The file's text, extracted by GovTribe without its formatting.
J.2 - ATTACHMENT A-2 – GSS 2.0 PRICING TABLES, Rev. 10-24-2018
(TO BE COMPLETED BY OFFEROR)
GSS Transition
| CLIN |
| Description |
| Unit |
| Unit Price (ceiling) |
| 0000 |
| GSS Transition – Base Year |
| TBD |
| TBD |
| 1000 |
| GSS Transition – Option Year One (1) |
| TBD |
| TBD |
| 2000 |
| GSS Transition – Option Year Two (2) |
| TBD |
| TBD |
| 3000 |
| GSS Transition – Option Year Three (3) |
| TBD |
| TBD |
| 4000 |
| GSS Transition – Option Year Four (4) |
| TBD |
| TBD |
| 5000 |
| GSS Transition – Option Year Five (5) |
| TBD |
| TBD |
| 6000 |
| GSS Transition – Option Year Six (6) |
| TBD |
| TBD |
| 7000 |
| GSS Transition – Option Year Seven (7) |
| TBD |
| TBD |
| 8000 |
| GSS Transition – Option Year Eight (8) |
| TBD |
| TBD |
| 9000 |
| GSS Transition – Option Year Nine (9) |
| TBD |
| TBD |
Table B-1 – GSS Transition
GSS Services – Base Year
| CLIN |
| Description |
| Quantity |
(# of applicants)
| Unit |
| Unit Price (ceiling) |
Service Package 1 – Information, appointment, fee collection, document delivery, greeter, and offsite data collection services
| 0101A |
| Base volume (1 - 75,000) |
| 1 - 75,000 |
| Per year |
| $ |
| 0101B |
| Step 1 – 10% of base volume for 0101A |
| 75,001 to 82,500 |
| Per applicant |
| $ |
| 0101C |
| Step 2 – 10% of base volume for 0101A |
| 82,501 to 90,000 |
| 0101D |
| Step 3 – 10% of base volume for 0101A |
| 90,001 to 97,500 |
| 0101E |
| Step 4 – 10% of base volume for 0101A |
| 97,501 to 105,000 |
| 0101F |
| Step 5 – 10% of base volume for 0101A |
| 105,001 to 112,500 |
| 0101G |
| Step 6 – 10% of base volume for 0101A |
| 112,501 to 120,000 |
| 0101H |
| Step 7 – 10% of base volume for 0101A |
| 120,001 to 127,500 |
| 0101I |
| Step 8 – 10% of base volume for 0101A |
| 127,501 to 135,000 |
| 0101J |
| Step 9 – 10% of base volume for 0101A |
| 135,001 to 142,500 |
| 0101K |
| Step 10 – 10% of base volume for 0101A |
| 142,501 to 150,000 |
| 0102A |
| Base volume (75,001 - 125,000) |
| 75,001 - 125,000 |
| Per year |
| $ |
| 0102B |
| Step 1 – 10% of base volume for 0102A |
| 125,001 to 137,500 |
| Per applicant |
| $ |
| 0102C |
| Step 2 – 10% of base volume for 0102A |
| 137,501 to 150,000 |
| 0102D |
| Step 3 – 10% of base volume for 0102A |
| 150,001 to 162,500 |
| 0102E |
| Step 4 – 10% of base volume for 0102A |
| 162,501 to 175,000 |
| 0102F |
| Step 5 – 10% of base volume for 0102A |
| 175,001 to 187,500 |
| 0102G |
| Step 6 – 10% of base volume for 0102A |
| 187,501 to 200,000 |
| 0102H |
| Step 7 – 10% of base volume for 0102A |
| 200,001 to 212,500 |
| 0102I |
| Step 8 – 10% of base volume for 0102A |
| 212,501 to 225,000 |
| 0102J |
| Step 9 – 10% of base volume for 0102A |
| 225,001 to 237,500 |
| 0102K |
| Step 10 – 10% of base volume for 0102A |
| 237,501 to 250,000 |
| 0103A |
| Base volume (125,001 - 250,000) |
| 125,001 - 250,000 |
| Per year |
| $ |
| 0103B |
| Step 1 – 10% of base volume for 0103A |
| 250,001 to 275,000 |
| Per applicant |
| $ |
| 0103C |
| Step 2 – 10% of base volume for 0103A |
| 275,001 to 300,000 |
| 0103D |
| Step 3 – 10% of base volume for 0103A |
| 300,001 to 325,000 |
| 0103E |
| Step 4 – 10% of base volume for 0103A |
| 325,001 to 350,000 |
| 0103F |
| Step 5 – 10% of base volume for 0103A |
| 350,001 to 375,000 |
| 0103G |
| Step 6 – 10% of base volume for 0103A |
| 375,001 to 400,000 |
| 0103H |
| Step 7 – 10% of base volume for 0103A |
| 400,001 to 425,000 |
| 0103I |
| Step 8 – 10% of base volume for 0103A |
| 425,001 to 450,000 |
| 0103J |
| Step 9 – 10% of base volume for 0103A |
| 450,001 to 475,000 |
| 0103K |
| Step 10 – 10% of base volume for 0103A |
| 475,001 to 500,000 |
| 0104A |
| Base volume (250,001 - 500,000) |
| 250,001 - 500,000 |
| Per year |
| $ |
| 0104B |
| Step 1 – 10% of base volume for 0104A |
| 500,001 to 550,000 |
| Per applicant |
| $ |
| 0104C |
| Step 2 – 10% of base volume for 0104A |
| 550,001 to 600,000 |
| 0104D |
| Step 3 – 10% of base volume for 0104A |
| 600,001 to 650,000 |
| 0104E |
| Step 4 – 10% of base volume for 0104A |
| 650,001 to 700,000 |
| 0104F |
| Step 5 – 10% of base volume for 0104A |
| 700,001 to 750,000 |
| 0104G |
| Step 6 – 10% of base volume for 0104A |
| 750,001 to 800,000 |
| 0104H |
| Step 7 – 10% of base volume for 0104A |
| 800,001 to 850,000 |
| 0104I |
| Step 8 – 10% of base volume for 0104A |
| 850,001 to 900,000 |
| 0104J |
| Step 9 – 10% of base volume for 0104A |
| 900,001 to 950,000 |
| 0104K |
| Step 10 – 10% of base volume for 0104A |
| 950,001 to 1,000,000 |
| 0105A |
| Base volume (500,001 - 750,000) |
| 500,001 - 750,000 |
| Per year |
| $ |
| 0105B |
| Step 1 – 10% of base volume for 0105A |
| 750,001 to 825,000 |
| Per applicant |
| $ |
| 0105C |
| Step 2 – 10% of base volume for 0105A |
| 825,001 to 900,000 |
| 0105D |
| Step 3 – 10% of base volume for 0105A |
| 900,001 to 975,000 |
| 0105E |
| Step 4 – 10% of base volume for 0105A |
| 975,001 to 105,0000 |
| 0105F |
| Step 5 – 10% of base volume for 0105A |
| 1,050,001 to 1,125,000 |
| 0105G |
| Step 6 – 10% of base volume for 0105A |
| 1,125,001 to 1,200,000 |
| 0105H |
| Step 7 – 10% of base volume for 0105A |
| 1,200,001 to 1,275,000 |
| 0105I |
| Step 8 – 10% of base volume for 0105A |
| 1,275,001 to 1,350,000 |
| 0105J |
| Step 9 – 10% of base volume for 0105A |
| 1,350,001 to 1,425,000 |
| 0105K |
| Step 10 – 10% of base volume for 0105A |
| 1,425,001 to 1,500,000 |
| 0106A |
| Base volume (750,001 - 1,000,000) |
| 750,001 - 1,000,000 |
| Per year |
| $ |
| 0106B |
| Step 1 – 10% of base volume for 0106A |
| 1,000,001 to 1,100,000 |
| Per applicant |
| $ |
| 0106C |
| Step 2 – 10% of base volume for 0106A |
| 1,100,001 to 1,200,000 |
| 0106D |
| Step 3 – 10% of base volume for 0106A |
| 1,200,001 to 1,300,000 |
| 0106E |
| Step 4 – 10% of base volume for 0106A |
| 1,300,001 to 1,400,000 |
| 0106F |
| Step 5 – 10% of base volume for 0106A |
| 1,400,001 to 1,500,000 |
| 0106G |
| Step 6 – 10% of base volume for 0106A |
| 1,500,001 to 1,600,000 |
| 0106H |
| Step 7 – 10% of base volume for 0106A |
| 1,600,001 to 1,700,000 |
| 0106I |
| Step 8 – 10% of base volume for 0106A |
| 1,700,001 to 1,800,000 |
| 0106J |
| Step 9 – 10% of base volume for 0106A |
| 1,800,001 to 1,900,000 |
| 0106K |
| Step 10 – 10% of base volume for 0106A |
| 1,900,001 to 2,000,000 |
| 0107A |
| Base volume (1,000,001 - 1,250,000) |
| 1,000,001 - 1,250,000 |
| Per year |
| $ |
| 0107B |
| Step 1 – 10% of base volume for 0107A |
| 1,250,001 to 1,375,000 |
| Per applicant |
| $ |
| 0107C |
| Step 2 – 10% of base volume for 0107A |
| 1,375,001 to 1,500,000 |
| 0107D |
| Step 3 – 10% of base volume for 0107A |
| 1,500,001 to 1,625,000 |
| 0107E |
| Step 4 – 10% of base volume for 0107A |
| 1,625,001 to 1,750,000 |
| 0107F |
| Step 5 – 10% of base volume for 0107A |
| 1,750,001 to 1,875,000 |
| 0107G |
| Step 6 – 10% of base volume for 0107A |
| 1,875,001 to 2,000,000 |
| 0107H |
| Step 7 – 10% of base volume for 0107A |
| 2,000,001 to 2,125,000 |
| 0107I |
| Step 8 – 10% of base volume for 0107A |
| 2,125,001 to 2,250,000 |
| 0107J |
| Step 9 – 10% of base volume for 0107A |
| 2,250,001 to 2,375,000 |
| 0107K |
| Step 10 – 10% of base volume for 0107A |
| 2,375,001 to 2,500,000 |
| 0108A |
| Base volume (1,250,001 - 1,500,000) |
| 1,250,001 - 1,500,000 |
| Per year |
| $ |
| 0108B |
| Step 1 – 10% of base volume for 0108A |
| 1,500,001 to 1,650,000 |
| Per applicant |
| $ |
| 0108C |
| Step 2 – 10% of base volume for 0108A |
| 1,650,001 to 1,800,000 |
| 0108D |
| Step 3 – 10% of base volume for 0108A |
| 1,800,001 to 1,950,000 |
| 0108E |
| Step 4 – 10% of base volume for 0108A |
| 1,950,001 to 2,100,000 |
| 0108F |
| Step 5 – 10% of base volume for 0108A |
| 2,100,001 to 2,250,000 |
| 0108G |
| Step 6 – 10% of base volume for 0108A |
| 2,250,001 to 2,400,000 |
| 0108H |
