PERFORMANCE PAINTED FINISH. REPA Project No.:
DATE:
PALMETTO ESP RENOVATION
1107 14TH AVE W, PALMETTO, FL 34221
1910.09
MARCH 30, 2026
DMA CFMO # 224004
100% CONSTRUCTION DOCUMENTS
WEB: WWW.REPARCH.COM / EMAIL: RHEADLAND@REPARCH.COM / CELL: (727) 212-8730
LIC. AA C001447 1609 Dr. Martin Luther King Jr. Street North • St. Petersburg, Florida • 33704-4203 • (727-821-2986)
CITY OF PALMETTO
Application # TBD Permit # TBD
601 17TH STYREET WEST, PALMETTO, FL, 34221
PHONE: (941) 721-2166
STATE FIRE MARSHALL
Application #: TBD SFM Permit #: TBD
INSPECTOR / SOUTH-WEST REGION
MR. CODY KELLY
EMAIL : Cody.Kelly@myfloridacfo.com
PHONE : (850) 413 - 3740
PERMIT REVIEW AGENCIES
STATEMENT OF COMPLIANCE:
TO THE BEST OF MY
KNOWLEDGE, THESE DRAWINGS
AND THE PROJECT MANUAL ARE
COMPLETE AND COMPLY WITH
THE FLORIDA BUILDING CODE.
FLORIDA BUILDING CODE (FBC)
8TH EDITION (2023)
FLORIDA FIRE PREVENTION
CODE 8TH EDITION (2023)
LOCATION MAP N
ALTERNATE BID ITEMS ABI WORK LIST
HIGH BAY MAINTENANCES SHELTER BUILDING
INDEX OF DRAWINGS
- COVER
II ARCHITECTURAL
GA1.1 GENERAL ARCHITECTURAL
SA1.2 ARCHITECTURAL SITE PLAN
DSA1.2 EXISTING / DEMO SITE PLAN
DA1.4 EXISTING / DEMO HIGH BAY MAINTENANCE
SHELTER PLAN & ELEV
A1.4 HIGH BAY MAINTENANCE SHELTER PLAN &
ELEV
VI ELECTRICAL
E0.1 SYMBOLS LIST, DETAILS & NOTES
E3.3 MAINTENANCE BAY DEMO & PROPOSESD
LIGHTING PLAN
1 06-17-26 ADDENDUM 02
A1.1
TYP
A1.1
1 Ref
R ef
1 Ref
R ef
Name Elevation
A1.1
TYP
1i
S#
N
1 DRAWING TITLE
1/8" = 1'-0"A1.1
A1.1
TYP
DRAWING TITLE
VIEW SCALE
SECTION NUMBER
LOCATION SHEET
DETAIL NUMBER
LOCATION SHEET
DETAIL NUMBER
LOCATION SHEET
ELEVATION NUMBER
LOCATION SHEET
ELEVATION MARKDOOR TAG
SPECIFIC NOTE
PARTITION TYPE
STOREFRONT TYPE
1t WINDOW / LOUVER TYPE
?00
PROJECT DESCRIPTION: RENOVATION OF THE EXISTING
HIGH BAY MAINTENANCES SHELTER BUILDING
EXISTING FLOOR PLAN GSF: 900 GSF
NO NEW ADDITIONAL AREAS
TOTAL GROSS SQUARE FEET: 900 GSF
OCCUPANCY CLASSIFICATION / CONSTRUCTION TYPE:
CLASSIFICATION OF WORK: EXISTING BUILDING -
ALTERATION LEVEL 1
OCCUPANCY CLASSIFICATION: S-1 MODERATE - HAZARD STORAGE
CONSTRUCTION TYPE: TYPE IIB (UNPROTECTED)
(NON - SPRINKLERED)
PROJECT HEIGHT: EXISTING- 18' HIGH +/-
NUMBER OF STORIES: 1 STORY
• ARCHITECTURAL: ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT WITH TRAFFIC YELLOW EPOXY.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:0
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
GA1.1
GENERAL
ARCHITECTURAL
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
ARCHITECTURAL ABBREVIATIONS DRAWING LEGEND
AB ANCHOR BOLT
ACOUST ACOUSTICAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APC ACOUSTIC PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTICAL TILE
BD BOARD
BFE BASE FLOOD ELEVATION
BLDG BUILDING
BM BEAM
BOT BOTTOM
BUR BUILT-UP ROOFING
C.F.C.I. CONTRACTOR FURNISHED
AND CONTRACTOR
INSTALLED
CAB CABINET
CG CORNER GUARD
CI CAST IRON
CJ CONTROL JOINT
CL CLEAR
CLO CLOSET
CMU CONCRETE MASONRY UNIT
CNT COUNTER
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DWG DRAWING
EB EXPANSION BOLT
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
FC FURRING CHANNEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FHC FIRE HOSE CABINET
FIN FINISH
FL FLOOR
FR FIRE RATED
GA GUAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED
CEMENT
GFRG GLASS FIBER REINFORCED
GYPSUM
GL GLASS
GR GRADE
GWB GYPSUM WALLBOARD
GYP GYPSUM
HB HOSE BIB
HT HEIGHT
HVAC HEATING, VENTILATING, & AIR
CONDITIONING
ID INSIDE DIAMETER
INSUL INSULATION
