Basis of Design Manual - Construction Documents Summary

This document is a Basis of Design Manual for construction documents prepared by Prime Architects and Coffman Engineers for the Federal Bureau of Prisons (FBOP) project to replace backup generators, associated infrastructure, and a transformer at Federal Correctional Institution Three Rivers in Three Rivers, Texas (Project No. 2403), issued March 6, 2025. The project involves removal and replacement of two existing 800kW, 480V generators with three new 1000kW, 480V generators sized to meet the campus's total peak demand load of 2,286kW; installation of a secondary "Loop B" electrical distribution system alongside the existing "Loop A" loop to provide redundancy and prevent service disruption; replacement of thirteen building primary transformers across the campus; and installation of new medium voltage load break switches at each building. The new generators will be located in an exterior, fenced generator yard northeast of the powerhouse with associated step-up transformers, and will be powered by existing 10,000-gallon diesel fuel day tanks via double-walled fuel piping with leak detection routed through directional boring under the security fence.

The design includes civil work for underground concrete-encased electrical ductbank installation with minimum 36-inch depth for the primary and secondary loops, maintaining 24-inch separation from other utilities and 25-foot minimum separation between loops; site improvements including gravel areas, walkways, and a security fence around the generator yard; replacement of the existing campus medium voltage switchgear with new paralleling switchgear capable of automatic paralleling for the three generator sets; demolition of the existing generator room and tool room walls to create a larger switchgear room requiring HVAC conditioning through three heat pump mini-splits; replacement of kitchen panelboards and associated feeders; and new LED lighting with battery backup. Design compliance is required with Federal Bureau of Prisons Technical Design Guidelines, International Building Code 2024 Edition, NFPA standards including codes for electrical systems and fire protection, and the most current OSHA requirements, with detailed electrical cutsheets and lighting calculations provided in project appendices.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIS OF DESIGN MANUAL

CONSTRUCTION DOCUMENTS

Replace Generators 1 & 2 / Infrastructure / Transformer

1700 TX-72

Three Rivers, TX 78071 Project No. 2403

Architecture

425 Gray Street Norman, OK 73069

Phone: (866) 226-8071

Engineering

1505 Lyndon B Johnson Fwy, Suite 240 Dallas, TX 75234

Phone: (919) 314-6686

Issued: 6 MARCH 2025

Contents

CIVIL DESIGN ANALYSIS............................................................................................C-1

FIRE PROTECTION DESIGN ANALYSIS ....................................................................F-1

MECHANICAL DESIGN ANALYSIS.............................................................................M-1

ELECTRICAL DESIGN ANALYSIS...............................................................................E-1

APPENDIX A – DRAWINGS

APPENDIX B – PROJECT MANUAL | SPECIFICATIONS

APPENDIX C – COST ESTIMATE

APPENDIX D – ELECTRICAL CUTSHEETS

APPENDIX E – LIGHTING CALCULATIONS

Federal Bureau of Prisons Prime Architects Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

IFC Design March 6, 2025 C-1

C

CIVIL DESIGN ANALYSIS

Three Rivers, Texas March 6, 2025

IFC Design March 6, 2025 C-2

CIVIL BASIS OF DESIGN

1. Scope of Work/Basis of Design

A. Design Concept

Federal Correctional Institution Three Rivers is located south of US Highway 72 in Three Rivers, TX.

The existing FCI Three Rivers project site is comprised of an existing Federal Correctional Institution (FCI) that houses adult male offenders at a low security level, and a Satellite Camp (SCP), that houses adult male offenders at a medium security level. The project includes replacement of the backup generators and installation of B loop wiring as original design or the electrical distribution system in accordance with the FBOP technical design guidelines.

Site development includes the installation of three new generators at Building N, within the SCP and a secondary electrical power loop with connections to new transformers and switches within the FCI and SCP. Subsequent improvements include trench ground surface restoration in landscape and pavement areas and electrical utility pads for the new generators, transformers and switches.

B. References

Code Reference and Industry Standards Criteria: Design and construction shall comply with the most recently adopted editions of the following guides and standards, and local codes and ordinances.

C. List of References

• Federal Bureau of Prisons Technical Design Guidelines for New Institution Construction, 2021

• American Society for Testing and Materials (ASTM) A1011 / A1011M - 15 Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High- Strength Low-Alloy with Improved Formability, and Ultra-High Strength

• Federal Standards (FS) FED-STD TT-V-51 (Rev F) Varnish: Asphalt

• InterNational Electrical Testing Association (NETA) ATS Acceptance Testing Specifications for

Electrical Power Distribution Equipment and Systems.