| Step 7 – 10% of base volume for 0108A |
| 2,400,001 to 2,550,000 |
| 0108I |
| Step 8 – 10% of base volume for 0108A |
| 2,550,001 to 2,700,000 |
| 0108J |
| Step 9 – 10% of base volume for 0108A |
| 2,700,001 to 2,850,000 |
| 0108K |
| Step 10 – 10% of base volume for 0108A |
| 2,850,001 to 3,000,000 |
| 0109A |
| Base volume (1,500,001 - 1,750,000) |
| 1,500,001 - 1,750,000 |
| Per year |
| $ |
| 0109B |
| Step 1 – 10% of base volume for 0109A |
| 1,750,001 to 1,925,000 |
| Per applicant |
| $ |
| 0109C |
| Step 2 – 10% of base volume for 0109A |
| 1,925,001 to 2,100,000 |
| 0109D |
| Step 3 – 10% of base volume for 0109A |
| 2,100,001 to 2,275,000 |
| 0109E |
| Step 4 – 10% of base volume for 0109A |
| 2,275,001 to 2,450,000 |
| 0109F |
| Step 5 – 10% of base volume for 0109A |
| 2,450,001 to 2,625,000 |
| 0109G |
| Step 6 – 10% of base volume for 0109A |
| 2,625,001 to 2,800,000 |
| 0109H |
| Step 7 – 10% of base volume for 0109A |
| 2,800,001 to 2,975,000 |
| 0109I |
| Step 8 – 10% of base volume for 0109A |
| 2,975,001 to 3,150,000 |
| 0109J |
| Step 9 – 10% of base volume for 0109A |
| 3,150,001 to 3,325,000 |
| 0109K |
| Step 10 – 10% of base volume for 0109A |
| 3,325,001 to 3,500,000 |
| 0110A |
| Base volume (1,750,001 - 2,000,000) |
| 1,750,001 - 2,000,000 |
| Per year |
| $ |
| 0110B |
| Step 1 – 10% of base volume for 0110A |
| 2,000,001 to 2,200,000 |
| Per applicant |
| $ |
| 0110C |
| Step 2 – 10% of base volume for 0110A |
| 2,200,001 to 2,400,000 |
| 0110D |
| Step 3 – 10% of base volume for 0110A |
| 2,400,001 to 2,600,000 |
| 0110E |
| Step 4 – 10% of base volume for 0110A |
| 2,600,001 to 2,800,000 |
| 0110F |
| Step 5 – 10% of base volume for 0110A |
| 2,800,001 to 3,000,000 |
| 0110G |
| Step 6 – 10% of base volume for 0110A |
| 3,000,001 to 3,200,000 |
| 0110H |
| Step 7 – 10% of base volume for 0110A |
| 3,200,001 to 3,400,000 |
| 0110I |
| Step 8 – 10% of base volume for 0110A |
| 3,400,001 to 3,600,000 |
| 0110J |
| Step 9 – 10% of base volume for 0110A |
| 3,600,001 to 3,800,000 |
| 0110K |
| Step 10 – 10% of base volume for 0110A |
| 3,800,001 to 4,000,000 |
| 0111A |
| Base volume (2,000,001 - 2,500,000) |
| 2,000,001 - 2,500,000 |
| Per year |
| $ |
| 0111B |
| Step 1 – 10% of base volume for 0111A |
| 2,500,001 to 2,750,000 |
| Per applicant |
| $ |
| 0111C |
| Step 2 – 10% of base volume for 0111A |
| 2,750,001 to 3,000,000 |
| 0111D |
| Step 3 – 10% of base volume for 0111A |
| 3,000,001 to 3,250,000 |
| 0111E |
| Step 4 – 10% of base volume for 0111A |
| 3,250,001 to 3,500,000 |
| 0111F |
| Step 5 – 10% of base volume for 0111A |
| 3,500,001 to 3,750,000 |
| 0111G |
| Step 6 – 10% of base volume for 0111A |
| 3,750,001 to 4,000,000 |
| 0111H |
| Step 7 – 10% of base volume for 0111A |
| 4,000,001 to 4,250,000 |
| 0111I |
| Step 8 – 10% of base volume for 0111A |
| 4,250,001 to 4,500,000 |
| 0111J |
| Step 9 – 10% of base volume for 0111A |
| 4,500,001 to 4,750,000 |
| 0111K |
| Step 10 – 10% of base volume for 0111A |
| 4,750,001 to 5,000,000 |
| 0112A |
| Base volume (2,500,001 - 3,000,000) |
| 2,500,001 - 3,000,000 |
| Per year |
| $ |
| 0112B |
| Step 1 – 10% of base volume for 0112A |
| 3,000,001 to 3,300,000 |
| Per applicant |
| $ |
| 0112C |
| Step 2 – 10% of base volume for 0112A |
| 3,300,001 to 3,600,000 |
| 0112D |
| Step 3 – 10% of base volume for 0112A |
| 3,600,001 to 3,900,000 |
| 0112E |
| Step 4 – 10% of base volume for 0112A |
| 3,900,001 to 4,200,000 |
| 0112F |
| Step 5 – 10% of base volume for 0112A |
| 4,200,001 to 4,500,000 |
| 0112G |
| Step 6 – 10% of base volume for 0112A |
| 4,500,001 to 4,800,000 |
| 0112H |
| Step 7 – 10% of base volume for 0112A |
| 4,800,001 to 5,100,000 |
| 0112I |
| Step 8 – 10% of base volume for 0112A |
| 5,100,001 to 5,400,000 |
| 0112J |
| Step 9 – 10% of base volume for 0112A |
| 5,400,001 to 5,700,000 |
| 0112K |
| Step 10 – 10% of base volume for 0112A |
| 5,700,001 to 6,000,000 |
Table B-2 – GSS Services Service Package 1 (Base Year)
| CLIN |
| Description |
| Quantity |
(# of applicants)
| Unit |
| Unit Price (ceiling) |
Service Package 2 – Information, appointment, fee collection, document delivery, and greeter services
| 0201A |
| Base volume (1 - 75,000) |
| 1 - 75,000 |
| Per year |
| $ |
| 0201B |
| Step 1 – 10% of base volume for 0201A |
| 75,001 to 82,500 |
| Per applicant |
| $ |
| 0201C |
| Step 2 – 10% of base volume for 0201A |
| 82,501 to 90,000 |
| 0201D |
| Step 3 – 10% of base volume for 0201A |
| 90,001 to 97,500 |
| 0201E |
| Step 4 – 10% of base volume for 0201A |
| 97,501 to 105,000 |
| 0201F |
| Step 5 – 10% of base volume for 0201A |
| 105,001 to 112,500 |
| 0201G |
| Step 6 – 10% of base volume for 0201A |
| 112,501 to 120,000 |
| 0201H |
| Step 7 – 10% of base volume for 0201A |
| 120,001 to 127,500 |
| 0201I |
| Step 8 – 10% of base volume for 0201A |
| 127,501 to 135,000 |
| 0201J |
| Step 9 – 10% of base volume for 0201A |
| 135,001 to 142,500 |
| 0201K |
| Step 10 – 10% of base volume for 0201A |
| 142,501 to 150,000 |
| 0202A |
| Base volume (75,001 - 125,000) |
| 75,001 - 125,000 |
| Per year |
| $ |
| 0202B |
| Step 1 – 10% of base volume for 0202A |
| 125,001 to 137,500 |
| Per applicant |
| $ |
| 0202C |
| Step 2 – 10% of base volume for 0202A |
| 137,501 to 150,000 |
| 0202D |
| Step 3 – 10% of base volume for 0202A |
| 150,001 to 162,500 |
| 0202E |
| Step 4 – 10% of base volume for 0202A |
| 162,501 to 175,000 |
| 0202F |
| Step 5 – 10% of base volume for 0202A |
| 175,001 to 187,500 |
| 0202G |
| Step 6 – 10% of base volume for 0202A |
| 187,501 to 200,000 |
| 0202H |
| Step 7 – 10% of base volume for 0202A |
| 200,001 to 212,500 |
| 0202I |
| Step 8 – 10% of base volume for 0202A |
| 212,501 to 225,000 |
| 0202J |
| Step 9 – 10% of base volume for 0202A |
| 225,001 to 237,500 |
| 0202K |
| Step 10 – 10% of base volume for 0202A |
| 237,501 to 250,000 |
| 0203A |
| Base volume (125,001 - 250,000) |
| 125,001 - 250,000 |
| Per year |
| $ |
| 0203B |
| Step 1 – 10% of base volume for 0203A |
| 250,001 to 275,000 |
| Per applicant |
| $ |
| 0203C |
| Step 2 – 10% of base volume for 0203A |
| 275,001 to 300,000 |
| 0203D |
| Step 3 – 10% of base volume for 0203A |
| 300,001 to 325,000 |
| 0203E |
| Step 4 – 10% of base volume for 0203A |
| 325,001 to 350,000 |
| 0203F |
| Step 5 – 10% of base volume for 0203A |
| 350,001 to 375,000 |
| 0203G |
| Step 6 – 10% of base volume for 0203A |
| 375,001 to 400,000 |
| 0203H |
| Step 7 – 10% of base volume for 0203A |
| 400,001 to 425,000 |
| 0203I |
| Step 8 – 10% of base volume for 0203A |
| 425,001 to 450,000 |
| 0203J |
| Step 9 – 10% of base volume for 0203A |
| 450,001 to 475,000 |
| 0203K |
| Step 10 – 10% of base volume for 0203A |
| 475,001 to 500,000 |
| 0204A |
| Base volume (250,001 - 500,000) |
| 250,001 - 500,000 |
| Per year |
| $ |
| 0204B |
| Step 1 – 10% of base volume for 0204A |
| 500,001 to 550,000 |
| Per applicant |
| $ |
| 0204C |
| Step 2 – 10% of base volume for 0204A |
| 550,001 to 600,000 |
| 0204D |
| Step 3 – 10% of base volume for 0204A |
| 600,001 to 650,000 |
| 0204E |
| Step 4 – 10% of base volume for 0204A |
| 650,001 to 700,000 |
| 0204F |
| Step 5 – 10% of base volume for 0204A |
| 700,001 to 750,000 |
| 0204G |
| Step 6 – 10% of base volume for 0204A |
| 750,001 to 800,000 |
| 0204H |
| Step 7 – 10% of base volume for 0204A |
| 800,001 to 850,000 |
| 0204I |
| Step 8 – 10% of base volume for 0204A |
| 850,001 to 900,000 |
| 0204J |
| Step 9 – 10% of base volume for 0204A |
| 900,001 to 950,000 |
| 0204K |
| Step 10 – 10% of base volume for 0204A |
| 950,001 to 1,000,000 |
| 0205A |
| Base volume (500,001 - 750,000) |
| 500,001 - 750,000 |
| Per year |
| $ |
| 0205B |
| Step 1 – 10% of base volume for 0205A |
| 750,001 to 825,000 |
| Per applicant |
| $ |
| 0205C |
| Step 2 – 10% of base volume for 0205A |
| 825,001 to 900,000 |
| 0205D |
