This document provides details for a Job Order Contract (JOC) solicitation notice issued by the Federal Bureau of Investigation (FBI). The FBI requires continued JOC services to support construction, alteration, and repair projects at various facilities on Quantico, Virginia. Services include project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design, and other tasks to fulfill construction requirements. The contract will have a one year base period and up to four option periods for a total of up to five years. The solicitation will be a request for proposal with a 100% small business set-aside for the North American Industry Classification System code 236220. Interested small businesses should submit contact information by the dates listed to be notified when the solicitation is posted to receive the solicitation documents. An industry day will be held on April 5, 2022 for interested small businesses to attend with priority given to small businesses and a limit of three representatives per company.

View the file

Other files

File Type Posted
15F06722R0000138_P00002.pdf PDF
15F06722R0000138 SECTION M - EVALUATION CRITERIA (Amendment P00002).pdf PDF
15F06722R0000138 SECTION L Instructions Conditions and Notices to Offerors (Amendment P00002).pdf PDF
Attachment R Contractor Teaming Arrangement Instructions.pdf PDF
15F06722R0000138 Attachment H - Part II Questions (AS OF 17 MAY 22).pdf PDF
Attachment O Joint Venture Partner Form (Amended).pdf PDF
Attachment Q Resume Template.pdf PDF
15F06722R0000138 Attachment H - Questions (Answered) AS OF 1626 CST.pdf PDF
15F06722R0000138 P00001 SECTION L Instructions Conditions and Notices to Offerors (Amended).pdf PDF
15F06722R0000138_P00001 FY22 Quantico JOC.pdf PDF
15F06722R0000138 P00001 SECTION M - EVALUATION CRITERIA (Amended).pdf PDF
15F06722R0000138 Attachment H - Questions (Answered).pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet (Amended).pdf PDF
15F06722R0000138 P00001 - SECTION C - STATEMENT OF WORK (Amended).pdf PDF
15F06722R0000138_FY22_Quantico_JOC.pdf PDF
JOC Industry Day Attendees Roster (2).pdf PDF
SECTION_H_-_SPECIAL_CONTRACT_REQUIREMENTS.pdf PDF
Attachment O Joint Venture Partner Form.pdf PDF
Attachment N FD-816 Access of Non-FBI Personnel to FBI Facilities Background Data Information Form.pdf PDF
Attachment F - Surety Form.pdf PDF
Attachment A - Construction Task Catalog - FBI Quantico.pdf PDF
SECTION_C_-_STATEMENT_OF_WORK.pdf PDF
Attachment L - RSA Badge Request Form.pdf PDF
Attachment I Ethics Fact Sheet.pdf PDF
Attachment M - SF-85 FBI LAR Form.pdf PDF
SECTION_L_-_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
15F06722R0000138_FY22_Quantico_JOC.pdf PDF
SECTION_M_-_EVALUATION_CRITERIA.pdf PDF
Attachment K - LAR_SF_85_Completion_Guide.pdf PDF
Attachment E - Acquisition Risk Questions.pdf PDF
Attachment P Coeffecient Explained.pdf PDF
SECTION_E_-_INSPECTION_AND_ACCEPTANCE.pdf PDF
Attachment C-Past Performance Questionaire.pdf PDF
Attachment G - Financial Questionnaire.pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet.pdf PDF
SECTION_B_-_SUPPLIES_OR_SERVICE_AND_PRICE_-_COST.pdf PDF
Attachment J - FD-857a NDA.pdf PDF
SECTION_F_-_DELIVERIES_OR_PERFORMANCE.pdf PDF
Attachment H - Questions Template.xlsx XLSX spreadsheet
FBI Quantico JOC PreIndustry Day Pres - April 2022_04012022.pptx PPTX presentation
ATTACHMENT 6 Directions and Parking East Gate FBI Academy.pdf PDF
ATTACHMENT 1 DRAFT Statement of Work Quantico JOC.pdf PDF
ATTACHMENT 3 Seed Project Sketches (Range 7 Shoothouse).pdf PDF
ATTACHMENT 2 Seed Project DRAFT SOW (Range 7 Shoothouse Repair).pdf PDF
ATTACHMENT 6 Directions and Parking East Gate FBI Academy.pdf PDF
ATTACHMENT 5 eGordian Job Order Contract 5 Step Process.pdf PDF
ATTACHMENT 4 -Coeffecient Explained.pdf PDF
VR-219 Unlocked JOC Industry Day Visitors 20220405.xlsx XLSX spreadsheet
VR-219_JOC Industry Day Visitors 20220405.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building knowledge

Job Order Contract Technical Specifications

Book 1 CSI Divisions 01 - 43 April 2022

Quantico Federal Bureau of Investigation Buildings

This Page Intentionally Left Blank

Table of Contents

April 2022 Quantico FBI Buildings TOC - 1

01 General Requirements

01 22 16 00 No Specification Required 01 45 23 00 Indoor Air Quality Protection During Construction 01 51 13 00 Panelboards 01 52 13 00 Temporary Facilities and Controls 01 54 23 00 Scaffolding Tubular Steel 01 54 23 00a Unit Masonry Assemblies 01 56 26 00 Sediment Removal 01 56 26 00a Erosion Control 01 58 13 00 Signage 01 71 23 16 Cutting and Patching 01 74 19 00 Construction Waste Management

02 Existing Conditions

02 32 13 00 Subsurface Drilling, Sampling, And Testing 02 41 13 13 Portland Cement Concrete Removal 02 41 16 13 Selective Demolition 02 41 16 13a Building Demolition 02 58 13 00 Farm-Type Wire Fencing 02 58 13 00a Snow And Other Temporary Fencing 02 61 00 00 Excavation And Handling Of Contaminated Material 02 61 13 00 Underground Storage Tank Removal 02 61 13 00a Precision Testing Of Underground Fuel Oil Tanks 02 61 13 00b Hydrostatic Pressure Testing Of Air Receiving Tanks 02 61 26 00 Disposal Of Hazardous Materials 02 61 26 00a Removal Of Friable Asbestos-Containing Materials 02 82 16 00 Encapsulation (Lock-Down) Of Asbestos-Containing Materials 02 82 33 00 Removal Of Nonfriable Asbestos-Containing Materials 02 83 19 13 Removal And Disposal Of Lead-Containing Paint 02 83 19 13a Lead Paint Related Abatement Procedures 02 83 19 13b XRF Testing For Lead-Based Paint 02 83 19 13c Lead Dust Wipe, Air And Tclp Sampling And Analysis 02 84 16 00 Removal of Fluorescent Light Ballasts/Capacitors and Fluorescent Light Tubes 02 84 16 00a Interior Lighting 02 84 16 00b Exterior Lighting 02 84 33 00 Overhead Electrical Distribution 02 87 13 33 Mold Remediation 02 87 16 13 Bird And Bird Waste Abatement

03 Concrete

03 01 30 71 Concrete Rehabilitation 03 05 13 00 Cast-In-Place Concrete 03 11 16 13 Rusticated Concrete Finishes 03 11 16 13a Cast-In-Place Architectural Concrete 03 15 19 00 Metal Fabrications 03 30 53 00 Miscellaneous Cast-In-Place Concrete 03 35 23 00 Exposed Aggregate Surface Concrete Walls 03 37 13 00 Shotcrete 03 37 13 00a Glass Fiber Reinforced Concrete 03 41 16 00 Precast Lighweight Roof Slabs 03 41 23 00 Plant-Precast Structural Concrete 03 41 26 00 Unbonded Post-Tensioned Concrete 03 51 13 00 Cementitious Wood-Fiber Deck 03 51 16 00 Gypsum Plank Decking 03 51 16 00a Gypsum Concrete Decks 03 53 14 00 Concrete Floor Topping 03 54 16 00 Cement-Based Underlayment

