These are structural engineering drawings for a Veterans Affairs hospital renovation project located in Lake City, Florida, focusing on correcting patient privacy deficiencies in the 2N and 2S areas. The drawings, part of Project #573A4-18-603, provide detailed structural design specifications for floor framing, steel details, concrete reinforcement, and equipment support structures across multiple floors.
Key technical details include design for Air Handling Units (AHU-1, AHU-2, AHU-3, AHU-4), patient lift rail supports (including bariatric and standard capacities), and structural modifications involving steel beam replacements, concrete slab reinforcement, and strategic beam/column connections. The design follows International Building Code (IBC) standards, incorporates seismic design requirements, and specifies precise structural elements like steel channels, wide flange beams, HSS tubes, and reinforced concrete with specific rebar configurations. The drawings indicate a comprehensive renovation approach that maintains structural integrity while addressing specific functional improvements for patient care spaces.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN CODES
1.01 2018 INTERNATIONAL BUILDING CODE (IBC) AS MODIFIED BY:
A. ANSI/ASCE 7-16, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
B. VA SEISMIC DESIGN REQUIREMENTS H18-8. 2020 EDITION
C. VA STRUCTURAL DESIGN MANUAL FOR HOSPITALS, FEBRUARY 1, 2014
D. VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL OCTOBER 1, 2020
1.02 AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
A. ANSI/AISC 360-16, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS
1.03 AMERICAN CONCRETE INSTITUTE (ACI)
A. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
DESIGN LOADS
1.01 DESIGN LOADS ARE AS FOLLOWS:
A. ROOF:
1. DEAD LOADS:
a. EXISTING ROOF: SELF WEIGHT OF EXISTING MATERIALS PLUS 15 PSF
2. LIVE LOADS:
a. ROOF: 20 PSF UNREDUCIBLE
B. FLOOR:
1. DEAD LOADS:
a. EXISTING FLOOR SLAB: SELF WEIGHT OF EXISTING MATERIAL PLUS 15 PSF
b. EQUIPMENT PLATFORM: SEE BELOW
2. LIVE LOADS:
a. EXISTING FLOOR SLAB: 40 PSF
b. PLATFORM: 60 PSF
3. DESIGN BASIS AHU LOADS REF DESIGN BASIS AHU-1 V5 & AHU -2V5 TRANE OUTDOOR UNITS FOR VAMC LAKE
CITY DATED 09/05/23
4. DESIGN BASIS PATIENT LIFT LOADS AND SUPPORT SPACING. HANDICARE 650 LB (USE C800LB) AND C1000LB CAPACITY FOR BARIATRIC. MAX SINGLE ROD SUPPORT SPACING 56" FOR C800LB CAPACITY AND 46" FOR
C1000LB CAPACITY.
5. FLOOD LOADS:
a. N/A: NOT IN FLOOD HAZARD AREA
6. SNOW LOADS:
a. N/A: NOT APPLICABLE
C. WIND LOADS:
1. DESIGN WIND SPEED = Vult 141 MPH
2. WIND EXPOSURE = C
3. RISK CATEGORY = IV
D. SEISMIC LOADS
a. RISK CATEGORY = IV
b. SITE CLASS = D
c. SEISMIC IMPORTANCE FACTOR = 1.5
d. MAPPED SPECTRAL RESPONSE ACCELERATIONS:
1) Ss = 0.086
2) S1 = 0.015
e. SPECTRAL RESPONSE COEFFICIENTS:
1) SDS = 0.092
2) SD1 = 0.082
f. SITE COEFFICIENTS:
1) Fa = 1.6
2) Fv = 2.4
g. SEISMIC DESIGN CATEGORY = C
h. SITE CLASS = D
i. COMPONENT AMPLIFICATION FACTOR (Ap) = 1.5
j. COMPONENT RESPONSE MODIFICATION FACTOR (Rp) = 2.5
k. ANALYSIS PROCEDURE = EQUIVALENT LATERAL FORCE PROCEDURE
l. MECHANICAL COMPONENT ANCHORAGE: Fp = 0.061Wp
1.02 DEFLECTION CRITERIA: REFER TO TABLE 1604.3 FOR DEFLECTION LIMITS.
UNIT IDENTIFIER
AHU-1
AHU-2
AHU-3
AHU-4
MAX DIMENSIONS
L (IN) W (IN) H (IN)
MAX WEIGHT (LBS)
286.7 80 111.7
286.5 80 111.7
286.7 80 111.7
286.5 80 111.7
7,682
7,733
7,682
7,733
GENERAL STRUCTURAL NOTES
1.01 ELEVATIONS AS SHOWN ON THE STRUCTURAL DRAWINGS ARE ELEVATIONS RELATIVE TO THE EXISTING
TOP OF ROOFING.
1.02 WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION OR NOTE IS SHOWN FOR ONE CONDITION, IT SHALL APPLY FOR ALL SIMILAR OR LIKE CONDITIONS UNLESS OTHERWISE NOTED.
1.03 THE STRUCTURAL DESIGN OF THE STRUCTURE, IS BASED ON THE FULL INTERACTION OF ALL ITS COMPONENT PARTS, WITH NO PROVISION MADE FOR CONDITIONS OCCURRING DURING CONSTRUCTION.
THEREFORE, CONTRACTOR SHALL PROVIDE ADEQUATE BRACING AND TEMPORARY SHORING DURING
CONSTRUCTION IN ACCORDANCE WITH APPLICABLE STANDARDS.
1.04 CONTRACTOR IS RESPONSIBLE FOR ALL JOB SITE SAFETY INCLUDING THE SAFE RIGGING, LIFTING, BRACING AND SETTING OF MATERIALS AND EQUIPMENT IN ACCORDANCE WITH APPLICABLE STANDARDS.
1.05 FURNISH AND INSTALL ALL NECESSARY ATTACHMENTS, ANCHORAGES AND ACCESSORIES TO PROVIDE A
COMPLETE STRUCTURALLY SOUND STRUCTURE WITH A CONTINUOUS LOAD PATH. BRING ANY
DISCONTINUITIES TO THE ATTENTION OF THE STRUCTURAL ENGINEER IMMEDIATELY.
1.06 FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF FABRICATION OR CONSTRUCTION.
BRING ANY DISCREPANCIES ALONG WITH DETAILED FIELD SKETCHES OF AS-BUILT CONDITIONS TO THE
ATTENTION OF THE STRUCTURAL ENGINEER IMMEDIATELY.
1.07 COORDINATE AND VERIFY ALL DIMENSIONS AND DETAILS WITH THE EXISTING, CIVIL, PROCESS, ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, SHOP AND
SUBMITTAL DRAWINGS. NOTIFY THE COR IMMEDIATELY OF ANY DISCREPANCIES
1.08 EXISTING DRAWINGS FOR HOSPITAL BUILDING NO.64 DATED 11/10/52 ARE TO BE CONSIDERED A PART OF
THE CONSTRUCTION CONTRACT DOCUMENTS.
SHOP DRAWINGS
1.01 STRUCTURAL DRAWINGS INDICATE TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. SHOP DRAWINGS SHALL DETAIL ALL CONDITIONS IN ACCORDANCE WITH SPECIFIED STANDARDS AND THE SPECIFIC
REQUIREMENTS OF THIS PROJECT AS INDICATED ON THE DRAWINGS.
EXISTING CONDITIONS:
1.01 AS WITH ANY WORK AFFECTING EXISTING CONSTRUCTION, UNFORESEEN CONDITIONS ARE
UNAVOIDABLE WITHOUT DEMOLISHING OTHERWISE SERVICEABLE CONSTRUCTION, DISRUPTING
OCCUPIED OPERATIONS AND INCURRING SIGNIFICANT COST FOR CLOSE UP EXAMINATION AND
NON-DESTRUCTIVE TESTING DURING THE DESIGN STAGE.
1.02 WITH THE PASSAGE OF TIME SINCE THE CREATION OF AS-BUILT DRAWINGS AND/OR THE
DESIGNERS SURVEY, BOTH CONCEALED AND VISIBLE CONDITIONS MAY HAVE CHANGED DUE TO
ALTERATIONS, ADDITIONS, RENOVATIONS, AND DETERIORATION.
1.03 PRIOR TO THE COMMENCEMENT OF ANY WORK IN PREPARATION OF CONSTRUCTION RELATED
ACTIVITIES, INCLUDING BUT NOT LIMITED TO SHOP DRAWING PREPARATION, ALL BURIED,
EMBEDDED, OR CONCEALED ITEMS LIKELY TO BE ENCOUNTERED DURING CONSTRUCTION SHALL
BE LOCATED AND MARKED ON THE SURFACE. THIS WORK SHALL BE ACCOMPLISHED BY
DESTRUCTIVE AND/OR NON-DESTRUCTIVE MEANS WITHOUT IMPAIRING THE STRUCTURAL
INTEGRITY OF THE ASSOCIATED MEMBERS. SHORING AS REQUIRED SHALL BE DESIGNED BY A
PROFESSIONAL STRUCTURAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT, AND
FURNISHED AND INSTALLED AT NO ADDITIONAL COST.
1.04 THE OWNER/CLIENT SHALL CARRY A CONTINGENCY TO ALLOW FOR ADDITIONAL DESIGN AND
CONSTRUCTION COSTS ASSOCIATED WITH UNFORESEEN EXISTING CONDITIONS.
DEMOLITION AND REMOVAL:
1.01 GENERAL
A. PERFORM ALL DEMOLITION WORK INCLUDING REMOVAL, TRANSPORT, AND DISPOSAL PER
ALL FEDERAL, STATE AND LOCAL RULES AND REGULATIONS.
1.02 EXISTING CONDITIONS
A. BEFORE BEGINNING ANY DEMOLITION WORK, SURVEY THE SITE AND EXAMINE THE
DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE
WORK. PHOTOGRAPH EXISTING CONDITIONS AND RECORD EXISTING ELEVATIONS OF
FINISH FLOORS, FOUNDATIONS, ETC.