INT INTERIOR
DIMENSION NOTES
1 ALL DOOR FRAME OPENINGS IN MASONRY SHALL BE 3'-4" MO UNO
2 ALL DIMENSION STRINGS SHALL BE TO FACE OF WALL STRUCTURE
(IE CMU, MTL STUD FRAMING)
3 DIMENSION STRINGS NOTED AS CLEAR SHALL BE TO FACE OF
FINISHED WALL OR PARTITION (IE FACE OF GWB, PLASTER, OR TILE)
4 DOOR JAMB RETURNS IN MASONRY WALLS TO HINGE SIDE SHALL BE
8" NOM UNO
5 DOOR JAMB RETURNS IN MTL FRAMING WALLS TO HINGE SIDE
SHALL BE 4" NOM UNO
JT JOINT
KIT KITCHEN
KW KILOWATT
L LENGTH
LAM LAMINATE
LAV LAVATORY
LF LINEAR FEET
LKR LOCKER
LL LEAD LINED
MCJ MASONRY CONTROL JOINT
MFD MANUFACTURED
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MORROR
MISC MISCELLANEOUS
MLDG MOLDING
MO MASONRY OPENING
MR MOISTURE RESISTANT
MRGWB MOISTURE-RESISTANT
GYPSUM WALL BOARD
MT METAL THRESHOLD
MTD MOUNTED
MTL METAL
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PLWD PLYWOOD
PNT PAINT
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RADIUS
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
REC RECEPTACLE
REF REFRIGERATOR
REG REGLET
REINF REINFORCED
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
SCHD SCHEDULE
SCRN SCREEN
SEC SECTION
SH SHELF
SHT SHEET
SIM SIMILAR
SP SPACE
SPECS SPECIFICATIONS
SS STAINLESS STEEL
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
TB TOGGLE BOLT
TC TOILET COMPARTMENT
TEL TELEPHONE
TEMP TEMPERATURE
TPD TOILET PAPER DISPENSER
TYP TYPICAL
UC UNDERCOUNTER
UTIL UTILITY
VB VINYL BASE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VWC VINYL WALLCOVERING
W WIDTH
W/ WITH
WC WATER CLOSET
WD WOOD
WP WEATHER PROOF
WWF WELDED WIRE FABRIC
NOTE: REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE
ALTERNATE BID ITEMS SCOPE OF WORK.
APPLICABLE CODES
2023 FLORIDA BUILDING CODE - BUILDING
2023 FLORIDA BUILDING CODE - EXISTING BUILDING
2023 FLORIDA BUILDING CODE - MECHANICAL
2023 FLORIDA BUILDING CODE - PLUMBING
2023 FLORIDA BUILDING CODE - FUEL GAS
2023 FLORIDA BUILDING CODE - TEST PROTOCOLS
2023 FLORIDA BUILDING CODE - ENERGY
2023 FLORIDA BUILDING CODE - ACCESSIBILITY
2020 NFPA 70 NATIONAL ELECTRICAL CODE
2023 FLORIDA FIRE PREVENTION CODE, 8th EDITION
BUILDING CODE SUMMARY
GENERAL PROJECT NOTES
A ISOLATE ALL DISSIMILAR MATERIALS, TYP.
B SEALERS TO BE COMPATIBLE WHERE IN CONTACT W/ ONE ANOTHER AND OTHER
MATERIALS.
C CONTRACTOR SHALL HAVE PORTABLE FIRE EXTINGUISHER ON SITE AND AVAILABLE AT
ALL TIMES.
D CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO PERFORM THEIR PROJECT.
E DO NOT SCALE DRAWINGS, IF DIMENSIONS ARE IN QUESTION THE CONTRACTOR SHALL
BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT PRIOR TO
CONTINUATION OF WORK.
F USER GROUP TO RELOCATE ALL NON-FIXED EQUIPMENT PRIOR TO CONTRACTORS
NOTICE TO PROCEED.
G CONTRACTOR TO BE RESPONSIBLE FOR RELOCATION/ STORAGE/ RE-INSTALLATION OF
ALL FIXED EQUIPMENT. CONSULT WITH OWNER REGARDING AVAILABILITY OF ON-SITE
STORAGE.
H CONTRACTOR TO PROVIDE DETAILED SPECIFIC WORK PLAN WITH COMPLETE
DURATION PRIOR TO STARTING ANY WORK. PRIOR TO CONTRACTORS NTP.
I ALL NEW MECHANICAL UNITS TO BE PROVIDED WITH REQUIRED REFRIDGERANT FOR
FULL EFFECTIVE OPERATION.
J ANY UTILITY OUTAGE THAT EXCEEEDS 2 HOURS, CONTRACTOR IS TO PROVIDE FULL
PROVISION TO MAINTAIN OPERATIONS AT ALL TIMES.
K ALL EXISTING CONDITIONS ARE TO BE REVIEWED BY THE CONTRACTOR AND
ACCOUNTED WITH REGARD TO THE CONTRACT SCOPE OF WORK.
L ARMORY IS TO BE OCCUPIED THROUGHOUT THE CONSTRUCTION PERIOD, FULL
COORIDNATION WITH THE UNIT IS REQUIREMNED FOR THE COMPLETE DURATION OF
THE WORK.