TOC - 2 Quantico FBI Buildings

04 Masonry

04 01 20 91 Clay Masonry Restoration And Cleaning 04 01 40 51 Stone Restoration And Cleaning 04 01 40 52 Stone Masonry 04 05 23 16 Sheet Metal Flashing And Trim 04 23 13 00 Glass Unit Masonry Assemblies 04 41 00 00 Dimension Stone Cladding 04 41 00 00a Interior Stone Facing 04 72 00 00 Architectural Precast Concrete

05 Metals

05 05 21 00 Structural Steel 05 12 23 00 Cold-Formed Metal Framing 05 14 13 00 Structural Aluminum 05 15 16 00 Ornamental Metal 05 21 19 00 Steel Joists 05 31 13 00 Steel Deck 05 51 13 00 Metal Stairs 05 51 13 00a Fabricated Spiral Stairs 05 52 13 00 Pipe And Tube Railings 05 53 13 00 Gratings 05 58 16 00 Ornamental Formed Metal 05 73 23 00 Miscellaneous Ornamental Metals 05 73 23 00a Ornamental Railings

06 Wood, Plastics, and Composites

06 01 20 91 Wood Restoration 06 01 40 91 Door Hardware 06 05 23 00 Timber Bridge Components 06 05 23 00a Miscellaneous Carpentry 06 05 23 00b Heavy Timber Construction 06 05 73 33 Wood Decking 06 05 73 91 Exterior Architectural Woodwork 06 10 00 00 Rough Carpentry 06 11 16 00 Rough Carpentry Renovation 06 15 13 00 Exterior Rough Carpentry 06 16 23 00 Sheathing 06 17 13 00 Structural Glued-Laminated Timber 06 17 53 00 Metal-Plate-Connected Wood Trusses 06 22 13 00 Exterior Finish Carpentry 06 22 13 00a Interior Finish Carpentry 06 25 16 00 Paneling 06 41 13 00 Interior Architectural Woodwork 06 41 13 00a WOOD-VENEER-FACED ARCHITECTURAL CABINETS 06 42 19 00 Plastic Paneling 06 48 13 00 Wood Doors 06 51 13 00 Plastic Lumber 06 51 13 00a Composite Plastic Lumber 06 51 13 00b Structural Plastic Lumber 06 74 13 00 Pultruded Fiberglass Industrial Grating 06 82 00 00 Pultruded Fiberglass Structural Shapes

07 Thermal And Moisture Protection

07 01 50 81 Built-Up Coal-Tar Roofing 07 01 50 81a Preparation for Re-Roofing

Quantico FBI Buildings TOC - 3

07 05 13 00 CSPE Membrane Roofing 07 05 13 00a APP-Modified Bituminous Membrane Roofing 07 05 13 00b SBS-Modified Bituminous Membrane Roofing 07 11 13 00 Bituminous Dampproofing 07 13 13 00 Bituminous Waterproofing 07 13 53 00 Self-Adhering Sheet Waterproofing 07 13 53 00a Elastomeric Sheet Waterproofing 07 14 13 00 Hot Fluid-Applied Rubberized Asphalt Waterproofing 07 14 16 00 Cold Fluid-Applied Waterproofing 07 16 13 00 Modified Cement Waterproofing 07 16 16 00 Crystalline Waterproofing 07 16 19 00 Metal-Oxide Waterproofing 07 17 13 00 Bentonite Waterproofing 07 19 13 00 Water Repellents 07 21 13 13 Modified Bitumous Protected Membrane Roofing 07 21 16 00 Building Insulation 07 24 13 00 Polymer-Based Exterior Insulation And Finish System (EIFS) 07 24 13 00a Water-Drainage Exterior Insulation and Finish System (EIFS) 07 31 13 13 Asphalt Shingles 07 31 16 00 Metal Shingles 07 31 26 00 Slate Shingles 07 31 29 13 Wood Shingles And Shakes 07 31 33 00 Composite Rubber Shingles 07 32 13 00 Clay Roof Tiles 07 32 16 00 Concrete Roof Tiles 07 41 13 00 Metal Roof Panels 07 41 13 00a Sheet Metal Roofing 07 42 13 19 Glazing 07 42 93 00 Siding 07 46 16 00 Metal Wall Panels 07 46 16 00a Metal Plate Wall Panels 07 46 63 00 Insulated-Core Metal Wall Panels 07 51 13 00 Built-Up Asphalt Roofing 07 53 16 00 EPDM Membrane Roofing 07 54 19 00 Polyvinyl-Chloride (PVC) Roofing 07 54 23 00 Thermoplastic Polyolefin (TPO) Roofing 07 56 00 00 Coated Foamed Roofing 07 63 00 00 Common Work Results for Fire Suppression 07 63 00 00a Common Work Results for Plumbing 07 63 00 00b Common Work Results for HVAC 07 71 23 00 Manufactured Roof Specialties 07 72 13 00 Packaged, Outdoor, Central-Station Air-Handling Units 07 72 13 00a Intake and Relief Ventilators 07 72 23 00 Roof Accessories 07 72 56 00 Radiant-Heating Electric Cables 07 72 56 00a Heat Tracing for Fire-Suppression Piping 07 72 56 00b Heat Tracing for Plumbing Piping 07 72 56 00c Heat Tracing for HVAC Piping 07 81 16 00 Sprayed Fire-Resistive Materials 07 84 13 16 Through-Penetration Firestop Systems 07 84 13 16a Fire-Resistive Joint Systems 07 84 13 16b Firestopping 07 84 56 13 Board Fire Protection 07 91 23 00 Joint Sealants 07 95 13 13 Architectural Joint Systems 07 95 13 16 Roof Expansion Assemblies

08 Openings

08 01 52 61 Wood Windows 08 05 13 00 Steel Doors And Frames 08 05 13 00a Flush Wood Doors 08 11 63 13 Steel Storm Doors 08 11 63 13a Security Window Screens and Doors 08 11 63 23 Aluminum Storm Doors 08 11 73 00 Sliding Metal Fire Doors 08 12 13 13 Steel Entry Doors 08 12 13 13a Stainless Steel Doors And Frames

TOC - 4 Quantico FBI Buildings

08 14 16 00 Stile And Rail Wood Doors 08 16 13 00 Fiberglass Reinforced Plastic (FRP) Doors and Frames 08 18 16 00 Sliding Aluminum-Framed Glass Doors 08 18 16 00a Sliding Wood-Framed Glass Doors 08 31 13 00 Access Doors And Frames 08 33 16 00 Overhead Coiling Grilles 08 33 23 11 Overhead Coiling Doors 08 33 36 00 Side Coiling Grilles 08 34 49 13 Radiation Protection 08 34 53 00 Detention Doors And Frames 08 34 53 00a Security Grilles 08 34 59 00 Security Vault Doors 08 34 59 00a Vault Doors and Day Gates 08 34 59 00b Modular Vaults 08 34 73 16 Sound Control Doors 08 35 13 13 Folding Doors 08 36 13 00 Sectional Overhead Doors 08 38 13 00 Flexible Doors 08 42 13 00 Aluminum-Framed Entrances And Storefronts 08 42 26 00 All-Glass Entrances And Storefronts 08 42 29 23 ICU/CCU Entrance Doors 08 42 33 00 Revolving Entrance Doors 08 44 13 00 Glazed Aluminum Curtain Walls 08 44 13 00a Structural-Sealant-Glazed Curtain Walls 08 44 13 00b Sloped Glazing Assemblies 08 45 23 00 Unit Skylights 08 45 23 00a Metal-Framed Skylights 08 45 23 00b Structured-Polycarbonate-Panel Assemblies 08 45 23 00c Fiberglass-Sandwich-Panel Assemblies 08 51 13 00 Aluminum Windows 08 51 13 00a Aluminum Replacement Windows 08 51 23 00 Steel Windows 08 51 69 00 Aluminum Storm Windows 08 53 13 00 Vinyl Windows 08 56 19 00 Security Windows 08 62 00 00 Roof Windows 08 71 11 00 Detention Door Hardware 08 75 13 00 Automatic Door Operators 08 83 13 00 Mirrors 08 84 00 00 Plastic Glazing 08 87 23 16 Fragment Retention Film For Glass 08 88 53 00 Security Glazing 08 90 00 00 Louvers And Vents