| Step 3 – 10% of base volume for 0205A |
| 900,001 to 975,000 |
| 0205E |
| Step 4 – 10% of base volume for 0205A |
| 975,001 to 1,050,000 |
| 0205F |
| Step 5 – 10% of base volume for 0205A |
| 1,050,001 to 1,125,000 |
| 0205G |
| Step 6 – 10% of base volume for 0205A |
| 1,125,001 to 1,200,000 |
| 0205H |
| Step 7 – 10% of base volume for 0205A |
| 1,200,001 to 1,275,000 |
| 0205I |
| Step 8 – 10% of base volume for 0205A |
| 1,275,001 to 1,350,000 |
| 0205J |
| Step 9 – 10% of base volume for 0205A |
| 1,350,001 to 1,425,000 |
| 0205K |
| Step 10 – 10% of base volume for 0205A |
| 1,425,001 to 1,500,000 |
| 0206A |
| Base volume (750,001 - 1,000,000) |
| 750,001 - 1,000,000 |
| Per year |
| $ |
| 0206B |
| Step 1 – 10% of base volume for 0206A |
| 1,000,001 to 1,100,000 |
| Per applicant |
| $ |
| 0206C |
| Step 2 – 10% of base volume for 0206A |
| 1,100,001 to 1,200,000 |
| 0206D |
| Step 3 – 10% of base volume for 0206A |
| 1,200,001 to 1,300,000 |
| 0206E |
| Step 4 – 10% of base volume for 0206A |
| 1,300,001 to 1,400,000 |
| 0206F |
| Step 5 – 10% of base volume for 0206A |
| 1,400,001 to 1,500,000 |
| 0206G |
| Step 6 – 10% of base volume for 0206A |
| 1,500,001 to 1,600,000 |
| 0206H |
| Step 7 – 10% of base volume for 0206A |
| 1,600,001 to 1,700,000 |
| 0206I |
| Step 8 – 10% of base volume for 0206A |
| 1,700,001 to 1,800,000 |
| 0206J |
| Step 9 – 10% of base volume for 0206A |
| 1,800,001 to 1,900,000 |
| 0206K |
| Step 10 – 10% of base volume for 0206A |
| 1,900,001 to 2,000,000 |
| 0207A |
| Base volume (1,000,001 - 1,250,000) |
| 1,000,001 - 1,250,000 |
| Per year |
| $ |
| 0207B |
| Step 1 – 10% of base volume for 0207A |
| 1,250,001 to 1,375,000 |
| Per applicant |
| $ |
| 0207C |
| Step 2 – 10% of base volume for 0207A |
| 1,375,001 to 1,500,000 |
| 0207D |
| Step 3 – 10% of base volume for 0207A |
| 1,500,001 to 1,625,000 |
| 0207E |
| Step 4 – 10% of base volume for 0207A |
| 1,625,001 to 1,750,000 |
| 0207F |
| Step 5 – 10% of base volume for 0207A |
| 1,750,001 to 1,875,000 |
| 0207G |
| Step 6 – 10% of base volume for 0207A |
| 1,875,001 to 2,000,000 |
| 0207H |
| Step 7 – 10% of base volume for 0207A |
| 2,000,001 to 2,125,000 |
| 0207I |
| Step 8 – 10% of base volume for 0207A |
| 2,125,001 to 2,250,000 |
| 0207J |
| Step 9 – 10% of base volume for 0207A |
| 2,250,001 to 2,375,000 |
| 0207K |
| Step 10 – 10% of base volume for 0207A |
| 2,375,001 to 2,500,000 |
| 0208A |
| Base volume (1,250,001 - 1,500,000) |
| 1,250,001 - 1,500,000 |
| Per year |
| $ |
| 0208B |
| Step 1 – 10% of base volume for 0208A |
| 1,500,001 to 1,650,000 |
| Per applicant |
| $ |
| 0208C |
| Step 2 – 10% of base volume for 0208A |
| 1,650,001 to 1,800,000 |
| 0208D |
| Step 3 – 10% of base volume for 0208A |
| 1,800,001 to 1,950,000 |
| 0208E |
| Step 4 – 10% of base volume for 0208A |
| 1,950,001 to 2,100,000 |
| 0208F |
| Step 5 – 10% of base volume for 0208A |
| 2,100,001 to 2,250,000 |
| 0208G |
| Step 6 – 10% of base volume for 0208A |
| 2,250,001 to 2,400,000 |
| 0208H |
| Step 7 – 10% of base volume for 0208A |
| 2,400,001 to 2,550,000 |
| 0208I |
| Step 8 – 10% of base volume for 0208A |
| 2,550,001 to 2,700,000 |
| 0208J |
| Step 9 – 10% of base volume for 0208A |
| 2,700,001 to 2,850,000 |
| 0208K |
| Step 10 – 10% of base volume for 0208A |
| 2,850,001 to 3,000,000 |
| 0209A |
| Base volume (1,500,001 - 1,750,000) |
| 1,500,001 - 1,750,000 |
| Per year |
| $ |
| 0209B |
| Step 1 – 10% of base volume for 0209A |
| 1,750,001 to 1,925,000 |
| Per applicant |
| $ |
| 0209C |
| Step 2 – 10% of base volume for 0209A |
| 1,925,001 to 2,100,000 |
| 0209D |
| Step 3 – 10% of base volume for 0209A |
| 2,100,001 to 2,275,000 |
| 0209E |
| Step 4 – 10% of base volume for 0209A |
| 2,275,001 to 2,450,000 |
| 0209F |
| Step 5 – 10% of base volume for 0209A |
| 2,450,001 to 2,625,000 |
| 0209G |
| Step 6 – 10% of base volume for 0209A |
| 2,625,001 to 2,800,000 |
| 0209H |
| Step 7 – 10% of base volume for 0209A |
| 2,800,001 to 2,975,000 |
| 0209I |
| Step 8 – 10% of base volume for 0209A |
| 2,975,001 to 3,150,000 |
| 0209J |
| Step 9 – 10% of base volume for 0209A |
| 3,150,001 to 3,325,000 |
| 0209K |
| Step 10 – 10% of base volume for 0209A |
| 3,325,001 to 3,500,000 |
| 0210A |
| Base volume (1,750,001 - 2,000,000) |
| 1,750,001 - 2,000,000 |
| Per year |
| $ |
| 0210B |
| Step 1 – 10% of base volume for 0210A |
| 2,000,001 to 2,200,000 |
| Per applicant |
| $ |
| 0210C |
| Step 2 – 10% of base volume for 0210A |
| 2,200,001 to 2,400,000 |
| 0210D |
| Step 3 – 10% of base volume for 0210A |
| 2,400,001 to 2,600,000 |
| 0210E |
| Step 4 – 10% of base volume for 0210A |
| 2,600,001 to 2,800,000 |
| 0210F |
| Step 5 – 10% of base volume for 0210A |
| 2,800,001 to 3,000,000 |
| 0210G |
| Step 6 – 10% of base volume for 0210A |
| 3,000,001 to 3,200,000 |
| 0210H |
| Step 7 – 10% of base volume for 0210A |
| 3,200,001 to 3,400,000 |
| 0210I |
| Step 8 – 10% of base volume for 0210A |
| 3,400,001 to 3,600,000 |
| 0210J |
| Step 9 – 10% of base volume for 0210A |
| 3,600,001 to 3,800,000 |
| 0210K |
| Step 10 – 10% of base volume for 0210A |
| 3,800,001 to 4,000,000 |
| 0211A |
| Base volume (2,000,001 - 2,500,000) |
| 2,000,001 - 2,500,000 |
| Per year |
| $ |
| 0211B |
| Step 1 – 10% of base volume for 0211A |
| 2,500,001 to 2,750,000 |
| Per applicant |
| $ |
| 0211C |
| Step 2 – 10% of base volume for 0211A |
| 2,750,001 to 3,000,000 |
| 0211D |
| Step 3 – 10% of base volume for 0211A |
| 3,000,001 to 3,250,000 |
| 0211E |
| Step 4 – 10% of base volume for 0211A |
| 3,250,001 to 3,500,000 |
| 0211F |
| Step 5 – 10% of base volume for 0211A |
| 3,500,001 to 3,750,000 |
| 0211G |
| Step 6 – 10% of base volume for 0211A |
| 3,750,001 to 4,000,000 |
| 0211H |
| Step 7 – 10% of base volume for 0211A |
| 4,000,001 to 4,250,000 |
| 0211I |
| Step 8 – 10% of base volume for 0211A |
| 4,250,001 to 4,500,000 |
| 0211J |
| Step 9 – 10% of base volume for 0211A |
| 4,500,001 to 4,750,000 |
| 0211K |
| Step 10 – 10% of base volume for 0211A |
| 4,750,001 to 5,000,000 |
| 0212A |
| Base volume (2,500,001 - 3,000,000) |
| 2,500,001 - 3,000,000 |
| Per year |
| $ |
| 0212B |
| Step 1 – 10% of base volume for 0212A |
| 3,000,001 to 3,300,000 |
| Per applicant |
| $ |
| 0212C |
| Step 2 – 10% of base volume for 0212A |
| 3,300,001 to 3,600,000 |
| 0212D |
| Step 3 – 10% of base volume for 0212A |
| 3,600,001 to 3,900,000 |
| 0212E |
| Step 4 – 10% of base volume for 0212A |
| 3,900,001 to 4,200,000 |
| 0212F |
| Step 5 – 10% of base volume for 0212A |
| 4,200,001 to 4,500,000 |
| 0212G |
| Step 6 – 10% of base volume for 0212A |
| 4,500,001 to 4,800,000 |
| 0212H |
| Step 7 – 10% of base volume for 0212A |
| 4,800,001 to 5,100,000 |
| 0212I |
| Step 8 – 10% of base volume for 0212A |
| 5,100,001 to 5,400,000 |
| 0212J |
| Step 9 – 10% of base volume for 0212A |
| 5,400,001 to 5,700,000 |
| 0212K |
| Step 10 – 10% of base volume for 0212A |
| 5,700,001 to 6,000,000 |
Table B-3 – GSS Services Service Package 2 Countries (Base Year)
| CLIN |
| Description |
| Quantity |
(# of applicants)
| Unit |
| Unit Price (ceiling) |
Service Package 3 – Information, appointment, fee collection, and document delivery services
| 0301A |
| Base volume (1 - 75,000) |
| 1 - 75,000 |
| Per year |
| $ |
| 0301B |
| Step 1 – 10% of base volume for 0301A |
| 75,001 to 82,500 |
| Per applicant |
| $ |
| 0301C |
| Step 2 – 10% of base volume for 0301A |
| 82,501 to 90,000 |
| 0301D |
| Step 3 – 10% of base volume for 0301A |
| 90,001 to 97,500 |
| 0301E |
| Step 4 – 10% of base volume for 0301A |
| 97,501 to 105,000 |
| 0301F |
| Step 5 – 10% of base volume for 0301A |
| 105,001 to 112,500 |
| 0301G |
| Step 6 – 10% of base volume for 0301A |
| 112,501 to 120,000 |
| 0301H |
| Step 7 – 10% of base volume for 0301A |
| 120,001 to 127,500 |
| 0301I |
| Step 8 – 10% of base volume for 0301A |