B. SCAN EXISTING CONCRETE FOR EMBEDDED ITEMS UTILIZING RADAR. NOTIFY COR
IMMEDIATELY IN THE EVENT THAT EMBEDDED ITEMS ARE DISCOVERED THAT ARE NOT ON
THE STRUCTURAL DRAWINGS. DETERMINE WHAT THE EMBEDDED ITEM IS AND THE
PURPOSE IT SERVES. DO NOT PROCEED WITH DEMOLITION OF THE AFFECTED AREA
UNTIL AUTHORIZED TO BY THE GOVERNMENT.
1.03 DUST, DEBRIS AND NOISE CONTROL
A. CONFINE NOISE AND DUST TO IMMEDIATE WORK AREA.
B. CONTRACTOR SHALL REMOVE AND DISPOSE OFF-SITE ALL MATERIALS INDICATED TO BE
DEMOLISHED AND REMOVED, RUBBISH AND DEBRIS DAILY INCLUDING DUST AND DIRT.
1.04 ITEMS TO REMAIN IN PLACE
A. TAKE PRECAUTIONS TO AVOID DAMAGE TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE
REUSED OR TO REMAIN THE PROPERTY OF THE OWNER.
B. DO NOT DISTURB EXISTING CONSTRUCTION BEYOND THE EXTENT INDICATED OR
NECESSARY FOR INSTALLATION OF THE NEW WORK.
C. PROTECT NEW WORK FROM DAMAGE AS A RESULT OF SUBSEQUENT WORK.
D. DO NOT OVERLOAD EXISTING PAVEMENT, FOUNDATIONS OR WORK TO REMAIN.
E. INCREASE STRUCTURAL SUPPORT OR ADD NEW SUPPORTS AS MAY BE REQUIRED AS A
RESULT OF DEMOLITION WORK INCLUDING BUT NOT LIMITED TO CUTTING, REMOVAL, AND
DECONSTRUCTION.
F. PROVIDE NEW SUPPORTS AND REINFORCEMENT FOR EXISTING CONSTRUCTION
WEAKENED BY DEMOLITION, DECONSTRUCTION, OR REMOVAL WORK.
G. PROVIDE TEMPORARY SHORING AND BRACING FOR SUPPORT OF BUILDING COMPONENTS
TO PREVENT SETTLEMENT OR OTHER MOVEMENT.
H. COMPLY WITH ALL OSHA REGULATIONS INCLUDING BUT NOT LIMITED TO EXCAVATION
SUPPORT.
I. REPAIR OR REPLACE DAMAGED ITEMS AT NO COST TO THE GOVERNMENT.
1.05 PAVING AND SLABS
A. PROVIDE NEAT SAWCUTS AT LIMITS OF PAVEMENT OR SLABS TO BE REMOVED. REMOVE
CONCRETE AND ASPHALTIC PAVING AND SLABS INCLUDING BASE AS REQUIRED FOR THE
NEW WORK.
B. PROVIDE SHORING AND/OR LAY BACK SIDES OF EXCAVATION AS REQUIRED NOT TO
UNDERMINE ADJACENT PAVING OR SLABS.
C. LAP AND TAPE NEW TO EXISTING VAPOR BARRIER TO CREATE A MOISTURE PROOF SEAL.
1.06 UTILITIES AND RELATED EQUIPMENT
A. DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR USED FACILITIES
WITHOUT FIRST COORDINATING WITH THE GOVERNMENT.
STRUCTURAL STEEL NOTES:
1.01 PART 1 GENERAL
A. GENERAL REQUIREMENTS
1. DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE MANUAL OF STEEL CONSTRUCTION, BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION, INC.
B. SUBMITTALS
1. SHOP DRAWINGS: ERECTION AND FABRICATION DRAWINGS. SHOP DRAWINGS SHALL NOT
CONTAIN REPRODUCTIONS OF THE CONTRACT DRAWINGS. MEMBER SUBSTITUTION AND DEVIATIONS FROM THE CONTRACT DRAWINGS SHALL BE CLEARLY IDENTIFIED WITH AN EXPLANATION FOR THE
PROPOSED DEVIATION.
C. DELIVERY, STORAGE AND HANDLING
1. PROTECT FROM CORROSION, DEFORMATION, AND OTHER TYPES OF DAMAGE. STORE ITEMS IN
AN ENCLOSED AREA FREE FROM CONTACT WITH SOIL AND WEATHER. REMOVE AND REPLACE DAMAGED
ITEMS WITH NEW ITEMS.
1.02 PRODUCTS
A. MATERIALS:
1. ALL WIDE FLANGE W'S & WT'S SHALL BE IN CONFORMANCE WITH ASTM A 992, LATEST ADOPTED EDITION, UNO.
2. ALL OTHER SHAPES, PLATES AND BARS SHALL BE IN CONFORMANCE WITH ASTM A 36, LATEST ADOPTED
EDITION, UNO.
3. ALL SQUARE, RECTANGULAR AND ROUND TUBING SHALL BE IN CONFORMANCE WITH ASTM A 500, LATEST
ADOPTED EDITION, GRADE B.
4. ALL ROUND PIPE SHALL BE IN CONFORMANCE WITH ASTM A 53, LATEST ADOPTED EDITION, GRADE B.
5. BOLTS SHALL CONFORM TO F 1852 (A 325) TYPE 1 LOAD INDICATOR BOLTS, UNO.
6. THREADED RODS SHALL COMPLY WITH ASTM A 36, LATEST ADOPTED EDITION, UNO.
7. HARDENED STEEL WASHERS SHALL COMPLY WITH ASTM F 436.
8. HEAVY HEX NUTS SHALL COMPLY WITH ASTM A 563.
9. GROUT (WHERE SHOWN OR REQUIRED) SHALL BE NON-SHRINK, NON-METALLIC FACTORY PREMIXED
GROUT HAVING A COMPRESSIVE STRENGTH OF 6800PSI AT 28 DAYS.
B. FABRICATION
1. ALL NATURAL AND FABRICATED CAMBER SHALL BE INSTALLED UPWARD.
2. THE MINIMUM THICKNESS OF GUSSET AND FIN PLATES SHALL BE 3/8 IN.
3. BOLTED CONNECTIONS:
a. BOLTS IN MOMENT CONNECTIONS SHALL BE SLIP CRITICAL
b. ALL OTHERS MAY BE CONSIDERED AS "BEARING" TYPE N.
c. THE MINIMUM NUMBER OF BOLTS IN STRUCTURAL STEEL CONNECTIONS SHALL BE AS FOLLOWS:
1) A MINIMUM OF TWO BOLTS PER CONNECTION SHALL BE USED, UNO.
C. FINISH
1. HOT DIPPED GALVANIZED: ALL STRUCTURAL STEEL PERMANENTLY EXPOSED TO THE WEATHER, INCLUDING BRICK SHELF ANGLES SHALL BE HOT-DIPPED GALVANIZED IN ACCORDANCE WITH ASTM A153.
2. HOT-DIP GALVANIZING
a. SURFACE PREPARATION:
1) REMOVE BY BLAST-CLEANING, OR OTHER METHODS, SURFACE CONTAMINANTS AND COATINGS
THAT ARE NOT REMOVABLE BY THE NORMAL CHEMICAL CLEANING PROCESS IN THE
GALVANIZING OPERATION.
2) PRE-CLEAN STEEL WORK IN ACCORDANCE WITH ACCEPTED METHODS TO PRODUCE AN
ACCEPTABLE SURFACE FOR QUALITY HOT-DIP GALVANIZING.
b. MATERIAL SPECIFIED TO BE GALVANIZED SHALL BE HOT DIP GALVANIZED AFTER FABRICATION ON THE SAME DAY THE SURFACE IS SANDBLASTED OR PICKLED. GALVANIZING SHALL OCCUR BEFORE
ASSEMBLY.
c. CLIPS AND OTHER STRUCTURAL MEMBERS THAT ARE TO RECEIVE WELDING OR OTHERWISE COME INTO CONTACT WITH AUSTENITIC STAINLESS STEEL SHALL NOT BE GALVANIZED OR PAINTED WITH
ZINC RICH COATINGS.
d. GALVANIZE STEEL MEMBERS, FABRICATIONS AND ASSEMBLIES AFTER FABRICATION BY THE HOT- DIP PROCESS IN ACCORDANCE WITH ASTM A 123 / 123M. CRANE RAILS SHALL NOT BE GALVANIZED.
e. GALVANIZE BOLTS, NUTS, WASHERS AND IRON AND STEEL HARDWARE COMPONENTS IN
ACCORDANCE WITH ASTM A 153 / 153M OR B695. ASTM A 490 / 490M BOLTS SHALL NOT BE
GALVANIZED.
f. NUTS SHALL BE TAPPED OVERSIZE IN ACCORDANCE WITH ASTM A563 / A563M. NUT THREADS SHALL
BE RETAPPED AFTER HOT-DIP GALVANIZING TO PROVIDE A PROPER FIT.
g. DIRECT TENSION INDICATORS SHALL BE MECHANICALLY GALVANIZED BY THE MANUFACTURER IN
ACCORDANCE WITH CLASS 50 OF ASTM B695.
h. SAFEGUARD PRODUCTS AGAINST STEEL EMBRITTLEMENT IN CONFORMANCE WITH ASTM A 143.
i. FABRICATION DETAILS SHALL MEET THE REQUIREMENTS OF ASTM A385 TO ALLOW FOR THE
CREATION OF HIGH-QUALITY ZINC COATINGS.
j. WHENEVER PRACTICAL, CUTTING, DRILLING, AND WELDING SHALL BE PERFORMED BEFORE
GALVANIZING. THE FABRICATOR SHALL REMOVE WELD SLAG BEFORE GALVANIZING.
k. THE EDGES OF TIGHTLY CONTACTING SURFACES SHALL BE COMPLETELY SEAL WELDED.
l. VENT HOLES SHALL BE PROVIDED FOR PIPING OR TUBULAR ASSEMBLIES AS REQUIRED BY ASTM
A385.
m. POTENTIAL PROBLEMS THAT REQUIRE A MODIFICATION IN DESIGN SHALL BE BROUGHT TO THE
ATTENTION OF THE BUYER BY THE FABRICATOR BEFORE PROCEEDING.
n. HANDLE ALL ARTICLES TO BE GALVANIZED IN SUCH A MANNER AS TO AVOID ANY MECHANICAL
DAMAGE AND TO MINIMIZE DISTORTION.
o. SURFACE FINISH SHALL BE CONTINUOUS, ADHERENT, AS SMOOTH AND EVENLY DISTRIBUTED AS
POSSIBLE AND FREE FROM ANY DEFECT DETRIMENTAL TO THE STATED END USE OF THE COATED
ARTICLE.
p. ADHESION SHALL WITHSTAND NORMAL HANDLING CONSISTENT WITH THE NATURE AND THICKNESS
OF THE COATING AND NORMAL USE OF THE ARTICLE.
q. QUALITY CONTROL
1) INSPECTION AND TESTING OF HOT-DIPPED GALVANIZED COATINGS SHALL BE DONE IN
ACCORDANCE WITH THE AMERICAN GALVANIZERS ASSOCIATION (AGA) PUBLICATION
"INSPECTION OF PRODUCTS HOT-DIPPED GALVANIZED AFTER FABRICATION".