09 Finishes

09 01 30 91 Ceramic Tile 09 01 60 91 Portland Cement Terrazzo Flooring 09 01 60 91a Carpet 09 22 13 13 Gypsum Plaster 09 22 13 13a Gypsum Veneer Plaster 09 22 13 13b Portland Cement Plaster 09 22 16 13 Non-Load-Bearing Steel Framing 09 22 36 23 Lath and Plaster Renovation 09 23 13 00 Gypsum Board Renovation 09 28 13 00 Gypsum Board 09 28 13 00a Gypsum Board Shaft-Wall Assemblies 09 51 13 00 Acoustical Panel Ceilings 09 51 23 00 Acoustical Tile Ceilings 09 54 23 00 Acoustical Metal Pan Ceilings 09 54 23 00a Linear Metal Ceilings 09 63 13 00 Brick Flooring 09 64 13 00 Wood Flooring 09 64 23 00 Wood Sports-Floor Assemblies 09 65 13 13 Cork Flooring 09 65 13 13a Resilient Wall Base And Accessories

Quantico FBI Buildings TOC - 5

09 65 13 33 Resilient Floor Tile 09 65 13 33a Resilient Sheet Flooring 09 65 13 33b Linoleum Floor Coverings 09 65 66 00 Fluid-Applied Athletic Flooring 09 65 66 00a Resilient Sports-Floor Coverings 09 66 23 00 Resinous Matrix Terrazzo Flooring 09 67 16 00 Resinous Flooring 09 68 13 00 Carpet Tile 09 69 13 00 Access Flooring 09 69 33 00 Cable Management System 09 72 13 00 Wall Coverings 09 84 13 00 Acoustical Wall Panels 09 91 13 00 Exterior Painting 09 91 13 00a Wood Stains and Transparent Finishes 09 91 13 00b High-Temperature-Resistant Coatings 09 91 23 00 Interior Painting 09 91 23 00a Multicolored Interior Coatings 09 93 23 13 Floor Treatment Refinishing Wood Floors 09 96 00 00 High-Performance Coatings 09 96 56 00 Fiberglass Reinforced Epoxy Coating 09 96 66 00 Cementitious Coatings

10 Specialties

10 01 50 11 Metal Lockers 10 11 13 13 Visual Display Surfaces 10 14 00 00 Vitrified Brick Pavement Replacement 10 14 53 11 Traffic Signs 10 17 16 13 Telephone Specialties 10 21 13 13 Toilet Compartments 10 21 13 19 Solid Surface Material Toilet Compartments 10 21 16 17 Shower and Dressing Compartments 10 21 16 17a Cubicle Curtains and Tracks 10 22 13 00 Wire Mesh Partitions 10 22 19 13 Demountable Partitions 10 22 43 00 Operable Panel Partitions 10 26 13 00 Impact-Resistant Wall Protection 10 28 13 13 Toilet And Bath Accessories 10 28 13 13a Detention Toilet Accessories 10 28 16 13 Bath Accessories 10 28 19 16 Plumbing Fixtures 10 44 13 00 Fire Protection Cabinets 10 44 16 13 Fire Extinguishers 10 51 13 00 Wire Basket Lockers 10 51 26 00 Solid Plastic Lockers 10 55 23 23 Postal Specialties 10 56 13 16 Metal Storage Shelving 10 71 13 13 Exterior Shutters 10 73 13 13 Awnings 10 73 26 13 Extruded Aluminum Walkway Cover 10 75 16 00 Flagpoles 10 81 13 00 Oriented Flexible Netting Bird Barrier 10 86 00 00 Detention Furniture

11 Equipment

11 12 16 00 Parking Control Equipment 11 12 16 00a Prefabricated Control Booths 11 13 13 00 Loading Dock Equipment 11 14 13 16 Turnstiles 11 21 63 00 Food Service Equipment 11 30 13 13 Residential Appliances 11 30 13 13a Refrigerators 11 30 13 13b Gas Ranges 11 30 13 13c Electric Ranges

TOC - 6 Quantico FBI Buildings

11 30 13 13d Range Hoods 11 32 13 00 Unit Kitchens 11 41 33 00 Residential Casework 11 52 13 13 Projection Screens 11 61 23 00 Folding And Portable Stages 11 66 13 00 Playground Equipment And Structures 11 66 13 00a Recreational Facilities 11 66 13 00b Gymnasium Equipment 11 66 53 11 Gymnasium Dividers 11 68 23 13 Playing Fields 11 81 29 00 Roof Edge Protection System 11 82 19 00 Packaged Incinerators 11 82 26 00 Waste Compactors 11 98 12 00 Detention Enclosures

12 Furnishings

12 01 60 00 Fixed Audience Seating 12 21 13 13 Horizontal Louver Blinds 12 21 13 13a Vertical Louver Blinds 12 22 13 00 Draperies and Tracks 12 24 13 00 Roller Shades 12 24 13 00a Pleated Shades 12 31 16 00 Stone Countertops 12 31 16 00a Kitchen Casework, Stainless Steel Cabinets 12 36 61 16 Solid Polymer Fabrications 12 48 13 13 Floor Mats And Frames 12 48 13 13a Foot Grilles 12 56 53 00 Laboratory Casework 12 59 16 00 Systems Furniture 12 62 23 00 Portable Bleachers 12 66 13 00 Telescoping Stands

13 Special Construction

13 12 13 00 Water Distribution 13 34 16 13 Fixed Wood Bleachers (Exterior) 13 34 16 13a Demountable Bleachers (Exterior) 13 34 16 13b Grandstands And Bleachers 13 34 19 00 Metal Building Systems 13 42 63 16 Security Ceiling Systems 13 47 13 13 Cathodic Protection

14 Conveying Equipment

14 01 30 71 Electric Traction Elevators 14 01 30 71a Hydraulic Elevators 14 11 00 00 Dumbwaiters 14 31 00 00 Escalators 14 41 16 00 Personnel Lifts 14 42 13 00 Wheelchair Lifts 14 91 33 00 Chutes

21 Fire Suppression

21 05 13 00 Common Motor Requirements for Fire Suppression Equipment 21 05 19 00 Meters and Gages for Plumbing Piping

Quantico FBI Buildings TOC - 7

21 05 19 00a Meters and Gages for HVAC Piping 21 05 48 13 Vibration And Seismic Controls For Fire-Suppression Piping And Equipment 21 07 00 00 Fire-Suppression Systems Insulation 21 11 19 00 Fire-Suppression Standpipes 21 13 13 00 Wet-Pipe Fire-Suppression Sprinklers 21 13 16 00 Dry-Pipe Fire-Suppression Sprinklers 21 13 39 00 Foam Fire Extinguishing 21 22 16 00 Clean-Agent Extinguishing Systems 21 24 00 00 Fiberglass Reinforced Polyester (FRP) Flush Doors 21 30 00 00 Electric-Drive, Centrifugal Fire Pumps 21 30 00 00a Diesel-Drive, Centrifugal Fire Pumps 21 31 13 00 Pressure-Maintenance Pumps 21 31 13 00a Controllers for Fire-Pump Drivers

