This solicitation package provides the terms for a Job Order Contract (JOC) to support construction projects at Federal Bureau of Investigation facilities in Quantico, Virginia. The JOC will have a one year base period and four optional one year periods, for a total of up to five years. Services required under the contract include project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design, and other tasks to fulfill construction requirements. The North American Industry Classification System code is 236220 for Commercial and Institutional Building Construction. The solicitation will utilize full small business set-aside provisions and use best value source selection. Interested small businesses within a 50 mile radius of Quantico must submit requests to attend the April 5th industry day by March 30th. Pricing will be determined by coefficients applied to calculated labor and material costs for individual task orders issued against the JOC.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15F06722R0000138/P00001 Page 1 of 11
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 11
2. AMENDMENT/MODIFICATION NUMBER
P00001
3. EFFECTIVE DATE
05/11/2022
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
15F067CODE
FEDERAL BUREAU OF INVESTIGATION
FAU - FACILITIES ACQUISITION UNIT
935 PENNSYLVANIA AVE, NW
WASHINGTON, DC 20535-0001
6. ISSUED BY 1200CODE
FACILITIES CONTRACTS UNIT - QUANTICO
FBI Academy Building 12, Room 203 Quantico, VA 22135
7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NUMBER
15F06722R0000138
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
04/29/2022
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to: 1. Update Section C - Statement of Work, Section L - Instructions, Conditions, and Notices to Offerors, and Section M - Evaluation Criteria. (SEE TRACKED CHANGES) 2. Add clause FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination.
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Dennis Guido Alber
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
05/11/2022 Previous edition unusable STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
15F06722R0000138/P00001 Page 2 of 11
Table of Contents
Section Description Page Number
1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements
FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination 5 Attachments 6 Solicitation Provisions
15F06722R0000138/P00001 Page 3 of 11
Section 2 - Commodity or Services Schedule
Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) Job Order Contract( JOC).
Firm Fixed Price
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 08/15/2022 - 08/14/2023
Base Period
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2022 - 08/14/2023
Base Period
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 08/15/2022 - 08/14/2023
Base Period
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
15F06722R0000138/P00001 Page 4 of 11
0004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2022 - 08/14/2023
Base Period
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
0005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 08/15/2022 - 08/14/2023
Base Period
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 08/15/2023 - 08/14/2024
Option Period 1
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
15F06722R0000138/P00001 Page 5 of 11
Line Period of Performance: 08/15/2023 - 08/14/2024
Option Period 1
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 08/15/2023 - 08/14/2024
Option Period 1
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2023 - 08/14/2024
Option Period 1
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
1005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 08/15/2023 - 08/14/2024
Option Period 1
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Previous : 1 LT $________ $_________________
15F06722R0000138/P00001 Page 6 of 11
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 08/15/2024 - 08/14/2025
Option Period 2
Change: 0
Current : 1
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2024 - 08/14/2025
Option Period 2
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order
PSC: Y1JZ
Line Period of Performance: 08/15/2024 - 08/14/2025
Option Period 2
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2024 - 08/14/2025
Option Period 2
Previous : 1
Change: 0
15F06722R0000138/P00001 Page 7 of 11
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
2005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 08/15/2024 - 08/14/2025
Option Period 2
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 08/15/2025 - 08/14/2026
Option Period 3
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2025 - 08/14/2026
Option Period 3
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission
Previous : 1
Change: 0
15F06722R0000138/P00001 Page 8 of 11 requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.
PSC: Y1JZ
Line Period of Performance: 08/15/2025 - 08/14/2026
Option Period 3
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2025 - 08/14/2026
Option Period 3
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
3005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
PSC: Y1JZ
Line Period of Performance: 08/15/2025 - 08/14/2026
Option Period 3
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order
PSC: Y1JZ
Line Period of Performance: 08/15/2026 - 08/14/2027
Option Period 4
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
15F06722R0000138/P00001 Page 9 of 11
4002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2026 - 08/14/2027
Option Period 4
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4003 NON-PRE-PRICED
STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order
PSC: Y1JZ
Line Period of Performance: 08/15/2026 - 08/14/2027
Option Period 4
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4004 NON-PRE-PRICED
NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.
Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.
PSC: Y1JZ
Line Period of Performance: 08/15/2026 - 08/14/2027
Option Period 4
Previous : 1
Change: 0
Current : 1
LT $________ $_________________
ITEM NO. SUPPLIES/SERVICES MAX.
QUANTITY
UNIT UNIT PRICE AMOUNT
4005 Minimal Design
Labor Categories:
Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $
Previous : 1
Change: 0
15F06722R0000138/P00001 Page 10 of 11
PSC: Y1JZ
Line Period of Performance: 08/15/2026 - 08/14/2027
Option Period 4
Section 3 - Special Contract Requirements
Clauses By Full Text
FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination
Providing Deoxyribonucleic Acid (DNA) Sample for Elimination
FBI employees, contractors and service providers may interact with evidence or federal deoxyribonucleic acid (DNA) database samples in Laboratory Division (LD) space, or their work requires them to enter laboratory examination areas where evidence or DNA database samples are processed or examined. As a result, evidence may inadvertently become contaminated with their DNA. Per the Federal Bureau of Investigation Laboratory Elimination Deoxyribonucleic Acid Database Policy Directive (FLEDD) (1149D), LD is collecting DNA samples to identify FBI employee, contractor or service provider DNA profiles in the event of a sample contamination via the Form FD-1176, “Federal Bureau of Investigation Deoxyribonucleic Acid (DNA) Sample Collection Acknowledgement Form.”
A contractor or service provider funded by the procurement action referenced in this letter is requested to provide a DNA sample, which will be processed for DNA and used to detect contamination on forensic evidence. The DNA will be collected by having the individual swab the inside of their cheek. The samples are processed to develop a standard forensic DNA profile which is similar to a fingerprint in that it is unique to an individual but does not provide any other personal information about an individual such as ancestry or appearance values. The DNA profiles are stored in anonymous databases on FBI-secured networks, without Personal Identifiable Information (PII), and are only accessible by authorized DNA personnel for the sole purpose of detecting contamination.
If the contractor or service provider’s DNA profile is detected during evidence analysis, it will be identified as sample contamination only.
Section 5 - Attachments
No Clauses
Identifier Title Number of Pages
1 SECTION B - SUPPLIES OR SERVICE AND PRICE - COST.pdf 17 2 SECTION C - STATEMENT OF WORK.pdf 27 3 SECTION E - INSPECTION AND ACCEPTANCE.pdf 2 4 SECTION F - DELIVERIES OR PERFORMANCE.pdf 3 5 SECTION G - CONTRACT ADMINISTRATION DATA.pdf 17 7 SECTION L - Instructions Conditions and Notices to Offerors.pdf 8 8 SECTION M - EVALUATION CRITERIA.pdf 12
Section 6 - Solicitation Provisions
Provisions By Reference
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.
15F06722R0000138/P00001 Page 11 of 11
In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): www.acquisition.gov
Provision Title Fill-ins (if applicable)
52.215-1 Instructions to Offerors-Competitive Acquisition (Nov 2021)
52.215-22 Limitations on Pass-Through Charges-Identification of Subcontract
Effort (Oct 2009)
52.222-46 Evaluation of Compensation for Professional Employees (Feb 1993)
File details come from the government source that posted it. Updated .