15F06722R0000138_P00002.pdf

PDF 41 KB Posted

Attached to
FBI Quantico Job Order Contract (JOC) PHASE 1 SOLICITATION NOTICE
Solicitation number
15F06722R0000138
Issued by

About this file

This document is an amendment to a solicitation for a Job Order Contract (JOC) to provide continued construction services at various FBI facilities in Quantico, Virginia. The FBI requires project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, design, and other associated tasks to fulfill construction requirements on task orders. The base period of performance is one year with up to four optional one-year periods, for a total of up to five years. The NAICS code is 236220 for Commercial and Institutional Building Construction. Proposals are due by June 6, 2022 at 9:00 AM EST. The solicitation will utilize full small business set-aside and best value source selection procedures.

View the file

Other files

File Type Posted
15F06722R0000138 SECTION M - EVALUATION CRITERIA (Amendment P00002).pdf PDF
15F06722R0000138 SECTION L Instructions Conditions and Notices to Offerors (Amendment P00002).pdf PDF
Attachment R Contractor Teaming Arrangement Instructions.pdf PDF
15F06722R0000138 Attachment H - Part II Questions (AS OF 17 MAY 22).pdf PDF
Attachment O Joint Venture Partner Form (Amended).pdf PDF
Attachment Q Resume Template.pdf PDF
15F06722R0000138 Attachment H - Questions (Answered) AS OF 1626 CST.pdf PDF
15F06722R0000138 P00001 SECTION L Instructions Conditions and Notices to Offerors (Amended).pdf PDF
15F06722R0000138_P00001 FY22 Quantico JOC.pdf PDF
15F06722R0000138 P00001 SECTION M - EVALUATION CRITERIA (Amended).pdf PDF
15F06722R0000138 Attachment H - Questions (Answered).pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet (Amended).pdf PDF
15F06722R0000138 P00001 - SECTION C - STATEMENT OF WORK (Amended).pdf PDF
15F06722R0000138_FY22_Quantico_JOC.pdf PDF
JOC Industry Day Attendees Roster (2).pdf PDF
SECTION_H_-_SPECIAL_CONTRACT_REQUIREMENTS.pdf PDF
Attachment O Joint Venture Partner Form.pdf PDF
Attachment N FD-816 Access of Non-FBI Personnel to FBI Facilities Background Data Information Form.pdf PDF
Attachment F - Surety Form.pdf PDF
Attachment B - Specifications - FBI Quantico.pdf PDF
Attachment A - Construction Task Catalog - FBI Quantico.pdf PDF
SECTION_C_-_STATEMENT_OF_WORK.pdf PDF
Attachment L - RSA Badge Request Form.pdf PDF
Attachment I Ethics Fact Sheet.pdf PDF
Attachment M - SF-85 FBI LAR Form.pdf PDF
SECTION_L_-_Instructions_Conditions_and_Notices_to_Offerors.pdf PDF
15F06722R0000138_FY22_Quantico_JOC.pdf PDF
SECTION_M_-_EVALUATION_CRITERIA.pdf PDF
Attachment K - LAR_SF_85_Completion_Guide.pdf PDF
Attachment E - Acquisition Risk Questions.pdf PDF
Attachment P Coeffecient Explained.pdf PDF
SECTION_E_-_INSPECTION_AND_ACCEPTANCE.pdf PDF
Attachment C-Past Performance Questionaire.pdf PDF
Attachment G - Financial Questionnaire.pdf PDF
Attachment D - Past Performance Information (PPI) Contract Reference Sheet.pdf PDF
SECTION_B_-_SUPPLIES_OR_SERVICE_AND_PRICE_-_COST.pdf PDF
Attachment J - FD-857a NDA.pdf PDF
SECTION_F_-_DELIVERIES_OR_PERFORMANCE.pdf PDF
Attachment H - Questions Template.xlsx XLSX spreadsheet
FBI Quantico JOC PreIndustry Day Pres - April 2022_04012022.pptx PPTX presentation
ATTACHMENT 6 Directions and Parking East Gate FBI Academy.pdf PDF
ATTACHMENT 1 DRAFT Statement of Work Quantico JOC.pdf PDF
ATTACHMENT 3 Seed Project Sketches (Range 7 Shoothouse).pdf PDF
ATTACHMENT 2 Seed Project DRAFT SOW (Range 7 Shoothouse Repair).pdf PDF
ATTACHMENT 6 Directions and Parking East Gate FBI Academy.pdf PDF
ATTACHMENT 5 eGordian Job Order Contract 5 Step Process.pdf PDF
ATTACHMENT 4 -Coeffecient Explained.pdf PDF
VR-219 Unlocked JOC Industry Day Visitors 20220405.xlsx XLSX spreadsheet
VR-219_JOC Industry Day Visitors 20220405.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15F06722R0000138/P00002 Page 1 of 11

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 11

2. AMENDMENT/MODIFICATION NUMBER

P00002

3. EFFECTIVE DATE

05/17/2022

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

15F067CODE

FEDERAL BUREAU OF INVESTIGATION

FAU - FACILITIES ACQUISITION UNIT

935 PENNSYLVANIA AVE, NW

WASHINGTON, DC 20535-0001

6. ISSUED BY 1200CODE

FACILITIES CONTRACTS UNIT - QUANTICO

FBI Academy Building 12, Room 203 Quantico, VA 22135

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

15F06722R0000138

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

04/29/2022

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to: 1. Extend proposal due date: Proposals are due electronically to the FBI by June 6, 2022, 9:00AM EST. 2.