2) INCLUDE VISUAL EXAMINATION AND TESTS IN ACCORDANCE WITH ASTM A 123 / 123M OR A 153 /
153M, AS APPLICABLE, TO DETERMINE THE THICKNESS OF THE ZINC COATING ON THE METAL
SURFACE.
3) FURNISH NOTARIZED CERTIFICATE OF COMPLIANCE WITH ASTM STANDARDS AND
SPECIFICATIONS HEREIN LISTED. THE CERTIFICATE MUST BE SIGNED BY A DULY AUTHORIZED
REPRESENTATIVE OF THE GALVANIZER AND CONTAIN A DETAILED DESCRIPTION OF THE
MATERIAL PROCESSED. THE CERTIFICATE SHALL INCLUDE INFORMATION AS TO THE ASTM
STANDARD USED FOR THE COATING.
4) THE BUYER RESERVES THE RIGHT TO INSPECT AND REJECT ALL GALVANIZED STEEL IN
ACCORDANCE WITH ASTM A123 AND ASTM E376.
r. REPAIR OF DAMAGED COATING
1) REPAIR OF ANY DAMAGED AND/OR UNCOATED AREAS SHALL BE REPAIRED IN ACCORDANCE
WITH ASTM A780.
2) BEFORE REPAIR OF GALVANIZED COATING, THE EXPOSED SUBSTRATE METAL SHALL BE
CLEANED TO BRIGHT METAL AND FREE OF ALL VISUAL RUST, OIL, OR GREASE. ANY
NONADHERING GALVANIZING SHALL BE REMOVED TO THE EXTENT THAT THE SURROUNDING
GALVANIZING IS INTEGRAL AND ADHERENT.
3) WHEN SURFACE DEFECTS EXCEED 2% OF A MEMBER'S AREA, THE DEFECTS SHALL BE
REPAIRED BY REDIPPING THE MEMBER IN THE ZINC BATH.
4) COLD REPAIR USING AN ORGANIC ZINC-RICH COATING IS ALLOWED IF THE TOTAL DAMAGED AREA IS LESS THAN 1% OF THE TOTAL COATED AREA OF THE MEMBER BEING REPAIRED AND NO SINGLE REPAIR IS GREATER THAN 2 SQUARE INCHES (1,300 SQUARE MM) OR 12 INCHES (300 MM) LONG. THE DRY FILM THICKNESS SHALL BE 2 MILS TO 3 MILS (0.05 MM TO 0.08 MM) AND
CONTAIN A MINIMUM OF 65% ZINC DUST BY WEIGHT.
5) HOT REPAIRS SHALL BE MADE IN THE SHOP IF ANY OF THE FOLLOWING CONDITIONS EXIST:
(1) TOTAL REPAIR AREA IS GREATER THAN 1%, BUT LESS THAN 2%, OF THE TOTAL COATED AREA
OF THE MEMBER BEING REPAIRED.
(2) ANY SINGLE REPAIR IS AT LEAST 2 SQUARE INCHES (1,300 SQUARE MM) IN AREA.
(3) ANY SINGLE REPAIR IS 12 INCHES (300 MM) LONG OR MORE.
6) HOT REPAIRS SHALL BE MADE USING ZINC ALLOY ROD OR POWDER MANUFACTURED FOR THE
REPAIR OF GALVANIZED STEEL.
7) FLUX, HEAVY ASH, OR HEAVY DROSS INCLUSIONS SHALL BE REMOVED BY BRUSHING, GRINDING, OR FILING AS REQUIRED.
8) GALVANIZED STEEL THAT HAS BEEN REJECTED SHALL BE STRIPPED, REGALVANIZED, AND
SUBMITTED AGAIN FOR INSPECTION.
LOCATION ZONE
EFFECTIVE
WIND AREA (SF)
ULTIMATE DESIGN WIND
PRESSURE
(PSF)
ROOF
WALLS
5 5 a = 10'-2 3/8" a a h a a
-43.8,+16.0
-37.1,+16.0
-34.2,+16.0
-25.2,+16.0
-25.2,+16.0
-25.2,+16.0
-57.8,+16.0
-49.2,+16.0
-45.5,+16.0
-78.8,+16.0
-61.5,+16.0
-54.1,+16.0
-27.3,+25.2
-24.7,+22.6
-23.6,+21.5
1'
6h 6h
.2 h
1'
POSITIVE
CASE A
ZONE 2
POSITIVE
CASE A
ZONE 3
NEGATIVE
CASE B
INTERIOR
ZONE
NEGATIVE
CASE B
CORNER
ZONE
PARAPETS
-33.6,+25.2
-28.4,+22.6
-26.2,+21.5
+74.6
+63.4
+58.5
+95.5
+75.7
+67.2
-44.0
-38.9
-36.6
-50.3
-42.6
-39.2
SHOP DRAWINGS: (CTD)
1.02 PHOTOCOPY REPRODUCTIONS OF THE CONTRACT DOCUMENTS WILL BE REJECTED AND CONTRACTOR WILL BE RESPONSIBLE FOR ANY ASSOCIATED DELAYS. STRUCTURAL DRAWINGS INDICATE TYPICAL AND CERTAIN SPECIFIC CONDITIONS ONLY. SHOP DRAWINGS SHALL DETAIL ALL CONDITIONS IN ACCORDANCE WITH SPECIFIED STANDARDS AND THE SPECIFIC REQUIREMENTS OF THIS PROJECT AS INDICATED ON THE DRAWINGS. THE PURPOSE OF SHOP DRAWINGS IS TO VERIFY THAT THE CONTRACTOR HAS INTERPRETED THE INTENT OF THE CONSTRUCTION DOCUMENTS CORRECTLY, DETAIL ALL CONDITIONS, INDEPENDENTLY CHECK, CONFIRM AND COORDINATE ALL DIMENSIONS AND DETAILS, TAKE FIELD MEASUREMENTS, VERIFY FIELD CONDITIONS, FUNCTIONALITY AND CONSTRUCTABILITY AS WELL AS COORDINATE WITH OTHER TRADES AND ACTUAL PRODUCTS PURCHASED. THE CONTRACT DRAWINGS ARE NOT INTENDED FOR THIS PURPOSE AND TRANSLATION OF ELECTRONIC MEDIA MAY NOT BE ACCURATE. THE USE OF PHOTOCOPY REPRODUCTIONS DEFEATS THE PURPOSE OF SHOP DRAWINGS AND DOING SO IS ENTIRELY AT THE
CONTRACTORS OWN RISK.
1.03 SUBMITTALS FOR DELEGATED DESIGNED COMPONENTS SHALL BE ACCOMPANIED BY DRAWINGS AND CALCULATIONS SEALED BY A STRUCTURAL ENGINEER REGISTERED IN THE STATE OF THE PROJECT. IN ADDITION, THESE SHOP DRAWINGS AND CALCULATIONS SHALL BE PREPARED UNDER THE DIRECT
SUPERVISION OF THE STRUCTURAL ENGINEER SEALING THIS WORK.
1.04 COMPONENTS OR SYSTEMS REQUIRING SPECIALTY STRUCTURAL ENGINEER DELEGATED DESIGN:
A) STRUCTURAL STEEL CONNECTIONS WHERE IDENTIFIED ON THE DRAWINGS OR IN SPECIFICATIONS.
B) PIPING SUPPORTS INCLUDING ANY SUPPLEMENTAL FRAMING REQUIRED TO FACILITATE A
CONTINUOUS LOAD PATH TO THE PRIMARY STRUCTURE.
C) TEMPORARY SHORING.
1.05 COMPLETE SHOP DRAWINGS FOR CONSTRUCTION OF EACH STRUCTURE COMPONENT NOT DESIGNED BY THE DESIGN TEAM-OF-RECORD AND NOT SPECIFIED ON THE PROJECT CONSTRUCTION DOCUMENTS SHALL BE SEALED AND SIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF THE PROJECT AND
SHALL BE AVAILABLE AT THE JOB SITE DURING THE TIMES OF INSPECTION.
1.06 REVIEW OF SUBMITTALS INCLUDING SHOP DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE SOLE
RESPONSIBILITY FOR ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF THOSE
SUBMITTALS.
1.07 SUBMITTALS SHALL BE REVIEWED BY THE CONTRACTOR, PRIOR TO SUBMISSION FOR ENGINEER'S REVIEW, FOR CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS AND AS-BUILT CONDITIONS. ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS SHALL BE CLEARLY NOTED ALONG WITH REASONS FOR THE
DEVIATION.
1.08 ALLOW A MINIMUM OF TWO CALENDAR WEEKS (14 DAYS), THREE CALENDAR WEEKS (21 DAYS) AT THANKSGIVING, CHRISTMAS AND NEW YEARS FROM RECEIPT OF SUBMITTALS AT THE ENGINEERS OFFICE FOR REVIEW. ALLOW TIME IN THE CONSTRUCTION SCHEDULE FOR SHIPPING AND PROCESSING TIME IN
ADDITION TO SUCH REVIEWS.