M COORDINATE FOR TEMPORARY SHOWER FACILITIES / LATRINES DURING DRILL WEEK.
COORDIATE WITH CFMO PM & UNIT.
1 06-17-26 ADDENDUM 02
SCOPE OF WORK - BASE BID
x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
S
S
SSS
WV
WV
WV
WV
H Y D
WV
x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxx
UC
U-
O N E
S T O R Y
B
LO
C K
C H U R C H
ONE STORY
BLOCK AND WOOD
BUILDING
ONE STORY
BLOCK
BUILDING
LOT 1LOT 2LOT 3LOT 4LOT 5
LOT 6
LOT 7LOT 8LOT 1LOT 2LOT 3
LOT 12 LOT 13
LOT 14
LOT 9 LOT 10
LOT 11 LOT 12
LOT 15
LOT 16
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5 LOT 6
LOT 7
(NOT INCLUDED)
LOT 4 LOT 3 LOT 2 LOT 1
LOT 11 LOT 12 LOT 13 LOT 14
14"OAK
28"OAK
48"OAK
48"OAK
4-24"OAKS
2-14"OAKS
1-20"OAK
1-15"OAK
48"OAK
12"OAK
10"OAK
20"OAK
26"OAK
18"OAK
30"OAK
60"OAK
48"TWIN OAK
4-14"OAKS
1-12"OAK
2-18"OAKS
2-20"OAKS
48"OAK
30"OAK
52"OAK
30"OAK
48"OAK
48"OAK 24"OAK 14"OAK
38"TWIN OAK
CLUSTER OF OAKS
CLUSTER OF
TREES
8"PALM
24"OAK
18"OAK
30"OAK
8"PALM
10"PALM
8"PALM
8"PALM
E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E X11.5'
X11 .4'
X11.3'
X11 .1'
X10 .2'
X1 0.
9'
X10.9'
X1 1.
4'
X10 .7'
X11 .4'X12
.2'
X11 .2'X1
1.2
X10 .3'
X10 .6'
X9.7
X10 .5'
X11 .2'
X10 .9'
X12.6'
X10.8'
X10.9'
X10 .5'
X1 1.3
X11.5'
X1 1.4
X10 .2'
X12.2'
X10 .4'
X12 .5' X10
.66
X .5
X10 .6'
X11 .0'
X11.2'
X10 .8' X10
.5' X12
.0' X12
.0'
X12 .1'
X11 .2'
X12.4'
X12 .4'
X11 .6'
X11 .5'
X11 .7'
X11 .7'
X 11.5
X11.6'
X11.4'
X11 .4'
X11.3'
X11 .2'
X11 .3'
X11 .5'
X12.
1'
X12 .2'
X11.9' X11.7'
X .8
X11.7'
X12.0
X11.7'
X11.9'
X12.0'
X12 .2'
X12 .8'
X12 .2'
X11 .4'
X11 .2'
X11 .1'
X12 .3'
X12 .6'
X1 2.
8'X1
1.
3' X
.4
X12 .4' X1
2.
4'
X12 .7'
X12 .3'
X1 2.
6'
X1 2.
5'
X1 2.
1'
X12 .1'
X1 1.4
'X1 1.6
X1 1.9
X1 1.6
X1 1.7
X1 1.8
X1 1.7
X1 1.7
X11
.8'
X1 1.4
X1 1.6
X1 0.9
X1 1.0
X .5
X1 1.7
X1 1.1
X1 1.7
X1 1.4
X1 1.3
X1 1.5
X1 1.7
X1 1.5
X1 1.9
X1 1.6
X .5
X1 1.6
'X .5 ' X11.4' X1
1.4
X1 1.6
X1 1.3
X1 1.9
X1 1.4
X1 1.8
X1 2.0
X1 1.8
X1 2.5
X1 2.3
' X1 2.3
X1 2.6
X12.5'
X .4
X1 2.6
X11.5'
X1 2.3
X1 1.8
X .6
X1 2.8
X1 2.5
X1 1.8
X1 2.2
X .3
X1 2.6
'X .8
X .0
X1 1.4
X1 1.6
X1 1.5
X11
.9'
X1 2.0
X1 2.2
X1 2.3
X12.8'
X1 2.
0'
X1 1.8
X1 1.0
X1 0.9
X11.2'
X1 1.3
X11.2'
X1 1.2
X11.4'
X11 .3'
X10 .2'
X10.3'
X10 .2'
X1 0.
3'
X10 .2'
X10 .4'
X .5
X10 .6'
X10 .4'X1
0.
6'
X11 .0'X12
.1'
X10 .7' X
.1 ' X11
.8'
X11 .4'
X11 .4'
X12 .0'
X12 .2'
X12 .0'X11
.6' X10
.7' X10
.4' X10
.4'
X9 .0'X10
.5' X10
.4'
X9 .1'
X9 .5'
X9 .7'
X10 .6'
X11 .3'X11
.2'X11 .2'
X11 .1'
X11 .0'
X10 .6'
X10 .2'
X10 .7'
X11 .1' X9
.8'
X10 .5'
X10 .4'
X10 .8'
X10 .4'
X10 .5'
X10 .7'
X11 .7'
X11 .8'
X12 .8'
X11 .8'
X11 .1'
X1 1.5
X1 1.4
X1 2.
