224004 Palmetto_100% ADD 02 MECHANICAL_SS.pdf
PDF 3 MB Posted
- Attached to
- 224004 Palmetto Revamp
- Solicitation number
- ITB-15884
- Issued by
- St. Johns County, Florida
About this file
Mechanical System Renovation Specifications for Florida National Guard Palmetto Readiness Center
This is a mechanical engineering construction document prepared by BAL Engineering, Inc. for the Florida Department of Military Affairs regarding HVAC system upgrades at the Palmetto Readiness Center located at 1107 14th Avenue West, Palmetto, Florida 34221. The project scope includes removal of existing DX split system air handlers (AHU-3 and AHU-4) and associated condensing units, installation of new air handlers with hot gas reheat for humidity control, installation of new condensing units (CU-3 and CU-4) secured to concrete housekeeping pads, installation of stand-alone and ducted dehumidifiers to serve multiple zones, and removal of existing exhaust fans with new fan installation. The document provides detailed mechanical load summaries based on Florida Building Code 8th Edition (2023) design conditions (outdoor 94°F dry bulb/77°F wet bulb, indoor 75°F dry bulb/50% RH), with AHU-3 requiring 66,500 BTU total cooling and AHU-4 requiring 43,400 BTU total cooling. Equipment schedules identify specific manufacturers including Trane air handlers, Mitsubishi mini-split units, and Greenheck exhaust fans with corresponding capacities and electrical specifications. The mechanical plans indicate seven existing air handling units to remain (AHU-1, AHU-2, AHU-5, AHU-6, AHU-7), three new units to be installed (AHU-3N, AHU-4N, MAC-1N), and seven condensing units with varying capacities from 1 to 18.1 tons. Construction documents are dated March 30, 2026, with Addendum 02 issued June 17, 2026.
The specifications require strict compliance with Florida Building Code 8th Edition (2023), NFPA standards (90A, 101), ASHRAE standards (62.1-2019, 126-2016, 180-2018), and SMACNA duct construction standards. All ductwork must be internally insulated with minimum 1.5-inch R-6 duct liner, with supply ducts rated for 3-inch pressure class upstream of VAV boxes and 1-inch downstream, and return ducts at minimum -3-inch pressure class. Duct leakage is limited to 2 percent for ducts rated ≤2 inches WG and 1 percent for higher ratings, verified through independent NEBB or AABC certified test and balance agencies. Condensate drain lines must be copper, sized one diameter larger than unit connections (minimum 3/4 inch), with all lines sloped at minimum 1/8 inch per foot and insulated with 3/4-inch seamless closed-cell rubber insulation. Refrigerant piping requires sizing per manufacturer recommendations with suction lines insulated in 3/4-inch closed-cell rubber with UV-resistant coating for exterior exposure. The document includes eight alternate bid items addressing parking stormwater mitigation, LED lighting upgrades, exterior facade refinishing, impact glazing replacement, fence systems, pavement overlays, and vault dehumidification systems. All equipment must be labeled with laminated plastic signs, and roof-mounted equipment must be secured per Florida Product Approval listings or third-party structural engineer certification. An independent commissioning authority must be retained to perform HVAC system commissioning per Florida Energy Conservation Code, with as-built drawings, O&M manuals, and commissioning reports due within 90 days of certificate of occupancy.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FBC FLORIDA BUILDING CODE 8TH EDITION (2023) ENERGY CONSERVATION
PROJECT LOAD SUMMARYC403.2.1
PROJECT: FLORIDA NATIONAL GUARD
PALMETTO READINESS
CENTER
1107 14TH AVE WEST
PALMETTO, FLORIDA 34221
OWNER: DEPARTMENT OF MILITARY
AFFAIRS
P.O. BOX 1008
ST. AUGUSTINE, FLORIDA,
32085-1008
AHU-3[N]/CU-3[N] AHU-4[N]/CU-4[N]
ZONE AREA: 1700 ZONE AREA: 1923
CONDITIONED AREA: 1700 CONDITIONED AREA: 1923
SIZING METHOD: HEAT BALANCE METHOD SIZING METHOD: HEAT BALANCE METHOD
OUTDOOR DRY BULB: 94.0 OUTDOOR DRY BULB: 94.0
OUTDOOR WET BULB: 77.0 OUTDOOR WET BULB: 77.0
INDOOR DRY BULB: 75 INDOOR DRY BULB: 75
INDOOR RH: 50% INDOOR RH: 50%
TOTAL COOLING REQUIRED: 66,500 TOTAL COOLING REQUIRED: 43,400
TOTAL HEATING REQUIRED: 25,000 TOTAL HEATING REQUIRED: 23,000
TOTAL SENSIBLE GAIN: 54,400 TOTAL SENSIBLE GAIN: 38,600
TOTAL LATENT GAIN: 12,100 TOTAL LATENT GAIN: 4,800
GRAINS WATER (DIFFERENCE): 114.7 - 64 = 50.7 GRAINS WATER (DIFFERENCE): 114.7 - 64 = 50.7
MAC-1[N]/MCU-1[N]
ZONE AREA: 210
CONDITIONED AREA: 210
SIZING METHOD: HEAT BALANCE METHOD
OUTDOOR DRY BULB: 94.0
OUTDOOR WET BULB: 77.0
INDOOR DRY BULB: 75
INDOOR RH: 50%
TOTAL COOLING REQUIRED: 12,000
TOTAL HEATING REQUIRED: 0
TOTAL SENSIBLE GAIN: 9,240
TOTAL LATENT GAIN: 2,760
GRAINS WATER (DIFFERENCE): 78.6-64.6 = 14.0
GENERAL MECHANICAL NOTES
M
230000
1. THE INTENT OF THESE NOTES AND MECHANICAL NOTES ON DRAWINGS IS TO CLARIFY THE SCOPE OF WORK AND ALERT THE CONTRACTOR OF FIELD CONDITIONS. CONTRACTOR TO VISIT SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK AND PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS AND COORDINATE WITH ELECTRICAL, PLUMBING AND FIRE PROTECTION SUBCONTRACTOR BEFORE ANY CONSTRUCTION WORK. NO ALLOWANCES WILL BE MADE FOR THE CONTRACTOR'S UNFAMILIARITY WITH THE JOB SITE AND CONDITIONS.
2. PLANS SHALL NOT BE SCALED. PLANS INDICATE THE SCHEMATIC LAYOUT AND LOCATION OF THE MECHANICAL SYSTEM COMPONENTS. UNLESS SPECIFIC DIMENSIONS ARE NOTED, THE ACTUAL LOCATION OF THESE COMPONENTS SHALL BE DETERMINED IN THE FIELD IN COORDINATION WITH THE WORK OF OTHER TRADES, THE USE OF MANUFACTURER’S SHOP DRAWINGS AND SIMILAR CERTIFIED DATA. THE ELEVATION OF EXPOSED DUCTWORK SHALL BE COORDINATED
WITH THE ARCHITECT PRIOR TO ORDERING ANY DUCTWORK.
3. NO EXCLUSIONS FROM OR LIMITATIONS IN THE LANGUAGE USED IN THE CONTRACT DOCUMENTS SHALL BE INTERPRETED AS MEANING THAT THE EQUIPMENT, APPURTENANCES, AND/OR ACCESSORIES NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM ARE NOT TO BE PROVIDED AS REQUIRED.
a. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF THE CONTRACT DOCUMENTS. THE SEPARATE DIVISIONAL DRAWINGS AND SPECIFICATIONS DO
NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE THE WORK WHICH IS INDICATED ON ANY OF THE DRAWINGS OR DIVISION OF THE SPECIFICATIONS. REVIEW AND COORDINATE THE SCOPE OF WORK TO ASSURE A COMPLETE FUNCTIONAL SYSTEM IS INSTALLED. SHOP
DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW.
4. SUBMIT SHOP DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW. WHERE MANUFACTURERS ARE LISTED IN THE PROJECT MANUAL, ONE OF THOSE MANUFACTURERS SHALL BE PROVIDED UNLESS A REQUEST FOR SUBSTITUTION HAS BEEN SUBMITTED PRIOR TO BID AND THE MANUFACTURER SUBSEQUENTLY IS LISTED AS AN ACCEPTABLE MANUFACTURER IN AN ADDENDUM. PARTIAL SUBMITTALS WILL NOT BE ACCEPTED FOR REVIEW AND APPROVAL.
INSTALL AND TEST ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND RECOMMENDATIONS. FOR ALL EQUIPMENT, WHICH HAS BEEN SCHEDULED DIRECTLY ON THE DRAWINGS, PROVIDE WITHIN THE SUBMITTAL, A PERFORMANCE SCHEDULE FOR THE PROPOSED EQUIPMENT IN THE EXACT SAME FORMAT AS INCLUDED ON THE CONTRACT DOCUMENTS. FAILURE TO PROVIDE THE REQUIRED PERFORMANCE SCHEDULE WILL RESULT IN REJECTION OF THE ENTIRE SUBMITTAL. SUBMIT DRAWINGS AND CUT SHEETS FOR ALL PRODUCTS ALL AT ONE TIME. INDEX ALL ITEMS TO THE PROJECT MANUAL OR DRAWINGS AS APPLICABLE. SHOP DRAWINGS THAT DEVIATE FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS SHALL LIST ALL DIFFERENCES IN A COVER LETTER ATTACHED TO THE FRONT OF THE SUBMITTAL. ANY UNLISTED DEVIATIONS FOUND DURING THE REVIEW WILL RESULT IN THE REJECTION OF THE ENTIRE SUBMITTAL. FOR ITEMS REVIEWED AND MARKED "REJECTED" OR "REVISE AND RESUBMIT”, ONLY ONE ADDITIONAL SUBMITTAL WILL BE REVIEWED TO VERIFY PRODUCT COMPLIANCE WITH THE CONTRACT DOCUMENTS. SHOULD FURTHER SUBMITTALS BE REQUIRED FOR THE DESIGN PROFESSIONAL TO VERIFY THE SUBMITTAL WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, THE HOURLY RATE OF $150.00 PLUS EXPENSES WILL BE
BILLED TO THE CONTRACTOR FOR THE PROFESSIONAL(S) TIME IS SPENT ON THE REVIEW.
5. DUCTWORK, AIR DEVICES AND OTHER ITEMS OF THE AIR DISTRIBUTION SYSTEM SHALL BE SUPPORTED DIRECTLY FROM THE BUILDING STRUCTURE AND NOT FROM THE CEILING OR CEILING SUSPENSION SYSTEM. COORDINATE LOCATION OF AIR DEVICES AND LOUVERS WITH ELECTRICAL, ARCHITECTURAL, AND PLUMBING WORK. AIR DEVICES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE FROM AT LEAST TWO POINTS.
6. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF "SMACNA" DUCT CONSTRUCTION STANDARDS AND COMPLY WITH THE LATEST "NFPA" 90A REQUIREMENTS. ALL DUCT\'WORK SHALL BE LEAK TESTED IN ACCORDANCE WITH SMACNA AND ASHRAE STANDARDS, AND BE COMPLETED BY THE TEST AND BALANCE COMPANY AND WITNESSED BY THE OWNER. DUCT LEAKAGE RATE SHALL NOT EXCEED 2% FOR DUCTS RATED
LESS THAN OR EQUAL TO 2" W.G., AND 1% FOR DUCTS RATED GREATER THAN 2” W.G.
a. ALL MAIN SUPPLY AND RETURN AIR DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED G90 SHEET METAL INTERNALLY INSULATED WITH MINIMUM
1-1/2” THICKNESS R-6 DUCT LINER INSULATION PER INTERNALLY LINED DUCT DETAIL, SEAL ALL DUCT JOINTS WITH HARDCAST, UNLESS OTHERWISE
NOTED.
1. DUCT LINER EQUAL TO JOHNS MANVILLE LINACOUSTIC R-300 OR EQUAL OR ARMACELL AP ARMAFLEX.
b. ALL BRANCH SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK SHALL BE GALVANIZED G90 SHEET METAL. SEAL ALL DUCT JOINTS WITH
HARDCAST. ALL SUPPLY. RETURN AND OUTSIDE AIR DUCTS SHALL BE INSULATED WITH BLANKET TYPE INSULATION WITH VAPOR BARRIER (MINIMUM INSTALLED R 6.0). DUCT INSULATION SHALL BE LABELED AND MARKED AT THE REQUIRED INTERVALS AS REQUIRED BY THE FLORIDA BUILDING CODE.
EXHAUST AIR DUCTS SERVING ENERGY RECOVERY UNIT SHALL BE INSULATED.
c. DUCT PRESSURE CLASSES SHALL BE AS FOLLOWS:
1. SUPPLY UPSTREAM OF VAV BOXES 3" PRESSURE CLASS.
2. SUPPLY DOWNSTREAM OF VAV BOXES 1" PRESSURE CLASS.
3. RETURN MIN. -3" PRESSURE CLASS.
4. EXHAUST -2" PRESSURE CLASS
d. PROVIDE TURNING VANES IN ALL RECTANGULAR AND SQUARE DUCT ELBOWS GREATER THAN 8" IN WIDTH.
e. CONSTRUCT AND INSTALL DUCTWORK IN ACCORDANCE WITH THE LATEST SMACNA GUIDELINES.
f. PROVIDE HANGER AND DUCT WORK ACCESSORIES AS PER SMACNA RECOMMENDATIONS.
g. FLEXIBLE CONNECTION SHALL BE PROVIDED BETWEEN ALL AIR MOVING APPARATUS AND DUCTWORK WIDTH SHALL NOT BE LESS THAN 4" AND EQUAL
TO DURO-DYNE FLEXIBLE DUCT CONNECTOR.
h. DUCTWORK SHALL BE SEALED IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA DUCT CONSTRUCTION STANDARDS.
7. ALL DUCT DIMENSIONS SHOWN\IN ON DRAWINGS ARE CLEAR INSIDE
8. ALL VOLUME DAMPERS SHALL BE OPPOSED BLADE TYPE. PROVIDE A ONE-FOOT-LONG PLASTIC STRIP OF MATERIAL FROM ALL DAMPER HANDLES TO ASSIST
TEST AND BALANCE AGENCY IN IDENTIFYING ALL DAMPERS. IN AREAS WHERE THE FINAL DAMPER INSTALLATION PROHIBITS ACCESS FOR TEST AND BALANCE, PROVIDE MANUAL REMOTE CABLE CONTROLS EQUAL TO YOUNG REGULATOR MODEL 830ACC/270—896. ACCESS TO END OF CABLE TO BE FLUSH IN CEILING NEATLY CONCEALED WITH THREADED CAP. PAINT CAP TO MATCH CEILING COLOR. INDICATE LOCATIONS OF ALL CAPS ON DUCTWORK COORDINATION DRAWINGS AND OBTAIN WRITTEN APPROVAL FROM ARCHITECT/ENGINEER PRIOR TO INSTALLATION. REMOVE MATERIAL FROM EXPOSED DUCT DAMPERS
AFTER SUBSTANTIAL COMPLETION.
9. ALL DUCT ELBOWS SHALL INCLUDE AIR FLOW DIRECTIONAL VANES AS PER ”SMACNA” DUCT CONSTRUCTION STANDARDS. SPLITTER VANES SHALL BE PROVIDED IN ALL ELBOWS AND DUCT OFFSETS WITH ANGLES BETWEEN 15 DEGREE AND 90 DEGREES AS PER FIG. 2—5 OF THE SMACNA MANUAL. 90 DEGREE
ELBOWS SHALL HAVE TURNING VANES.
10. PROVIDE CONICAL SPIN—IN FITTINGS AT ALL CONNECTIONS OF ROUND SHEET METAL OR FLEXIBLE SUPPLY AIR DUCTS TO RIGID RECTANGULAR DUCT.
11. ALL PIPING AND/OR DUCTWORK MUST BE INSTALLED 6” AWAY FROM ANY FIRE RATED WALL.
12. FOR SEALING OF FIRE DAMPER AND PIPE OR DUCT PENETRATION THROUGH FIRE-RATED WALLS, REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS.
ALL PIPE PENETRATIONS SHALL BE SEALED USING APPROVED UL DETAILS. ALL FIRE DAMPERS SHALL BE DYNAMIC TYPE.
13. PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF FIRE RATED WALLS. DUCTWORK OR PIPING SHALL NOT BE
SUPPORTED FROM ANY FIRE-RATED WALL.
14. FLEXIBLE DUCTS SHALL BE FACTORY INSULATED (MINIMUM R—6) AND INCLUDE A VINYL VAPOR JACKET AND HELIX STEEL WIRE. ”FLEXMASTER” TYPE
5M OR APPROVED EQUAL. FLEXIBLE DUCT SHALL BE ATTACHED WITH THERMAFLEX STAINLESS STEEL SNAP LOCK CLAMPS. THE MAXIMUM LENGTH OF
FLEXIBLE DUCT SHALL BE 6’—0". SUPPORT ELBOWS USING THERMAFLEX FLEXFLOW ELBOW.
15. SMOKE AND HIGH TEMPERATURE PROTECTION OF MECHANICAL AIR DISTRIBUTION SYSTEMS.
a. DUCT MOUNTED SMOKE DETECTORS SHALL BE FURNISHED AND WIRED UNDER DIVISION 26 (ELECTRICAL) AT LOCATIONS INDICATED ON THE PLANS
AND AS HEREIN SPECIFIED. DUCT DETECTORS SHALL COMPLY WITH UL 268A.
b. MECHANICAL PLANS INDICATE THE APPROXIMATE LOCATION OF DUCT DETECTORS. ASSIST THE SMOKE DETECTOR INSTALLER IN LOCATING AND
INSTALLING THE DETECTORS IN ACCORDANCE WITH MANUFACTURER’S INSTALLATION INSTRUCTIONS. WHEN RECOMMENDED CLEARANCES CAN NOT BE MAINTAINED, SIMULATE A SMOKE AIR FLOW TEST OF EACH DEVICE AND PROVIDE A COPY OF THE FIELD TEST TO THE OWNER’S REPRESENTATIVE.
16. PROVIDE A MINIMUM 12“ X 12” INSULATED AND DOUBLE GASKETED DUCT ACCESS DOOR ADJACENT TO EACH DUCT MOUNTED SMOKE DETECTOR TO FACILITATE INSPECTION OF DUCT DETECTOR TUBES. ACCESS DOOR SHALL NOT REQUIRE TOOLS TO BE OPENED.
17. PROVIDE P—TRAPS AS PER DETAIL AT ALL CONDENSATE DRAIN LINE CONNECTIONS. SLOPE DRAIN LINES TOWARD THE POINT OF DISCHARGE (MIN 1/8"/FOOT).
INSULATE CONDENSATE DRAIN LINES WITH 3/4" THICK SEAMLESS CLOSED CELL RUBBER PIPE INSULATION. CONDENSATE DRAIN LINES TO BE COPPER. LINES SHALL BE ONE DIAMETER LARGER THAN THE UNIT DRAIN CONNECTION, BUT NOT LESS THAN 3/4 INCH. PROVIDE CLEANOUTS AT ALL CHANGES OF DIRECTION.
THE FOLLOWING MINIMUM PIPE SIZES SHALL BE USED:
EQUIPMENT CAPACITY MINIMUM PIPE DIAMETER
a. UP TO 20 TONS 3/4”
b. OVER 20 TONS UP TO 40 TONS 1“
18. PROVIDE FLEXIBLE CONNECTIONS BETWEEN ALL AIR MOVING APPARATUS AND DUCTWORK. RECOMMENDED WIDTH IS 4".
19. WHERE INDICATED ON DRAWINGS AND/OR EQUIPMENT SCHEDULES EXTERNAL STATIC PRESSURE IS DEFINED AS NOT INCLUDING LOSSES DUE TO UNIT
MOUNTED FILTER(S), RETURN AIR PLENUM OR MIXING BOXES. THOSE LOSSES SHALL BE PART OF THE EQUIPMENT INTERNAL LOSSES SAME AS THOSE CAUSED
BY COILS, CABINET, ETC.
20. ROOF MOUNTED EQUIPMENT SHALL BE SECURED TO THE CURB AND THE CURBS SHALL BE SECURED TO THE STRUCTURE IN ACCORDANCE WITH THE EQUIPMENT’S FLORIDA PRODUCT APPROVAL LISTING OR PROVIDED WITH A THIRD PARTY STRUCTURAL ENGINEERS SIGNED AND SEALED INSTALLATION
DETAILS.