1.09 THE STRUCTURAL ENGINEER'S OBLIGATIONS TO REVIEW SHOP DRAWINGS AND OTHER SUBMITTALS AND TO RETURN THEM IN A TIMELY MANNER ARE CONDITIONED UPON THE PRIOR REVIEW AND APPROVAL OF THE SHOP DRAWINGS OR SUBMITTALS BY THE CONTRACTOR AS REQUIRED IN THE CONSTRUCTION CONTRACT AND THE CONTRACTOR'S SUBMITTAL OF THE SHOP DRAWINGS AND OTHER SUBMITTALS IN ACCORDANCE WITH A WRITTEN SCHEDULE DISTRIBUTED IN ADVANCE TO THE ENGINEER IDENTIFYING THE
DATES FOR THE SUBMITTAL OF THE VARIOUS SHOP DRAWINGS AND SUBMITTALS
SPECIAL INSPECTIONS:
1.01 SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH CHAPTER 17 OF THE BUILDING
CODE REFERENCED ABOVE AND AS DEFINED IN THE SPECIFICATIONS.
1.02 INSPECTION REPORTS SHALL BE FURNISHED TO THE GOVERNMENT, ARCHITECT, AND STRUCTURAL ENGINEER. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR, AND, IF
NOT CORRECTED, SHALL BE REPORTED TO THE GOVERNMENT, ARCHITECT, AND STRUCTURAL
ENGINEER.
REINFORCED CONCRETE NOTES:
1.01 CONCRETE DESIGN IS IN ACCORDANCE WITH THE BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE, ACI 318.
1.02 CONCRETE WORK SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE FIELD REFERENCE MANUAL: STANDARD SPECIFICATIONS FOR STRUCTURAL CONCRETE ACI 301 WITH SELECTED ACI AND ASTM
REFERENCES (SP-15).
1.03 SUBMIT REINFORCING STEEL SHOP DRAWINGS AND RECEIVE APPROVAL PRIOR TO FABRICATION OF SAME.
1.04 ALL CONCRETE SHALL BE NORMAL WEIGHT (145PCF) AND HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH
AS FOLLOWS UNLESS NOTED OTHERWISE:
A. f'c = 3000 PSI FOR FOUNDATIONS AND LOCATIONS NOT OTHERWISE NOTED.
B. f'c = 4,000 PSI FOR LIGHT WEIGHT CONCRETE FILL ON STEEL DECK. LIGHT WEIGHT AIR ENTRAINED
CONCRETE SHALL HAVE A FRESH UNIT WEIGHT OF 110-120 PCF AND AIR-DRIED UNIT WEIGHT
OF 107-116 PCF.
1.05 CONCRETE MIX DESIGN SUBMITTAL REQUIREMENTS:
A. FOR EACH UNIQUE MIX DESIGN/CODE PROPOSED, CLEARLY INDICATED WHICH COMPONENT THE MIX WILL
BE USED FOR. (E.G. FOOTING, EXTERIOR WALLS, INTERIOR WALLS, EXTERIOR SLAB ON GRADE, INTERIOR
SLAB ON GRADE, ELEVATED SLAB, MASONRY GROUT FILL, PAVING ETC.)
B. CEMENT: AMOUNT PER CUBIC YARD AND SUPPLIER.
C. FLYASH: AMOUNT PER CUBIC YARD, SUPPLIER, A HISTORY OF SUCCESSFUL USE OF FLYASH CONCRETE IN
SIMILAR APPLICATIONS.
D. AGGREGATE: AMOUNT PER CUBIC YARD, TYPE AND COMPOSITE GRADATION ANALYSIS INCLUDING BOTH
COARSE AND FINE.
E. WATER: AMOUNT PER CUBIC YARD AND WATER/CEMENT RATIO.
F. ADMIXTURES: TYPE, AMOUNT PER CUBIC YARD, PRODUCT DATA INDICATING ASTM COMPLIANCE AND
CHLORIDE ION CONTENT.
G. COMPRESSIVE TESTS OF PAST USAGE OF THE SUBMITTED MIX DESIGN INDICATING THE SAME MIX DESIGN
CODE.
1.06 WHEN STRENGTH DATA FROM FIELD EXPERIENCE OR TRIAL MIXTURES ARE NOT AVAILABLE, CONCRETE MIX
DESIGN SHALL COMPLY WITH THE FOLLOWING:
A. 4000 PSI NORMAL WEIGHT CONCRETE SHALL BE BASED ON A MAXIMUM AGGREGATE SIZE OF 1 IN., MAXIMUM
WATER/CEMENT RATIO OF .44 FOR NON-AIR-ENTRAINED AND.35 FOR AIR-ENTRAINED CONCRETE AND A
MAXIMUM SLUMP OF 3"
B. 3000 PSI NORMAL WEIGHT CONCRETE SHALL BE BASED ON A MAXIMUM AGGREGATE SIZE OF 1", MAXIMUM WATER/CEMENT RATIO OF.58 FOR NON-AIR-ENTRAINED AND.46 FOR AIR-ENTRAINED CONCRETE AND A
MAXIMUM SLUMP OF 4"
C. THE MAXIMUM SLUMPS SPECIFIED ABOVE SHALL NOT BE EXCEEDED PRIOR TO THE ADDITION OF WATER
REDUCING ADMIXTURES REGARDLESS OF THE EXISTENCE OF TEST DATA.
D. AIR ENTRAINED CONCRETE SHALL BE USED FOR EXTERIOR EXPOSED CONCRETE IN ACCORDANCE WITH
THE FOLLOWING:
1. MODERATE EXPOSURE BASED ON THE MAXIMUM NOMINAL AGGREGATE SIZE:
a. 3/4": 5 % +/- 1-1/2%
b. 1": 4.5 % +/- 1-1/2%
c. 1-1/2": 4.5 % +/- 1-1/2%
E. NORMAL WEIGHT AGGREGATE SHALL COMPLY WITH ASTM C 33.
F. LIGHTWEIGHT AGGREGATE, WHEN SPECIFIED SHALL COMPLY WITH ASTM C 330.
G. WHEN PERMITTED, THE WEIGHT OF FLYASH SHALL NOT EXCEED 25% OF THE WEIGHT OF CEMENT PLUS
POZZOLAN.
1.07 CONCRETE SLABS ON GRADE SHALL NOT BE LOADED UNTIL A MINIMUM CONCRETE STRENGTH OF 1800 PSI HAS
BEEN ATTAINED AND THE CONCRETE IS AT LEAST THREE DAYS OLD. ALL OTHER CONCRETE MEMBERS SHALL
NOT BE LOADED UNTIL THE SPECIFIED CONCRETE DESIGN STRENGTH HAS BEEN ATTAINED.
1.08 CONCRETE SHALL BE TESTED IN ACCORDANCE WITH ACI 301 AND THE SPECIFICATIONS, WHEN PROVIDED, FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. AT A MINIMUM, CONCRETE SPECIMENS SHALL BE TAKEN FOR EVERY 100 YARDS OR PORTION THEREOF FOR EACH MIX DESIGN PLACED IN A DAY. CONCRETE TEST REPORTS
SHALL BE AVAILABLE ON SITE FOR INSPECTION.
1.09 C.J. ON THE SLAB AND FOUNDATION PLAN INDICATES A KEY-FORMED CONSTRUCTION JOINT OR SAW-CUT CONTROL JOINT IN THE CONCRETE SLAB ON GRADE. SAW-CUT CONTROL JOINTS SHALL BE INSTALLED WITHIN 12 HOURS OF SLAB PLACEMENT. CONTINUE REINFORCEMENT THROUGH JOINTS UNLESS NOTED OTHERWISE, IN WHICH CASE DO NOT CUT REINFORCING STEEL. UNLESS OTHERWISE NOTED CONSTRUCTION AND/OR CONTROL JOINTS SHALL BE SPACED NO FARTHER APART THAN 15-FT. O.C. IN EACH DIRECTION CREATING
PANELS WITH AN ASPECT RATIO NOT GREATER THAN 2:1.
1.10 ALL STEEL REINFORCEMENT SHALL CONFORM WITH THE FOLLOWING:
A. DEFORMED BARS SHALL CONFORM WITH ASTM A 615 GRADE 60.
B. DEFORMED BARS THAT WILL BE WELDED SHALL CONFORM TO ASTM A 706 GRADE 60. WELDING SHALL BE IN
ACCORDANCE WITH AWS D1.4 STRUCTURAL WELDING CODE.
C. WELDED WIRE FABRIC (WWF) SHALL CONFORM WITH ASTM A 185, LATEST ADOPTED EDITION, 65 KSI YIELD
AND SHALL BE SUPPLIED IN FLAT SHEETS.
1. SLAB-ON-GRADE WWF SHALL BE SUPPORTED BY PLASTIC COATED CHAIRS OR CONCRETE BRICK 2"
BELOW THE TOP OF SLAB. THE USE OF CLAY BRICKS OR PULLING UP WWF DURING CONCRETE
PLACEMENT IS STRICTLY PROHIBITED. USE A MINIMUM OF 6 X 6 - W1.4 X W1.4.
2. WWF ABOVE FORMED SURFACES SHALL BE SUPPORTED BY PLASTIC COATED CHAIRS AT THE MID DEPTH
BETWEEN THE CONCRETE SURFACE AND TOP OF FORM OR FLOOR DECK FLUTE.
1.11 PROVIDE CONTINUOUS REINFORCEMENT WHEREVER POSSIBLE. SPLICE ONLY AS SHOWN OR APPROVED.
STAGGER SPLICES WHERE POSSIBLE. DOWELS SHALL MATCH SIZE AND SPACING OF THE SPECIFIED REINFORCEMENT AND SHALL BE LAPPED WITH TENSION SPLICES. UNLESS OTHERWISE NOTED, ALL REINFORCING SHALL BE CONTACT LAP SPLICED WITH A CLASS B SPLICE IN ACCORDANCE WITH ACI 318-11.
FOR BARS WITH A MINIMUM COVER AND SPACING GREATER THAN 2.0DB AND 3.0DB (DB = BAR DIAMETER) RESPECTIVELY, THE MINIMUM SPLICE LENGTH, EXPRESSED IN BAR DIAMETERS, SHALL NOT BE LESS THAN SPECIFIED IN THE REBAR SPLICE SCHEDULE. SPLICE LENGTHS SHALL BE INCREASED BY A FACTOR OF 1.3 FOR TOP REINFORCEMENT AND WHEN LIGHTWEIGHT CONCRETE IS USED. LAP WELDED WIRE FABRIC (WWF) ONE
SPACE PLUS 2" ON ALL SIDES AT SPLICES.