0'
X11.3'
X1 1.3
X1 1.1
X1 0.8
X1 1.8
X1 1.6
X1 0.6
X1 2.1
X1 2.5
X1 2.4
X1 1.0
X1 1.3
X1 1.3
X1 1.7
X1 1.1
X1 1.0
X1 0.
8'
X1 0.
6'
X1 0.
6'
X1 0.
9'
X .0
X1 1.0
X1 1.6
WM
FIELD BOOK , PAGE (SEE FILE)
DATE OF FIELD SURVEY: 04/29/06
REVISED: 12/21/06, ADDED MORE TOPO AND LOCATION
16' ALLEY (VACATED)
SPEAR AVENUE 50' WIDE (VACATED)
LE
E
S T R E E T
W
ID
E
(V A C A T E D
(20' WIDE PAVEMENT) (50' R/W)
(2 W
ID
E
P A V E M E N T (4 R W P
POINT OF COMMENCEMENT
SE CORNER OF NE 1/4 OF
SECTION 15-34-17, MANATEE
COUNTY, FLORIDA.
N O R T H
.9 1' (D
WEST 33.00'(D)
WEST 473.00'(D)
S O U T H
.7 (D )N
O R T H
.7 (D
EAST(ASSUMED) 473.00'+/-(D) 473.07'(M)
POINT OF BEGINNING
33' WEST & 175.91'
NORTH OF SE
CORNER OF NE 1/4
OF SECTION
15-34-17
S. BOUNDARY LINE OF
LOT 1, BLOCK 8, ALSO
BEING THE NORTH
BOUNDARY LINE OF A
PLATTED ALLEY
SOUTH BOUNDARY LINE OF
LOT 1, BLOCK 7
S. RIGHT OF WAY LINE OF
12th STREET
S 89°59'53" W 473.09'(M)
N
'2 W
.6 M
S
'2 E
.6 '(M
N
'0 W
.9 M
CONC. PIPE
END SECTION
24.3'
.2
150.3'
150.3'
.2
.3
CONC.
PAD
CONC.
PAD
C O N C R E T E
ASPHALT ROAD
ASPHALT DRIVEWAY
C O N C R E T E
S
ID
E W A
LK
12" HDP PIPE
INV.=9.14'
PAD
CONC.
SHED
18'
7.
6'
C O N C R E T E
S
ID
E W A
LK
12" RCP PIPE
END SECTION
CONC. PIPE
INV.=10.0'
6' CHAINLINK FENCE
6' CHAINLINK FENCE
C H A
IN
LI
N K
F E N C E
ONE STORY
CHP BUILDING
FINISHED FLOOR
ELEVATION = 12.92'
ELEVATION = 11.95'
FINISHED FLOOR
METAL BUILDING
ONE STORY
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.05'
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.42'
.0
.9
80.1'
80.1'
.2
.0
130.2'
130.1'
WM
PROPANE
TANK
MW
MW
C H A
IN
LI
N K F
EN
C E
LIGHT
P
LA
T T E D
R W
(PLATTED ALLEY)
POND
TOE OF SLOPE
TOP OF SLOPE
CONC. TRANSFORMER
PAD
FOUND I/R
(LB613)
FOUND I/R
(LB613)
CHAINLINK FENCE
CHAINLINK FENCE
TENNIS COURT
"R C P
D.R.A.
INV.=9.03'
INV.=9.14'
TO
P
O F D .R .A
BARRY AVENUE(P) 12tH STREET WEST(F)
H A R L E E
S T R E E T (P th
A V E N U E
W E S T (F
WM
GFI
DN
DN
X X
XX X
METAL ROOFING
SYSTEM
CONCRETE
SLAB
NEW LIME ROCK
BASE / GRAVEL
CHAIN-LINK FE-7
FENCE SYSTEM.
PROPERTY LINE
PR
O
PE
R
TY
L
IN
E
PROPERTY LINE
EXISTING 1 STORY
NATIONAL GUARD
ARMORY BUILDING
F.F.E.= 12.94
EXISTING STORAGE BUILDING
F.F = 25.67
PR
O
PE
R
TY
L
IN
E
EXIST MOTOR POOL
STORAGE BLDG.
EXIST.
MAINTENANCE
BAY
12" CONC.
CURB TYP.
WATER TANK
CONC.
PAD PARKING AREA
ASPHALT
ASPHALT
CROSS W
ALK
PA
R
K
IN
G A
R
EA
CONC.
PAD
CONC.
PAD
EXIST
DUMPSTER
PA
R
K
IN
G A
R
EA
FLAG
POLE UNIT
SIGN
A1.4
EXIST.
SHED
4'
0"
TYP
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:0
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
SA1.2
ARCHITECTURAL
SITE PLAN
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
SPECIFIC NOTES
1 ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT WITH TRAFFIC YELLOW EPOXY / INCLUDING @ 10 BAY
STORAGE BUILDING.
SITE PLAN LEGEND
N
1" = 30'-0"SA1.2
1 ARCHITECTURAL SITE PLAN
1 06-17-26 ADDENDUM 02
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE ALTERNATE BID ITEMS SCOPE OF WORK.