D. Applicable Codes and Standards

• American Society of Civil Engineers (ASCE)

• American Society of Testing Material (ASTM)

• International Building Code (IBC), 2024 Edition

• National Fire Protection Association (NFPA)

• National Standard Plumbing Code (NSPC)

2. Design Objectives and Provisions

A. Survey

An existing site plan has been provided by FCI Three Rivers. Existing monumentation and site infrastructure shall be protected from damage during construction.

Three Rivers, Texas March 6, 2025

IFC Design March 6, 2025 C-3

3. Site Design

A. Existing Site

Existing site infrastructure includes buildings, asphalt and concrete paving, sidewalks, landscaping and site fencing. Existing utility infrastructure includes sanitary sewer, gas, domestic water, chilled water, power and telecommunications. There is an abandoned effluent lagoon and new, active effluent lagoon located south of the FCI.

The FCI is located on the eastern portion of the site and consists of Building A through Building M as well as Building BB, Building CC, Building HH and Building SL. Existing fencing surrounds the facilities and extends along the paved entry roads from US Highway 72 and parking lot west of the FCI. The SCP is located west of the FCI and consists of Building N, the powerhouse, through Building X as well as Building AA, Building DD, Building EE, Building FB and Building RS. There is some existing fencing present around these facilities and along paved entry roads to the SCP.

The project area is relatively flat with elevations ranging from 248 in the southern portion of the FCI to 262 in the western portion of the SCP. There are some more depressed areas with elevations ranging from 239-245 nearing the pond that is located north of the site between the SCP and US Highway 72. Elevations are based on google earth imagery and corresponding topographic data.

Topographic survey data has not been provided by FCI Three Rivers at this time.

The civil team has reviewed the site plans and utility information provided by FCI and has not identified significant aboveground existing conditions that will affect the installation of the new electrical loop to the new transformers. Existing underground sanitary sewer, domestic and chilled water, natural gas, power and telecommunications utilities traverse the site through both the FCI and SCP. Sanitary sewer infrastructure includes an 8-inch sanitary sewer line with associated manholes and tank located in the SCP area. Water infrastructure consists of an 8-inch domestic water line, 12-inch water main as well as both 8-inch and 18-inch chilled water lines. Natural gas infrastructure exists as a 6-inch gas line with the natural gas plant located south of the SCP. Two above ground 10,000-gallon diesel day tanks sit outside adjacent to the powerhouse building. Power and communication lines and supporting infrastructure also exist throughout the site with the electric service point located south of the SCP near the natural gas plant. Two 450KW Marathon/Detroit generators that provide part-load emergency power to the SCP and FCI facility personnel have indicated the possibility of some existing secondary electrical loop; however, this information has not been confirmed at this time. The CAD file provided by FCI Three Rivers does not show existing stormwater utilities. Coffman has requested the original ACAD (.DWG) files from the FCI facility for existing utility information for the facility and as-built information to the existing electrical infrastructure.

Three Rivers, Texas March 6, 2025

IFC Design March 6, 2025 C-4

B. New Site Work

The primary civil scope is to provide a schematic design for the secondary “B” electrical loop between the new replacement transformers as indicated by the electrical assessment provided by FCI Three Rivers and electrical routing for the new generators to the main transformer at the Central Utility Plant (CUP), Building N. All new electrical infrastructure shall be furnished and installed in compliance with the Federal Bureau of Prisons Technical Design Guidelines and designed with the intent to prevent inmate control or disruption.

Coffman proposes an open cut trench excavation for the proposed B loop pathway, extended Loop A pathways, medium voltage switch to new transformer pathways as well as the new sight lighting conduit pathways. The electrical trench will be consistent with Section 26 05 43 of the FBOP Technical Design Guidelines. All power distribution external to buildings shall be underground and concrete encased with PVC rigid schedule 40 conduits and fittings. Concrete encased duct banks shall be installed at a minimum depth of 36” below final grade. The minimum duct size is 4-inches for secondary electric power distribution and minimum separation between ducts must be in accordance with NEC Figure 310-60. A minimum of 2 spare ducts or 25% spare ducts, whichever is greater, shall be included for future expansion for all underground power distribution services. A 24-inch minimum separation shall be maintained from all other site utilities where possible. The secondary B loop shall be installed at a minimum 25-feet away, where possible, from the existing primary A loop as to prevent service disruption if either the primary or secondary loop is damaged.