21. PROVIDE PAINTED GALVANIZED EXPANDED METAL GRILLE OVER ALL CONDENSER COILS.
22. ALL EQUIPMENT (AIR HANDLERS, CONDENSING UNITS, ROOFTOP UNITS, ETC.) SHALL BE LABELED WITH PLASTIC SIGNS, LAMINATED. ENGRAVED: 1/8" THICK
BLANKS FOR SIGNS SHALL BE A MINIMUM OF 1 1/4" HIGH, WITH 3/4" HIGH LETTERS. LENGTH OF THE SIGN SHALL BE THE SUM OF THE LETTERS/NUMBERS PLUS 3/4” EACH END. SIGNS DESIGNATED FOR INSTALLATION ON THE OUTSIDE, IN OPEN AREAS, OR LOCATED IN A PROTECTED AREA THAT IS SUBJECT TO DIRECT SUNLIGHT, SHALL BE UV RATED, DESIGNATED AND MANUFACTURED TO BE EXPOSED TO THE ELEMENTS. SUBMITTAL DATA INDICATING THE ABOVE WILL BE REQUIRED. LABELS SHALL ALSO INCLUDE THE ROOM NUMBER, CORRESPONDING AIR HANDLER LOCATION OR AREA SERVED TO ASSIST IN THE DETERMINATION OF THE SERVICE LOCATION OF SAID EQUIPMENT. PROVIDE ADDITIONAL NAMEPLATE ON CEILING GRID DIRECTLY BELOW EQUIPMENT CONCEALED ABOVE CEILINGS TO AID IN LOCATING THE UNIT. NAMEPLATE DESIGNATION SHALL CONSIST OF UNIT NUMBER. LABELS SHALL BE PERMANENTLY AFFIXED TO
EQUIPMENT BY USE OF RIVET OR SCREW TYPE FASTENERS.
23. EQUIPMENT SHALL BE MANUFACTURED AND/OR COATED AS REQUIRED FOR INSTALLATION IN A SEA COAST ENVIRONMENT.
24. ALL WALL MOUNTED TEMPERATURE AND HUMIDITY SENSORS SHALL BE INSTALLED AT A CENTER LINE ELEVATION OF 4’ 0” ABOVE FINISHED FLOOR UNLESS
OTHERWISE NOTED ON DRAWINGS. LOCATION OF THE WALL MOUNTED THERMOSTAT SHALL BE COORDINATED WITH OTHER TRADES FOR A NEAT APPEARANCE. THE FINAL LOCATION OF THERMOSTAT SHALL BE SUBJECT TO THE APPROVAL OF THE ARCHITECT OR HIS REPRESENTATIVE IN THE FIELD. WHEN
THE SENSOR IS INSTALLED ON EXTERIOR WALLS, PROVIDE AN INSULATED SUB—BASE.
25. RETAIN THE SERVICES OF A NEBB AND/OR AABC CERTIFIED TEST AND BALANCE AGENCY TO PERFORM FINAL TESTING AND BALANCING OF ALL HVAC SYSTEMS.
THE TEST AND BALANCE AGENCY SHALL BE HIRED INDEPENDENTLY FROM THE MECHANICAL CONTRACTOR THROUGH THE GENERAL CONTRACTOR. RECORD ALL DATA ON STANDARD ’AABC’ OR OTHER APPROVED FORMS AND SUBMIT TO THE ARCHITECT FOR REVIEW.
26. PROVIDE SCHEDULE 40 STEEL PIPE SLEEVES FOR CONDENSATE DRAIN LINES PENETRATING EXTERIOR WALLS. NEATLY SEAL VOIDS AROUND PIPING WITH A
WEATHER TIGHT PERMANENT NON-SHRINKING SEALANT.
27. REFRIGERANT LINES SHALL BE SIZED AS PER THE AIR CONDITIONING EQUIPMENT MANUFACTURER’S RECOMMENDATIONS. PROVIDE SIZING AND ACCESSORY DATA WITH THE EQUIPMENT PACKAGE SUBMITTAL. PIPING IS TO BE FILLED WITH DRY NITROGEN WHILE SOLDERING. TEST, CLEAN, AND DEHYDRATE PIPES AND PROVIDE CRITICAL CHARGE OF REFRIGERANT AS PER EQUIPMENT MANUFACTURER’S RECOMMENDATION. PROVIDE ALL NECESSARY VALVES. TRAPS, FILTER/DRYERS. SIGHT GLASS, ETC. AS REQUIRED FOR A COMPLETE AND READY TO OPERATE INSTALLATION. INCLUDE ACCESSIBLE SERVICE FITTINGS. BI—
FLOW LIQUID LINE FILTER DRYER SHALL BE PROVIDED IN HEAT PUMP UNITS.
28. ALL SUCTION LINE REFRIGERANT PIPING SHALL BE INSULATED WITH 3/4" THICK SEAMLESS CLOSED CELL RUBBER PIPE INSULATION. INSULATION EXPOSED TO THE OUTSIDE ENVIRONMENT SHALL BE PAINTED WITH TWO COATS OF UV RESISTANT WHITE ARMAFLEX PAINT OR PROVIDED WITH A FACTORY UV RESISTANT
OUTER LAYER.
29. EQUIPMENT SERVICE ACCESS: PROVIDE ADEQUATE SERVICE SPACE AROUND AIR HANDLING UNITS, VARIABLE VOLUME BOXES, ELECTRIC DUCT HEATERS AND THE PULL SIDE OF FILTERS, OR AS REQUIRED BY THE MANUFACTURER’S INSTALLATION INSTRUCTIONS. THE SERVICE AREA SHALL BE CLEAR OF DUCTS, PIPES, CONDUITS, WALL STUDS, CEILING HANGERS. AND ANY OTHER CONSTRUCTION APPURTENANCE.
30. ALL AIR HANDLING UNITS SHALL BE PROVIDED WITH A FLOAT SWITCH IN THE PRIMARY DRAIN LINE OR IN THE EQUIPMENT SUPPLIED DRAIN PAN, LOCATED AT A POINT HIGHER THAN THE PRIMARY DRAIN LINE CONNECTION AND BELOW THE OVERFLOW RIM OF SUCH PAN, WIRED TO SHUT DOWN THE ENTIRE SYSTEM
WHEN THE PRIMARY DRAIN BECOMES OBSTRUCTED.
31. ADEQUATE MEANS OF PROTECTION FOR ALL UTILITIES SHALL BE PROVIDED AND IF UTILITIES ARE DAMAGED DURING WORKING OPERATIONS, SUCH SHALL BE
REPAIRED TO THE SATISFACTION OF THE OWNER, AT NO COST TO THE CONTRACT.
32. ACCESS PANELS THAT MAY BE REQUIRED FOR INSPECTION OF DUCTWORK, PIPING. DUCT MOUNTED DEVICES OR PIPE MOUNTED DEVICES SHALL BE PROVIDED AND ADEQUATELY SIZED. REFER TO THE ARCHITECTURAL CONTRACT DOCUMENTS FOR DOOR SPECIFICATIONS.
33. ALL DUCTWORK SHALL BE STORED IN CLEAN AREAS. PROTECT ALL DUCTWORK FROM DUST AND DEBRIS WHILE IT IS STORED ON SITE. WHILE UNDER CONSTRUCTION, ALL INSTALLED DUCTWORK SHALL BE TEMPORARILY SEALED WITH DUCT PROTECTION FILM PRIOR TO TEST AND BALANCE IN ORDER TO LIMIT ACCUMULATION OF CONSTRUCTION DUST INSIDE THE DUCTWORK SYSTEM. IF EITHER OF THESE PROCEDURES IS NOT CONDUCTED, THE ENTIRE ASSOCIATED DUCTWORK SYSTEM AND MECHANICAL EQUIPMENT SHALL BE CLEANED TO THE OWNER'S SATISFACTION.
34. RETAIN THE SERVICES OF AN INDEPENDENT COMMISSIONING AUTHORITY TO PERFORM COMMISSIONING SERVICES OF ALL NEW HVAC SYSTEMS AND CONTROL SYSTEMS IN ACCORDANCE WITH THE FLORIDA ENERGY CONSERVATION CODE. THE COMMISSIONING AUTHORITY SHALL BE HIRED INDEPENDENTLY FROM THE MECHANICAL CONTRACTOR THROUGH THE GENERAL CONTRACTOR. THE COMMISSIONING AUTHORITY CANNOT BE THE SAME AS THE TEST AND BALANCE CONTRACTOR. THE COMMISSIONING AUTHORITY SHALL DEVELOP A COMMISSIONING PLAN, PERFORM FUNCTIONAL TESTING WITH THE ASSISTANCE OF THE ASSOCIATED CONTRACTOR(S), AND PROVIDE A PRELIMINARY AND FINAL COMMISSIONING REPORT.
35. AS-BUILT DRAWINGS, O&M MANUALS, CERTIFIED TEST AND BALANCE REPORT, AND THE FINAL COMMISSIONING REPORT ARE TO BE PROVIDED TO THE OWNER WITHIN 90 DAYS OF THE DATE OF RECEIPT OF THE CERTIFICATE OF OCCUPANCY AND SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW.
36. SYSTEMS SHALL BE MAINTAINED IN ACCORDANCE WITH ASHRAE STANDARD 180—2018— STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF
COMMERCIAL BUILDING HVAC SYSTEMS.
CODE COMPLIANCE
M
220000
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 8TH EDITION (2023) FLORIDA BUILDING CODE
A. BUILDING EDITION
B. EXISTING BUILDING EDITION
C. MECHANICAL EDITION
D. PLUMBING EDITION
E. FUEL GAS EDITION
F. ENERGY EFFICIENCY EDITION
G. 8TH EDITION (2023) FLORIDA FIRE PREVENTION CODE.
2. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
A. NFPA-1 NATIONAL FIRE CODE WITH FLORIDA MODIFICATIONS
B. NFPA-70 NATIONAL ELECTRIC CODE
C. NFPA-72 NATIONAL FIRE ALARM CODE
D. NFPA-90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS E. NFPA-90B STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR CONDITION SYSTEMS
F. NFPA-101 NATIONAL LIFE SAFETY CODE
3. AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS, INC. (ASHRAE) A. ASHRAE GUIDELINE 4-2008 - PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS B. ASHRAE STANDARD 62.1-2019 AND APPROVED ADDENDA - VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
C. ASHRAE STANDARD 126-2016 - METHOD OF TESTING HVAC AIR DUCTS
D. ASHRAE STANDARD 180-2016 - STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF COMMERCIAL BUILDING
HVAC SYSTEMS.
4. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
OUTDOOR
INDOOR
CONDITION
42.0°F
69.0°F
WINTER
DRY BULB
94.0°F
74.0°F
SUMMER
DRY BULB
61.8°F
WET BULB
77.0°F
DESIGN CONDITIONS
M
230000
NOTE:
ALL SYMBOLS OR ABBREVIATIONS MAY NOT APPEAR ON PLANS. CONTRACTOR
IS ONLY RESPONSIBLE FOR EQUIPMENT INDICATED ON CONSTRUCTION PLANS
OR BY SPECIFICATION.
BD
AD
NEW DUCTWORK OR
EQUIPMENT
NEW COMBINATION
FIRE/SMOKE DAMPER
NEW AUTOMATIC
SMOKE
DAMPER
NEW AUTOMATIC FIRE
DAMPER
COUNTER BALANCED
BACKDRAFT DAMPER
MANUAL VOLUME DAMPER
WITH 2" INSULATION
STAND-OFF
DRAWING SYMBOL DESCRIPTION DRAWING SYMBOL DESCRIPTION
EXISTING DUCTWORK OR
EQUIPMENT
DUCTWORK OR EQUIPMENT
TO BE REMOVED
NEW SMOKE
WALL
PENETRATION
NEW INTERNALLY LINED
DUCTWORK
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
INSULATED FLEXIBLE
DUCTWORK
DUCT ACCESS DOOR
ROUND DUCT TURNING
DOWN
ROUND DUCT TURNING UP
SUPPLY OR OA DUCT
TURNING DOWN
SUPPLY OR OA DUCT
TURNING UP
RETURN DUCT TURNING
DOWN
RETURN DUCT TURNING UP
EXHAUST DUCT TURNING
DOWN
EXHAUST DUCT TURNING UP
MITERED ELBOW WITH
TURNING VANESMITERED ELBOW
NEW / EXISTING
THERMOSTAT
NEW / EXISTING HUMIDISTAT
NEW / EXISTING
COMBINATION THERMOSTAT
/ HUMIDISTAT
NEW / EXISTING CO2 SENSOR
NEW / EXISTING FIRESTAT
NEW / EXISTING MOTOR
ACTUATOR
NEW / EXISTING SMOKE
DETECTOR (PROVIDED BY
DIV. 26)
PLAN NOTE
REVISION MARK
DEMOLITION NOTE
POINT OF DISCONNECT OR
CONNECTION
SUPPLY AIR DEVICE
EXHAUST AIR DEVICE
ROUND SUPPLY AIR DEVICE
RETURN AIR DEVICE
SIDEWALL SUPPLY
AIR
DEVICE
SIDEWALL EXHAUST
OR
RETURN AIR DEVICE
1" UNDERCUT FLOW ARROW
LEGEND
M
230000
ABBREVIATIONS
H
T
T/H
CO2
H
T
T/H
CO2
F
SD
M
F
SD
M
NEW / EXISTING SMOKE
DETECTOR (PROVIDED BY
DIV. 26)
TS TS
KEF
SA
MUA
EF
KH
SF
CT
CH
FP
MB
VV
RTU
CU
AH
AC
RA
OA
EA
[E]
[D]
TYP
CHW
CW
HW
CF
(0)
TF
CONDENSING UNIT
AIR HANDLING UNIT
AIR CONDITIONING UNIT
ROOF TOP UNIT
FAN POWERED VAV BOX
VAV BOX
MIXING BOX
CHILLER
COOLING TOWER
EXHAUST FAN SUPPLY FAN
KITCHEN HOOD
MAKE-UP AIR UNIT
KITCHEN EXHAUST FAN
SUPPLY AIR
RETURN AIR
OUTSIDE AIR
EXHAUST AIR
EXISTING TO REMAIN
TO BE DEMOLISHED
TYPICAL
CHILLED WATER
CONDENSER WATER
HEATING HOT WATER
CIRCULATING FAN
POSITIVE PRESSURE
NEGATIVE PRESSURE
NEUTRAL PRESSURE
TRANSFER FAN
[R] TO BE RELOCATED
MS
HP
MINI SPLIT
HEAT PUMP
L LOUVER
RD
NIC
RETURN AIR DEVICE
NOT IN CONTRACT
ED
UNO
EXHAUST AIR DEVICE
UNLESS NOTES OTHERWISE
CD CONDENSATE DRAIN
F FAN
P PUMP
PCHWP
PRIMARY CHILLED WATER
PUMP
SCHWP
SECONDARY CHILLED
WATER PUMP
CWP CONDENSER WATER PUMP
SD SUPPLY AIR DEVICE
SCOPE OF WORK
M
230000
1. REMOVE EXISTING DX SPLIT SYSTEM AHU-3, AHU-4, AND ASSOCIATED CONDENSING UNITS.
2. REMOVE EXISTING EXHAUST FANS.
3. CLEAN SUPPLY RETURN AND OUTSIDE AIR DUCTWORK TO REMAIN.
4. INSTALL NEW AHU-3, AHU-4, AIR HANDLERS WITH HOT GAS REHEAT FOR HUMIDITY CONTROL.
5. INSTALL NEW CONDENSING UNITS CU-3, CU-4, PROPERLY SECURED TO CONCRETE HOUSEKEEPING PADS.
6. INSTALL NEW STAND-ALONE DEHUMIDIFIERS IN VAULT, SUPPLY AREA AND EQUIPMENT AREA.
7. INSTALL NEW DUCTED DEHUMIDIFIERS TO SERVE AHU-1 AND AHU-2.
ALTERNATE BID ITEMS
A. ALTERNATE BID ITEM NO. 1: PARKING AREA - STORMWATER MITIGATION, ASPHALT MILLING, AND RESURFACE. CONNECT MAIN ARMORY ROOF DRAINS TO
UNDERGROUND STORM DRAIN SYSTEM.
B. ALTERNATE BID ITEM NO. 2: UPGRADE MAIN ARMORY BUILDING INTERIOR AND EXTERIOR LIGHTING TO LED TO INCLUDE UNIT SIGN AND FLAGPOLE.
C. ALTERNATE BID ITEM NO. 3: REFINISH AND REPAINT COMPLETE EXTERIOR STUCCO / BRICK FACADE WITH UP TO 4 COLOR SCHEME. INCLUDE THE PAINTING OF ALL
EXTERIOR HM DOORS AND FRAMES INCLUDING ALL INSIDE AND OUTSIDE FACES.
D. ALTERNATE BID ITEM NO. 4: COMPLETE GLAZING REPLACEMENT OF ALL EXISTING LAMINATED IMPACT GLAZING IN EXISTING ALUMINUM WINDOW FRAME SYSTEMS AT
THE EXTERIOR CLERESTORY LEVEL.
E. ALTERNATE BID ITEM NO. 5: COMPLETE GLAZING REPLACEMENT OF ALL EXISTING LAMINATED IMPACT GLAZING IN ALL EXISTING ALUMINUM WINDOW FRAME SYSTEMS AT ALL THE EXTERIOR 1ST FLOOR LEVEL GLAZED OPENINGS EXCEPT NEW EXTERIOR FIXED WINDOWS & IMPACT GLAZING
FOR KITCHEN ONLY.
F. ALTERNATE BID ITEM NO. 6: PROVIDE NEW 20'-0" WIDE (K-8 FORCE PROTECTION) FENCE SYSTEM) DOUBLE SWING GATE WITH MANUAL FUNCTION TO SOUTH SIDE OF POV PARKING. EXISTING DEAD MAN ANCHOR LAYOUT TO BE RE-CONFIGURED FOR NEW GATE. COMPLETE FUNCTIONAL INSTALLATION
REQUIRED.
G. ALTERNATE BID ITEM NO. 7: PROVIDE MILL AND OVERLAY OF THE NORTH & EAST POV PARKING LOT AS INDICATED IN THE ATTACHED CIVIL DRAWINGS.
H. ALTERNATE BID ITEM NO. 8: PROVIDE NEW DEHUMIDIFIER AND MECHANICAL AIR INSTALLED INTO THE TO THE EXISTING VAULT ROOM # 110 & #111.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
CONSULTING ENGINEERS
154A Whitaker Rd.
Lutz, Florida 33549
813.333.2103 www.balengineering.com
Registry No. 31211
TO THE BEST OF THE KNOWLEDGE OF
THE ENGINEERS AND ARCHITECTS,
SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE
MINIMUM BUILDING CODES AND THE
APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
/1
/2
:0 :3
P
M
C U se rs
\A d a m
G o re ck i\ B
A L E n g in e e ri n g In c\ B
A L E n g in e e ri n g In c.
I n te rn a l -
D o cu m e n ts
P ro je ct s\
\2
D M
A C
F M
O P a lm e tt o \W o rk in g
D ra w in g s\
M
P
R
.r vt
AG
M0.1
NOTES, LEGENDS,
AND SCHEDULES
T
H A
V E
W E
S T
P
A L M
E T
T O
F
L
1910.08
MARCH 30, 2026
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
N A
T
IO
N A
L G
U A
R D
A R
M O
R Y
D M
A C
F M
O
P A
L M
E T
T O
E S
P R
E N
O V
A T
IO
N
1 06-17-26 ADDENDUM 02
THIS ITEM HAS BEEN ELECTRONICALLY
SIGNED AND SEALED BY BRYANT A. LYLE ON
JUNE 16, 2026 USING A DIGITAL SIGNATURE.
PRINTED COPIES OF THIS DOCUMENT ARE
NOT CONSIDERED SIGNED AND SEALED AND
THE SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
CONSULTING ENGINEERS
154A Whitaker Rd.
Lutz, Florida 33549
813.333.2103 www.balengineering.com
Registry No. 31211
TO THE BEST OF THE KNOWLEDGE OF
THE ENGINEERS AND ARCHITECTS,
SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE
MINIMUM BUILDING CODES AND THE
APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
/1
/2
:0 :4
P
M
C U se rs
\A d a m
G o re ck i\ B
A L E n g in e e ri n g In c\ B
A L E n g in e e ri n g In c.
I n te rn a l -
D o cu m e n ts
P ro je ct s\
\2
D M
A C
F M
O P a lm e tt o \W o rk in g
D ra w in g s\
M
P
R
.r vt
AG
M0.2
SCHEDULES
T
H A
V E
W E
S T
P
A L M
E T
T O
F
L
1910.08
MARCH 30, 2026
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
N A
T
IO
N A
L G
U A
R D
A R
M O
R Y
D M
A C
F M
O
P A
L M
E T
T O
E S
P R
E N
O V
A T
IO
N
10. PROVIDE 18 INCH TALL INSULATED ROOF CURB.
9. PROVIDE WITH GREASE CUP.
8. PROVIDE WITH EXTENDED WEATHER HOOD INTAKE TO PROVIDE MIN. 10'-0" SEPARATION FROM EXHAUST FAN. INLET SHALL BE PROVIDED WITH ALUMINUM FILTER SCREEN.