B ALL ARCHITECTURAL, CIVIL, MECHANICAL, PLUMBING, AND ELECTIRICAL WORK IS TO COMPLY WITH THE FBC
REQUIREMENTS AND ALL AUTHORITIES HAVING JURISDICTION.
C COORDINATE FULL SCOPE OF WORK W/ ELECTRICAL DRAWINGS.
D VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS FOR THE PROPOSED SCOPE OF WORK. NOTIFY ARCHITECT
OF ANY DISCREPANCIES.
E AT LOCATIONS WHERE SYSTEMS AND ACCESSORIES HAVE BEEN REMOVED, PATCH AND REPAIR TO BE FLUSH
AND MATCH ADJACENT FINISHES.
F COORDINATE ALL SITE ACCESS & LAY DOWN AREA W/ OWNER.
G SECURE ALL EXTERIOR OPENINGS IN THE BUILDING ENVELOPE AT THE END OF WORK EACH DAY.
H PROTECT EXISTING EXFILTRATION SYSTEM FROM ALL LOADING.
GENERAL SITE NOTES
x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
S
S
SSS
WV
WV
WV
WV
H Y D
WV
x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxxxx
UC
U-
O N E
S T O R Y
B
LO
C K
C H U R C H
ONE STORY
BLOCK AND WOOD
BUILDING
ONE STORY
BLOCK
BUILDING
LOT 1LOT 2LOT 3LOT 4LOT 5
LOT 6
LOT 7LOT 8LOT 1LOT 2LOT 3
LOT 12 LOT 13
LOT 14
LOT 9 LOT 10
LOT 11 LOT 12
LOT 15
LOT 16
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5 LOT 6
LOT 7
(NOT INCLUDED)
LOT 4 LOT 3 LOT 2 LOT 1
LOT 11 LOT 12 LOT 13 LOT 14
14"OAK
28"OAK
48"OAK
48"OAK
4-24"OAKS
2-14"OAKS
1-20"OAK
1-15"OAK
48"OAK
12"OAK
10"OAK
20"OAK
26"OAK
18"OAK
30"OAK
60"OAK
48"TWIN OAK
4-14"OAKS
1-12"OAK
2-18"OAKS
2-20"OAKS
48"OAK
30"OAK
52"OAK
30"OAK
48"OAK
48"OAK 24"OAK 14"OAK
38"TWIN OAK
CLUSTER OF OAKS
CLUSTER OF
TREES
8"PALM
24"OAK
18"OAK
30"OAK
8"PALM
10"PALM
8"PALM
8"PALM
E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E X11.5'
X11 .4'
X11.3'
X11 .1'
X10 .2'
X1 0.
9'
X10.9'
X1 1.
4'
X10 .7'
X11 .4'X12
.2'
X11 .2'X1
1.2
X10 .3'
X10 .6'
X9.7
X10 .5'
X11 .2'
X10 .9'
X12.6'
X10.8'
X10.9'
X10 .5'
X1 1.3
X11.5'
X1 1.4
X10 .2'
X12.2'
X10 .4'
X12 .5' X10
.66
X .5
X10 .6'
X11 .0'
X11.2'
X10 .8' X10
.5' X12
.0' X12
.0'
X12 .1'
X11 .2'
X12.4'
X12 .4'
X11 .6'
X11 .5'
X11 .7'
X11 .7'
X 11.5
X11.6'
X11.4'
X11 .4'
X11.3'
X11 .2'
X11 .3'
X11 .5'
X12.
1'
X12 .2'
X11.9' X11.7'
X .8
X11.7'
X12.0
X11.7'
X11.9'
X12.0'
X12 .2'
X12 .8'
X12 .2'
X11 .4'
X11 .2'
X11 .1'
X12 .3'
X12 .6'
X1 2.
8'X1
1.
3' X
.4
X12 .4' X1
2.
4'
X12 .7'
X12 .3'
X1 2.
6'
X1 2.
5'
X1 2.
1'
X12 .1'
X1 1.4
'X1 1.6
X1 1.9
X1 1.6
X1 1.7
X1 1.8
X1 1.7
X1 1.7
X11
.8'
X1 1.4
X1 1.6
X1 0.9
X1 1.0
X .5
X1 1.7
X1 1.1
X1 1.7
X1 1.4
X1 1.3
X1 1.5
X1 1.7
X1 1.5
X1 1.9
X1 1.6
X .5
X1 1.6
'X .5 ' X11.4' X1
1.4
X1 1.6
X1 1.3
X1 1.9
X1 1.4
X1 1.8
X1 2.0
X1 1.8
X1 2.5
X1 2.3
' X1 2.3
X1 2.6
X12.5'
X .4
X1 2.6
X11.5'
X1 2.3
X1 1.8
X .6
X1 2.8
X1 2.5
X1 1.8
X1 2.2
X .3
X1 2.6
'X .8
X .0
X1 1.4
X1 1.6
X1 1.5
X11
.9'
X1 2.0
X1 2.2
X1 2.3
X12.8'
X1 2.
0'
X1 1.8
X1 1.0
X1 0.9
X11.2'
X1 1.3
X11.2'
X1 1.2
X11.4'
X11 .3'
X10 .2'
X10.3'
X10 .2'
X1 0.