The existing generator and day tank located inside of the powerhouse are to be removed, and three

(3) new generators are to be installed exterior to the existing generator room at the powerhouse along with three (3) step-up transformers. The new generators will sit on belly tanks that are fed fuel from the existing above ground storage tanks located south of the powerhouse building. The fuel piping between the existing storage tanks and new generators shall be double walled with a steel carrier pipe and fiber reinforced plastic (FRP) containment piping with leak detection. The proposed fuel pathway will require directional boring under the existing security fence located east of the powerhouse.

A new gravel area shall is proposed northeast of the Powerhouse for the three (3) new generators and step-up transformers to be installed. The generators are to be enclosed with a 10-foot-tall security chain link fence with a 20-foot-wide double gate located north and south of the generator area. There will be an adjoining gravel road that wraps around the generator area and connects back to the existing chain-link fenced in area northwest of the Powerhouse. The gravel road shall then extend and connect into the existing 24-foot asphalt paved drive. A 5-foot gravel walkway shall be installed between the Powerhouse and generator area.

C. Site Preparation

Site preparation for the FCI and SCP site will include demolition of the ground surfaces for new trenching and electrical equipment through the site. The ground surfaces of all trenches and equipment in landscaping and pavement areas shall be restored to their original condition or better in conformance with the requirements of the authorities having jurisdiction. The backfill of trenches shall also be in accordance with authorities having jurisdiction.

IFC Design – March 6, 2025 F-1FIRE PROTECTION DESIGN ANALYSIS

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

F

FIRE PROTECITON DESIGN ANALYSIS

FIRE PROTECTION DESIGN ANALYSIS

IFC Design – March 6, 2025 F-2FIRE PROTECTION DESIGN ANALYSIS

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

FIRE PROTECTION DESIGN ANALYSIS

1. Scope of Work/Basis of Design

A. Design Concept

Federal Correctional Institution Three Rivers is located south of US Highway 72 in Three Rivers, TX.

The existing FCI Three Rivers project site is comprised of an existing Federal Correctional Institution (FCI) that houses adult male offenders at a low security level, and a Satellite Camp (SCP), that houses adult male offenders at a medium security level. The project includes replacement of the backup generators and installation of B loop wiring as original design or the electrical distribution system in accordance with the FBOP technical design guidelines.

Site development includes the installation of two new generators at Building N, within the SCP and a secondary electrical power loop with connections to new transformers within the FCI.

Subsequent improvements include trench ground surface restoration in landscape and pavement areas and electrical utility pad for the new generators.

2. References

The reference list provided below is in alpha-numerical order. The following references are applicable as referenced by National Fire Protection Policy Program Statement 1600.15.

A. List of References

• NFPA 5000 Building Construction and Safety Code 2024

• International Building Code 2024

• NFPA 1 Fire Code 2024

• NFPA 10 Portable Fire Extinguishers, 2022

• NFPA 13 Installation of Sprinkler Systems, 2022

• NFPA 25 Inspection, Testing and Maintenance of Water-Based Fire Protection Systems,

• NFPA 30 Flammable and Combustible Liquids Code, 2021

• NFPA 70 National Electrical Code, 2023

• NFPA 70E Standard for Electrical Safety in the Workplace, 2015

• NFPA 72 National Fire Alarm Code, 2022

• NFPA 80 Fire Doors and Other Opening Protectives, 2022

• NFPA 90A Air-Conditioning and Ventilating Systems, 2024

• NFPA 101 Life Safety Code, 2024 (For Egress and Life Safety Items)

• Most current Occupational Health and Safety Administration (OSHA) requirements

3. Design Objectives and Provisions

The project includes modifying the existing fire protection and fire alarm systems as required to accomplish the modifications to the mechanical and electrical systems. Sprinkler system and fire alarm work are not anticipated currently aside from the installation of drip pans in the main breaker room. It was identified that sprinkler system branchlines currently pass over the existing electrical equipment in the breaker room. It’s recommended that drip pans are installed underneath the branchlines in accordance with NFPA 70., The existing generator room is to be repurposed as the new switch gear room. Currently, it does not appear sprinkler system branchlines will be over the electrical equipment. However, IFC Design – March 6, 2025 F-3FIRE PROTECTION DESIGN ANALYSIS

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025 if during field installation sprinkler branch lines are found above electrical equipment drip pans underneath the branchlines should be provided.