| 127,501 to 135,000 |
| 0301J |
| Step 9 – 10% of base volume for 0301A |
| 135,001 to 142,500 |
| 0301K |
| Step 10 – 10% of base volume for 0301A |
| 142,501 to 150,000 |
| 0302A |
| Base volume (75,001 - 125,000) |
| 75,001 - 125,000 |
| Per year |
| $ |
| 0302B |
| Step 1 – 10% of base volume for 0302A |
| 125,001 to 137,500 |
| Per applicant |
| $ |
| 0302C |
| Step 2 – 10% of base volume for 0302A |
| 137,501 to 150,000 |
| 0302D |
| Step 3 – 10% of base volume for 0302A |
| 150,001 to 162,500 |
| 0302E |
| Step 4 – 10% of base volume for 0302A |
| 162,501 to 175,000 |
| 0302F |
| Step 5 – 10% of base volume for 0302A |
| 175,001 to 187,500 |
| 0302G |
| Step 6 – 10% of base volume for 0302A |
| 187,501 to 200,000 |
| 0302H |
| Step 7 – 10% of base volume for 0302A |
| 200,001 to 212,500 |
| 0302I |
| Step 8 – 10% of base volume for 0302A |
| 212,501 to 225,000 |
| 0302J |
| Step 9 – 10% of base volume for 0302A |
| 225,001 to 237,500 |
| 0302K |
| Step 10 – 10% of base volume for 0302A |
| 237,501 to 250,000 |
| 0303A |
| Base volume (125,001 - 250,000) |
| 125,001 - 250,000 |
| Per year |
| $ |
| 0303B |
| Step 1 – 10% of base volume for 0303A |
| 250,001 to 275,000 |
| Per applicant |
| $ |
| 0303C |
| Step 2 – 10% of base volume for 0303A |
| 275,001 to 300,000 |
| 0303D |
| Step 3 – 10% of base volume for 0303A |
| 300,001 to 325,000 |
| 0303E |
| Step 4 – 10% of base volume for 0303A |
| 325,001 to 350,000 |
| 0303F |
| Step 5 – 10% of base volume for 0303A |
| 350,001 to 375,000 |
| 0303G |
| Step 6 – 10% of base volume for 0303A |
| 375,001 to 400,000 |
| 0303H |
| Step 7 – 10% of base volume for 0303A |
| 400,001 to 425,000 |
| 0303I |
| Step 8 – 10% of base volume for 0303A |
| 425,001 to 450,000 |
| 0303J |
| Step 9 – 10% of base volume for 0303A |
| 450,001 to 475,000 |
| 0303K |
| Step 10 – 10% of base volume for 0303A |
| 475,001 to 500,000 |
| 0304A |
| Base volume (250,001 - 500,000) |
| 250,001 - 500,000 |
| Per year |
| $ |
| 0304B |
| Step 1 – 10% of base volume for 0304A |
| 500,001 to 550,000 |
| Per applicant |
| $ |
| 0304C |
| Step 2 – 10% of base volume for 0304A |
| 550,001 to 600,000 |
| 0304D |
| Step 3 – 10% of base volume for 0304A |
| 600,001 to 650,000 |
| 0304E |
| Step 4 – 10% of base volume for 0304A |
| 650,001 to 700,000 |
| 0304F |
| Step 5 – 10% of base volume for 0304A |
| 700,001 to 750,000 |
| 0304G |
| Step 6 – 10% of base volume for 0304A |
| 750,001 to 800,000 |
| 0304H |
| Step 7 – 10% of base volume for 0304A |
| 800,001 to 850,000 |
| 0304I |
| Step 8 – 10% of base volume for 0304A |
| 850,001 to 900,000 |
| 0304J |
| Step 9 – 10% of base volume for 0304A |
| 900,001 to 950,000 |
| 0304K |
| Step 10 – 10% of base volume for 0304A |
| 950,001 to 1,000,000 |
| 0305A |
| Base volume (500,001 - 750,000) |
| 500,001 - 750,000 |
| Per year |
| $ |
| 0305B |
| Step 1 – 10% of base volume for 0305A |
| 750,001 to 825,000 |
| Per applicant |
| $ |
| 0305C |
| Step 2 – 10% of base volume for 0305A |
| 825,001 to 900,000 |
| 0305D |
| Step 3 – 10% of base volume for 0305A |
| 900,001 to 975,000 |
| 0305E |
| Step 4 – 10% of base volume for 0305A |
| 975,001 to 105,0000 |
| 0305F |
| Step 5 – 10% of base volume for 0305A |
| 1,050,001 to 1,125,000 |
| 0305G |
| Step 6 – 10% of base volume for 0305A |
| 1,125,001 to 1,200,000 |
| 0305H |
| Step 7 – 10% of base volume for 0305A |
| 1,200,001 to 1,275,000 |
| 0305I |
| Step 8 – 10% of base volume for 0305A |
| 1,275,001 to 1,350,000 |
| 0305J |
| Step 9 – 10% of base volume for 0305A |
| 1,350,001 to 1,425,000 |
| 0305K |
| Step 10 – 10% of base volume for 0305A |
| 1,425,001 to 1,500,000 |
| 0306A |
| Base volume (750,001 - 1,000,000) |
| 750,001 - 1,000,000 |
| Per year |
| $ |
| 0306B |
| Step 1 – 10% of base volume for 0306A |
| 1,000,001 to 1,100,000 |
| Per applicant |
| $ |
| 0306C |
| Step 2 – 10% of base volume for 0306A |
| 1,100,001 to 1,200,000 |
| 0306D |
| Step 3 – 10% of base volume for 0306A |
| 1,200,001 to 1,300,000 |
| 0306E |
| Step 4 – 10% of base volume for 0306A |
| 1,300,001 to 1,400,000 |
| 0306F |
| Step 5 – 10% of base volume for 0306A |
| 1,400,001 to 1,500,000 |
| 0306G |
| Step 6 – 10% of base volume for 0306A |
| 1,500,001 to 1,600,000 |
| 0306H |
| Step 7 – 10% of base volume for 0306A |
| 1,600,001 to 1,700,000 |
| 0306I |
| Step 8 – 10% of base volume for 0306A |
| 1,700,001 to 1,800,000 |
| 0306J |
| Step 9 – 10% of base volume for 0306A |
| 1,800,001 to 1,900,000 |
| 0306K |
| Step 10 – 10% of base volume for 0306A |
| 1,900,001 to 2,000,000 |
| 0307A |
| Base volume (1,000,001 - 1,250,000) |
| 1,000,001 - 1,250,000 |
| Per year |
| $ |
| 0307B |
| Step 1 – 10% of base volume for 0307A |
| 1,250,001 to 1,375,000 |
| Per applicant |
| $ |
| 0307C |
| Step 2 – 10% of base volume for 0307A |
| 1,375,001 to 1,500,000 |
| 0307D |
| Step 3 – 10% of base volume for 0307A |
| 1,500,001 to 1,625,000 |
| 0307E |
| Step 4 – 10% of base volume for 0307A |
| 1,625,001 to 1,750,000 |
| 0307F |
| Step 5 – 10% of base volume for 0307A |
| 1,750,001 to 1,875,000 |
| 0307G |
| Step 6 – 10% of base volume for 0307A |
| 1,875,001 to 2,000,000 |
| 0307H |
| Step 7 – 10% of base volume for 0307A |
| 2,000,001 to 2,125,000 |
| 0307I |
| Step 8 – 10% of base volume for 0307A |
| 2,125,001 to 2,250,000 |
| 0307J |
| Step 9 – 10% of base volume for 0307A |
| 2,250,001 to 2,375,000 |
| 0307K |
| Step 10 – 10% of base volume for 0307A |
| 2,375,001 to 2,500,000 |
| 0308A |
| Base volume (1,250,001 - 1,500,000) |
| 1,250,001 - 1,500,000 |
| Per year |
| $ |
| 0308B |
| Step 1 – 10% of base volume for 0308A |
| 1,500,001 to 1,650,000 |
| Per applicant |
| $ |
| 0308C |
| Step 2 – 10% of base volume for 0308A |
| 1,650,001 to 1,800,000 |
| 0308D |
| Step 3 – 10% of base volume for 0308A |
| 1,800,001 to 1,950,000 |
| 0308E |
| Step 4 – 10% of base volume for 0308A |
| 1,950,001 to 2,100,000 |
| 0308F |
| Step 5 – 10% of base volume for 0308A |
| 2,100,001 to 2,250,000 |
| 0308G |
| Step 6 – 10% of base volume for 0308A |
| 2,250,001 to 2,400,000 |
| 0308H |
| Step 7 – 10% of base volume for 0308A |
| 2,400,001 to 2,550,000 |
| 0308I |
| Step 8 – 10% of base volume for 0308A |
| 2,550,001 to 2,700,000 |
| 0308J |
| Step 9 – 10% of base volume for 0308A |
| 2,700,001 to 2,850,000 |
| 0308K |
| Step 10 – 10% of base volume for 0308A |
| 2,850,001 to 3,000,000 |
| 0309A |
| Base volume (1,500,001 - 1,750,000) |
| 1,500,001 - 1,750,000 |
| Per year |
| $ |
| 0309B |
| Step 1 – 10% of base volume for 0309A |
| 1,750,001 to 1,925,000 |
| Per applicant |
| $ |
| 0309C |
| Step 2 – 10% of base volume for 0309A |
| 1,925,001 to 2,100,000 |
| 0309D |
| Step 3 – 10% of base volume for 0309A |
| 2,100,001 to 2,275,000 |
| 0309E |
| Step 4 – 10% of base volume for 0309A |
| 2,275,001 to 2,450,000 |
| 0309F |
| Step 5 – 10% of base volume for 0309A |
| 2,450,001 to 2,625,000 |
| 0309G |
| Step 6 – 10% of base volume for 0309A |
| 2,625,001 to 2,800,000 |
| 0309H |
| Step 7 – 10% of base volume for 0309A |
| 2,800,001 to 2,975,000 |
| 0309I |
| Step 8 – 10% of base volume for 0309A |
| 2,975,001 to 3,150,000 |
| 0309J |
| Step 9 – 10% of base volume for 0309A |
| 3,150,001 to 3,325,000 |
| 0309K |
| Step 10 – 10% of base volume for 0309A |
| 3,325,001 to 3,500,000 |
| 0310A |
| Base volume (1,750,001 - 2,000,000) |
| 1,750,001 - 2,000,000 |
| Per year |
| $ |
| 0310B |
| Step 1 – 10% of base volume for 0310A |
| 2,000,001 to 2,200,000 |
| Per applicant |
| $ |
| 0310C |
| Step 2 – 10% of base volume for 0310A |
| 2,200,001 to 2,400,000 |
| 0310D |
| Step 3 – 10% of base volume for 0310A |
| 2,400,001 to 2,600,000 |
| 0310E |
| Step 4 – 10% of base volume for 0310A |
| 2,600,001 to 2,800,000 |
| 0310F |
| Step 5 – 10% of base volume for 0310A |
| 2,800,001 to 3,000,000 |
| 0310G |
| Step 6 – 10% of base volume for 0310A |
| 3,000,001 to 3,200,000 |
| 0310H |