1.12 ALL DOWELS AND TERMINATING BARS SHALL HAVE A STANDARD 90-DEG HOOK UNO.
1.13 ALL HORIZONTAL REINFORCING SHALL BE CONTINUOUS AROUND CORNERS AND THROUGH CONSTRUCTION
JOINTS UNO.
1.14 CONCRETE COVER AT REINFORCEMENT:
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH -3"
B. FORMED CONCRETE EXPOSED TO WEATHER OR EARTH:
1. (#5 AND SMALLER) -1½ ".
2. (#6 TO #18) -2".
C. FORMED CONCRETE NOT EXPOSED TO WEATHER OR EARTH:
1. SLABS, WALL AND JOISTS:
a. # 11 BARS & SMALLER - 3/4".
2. BEAMS AND COLUMNS - 1½"
1.15 CORNER EDGES OF CONCRETE TO BE LEFT EXPOSED TO VIEW SHALL HAVE A CHAMFER OR RADIUS OR AS
INDICATED ON THE DRAWINGS.
1.16 CHECK ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND EQUIPMENT
DRAWINGS FOR EMBEDDED ITEMS AND PENETRATIONS PRIOR TO CONCRETE PLACEMENT
1.17 ALL CONSTRUCTION JOINTS SHALL HAVE A ROUGH SURFACE AND BE CLEAN PRIOR TO SUBSEQUENT
CONCRETE POUR.
1.18 NO HORIZONTAL CONSTRUCTION JOINTS WILL BE PERMITTED IN SLABS AND FOOTINGS UNO.
1.19 WHERE OPENINGS OCCUR IN SLABS AND WALLS, PLACE THE REINFORCING THAT NORMALLY OCCURS IN LINE
WITH THE OPENING EQUALLY TO EITHER SIDE OF THE OPENING.
1.20 CONCRETE SHALL RECEIVE THE FOLLOWING FINISHES:
A. EXTERIOR SLABS - BROOM FINISH IN DIRECTION OF SLOPE.
B. ALL OTHER CONCRETE - STEEL TROWEL FINISH
1.21 ALL CONCRETE SHALL BE CONSOLIDATED BY VIBRATION, SPADING, RODDING OR FORKING SO THAT THE CONCRETE IS THOROUGHLY WORKED AROUND THE REINFORCEMENT, AROUND EMBEDDED ITEMS, AND INTO CORNERS OF FORMS, ELIMINATING ALL AIR OR STONE POCKETS WHICH MAY CAUSE HONEYCOMBING, PITTING, OR PLANES OF WEAKNESS. IF VIBRATORS, OF ADEQUATE SIZE, ARE USED THEY SHALL BE INSERTED AND WITHDRAWN AT POINTS APPROXIMATELY 18 INCHES APART. AT EACH INSERTION, THE DURATION SHALL BE SUFFICIENT TO CONSOLIDATE THE CONCRETE BUT NOT SUFFICIENT TO CAUSE SEGREGATION (GENERALLY
FROM 5 TO 15 SECONDS).
1.22 MAINTAIN CONCRETE AFTER PLACEMENT WITH MINIMAL MOISTURE LOSS AT RELATIVELY CONSTANT TEMPERATURE FOR THE PERIOD NECESSARY FOR HYDRATION OF CEMENT AND HARDENING OF CONCRETE (NOT LESS THAN 7 DAYS). COMPLY WITH THE REQUIREMENTS OF ACI 308 - STANDARD PRACTICE FOR CURING CONCRETE; AMERICAN CONCRETE INSTITUTE. A COMBINATION CURING AND SEALING COMPOUND SHALL BE APPLIED AFTER THE CONCRETE HAS BEEN FINISHED OR THE FORMS REMOVED. COMPOUND SHALL BE IN ACCORDANCE WITH ASTM C309, LATEST ADOPTED EDITION, TYPE I, CLASS B. (DESIGN BASIS W.R. MEADOWS
CS-309).
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
Building #64
STRUCTURAL NOTES CORRECT PATIENT PRIVACY
DEFICIENCIES - BLDG
64-UNIT A LAKE CITY VAMC
Lake City, FL
S001
573A4-18-603
JANUARY 29, 2024
BID DOCUMENTS
DCASLW
BAR GRATING NOTES:
1.01 PART 1 GENERAL
A. GENERAL REQUIREMENTS: FABRICATE AND INSTALL BAR GRATING AND STAIR TREADS IN ACCORDANCE
WITH:
1. ANSI/NAAMM METAL BAR GRATING MANUAL MBG 531 (ALUMINUM AND LIGHT DUTY STEEL AND STAINLESS
STEEL GRATING)
B. SUBMITTALS
1. FIELD MEASURE EXISTING CONDITIONS PRIOR TO THE PREPARATION OF SHOP DRAWINGS AND
FABRICATION.
2. PRODUCT DATA AND SHOP AND SETTING DRAWINGS SHALL DEMONSTRATE COMPLIANCE WITH THE
LOADING CRITERIA, THE REQUIREMENTS CONTAINED HEREIN AND THE GRATING AND TREADS,
INCLUDING FASTENERS, SPECIFIED ON THE DRAWINGS.
C. QUALITY ASSURANCE
1. MANUFACTURER QUALIFICATIONS: A COMPANY SPECIALIZING IN THE MANUFACTURING OF METAL BAR
GRATINGS WITH NOT LESS THAN 5 YEARS DOCUMENTED EXPERIENCE.
2. INSTALLER QUALIFICATIONS: A COMPANY SPECIALIZING IN THE INSTALLATION OF METAL BAR GRATINGS
WITH NOT LESS THAN 5 YEARS DOCUMENTED EXPERIENCE.
3. WELDERS SHALL BE CERTIFIED IN ACCORDANCE WITH AWS D1.1/D1.1M FOR THE TYPE OF WELDING AND
POSITION UTILIZED ON THIS PORTION OF WORK. IF WELDERS CERTIFICATION IF MORE THAN ONE-YEAR OLD, WELDER SHALL BE ABLE TO DOCUMENT THAT THE WELDER HAS BEEN ENGAGED IN WELDING SINCE
THE DATE OF CERTIFICATION WITH NO BREAK IN SERVICE GREATER THAN 6 MONTHS.
D. DELIVERY, STORAGE AND HANDLING
1. PROTECT FROM CORROSION, DEFORMATION, AND OTHER TYPES OF DAMAGE. STORE ITEMS IN AN
ENCLOSED AREA FREE FROM CONTACT WITH SOIL AND WEATHER. REMOVE AND REPLACE DAMAGED
ITEMS WITH NEW ITEMS.
1.02 PART 2 PRODUCTS
A. MATERIALS
1. STEEL GRATING:
a. BEARING, CROSS AND CONNECTING BARS OF RECTANGULAR SECTION SHALL COMPLY WITH ASTM A
1011/A 1011M, LATEST ADOPTED EDITION, COMMERCIAL SERIES (TYPE 2) FOR HOT ROLLED CARBON
SHEET AND STRIP STEEL.
b. TOP SURFACE OF BEARING BARS SHALL HAVE THE FOLLOWING FINISH:
1) SERRATED
c. CROSS BARS MADE OF WIRE ROD SHALL COMPLY WITH ASTM A 510/A510M, LATEST ADOPTED EDITION, FOR CARBON STEEL WIRE RODS AND COARSE ROUND WIRE.
d. STAIR TREAD NOSING SHALL HAVE THE FOLLOWING FINISH:
1) ABRASIVE
e. STAIR TREAD BEARING BAR SPACING
1) PLAIN: 1 3/16" O.C.
2) SERRATED: 15/16" O.C.
f. FABRICATION:
1) PROVIDE 1/4" CLEARANCE AT ALL SIDES TO PERMIT EASY REMOVAL OF GRATING.
2) FABRICATE SECTIONS NOT TO EXCEED 25 SF (2.3M2) IN AREA AND 200 LBS (90 KG) IN WEIGHT.
3) FABRICATE SECTIONS OF GRATING WITH END-BANDING BARS.
4) FINISH GRATING PENETRATIONS WITH EDGE BANDING.
g. FINISHES:
1) GALVANIZED GRATING SHALL HAVE ALL EXPOSED SURFACES ZINC-COATED BY THE HOT DIP
PROCESS AFTER FABRICATION, WITH A COATING OF NOT LESS THAN 1.8 OZ/SF (550 G/M2) OF
COATED SURFACE.
2. FASTENERS:
a. REMOVABLE PANELS
1) STAINLESS STEEL SADDLE CLIPS WITH 1/4" STAINLESS STEEL FASTENERS.
1.03 PART 3 EXECUTION
A. EXAMINATION
1. PRIOR TO GRATING INSTALLATION, INSTALLER SHALL INSPECT SUPPORTS FOR CORRECT SIZE, LAYOUT
AND ALIGNMENT. ANY INCONSISTENCIES DEEMED DETRIMENTAL TO GRATING PLACEMENT SHALL BE
REPORTED AND REPAIRED PRIOR TO INSTALLATION.
B. INSTALLATION
1. INSTALL AND SECURE GRATING IN ACCORDANCE WITH APPROVED SHOP DRAWINGS AND STANDARD
INSTALLATION CLEARANCES IN ACCORDANCE WITH ANSI/NAAMM METAL BAR GRATING MANUAL.
2. CUTTING, FITTING AND PLACEMENT
a. PERFORM ALL CUTTING AND FITTING REQUIRED FOR INSTALLATION. GRATING SHALL BE PLACED
SUCH THAT CROSS BARS ALIGN.
b. WHEREVER GRATING IS PIERCED BY PIPES, DUCTS AND STRUCTURAL MEMBERS, CUT OPENINGS NEATLY AND ACCURATELY TO SIZE AND WELD RECTANGULAR BAND BAR OF THE SAME HEIGHT AND
MATERIAL AS THE BEARING BARS.
c. CUTOUTS FOR CIRCULAR OBSTRUCTIONS ARE TO BE AT LEAST 2" LARGER IN DIAMETER THAN THE
OBSTRUCTION.
d. UTILIZE STANDARD PANEL WIDTHS WHEREVER POSSIBLE.