22 Plumbing

22 01 40 81 Emergency Plumbing Fixtures 22 05 13 00 Common Motor Requirements for Plumbing Equipment 22 05 48 13 Vibration And Seismic Controls For Plumbing Piping And Equipment 22 05 53 00 Identification for Plumbing Piping and Equipment 22 05 76 00 Sanitary Sewerage 22 05 76 00a Storm Drainage Piping Specialties 22 07 19 00 Plumbing Insulation 22 11 16 00 Piped Utilities Basic Materials And Methods 22 11 16 00a Domestic Water Piping 22 11 16 00b Sanitary Waste And Vent Piping 22 11 16 00c Storm Drainage Piping 22 11 16 00d Hydronic Piping 22 11 16 00e Steam And Condensate Piping 22 11 16 00f Refrigerant Piping 22 11 16 00g General-Service Compressed-Air Piping 22 11 16 00h Compressed-Air Piping For Laboratory And Healthcare Facilities 22 11 16 00i Vacuum Piping For Laboratory And Healthcare Facilities 22 11 16 00j Gas Piping For Laboratory And Healthcare Facilities 22 11 19 00 Electronic Air Cleaners 22 11 23 13 Water Distribution Pumps 22 11 23 13a Packaged Booster Pumps 22 11 23 23 Water Supply Wells 22 11 23 23a Hydronic Pumps 22 12 19 00 Surface Water-Storage Tanks 22 12 19 00a Potable-Water Storage Tanks 22 12 23 13 Electric, Domestic Water Heaters 22 12 23 13a Fuel-Fired, Domestic Water Heaters 22 12 23 26 Underground Storage Tanks 22 13 19 00 High-Efficiency Particulate Filtration 22 13 19 26 Interceptors 22 13 19 33 General-Duty Valves for Plumbing Piping 22 13 19 33a General-Duty Valves for HVAC Piping 22 13 29 13 Packaged Sewage Pumping Stations 22 13 29 13a Lift Station 22 13 29 13b Sewage Pumps 22 14 29 13 Sump Pumps 22 15 13 00 General-Service Packaged Air Compressors and Receivers 22 31 16 00 Water Softeners 22 34 36 23 Water-Tube Boilers 22 35 23 13 Domestic Water Heat Exchangers 22 42 19 00 Porcelain Steel Bathtub Liners and Surrounds 22 43 00 00 Medical Plumbing Fixtures 22 46 13 13 Security Plumbing Fixtures 22 47 13 00 Drinking Fountains And Water Coolers 22 66 83 16 Chemical-Waste Systems for Laboratory and Healthcare Facilities

23 Heating, Ventilating, and Air-Conditioning (HVAC)

23 01 10 91 Sequence Of Operation

TOC - 8 Quantico FBI Buildings

23 01 10 91a Testing, Adjusting, And Balancing 23 01 30 51 Air Duct Cleaning 23 01 50 61 Cast-Iron Boilers 23 01 60 71 Condensing Units 23 05 13 00 Common Motor Requirements for HVAC Equipment 23 05 16 00 Expansion Fittings and Loops for Plumbing Piping 23 05 16 00a Expansion Fittings and Loops for HVAC Piping 23 05 29 00 Steam Distribution 23 05 29 00a Hangers and Supports for Plumbing Piping and Equipment 23 05 29 00b Hangers and Supports for HVAC Piping and Equipment 23 05 48 13 Vibration And Seismic Controls For HVAC Piping And Equipment 23 05 53 00 Identification for HVAC Piping and Equipment 23 05 66 00 Interlocking Resilient Flooring 23 07 13 00 HVAC Insulation 23 09 00 00 HVAC Instrumentation And Controls 23 09 23 53 Enclosed Controllers 23 11 23 00 Relief Wells 23 11 23 00a Monitoring Wells 23 11 23 00b Facility Natural-Gas Piping 23 11 23 00c Facility Liquefied-Petroleum Gas Piping 23 13 23 16 Facility Fuel-Oil Piping 23 21 13 23 Radiant Heating Piping 23 21 23 23 Electric-Drive, Vertical-Turbine Fire Pumps 23 21 23 23a Diesel-Drive, Vertical-Turbine Fire Pumps 23 22 23 13 Steam Condensate Pumps 23 25 13 00 HVAC Water Treatment 23 31 13 13 Metal Ducts 23 31 13 13a HVAC Casings 23 31 13 16 Tailpipe Exhaust Equipment 23 31 13 19 Duct Accessories 23 31 16 13 Nonmetal Ducts 23 33 13 13 Draft Control Devices 23 34 13 00 Axial Fans 23 34 16 00 Centrifugal Fans 23 34 16 00a Power Ventilators 23 34 33 00 Air Curtains 23 36 13 00 Diffusers, Registers, And Grilles 23 36 16 00 Air Terminal Units 23 41 13 00 Air Filters 23 42 13 00 Gas-Phase Air Filtration 23 51 13 13 Breechings, Chimneys, And Stacks 23 52 13 00 Electric Boilers 23 52 16 13 Condensing Boilers 23 52 36 00 Fire-Tube Boilers 23 53 16 00 Feedwater Equipment 23 53 16 00a Deaerators 23 54 16 13 Furnaces 23 55 23 13 Radiant Heating and Cooling Units 23 55 23 13a Radiant-Heating Electric Panels 23 55 33 13 Unit Heaters 23 55 33 16 Fuel-Fired Unit Heaters 23 57 13 00 Heat Exchangers 23 61 16 00 Centrifugal Water Chillers 23 61 16 00a Rotary-Screw Water Chillers 23 62 13 00 Indirect-Fired Absorption Water Chillers 23 63 13 00 Air-Cooled Condensers 23 63 13 00a Split-System Air-Conditioning Units 23 64 13 16 Direct-Fired Absorption Water Chillers 23 64 16 16 Fan-Coil Units 23 64 23 13 Scroll Water Chillers 23 64 23 16 Reciprocating Water Chillers 23 65 13 16 Cooling Towers 23 72 13 00 Air-To-Air Energy Recovery Units 23 73 13 00 Modular Indoor Central-Station Air-Handling Units 23 74 16 13 Rooftop Replacement Air Units 23 74 16 13a Self-Contained Air-Conditioners 23 74 16 13b Unit Ventilators 23 74 23 13 Direct-Fired, Makeup Air Units 23 74 23 13a Indirect-Fired, Packaged H&V Units 23 81 13 11 Packaged Terminal Air Conditioners

Quantico FBI Buildings TOC - 9

23 81 23 12 Computer-Room Air-Conditioners 23 82 16 11 Air Coils 23 82 29 00 Convection Heating Units 23 84 13 23 Humidifiers 23 84 16 33 Dehumidification Units