| Step 7 – 10% of base volume for 0310A |
| 3,200,001 to 3,400,000 |
| 0310I |
| Step 8 – 10% of base volume for 0310A |
| 3,400,001 to 3,600,000 |
| 0310J |
| Step 9 – 10% of base volume for 0310A |
| 3,600,001 to 3,800,000 |
| 0310K |
| Step 10 – 10% of base volume for 0310A |
| 3,800,001 to 4,000,000 |
| 0311A |
| Base volume (2,000,001 - 2,500,000) |
| 2,000,001 - 2,500,000 |
| Per year |
| $ |
| 0311B |
| Step 1 – 10% of base volume for 0311A |
| 2,500,001 to 2,750,000 |
| Per applicant |
| $ |
| 0311C |
| Step 2 – 10% of base volume for 0311A |
| 2,750,001 to 3,000,000 |
| 0311D |
| Step 3 – 10% of base volume for 0311A |
| 3,000,001 to 3,250,000 |
| 0311E |
| Step 4 – 10% of base volume for 0311A |
| 3,250,001 to 3,500,000 |
| 0311F |
| Step 5 – 10% of base volume for 0311A |
| 3,500,001 to 3,750,000 |
| 0311G |
| Step 6 – 10% of base volume for 0311A |
| 3,750,001 to 4,000,000 |
| 0311H |
| Step 7 – 10% of base volume for 0311A |
| 4,000,001 to 4,250,000 |
| 0311I |
| Step 8 – 10% of base volume for 0311A |
| 4,250,001 to 4,500,000 |
| 0311J |
| Step 9 – 10% of base volume for 0311A |
| 4,500,001 to 4,750,000 |
| 0311K |
| Step 10 – 10% of base volume for 0311A |
| 4,750,001 to 5,000,000 |
| 0312A |
| Base volume (2,500,001 - 3,000,000) |
| 2,500,001 - 3,000,000 |
| Per year |
| $ |
| 0312B |
| Step 1 – 10% of base volume for 0312A |
| 3,000,001 to 3,300,000 |
| Per applicant |
| $ |
| 0312C |
| Step 2 – 10% of base volume for 0312A |
| 3,300,001 to 3,600,000 |
| 0312D |
| Step 3 – 10% of base volume for 0312A |
| 3,600,001 to 3,900,000 |
| 0312E |
| Step 4 – 10% of base volume for 0312A |
| 3,900,001 to 4,200,000 |
| 0312F |
| Step 5 – 10% of base volume for 0312A |
| 4,200,001 to 4,500,000 |
| 0312G |
| Step 6 – 10% of base volume for 0312A |
| 4,500,001 to 4,800,000 |
| 0312H |
| Step 7 – 10% of base volume for 0312A |
| 4,800,001 to 5,100,000 |
| 0312I |
| Step 8 – 10% of base volume for 0312A |
| 5,100,001 to 5,400,000 |
| 0312J |
| Step 9 – 10% of base volume for 0312A |
| 5,400,001 to 5,700,000 |
| 0312K |
| Step 10 – 10% of base volume for 0312A |
| 5,700,001 to 6,000,000 |
Table B-5 – GSS Services Service Package 3 for Countries (Base Year)
| CLIN |
| Description |
| Quantity |
(# of applicants)
| Unit |
| Unit Price (ceiling) |
Service Package 4 – Information, appointment, and fee collection services
| 0401A |
| Base volume (1 - 75,000) |
| 1 - 75,000 |
| Per year |
| $ |
| 0401B |
| Step 1 – 10% of base volume for 0401A |
| 75,001 to 82,500 |
| Per applicant |
| $ |
| 0401C |
| Step 2 – 10% of base volume for 0401A |
| 82,501 to 90,000 |
| 0401D |
| Step 3 – 10% of base volume for 0401A |
| 90,001 to 97,500 |
| 0401E |
| Step 4 – 10% of base volume for 0401A |
| 97,501 to 105,000 |
| 0401F |
| Step 5 – 10% of base volume for 0401A |
| 105,001 to 112,500 |
| 0401G |
| Step 6 – 10% of base volume for 0401A |
| 112,501 to 120,000 |
| 0401H |
| Step 7 – 10% of base volume for 0401A |
| 120,001 to 127,500 |
| 0401I |
| Step 8 – 10% of base volume for 0401A |
| 127,501 to 135,000 |
| 0401J |
| Step 9 – 10% of base volume for 0401A |
| 135,001 to 142,500 |
| 0401K |
| Step 10 – 10% of base volume for 0401A |
| 142,501 to 150,000 |
| 0402A |
| Base volume (75,001 - 125,000) |
| 75,001 - 125,000 |
| Per year |
| $ |
| 0402B |
| Step 1 – 10% of base volume for 0402A |
| 125,001 to 137,500 |
| Per applicant |
| $ |
| 0402C |
| Step 2 – 10% of base volume for 0402A |
| 137,501 to 150,000 |
| 0402D |
| Step 3 – 10% of base volume for 0402A |
| 150,001 to 162,500 |
| 0402E |
| Step 4 – 10% of base volume for 0402A |
| 162,501 to 175,000 |
| 0402F |
| Step 5 – 10% of base volume for 0402A |
| 175,001 to 187,500 |
| 0402G |
| Step 6 – 10% of base volume for 0402A |
| 187,501 to 200,000 |
| 0402H |
| Step 7 – 10% of base volume for 0402A |
| 200,001 to 212,500 |
| 0402I |
| Step 8 – 10% of base volume for 0402A |
| 212,501 to 225,000 |
| 0402J |
| Step 9 – 10% of base volume for 0402A |
| 225,001 to 237,500 |
| 0402K |
| Step 10 – 10% of base volume for 0402A |
| 237,501 to 250,000 |
| 0403A |
| Base volume (125,001 - 250,000) |
| 125,001 - 250,000 |
| Per year |
| $ |
| 0403B |
| Step 1 – 10% of base volume for 0403A |
| 250,001 to 275,000 |
| Per applicant |
| $ |
| 0403C |
| Step 2 – 10% of base volume for 0403A |
| 275,001 to 300,000 |
| 0403D |
| Step 3 – 10% of base volume for 0403A |
| 300,001 to 325,000 |
| 0403E |
| Step 4 – 10% of base volume for 0403A |
| 325,001 to 350,000 |
| 0403F |
| Step 5 – 10% of base volume for 0403A |
| 350,001 to 375,000 |
| 0403G |
| Step 6 – 10% of base volume for 0403A |
| 375,001 to 400,000 |
| 0403H |
| Step 7 – 10% of base volume for 0403A |
| 400,001 to 425,000 |
| 0403I |
| Step 8 – 10% of base volume for 0403A |
| 425,001 to 450,000 |
| 0403J |
| Step 9 – 10% of base volume for 0403A |
| 450,001 to 475,000 |
| 0403K |
| Step 10 – 10% of base volume for 0403A |
| 475,001 to 500,000 |
| 0404A |
| Base volume (250,001 - 500,000) |
| 250,001 - 500,000 |
| Per year |
| $ |
| 0404B |
| Step 1 – 10% of base volume for 0404A |
| 500,001 to 550,000 |
| Per applicant |
| $ |
| 0404C |
| Step 2 – 10% of base volume for 0404A |
| 550,001 to 600,000 |
| 0404D |
| Step 3 – 10% of base volume for 0404A |
| 600,001 to 650,000 |
| 0404E |
| Step 4 – 10% of base volume for 0404A |
| 650,001 to 700,000 |
| 0404F |
| Step 5 – 10% of base volume for 0404A |
| 700,001 to 750,000 |
| 0404G |
| Step 6 – 10% of base volume for 0404A |
| 750,001 to 800,000 |
| 0404H |
| Step 7 – 10% of base volume for 0404A |
| 800,001 to 850,000 |
| 0404I |
| Step 8 – 10% of base volume for 0404A |
| 850,001 to 900,000 |
| 0404J |
| Step 9 – 10% of base volume for 0404A |
| 900,001 to 950,000 |
| 0404K |
| Step 10 – 10% of base volume for 0404A |
| 950,001 to 1,000,000 |
| 0405A |
| Base volume (500,001 - 750,000) |
| 500,001 - 750,000 |
| Per year |
| $ |
| 0405B |
| Step 1 – 10% of base volume for 0405A |
| 750,001 to 825,000 |
| Per applicant |
| $ |
| 0405C |
| Step 2 – 10% of base volume for 0405A |
| 825,001 to 900,000 |
| 0405D |
| Step 3 – 10% of base volume for 0405A |
| 900,001 to 975,000 |
| 0405E |
| Step 4 – 10% of base volume for 0405A |
| 975,001 to 105,0000 |
| 0405F |
| Step 5 – 10% of base volume for 0405A |
| 1,050,001 to 1,125,000 |
| 0405G |
| Step 6 – 10% of base volume for 0405A |
| 1,125,001 to 1,200,000 |
| 0405H |
| Step 7 – 10% of base volume for 0405A |
| 1,200,001 to 1,275,000 |
| 0405I |
| Step 8 – 10% of base volume for 0405A |
| 1,275,001 to 1,350,000 |
| 0405J |
| Step 9 – 10% of base volume for 0405A |
| 1,350,001 to 1,425,000 |
| 0405K |
| Step 10 – 10% of base volume for 0405A |
| 1,425,001 to 1,500,000 |
| 0406A |
| Base volume (750,001 - 1,000,000) |
| 750,001 - 1,000,000 |
| Per year |
| $ |
| 0406B |
| Step 1 – 10% of base volume for 0406A |
| 1,000,001 to 1,100,000 |
| Per applicant |
| $ |
| 0406C |
| Step 2 – 10% of base volume for 0406A |
| 1,100,001 to 1,200,000 |
| 0406D |
| Step 3 – 10% of base volume for 0406A |
| 1,200,001 to 1,300,000 |
| 0406E |
| Step 4 – 10% of base volume for 0406A |
| 1,300,001 to 1,400,000 |
| 0406F |
| Step 5 – 10% of base volume for 0406A |
| 1,400,001 to 1,500,000 |
| 0406G |
| Step 6 – 10% of base volume for 0406A |
| 1,500,001 to 1,600,000 |
| 0406H |
| Step 7 – 10% of base volume for 0406A |
| 1,600,001 to 1,700,000 |
| 0406I |
| Step 8 – 10% of base volume for 0406A |
| 1,700,001 to 1,800,000 |
| 0406J |
| Step 9 – 10% of base volume for 0406A |
| 1,800,001 to 1,900,000 |
| 0406K |
| Step 10 – 10% of base volume for 0406A |
| 1,900,001 to 2,000,000 |
| 0407A |
| Base volume (1,000,001 - 1,250,000) |
| 1,000,001 - 1,250,000 |
| Per year |
| $ |
| 0407B |
| Step 1 – 10% of base volume for 0407A |
| 1,250,001 to 1,375,000 |
| Per applicant |
| $ |
| 0407C |
| Step 2 – 10% of base volume for 0407A |
| 1,375,001 to 1,500,000 |
| 0407D |
| Step 3 – 10% of base volume for 0407A |