3. GRATING ANCHORAGE
a. MECHANICALLY ANCHOR GRATING TO SUBSTRATE AT A SPACING NOT TO EXCEED 24 INCHES (600 MM) ON CENTER. A MINIMUM OF TWO FASTENERS PER PANEL SHALL BE USED AT EACH SUPPORT, WITH A MINIMUM OF FOUR FASTENERS PER PANEL. LOCATE FASTENERS 6" FROM EACH SIDE OF THE PANEL.
REMOVABLE GRATING PANELS SHALL BE FASTENED TO SUPPORT MEMBERS WITH U-SHAPE CLIPS, OR
BY CLIPS THAT WILL NOT CREATE A TRIPPING HAZARD.
C. FIELD QUALITY CONTROL
1. INSTALLATION TOLERANCES SHALL BE IN ACCORDANCE WITH THE METAL BAR GRATING MANUAL.
D. REPAIR
1. TOUCH-UP DAMAGED AND ABRADED GRATING WITH ZINC COATING AS RECOMMENDED BY THE GRATING
MANUFACTURER.
E. CLEANING AND PROTECTION
1. CLEAN AFTER INSTALLATION EXPOSED PREFINISHED ITEMS IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
F. PROTECT INSTALLED ITEMS FROM DAMAGE CAUSED BY SUBSEQUENT CONSTRUCTION.
POST-INSTALLED ANCHORS:
1.01 POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE SPECIFIED ON THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLING POST-INSTALLED ANCHORS IN PLACE OF MISSING OR MISPLACED CAST-IN-PLACE ANCHORS. CARE SHALL BE TAKEN IN PLACING POST-INSTALLED ANCHORS TO AVOID CONFLICTS WITH EXISTING REBAR. HOLES SHALL BE DRILLED AND CLEANED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
SUBSTITUTION REQUESTS, FOR PRODUCTS OTHER THAN THOSE SPECIFIED BELOW, SHALL BE SUBMITTED BY THE CONTRACTOR TO THE ENGINEER-OF-RECORD ALONG WITH CALCULATIONS THAT ARE PREPARED & SEALED BY A REGISTERED PROFESSIONAL ENGINEER. THE CALCULATIONS SHALL DEMONSTRATE THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING THE PERTINENT EQUIVALENT PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S)
AS REQUIRED BY THE BUILDING CODE.
1.02 CONCRETE ANCHORS
A. ADHESIVE ANCHORS FOR USE IN CRACKED AND UNCRACKED CONCRETE SHALL HAVE BEEN TESTED IN
ACCORDANCE WITH ACI 318 APPENDIX D.
B. ALL POST INSTALLED ANCHORS THAT ARE NOT PROPERLY INSPECTED IN ACCORDANCE WITH THE
APPROPRIATE ICC ESR CODE REPORT SHALL BE CONSIDERED TO HAVE ZERO CAPACITY AND CORRECTED BY THE CONTRACTOR AND INSPECTED DURING INSTALLATION AT NO COST TO THE GOVERNMENT.
C. ALL POST-INSTALLED ANCHORS SHALL BE DESIGNED, DETAILED, INSTALLED, AND INSPECTED WITH THE
APPROPRIATE ICC ESR CODE REPORT.
D. PRE-APPROVED ANCHOR MANUFACTURER
1) HILTI HY200 W/ HAS STD ROD IN ACCORDANCE WITH ICC ESR #3187
1.03 LOCATE ALL EXISTING REINFORCING, TENDONS, PIPES, CONDUIT OR OTHER ELEMENTS ENCASED IN EXISTING CONCRETE PRIOR TO DRILLING FOR INSTALLATION OF POST INSTALLED ANCHORS. DO NOT DAMAGE EXISTING REINFORCING, TENDONS, PIPES, CONDUIT, OR OTHER ELEMENTS ENCASED IN EXISTING CONCRETE. LOCATE EXISTING ENCASED ELEMENTS THROUGH NON-DESTRUCTIVE MEANS SUCH AS GPR.
DO NOT USE PILOT HOLES AS A MEANS OF INVESTIGATION.
STRUCTURAL DRAWING ABBREVIATIONS:
BOT BOTTOM
B/STL BOTTOM OF STEEL
C.J. CONSTRUCTION OR CONTROL JOINT
CONN CONNECTION
DIAG DIAGONAL
EA EACH
EF EACH FACE
EL ELEVATION
EMBED EMBEDMENT
EOS EDGE OF SLAB
EW EACH WAY
EXF EXISTING FOOTING
FF FAR FACE
FP FACE OF PANEL
FX FOOTING MARK NUMBER (SEE SCHEDULE)
HORIZ HORIZONTAL
IFW INSIDE FACE OF WALL
MAX. MAXIMUM
MIN. MINIMUM
NF NEAR FACE
OC ON CENTER
OFW OUTSIDE FACE OF WALL
PJF PREMOLDED JOINT FILLER
PLF POUNDS PER LINEAR FOOT
REF REFERENCE
REQ'D REQUIRED
RRS REBAR REINFORCING STEEL
SOG SLAB-ON-GROUND
STD STANDARD
T&B TOP AND BOTTOM
T/FTG TOP OF FOOTING
T/STL TOP OF STEEL
TYP TYPICAL
U.N.O. UNLESS NOTED OTHERWISE
VERT VERTICAL
WWR WELDED WIRE REINFORCEMENT
STRUCTURAL STEEL NOTES: (CTD)
9) CORRECTION OF EXCESSIVE WARPAGE (THAT EXCEEDS ASTM A6 / A6M) SHALL BE BY PRESS
STRAIGHTENING WHEN POSSIBLE. THE APPLICATION OF LOCALIZED HEATING TO
STRAIGHTEN MUST BE APPROVED BY THE ENGINEER OF RECORD.
10)IF GALVANIZED TENSION CONTROL BOLTS ARE USED, ALL BARE STEEL SURFACES (I.E. BOLT
ENDS) SHALL BE REPAIR GALVANIZED AS SPECIFIED ABOVE.
11)GALVANIZING PLANT REPAIR: THE MAXIMUM AREA TO BE REPAIRED IS DEFINED IN ACCORDANCE
WITH ASTM A123 / 123M.
12)FIELD REPAIR: REPAIR DAMAGE TO GALVANIZED COATINGS, WHENEVER DAMAGE EXCEEDS 3/16"
IN WIDTH, USING ASTM A780 / 780M ZINC RICH PAINT FOR GALVANIZING DAMAGED BY
HANDLING, TRANSPORTING, CUTTING, WELDING, OR BOLTING. DO NOT HEAT SURFACES TO
WHICH REPAIR PAINT HAS BEEN APPLIED. MINIMUM THICKNESS REQUIREMENTS FOR THE
REPAIR ARE THOSE DESCRIBED IN ASTM A123 / 123M.
D. FINISH (ALL OTHER STEEL)
1. SURFACE PREPARATION:
a. UNLESS NOTED OTHERWISE, SHOP CLEAN THE SURFACE OF ALL STRUCTURAL STEEL IN
ACCORDANCE WITH THE REQUIREMENTS OF SSPC-SP2.
2. PRIMER:
a. UNLESS NOTED OTHERWISE SHOP PAINT WITH A MINIMUM OF 1.0 MILS OF THE RUST INHIBITIVE
PRIMER.
3. FINISH COATING
a. PAINT AS DIRECTED BY THE ARCHITECT STANDARD COLORS AS SELECTED BY THE GOVERNMENT
1.03 PART 3 EXECUTION
A. EXAMINATION
1. PRIOR TO STRUCTURAL STEEL ERECTION, ERECTOR SHALL INSPECT EXISTING CONSTRUCTION FOR
CORRECT SIZE, LAYOUT AND ALIGNMENT. ANY INCONSISTENCIES DEEMED DETRIMENTAL TO THE
ERECTION OF STEEL SHALL BE REPORTED AND REPAIRED PRIOR TO INSTALLATION.
B. INSTALLATION
1. WELDED CONNECTIONS SHALL BE MADE WITH E70XX ELECTRODES IN ACCORDANCE WITH AWS D1.1, STRUCTURAL WELDING CODE BY THE AMERICAN WELDING SOCIETY, AND SHALL BE PERFORMED BY CERTIFIED WELDERS. WELDER CERTIFICATION SHALL BE AVAILABLE ON SITE FOR INSPECTION.
C. FIELD QUALITY CONTROL
1. TOLERANCES
a. MAXIMUM VARIATION FROM PLUMB: 1/4" (6 MM) PER STORY, NON-CUMULATIVE.
b. MAXIMUM OFFSET FROM TRUE ALIGNMENT
2. WELDED CONNECTIONS:
a. ALL WELDS SHALL BE VISUALLY EXAMINED.
b. 15% OF ALL WELDS SHALL BE TESTED IN ACCORDANCE WITH THE FOLLOWING METHODS:
1) TESTED BY THE LIQUID PENETRANT METHOD IN ACCORDANCE WITH ASTM E 165 OR THE MAGNETIC
PARTICLE METHOD IN ACCORDANCE WITH ASTM E 709.
D. REPAIR
1. PROTECTIVE COATINGS DAMAGED DURING THE TRANSPORTATION, ERECTION AND FIELD WELDING
PROCESSES SHALL BE REPAIRED IN THE FIELD TO MATCH THE SHOP APPLIED COATING.
E. CLEANING AND PROTECTION
1. CLEAN AFTER INSTALLATION EXPOSED PREFINISHED ITEMS IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
2. PROTECT INSTALLED ITEMS FROM DAMAGE CAUSED BY SUBSEQUENT CONSTRUCTION.
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
Building #64
STRUCTURAL NOTES CORRECT PATIENT PRIVACY
DEFICIENCIES - BLDG
64-UNIT A LAKE CITY VAMC
Lake City, FL
S002
573A4-18-603
JANUARY 29, 2024
BID DOCUMENTS
DCASLW
PLAN
NORTH
TRUE
NORTH
SLOPES 1"
EXIST. STEEL & CONC.
REMOVE EXIST.
HAND RAILING
REMOVE EXIST. L4x4x1/4
EXIST. W14x30 OR M14x17.2
EXIST. 1/2" CAP PLATE W/
(2) 3/4" DIA. BOLTS EA. SIDE
DEMO AT W14
EXIST. W8x24
COLUMN
EXIST. 2 1/2" LT WT. CONC. FILL
OVER 1 1/2" GALV. METAL
DECK (20 GA.)