Sprinkler system specifications have been included in case drip pans cannot be provided and the sprinkler system needs to be modified.

MECHANICAL DESIGN ANALYSIS IFC Design – March 6, 2025 M-1

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

M

MECHANICAL DESIGN ANALYSIS

MECHANICAL DESIGN ANALYSIS IFC Design – March 6, 2025 M-2

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

MECHANICAL DESIGN ANALYSIS

1. Scope of Work/Basis of Design

A. Design Concept

This project includes the removal and replacement of two emergency back-up generators located at the Federal Correctional in Three Rivers, TX. The existing generators are 1000 kW with two 10,000-gallon diesel tanks, which are existing to remain. The new design uses these two 10,000-gallon tanks to serve the new three generators, each with a 5,000 gallon belly-tank. Additionally, the project will update additional electrical infrastructure including select panels, transformers, and transfer switch. The backup generators will provide partial back-up power. The new switch gear room will be conditioned utilizing three heat pump mini-splits for comfort cooling and freeze protection. The design will satisfy all functional and security requirements described in the Statement of Work. The generator design and renovation will comply with the International Building Code (IBC), National Fire Protection Agency (NFPA) and all applicable reference standards.

2. References and Design Criteria

A. References

• NFPA 70 National Electrical Code 2023

• NFPA 5000 Building Construction and Safety Code 2024

• ICC International Building Code (IBC) 2024

• NFPA 1 Fire Code 2024

• NFPA 90A Air-Conditioning and Ventilating Systems, 2024

• NFPA 101 Life Safety Code, 2024 (For Egress and Life Safety Items)

• Most current Occupational Health and Safety Administration (OSHA) requirements

• American National Standards Institute (ANSI)

• National Electrical Safety Code (NESC)

• National Electrical Manufacturers Association (NEMA)

• Underwriters’ Laboratories, Inc. (UL)

3. Design Objectives and Provisions

The project includes modifying the existing Mechanical and Plumbing systems as required to accomplish the modifications to the electrical systems.

A. HVAC Engineering Scope

1) Coordinate modifications to the plumbing systems required by electrical design.

2) Provide and install three new mini-splits.

B. Plumbing Engineering Scope

MECHANICAL DESIGN ANALYSIS IFC Design – March 6, 2025 M-3

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

1) Coordinate modifications to the mechanical duct work required by electrical design.

2) Re-route water piping in the areas that are located above the main switch gear.

3) Remove the existing eye-wash station from the new switch gear room.

ELECTRICAL DESIGN ANALYSIS IFC Design – March 6, 2025 E-1

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

E

ELECTRICAL DESIGN ANALYSIS

ELECTRICAL DESIGN ANALYSIS IFC Design – March 6, 2025 E-2

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

ELECTRICAL DESIGN ANALYSIS

1. Scope of Work/Basis of Design

A. Design Concept

The primary objective of this project includes the removal and replacement of several major components of the existing campus electrical distribution system at the Federal Correctional Institution in Three Rivers, TX, including two (2) emergency backup generators, thirteen (13) individual building primary transformers, and the campus medium voltage (MV) main switchgear.

New feeders from the utility substation transformer to the new campus medium voltage distribution switchgear. The project will also include the installation of a redundant “Loop B” medium voltage feeder throughout the campus to supply the new building transformers with a second source of supply. New medium voltage load break switches will also be installed at each building ahead of the transformers, to allow for switching between “A” and “B” loop connection, and to allow each building’s transformer to be isolated from the campus loop system for maintenance.

Finally, the project will update additional electrical infrastructure including the replacement of select kitchen panels and their supply feeders, new lighting in the new Switchgear Room, and new branch circuiting for HVAC equipment being installed to condition the new Switchgear Room.

The design will satisfy all functional and security requirements described in the Statement of Work. The generator design and renovation will comply with the International Building Code (IBC), National Fire Protection Agency (NFPA) and all applicable reference standards as adopted by the applicable Unified Facilities Criteria (UFC).

Refer to the Electrical Cutsheets Appendix for select basis-of-design equipment, including the generators, paralleling switchgear, medium voltage switches, and medium voltage transformers.

2. References and Design Criteria

A. References

• NFPA 70 National Electrical Code.