| 1,500,001 to 1,625,000 |
| 0407E |
| Step 4 – 10% of base volume for 0407A |
| 1,625,001 to 1,750,000 |
| 0407F |
| Step 5 – 10% of base volume for 0407A |
| 1,750,001 to 1,875,000 |
| 0407G |
| Step 6 – 10% of base volume for 0407A |
| 1,875,001 to 2,000,000 |
| 0407H |
| Step 7 – 10% of base volume for 0407A |
| 2,000,001 to 2,125,000 |
| 0407I |
| Step 8 – 10% of base volume for 0407A |
| 2,125,001 to 2,250,000 |
| 0407J |
| Step 9 – 10% of base volume for 0407A |
| 2,250,001 to 2,375,000 |
| 0407K |
| Step 10 – 10% of base volume for 0407A |
| 2,375,001 to 2,500,000 |
| 0408A |
| Base volume (1,250,001 - 1,500,000) |
| 1,250,001 - 1,500,000 |
| Per year |
| $ |
| 0408B |
| Step 1 – 10% of base volume for 0408A |
| 1,500,001 to 1,650,000 |
| Per applicant |
| $ |
| 0408C |
| Step 2 – 10% of base volume for 0408A |
| 1,650,001 to 1,800,000 |
| 0408D |
| Step 3 – 10% of base volume for 0408A |
| 1,800,001 to 1,950,000 |
| 0408E |
| Step 4 – 10% of base volume for 0408A |
| 1,950,001 to 2,100,000 |
| 0408F |
| Step 5 – 10% of base volume for 0408A |
| 2,100,001 to 2,250,000 |
| 0408G |
| Step 6 – 10% of base volume for 0408A |
| 2,250,001 to 2,400,000 |
| 0408H |
| Step 7 – 10% of base volume for 0408A |
| 2,400,001 to 2,550,000 |
| 0408I |
| Step 8 – 10% of base volume for 0408A |
| 2,550,001 to 2,700,000 |
| 0408J |
| Step 9 – 10% of base volume for 0408A |
| 2,700,001 to 2,850,000 |
| 0408K |
| Step 10 – 10% of base volume for 0408A |
| 2,850,001 to 3,000,000 |
| 0409A |
| Base volume (1,500,001 - 1,750,000) |
| 1,500,001 - 1,750,000 |
| Per year |
| $ |
| 0409B |
| Step 1 – 10% of base volume for 0409A |
| 1,750,001 to 1,925,000 |
| Per applicant |
| $ |
| 0409C |
| Step 2 – 10% of base volume for 0409A |
| 1,925,001 to 2,100,000 |
| 0409D |
| Step 3 – 10% of base volume for 0409A |
| 2,100,001 to 2,275,000 |
| 0409E |
| Step 4 – 10% of base volume for 0409A |
| 2,275,001 to 2,450,000 |
| 0409F |
| Step 5 – 10% of base volume for 0409A |
| 2,450,001 to 2,625,000 |
| 0409G |
| Step 6 – 10% of base volume for 0409A |
| 2,625,001 to 2,800,000 |
| 0409H |
| Step 7 – 10% of base volume for 0409A |
| 2,800,001 to 2,975,000 |
| 0409I |
| Step 8 – 10% of base volume for 0409A |
| 2,975,001 to 3,150,000 |
| 0409J |
| Step 9 – 10% of base volume for 0409A |
| 3,150,001 to 3,325,000 |
| 0409K |
| Step 10 – 10% of base volume for 0409A |
| 3,325,001 to 3,500,000 |
| 0410A |
| Base volume (1,750,001 - 2,000,000) |
| 1,750,001 - 2,000,000 |
| Per year |
| $ |
| 0410B |
| Step 1 – 10% of base volume for 0410A |
| 2,000,001 to 2,200,000 |
| Per applicant |
| $ |
| 0410C |
| Step 2 – 10% of base volume for 0410A |
| 2,200,001 to 2,400,000 |
| 0410D |
| Step 3 – 10% of base volume for 0410A |
| 2,400,001 to 2,600,000 |
| 0410E |
| Step 4 – 10% of base volume for 0410A |
| 2,600,001 to 2,800,000 |
| 0410F |
| Step 5 – 10% of base volume for 0410A |
| 2,800,001 to 3,000,000 |
| 0410G |
| Step 6 – 10% of base volume for 0410A |
| 3,000,001 to 3,200,000 |
| 0410H |
| Step 7 – 10% of base volume for 0410A |
| 3,200,001 to 3,400,000 |
| 0410I |
| Step 8 – 10% of base volume for 0410A |
| 3,400,001 to 3,600,000 |
| 0410J |
| Step 9 – 10% of base volume for 0410A |
| 3,600,001 to 3,800,000 |
| 0410K |
| Step 10 – 10% of base volume for 0410A |
| 3,800,001 to 4,000,000 |
| 0411A |
| Base volume (2,000,001 - 2,500,000) |
| 2,000,001 - 2,500,000 |
| Per year |
| $ |
| 0411B |
| Step 1 – 10% of base volume for 0411A |
| 2,500,001 to 2,750,000 |
| Per applicant |
| $ |
| 0411C |
| Step 2 – 10% of base volume for 0411A |
| 2,750,001 to 3,000,000 |
| 0411D |
| Step 3 – 10% of base volume for 0411A |
| 3,000,001 to 3,250,000 |
| 0411E |
| Step 4 – 10% of base volume for 0411A |
| 3,250,001 to 3,500,000 |
| 0411F |
| Step 5 – 10% of base volume for 0411A |
| 3,500,001 to 3,750,000 |
| 0411G |
| Step 6 – 10% of base volume for 0411A |
| 3,750,001 to 4,000,000 |
| 0411H |
| Step 7 – 10% of base volume for 0411A |
| 4,000,001 to 4,250,000 |
| 0411I |
| Step 8 – 10% of base volume for 0411A |
| 4,250,001 to 4,500,000 |
| 0411J |
| Step 9 – 10% of base volume for 0411A |
| 4,500,001 to 4,750,000 |
| 0411K |
| Step 10 – 10% of base volume for 0411A |
| 4,750,001 to 5,000,000 |
| 0412A |
| Base volume (2,500,001 - 3,000,000) |
| 2,500,001 - 3,000,000 |
| Per year |
| $ |
| 0412B |
| Step 1 – 10% of base volume for 0412A |
| 3,000,001 to 3,300,000 |
| Per applicant |
| $ |
| 0412C |
| Step 2 – 10% of base volume for 0412A |
| 3,300,001 to 3,600,000 |
| 0412D |
| Step 3 – 10% of base volume for 0412A |
| 3,600,001 to 3,900,000 |
| 0412E |
| Step 4 – 10% of base volume for 0412A |
| 3,900,001 to 4,200,000 |
| 0412F |
| Step 5 – 10% of base volume for 0412A |
| 4,200,001 to 4,500,000 |
| 0412G |
| Step 6 – 10% of base volume for 0412A |
| 4,500,001 to 4,800,000 |
| 0412H |
| Step 7 – 10% of base volume for 0412A |
| 4,800,001 to 5,100,000 |
| 0412I |
| Step 8 – 10% of base volume for 0412A |
| 5,100,001 to 5,400,000 |
| 0412J |
| Step 9 – 10% of base volume for 0412A |
| 5,400,001 to 5,700,000 |
| 0412K |
| Step 10 – 10% of base volume for 0412A |
| 5,700,001 to 6,000,000 |
Table B-7 – GSS Services Service Package 4 (Base Year)
| CLIN |
| Description |
| Quantity |
(# of applicants)
| Unit |
| Unit Price (ceiling) |
Service Package 5 – Information services
| 0501A |
| Base volume (1 - 75,000) |
| 1 - 75,000 |
| Per year |
| $ |
| 0501B |
| Step 1 – 10% of base volume for 0501A |
| 75,001 to 82,500 |
| Per applicant |
| $ |
| 0501C |
| Step 2 – 10% of base volume for 0501A |
| 82,501 to 90,000 |
| 0501D |
| Step 3 – 10% of base volume for 0501A |
| 90,001 to 97,500 |
| 0501E |
| Step 4 – 10% of base volume for 0501A |
| 97,501 to 105,000 |
| 0501F |
| Step 5 – 10% of base volume for 0501A |
| 105,001 to 112,500 |
| 0501G |
| Step 6 – 10% of base volume for 0501A |
| 112,501 to 120,000 |
| 0501H |
| Step 7 – 10% of base volume for 0501A |
| 120,001 to 127,500 |
| 0501I |
| Step 8 – 10% of base volume for 0501A |
| 127,501 to 135,000 |
| 0501J |
| Step 9 – 10% of base volume for 0501A |
| 135,001 to 142,500 |
| 0501K |
| Step 10 – 10% of base volume for 0501A |
| 142,501 to 150,000 |
| 0502A |
| Base volume (75,001 - 125,000) |
| 75,001 - 125,000 |
| Per year |
| $ |
| 0502B |
| Step 1 – 10% of base volume for 0502A |
| 125,001 to 137,500 |
| Per applicant |
| $ |
| 0502C |
| Step 2 – 10% of base volume for 0502A |
| 137,501 to 150,000 |
| 0502D |
| Step 3 – 10% of base volume for 0502A |
| 150,001 to 162,500 |
| 0502E |
| Step 4 – 10% of base volume for 0502A |
| 162,501 to 175,000 |
| 0502F |
| Step 5 – 10% of base volume for 0502A |
| 175,001 to 187,500 |
| 0502G |
| Step 6 – 10% of base volume for 0502A |
| 187,501 to 200,000 |
| 0502H |
| Step 7 – 10% of base volume for 0502A |
| 200,001 to 212,500 |
| 0502I |
| Step 8 – 10% of base volume for 0502A |
| 212,501 to 225,000 |
| 0502J |
| Step 9 – 10% of base volume for 0502A |
| 225,001 to 237,500 |
| 0502K |
| Step 10 – 10% of base volume for 0502A |
| 237,501 to 250,000 |
| 0503A |
| Base volume (125,001 - 250,000) |
| 125,001 - 250,000 |
| Per year |
| $ |
| 0503B |
| Step 1 – 10% of base volume for 0503A |
| 250,001 to 275,000 |
| Per applicant |
| $ |
| 0503C |
| Step 2 – 10% of base volume for 0503A |
| 275,001 to 300,000 |
| 0503D |
| Step 3 – 10% of base volume for 0503A |
| 300,001 to 325,000 |
| 0503E |
| Step 4 – 10% of base volume for 0503A |
| 325,001 to 350,000 |
| 0503F |
| Step 5 – 10% of base volume for 0503A |
| 350,001 to 375,000 |
| 0503G |
| Step 6 – 10% of base volume for 0503A |
| 375,001 to 400,000 |
| 0503H |
| Step 7 – 10% of base volume for 0503A |
| 400,001 to 425,000 |
| 0503I |
| Step 8 – 10% of base volume for 0503A |
| 425,001 to 450,000 |
| 0503J |
| Step 9 – 10% of base volume for 0503A |
| 450,001 to 475,000 |
| 0503K |
| Step 10 – 10% of base volume for 0503A |
| 475,001 to 500,000 |
| 0504A |