3'
X10 .2'
X10 .4'
X .5
X10 .6'
X10 .4'X1
0.
6'
X11 .0'X12
.1'
X10 .7' X
.1 ' X11
.8'
X11 .4'
X11 .4'
X12 .0'
X12 .2'
X12 .0'X11
.6' X10
.7' X10
.4' X10
.4'
X9 .0'X10
.5' X10
.4'
X9 .1'
X9 .5'
X9 .7'
X10 .6'
X11 .3'X11
.2'X11 .2'
X11 .1'
X11 .0'
X10 .6'
X10 .2'
X10 .7'
X11 .1' X9
.8'
X10 .5'
X10 .4'
X10 .8'
X10 .4'
X10 .5'
X10 .7'
X11 .7'
X11 .8'
X12 .8'
X11 .8'
X11 .1'
X1 1.5
X1 1.4
X1 2.
0'
X11.3'
X1 1.3
X1 1.1
X1 0.8
X1 1.8
X1 1.6
X1 0.6
X1 2.1
X1 2.5
X1 2.4
X1 1.0
X1 1.3
X1 1.3
X1 1.7
X1 1.1
X1 1.0
X1 0.
8'
X1 0.
6'
X1 0.
6'
X1 0.
9'
X .0
X1 1.0
X1 1.6
WM
FIELD BOOK , PAGE (SEE FILE)
DATE OF FIELD SURVEY: 04/29/06
REVISED: 12/21/06, ADDED MORE TOPO AND LOCATION
16' ALLEY (VACATED)
SPEAR AVENUE 50' WIDE (VACATED)
LE
E
S T R E E T
W
ID
E
(V A C A T E D
(20' WIDE PAVEMENT) (50' R/W)
(2 W
ID
E
P A V E M E N T (4 R W P
POINT OF COMMENCEMENT
SE CORNER OF NE 1/4 OF
SECTION 15-34-17, MANATEE
COUNTY, FLORIDA.
N O R T H
.9 1' (D
WEST 33.00'(D)
WEST 473.00'(D)
S O U T H
.7 (D )N
O R T H
.7 (D
EAST(ASSUMED) 473.00'+/-(D) 473.07'(M)
POINT OF BEGINNING
33' WEST & 175.91'
NORTH OF SE
CORNER OF NE 1/4
OF SECTION
15-34-17
S. BOUNDARY LINE OF
LOT 1, BLOCK 8, ALSO
BEING THE NORTH
BOUNDARY LINE OF A
PLATTED ALLEY
SOUTH BOUNDARY LINE OF
LOT 1, BLOCK 7
S. RIGHT OF WAY LINE OF
12th STREET
S 89°59'53" W 473.09'(M)
N
'2 W
.6 M
S
'2 E
.6 '(M
N
'0 W
.9 M
CONC. PIPE
END SECTION
24.3'
.2
150.3'
150.3'
.2
.3
CONC.
PAD
CONC.
PAD
C O N C R E T E
ASPHALT ROAD
ASPHALT DRIVEWAY
12" HDP PIPE
INV.=9.14'
PAD
CONC.
SHED
18'
7.
6'
C O N C R E T E
S
ID
E W A
LK
12" RCP PIPE
END SECTION
CONC. PIPE
INV.=10.0'
6' CHAINLINK FENCE
6' CHAINLINK FENCE
C H A
IN
LI
N K
F E N C E
ONE STORY
CHP BUILDING
FINISHED FLOOR
ELEVATION = 12.92'
ELEVATION = 11.95'
FINISHED FLOOR
METAL BUILDING
ONE STORY
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.05'
BENCHMARK
SET NAIL & DISC IN PAVEMENT
TOP OF NAIL
ELEVATION = 12.42'
.0
.9
80.1'
80.1'
.2
.0
130.2'
130.1'
WM
PROPANE
TANK
MW
MW
C H A
IN
LI
N K F
EN
C E
LIGHT
P
LA
T T E D
R W
(PLATTED ALLEY)
POND
TOE OF SLOPE
TOP OF SLOPE
CONC. TRANSFORMER
PAD
FOUND I/R
(LB613)
FOUND I/R
(LB613)
CHAINLINK FENCE
CHAINLINK FENCE
TENNIS COURT
"R C P
D.R.A.
INV.=9.03'
INV.=9.14'
TO
P
O F D .R .A
BARRY AVENUE(P) 12tH STREET WEST(F)
H A R L E E
S T R E E T (P th
A V E N U E
W E S T (F
WM
GFI
DN
X X
XX X
PROPERTY LINE
PR
O
PE
R
TY
L
IN
E
PROPERTY LINE
EXISTING 1 STORY
NATIONAL GUARD
ARMORY BUILDING
F.F.E.= 12.94
EXISTING STORAGE BUILDING
F.F = 25.67
PR
O
PE
R
TY
L
IN
E
EXIST MOTOR POOL
STORAGE BLDG.
EXIST.
MAINTENANCE
BAY
WATER TANK
CONC.
PAD PARKING AREA
ASPHALT DRIVEWAY
CROSS W
ALK
PA
R
K
IN
G A
R
EA
PA
R
K
IN
G A
R
EA
CONC.
PAD
CONC.