7. PROVIDE COMBINATION SUPPLY AND EXHAUST FAN CURB CAP ADAPTOR TO EXISTING CURB. CONTRACTOR SHALL FIELD MEASURE PRIOR TO SUBMITTING FOR APPROVAL.
6. PROVIDE RETROFIT KITCHEN HOOD CONTROL WITH EXHAUST AIR STREAM TEMPERATURE AND SPACE TEMPERATURE FOR AUTOMATIC CONTROL OF THE KITCHEN HOOD SUPPLY AND EXHAUST FAN.
5. UL-762, RESTAURANT EXHAUST.
4. EXHAUST FAN SHALL BE INTERLOCKED WITH AHU-1 AND AHU-2 TO RUN SIMULTANEOUSLY.
3. PROVIDE WITH BIRDSCREEN.
2. PROVIDE WITH FACTORY MOUNTED AND WIRED DISCONNECT SWITCH AND FSC SPEED CONTROLLER COMPATIBLE WITH SUPPLIED MOTOR.
1. AS MANUFACTURED BY GREENHECK OR EQUAL.
NOTES
KSF-1 KITCHEN HOOD KSQ-12-M2 Direct 1,164 1.000 1,750 0.45 1/2 115/60/1 9.8 12.2 20 1,2,7,8,10
KEF-1 KITCHEN HOOD CUE-130-A Direct 1,596 1.000 1,725 0.59 3/4 15.0 115/60/1 13.8 17.2 30 1,2,5,6,7,9,10
EF-2 WOMEN'S LOCKER G-100-VG Direct 700 0.250 1,041 0.06 1/4 4.9 115/60/1 3.8 4.8 15 1,2,3,4,10
EF-1 MEN'S LOCKER G-120-VG Direct 800 0.250 863 0.06 1/4 5.3 115/60/1 3.8 4.8 15 1,2,3,4,10
TAG AREA SERVED MODEL DRIVE TYPE VOLUME (CFM)
EXTERNAL SP
(IN WG)
FAN SPEED
(RPM)
OPERATING
POWER
(HP)
MOTOR SIZE
(HP)
SONES
(INLET)
ELECTICAL
V/C/P
NEC FLA
(AMPS)
MIN CIRCUIT
AMPACITY
(MCA)
MAX
OVERCURRENT
PROTECTION
(MOP)
NOTES
230000
M FAN SCHEDULE
6. RECTANGULAR SURFACE MOUNT HEAVY DUTY GYMNASIUM RETURN GRILLE. REFER TO PLANS FOR DETAILS AND
QUANTITIES.
5. RECTANGULAR MIAMI-DADE QUALIFIED AND FLORIDA PRODUCT APPROVED STATIONARY VERTICAL BLADE WIND DRIVEN
RAIN EXTRUDED ALUMINUM LOUVER
4. RECTANGULAR LOUVERED SURFACE MOUNT RETURN GRILLE. REFER TO PLANS FOR DETAILS AND QUANTITIES
3. SQUARE LOUVERED FACE LAY-IN CEILING RETURN GRILLE. REFER TO PLANS FOR DETAILS AND QUANTITIES
2. RECTANGULAR SURFACE MOUNT SUPPLY AIR GRILLE. REFER TO PLANS FOR DETAILS AND QUANTITIES.
1. SQUARE CONE LAY-IN CEILING SUPPLY AIR DIFFUSER. REFER TO PLANS FOR DETAILS AND QUANTITIES.
NOTES 6 5 4 ---
MODEL 98LA EVH-501D 635 ---
MANUFACTURER PRICE GREENHECK PRICE ---
ACCESSORIES --- BIRD SCREEN --- ---
FINISH BY ARCH. BY ARCH. --- ---
MATERIAL ALUMINUM ALUMINUM ALUMINUM ---
TYPE RETURN INTAKE LOUVER TRANSFER GRILLE ---
ITEM NO. RG-3 L-1 TG-1 ---
NOTES 1 2 3 4
MODEL ASCD 620 635 635
MANUFACTURER PRICE PRICE PRICE PRICE
FRAME LAY-IN 1" FLAT W/ SCREWS LAY-IN 1" FLAT W/ SCREWS
ACCESSORIES --- --- --- ---
FINISH WHITE WHITE WHITE WHITE
MATERIAL ALUMINUM ALUMINUM ALUMINUM ALUMINUM
TYPE SUPPLY SUPPLY RETURN/EXHAUST RETURN/EXHAUST
ITEM NO. SG-1 SG-2 RG-1/EG-1 RG-2/EG-2
233400
M AIR DEVICE SCHEDULE
1 06-17-26 ADDENDUM 02
1,238 9 1,450 Zone Totals: 119 0 120 0 120
130 CORRIDOR 166 0 125 0 0.06 10.0 0 10 0 10
129 OFFICE 6 199 2 240 5 0.06 21.9 0 20 0 20
128 OFFICE 5 201 2 280 5 0.06 22.1 0 23 0 23
127 OFFICE 4 200 2 275 5 0.06 22.0 0 23 0 23
126 OFFICE 3 196 2 180 5 0.06 21.8 0 15 0 15
123 COMMANDER'S... 276 1 350 5 0.06 21.6 0 29 0 29
AHU-3[N]
(ft²) (CFM) (CFM/Person) (CFM/ft²) (CFM) (CFM) (CFM) (CFM) (CFM)
Zone Name / Space Name Floor Area
Maximum Occupants
Maximum Supply Air
Required Outdoor Air
Required Outdoor Air
Required Outdoor Air Total
Required Exhaust Air Total
Provided Outdoor Air Total
Provided Exhaust Air Total
Space Pressure
VENTILATION SCHEDULE
891 21 1,400 Zone Totals: 158 0 195 0 195
122 1ST SGT OFFICE 265 1 300 5 0.06 20.9 0 42 0 42
120 TRAINING RM 1 626 20 1,100 5 0.06 137.6 0 153 0 153
AHU-4[N]
(ft²) (CFM) (CFM/Person) (CFM/ft²) (CFM) (CFM) (CFM) (CFM) (CFM)
Zone Name / Space Name Floor Area
Maximum Occupants
Maximum Supply Air
Required Outdoor Air
Required Outdoor Air
Required Outdoor Air Total
Required Exhaust Air Total
Provided Outdoor Air Total
Provided Exhaust Air Total
Space Pressure
VENTILATION SCHEDULE
BUILDING TOTAL 315 13,841 3,753 TOTAL BUILDING PRESSURE 2,253
AHU-7[E] 3 1,293 140 0.06 0.00 46.6 0 140
AHU-6[N] 4 1,889 165 0.05 0.00 41.2 1,500 -1,335
AHU-5[E] 28 1,114 134 0.06 5.00 4.8 0 134
AHU-4[N] 21 891 195 0.06 5.00 9.3 0 195
AHU-3[N] 9 1,238 120 0.06 4.17 13.3 0 120
AHU-1[E]&AHU-2[E] 250 7,416 3000 0.06 6.67 12.0 0 3,000
SYSTEM
SYSTEM POP.
(PEOPLE)
SYSTEM AREA
(SF)
PROVIDED OA
(CFM)
AVERAGE
(CFM/SF)
AVERAGE
(CFM/PERSON)
EFFECTIVE OA
(CFM/PERSON)
PROVIDED
EXHAUST AIR
ZONE PRESSURE
230000
M BUILDING PRESSURE SUMMARY
7. PROVIDE CONCRETE HOUSEKEEPING PAD AND ANCHOR CONDENSING UNIT TO PAD PER DETAILS.
6. COOLING ONLY MODEL. PROVIDED FOR PROCESS COOLING, NO HEAT.
5. PROVIDE REFRIGERANT PIPING PENETRATION SYSTEME EQUAL TO AIREX TITAN OUTLET WITH
E-FLEX GUARD. COORDINATE EXACT MODEL WITH MANUFACTURER'S RECCOMENDED...
4. PROVIDE MANUFACTURER'S INTEGRAL CONDENSATE PUMP.
3. CONTROLS & POWER TO INDOOR UNIT IS WIRED FROM OUTDOOR CONDENSING UNIT.
2. PROVIDE MANUFACTURER'S WIRED PROGRAMMABLE THERMOSTAT.
1. NEW EVAPORATOR TO BE INSTALLED ON MANUFACTURER'S WALL BRACKET. REFER TO DETAILS.
NOTES:
NOTES --- 1-7
MODEL --- PUY-AK12NL
MANUFACTURER --- MITSUBISHI
WEIGHT LBS. 99
COMPRESSOR POWER MCA/MOCP 16/27
MINIMUM UNIT HSPF2 WATT/HR --
MINIMUM UNIT SEER2/EER2 BTUH/WATT 21.1 / 14.8
ELECTRICAL V/PH./HZ. 208-230/1/60
LOCATION --- EXTERIOR PAD
REFRIGERANT --- R454B
CIRCUITS NO. 1
QUANITY OF COMPRESSORS --- 1
AMBIENT TEMPERATURE °F 95
NOMINAL CAPACITY TONS 1
ITEM NO. --- MSCU-1
MODEL --- MSY-GS12NA
MANUFACTURER --- MITSUBISHI
LOCATION --- 109-MECH/ELECT COMM.
UNIT POWER MCA SEE MCU-2
WEIGHT LBS. 28
CONTROLS --- SEE NOTES 2 & 3
ELECTRICAL V/PH./HZ. 208-230/1/60
HEATING CAPACITY BTUH NONE
OUTSIDE AIR CFM 0
SUPPLY AIR (HIGH/MED/LOW) CFM 265/310/385
TOTAL COOLING CAPACITY BTUH 12,200
ITEM NO. --- MAC-1
233700
M DUCTLESS SPLIT SYSTEM SCHEDULE
8 PROVIDE A PROGRAMMABLE THERMOSTAT CAPABLE OF CONTROLLING TO BOTH SPACE TEMPERATURE AND HUMIDITY.
7 PROVIDE UNIT WITH A REFRIGERANT REHEAT SYSTEM CAPABLE OF INCREASING THE TEMPERATURE OF THE SUPPLY AIR BY TEN DEGREES FOR HUMIDITY CONTROL.
6. PROVIDE A DOUBLE WALL FOAM INJECTED UNIT WITH MODULATING HOT GAS REHEAT COIL IN THE REHEAT POSITION.
5.