26 Electrical

26 05 00 00 Common Work Results for Electrical 26 05 13 16 Conductors And Cables 26 05 13 16a Undercarpet Cables 26 05 13 16b Medium-Voltage Cables 26 05 19 13 Underfloor Raceways For Electrical Systems 26 05 19 16 Common Work Results for Communications 26 05 19 16a Common Work Results for Electronic Safety and Security 26 05 19 16b Electrical Renovation 26 05 19 16c Control-Voltage Electrical Power Cables 26 05 19 16d Communications Equipment Room Fittings 26 05 19 16e Communications Backbone Cabling 26 05 19 16f Communications Horizontal Cabling 26 05 19 16g Conductors and Cables for Electronic Safety and Security 26 05 26 00 Lightning Protection 26 05 26 00a Grounding And Bonding 26 05 29 00 Hangers And Supports For Electrical Systems 26 05 29 00a Vibration And Seismic Controls For Electrical Systems 26 05 33 16 Raceways And Boxes 26 05 33 16a Wiring Devices 26 05 36 00 Cable Trays 26 05 53 00 Electrical Identification 26 05 53 00a Residential Voice and Data Communication Cabling 26 05 53 00b Intercommunications and Program Systems 26 09 23 00 Lighting Controls 26 09 23 00a Lighting Control Devices 26 09 23 00b Electrical Power Monitoring And Control 26 09 23 00c Motor-Control Centers 26 09 23 00d Central Dimming Controls 26 09 23 00e Modular Dimming Controls 26 11 13 00 Secondary Unit Substations 26 11 16 11 Switchgear 26 12 13 00 Medium-Voltage Transformers 26 12 13 00a Low-Voltage Transformers 26 24 13 00 Electricity Metering 26 24 13 00a Enclosed Switches And Circuit Breakers 26 24 13 00b Switchboards 26 24 19 00 Power Distribution Units 26 25 13 00 Enclosed Bus Assemblies 26 28 13 00 Fuses 26 31 00 00 Photovoltaic Energy Equipment 26 32 13 13 Packaged Engine Generators 26 33 43 00 Central Battery Inverters 26 33 43 00a Nurse Call 26 33 43 00b Public Address and Mass Notification Systems 26 33 53 00 Static Uninterruptible Power Supply 26 35 33 16 Power Factor Correction Capacitors 26 36 13 00 Transfer Switches 26 43 13 00 Transient Voltage Suppression 26 55 61 00 Stage Lighting

27 Communications

27 11 19 00 Loose-Tube Gel-Filled Fiber Optic Cables 27 51 43 00 Educational Intercommunications and Program Systems 27 53 13 16 Clock And Program Control

TOC - 10 Quantico FBI Buildings

28 Electronic Safety and Security

28 16 11 00 Perimeter Security 28 16 11 00a Intrusion Detection 28 16 11 00b Security Access 28 21 31 00 Video Surveillance 28 46 00 00 Oil/Water Separator 28 46 13 31 Digital, Addressable Fire-Alarm System 28 46 13 31a Zoned (DC Loop) Fire-Alarm System

31 Earthwork

31 05 13 00 Earthwork 31 05 13 00a Subdrainage 31 11 00 00 Site Clearing 31 13 13 00 Tree Protection And Trimming 31 23 16 13 Excavation Support And Protection 31 23 16 26 Embankment 31 23 19 00 Dewatering 31 24 13 00 Levee Closure 31 25 14 13 Geosynthetic Fabric 31 25 14 23 Roller Compacted Concrete Pavement 31 25 14 23a Unit Pavers 31 25 14 26 Silt Fences 31 31 16 13 Termite Control 31 31 19 13 Soil Sterilization 31 32 13 16 Soil Stabilization-Lime 31 32 13 19 Soil Stabilization-Vibroflotation 31 32 19 16 Sewage Treatment Lagoons 31 32 19 16a Pond Reservoir Liners 31 36 13 00 Wire Mesh Gabions 31 37 13 00 Riprap 31 41 13 00 Drilled Piers 31 62 13 23 Prestressed Concrete Piles 31 62 16 16 Steel H Piles 31 62 19 00 Timber Piles 31 62 23 13 Concrete-Filled Steel Piles 31 66 15 00 Resistance Pier Systems

32 Exterior Improvements

32 01 11 53 Traffic Coatings 32 01 13 61 Asphalt Paving 32 01 13 61a Crack Sealing Of Bituminous Pavements 32 01 13 61b Spray Applications, Seal Coats, And Surface Treatments 32 01 16 71 Grinding/Grooving Pavement 32 01 16 74 Bituminous Rejuvenation 32 01 16 74a Cold Mix Recycling 32 01 16 74b Central Plant Hot-Mix Recycling 32 11 16 16 Crushed Stone Paving 32 11 16 16a Crushed Stone 32 11 16 16b Select Gravel 32 12 13 13 Bituminous Paving-Repair And Resurfacing 32 12 13 13a Asphaltic Concrete Overlays 32 12 16 13 Pavement Joint Sealants 32 13 13 33 Cement Concrete Pavement 32 13 13 33a Decorative Cement Concrete Pavement 32 13 13 33b Portland Cement Concrete Overlays 32 13 13 33c Steel Reinforced Portland Cement Concrete Overlays 32 13 13 33d Fiber Reinforced Portland Cement Concrete Overlays

Quantico FBI Buildings TOC - 11

32 14 09 00 Exterior Plants 32 14 11 00 Asphalt Concrete Sidewalks 32 14 11 00a Miscellaneous Sidewalks 32 14 11 00b Precast Sidewalks And Pavers 32 14 33 13 Porous Unit Paving 32 16 13 13 Steel Curbs 32 17 26 00 Tactile/Detectable Warning Tile 32 18 16 13 Playground Surface Systems 32 18 16 13a Track, Court, And Playground Markings 32 18 16 13b Synthetic Running Track Surface 32 18 23 13 Lawns And Grasses 32 18 23 29 Colored Athletic Wearing Surface 32 18 23 29a Synthetic Turf 32 31 11 00 Chain-Link Fences And Gates 32 31 13 53 High-Security Chain-Link Fences And Gates 32 31 19 00 Ornamental Metal Fences and Gates 32 31 29 00 Permanent Wood Fencing 32 32 13 00 Segmental Retaining Walls 32 33 13 00 Miscellaneous Site and Street Furnishings 32 33 23 00 Site Furnishings 32 84 13 00 Irrigation Systems 32 91 13 16 Tree Relocation 32 91 19 13 Concrete Revetment 32 91 19 13a Septic Tank Systems

33 Utilities

33 01 10 58 Repair And Maintenance Of Imhoff Tanks 33 01 10 58a Sewer Line Cleaning 33 01 10 71 Pipe Lining 33 01 30 81 Repair And Maintenance Of Siphon Tank And Siphons 33 01 30 81a Underground Ducts And Utility Structures 33 05 07 13 Trenchless Excavation Using Microtunneling 33 11 13 00 Well Repair 33 14 13 23 Sand Drains 33 14 13 23a Hydronic Distribution 33 14 13 23b Ground-Loop Heat-Pump Piping 33 42 11 00 Storm Drainage 33 42 13 13 Culverts

34 Transportation

34 41 13 00 Electrical Traffic Control Signals 34 71 13 13 Beam-Type Guardrail 34 71 13 16 Active Vehicle Barriers

35 Waterway and Marine Construction

35 22 26 00 Sluice Gate

41 Material Processing and Handling Equipment

41 22 23 13 Material Handling Hoists 41 22 23 13a Monorails With Air Motor Powered Hoist 41 22 23 13b Monorails With Electric Powered Hoists 41 22 23 13c Monorails With Manual Hoist 41 22 23 23 Ash Hoists

TOC - 12 Quantico FBI Buildings

01 - General Requirements

April 2022 No Specification Required Quantico FBI Buildings 01 22 16 00 - 1

SECTION 01 22 16 00 - NO SPECIFICATION REQUIRED

1.1 GENERAL

A. A separate specification is not required for this item. The description given in the line item of the Construction Task Catalog completely defines the item.

1.2 PRODUCTS - (Not Used)

1.3 EXECUTION - (Not Used)

END OF SECTION 01 22 16 00

No Specification Required April 2022

01 22 16 00 - 2 Quantico FBI Buildings

THIS PAGE INTENTIONALLY LEFT BLANK

Quantico FBI Buildings 01 22 20 00 to 01 22 23 00 - 1

Task Specification Specification Description 01 22 20 00 01 22 16 00 No Specification Required 01 22 23 00 01 22 16 00 No Specification Required

01 22 20 00 to 01 22 23 00 - 2 Quantico FBI Buildings

April 2022 Indoor Air Quality Protection During Construction Quantico FBI Buildings 01 45 23 00 - 1

SECTION 01 45 23 00 - INDOOR AIR QUALITY PROTECTION DURING CONSTRUCTION

PART 1 - GENERAL

DESCRIPTION

A. IAQ Management Plan: During construction meet or exceed the recommended Design Approaches of the Sheet Metal and Air Conditioning National Contractors Association (SMASNA), IAQ Guidelines for Occupied Buildings under Construction.