• NFPA 70E Standard for Electrical Safety in the Workplace

• NFPA 101, Life Safety

• American National Standards Institute (ANSI)

• National Electrical Safety Code (NESC)

• National Electrical Manufacturers Association (NEMA)

• Underwriters’ Laboratories, Inc. (UL)

• FBOP Technical Design Guidelines for New Institution Construction

ELECTRICAL DESIGN ANALYSIS IFC Design – March 6, 2025 E-3

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

3. Design Objectives and Provisions

A. Powerhouse – Campus Power Distribution

1) Emergency Backup Generators

The campus’s two (2) existing 800kW, 480V generators located inside the Powerhouse will be demolished and replaced with three (3) 1000kW, 480V generators. Each of the two existing generators have an associated 10,000 gallon diesel fuel day tank which will also be demolished.

The existing generators are directly connected to the existing campus MV switchgear, and are intended to provide emergency and backup power to the entire campus when utility power is offline. However, the existing generators are not paralleled and cannot support the total demand load of the campus.

The three (3) new 1000kW generators are sized to meet the campus’s total peak demand load of 2286kW. The new generators will be located exterior to the Powerhouse building, in a nearby dedicated, fenced Generator Yard to reduce disruption during power switchover. New site lighting will be provided for the Generator Yard. The new generators will feed the new parallelling medium voltage switchgear being installed as part of this project.

Each new generator will have a subbase fuel tank sized for a 72-hour runtime at full load. The fuel tanks will be connected to the site’s diesel fuel supply system via the existing above ground fuel storage tanks located to the south of the Powerhouse.

The new generators will require installation and performance verification prior to demolition and removal of the existing generators. During construction, the new generators output supply will be connected to the existing campus MV switchgear, to provide backup power to the campus while the existing generators are being demolished, and the new campus MV switchgear is being installed.

2) Generator Transformers

Each of the two (2) existing 800kW, 480V generators have an associated step-up transformer which steps the generator supply voltage (480V) up to medium voltage (12.47kV), in order to connect to and supply the campus’s medium voltage distribution switchgear. These two transformers will also be demolished and replaced under this project. Each of the three (3) new 1000kW generators will have a new 1250kVA, 480V:12,470V step-up transformer installed adjacent to it within the new generator yard.

3) Overhead Conduit Bridge

In order to avoid the many existing underground utilities around the Powerhouse building, all electrical conduit going from the Generator & Transformer Yard to the Powerhouse will be routed overhead instead of underground. The conduits will be supported by a conduit bridge structure until they reach the corner of the Powerhouse. The conduits will be routed along the exterior wall of the Powerhouse until their point of entry into the building.

4) Temporary Generator Connection

During the site visit, it was observed that the wiring for the temporary generator connection to the campus switchgear shown in the RFP/SOW was disconnected from the gear and laid out within the room for future use. Under this project, the temporary generator and the wiring and poke-through wall sleeve will be removed / demolished, once the existing campus MV

ELECTRICAL DESIGN ANALYSIS IFC Design – March 6, 2025 E-4

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025 switchgear is replaced. The wall sleeve location in the switchgear room exterior wall will be patched.

5) Medium Voltage (12.47kV) Paralleling Switchgear

Due to multiple factors including age, lack of generator paralleling capabilities, and the installation of “Loop B”, the existing campus MV switchgear will be replaced as part of this project. For reduced downtime and ease of cutover, the existing MV switchgear will remain in place and operational until the new paralleling switchgear is ready to be energized. The existing Hand-Off-Auto switching mechanism between utility and generator power on the existing switchgear will be demolished.

The new campus MV switchgear will be located in the old Generator Room, once the existing generators are demolished. In order to maintain NEC-required clearances around the new switchgear, the wall between the old Generator Room and the Tool Room will be demolished, to create a single larger New Switchgear Room.

The new gear will include automatic paralleling capabilities for the three new generator sets plus a spare section for temporary load bank connection. Each generator connection will land on its own vertical section of the gear. The generator supply bus will be connected to the “Loop A” and “Loop B” buses via normally open tie breakers.

Owner load monitoring for each feeder loop and for total utility consumption will be designed for the new gear. The new switchgear installation will also include a separate system controls switchboard for operation of the medium voltage gear, plus a station battery system panel.

6) Low Voltage (480V) Switchgear

The 480V switchgear located adjacent to the existing campus MV switchgear, which is fed from the existing backup generators and supplies the existing step-up (480V – 12.47kV) transformers, will be demolished.