PROVIDE A CONDENSER COIL COATING WITH A MINIMUM OF 10,000 HOURS IN THE ASTM B-117 SALT SPRAY TEST. COATING MAY NOT DECREASE HEAT TRANSFER BY MORE THAN 1%.
ADSIL MICROGUARD AND LUVATA INSITU ARE APPROVED. BAKE PHENOLIC COATINGS ARE NOT ACCEPTABLE.
4. PROVIDE CONDENSING UNIT WITH A LOW AMBIENT HEAD PRESSURE CONTROLLER.
3. PROVIDE START UP PERFORMED BY A FACTORY AUTHORIZED TECHNICIAN.
2. PROVIDE DIRECT DRIVE SUPPLY FAN.
1. CONTRACTOR SHALL VERIFY EXISTING UNIT INFORMATION AND PROVIDE IN SCHEDULE FOR AS-BUILT.
NOTES --- 1 1 2 THRU 8 2 THRU 8 1 1 1
CU MODEL --- 5TTA4042A3 5TTA4048A3
AHU MODEL --- 5TEM6D05AV41 5TEM6D05AV41
MANUFACTURER --- TRANE TRANE
LOCATION --- OUTDOOR PAD OUTDOOR PAD OUTDOOR PAD OUTDOOR PAD OUTDOOR PAD OUTDOOR PAD OUTDOOR PAD
OPERATING WEIGHT LBS 246 246
MCA/MOCP @ 208V AMPS/AMPS 16.3 / 25 16.3 / 25
ELECTRICAL V/PH/HZ 208/3/60 208/3/60
CIRCUITS NO. 1 1
QUANTITY OF COMPRESSORS NO. 1 1
COMPRESSOR (EACH) RLA / LRA 12.2 / 120.4 12.2 / 120.4
AMBIENT TEMPERATURE °F 95 95 95 95 95 95 95
CAPACITY TONS 18.1 (2)10.8 3.5 4.0 5.0 4.0 2.5
ITEM NO. --- CU-1[E] CU-2A[E], CU-2B[E] CU-3[N] CU-4[N] CU-5[E] CU-6[E] CU-7[E]
LOCATION --- 116 MECHANICAL 116 MECHANICAL 121 MECHANICAL 2 121 MECHANICAL 2 116 MECHANICAL 109 MECH./ELECT. 132 MECH RM
OPERATING WEIGHT LBS 155 155
EFFICIENCY EER2/SEER2 12.0 / 15.2 12.0 / 15.2
EFFICIENCY EER/IEER --- ---
MCA/MOCP @ 208V AMPS/AMPS 45.0 / 45 32.0 / 45
ELECTRICAL V/PH/HZ 208/1/60 208/1/60
MERV RATING --- 13 13
PRESSURE DROP CLEAN/FINAL IN. WTR./IN. WTR. 0.05/0.60 0.05/0.60
THICKNES INCHES 2" 2"
FILTER TYPE --- PLEATED PLEATED
STEPS --- 1 1
ELECTRIC HEATER KW @ 208V 5.77 5.77
LVG. AIR TEMP. DB/WB °F / °F 57.3 / 55.2 56.7 / 54.4
ENT. AIR TEMP. DB/WB °F / °F 77.5 / 64.8 77.8 / 65.3
REFRIGERANT TYPE --- R-454B R-454B
COOLING COIL ROWS/FINS 4 / 14 3 / 16
FAN WHEEL TYPE --- VARIABLE FC VARIABLE FC
DRIVE TYPE --- DIRECT DIRECT
MOTOR SIZE BHP/HP ---/0.50 ---/0.50
AIR PRESSURE LOSS EXT./TOT. IN. WTR./IN. WTR. 0.5/--- 0.5/---
OUTSIDE AIR CFM 1,500 1,500 120 195 240 165 140
SUPPLY AIR CFM 5,500 7,000 1,450 1,400 1,200 1,625 950
NET SENSIBLE COOLING... BTUH 173,760 204,768 31,245 31,552 28,440 36,613 21,546
NET TOTAL COOLING CAPACITY BTUH 217,200 259,200 40,815 44,767 36,000 47,401 29,893
ITEM NO. --- AHU-1[E] AHU-2[E] AHU-3[N] AHU-4[N] AHU-5[E] AHU-6[E] AHU-7[E]
237313
M CENTRAL STATION DX AIR HANDLING UNITS 1
F E
F E
F E
F E
REF
F E
FE
T
T T
T
T
T
T
X X X
22"x12"[E]
"x
E
"x
E
16"x10"[E] 10"x8"[E]
20"x12"[E]
"x
E
"x
E
"x
E
"x
E
"x
E
"x
E
12"ø[E]
10"ø[E]
10"ø[E]
44"x6"[E]
18"x6"[E]3
"x
E
28"x12"[E]
8"x8"[E]
8"ø[E]
8"ø[E]
8"ø[E]
18"x10"[E]
"x
E
30"x6"[E]
"x
E
10"x8"[E]
24"x20"[E]
8"ø[E]
8"ø[E]
8"ø[E]
8"ø[E]
8"ø[E]
"ø
[E
"ø
[E
"ø
[E
10"x10"[E]
"x
E
"x
E
14"x6"[E]
"x
E
"x
E
20"x6"[E]
"x
E
"x
E
"x
E
"x
E
10"ø[E]
"x
E
"x
E
10"ø[E]
10"ø[E]
10"ø[E]
10"ø[E]
12"ø[E]
"ø [E
"ø [E
"x
E
8"ø[E]
8"ø[E]
"ø
[E
"ø
[E
"x
E
20"x6"[E]
20"x6"[E]
"x
E
CU-2[E] CU-2B[E]
CU-5[E]
1 2 3 4 5 6 7
A
B
C
D
E
F
G
H
I
CU-7[E]
CU-6[D]
CU-3[D]
CU-4[D]
"x
E
CU-1[E]
"x
E
AHU-6[E]
AHU-7[E]
AHU-3[D]
AHU-4[D]
AHU-5[E]
AHU-1[E]
AHU-2[E]
4 4
ENTRY
VESTIBULE
RECRUITER
OFFICE
RECRUITER
CLST.
103WOMENS
VEST
WOMENS
LATRINE
WOMENS
CHANGING
105A
WOMENS
SHOWER
105B
MENS
VEST
MENS LATRINE
MENS
CHANGING
107AMENS SHOWER
107B
MAIL / COPY
ROOM
MECH/ ELECT.
COMMUNICATIONS
VAULT
VAULT
SUPPLY AREA
MECH RM
EQUIPMENT
AREA
TABLES/
CHAIRS
VESTIBULE
VENDING
MECHANICAL
EXECUTIVE
OFFICER
MAIL ROOM
TRAINING
ROOM 1
GYM
MECHANICAL 1
PLT LDR'S
OFFICE
PLT SGT.
OFFICE
KITCHEN MESS
PORCH
OFFICE 3
COMMANDER
READINESS
NCO
TRAINING NCO
BTRY STAFF
DRILL HALL
VESTIBULE
118A
EDH-1[E]
EDH-2[E]
(2) SG-3[E]
8"x8"NK
150 CFM
SG-1[E]
8"øNK
200 CFM
SG-1[E]
8"øNK
200 CFM
SG-1[E]
8"øNK
200 CFM
R-1[E] 24"x20"NK
810 CFM
RG-2[E]
36"x10"NK
665 CFM
RG-1[E]
22"x22"NK
425 CFM
EG-1[E]
16"x10"NK
300 CFM
EG-1[E]
18"x12"NK
500 CFM
SG-2[E]
10"øNK
370 CFM
SG-2[E]
6"øNK
100 CFM
EG-1[E]
18"x12"NK
500 CFM
TG-1[E]
18"x10"NK
330 CFM
TG-1[E]
18"x10"NK
330 CFM
EG-1[E]
16"x10"NK
200 CFM
SG-2[E]
10"øNK
260 CFM
SG-2[E]
6"øNK
100 CFM
TG-1[E]
18"x10"NK
340 CFM
TG-1[E]
18"x10"NK
340 CFM
SG-2[E]
8"øNK
180 CFM
RG-1[E]
10"x10"NK
335 CFM
SG-2[E]
8"øNK
155 CFM
SG-2[E]
8"øNK
140 CFM
RG-1[E]
12"x12"NK
215 CFM
SG-2[E]
8"øNK
120 CFM
SG-2[E]
8"øNK
120 CFM
SG-2[E]
8"øNK
140 CFM
SG-2[E]
8"øNK
125 CFM
RG-1[E]
12"x12"NK
255 CFM
RG-1[E]
8"x8"NK
100 CFM
SG-2[E]
8"øNK
125 CFM
SG-2[E]
8"øNK
150 CFM
RG-1[E]
10"x10"NK
170 CFM
SG-2[E]
8"øNK
180 CFM
SG-2[E]
10"øNK
350 CFM
RG-1[E]
10"x10"NK
325 CFM
RG-1[E]
10"x10"NK
325 CFM
RG-1[E]
22"x22"NK
880 CFM
SG-2[E]
10"øNK
250 CFM
ø10"
SG-2[E]
10"øNK
275 CFM
SG-2[E]
10"øNK
250 CFM
SG-2[E]
10"øNK
275 CFM
RG-2[E]
10"x10"NK
170 CFM
TG-2
12"x8"NK
170 CFM
RG-2[E]
10"x10"NK
170 CFM
TG-2
12"x8"NK
170 CFM
SG-2[E]
12"øNK
250 CFM
SG-2[E]
10"øNK
175 CFM
SG-2[E]
10"øNK
175 CFM
SG-2[E]
12"øNK
250 CFM
SG-2[E]
10"øNK
150 CFM
SG-2[E]
12"øNK
250 CFM
RG-1[E]
6"x6"NK
350 CFM
RG-1[E]
22"x22"NK
725 CFM
RG[D]
48"x42"NK
5500 CFM
RG[D]
48"x42"NK
4000 CFM
SG-1[E]
10"øNK
320 CFM
AHU-5[D]
RG-1[E]
10"x10"NK
250 CFM
SG-2[E]
8"øNK
225 CFM
SG-2[E]
8"øNK
200 CFM
SG-3[E]
8"x4"NK
50 CFM
TG-2[E]
24"x6"NK
0 CFM
TG-2[E]
24"x6"NK
0 CFM
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
CONSULTING ENGINEERS
154A Whitaker Rd.