Update Section L- Instructions, Conditions, and Notices to Offerors, and Section M - Evaluation Criteria. 3. Amend Attachment O Joint Venture Partner Form 4. Add Attachment Q Resume Template 5. Add Attachment R Contractor Teaming Agreement Instructions

THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE/TIME TO: 06/06/2022 - 09:00 ET US/Eastern

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Dennis Guido Alber

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

05/17/2022 Previous edition unusable STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

15F06722R0000138/P00002 Page 2 of 11

Table of Contents

Section Description Page Number

1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements

FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination 5 Attachments 6 Solicitation Provisions

15F06722R0000138/P00002 Page 3 of 11

Section 2 - Commodity or Services Schedule

Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) Job Order Contract( JOC).

Firm Fixed Price

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

15F06722R0000138/P00002 Page 4 of 11

0004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

0005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2022 - 08/14/2023

Base Period

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

15F06722R0000138/P00002 Page 5 of 11

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

1005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2023 - 08/14/2024

Option Period 1

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Previous : 1 LT $________ $_________________

15F06722R0000138/P00002 Page 6 of 11

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

Change: 0

Current : 1

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

Previous : 1

Change: 0

15F06722R0000138/P00002 Page 7 of 11

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

2005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2024 - 08/14/2025

Option Period 2

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission

Previous : 1

Change: 0

15F06722R0000138/P00002 Page 8 of 11 requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

3005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

PSC: Y1JZ

Line Period of Performance: 08/15/2025 - 08/14/2026

Option Period 3

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4001 STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

15F06722R0000138/P00002 Page 9 of 11

4002 NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4003 NON-PRE-PRICED

STANDARD work hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period of 6:00 a.m. to 6:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during this period unless otherwise authorized by the CO (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, unless otherwise specified in the Task Order

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4004 NON-PRE-PRICED

NON-STANDARD working hours. The coefficient will be multiplied by the total price of labor and material for each project as computed using eGordian.

Defined as the period outside of Standard Work. The nonstandard coefficient may be used to account for work on weekends and during non-standard hours only, and to accelerate a TO to include multiple shifts both during standard hours AND nonstandard hours. Only work specified by the CO, prior to issuance of a TO, or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the nonstandard coefficient.

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

Previous : 1

Change: 0

Current : 1

LT $________ $_________________

ITEM NO. SUPPLIES/SERVICES MAX.

QUANTITY

UNIT UNIT PRICE AMOUNT

4005 Minimal Design

Labor Categories:

Project Manager: $ Senior Civil Engineer: $ Senior Architect: $ Architect: $ Junior Architect: $ Structural Engineer: $ Senior Mechanical Engineer: $ Mechanical Engineer: $ Senior Electrical Engineer: $ Electrical Engineer: $ IT/Communications Engineer: $

Previous : 1

Change: 0

15F06722R0000138/P00002 Page 10 of 11

PSC: Y1JZ

Line Period of Performance: 08/15/2026 - 08/14/2027

Option Period 4

Section 3 - Special Contract Requirements

Clauses By Full Text

FBI-0021 Providing Deoxyribonucleic Acid (DNA) Sample for Elimination

Providing Deoxyribonucleic Acid (DNA) Sample for Elimination

FBI employees, contractors, and service providers may interact with evidence or federal deoxyribonucleic acid (DNA) database samples in Laboratory Division (LD) space or their work may require them to enter LD examination areas where evidence or DNA database samples are processed or examined. As a result, evidence may inadvertently become contaminated with their DNA. Per the Federal Bureau of Investigation Laboratory Elimination Deoxyribonucleic Acid (DNA) Database Policy Directive (1149D), LD is collecting DNA samples to identify FBI employees, contractor, or service provider DNA profiles in the event of sample contamination. A contractor or service provider funded by this procurement action is required to provide a DNA sample which will be processed for DNA and used to detect contamination on forensic evidence. The DNA results will be protected, i.e.

anonymized, maintained in a secure database with controlled access, and used only by authorized DNA personnel for the sole purpose of detecting contamination. The remaining collected sample will be stored in a secure location for potential processing with future DNA technologies, if appropriate. If the contractor or service provider's DNA profile is detected during evidence analysis, it will be identified as sample contamination rather than reported as a possible perpetrator to law enforcement.

Section 5 - Attachments

No Clauses

Identifier Title Number of Pages

1 SECTION B - SUPPLIES OR SERVICE AND PRICE - COST.pdf 17 2 SECTION C - STATEMENT OF WORK.pdf 27 3 SECTION E - INSPECTION AND ACCEPTANCE.pdf 2 4 SECTION F - DELIVERIES OR PERFORMANCE.pdf 3 5 SECTION G - CONTRACT ADMINISTRATION DATA.pdf 17 7 SECTION L - Instructions Conditions and Notices to Offerors.pdf 8 8 SECTION M - EVALUATION CRITERIA.pdf 12

Section 6 - Solicitation Provisions

Provisions By Reference

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.

In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and

15F06722R0000138/P00002 Page 11 of 11 provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): www.acquisition.gov

Provision Title Fill-ins (if applicable)

52.215-1 Instructions to Offerors-Competitive Acquisition (Nov 2021)

52.215-22 Limitations on Pass-Through Charges-Identification of Subcontract

Effort (Oct 2009)

52.222-46 Evaluation of Compensation for Professional Employees (Feb 1993)