EXIST. C2x3.6 @ 3'-0" O.C.
EXIST. L4x4x3/8 DEMO
PROVIDE SHORING FOR EACH
INTERSECTING BEAM.
PRIOR TO DEMO LEAVE SHORED
UNTIL REPAIRS ARE MADE
REMOVE W14x30 & M14x17.2 SPANDREL
REMOVE CONCRETE FILL AND DECK
AS REQUIRED FOR CORROSION &
TO REPLACE BEAMS, 1'-6" MIN.
SEE PLAN
NOTE:
ARCHITECTURAL FINISHES & ENCLOSURE DEMOLITION
WILL BE REQUIRED BEFORE STRUCTURAL DEMOLITION
REMOVE EXISTING
WWR 6x6-W1.4XW1.4
4037 38
R.5
Q
38.1
REF
18' - 3"
REF
1' - 11"
REF
11' - 5 3/4"
R E
F
/2
R E
F
3/ 4"
E -W x3
E-M14x17.2
E-M14x17.2
E-M14x17.2
E-M14x17.2
E-M14x17.2
E-W14x30
E -W x3
E
-W x3
E- W8X24
COLUMN
S101
EXIST. 2 1/2" LT. WT.
CONCRETE FILL OVER 1 1/2"
20GA GALV DECK
1' - 6"
5'
8"
P
DEMO SLAB,
METAL DECK,
AND SLAB STOP
1" SLOPE
EXISTING BEAM
DEMOLISHED BEAM
DEMOLISHED SLAB, DECK, AND SLAB STOP
DENOTES DECK SPAN DIRECTION & DECK DESCRIPTION
1. REF. DENOTES FOR REFERENCE ONLY, CONTRACTOR SHALL FIELD
VERIFY
2. E-WXxXX DENOTES EXISTING FRAMING MEMBER
4037 38
R.5
Q
REF
18' - 3"
REF
1' - 11" REF
11' - 5 3/4"
R E
F
/2
38.1
W x3
E-M14x17.2
E-M14x17.2
E-M14x17.2
E-M14x17.2
E-M14x17.2
E-W14x30
E- W8X24
COLUMN
E -W x3
E
-W x3
EXIST. 2 1/2" LT. WT.
CONCRETE FILL OVER 1 1/2"
20GA GALV DECK
S101
3/ 4"
5'
8"
0"
1' - 6"
1'
6"
NEW CONCRETE FILL, DECK
AND SLAB STOP TO MATCH
EXISTING
REPLACE EXIST L4x4x1/4.
P
1" SLOPE
(3)#4
DOWELS#4@6"x12" EMBED, THIS LOCATION ONLY
(3)#4
#4@10"O.C.
TYP.
#4@10" O.C. E.W.
DOWELS#4@6"x12" EMBED, THIS LOCATION ONLY
SLOPES 1"
STEEL & CONC.
NEW HAND RAILING
VENDOR DESIGN
NEW L4x4x1/4
NEW W14x30
NEW 1/2" CAP PLATE W/ (2)
3/4" DIA. BOLTS EA. SIDE FOR
NEW W14
EXIST. W8x24
COLUMN
EXIST. 2 1/2" LT WT. CONC. FILL
OVER 1 1/2" GALV. COMPOSITE
METAL DECK (20 GA.)
EXIST. C2x3.6 @ 3'-0" O.C.
NEW L4x4x3/8
EXIST. W14x30 OR M14x17.2
EXIST CONCRETE FILL AND DECK
NEW 2 1/2" LT WT. CONC. FILL
OVER 1 1/2" GALV. VENTED
COMPOSITE METAL DECK (20 GA.)
NEW (3) 3/4" DIA. ASTM A325
LOAD INDICATOR BOLTS
NOTE:
REPLACE ARCHITECTURAL FINISHES
AND ENCLOSURE TO MATCH EXISTING.
CLEAN AND ROUGHEN EXISTING SURFACE APPLY
EPOXY BONDING AGENT PRIOR TO PLACEMENT
OF FRESH CONCRETE IN ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS
#4@10" O.C. , (3)#4 MIN. E.W. AT
MID-DEPTH OF SLAB
#4@10"O.C. EPOXY DOWEL INTO 5/8" DIA. HOLE
x4 1/2" EMBED W/ HILTI HIT RE-500 V3 U.N.O.
NEW BEAM
EXISTING BEAM
NEW CONCRETE SLAB INFILL
DENOTES DECK SPAN DIRECTION & DECK DESCRIPTION
1. T/STL. 129'-10" TYP. @ NORTH SIDE. SLAB & STEEL SLOPE 1" IN 18'-6 1/2"
DOWN TO SOUTH.
2. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE PROOFING
3. REF. DENOTES FOR REFERENCE ONLY, CONTRACTOR SHALL FIELD
VERIFY
4. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS
PLAN
NORTH
TRUE
NORTH
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
Building #64
FLOOR FRAMING PLAN CORRECT PATIENT PRIVACY
DEFICIENCIES - BLDG
64-UNIT A LAKE CITY VAMC
Lake City, FL
S101
573A4-18-603
JANUARY 29, 2024
BID DOCUMENTS
DCASLW
3/4" = 1'-0"S101
3 DEMO SECTION
3/16" = 1'-0"S101
1 FLOOR FRAMING DEMOLITION PLAN
DEMO FLOOR FRAMING LEGEND DEMO FLOOR FRAMING NOTES
3/16" = 1'-0"S101
2 FLOOR FRAMING PLAN
3/4" = 1'-0"S101
4 SECTION
FLOOR FRAMING LEGENDFLOOR FRAMING NOTES
KEY PLAN
CG
CG
CG
R.5
V
U
T
S
W
5352504744 464342
R
Z
Y
X
R E
F
R E
F
/2
R E
F
R E
F
2'
6"
R E
F
1/ 2"
R E
F
9'
6"
R E
F
1/ 2"
R E
F
2'
5"
R E
F
3'
1/
2"
REF
9' - 6"
REF
3' - 7"
REF
9' - 9 3/4"
REF
10' - 5 1/2"
REF
8' - 10 1/4"
REF
21' - 0 3/4"
REF
19' - 3 3/4"
REF
19' - 7 3/4"
(7) #4 @ 7" O.C. NORTH END
(6) #4 @ 7" O.C. SOUTH END
(12) #4 @ 5" O.C. NORTH END
(10) #4 @ 5" O.C. SOUTH END
(6) #4 @ 7" O.C. EAST END
(10) #4 @ 7" O.C. WEST END (11) #4 @ 5" O.C. NORTH END
(12) #4 @ 5" O.C. SOUTH END
(10) #4 @ 7" O.C. EAST END
(6) #4 @ 7" O.C. WEST END
(21) #4 @ 5" O.C. NORTH END
(12) #4 @ 5" O.C. SOUTH END
(11) #4 @ 5" O.C. EAST END
(12) #4 @ 5" O.C. WEST END
(7) #4 @ 7" O.C. EACH END
(9) #4 @ 5" O.C. EACH END
(9) #4 @ 5" O.C. EACH END
(10) #4 @ 5" O.C. EAST END
(9) #4 @ 5" O.C. WEST END
(9) #4 @ 7" O.C. EAST END
(8) #4 @ 7" O.C. WEST END
(9) #4 @ 7" O.C. NORTH END
(8) #4 @ 7" O.C. SOUTH END
(10) #4 @ 5" O.C. NORTH END
(9) #4 @ 5" O.C. SOUTH END
(12) #4 @ 9" O.C. NORTH END
(7) #4 @ 9" O.C. SOUTH END
(8) #4 @ 7" O.C. NORTH END
(9) #4 @ 7" O.C. SOUTH END
REF
13' - 4 3/4"
T Y
P
3/
4" M
A X
TYP.
6'- 2 3/4" MAX
S502
TYP.
S502TYP.
S502
BARIATRIC
BARIATRIC
LIFT RAIL
PATIENT
LIFT RAIL
BARIATRIC
BARIATRIC
BARIATRIC
C10x20 C10x20
C10x20
C10x20
HSS5x3 TYP.
C8 TYP.