| Base volume (250,001 - 500,000) |
| 250,001 - 500,000 |
| Per year |
| $ |
| 0504B |
| Step 1 – 10% of base volume for 0504A |
| 500,001 to 550,000 |
| Per applicant |
| $ |
| 0504C |
| Step 2 – 10% of base volume for 0504A |
| 550,001 to 600,000 |
| 0504D |
| Step 3 – 10% of base volume for 0504A |
| 600,001 to 650,000 |
| 0504E |
| Step 4 – 10% of base volume for 0504A |
| 650,001 to 700,000 |
| 0504F |
| Step 5 – 10% of base volume for 0504A |
| 700,001 to 750,000 |
| 0504G |
| Step 6 – 10% of base volume for 0504A |
| 750,001 to 800,000 |
| 0504H |
| Step 7 – 10% of base volume for 0504A |
| 800,001 to 850,000 |
| 0504I |
| Step 8 – 10% of base volume for 0504A |
| 850,001 to 900,000 |
| 0504J |
| Step 9 – 10% of base volume for 0504A |
| 900,001 to 950,000 |
| 0504K |
| Step 10 – 10% of base volume for 0504A |
| 950,001 to 1,000,000 |
| 0505A |
| Base volume (500,001 - 750,000) |
| 500,001 - 750,000 |
| Per year |
| $ |
| 0505B |
| Step 1 – 10% of base volume for 0505A |
| 750,001 to 825,000 |
| Per applicant |
| $ |
| 0505C |
| Step 2 – 10% of base volume for 0505A |
| 825,001 to 900,000 |
| 0505D |
| Step 3 – 10% of base volume for 0505A |
| 900,001 to 975,000 |
| 0505E |
| Step 4 – 10% of base volume for 0505A |
| 975,001 to 105,0000 |
| 0505F |
| Step 5 – 10% of base volume for 0505A |
| 1,050,001 to 1,125,000 |
| 0505G |
| Step 6 – 10% of base volume for 0505A |
| 1,125,001 to 1,200,000 |
| 0505H |
| Step 7 – 10% of base volume for 0505A |
| 1,200,001 to 1,275,000 |
| 0505I |
| Step 8 – 10% of base volume for 0505A |
| 1,275,001 to 1,350,000 |
| 0505J |
| Step 9 – 10% of base volume for 0505A |
| 1,350,001 to 1,425,000 |
| 0505K |
| Step 10 – 10% of base volume for 0505A |
| 1,425,001 to 1,500,000 |
| 0506A |
| Base volume (750,001 - 1,000,000) |
| 750,001 - 1,000,000 |
| Per year |
| $ |
| 0506B |
| Step 1 – 10% of base volume for 0506A |
| 1,000,001 to 1,100,000 |
| Per applicant |
| $ |
| 0506C |
| Step 2 – 10% of base volume for 0506A |
| 1,100,001 to 1,200,000 |
| 0506D |
| Step 3 – 10% of base volume for 0506A |
| 1,200,001 to 1,300,000 |
| 0506E |
| Step 4 – 10% of base volume for 0506A |
| 1,300,001 to 1,400,000 |
| 0506F |
| Step 5 – 10% of base volume for 0506A |
| 1,400,001 to 1,500,000 |
| 0506G |
| Step 6 – 10% of base volume for 0506A |
| 1,500,001 to 1,600,000 |
| 0506H |
| Step 7 – 10% of base volume for 0506A |
| 1,600,001 to 1,700,000 |
| 0506I |
| Step 8 – 10% of base volume for 0506A |
| 1,700,001 to 1,800,000 |
| 0506J |
| Step 9 – 10% of base volume for 0506A |
| 1,800,001 to 1,900,000 |
| 0506K |
| Step 10 – 10% of base volume for 0506A |
| 1,900,001 to 2,000,000 |
| 0507A |
| Base volume (1,000,001 - 1,250,000) |
| 1,000,001 - 1,250,000 |
| Per year |
| $ |
| 0507B |
| Step 1 – 10% of base volume for 0507A |
| 1,250,001 to 1,375,000 |
| Per applicant |
| $ |
| 0507C |
| Step 2 – 10% of base volume for 0507A |
| 1,375,001 to 1,500,000 |
| 0507D |
| Step 3 – 10% of base volume for 0507A |
| 1,500,001 to 1,625,000 |
| 0507E |
| Step 4 – 10% of base volume for 0507A |
| 1,625,001 to 1,750,000 |
| 0507F |
| Step 5 – 10% of base volume for 0507A |
| 1,750,001 to 1,875,000 |
| 0507G |
| Step 6 – 10% of base volume for 0507A |
| 1,875,001 to 2,000,000 |
| 0507H |
| Step 7 – 10% of base volume for 0507A |
| 2,000,001 to 2,125,000 |
| 0507I |
| Step 8 – 10% of base volume for 0507A |
| 2,125,001 to 2,250,000 |
| 0507J |
| Step 9 – 10% of base volume for 0507A |
| 2,250,001 to 2,375,000 |
| 0507K |
| Step 10 – 10% of base volume for 0507A |
| 2,375,001 to 2,500,000 |
| 0508A |
| Base volume (1,250,001 - 1,500,000) |
| 1,250,001 - 1,500,000 |
| Per year |
| $ |
| 0508B |
| Step 1 – 10% of base volume for 0508A |
| 1,500,001 to 1,650,000 |
| Per applicant |
| $ |
| 0508C |
| Step 2 – 10% of base volume for 0508A |
| 1,650,001 to 1,800,000 |
| 0508D |
| Step 3 – 10% of base volume for 0508A |
| 1,800,001 to 1,950,000 |
| 0508E |
| Step 4 – 10% of base volume for 0508A |
| 1,950,001 to 2,100,000 |
| 0508F |
| Step 5 – 10% of base volume for 0508A |
| 2,100,001 to 2,250,000 |
| 0508G |
| Step 6 – 10% of base volume for 0508A |
| 2,250,001 to 2,400,000 |
| 0508H |
| Step 7 – 10% of base volume for 0508A |
| 2,400,001 to 2,550,000 |
| 0508I |
| Step 8 – 10% of base volume for 0508A |
| 2,550,001 to 2,700,000 |
| 0508J |
| Step 9 – 10% of base volume for 0508A |
| 2,700,001 to 2,850,000 |
| 0508K |
| Step 10 – 10% of base volume for 0508A |
| 2,850,001 to 3,000,000 |
| 0509A |
| Base volume (1,500,001 - 1,750,000) |
| 1,500,001 - 1,750,000 |
| Per year |
| $ |
| 0509B |
| Step 1 – 10% of base volume for 0509A |
| 1,750,001 to 1,925,000 |
| Per applicant |
| $ |
| 0509C |
| Step 2 – 10% of base volume for 0509A |
| 1,925,001 to 2,100,000 |
| 0509D |
| Step 3 – 10% of base volume for 0509A |
| 2,100,001 to 2,275,000 |
| 0509E |
| Step 4 – 10% of base volume for 0509A |
| 2,275,001 to 2,450,000 |
| 0509F |
| Step 5 – 10% of base volume for 0509A |
| 2,450,001 to 2,625,000 |
| 0509G |
| Step 6 – 10% of base volume for 0509A |
| 2,625,001 to 2,800,000 |
| 0509H |
| Step 7 – 10% of base volume for 0509A |
| 2,800,001 to 2,975,000 |
| 0509I |
| Step 8 – 10% of base volume for 0509A |
| 2,975,001 to 3,150,000 |
| 0509J |
| Step 9 – 10% of base volume for 0509A |
| 3,150,001 to 3,325,000 |
| 0509K |
| Step 10 – 10% of base volume for 0509A |
| 3,325,001 to 3,500,000 |
| 0510A |
| Base volume (1,750,001 - 2,000,000) |
| 1,750,001 - 2,000,000 |
| Per year |
| $ |
| 0510B |
| Step 1 – 10% of base volume for 0510A |
| 2,000,001 to 2,200,000 |
| Per applicant |
| $ |
| 0510C |
| Step 2 – 10% of base volume for 0510A |
| 2,200,001 to 2,400,000 |
| 0510D |
| Step 3 – 10% of base volume for 0510A |
| 2,400,001 to 2,600,000 |
| 0510E |
| Step 4 – 10% of base volume for 0510A |
| 2,600,001 to 2,800,000 |
| 0510F |
| Step 5 – 10% of base volume for 0510A |
| 2,800,001 to 3,000,000 |
| 0510G |
| Step 6 – 10% of base volume for 0510A |
| 3,000,001 to 3,200,000 |
| 0510H |
| Step 7 – 10% of base volume for 0510A |
| 3,200,001 to 3,400,000 |
| 0510I |
| Step 8 – 10% of base volume for 0510A |
| 3,400,001 to 3,600,000 |
| 0510J |
| Step 9 – 10% of base volume for 0510A |
| 3,600,001 to 3,800,000 |
| 0510K |
| Step 10 – 10% of base volume for 0510A |
| 3,800,001 to 4,000,000 |
| 0511A |
| Base volume (2,000,001 - 2,500,000) |
| 2,000,001 - 2,500,000 |
| Per year |
| $ |
| 0511B |
| Step 1 – 10% of base volume for 0511A |
| 2,500,001 to 2,750,000 |
| Per applicant |
| $ |
| 0511C |
| Step 2 – 10% of base volume for 0511A |
| 2,750,001 to 3,000,000 |
| 0511D |
| Step 3 – 10% of base volume for 0511A |
| 3,000,001 to 3,250,000 |
| 0511E |
| Step 4 – 10% of base volume for 0511A |
| 3,250,001 to 3,500,000 |
| 0511F |
| Step 5 – 10% of base volume for 0511A |
| 3,500,001 to 3,750,000 |
| 0511G |
| Step 6 – 10% of base volume for 0511A |
| 3,750,001 to 4,000,000 |
| 0511H |
| Step 7 – 10% of base volume for 0511A |
| 4,000,001 to 4,250,000 |
| 0511I |
| Step 8 – 10% of base volume for 0511A |
| 4,250,001 to 4,500,000 |
| 0511J |
| Step 9 – 10% of base volume for 0511A |
| 4,500,001 to 4,750,000 |
| 0511K |
| Step 10 – 10% of base volume for 0511A |
| 4,750,001 to 5,000,000 |
| 0512A |
| Base volume (2,500,001 - 3,000,000) |
| 2,500,001 - 3,000,000 |
| Per year |
| $ |
| 0512B |
| Step 1 – 10% of base volume for 0512A |
| 3,000,001 to 3,300,000 |
| Per applicant |
| $ |
| 0512C |
| Step 2 – 10% of base volume for 0512A |
| 3,300,001 to 3,600,000 |
| 0512D |
| Step 3 – 10% of base volume for 0512A |
| 3,600,001 to 3,900,000 |
| 0512E |
| Step 4 – 10% of base volume for 0512A |
| 3,900,001 to 4,200,000 |
| 0512F |
| Step 5 – 10% of base volume for 0512A |
| 4,200,001 to 4,500,000 |
| 0512G |
| Step 6 – 10% of base volume for 0512A |
| 4,500,001 to 4,800,000 |
| 0512H |
| Step 7 – 10% of base volume for 0512A |
| 4,800,001 to 5,100,000 |
| 0512I |
| Step 8 – 10% of base volume for 0512A |