PAD
EXIST
DUMPSTER
PA
R
K
IN
G A
R
EA
FLAG
POLE
UNIT SIGN
TYP
DA1.4
ITEM TO BE REMOVED
AND DISPOSED OF
EXISTING CONCRETE / ASPHALT OR
SURFACE TO BE DEMOLISHED DOWN
TO CLEAN SUBSTRATE AS REQUIRED.
EXISTING TREE
TO BE REMOVED
N
1" = 30'-0"DSA1.2
1 EXISTING / DEMO SITE PLAN
DEMOLITION SITE PLAN LEGEND
DEMO SPECIFIC NOTES
1 ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT WITH TRAFFIC YELLOW EPOXY / INCLUDING @ 10 BAY
STORAGE BUILDING.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:3
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
DSA1.2
EXISTING / DEMO
SITE PLAN
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
1 06-17-26 ADDENDUM 02
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE ALTERNATE BID ITEMS SCOPE OF WORK.
B COORDINATE FULL SCOPE OF DEMOLITION WORK W/ ELECTRICAL DRAWINGS.
C EXISTING CONSTRUCTION: WALLS, CEILINGS, WINDOWS, FLOORING, EQUIPMENT, ETC. NOT DESIGNATED
FOR DEMOLITION SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE PROJECT.
D CLEAN UP ON A DAILY BASIS TO MAINTAIN A SAFE AND OPERABLE FACILITY. COORDIANTE WITH GC
SUPPLIED LOCATIONS OF WASTE BINS AND DUMPSTERS, AS REQUIRED FOR THE WORK.
E THE OWNER HAS FIRST RIGHT OF REFUSAL OF ANY FURNITURE, FIXTURES AND EQUIPMENT SLATED FOR
DEMOLITION.
F. PROTECT EXISTING EXFILTRATION SYSTEM FROM ALL LOADING.
G. REMOVE ALL ABANDONED DEVICES INCLUDING ALL SURFACE MOUNTED CABLE & COAX FROM BUILDING
FACADE. COORD. W/ OWNER.
GENERAL SITE DEMOLITION NOTES
N
EXISTING TO BE DEMOLISHED
EXISTING CONCRETE / ASPHALT
TO BE DEMOLISHED DOWN TO
CLEAN SUBSTRATE AS
REQUIRED.
EXISTING WALL / PARTITION
TO REMAIN
EXISTING 1x4 LIGHT FIXTURE TO REMAIN
5'
0"
30' - 0"
DA1.4
DA1.4
APRON
MAINTENANCE
BAY
TYP
TYP
TYP
PROJECTED LIGHTING @
CEILING PLAN (TYP)
TYP
TYP
TYP
TYP
TYP
27' - 1"
TYP
3TYP
TYP
27' - 6"
TYP
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:1
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
DA1.4
EXISTING / DEMO
HIGH BAY
MAINTENANCE
SHELTER PLAN &
ELEV
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
DEMOLITION PLAN LEGEND DEMO RCP LEGEND
DEMO SPECIFIC NOTES
1 PREPARE ALL EXTERIOR BOLLARDS FOR NEW REFINISH AND REPAINT. REFER TO
NEW SCOPE OF WORK.
2 IF ABI #02 IS SELECTED: REMOVE AND DISPOSE OF ALL EXISTING CEILING
MOUNTED LIGHTING FIXTURES. PREPARE AREA FOR NEW LED UPGRADE. REFER
TO ELECTRICAL DRAWINGS FOR COMPLETE SCOPE OF WORK.
3 EXISTING GUTTER & DOWNSPOUTS SYSTEM TO REMAIN / PROTECT. IF ABI #01 IS
SELECTED: CONNECT ALL DOWNSPOUTS TO UNDERGROUND CIVIL. RE-GRADE
RE-SOD AROUND ALL DOWNSPOUT AREAS FOLLOWING CIVIL CONNECTION.
REFER TO CIVIL DRAWINGS FOR COMPLETE SCOPE OF WORK.
4 IF ABI #03 IS SELECTED: PREPARE EXIST. HIGH BAY MAINTENANCE SHELTER FOR
NEW HIGH PERFORMANCE PAINTED FINISH. REFER TO NEW WORK.
N 1/4" = 1'-0"DA1.4
EXISTING / DEMO MAINTENANCE
BAY FLOOR PLAN
1/4" = 1'-0"DA1.4
2 MAINTENANCE BAY - EXIST. EAST ELEVATION
1/4" = 1'-0"DA1.4
3 MAINTENANCE BAY - EXIST. WEST ELEVATION
1 06-17-26 ADDENDUM 02
ABI #2
ABI #3
A REFER TO ABI WORK LIST ON COVER SHEET FOR COMPLETE ALTERNATE BID
ITEMS SCOPE OF WORK.
B COORDINATE FULL SCOPE OF DEMOLITION WORK W/ ELECTRICAL DRAWINGS
C EXISTING CONSTRUCTION: WALLS, CEILINGS, WINDOWS, FLOORING,
EQUIPMENT, ETC. NOT DESIGNATED FOR DEMOLITION SHALL BE PROTECTED
THROUGHOUT THE DURATION OF THE PROJECT.
D CLEAN UP ON A DAILY BASIS TO MAINTAIN A SAFE AND OPERABLE FACILITY.
