15F06722R0000138_FY22_Quantico_JOC.pdf

PDF 45 KB Posted

Attached to
FBI Quantico Job Order Contract (JOC) PHASE 1 SOLICITATION NOTICE
Solicitation number
15F06722R0000138
Issued by

About this file

This solicitation is for a Job Order Contract (JOC) to provide construction, alteration, and repair services at various FBI facilities in Quantico, Virginia. The contract will have a one year base period and four option periods for a total of up to five years. The services required include project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design, and other tasks to fulfill construction requirements. The NAICS code is 236220 and it is set aside 100% for small businesses located within 50 miles of Quantico. Proposals are due by May 31, 2022. Award will be made using best value evaluation. An industry day was held on April 5, 2022 to provide details to interested small businesses.

View the file

Other files

File Type Posted
15F06722R0000138_P00002.pdf PDF
15F06722R0000138 SECTION M - EVALUATION CRITERIA (Amendment P00002).pdf PDF
15F06722R0000138 SECTION L Instructions Conditions and Notices to Offerors (Amendment P00002).pdf PDF
Attachment R Contractor Teaming Arrangement Instructions.pdf PDF
15F06722R0000138 Attachment H - Part II Questions (AS OF 17 MAY 22).pdf PDF
Attachment O Joint Venture Partner Form (Amended).pdf PDF
Attachment Q Resume Template.pdf PDF
15F06722R0000138 Attachment H - Questions (Answered) AS OF 1626 CST.pdf PDF
15F06722R0000138 P00001 SECTION L Instructions Conditions and Notices to Offerors (Amended).pdf PDF
15F06722R0000138_P00001 FY22 Quantico JOC.pdf PDF
15F06722R0000138 P00001 SECTION M - EVALUATION CRITERIA (Amended).pdf PDF
15F06722R0000138 Attachment H - Questions (Answered).pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet (Amended).pdf PDF
15F06722R0000138 P00001 - SECTION C - STATEMENT OF WORK (Amended).pdf PDF
15F06722R0000138_FY22_Quantico_JOC.pdf PDF
JOC Industry Day Attendees Roster (2).pdf PDF
SECTION_H_-_SPECIAL_CONTRACT_REQUIREMENTS.pdf PDF
Attachment O Joint Venture Partner Form.pdf PDF
Attachment N FD-816 Access of Non-FBI Personnel to FBI Facilities Background Data Information Form.pdf PDF
Attachment F - Surety Form.pdf PDF
Attachment B - Specifications - FBI Quantico.pdf PDF
Attachment A - Construction Task Catalog - FBI Quantico.pdf PDF
SECTION_C_-_STATEMENT_OF_WORK.pdf PDF
Attachment L - RSA Badge Request Form.pdf PDF
Attachment I Ethics Fact Sheet.pdf PDF
Attachment M - SF-85 FBI LAR Form.pdf PDF
SECTION_L_-_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
SECTION_M_-_EVALUATION_CRITERIA.pdf PDF
Attachment K - LAR_SF_85_Completion_Guide.pdf PDF
Attachment E - Acquisition Risk Questions.pdf PDF
Attachment P Coeffecient Explained.pdf PDF
SECTION_E_-_INSPECTION_AND_ACCEPTANCE.pdf PDF
Attachment C-Past Performance Questionaire.pdf PDF
Attachment G - Financial Questionnaire.pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet.pdf PDF
SECTION_B_-_SUPPLIES_OR_SERVICE_AND_PRICE_-_COST.pdf PDF
Attachment J - FD-857a NDA.pdf PDF
SECTION_F_-_DELIVERIES_OR_PERFORMANCE.pdf PDF
Attachment H - Questions Template.xlsx XLSX spreadsheet
FBI Quantico JOC PreIndustry Day Pres - April 2022_04012022.pptx PPTX presentation
ATTACHMENT 6 Directions and Parking East Gate FBI Academy.pdf PDF
ATTACHMENT 1 DRAFT Statement of Work Quantico JOC.pdf PDF
ATTACHMENT 3 Seed Project Sketches (Range 7 Shoothouse).pdf PDF
ATTACHMENT 2 Seed Project DRAFT SOW (Range 7 Shoothouse Repair).pdf PDF
ATTACHMENT 6 Directions and Parking East Gate FBI Academy.pdf PDF
ATTACHMENT 5 eGordian Job Order Contract 5 Step Process.pdf PDF
ATTACHMENT 4 -Coeffecient Explained.pdf PDF
VR-219 Unlocked JOC Industry Day Visitors 20220405.xlsx XLSX spreadsheet
VR-219_JOC Industry Day Visitors 20220405.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15F06722R0000138 Page 1 of 14