B. Site Power Distribution

1) Site Building Transformers

Thirteen (13) of the fourteen building transformers require replacement across the Three Rivers campus. The only existing transformer not being replaced under this project is for Building W. All of the transformers are wye-wye connected with 12470Y/7200V primary, and either 480Y/277V or 208Y/120V secondaries, with kVA ratings ranging from 300 to 3000kVA.

The design intent is that all thirteen transformers will be replaced in-kind with identical voltage configurations and kVA ratings.

The new transformers will be 60Hz, 95kV BIL, liquid immersed and cooled, mineral oil insulated, with copper windings. The transformers will contain liquid containment measures to prevent the spread of fluid in the event of a leak. The transformers will be capable of isolation from the campus medium voltage loop so that maintenance and testing can be performed safely.

2) Pad-mounted Medium Voltage Switches

New medium voltage switches will be installed upstream of each building transformer on campus. The switch will allow for switching between the existing feeder “A”, and the new

ELECTRICAL DESIGN ANALYSIS IFC Design – March 6, 2025 E-5

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025 feeder “B” supply at each building. The switch will also allow for the building transformer to be isolated completely from the campus primary loop system.

3) Primary Feeder Loops

The existing primary feeder “A” will be existing to remain throughout most of the campus.

Feeder “A” will have short extensions with new conductors, conduit, and ductbank to connect to the new pad-mount medium voltage switches at each building. In some locations noted on the plans, feeder “A” ductbank will be abandoned in place due to the new construction.

According to the SOW and As-Built documents provided to Coffman, the original design for the site included electrical Loop Feeder “B”, but the infrastructure was never installed. This project will include installation of a new primary feeder “B” to provide a second power feed to each building on campus. The new feeder “B” will be a new concrete encased ductbank run (in most cases) parallel to the existing feeder “A”. Feeders “A” and “B” will connect to the medium voltage switches which will in turn supply the new building transformers.

C. Interior Electrical

1) Branch Circuit Panelboards

The design will include the replacement of six (6) panels in the Camp Kitchen area and eight (8) panels in the FCI Kitchen area. The panelboards will be surface-mounted, dead front construction with copper bussing. Breakers will be bolt-on type. Panelboards will be sized to include 25% spare breaker space. Due to the panel locations, the enclosures shall be NEMA 3R with stainless steel.

Feeder wiring to each replacement panelboard will be replaced with in-kind conductors. The existing conduit from the source of supply to each panelboard shall be reused.

2) Conductors

All interior branch circuit conductors will be copper. Building wiring (line-voltage between 100- 600 volts) will be type THHN/THWN except in unheated areas or outside, where XHHW and XHHW- 2 will be used. No wire for line voltage applications shall be specified as less than 12 AWG in size. A separate green insulated equipment grounding conductor will be installed in all raceways.

3) Raceway

All new building wiring will be installed in conduit. The minimum conduit size will be 3/4 inch.

All new interior exposed raceways will be RMC, IMC, or EMT. Conduits will be installed in accordance with FBOP’s guidelines for interior/exterior and secure/non-secure locations.

4) Lighting

All new interior lighting will be LED. New fixtures will be circuited to existing lighting circuits.

Emergency light fixtures will be provided with integral battery backup.

D. Recommendations

1) Feeder switchgear to kitchen panels

ELECTRICAL DESIGN ANALYSIS IFC Design – March 6, 2025 E-6

Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025

The switchgear that feeds the FCI kitchen panels and associated transformer was seen to be in poor condition and had exposed live parts. It is recommended that the exposed parts be closed up for safety concerns. The age of the switchgear was also seen to be passed its estimated usefulness lifespan. It is also recommended that this switchgear be replaced.

The switchgear that feeds the Camp kitchen panels had a HVAC duct that violated the required dedicated electrical space for safe working conditions. It is recommended that this duct be removed from this space.

2) Diesel fuel tanks

The above ground diesel fuel storage tanks’ condition are currently unknown. It is assumed that the tanks are original to the site and it is a concern that the interior may be corroded. This corrosion may contaminate the fuel going to the new generators. New generators will be more sensitive to the contaminates which could deteriorate the equipment. Confirmation is needed to determine the condition of the above ground storage tank and fuel supply system.

3) Dedicated emergency panels

It was confirmed that the site does not have dedicated emergency panels that would prioritize critical systems. It is recommended that the electrical system be reworked so that critical systems are on an emergency panel for easier transfer of emergency power and so that the breakers are easier to locate for maintenance purposes.