B. Protect indoor air, absorbent materials, and mechanical system from contamination.

C. Schedule construction and installation to prevent buildup of contaminates that cannot be removed prior to occupancy.

D. Existing buildings or phased occupancy. General IAQ requirements include:

1. Isolate areas of construction with solid physical barriers.

a. Securely attach and seal at floor and structure above.

2. Schedule adequate time for product installation.

3. Maintain negative air pressure in construction area of ≥ 0.01" WG

4. Do not recirculate air prior to occupancy.

5. Seal return air ducts and use direct exhaust to outside.

6. Factory age sheet goods.

7. Consult manufacturers for appropriate dry out times.

8. Existing facilities: Protect absorbent materials with recycled or recyclable materials.

E. Temporary Construction Ventilation: Maintain sufficient temporary ventilation of areas where materials are being used that emit VOCs. Maintain ventilation continuously during installation, and until emissions dissipate after installation. If continuous ventilation is not possible via building's HVAC system(s) then ventilation shall be supplied via open windows and temporary fans, sufficient to provide not less than three air changes per hour.

1. Period after installation shall be sufficient to dissipate odors and elevated concentrations of

VOCs. Where non-specified period is stated in these specifications, a time period of 72 hours shall be used.

2. When installing wet products (fluid applied coatings or adhesives) ventilate with outside air.

Provide minimum 5 air changes per hour.

3. Ventilate areas directly to outside; ventilation to other enclosed areas is not acceptable

F. During dust producing activities (e.g., drywall installation and finishing) turn ventilation system off, and openings in supply and return HVAC system shall be protected from dust infiltration. Provide temporary ventilation as required. Contractor to size and maintain temporary ventilation units in accordance with manufacturer's directions, and to document such maintenance in log for Government review.

G. Preconditioning: Prior to installation, allow products which have odors and significant VOC emissions to off-gas in dry, well-ventilated space for 14 calendar days to allow for reasonable dissipation of odors and emissions prior to delivery to Project site.

1. Condition products without containers and packaging to maximize off gassing of VOCs.Condition products in ventilated spaces.

H. Schedule Of Installation

1. Install finish materials using following sequence:

a. Fluid applied wall, ceiling, and floor materials.

b. Adhesive applied sheet and tile flooring.

Indoor Air Quality Protection During Construction April 2022

01 45 23 00 - 2 Quantico FBI Buildings

c. Adhesive applied wall covering.

d. Carpet.

e. Acoustical ceiling material.

2. Comply with sequencing requirements specified in Environmental Requirements.

1.2 SUMMARY

A. Related Sections include the following:

1. 'Indoor Air Quality Guideline 1 - Selecting Low Emitting Products for the Indoor Environment' for guidance on selecting low emitting products to maintain acceptable IAQ.

2. 'IAQ Guideline 2 - Commissioning HVAC Systems' for guidance on commissioning HVAC systems in new and renovated facilities to maintain acceptable IAQ.

3. `IAQ Guideline 3 - Design, Operation, Maintenance & Testing of Heating, Ventilation and Air-

Conditioning (HVAC) Systems' .

4. `IAQ Guideline 4 - Maintaining Acceptable IAQ During Construction and Renovation' for requirements that shall be used during construction and renovation activities.

5. "IAQ Construction Checklist"

SUBMITTALS

B. Sustainable Design Submittals:

1. LEED EQ Credit 3.1: Construction IAQ Management Plan: Comply with submittal requirements for Construction IAQ Management Plan specified in “Submittals”. Contractor shall submit written CIAQ Plan to COR for review and approval prior to the start of construction.

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION - NOT USED

END OF SECTION 01 45 23 00

April 2022 Panelboards Quantico FBI Buildings 01 51 13 00 - 1

SECTION 01 51 13 00 - PANELBOARDS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Power panelboards.

2. Lighting and appliance branch-circuit panelboards.

3. Load centers.

4. Electronic-grade panelboards.

5. Disconnecting and overcurrent protective devices.

B. Related Requirements:

1. Section 260010 "Supplemental Requirements for Electrical" for additional abbreviations, definitions, submittals, qualifications, testing agencies, and other Project requirements applicable to Work specified in this Section.

2. Section 260011 "Facility Performance Requirements for Electrical" for seismic-load, wind-load, acoustical, and other field conditions applicable to Work specified in this Section.

1.2 DEFINITIONS

A. GFEP: Ground-fault equipment protection.

B. MCCB: Molded-case circuit breaker.

C. VPR: Voltage protection rating.

1.3 ACTION SUBMITTALS

A. Product Data:

1. Power panelboards.

2. Lighting and appliance branch-circuit panelboards.

3. Load centers.

4. Electronic-grade panelboards.

5. Disconnecting and overcurrent protective devices.

6. Include materials, switching and overcurrent protective devices, SPDs, accessories, and components indicated.

7. Include dimensions and manufacturers' technical data on features, performance, electrical characteristics, ratings, and finishes.

B. Shop Drawings: For each panelboard and related equipment.

1. Include dimensioned plans, elevations, sections, and details.

2. Show tabulations of installed devices with nameplates, conductor termination sizes, equipment features, and ratings.

Panelboards April 2022

01 51 13 00 - 2 Quantico FBI Buildings

3. Detail enclosure types including mounting and anchorage, environmental protection, knockouts, corner treatments, covers and doors, gaskets, hinges, and locks.

4. Detail bus configuration, current, and voltage ratings.

5. Short-circuit current rating of panelboards and overcurrent protective devices.

6. Include evidence of listing, by qualified electrical testing laboratory recognized by authorities having jurisdiction, for series rating of installed devices.

7. Include evidence of listing, by qualified electrical testing laboratory recognized by authorities having jurisdiction, for SPD as installed in panelboard.

8. Detail features, characteristics, ratings, and factory settings of individual overcurrent protective devices and auxiliary components.

9. Include wiring diagrams for power, signal, and control wiring.

10. Key interlock scheme drawing and sequence of operations.

11. Include time-current coordination curves for each type and rating of overcurrent protective device included in panelboards. Submit on translucent log-log graft paper; include selectable ranges for each type of overcurrent protective device. Include Internet link for electronic access to downloadable PDF of coordination curves.

C. Field Quality-Control Submittals:

1. Field quality-control reports.

1.4 INFORMATIONAL SUBMITTALS

A. Panelboard Schedules: For installation in panelboards.[ Submit final versions after load balancing.]

B. Manufacturers' Published Instructions: Record copy of official installation[ and testing] instructions issued to Installer by manufacturer for the following:

1. Recommended procedures for installing panelboards.

2. Recommended torque settings for bolted connections on panelboards.

3. Recommended temperature range for energizing panelboards.

C. Sample warranties.

1.5 CLOSEOUT SUBMITTALS

A. Warranty documentation.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Spare Parts: Furnish to Owner spare parts, for repairing panelboards, that are packaged with protective covering for storage on-site and identified with labels describing contents.[ Include the following:]

1. Keys: [Two] <Insert number> spares for each type of panelboard cabinet lock.

2. Circuit Breakers Including GFCI and GFEP Types: [Two] <Insert number> spares for each panelboard.

3. Fuses for Fused Switches: Equal to 10 percent of quantity installed for each size and type, but no fewer than three of each size and type.

4. Fuses for Fused Power-Circuit Devices: Equal to 10 percent of quantity installed for each size and type, but no fewer than three of each size and type.

5. <Insert extra materials>.