Lutz, Florida 33549
813.333.2103 www.balengineering.com
Registry No. 31211
TO THE BEST OF THE KNOWLEDGE OF
THE ENGINEERS AND ARCHITECTS,
SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE
MINIMUM BUILDING CODES AND THE
APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
/1
/2
:0 :4
P
M
C U se rs
\A d a m
G o re ck i\ B
A L E n g in e e ri n g In c\ B
A L E n g in e e ri n g In c.
I n te rn a l -
D o cu m e n ts
P ro je ct s\
\2
D M
A C
F M
O P a lm e tt o \W o rk in g
D ra w in g s\
M
P
R
.r vt
AG
M1.1
GROUND FLOOR
MECHANICAL
DEMOLITION PLAN
T
H A
V E
W E
S T
P
A L M
E T
T O
F
L
1910.08
MARCH 30, 2026
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
N A
T
IO
N A
L G
U A
R D
A R
M O
R Y
D M
A C
F M
O
P A
L M
E T
T O
E S
P R
E N
O V
A T
IO
N
1/8" = 1'-0"M1.1
1 Ground Level Mechanical Demolition Plan
DEMOLITION NOTES
GENERAL PLAN NOTES
1. REFERENCE DRAWING M0.1 FOR ABI LIST, REVIEW REQUIREMENTS OF THE ABI'S TO BE FAMILIAR WITH
HOW A DECLINE OR ACCEPTANCE OF EACH ABI AFFECTS THE SCOPE OF WORK OUTLINED ON THESE
DRAWINGS.
1. EXISTING AIR HANDLER, CONDENSATE PIPING, AND DRAIN PAN TO BE REMOVED.
2. EXISTING CONDENSING UNIT AND REFRIGERANT PIPING TO BE REMOVED.
3. EXISTING THERMOSTAT TO BE REMOVED.
4. EXISTING DUCTWORK TO BE CLEANED.
5. EXISTING DRYWELL, ROCK/GRAVEL AND PIPING TO BE REMOVED.
6. EXISTING MOTORIZED CONTROL DAMPER TO REMAIN.
7. EXISTING MOTORIZED CONTROL DAMPER TO BE REMOVED.
8. EXISTING RETURN GRILLE TO BE REMOVED.
9. EXISTING AIR HANDLER, CONDENSATE PIPING AND DRAIN PAN TO REMAIN.
10. EXISTING CONDENSING UNIT TO REMAIN.
11. EXISTING CONDENSATE PIPING TO BE CUT AT 6” ABOVE GRADE. REMOVE UNDERGROUND PIPING TO
DRYWELL.
12. EXISTING DUCT HEATER TO REMAIN. CONTRACTOR TO CONFIRM OPERATION AND REPORT TO GENERAL
CONTRACTOR.
13. REMOVE EXISTING CONDENSATE PIPING BACK TO AIR HANDLER.
N
1 06-17-26 ADDENDUM 02
/4
1/4" / 1'-0"
1/4" / 1'-0"
/4
1/4" / 1'-0"
/4
1 2 3 4 5 6 7
A
B
C
D
E
F
G
H
I
EF-1[D]
EF-2[D]
KEF-1
KSF-1
OAI-1[E]
"x
E
12"ø[E]
12"ø[E]
12"ø[E]
12"ø[E]
12"ø[E]
12"ø[E]
12"ø[E]
"x
E
56"x14"[E]
"x
E
12"ø[E]
"x
E
"x
E
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
490 CFM
SG-[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
510 CFM
SG-1[E]
12"øNK
490 CFM
SG-1[E]
12"øNK
490 CFM
42"x14"[E]24"x14"[E]
"x
E
12"ø[E]
12"ø[E]
"x
E
12"ø[E]
"x
E
24"x14"[E]
"x
E
24"x14"[E]
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
CONSULTING ENGINEERS
154A Whitaker Rd.
Lutz, Florida 33549
813.333.2103 www.balengineering.com
Registry No. 31211
TO THE BEST OF THE KNOWLEDGE OF
THE ENGINEERS AND ARCHITECTS,
SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE
MINIMUM BUILDING CODES AND THE
APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
/1
/2
:0 :4
P
M
C U se rs
\A d a m
G o re ck i\ B
A L E n g in e e ri n g In c\ B
A L E n g in e e ri n g In c.
I n te rn a l -
D o cu m e n ts
P ro je ct s\
\2
D M
A C
F M
O P a lm e tt o \W o rk in g
D ra w in g s\
M
P
R
.r vt
AG
M1.2
ROOF AND HIGH
CEILING
MECHANICAL
DEMOLITION PLAN
T
H A
V E
W E
S T
P
A L M
E T
T O
F
L
1910.08
MARCH 30, 2026
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
N A
T
IO
N A
L G
U A
R D
A R
M O
R Y
D M
A C
F M
O
P A
L M
E T
T O
E S
P R
E N
O V
A T
IO
N
1/8" = 1'-0"M1.2
1 Mezzanine Level Mechanical Demolition Plan
DEMOLITION NOTES
1. EXISTING DUCTWORK TO BE CLEANED.
2. EXISTING OA INTAKE TO REMAIN
3. EXISTING EXHAUST FAN TO BE REMOVED.
4. EXISTING KITCHEN EXHAUST AND MAKE-UP FANS TO BE REMOVED. EXISTING COMBINATION CURB TO BE REMOVED.
5. EXISTING ROOF JACK TO REMAIN.
GENERAL PLAN NOTES
1. REFERENCE DRAWING M0.1 FOR ABI LIST, REVIEW REQUIREMENTS OF THE ABI'S TO BE FAMILIAR WITH
HOW A DECLINE OR ACCEPTANCE OF EACH ABI AFFECTS THE SCOPE OF WORK OUTLINED ON THESE
DRAWINGS.
N
1 06-17-26 ADDENDUM 02
F E
F E
F E
F E
REF
F E
F E
F E
F E
F E
F E
FEFE
FD
FD
FD
FD
FP
S S
WAP
S
FP
S S
S
FP
FP
FPFP
T
T
T/H
T
T T H
T
T/H
1 2 3 4 5 6 7
A
B
C
D
E
F
G
H
I
AHU-5[E]
AHU-1[E]
CU-5[E]
CU-2B[E]CU-2[E]
CU-1[E]
AHU-6[E]
CU-6[D]
AHU-2[E]
CU-3[N]
CU-4[N]
AHU-4[N]
AHU-3[N]
AHU-7[E]
10 1
ENTRY
VESTIBULE
RECRUITER
OFFICE
RECRUITER
CLST.
WOMENS
VEST
WOMENS
LATRINE
WOMENS
CHANGING
105A
WOMENS
SHOWER
105B
MENS
VEST
MENS LATRINE
MENS
CHANGING
107A
MENS SHOWER
107B
MAIL / COPY
ROOM
MECH/ ELECT.
COMMUNICATIONS
VAULT
VAULT
SUPPLY AREA
MECH RM
EQUIPMENT
AREA
TABLES/
CHAIRS
VESTIBULE
VENDING
MECHANICAL
EXECUTIVE
OFFICER
MAIL ROOM
TRAINING
ROOM 1
GYM
MECHANICAL 1
PLT LDR'S
OFFICE
PLT SGT.
OFFICE
KITCHEN MESS
PORCH
OFFICE 3
COMMANDER
READINESS
NCO
TRAINING NCO
BTRY STAFF
DRILL HALL
7MAC-1[N]
MCU-1[N]2
SG-2[E]
10"øNK
275 CFM
SG-2[E]
10"øNK
250 CFM
SG-2[E]
10"øNK
250 CFM
SG-2[E]
10"øNK
275 CFM
SG-2[E]
12"øNK
250 CFM
SG-2[E]
10"øNK
175 CFM
SG-2[E]
10"øNK
175 CFM
SG-2[E]
12"øNK
250 CFM
SG-2[E]
10"øNK
150 CFM
SG-2[E]
12"øNK
250 CFM
SG-1[E]
10"øNK
320 CFM
(2) SG-3[E]
8"x8"NK
150 CFM
(2) TG-2[E]
24"x6"NK
0 CFM
R-1[E] 24"x20"NK
810 CFM
SG-1[E]
8"øNK
200 CFM
SG-1[E]
8"øNK
200 CFM
SG-1[E]
8"øNK
200 CFM
SG-2[E]
8"øNK
200 CFM
SG-2[E]
8"øNK
225 CFM
SG-2[E]
10"øNK
370 CFM
SG-2[E]
10"øNK
260 CFM
SG-2[E]
8"øNK
180 CFM
SG-2[E]
8"øNK
155 CFM
SG-2[E]
6"øNK
100 CFM
SG-2[E]
8"øNK
140 CFM
SG-2[E]
8"øNK
140 CFM
SG-2[E]
8"øNK
125 CFM
SG-2[E]
8"øNK
120 CFMSG-2[E]
8"øNK
120 CFM
SG-2[E]
8"øNK
125 CFM
SG-2[E]
8"øNK
150 CFM
SG-2[E]
8"øNK
180 CFM
SG-2[E]
10"øNK
350 CFM
"x
E
"x
E
"x
E
"x
E
20"x12"[E]
"x
E
14"x8"[E] 10"ø[E]
12"x8"[E]
12"x8"[E]
14"x12"[E]
12"ø[E]
28"x12"[E]28"x12"[E]
"x
E
44"x6"[E]
"x
E
10"ø[E]
8"x8"[E]
"x
E
"x
E
"x
E
18"x10"[E]
22"x12"[E]
"x
E
"x
E
24"x12"[E]
20"x6"[E]
20"x6"[E]
16"x10"[E]
"x
E
10"x8"[E]
14"x6"[E]
"x
E
30"x6"[E]
"x
E
"x
E
"x
E
"x
E
SG-2
8"x6"NK
175 CFM
RG-1[E]
10"x10"NK
325 CFM
TG-2
12"x8"NK
170 CFM
TG-2
12"x8"NK
170 CFM
RG-2[E]
10"x10"NK
170 CFM
RG-2[E]
10"x10"NK
170 CFM
RG-2[E]
36"x10"NK
665 CFM
SG-3[E]
8"x4"NK
50 CFM
RG-1[E]
6"x6"NK
350 CFM
8"ø[E]
8"ø[E]
8"ø[E]
"ø [E
] 1
"ø [E
"ø
[E
"ø
[E
"x
E
8"ø[E]
10"x10"[E]
"x
E
20"x12"[E]
SG2[E]
8"x6"NK
175 CFM
RG-1[E]
10"x10"NK
325 CFM
RG-1[E]
12"x12"NK
255 CFM
RG-1[E]
8"x8"NK
100 CFM
RG-1[E]
10"x10"NK
250 CFM
RG-1[E]
12"x12"NK
215 CFM
RG-1[E]
10"x10"NK
170 CFM
RG-1[E]
10"x10"NK
335 CFM
EG-1[E]
18"x12"NK
500 CFM
EG-1[E]
16"x10"NK
200 CFM
TG-1[E]
18"x10"NK
330 CFM
TG-1[E]
18"x10"NK
330 CFM
EG-1[E]
18"x12"NK
500 CFM
EG-1[E]
16"x10"NK
300 CFM
TG-1[E]
18"x10"NK
340 CFM
TG-1[E]
18"x10"NK
340 CFMSG-2[E]
6"øNK
100 CFM
RG-1[E]
22"x22"NK
425 CFM
MAC-1[N]
RG-1[E]
22"x22"NK
880 CFM
AHU-3[N]
OAI-1[E]
RG-1[E]
22"x22"NK
725 CFM
18"x6"[E]
RG-2
8"x4"NK
160 CFM
SG-2
8"x4"NK
160 CFM
AHU-4[N]3
6"ø[N]8"ø[N]
8"ø[N]
CU-7[E]
6"ø[N]
8"ø[N]
RG-3[N]
48"x42"
5000 CFM
RG-3[N]
48"x42"
5000 CFM
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
CONSULTING ENGINEERS
154A Whitaker Rd.
