Appendix_J-12_-_CSP_Questionnaire.docx
DOCX document 26 KB Posted
- Solicitation number
- 19AQMM19R0182
About this file
Appendix J-12
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Information Required for OBO/SM to Draft a CSP Please fill out the form below and send as an attachment to OBO Security Management for processing.
| Post, Country: |
| Project Name: |
| Project Proponent POC: |
SCOPE SPECIFICS
Scope
Please describe the scope of work in a concise paragraph:
Estimated start date for construction
Estimated end date for construction
Estimated cost of the project
Notes:
Please select area(s) where work will be performed.
Area
☐ CAA Restricted
☐ CAA Core
☐ PCC
*Work in the PCC requires TS cleared Americans under escort by TS Crypto cleared Americans. This is coordinated by the project proponent with the Post IMO
☐ CAA Contiguous Will work be performed in GWA/LAA spaces that are contiguous/adjacent to CAA?
If Yes, which spaces is the work contiguous to:
☐ CAA Restricted ☐ CAA Core
☐ PCC
Will any material penetrate the plane of the CAA (e.g. anchors)? ☐ Yes ☐ No If Yes, the material must be secure material.
Notes:
LABOR
Please select labor category that will complete the construction.
Cleared Labor
☐ Uncleared
☐ Secret Cleared American Worker
☐ Top Secret Cleared American Worker
Notes:
MATERIAL SECURITY & LOGISTICS
CAA Material Procurement
☐ U.S. Secure Procurement
☐ Random Selection
☐ Local Random Procurement
☐ DS-Approved Inspection *Must be coordinated with SEO by proponent and DS-CAT through OBO/SM
Notes:
Secure Shipping
☐ Trapped Container (Secure Shipment)
☐ Courier Escort
☐ Diplomatic Secure Pouch
Notes:
Secure Storage
☐ Existing CAA Space
☐ Container on the Compound
☐ Existing Post Secure Storage Area
* Secure storage requires DS approved Locks, Alarms, and 24/7 CCTV coverage
Notes:
Project Execution/Documentation
The Regional Security Officer will be assigned as the Site Security Manager. The RSO may delegate the day to day duties to a cleared American, usually from the section managing the project.
The day to day duties would include maintaining project documentation such as logbooks detailing the work within the CAA, full identification of workers, materials, details of work, clearance levels, date and length of work time per shift, and a narrative explaining any anomalies or incidents involving personnel or materials relating to this project.
OBO/CFSM/SM/SOD/SSO
Last Revision Jul 2018
File details come from the government source that posted it.