| 5,100,001 to 5,400,000 |
| 0512J |
| Step 9 – 10% of base volume for 0512A |
| 5,400,001 to 5,700,000 |
| 0512K |
| Step 10 – 10% of base volume for 0512A |
| 5,700,001 to 6,000,000 |
Table B-8 – GSS Services Service Package 5 (Base Year)
GSS Services – Option Year One (1)
| CLIN |
| Description |
| Quantity |
(# of applicants)
| Unit |
| Unit Price (ceiling) |
Service Package 1 – Information, appointment, fee collection, document delivery, greeter, and offsite data collection services
| 1101A |
| Base volume (1 - 75,000) |
| 1 - 75,000 |
| Per year |
| $ |
| 1101B |
| Step 1 – 10% of base volume for 1101A |
| 75,001 to 82,500 |
| Per applicant |
| $ |
| 1101C |
| Step 2 – 10% of base volume for 1101A |
| 82,501 to 90,000 |
| 1101D |
| Step 3 – 10% of base volume for 1101A |
| 90,001 to 97,500 |
| 1101E |
| Step 4 – 10% of base volume for 1101A |
| 97,501 to 105,000 |
| 1101F |
| Step 5 – 10% of base volume for 1101A |
| 105,001 to 112,500 |
| 1101G |
| Step 6 – 10% of base volume for 1101A |
| 112,501 to 120,000 |
| 1101H |
| Step 7 – 10% of base volume for 1101A |
| 120,001 to 127,500 |
| 1101I |
| Step 8 – 10% of base volume for 1101A |
| 127,501 to 135,000 |
| 1101J |
| Step 9 – 10% of base volume for 1101A |
| 135,001 to 142,500 |
| 1101K |
| Step 10 – 10% of base volume for 1101A |
| 142,501 to 150,000 |
| 1102A |
| Base volume (75,001 - 125,000) |
| 75,001 - 125,000 |
| Per year |
| $ |
| 1102B |
| Step 1 – 10% of base volume for 1102A |
| 125,001 to 137,500 |
| Per applicant |
| $ |
| 1102C |
| Step 2 – 10% of base volume for 1102A |
| 137,501 to 150,000 |
| 1102D |
| Step 3 – 10% of base volume for 1102A |
| 150,001 to 162,500 |
| 1102E |
| Step 4 – 10% of base volume for 1102A |
| 162,501 to 175,000 |
| 1102F |
| Step 5 – 10% of base volume for 1102A |
| 175,001 to 187,500 |
| 1102G |
| Step 6 – 10% of base volume for 1102A |
| 187,501 to 200,000 |
| 1102H |
| Step 7 – 10% of base volume for 1102A |
| 200,001 to 212,500 |
| 1102I |
| Step 8 – 10% of base volume for 1102A |
| 212,501 to 225,000 |
| 1102J |
| Step 9 – 10% of base volume for 1102A |
| 225,001 to 237,500 |
| 1102K |
| Step 10 – 10% of base volume for 1102A |
| 237,501 to 250,000 |
| 1103A |
| Base volume (125,001 - 250,000) |
| 125,001 - 250,000 |
| Per year |
| $ |
| 1103B |
| Step 1 – 10% of base volume for 1103A |
| 250,001 to 275,000 |
| Per applicant |
| $ |
| 1103C |
| Step 2 – 10% of base volume for 1103A |
| 275,001 to 300,000 |
| 1103D |
| Step 3 – 10% of base volume for 1103A |
| 300,001 to 325,000 |
| 1103E |
| Step 4 – 10% of base volume for 1103A |
| 325,001 to 350,000 |
| 1103F |
| Step 5 – 10% of base volume for 1103A |
| 350,001 to 375,000 |
| 1103G |
| Step 6 – 10% of base volume for 1103A |
| 375,001 to 400,000 |
| 1103H |
| Step 7 – 10% of base volume for 1103A |
| 400,001 to 425,000 |
| 1103I |
| Step 8 – 10% of base volume for 1103A |
| 425,001 to 450,000 |
| 1103J |
| Step 9 – 10% of base volume for 1103A |
| 450,001 to 475,000 |
| 1103K |
| Step 10 – 10% of base volume for 1103A |
| 475,001 to 500,000 |
| 1104A |
| Base volume (250,001 - 500,000) |
| 250,001 - 500,000 |
| Per year |
| $ |
| 1104B |
| Step 1 – 10% of base volume for 1104A |
| 500,001 to 550,000 |
| Per applicant |
| $ |
| 1104C |
| Step 2 – 10% of base volume for 1104A |
| 550,001 to 600,000 |
| 1104D |
| Step 3 – 10% of base volume for 1104A |
| 600,001 to 650,000 |
| 1104E |
| Step 4 – 10% of base volume for 1104A |
| 650,001 to 700,000 |
| 1104F |
| Step 5 – 10% of base volume for 1104A |
| 700,001 to 750,000 |
| 1104G |
| Step 6 – 10% of base volume for 1104A |
| 750,001 to 800,000 |
| 1104H |
| Step 7 – 10% of base volume for 1104A |
| 800,001 to 850,000 |
| 1104I |
| Step 8 – 10% of base volume for 1104A |
| 850,001 to 900,000 |
| 1104J |
| Step 9 – 10% of base volume for 1104A |
| 900,001 to 950,000 |
| 1104K |
| Step 10 – 10% of base volume for 1104A |
| 950,001 to 1,000,000 |
| 1105A |
| Base volume (500,001 - 750,000) |
| 500,001 - 750,000 |
| Per year |
| $ |
| 1105B |
| Step 1 – 10% of base volume for 1105A |
| 750,001 to 825,000 |
| Per applicant |
| $ |
| 1105C |
| Step 2 – 10% of base volume for 1105A |
| 825,001 to 900,000 |
| 1105D |
| Step 3 – 10% of base volume for 1105A |
| 900,001 to 975,000 |
| 1105E |
| Step 4 – 10% of base volume for 1105A |
| 975,001 to 105,0000 |
| 1105F |
| Step 5 – 10% of base volume for 1105A |
| 1,050,001 to 1,125,000 |
| 1105G |
| Step 6 – 10% of base volume for 1105A |
| 1,125,001 to 1,200,000 |
| 1105H |
| Step 7 – 10% of base volume for 1105A |
| 1,200,001 to 1,275,000 |
| 1105I |
| Step 8 – 10% of base volume for 1105A |
| 1,275,001 to 1,350,000 |
| 1105J |
| Step 9 – 10% of base volume for 1105A |
| 1,350,001 to 1,425,000 |
| 1105K |
| Step 10 – 10% of base volume for 1105A |
| 1,425,001 to 1,500,000 |
| 1106A |
| Base volume (750,001 - 1,000,000) |
| 750,001 - 1,000,000 |
| Per year |
| $ |
| 1106B |
| Step 1 – 10% of base volume for 1106A |
| 1,000,001 to 1,100,000 |
| Per applicant |
| $ |
| 1106C |
| Step 2 – 10% of base volume for 1106A |
| 1,100,001 to 1,200,000 |
| 1106D |
| Step 3 – 10% of base volume for 1106A |
| 1,200,001 to 1,300,000 |
| 1106E |
| Step 4 – 10% of base volume for 1106A |
| 1,300,001 to 1,400,000 |
| 1106F |
| Step 5 – 10% of base volume for 1106A |
| 1,400,001 to 1,500,000 |
| 1106G |
| Step 6 – 10% of base volume for 1106A |
| 1,500,001 to 1,600,000 |
| 1106H |
| Step 7 – 10% of base volume for 1106A |
| 1,600,001 to 1,700,000 |
| 1106I |
| Step 8 – 10% of base volume for 1106A |
| 1,700,001 to 1,800,000 |
| 1106J |
| Step 9 – 10% of base volume for 1106A |
| 1,800,001 to 1,900,000 |
| 1106K |
| Step 10 – 10% of base volume for 1106A |
| 1,900,001 to 2,000,000 |
| 1107A |
| Base volume (1,000,001 - 1,250,000) |
| 1,000,001 - 1,250,000 |
| Per year |
| $ |
| 1107B |
| Step 1 – 10% of base volume for 1107A |
| 1,250,001 to 1,375,000 |
| Per applicant |
| $ |
| 1107C |
| Step 2 – 10% of base volume for 1107A |
| 1,375,001 to 1,500,000 |
| 1107D |
| Step 3 – 10% of base volume for 1107A |
| 1,500,001 to 1,625,000 |
| 1107E |
| Step 4 – 10% of base volume for 1107A |
| 1,625,001 to 1,750,000 |
| 1107F |
| Step 5 – 10% of base volume for 1107A |
| 1,750,001 to 1,875,000 |
| 1107G |
| Step 6 – 10% of base volume for 1107A |
| 1,875,001 to 2,000,000 |
| 1107H |
| Step 7 – 10% of base volume for 1107A |
| 2,000,001 to 2,125,000 |
| 1107I |
| Step 8 – 10% of base volume for 1107A |
| 2,125,001 to 2,250,000 |
| 1107J |
| Step 9 – 10% of base volume for 1107A |
| 2,250,001 to 2,375,000 |
| 1107K |
| Step 10 – 10% of base volume for 1107A |
| 2,375,001 to 2,500,000 |
| 1108A |
| Base volume (1,250,001 - 1,500,000) |
| 1,250,001 - 1,500,000 |
| Per year |
| $ |
| 1108B |
| Step 1 – 10% of base volume for 1108A |
| 1,500,001 to 1,650,000 |
| Per applicant |
| $ |
| 1108C |
| Step 2 – 10% of base volume for 1108A |
| 1,650,001 to 1,800,000 |
| 1108D |
| Step 3 – 10% of base volume for 1108A |
| 1,800,001 to 1,950,000 |
| 1108E |
| Step 4 – 10% of base volume for 1108A |
| 1,950,001 to 2,100,000 |
| 1108F |
| Step 5 – 10% of base volume for 1108A |
| 2,100,001 to 2,250,000 |
| 1108G |
| Step 6 – 10% of base volume for 1108A |
| 2,250,001 to 2,400,000 |
| 1108H |
| Step 7 – 10% of base volume for 1108A |
| 2,400,001 to 2,550,000 |
| 1108I |
| Step 8 – 10% of base volume for 1108A |
| 2,550,001 to 2,700,000 |
| 1108J |
| Step 9 – 10% of base volume for 1108A |
| 2,700,001 to 2,850,000 |
| 1108K |
| Step 10 – 10% of base volume for 1108A |
| 2,850,001 to 3,000,000 |
| 1109A |
| Base volume (1,500,001 - 1,750,000) |
| 1,500,001 - 1,750,000 |
| Per year |
| $ |
| 1109B |
| Step 1 – 10% of base volume for 1109A |
| 1,750,001 to 1,925,000 |
| Per applicant |
| $ |
| 1109C |
| Step 2 – 10% of base volume for 1109A |
| 1,925,001 to 2,100,000 |
This is the start of the file's text. The full file is on GovTribe.