COORDIANTE WITH GC SUPPLIED LOCATIONS OF WASTE BINS AND
DUMPSTERS, AS REQUIRED FOR THE WORK.
E THE OWNER HAS FIRST RIGHT OF REFUSAL OF ANY FURNITURE, FIXTURES
AND EQUIPMENT SLATED FOR DEMOLITION.
GENERAL DEMOLITION NOTES
N
EXISTING WALL
NEW WALL. REFER TO
PARTITION TYPE SCHEDULE
NEW DOOR.
REF. DOOR & FRAME.
SEE SCHEDULE
EXIST. DOOR & FRAME
TO REMAIN. PROTECT.
5'
0"
30' - 0"
APRON
A1.4
A1.4
MAINTENANCE
BAY
PROJECTED LIGHTING @
CEILING PLAN (TYP)
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
27' - 1"
TYP
3TYP
TYP
27' - 6"
TYP
NEW 1x4 LIGHT FIXTURE. RAISE
& SECURE IN PLACE. SEE ELECT.
NEW WALL MOUNTED LIGHT
FIXTURE. SEE ELECT.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
6/
/2
8:
:2
AM
Au to de sk
D oc s:
//1
0.
N
G A
Pa lm et to
/1
0.
D M
A C
FM
O
P
AL
M
ET
TO
E
SP
R
EN
O
VA
TI
O N
S.
rv t
ML
A1.4
HIGH BAY
MAINTENANCE
SHELTER PLAN &
ELEV
1910.09
MARCH 30, 2026
PA
LM
ET
TO
E
SP
R
EN
O
VA
TI
O
N
4T
H A
VE
W
, P
AL
M
ET
TO
, F
L
0%
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
N
AT
IO
N
AL
G
U
AR
D A
R M
O R
Y
D M
A C
FM
O
PLAN LEGEND
SPECIFIC NOTES - MAINT BAY
1 REFINISH AND REPAINT ALL EXTERIOR BOLLARDS WITH TRAFFIC
YELLOW EPOXY. TYP.
2 IF ABI #02 IS SELECTED: PROVIDE NEW LED WALL & CEILING
MOUNTED LIGHTING FIXTURES. REFER TO ELECTRICAL DRAWINGS
FOR COMPLETE SCOPE OF WORK.
3 EXISTING GUTTER & DOWNSPOUTS SYSTEM TO REMAIN / PROTECT.
IF ABI #01 IS SELECTED: CONNECT ALL DOWNSPOUTS TO
UNDERGROUND CIVIL. RE-GRADE RE-SOD AROUND ALL DOWNSPOUT
AREAS FOLLOWING CIVIL CONNECTION. REFER TO CIVIL DRAWINGS
FOR COMPLETE SCOPE OF WORK.
4 IF ABI #03 IS SELECTED: REFINISH AND REPAINT HIGH BAY
MAINTENANCE SHELTER WITH HIGH PERFORMANCE PAINTED FINISH.
/ 2 COLOR SCHEME MAX.
N
1/4" = 1'-0"A1.4
PROPOSED MAINTENANCE
BAY FLOOR PLAN
1/4" = 1'-0"A1.4
2 MAINTENANCE BAY - EAST ELEVATION
1/4" = 1'-0"A1.4
3 MAINTENANCE BAY - WEST ELEVATION
RCP LEGEND
1 06-17-26 ADDENDUM 02
ABI #2
ABI #3A REFER TO ABI WORK LIST ON COVER SHEET FOR
COMPLETE ALTERNATE BID ITEMS SCOPE OF WORK.
B AT LOCATIONS WHERE SYSTEMS AND ACCESSORIES HAVE BEEN
REMOVED, PATCH AND REPAIR TO BE FLUSH AND MATCH ADJACENT
FINISHES.
C VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS FOR THE
PROPOSED SCOPE OF WORK. NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
D COORDINATE WITH OWNER ON ALLOWABLE WORK HOURS FOR THE
CONSTRUCTION. CONSTRUCTION SHALL NOT CREATE EXCESSIVE
NOISE OR IMPEDE ON THE OPERATIONS OF THE ADJACENT
NEIGHBORS.
E SECURE ALL EXTERIOR OPENINGS IN THE BUILDING ENVELOPE AT THE
END OF WORK EACH DAY.
F NEW PAINT/ TOUCH UP SUBSTRATES AT ALL AREAS DISTURBED BY THE
SCOPE OF CONSTRUCTION ACTIVITIES.
G COORDINATE ALL SITE ACCESS & LAY DOWN AREA W/ OWNER.
GENERAL CONSTRUCTION NOTES 1
| -- - COVER |
| GA1.1 - GENERAL ARCHITECTURAL |
| SA1.2 - ARCHITECTURAL SITE PLAN |
| DSA1.2 - EXISTING / DEMO SITE PLAN |
| DA1.4 - EXISTING / DEMO HIGH BAY MAINTENANCE SHELTER PLAN & ELEV |
| A1.4 - HIGH BAY MAINTENANCE SHELTER PLAN & ELEV |
| 2026-06-17T09:23:09-0400 | |
| Richard HEADLAND, AIA, NCARB |
File details come from the government source that posted it. Updated .