SUPPORT TO BEAM
BY LIFT INSTALLER
SUPPORT TO BEAM
BY LIFT INSTALLER
SUPPORT TO BEAM
BY LIFT INSTALLER
SUPPORT TO BEAM
BY CONTRACTOR
REFER TO DETAIL
11& 12 S502
REFER TO DETAIL
11& 12 S502
REFER TO DETAIL
11& 12 S502
REFER TO DETAIL
11& 12 S502
S103
S103
S103
S103
S103
S103
S103
S103
S103
SUPPORT TO BEAM
BY LIFT INSTALLER
SEE 9/S502 A-A
SEE 9/S502 A-A
SEE 9/S502 A-A
SUPPORT TO BEAM
BY LIFT INSTALLER
SEE 9/S502 A-A
PLAN
NORTH
TRUE
NORTH
1. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE
PROOFING
2. REF. DENOTES FOR REFERENCE ONLY, CONTRACTOR SHALL FIELD
VERIFY
3. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS
4. THE CONTRACTOR SHALL LOCATE EXISTING SLAB REINFORCING
THROUGH NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF
COORDINATION PLUMBING AND HVAC DRAWINGS AND CORING OF
EXISTING SLABS. IN NO INSTANCE SHALL EXISTING BEAM, COLUMN
OR SLAB REINFORCING BE CUT DURING CORING WITHOUT A/E
REVIEW AND WRITTEN APPROVAL OF THE COR
NEW PATIENT LIFT RAIL, SEE ARCHITECTURAL FOR EXACT
LOCATION
EXISTING CONCRETE BEAM
DENOTES C8x11.5 (C10x20 AT BERIATRIC)
DENOTES HSS5x3x3/16 LSH
DENOTES BEAM SHEAR REINFORCEMENT, SEE S301
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
Building #64
PARTIAL THIRD FLOOR FRAMING PLAN
(SOUTH)
CORRECT PATIENT PRIVACY
DEFICIENCIES - BLDG
64-UNIT A LAKE CITY VAMC
Lake City, FL
S102
573A4-18-603
JANUARY 29, 2024
BID DOCUMENTS
DCASLW
3/16" = 1'-0"S102
1 PARTIAL THIRD FLOOR FRAMING PLAN (SOUTH)
KEY PLAN
THIRD FLOOR FRAMING PLAN NOTES
THIRD FLOOR FRAMING PLAN LEGEND
R.5
V
U
T
S
W
R
Z
Y
X
17151310
REF
19' - 7 3/4"
REF
19' - 3 3/4"
REF
21' - 0 3/4"
REF
8' - 10 1/4"
REF
10' - 5 1/2"
REF
13' - 4 3/4"
REF
9' - 6"
REF
13' - 4 3/4"
7"
7"
97421
R E
F
R E
F
/2
R E
F
R E
F
2'
6"
R E
F
1/ 2"
R E
F
9'
6"
R E
F
1/ 2"
R E
F
2'
5"
R E
F
3'
1/
2"
(6) #4 @ 7" O.C. NORTH END
(7) #4 @ 7" O.C. SOUTH END
(10) #4 @ 5" O.C. NORTH END
(12) #4 @ 5" O.C. SOUTH END (9) #4 @ 5" O.C. NORTH END
(10) #4 @ 5" O.C. SOUTH END
(12) #4 @ 5" O.C. NORTH END
(11) #4 @ 5" O.C. SOUTH END
(10) #4 @ 7" O.C. EAST END
(6) #4 @ 7" O.C. WEST END
(12) #4 @ 5" O.C. NORTH END
(21) #4 @ 5" O.C. SOUTH END
(11) #4 @ 5" O.C. EAST END
(12) #4 @ 5" O.C. WEST END
(7) #4 @ 7" O.C. EACH END
(9) #4 @ 5" O.C. EACH END
(9) #4 @ 5" O.C. EACH END
(10) #4 @ 5" O.C. EAST END
(9) #4 @ 5" O.C. WEST END
(8) #4 @ 7" O.C. EAST END
(9) #4 @ 7" O.C. WEST END
(8) #4 @ 7" O.C. NORTH END
(9) #4 @ 7" O.C. SOUTH END
(7) #4 @ 9" O.C. NORTH END
(12) #4 @ 9" O.C. SOUTH END
(9) #4 @ 7" O.C. NORTH END
(8) #4 @ 7" O.C. SOUTH END
(6) #4 @ 7" O.C. EAST END
(10) #4 @ 7" O.C. WEST END
(6) #4 @ 9" O.C. EAST END
(5) #4 @ 9" O.C. WEST END
S502
S502
BARIATRIC
BARIATRIC
BARIATRICBARIATRIC
S502
TYP.
TYP.
T Y
P
6'
- 2
/4
M
A X
TYP.
12' - 2 3/4" MAX
BARIATRIC
LIFT RAIL
PATIENT
LIFT RAIL
C10x20 C10x20
C10x20
C10x20
REFER TO DETAIL
11& 12 S502
SUPPORT TO BEAM
BY LIFT INSTALLER
SUPPORT TO BEAM
BY LIFT INSTALLER
SUPPORT TO BEAM
BY LIFT INSTALLER
SUPPORT TO BEAM
BY LIFT INSTALLER
REFER TO DETAIL
11& 12 S502
SUPPORT TO BEAM
BY LIFT INSTALLER
SUPPORT TO BEAM
BY CONTRACTOR
HSS5x3 TYP.
C8 TYP.
REFER TO DETAIL
11 & 12 S502
HSS5x3 TYP.
C8 TYP.
SEE 9/S502 A-A
SEE 9/S502 A-A
SEE 9/S502 A-A
SEE 9/S502 A-A
S103
S103
S103
S103
S103
S103
S103
S103
S103
PLAN
NORTH
TRUE
NORTH
1. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE
PROOFING
2. REF. DENOTES FOR REFERENCE ONLY, CONTRACTOR SHALL FIELD
VERIFY
3. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS
4. THE CONTRACTOR SHALL LOCATE EXISTING SLAB REINFORCING
THROUGH NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF
COORDINATION PLUMBING AND HVAC DRAWINGS AND CORING OF
EXISTING SLABS. IN NO INSTANCE SHALL EXISTING BEAM, COLUMN
OR SLAB REINFORCING BE CUT DURING CORING WITHOUT A/E
REVIEW AND WRITTEN APPROVAL OF THE COR
NEW PATIENT LIFT RAIL, SEE ARCHITECTURAL FOR EXACT
LOCATION
EXISTING CONCRETE BEAM
DENOTES C8x11.5 (C10x20 AT BERIATRIC)
DENOTES HSS5x3x3/16 LSH
DENOTES BEAM SHEAR REINFORCEMENT, SEE S301
10"
1/
4"
1 1/4"5" 5"
5" 5"
3/ 4"
3" 3/
4" 3/
4"
3/4" 3" 6 1/4"
1'
1/
2"
1/ 2"
1"
1"
NEW C10
CENTER LINE
OF LIFT RAIL
CENTER LINE
OF CHANNEL
NEW C10
THREADED ROD TO
LIFT (BY OTHERS)
PL1'-0 1/2x0'-10"x1/4"
(8) 1/2"DIA. ASTM
A325 BOLTS
CENTER LINE
OF LIFT
9"
1'
0"
1/
4"
1 1/4"
1/ 2"
3/4" 3"
3/ 4"
3/ 4"
3" NEW C8
NEW C8
PL1'-0x0'-9"x1/4"
(8) 1/2"DIA. ASTM
A325 BOLTS
THREADED ROD TO
LIFT (BY OTHERS)
CENTER LINE
OF LIFT RAIL
CENTER LINE
OF LIFT RAIL
CENTER LINE
OF CHANNEL
4" 4"
4" 4"
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
Building #64
PARTIAL THIRD FLOOR FRAMING PLAN
(NORTH)
CORRECT PATIENT PRIVACY
DEFICIENCIES - BLDG
64-UNIT A LAKE CITY VAMC
Lake City, FL
S103
573A4-18-603
JANUARY 29, 2024
BID DOCUMENTS
DCASLW
3/16" = 1'-0"S103
1 PARTIAL THRID FLOOR FRAMING PLAN (NORTH)
KEY PLAN
THIRD FLOOR FRAMING PLAN NOTES
THIRD FLOOR FRAMING PLAN LEGEND
1 1/2" = 1'-0"S103
2 CORNER C10 CONNECTION
1 1/2" = 1'-0"S103
3 CORNER C8 CONNECTION
C G
CG
M
PLAN
NORTH
TRUE
NORTH
1. T/STL ELEVATION +4'-0" ABOVE HIGH POINT OF ROOFING UNO
2. ALL STEEL SHALL BE HOT DIPPED GALVANIZED
3. REF. DENOTES FOR REFERENCE ONLY, CONTRACTOR SHALL FIELD VERIFY
4. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO SUBMISSION
OF SHOP DRAWINGS.
5. COORDINATE BEAM LOCATIONS WITH ACTUAL EQUIPMENT PROVIDED PRIOR
TO SUBMISSION OF SHOP DRAWINGS FOR REVIEW.
6. REFER TO 6 AND 7/S502 FOR DUCT SUPPORT DETAILS
7. THE CONTRACTOR SHALL LOCATE EXISTING SLAB REINFORCING THROUGH
NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF COORDINATION
PLUMBING AND HVAC DRAWINGS AND CORING OF EXISTING SLABS. IN NO
INSTANCE SHALL EXISTING BEAM, COLUMN OR SLAB REINFORCING BE CUT
DURING CORING WITHOUT A/E REVIEW AND WRITTEN APPROVAL OF THE COR
DENOTES NEW BEAM
DENOTES STEEL KNEE BRACE, L4x4x1/4
DENOTES EDGE OF DECK
DENOTES GUARD RAIL
HORIZONTAL BRACING
DENOTES EXISTING CONCRETE BEAM
DENOTES DECK SPAN DIRECTION OF W19-14(1x3/16) GALV STEEL
GRATING
DENOTES EXISTING BEAM SIZE AND EXISTING BEAM MARK NUMBER
NEW GALV STEEL GRATING W19-4(1x3/16)
MECHANICAL UNIT, SEE ARCH. / MECHANICAL
DENOTES BEAM SHEAR REINFORCEMENT, SEE S301 FOR DETAILS
AND PLACEMENT
DENOTES MOMENT CONNECTION, SEE STEEL DETAILS
(E)-CBXxXX - [XB-###]
R.5
Q
S
R
17151310 20
P
REF
13' - 4 3/4"
REF
9' - 6"
REF
13' - 4 3/4"
REF
18' - 3"
R E
F
2'
5"
R E
F
3'
1/
2"
R E
F
R E
F
0"
(E
C B x1
[2 B
-1
(E
C
B x1
[2
B -1
(E)- CB14x24 - [2B-87]
(E
C B x1
[2 B
-1
(E
C
B x1
[2
B -1
(E)- CB14x14 - [2B-88] (E)- CB14x26 - [2B-89]
(E
C B x2
[2 B
-2
(E
C B x2
[2 B
-2
(E
C B x2
[2 B
-1
(E
C B x2
[2 B
-1
(E
C B x2
[2 B
-2
(E
C
B x2
[2
B -2
(E)- CB14x14 - [2B-80] (E)- CB14x26 - [2B-81](E)- CB14x22 - [2B-79]
(E
C B x1
1/
[2 B
-1
(E
C
B x1
[2
B -1
(E)- CB14x20 - [2B-100] (E)- CB14x20 - [2B-101] (E)- CB14x20 - [2B-102]
EXISTING
CONCRETE SLAB
AHU-1
AHU-3
S502
5"
1'
6"
W10X12
W
X
W10X12
W10X12
W10X12
W
X
W
X
W10X12
W
X
W10X12 W10X12
W10X12
13' - 4 3/4" 9' - 1 1/2"
HSS4X4X3/8 HSS4X4X3/8 HSS4X4X3/8
HSS4X4X3/8HSS4X4X3/8HSS4X4X3/8
HSS4X4X3/8
HSS4X4X3/8
HSS4X4X3/8
HSS4X4X3/8
W12X26
W12X26
W 8X
W 8X
W12X26
W12X26
W
X
W
X
W 8X
6'
7" 4'
7"
4'
5" 3'
3"
14' - 11 1/2" 8' - 11 1/4"
2' - 5 1/4"5' - 6 1/2"
W 8X
8' - 11…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .