4130 Ridge Ave
PO Box 5621 Philadelphia, PA 19129
Structural Evaluation of Existing Storefront and Surrounding Structure
Project Address: 2224 Ridge Ave, Philadelphia, PA
To Whom it May Concern, Scope of Service
This Existing Structural Conditions Report has been prepared for the proposed storefront improvements at the above-referenced property. A site visit was conducted on March 24, 2026, and our findings are summarized herein.
The purpose of this report is to document observed structural deficiencies at the property. The scope of evaluation is limited to the front façade.
Observations were made at the front façade. The foundation wall at the building perimeter beneath the storefront was not observed. We were not able to access the inside of the building. No other areas or structural components were evaluated. Framing above the existing storefront was concealed at the time of the site visit and could not be observed.
The existing structure consists of rough-sawn wood framing supported by multi-wythe brick masonry bearing walls.
Summary of Key Findings
The subject property is generally in good overall structural condition based on visible observations at the time of the site visit. Most primary structural elements appear to be performing as intended, with no widespread signs of significant structural distress.
Localized deficiencies were observed, primarily related to water intrusion and deterioration of exterior elements and finishes. These conditions have the potential to impact concealed structural components if left unaddressed.
Selective demolition may be required in limited areas to verify the extent of any concealed damage and to facilitate appropriate repairs. Allowances should be carried for localized repair or replacement of a1ected structural elements where conditions cannot be fully confirmed at this time.
It is also noted that the adjacent property is slated for demolition. Typical row home construction relies on adjoining structures to provide shared sti1ness and lateral support. Removal of the neighboring structure will result in the subject building behaving as a stand-alone structure, which may induce additional movement, cracking, or other forms of damage. Evaluation of the building for this condition, including any required structural modifications to address standalone lateral performance, is not included in the scope of work.
31 March 2026
PRESTONSTRUCTURAL
SOLUTIONS.COM
+1 215 701 3375
INFO@PRESTONSTRUCTURAL
SOLUTIONS.COM
Required Structural Improvements
Item #1
Location: Front Façade
Deficiency: Existing front canopy over the storefront exhibits visible and significant gaps at the flashing interface with the adjacent stucco façade, creating a pathway for water intrusion into the canopy assembly.
Suggested Repair: Remove and replace the existing flashing at the canopy-to-stucco interface to provide a continuous, watertight seal. Perform selective demolition of the canopy so1it to expose the supporting framing for evaluation. Carry an allowance for repair or replacement of deteriorated framing members, including the storefront support beam, as corrosion is likely. Contractor to thoroughly inspect all exposed elements and address deficiencies as required.
Item #2
Location: Front Façade
Deficiency: Existing architectural cover on exterior storefront appears to have water damage. Steel columns may be behind cover.
Suggested Repair: Existing covers should be removed for further evaluating the existing conditions. Steel columns may be present and require supplemental reinforcing.
Assumptions, Limitations, and Reliance
This report has been prepared based on visual observations made during a site visit and on information available to Preston Structural Solutions, LLC at the time of the assessment. The evaluation was limited in nature and did not include comprehensive destructive testing, demolition, or verification of concealed or inaccessible conditions, except where limited exploratory demolition was observed in the field.
Preston Structural Solutions, LLC is not the original engineer of record for the structure and has not performed a complete review or verification of the original structural design, calculations, or construction documents, except where explicitly noted. The findings and recommendations herein shall not be interpreted as a certification of the overall structural adequacy of the building.
The existing framing above the storefront, supporting the overlying masonry, was not observable at the time of the site visit. This framing should be evaluated by the contractor once exposed. If significant deterioration is observed, or if there is uncertainty regarding the adequacy of the existing framing, Preston Structural Solutions, LLC should be notified for further evaluation.
The observations and conclusions presented herein are limited to conditions observed at the time of the site visit. Actual conditions may di1er as construction progresses or as concealed conditions are exposed.
Responsibility for construction means, methods, sequencing, temporary shoring, and job site safety remains solely with the contractor. Implementation of the recommended repairs may require temporary support, coordination with other trades, or additional engineering evaluation.
This report is intended for use by the client and project team for the purpose of evaluating and addressing the structural conditions described herein. Reliance by others, or use of this report for other purposes, is not authorized without written consent from Preston Structural Solutions, LLC.
Closing
We appreciate the opportunity to assist with the evaluation of the existing structural conditions at this project.
We are available to discuss the findings presented in this report, clarify recommended repair approaches, and assist with coordination as the project progresses.
Additional engineering services may be required during the implementation of repairs, upon exposure of concealed conditions, or as coordination with other project stakeholders advances. Further documentation and engineering design will be required as the project moves forward and as additional information becomes available.
Please contact our o1ice with any questions or to discuss next steps.
Sincerely, Ryan Preston, MS, PE