Quantico FBI Buildings 01 51 13 00 - 3

B. Special Tools: Furnish to Owner proprietary equipment, keys, and software required to operate, maintain, repair, adjust, or implement future changes to panelboards, that are packaged with protective covering for storage on-site and identified with labels describing contents.[ Include the following:]

1. Accessory Set: Include tools and miscellaneous items required for overcurrent protective device test, inspection, maintenance, and operation.

2. Portable Test Set: For testing functions of solid-state trip devices without removing from panelboard. Include relay and meter test plugs suitable for testing panelboard meters and switchboard class relays.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Remove loose packing and flammable materials from inside panelboards; install temporary electric heating (250 W per panelboard) to prevent condensation.

B. Handle and prepare panelboards for installation in accordance with [NECA 407] [NEMA PB 1].

1.8 WARRANTY

A. Special Installer Extended Warranty: Installer warrants that fabricated and installed panelboards perform in accordance with specified requirements and agrees to repair or replace components or products that fail to perform as specified within extended-warranty period.

1. Extended-Warranty Period: [Two] <Insert number> years from date of Substantial Completion;

full coverage for labor, materials, and equipment.

B. Special Manufacturer Extended Warranty: Manufacturer warrants that panelboards perform in accordance with specified requirements and agrees to provide repair or replacement of components or products that fail to perform as specified within extended-warranty period.

1. [Initial ]Extended-Warranty Period: [Three] [Four] <Insert number> years from date of Substantial Completion; [full] [prorated] coverage for labor, materials, and equipment.

2. Follow-On Extended-Warranty Period: [Five] <Insert number> years from date of Substantial Completion; [full] [prorated] coverage for materials[ that failed because of transient voltage surges] only, free on board [origin] [destination], freight prepaid.

PART 2 - PRODUCTS

2.1 EXISTING PRODUCTS[ TO BE MODIFIED] [ TO BE REMOVED AND RE-INSTALLED]

A. Basis for Pricing: <Insert name of manufacturer; model number or series for existing product>.

B. Description: <Insert description of existing product, including special features, options, and finishes that may impact Work>.

C. Accessories: <Insert accessories included with existing product>.

01 51 13 00 - 4 Quantico FBI Buildings

2.2 PANELBOARDS AND LOAD CENTERS COMMON REQUIREMENTS

A. Fabricate and test panelboards in accordance with IEEE 344 to withstand seismic forces defined in Section 260548.16 "Seismic Controls for Electrical Systems."

B. Product Selection for Restricted Space: Drawings indicate maximum dimensions for panelboards including clearances between panelboards and adjacent surfaces and other items. Comply with indicated maximum dimensions.

C. Electrical Components, Devices, and Accessories: Listed and labeled in accordance with NFPA 70, by qualified electrical testing agency recognized by authorities having jurisdiction, and marked for intended location and application.

D. Comply with NEMA PB 1.

E. Comply with NFPA 70.

F. Enclosures: [Flush] [and] [Surface]-mounted, dead-front cabinets.

1. Rated for environmental conditions at installed location.

a. Indoor Dry and Clean Locations: UL 50E, [Type 1] <Insert type>.

b. Outdoor Locations: UL 50E, [Type 3R] <Insert type>.

c. [Kitchen] [Wash-Down] Areas: UL 50E, [Type 4X] <Insert type>, [stainless steel]

<Insert material>.

d. Other Wet or Damp Indoor Locations: UL 50E, [Type 4] <Insert type>.

e. Indoor Locations Subject to Dust, Falling Dirt, and Dripping Noncorrosive Liquids: UL 50E, [Type 5] [Type 12].

2. Height: 7 ft (2.13 m) maximum.

3. Front: Secured to box with concealed trim clamps. For surface-mounted fronts, match box dimensions; for flush-mounted fronts, overlap box. Trims must cover live parts and may have no exposed hardware.

4. Hinged Front Cover: Entire front trim hinged to box and with standard door within hinged trim cover. Trims must cover live parts and may have no exposed hardware.

5. Skirt for Surface-Mounted Panelboards: Same gage and finish as panelboard front with flanges for attachment to panelboard, wall, and ceiling or floor.

6. Gutter Extension and Barrier: Same gage and finish as panelboard enclosure; integral with enclosure body. Arrange to isolate individual panel sections.

7. Finishes:

a. Panels and Trim: [Steel] [and] [galvanized steel], factory finished immediately after cleaning and pretreating with manufacturer's standard two-coat, baked-on finish consisting of prime coat and thermosetting topcoat.

b. Back Boxes: [Galvanized steel] [Same finish as panels and trim].

c. Fungus Proofing: Permanent fungicidal treatment for overcurrent protective devices and other components.

8. <Insert optional features>.

G. Incoming Mains:

1. Location: [Top] [Bottom] [Convertible between top and bottom].

2. Main Breaker: Main lug interiors up to 400 A must be field convertible to main breaker.

Quantico FBI Buildings 01 51 13 00 - 5

H. Phase, Neutral, and Ground Buses:

1. Material: [Tin-plated aluminum] [Hard-drawn copper, 98 percent conductivity].

a. Plating must run entire length of bus.

b. Bus must be fully rated for entire length.

2. Interiors must be factory assembled into unit. Replacing switching and protective devices may not disturb adjacent units or require removing main bus connectors.

3. Equipment Ground Bus: Adequate for feeder and branch-circuit equipment grounding conductors;

bonded to box.

4. Isolated Ground Bus: Adequate for branch-circuit isolated ground conductors; insulated from box.

5. Full-Sized Neutral: Equipped with full-capacity bonding strap for service entrance applications.

Mount electrically isolated from enclosure.

6. Extra-Capacity Neutral Bus: Neutral bus rated 200 percent of phase bus and listed and labeled, by qualified electrical testing laboratory recognized by authorities having jurisdiction, as suitable for nonlinear loads in electronic-grade panelboards and others designated on Drawings.

Connectors must be sized for double-sized or parallel conductors as indicated on Drawings.

7. Do not mount neutral bus in gutter.

8. Split Bus: Vertical buses divided into individual vertical sections.

9. <Insert optional features>.

I. Conductor Connectors: Suitable for use with conductor material and sizes.

1. Material: [Tin-plated aluminum] [Hard-drawn copper, 98 percent conductivity].

2. Terminations must allow use of 75 deg C rated conductors without derating.

3. Size: Lugs suitable for indicated conductor sizes, with additional gutter space, if required, for larger conductors.

4. Main and Neutral Lugs: [Compression] [Mechanical] type, with lug on neutral bar for each pole in panelboard.

5. Ground Lugs and Bus-Configured Terminators: [Compression] [Mechanical] type, with lug on bar for each pole in panelboard.

6. Feed-Through Lugs: [Compression] [Mechanical] type, suitable for use with conductor material.

Locate at opposite end of bus from incoming lugs or main device.

7. Subfeed (Double) Lugs: [Compression] [Mechanical] type suitable for use with conductor material. Locate at same end of bus as incoming lugs or main device.

8. Gutter-Tap Lugs: [Compression] [Mechanical] type suitable for use with conductor material and with matching insulating covers. Locate at same end of bus as incoming lugs or main device.

9. Extra-Capacity Neutral Lugs: Rated 200 percent of phase lugs mounted on extra-capacity neutral bus.

10. <Insert optional features>.

J. Quality-Control Label: Panelboards or load centers must be labeled, by qualified electrical testing laboratory recognized by authorities having jurisdiction, for use as service equipment with one or more main service disconnecting and overcurrent protective devices. Panelboards or load centers must have meter enclosures, wiring, connections, and other provisions for utility metering. Coordinate with utility company for exact requirements.

K. Future Devices: Panelboards or load centers must have mounting brackets, bus connections, filler plates, and necessary appurtenances required for future installation of devices.

1. Percentage of Future Space Capacity: [5] [10] [20] <Insert number> percent.

L. Panelboard Short-Circuit Current Rating:

01 51 13 00 - 6 Quantico FBI Buildings

1. Rated for series-connected system with integral or remote upstream overcurrent protective devices and labeled by qualified electrical testing laboratory recognized by authorities having jurisdiction. Include label or manual with size and type of allowable upstream and branch devices listed and labeled, by qualified electrical testing laboratory recognized by authorities having jurisdiction, for series-connected short-circuit rating.

a. Panelboards rated 240 V or less must have short-circuit ratings as shown on Drawings, but not less than 10 000 A(rms) symmetrical.

b. Panelboards rated above 240 V and less than 600 V must have short-circuit ratings as shown on Drawings, but not less than 14 000 A(rms) symmetrical.

2. Fully rated to interrupt symmetrical short-circuit current available at terminals. Assembly listed, by qualified electrical testing laboratory recognized by authorities having jurisdiction, for 100 percent interrupting capacity.

a. Panelboards and overcurrent protective devices rated 240 V or less must have short-circuit ratings as shown on Drawings, but not less than 10 000 A(rms) symmetrical.

b. Panelboards and overcurrent protective devices rated above 240 V and less than 600 V must have short-circuit ratings as shown on Drawings, but not less than 14 000 A(rms) symmetrical.

M. Surge Suppression: Factory installed as integral part of indicated panelboards, complying with UL 1449 SPD [Type 1] [Type 2].

2.3 POWER PANELBOARDS

A. <Double click here to find, evaluate, and insert list of manufacturers and products.>

B. Listing Criteria: NEMA PB 1, distribution type.

C. Doors: Secured with vault-type latch with tumbler lock; keyed alike.

1. For doors more than [36 inch (914 mm)] <Insert dimension> high, provide two latches, keyed alike.

D. Mains: [Circuit breaker] [Fused switch] [Lugs only].

E. Branch Overcurrent Protective Devices for Circuit-Breaker Frame Sizes 125 A and Smaller: [Plug-in circuit breakers] [Bolt-on circuit breakers] [Plug-in circuit breakers where individual positive-locking device requires mechanical release for removal].

F. Branch Overcurrent Protective Devices for Circuit-Breaker Frame Sizes Larger Than 125 A: [Bolt-on circuit breakers] [Plug-in circuit breakers where individual positive-locking device requires mechanical release for removal].

G. Branch Overcurrent Protective Devices: Fused switches.

H. Contactors in Main Bus: NEMA ICS 2, Class A, [electrically] [mechanically] held, general-purpose controller, with same short-circuit interrupting rating as panelboard.

1. Internal Control-Power Source: Control-power transformer, with fused primary and secondary terminals, connected to main bus ahead of contactor connection.

Quantico FBI Buildings 01 51 13 00 - 7

2. External Control-Power Source: [120 V branch circuit] [24 V control circuit] <Insert requirement>.

2.4 LIGHTING AND APPLIANCE BRANCH-CIRCUIT PANELBOARDS

A. <Double click here to find, evaluate, and insert list of manufacturers and products.>

B. Listing Criteria: NEMA PB 1, lighting and appliance branch-circuit type.

C. Mains: [Circuit breaker] [or] [lugs only].

D. Branch Overcurrent Protective Devices: [Plug-in] [Bolt-on] circuit breakers, replaceable without disturbing adjacent units.

E. Contactors in Main Bus: NEMA ICS 2, Class A, [electrically] [mechanically] held, general-purpose controller, with same short-circuit interrupting rating as panelboard.

1. Internal Control-Power Source: Control-power transformer, with fused primary and secondary terminals, connected to main bus ahead of contactor connection.

2. External Control-Power Source: [120 V branch circuit] [24 V control circuit] <Insert requirement>.

F. Doors: Door-in-door construction with concealed hinges; secured with [flush] [or] [multipoint] latch with tumbler lock; keyed alike.[ Outer door must permit full access to panel interior. Inner door must permit access to breaker operating handles and labeling, but current carrying terminals and bus must remain concealed.]

G. Column-Type Panelboards: Single row of overcurrent devices [with narrow gutter extension] [and] [overhead junction box equipped with ground and neutral terminal buses].

1. Column-Type Panelboard Doors: Concealed hinges secured with multipoint latch with tumbler lock; keyed alike.

2.5 LOAD CENTERS

A. <Double click here to find, evaluate, and insert list of manufacturers and products.>

B. Listing Criteria: Comply with UL 67.

C. Mains: [Circuit breaker] [or] [lugs only].

D. Branch Overcurrent Protective Devices: Plug-in circuit breakers, replaceable without disturbing adjacent units.

E. Doors: Concealed hinges secured with flush latch with tumbler lock; keyed alike.

F. Conductor Connectors: Mechanical type for main, neutral, and ground lugs and buses.

2.6 ELECTRONIC-GRADE PANELBOARDS

A. <Double click here to find, evaluate, and insert list of manufacturers and products.>

01 51 13 00 - 8 Quantico FBI Buildings

B. Listing Criteria: NEMA PB 1; UL 67; and UL 1449 after installing SPD.

C. Doors: Secured with vault-type latch with tumbler lock; keyed alike.

D. Main Overcurrent Protective Devices: Bolt-on thermal-magnetic circuit breakers.

E. Branch Overcurrent Protective Devices: Bolt-on thermal-magnetic circuit breakers.

F. Factory-Installed, Integral SPD:

1. Peak Surge Current Rating: Minimum single-pulse surge current withstand rating per phase may not be less than [100 kA] <Insert value>. Peak surge current rating must be arithmetic sum of ratings of individual MOVs in given mode.

2. Protection modes and UL 1449 VPR for grounded wye circuits with [480Y/277 V] [208Y/120 V], three-phase, four-wire circuits may not exceed the following:

a. Line to Neutral: [1200 V for 480Y/277 V] [700 V for 208Y/120 V].

b. Line to Ground: [1200 V for 480Y/277 V] [700 V for 208Y/120 V].

c. Neutral to Ground: [1200 V for 480Y/277 V] [700 V for 208Y/120 V].

d. Line to Line: [2000 V for 480Y/277 V] [1200 V for 208Y/120 V].

3. Protection modes and UL 1449 VPR for 240/120 V, single-phase, three-wire circuits may not exceed the following:

a. Line to Neutral: 700 V.

b. Line to Ground: 700 V.

c. Neutral to Ground: 700 V.

d. Line to Line: 1200 V.

4. SCCR: Equal to [SCCR of panelboard in which installed] [or exceed 100 kA] [or exceed 200 kA] [or exceed <Insert value>].

5. Inominal Rating: [20 kA] [10 kA].

G. Buses:

1. Copper phase and neutral buses; 200 percent capacity neutral bus and lugs.

2. Copper equipment and isolated ground buses.

2.7 DISCONNECTING AND OVERCURRENT PROTECTIVE DEVICES

A. <Double click here to find, evaluate, and insert list of manufacturers and products.>

B. MCCB: Comply with UL 489, with [series-connected rating] [interrupting capacity] to meet available fault currents.

1. Thermal-Magnetic Circuit Breakers:

a. Inverse time-current element for low-level overloads.

b. Instantaneous magnetic trip element for short circuits.

c. Adjustable magnetic trip setting for circuit-breaker frame sizes 250 A and larger.

2. Adjustable Instantaneous-Trip Circuit Breakers: Magnetic trip element with front-mounted, field-adjustable trip setting.

Quantico FBI Buildings 01 51 13 00 - 9

3. Electronic Trip Circuit Breakers:

a. RMS sensing.

b. Field-replaceable rating plug or electronic trip.

c. Digital display of settings, trip targets, and indicated metering displays.

d. Multi-button keypad to access programmable functions and monitored data.

e. Ten-event, trip-history log.