Lutz, Florida 33549
813.333.2103 www.balengineering.com
Registry No. 31211
TO THE BEST OF THE KNOWLEDGE OF
THE ENGINEERS AND ARCHITECTS,
SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE
MINIMUM BUILDING CODES AND THE
APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
/1
/2
:0 :4
P
M
C U se rs
\A d a m
G o re ck i\ B
A L E n g in e e ri n g In c\ B
A L E n g in e e ri n g In c.
I n te rn a l -
D o cu m e n ts
P ro je ct s\
\2
D M
A C
F M
O P a lm e tt o \W o rk in g
D ra w in g s\
M
P
R
.r vt
AG
M2.1
GROUND FLOOR
MECHANICAL
RENOVATION PLAN
T
H A
V E
W E
S T
P
A L M
E T
T O
F
L
1910.08
MARCH 30, 2026
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
N A
T
IO
N A
L G
U A
R D
A R
M O
R Y
D M
A C
F M
O
P A
L M
E T
T O
E S
P R
E N
O V
A T
IO
N
1/8" = 1'-0"M2.1
1 Ground Level Mechanical Renovation Plan
RENOVATION NOTES
GENERAL PLAN NOTES
1. REFERENCE DRAWING M0.1 FOR ABI LIST, REVIEW REQUIREMENTS OF THE ABI'S TO BE FAMILIAR WITH
HOW A DECLINE OR ACCEPTANCE OF EACH ABI AFFECTS THE SCOPE OF WORK OUTLINED ON THESE
DRAWINGS.
1. INSTALL NEW AIR HANDLER IN NEW DRAIN PAN ON NEW 6" CONCRETE PADS, MODIFY DUCTWORK AS NEEDED TO
ACCOMMODATE NEW UNIT.
2. INSTALL A NEW CONDENSING UNIT ON NEW 6" HIGH CONCRETE PAD. REFER TO DETAIL FOR CONDENSING UNIT TIE
DOWN.
3. INSTALL NEW THERMOSTAT WITH HUMIDITY CONTROL IN NEW LOCATION.
4. INSTALL NEW HUMIDITY SENSORS FOR DEHUMIDIFIERS ASSOCIATED WITH AHU-1 & 2.
5. ROUTE NEW INSULATED REFRIGERANT AND CONDENSATE PIPING THROUGH EXISTING SLEEVED PENETRATION IN
EXTERIOR WALL.
6. BASE BID: CONTRACTOR SHALL PROVIDE AND INSTALL NEW DRYWELL MIN. 10' FROM BUILDING STRUCTURE. REFER
TO DETAIL FOR ADDITIONAL INFORMATION.
ABI NO. 1: NEW 4” DRAIN TO NEW STORM WATER COLLECTION SYSTEM. COORDINATE CONNECTION AND TIE-IN WITH
CIVIL CONTRACTOR IN ACCORDANCE WITH ABI NO.1.
7. EXISTING GREASE HOOD TO REMAIN. RECERTIFY EXISTING ANSUL SYSTEM. PROVIDE NEW CAPTIVE AIR FAN CONTROLLER AND SENSORS FOR CONTROL OF NEW EXHAUST AND SUPPLY FAN ON ROOF. EXISTING KITCHEN
EQUIPMENT TO REMAIN AS-IS.
8. BASE BID: NO SCOPE
ABI NO.8: INSTALL NEW MUNTERS MODEL DEW-50 TURNKEY CONFIGURATION DEHUMIDIFIER. REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS FOR INSTALLATION REQUIREMENTS. REFER TO VAULT WALL
PENETRATION DETAIL.
9. INSTALL NEW WALL MOUNTED MINI-SPLIT, EXTEND CONDENSATE PIPING TO CONNECT TO AHU-6 CONDENSATE DRAIN
THROUGH WALL.
10. EXISTING CONDENSING UNIT TO REMAIN.
11. BASE BID: NO SCOPE
ABI NO. 8: Z-DUCT THROUGH VAULT WALL. MIN. 18” LEGS. ALL CONSTRUCTION SHALL BE WELDED ¼” STEEL PLATE
WITH 1/2” REBAR 3” O.C. EACH DIRECTION AND INSET ON EACH END BY 2”
12. BASE BID: NO SCOPE
ABI NO. 8: EXTEND 8X4 RELIEF DUCT UP THROUGH ROOF.
13. INSTALL NEW DEHUMIDIFIER EQUAL TO MUNTERS HC-300 TIED INTO THE RETURN DUCT OF THE AIR HANDLER IN ACCORDANCE WITH MANUFACTURE RECOMMENDATIONS. REACTIVATION AIR SHALL BE DUCTED TO EXTERIOR WALL AND TERMINATED WITH A WALL VENT INLET / OUTLET UNIT FEATURES A 6KW HEATER AT 240V/1 AND A FLA OF 31A.
14. INSTALL NEW WALL VENT EQUAL TO CANARM WHA SERIES WITH BIRD SCREEN.
15. INSTALL NEW MUNTERS MODEL DEW-50 TURNKEY CONFIGURATION DEHUMIDIFIER. REFER TO MANUFACTURERS
INSTALLATION INSTRUCTIONS FOR INSTALLATION REQUIREMENTS.
N
1 06-17-26 ADDENDUM 02
A
B
D
E
F
G
H
I
1 2 3 4 5 6
C
KEF-1[N]
KSF-1[N]
EF-1[N]
EF-2[N]
OAI-1[E]
"x
E
"x
E
"x
E
"x
E
"x
E
"x
E
12"ø[E]
"x
E
12"ø[E]
"x
E
24"x14"[E]
"x
E
56"x14"[E] 42"x14"[E]
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
510 CFM
SG-[E]
12"ø NK
490 CFM
SG-[E]
12"øNK
490 CFM
BASE BID: NO SCOPE
ABI NO. 8: NEW RELIEF
VENT ON ROOF EQUAL
TO GREENHECK MODEL
FGR. INSTALLED IN
ACCORDANCE WITH
NOA LISTING.
SHEET NO.:
PROJECT NO.:
DATE:
SHEET TITLE:
DRAWN BY:
REVISIONS:
CONSULTING ENGINEERS
154A Whitaker Rd.
Lutz, Florida 33549
813.333.2103 www.balengineering.com
Registry No. 31211
TO THE BEST OF THE KNOWLEDGE OF
THE ENGINEERS AND ARCHITECTS,
SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE
MINIMUM BUILDING CODES AND THE
APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
/1
/2
:0 :4
P
M
C U se rs
\A d a m
G o re ck i\ B
A L E n g in e e ri n g In c\ B
A L E n g in e e ri n g In c.
I n te rn a l -
D o cu m e n ts
P ro je ct s\
\2
D M
A C
F M
O P a lm e tt o \W o rk in g
D ra w in g s\
M
P
R
.r vt
AG
M2.2
ROOF AND HIGH
CEILING
MECHANICAL
RENOVATION PLAN
T
H A
V E
W E
S T
P
A L M
E T
T O
F
L
1910.08
MARCH 30, 2026
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
N A
T
IO
N A
L G
U A
R D
A R
M O
R Y
D M
A C
F M
O
P A
L M
E T
T O
E S
P R
E N
O V
A T
IO
N
1/8" = 1'-0"M2.2
1 Upper Ceiling and Partial Roof Plan
RENOVATION NOTES
GENERAL PLAN NOTES
1. REFERENCE DRAWING M0.1 FOR ABI LIST, REVIEW REQUIREMENTS OF THE ABI'S TO BE FAMILIAR WITH
HOW A DECLINE OR ACCEPTANCE OF EACH ABI AFFECTS THE SCOPE OF WORK OUTLINED ON THESE
DRAWINGS.
1. INSTALL NEW EXHAUST FANS ON EXISTING CURBS. PROVIDE CURB ADAPTERS AS NEEDED.
2. INSTALL NEW KITCHEN EXHAUST AND MAKE-UP AIR FAN ON NEW CURBS, COORDINATE ROOF WORK WITH
GENERAL CONTRACTOR.
3. EXISTING ROOF JACK TO REMAIN.
4. EXISTING OUTSIDE AIR INTAKE TO REMAIN.
5. CONNECT NEW SUPPLY DUCTWORK TO EXISTING HIGH IN CHASE.
6. INSTALL NEW MANUAL VOLUME DAMPER AT EACH SUPPLY MAIN.
N
1 06-17-26 ADDENDUM 02
| Sheets |
| M0.1 - NOTES, LEGENDS, AND SCHEDULES |
| M0.2 - SCHEDULES |
| M1.1 - GROUND FLOOR MECHANICAL DEMOLITION PLAN |
| M1.2 - ROOF AND HIGH CEILING MECHANICAL DEMOLITION PLAN |
| M2.1 - GROUND FLOOR MECHANICAL RENOVATION PLAN |
| M2.2 - ROOF AND HIGH CEILING MECHANICAL RENOVATION PLAN |
| 2026-06-16T17:53:56-0400 | |
| Bryant A Lyle |