SOLICITATION,OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

15F06722R0000138

SEALED BID (IFB)

X NEGOTIATED (RFP)

2. TYPE OF SOLICITATION 3. DATE ISSUED

04/29/2022

PAGE OF PAGES

1 14

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

CODE 15F067

FEDERAL BUREAU OF INVESTIGATION

FAU - FACILITIES ACQUISITION UNIT

935 PENNSYLVANIA AVE, NW

WASHINGTON, DC 20535-0001

7. ISSUED BY

FEDERAL BUREAU OF INVESTIGATION

FEDERAL BUREAU OF INVESTIGATION

935 PENNSYLVANIA AVE, NW

ROOM 6823

8. ADDRESS OFFER TO

9. FOR INFORMATION CALL: a. NAME b. TELEPHONE NUMBER (Include area code)(NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

A. Project Title: Federal Bureau of Investigation (FBI) Quantico Job Order Contract (JOC). B. This acquisition is a competitive local small business set-aside limited to businesses within a 60-mile radius of FBI Complex Quantico, VA. Interested offers must have an office within a 60 mile radius of FBI Complex Quantico, VA to be considered for award. C. The Total Contract minimum guarantee is $20,000. D. The total amount of this contract is not-to-exceed a monetary amount of $43.1M or a total term of 5 years (as extended through the exercise of options), whichever is reached first. E. Please reference Section L, (Instructions, Conditions and Notices to Offerors) for proper preparation of the offer and to Section M, (Evaluation Factors for Award). F. Proposals are due electronically to the FBI by May 31, 2022 5:00pm EST. Hand carried proposals are not permitted at this facility. Early submissions are encouraged. The Government will begin validating proposals as they are received. Submit Proposals to:

Mr. Dennis Alber: dgalber@fbi.gov Mr. Andre Wilson: alwilson6@fbi.gov

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving7 TBD

X award, notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

YES X NO

12b. CALENDAR DAYS

Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

05:00US/

Eastern a.

05/31/2022

b. An offer guarantee is, X is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

90d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

15F06722R0000138 Page 2 of 14

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

$0.00 See Line Item Detail

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY 1200

FACILITIES CONTRACTS UNIT - QUANTICO

FBI Academy Building 12, Room 203 Quantico, VA 22135

Send all invoices via IPP, NOT central_invoices@fbi.gov

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

Dennis Guido Alber

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY 04/29/2022

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

15F06722R0000138 Page 3 of 14

Table of Contents

Section Description Page Number

1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements 5 Attachments 6 Solicitation Provisions

15F06722R0000138 Page 4 of 14

Section 2 - Commodity or Services Schedule

Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) Job Order Contract( JOC).

Firm Fixed Price

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

15F06722R0000138 Page 5 of 14

0004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

1 LT $________ $_________________

15F06722R0000138 Page 6 of 14

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

15F06722R0000138 Page 7 of 14

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

15F06722R0000138 Page 8 of 14

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission

15F06722R0000138 Page 9 of 14 requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

15F06722R0000138 Page 10 of 14

4002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

1 LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

15F06722R0000138 Page 11 of 14

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

15F06722R0000138 Page 12 of 14

Section 3 - Special Contract Requirements

This Section Is Intentionally Left Blank

15F06722R0000138 Page 13 of 14

Section 5 - Attachments

Identifier Title Number of Pages

1 SECTION B - SUPPLIES OR SERVICE AND PRICE - COST.pdf 17 2 SECTION C - STATEMENT OF WORK.pdf 27 3 SECTION E - INSPECTION AND ACCEPTANCE.pdf 2 4 SECTION F - DELIVERIES OR PERFORMANCE.pdf 3 5 SECTION G - CONTRACT ADMINISTRATION DATA.pdf 17 7 SECTION L - Instructions Conditions and Notices to Offerors.pdf 8 8 SECTION M - EVALUATION CRITERIA.pdf 12

15F06722R0000138 Page 14 of 14

Section 6 - Solicitation Provisions

Provisions By Reference

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.

In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): www.acquisition.gov

Provision Title Fill-ins (if applicable)

52.222-46 Evaluation of Compensation for Professional Employees (Feb 1993)

52.215-1 Instructions to Offerors-Competitive Acquisition (Nov 2021)

52.215-22 Limitations on Pass-Through Charges-Identification of Subcontract

Effort (Oct 2009)

File details come from the government source that posted it. Updated .