Attachment 4 -APP_A-DRAWINGS.pdf
PDF 14 MB Posted
- Solicitation number
- 15BNAS27Q00000002
About this file
This file is a set of construction drawings and technical documents for the Federal Bureau of Prisons (FBOP) Federal Correctional Institution (FCI) Three Rivers replacement project located at 1700 TX-72, Three Rivers, Texas 78071. The drawings are preliminary in nature, dated March 6, 2025, and prepared by Prime Architects (Project No. 2403) in coordination with Coffman Engineers. The project scope encompasses the replacement of two generators (Generators 1 and 2) at Building N (the Powerhouse), installation of a secondary "Loop B" electrical feeder system between transformers, replacement of fuel system infrastructure, demolition of existing equipment, site restoration, and associated civil, mechanical, plumbing, electrical, and fire protection work. The construction documents include comprehensive site plans, demolition plans, power loop routing plans, civil details with concrete pad specifications and utility trench designs, architectural floor plans showing generator and switchgear room modifications, mechanical schedules for HVAC equipment (three 2-ton Daikin split systems), diesel fuel system design with submersible pump and polishing system specifications, and electrical site plans with one-line diagrams.
Key technical requirements include maintaining minimum 50-foot clearance between the new "Loop B" electrical pathways and existing "Loop A" pathways with 3-inch concrete encasement around electrical conduits, installation of double-wall steel carrier piping with fiber-reinforced plastic containment for fuel delivery approximately 500 linear feet from storage tanks to new generators, jack-and-bore installation of 58 linear feet of carrier pipe across security-fenced areas, concrete equipment pads with specific bearing capacity of 1,500 PSF minimum, and compliance with 2024 International Building Code standards. Critical coordination requirements include notifying One-Call (1-800-344-8377) at least 48 hours before digging, field verification of all existing utility locations, traffic control coordination with FBOP facility engineering minimum two weeks in advance, and compliance with OSHA excavation and construction safety standards. The contractor is responsible for all demolition waste removal, site protection of non-scheduled improvements, hazardous materials identification and notification, as-built documentation of installed subsurface utilities, and restoration of all disturbed surfaces to original or better condition.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
EN
E
LAVASTID
A
AT
T S
XETE FO
SA
R
EG
IS
TE
RED ARCHITEC
T
24186
425 WEST GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
Au to de sk D oc s:
//2 4Z 5A
U
- F
C I T hr ee R iv er s
- R ep la ce G en er at or s/
FC
I T hr ee R iv er s
- R ep la ce G en er at or s.
rv t
3/ 7/ 1:
:1
AM
FEDERAL CORRECTIONAL INSTITUTION,
THREE RIVERS
REPLACE GENERATORS 1 & 2 / INFRASTRUCTURE / TRANSFORMER
1700 TX-72
THREE RIVERS, TX 78071
Project No. 2403
CONSTRUCTION DOCUMENTS
MARCH 6, 2025
NO DIGGING SHOULD START
UNTIL LOCAL UNDERGROUND
UTILITY IDENTIFYING COMPANY
HAS BEEN NOTIFIED, AND ALL
UNDERGROUND UTILITIES HAVE
BEEN MARKED
SHEET INDEX
SHEET
NO. SHEET NAME
GENERAL
GI001 COVER SHEET
GI003 GENERAL NOTES AND SYMBOLS
CIVIL
C-100 EXISTING CONDITIONS PLAN
C-200 SITE DEMOLITION PLAN
C-300 SITE RESRORATION PLAN
C-301 POWER LOOP ROUTING PLAN
C-302 POWER LOOP ROUTING- POWERHOUSE PLAN
C-303 POWER LOOP ROUTING- POWER HOUSE & GENARATOR PLAN
C-304 CIVIL DETAILS
C-305 CIVIL DETAILS
C-306 CIVIL DETAILS
ARCHITECTURE
AD101 DEMO FLOOR PLAN POWERHOUSE BUILDING
AE101 FLOOR PLAN POWERHOUSE BUILDING
FIRE PROTECTION
FD101 SWITCHGEAR BUILDING FIRE PROTECTION DEMOLITION PLAN
FP101 SWITCHGEAR BUILDING FIRE PROTECTION PLAN
PLUMBING
PD-101 PLUMBING POWERHOUSE BUILDING DEMO PIPING PLANS
MECHANICAL
M-001 MECHANICAL GENERAL NOTES & LEGEND
MD-101 POWERHOUSE BUILDING DEMO PLANS
M-101 POWERHOUSE BUILDING PLANS
SHEET INDEX
SHEET
NO. SHEET NAME
M-601 MECHANICAL SCHEDULES
ELECTRICAL
E-001 ABBREVIATIONS, SYMBOLS LEGEND, AND SHEET INDEX
E-002 GENERAL NOTES
ES101 OVERALL ELECTRICAL DEMOLITION SITE PLAN
ES102 OVERAL ELECTRICAL SITE PLANS
ES401 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS
ES402 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS
ES403 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS
ES404 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS
ES405 ENLARGED ELECTRICAL SITE PLAN VIEWS
ES406 ENLARGED ELECTRICAL SITE PLAN VIEWS
ES407 ENLARGED ELECTRICAL SITE PLAN VIEWS
ES408 ENLARGED ELECTRICAL SITE PLAN VIEWS
ES409 ENLARGED ELECTRICAL SITE PLAN VIEWS
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
ES503 ELECTRICAL SITE DETAILS
ES504 ELECTRICAL SITE DETAILS
ES505 ELECTRICAL SITE DETAILS
ES506 ELECTRICAL SITE DETAILS
ES507 ELECTRICAL SITE DETAILS
ES508 ELECTRICAL SITE DETAILS
ES601 DEMOLITION SITE ONE-LINE DIAGRAM
ES602 NEW WORK SITE ONE-LINE DIAGRAM
SHEET INDEX
SHEET
NO. SHEET NAME
ED101 POWERHOUSE BUILDING ELECTRICAL DEMO PLAN
ED401 ENLARGED ELECTRICAL DEMOLITION PLANS
ED402 ENLARGED ELECTRICAL DEMOLITION PLANS
ED501 ELECTRICAL DEMOLITION DETAILS
ED601 BUILDING DEMOLITION ONE-LINE DIAGRAMS
ED602 BUILDING DEMOLITION ONE-LINE DIAGRAMS
ED603 BUILDING DEMOLITION ONE-LINE DIAGRAMS
ED604 BUILDING DEMOLITION ONE-LINE DIAGRAMS
E-101 POWERHOUSE BUILDING PLAN
E-401 ENLARGED ELECTRICAL PLANS
E-402 ENLARGED ELECTRICAL PLANS
E-501 ELECTRICAL DETAILS
E-502 ELECTRICAL DETAILS
E-601 BUILDING ONE-LINE DIAGRAMS
E-602 BUILDING ONE-LINE DIAGRAMS
E-603 BUILDING ONE-LINE DIAGRAMS
E-604 BUILDING ONE-LINE DIAGRAMS
E-605 GROUNDING RISER DIAGRAM
E-700 ELECTRICAL SCHEDULES
E-701 PANEL SCHEDULES
E-702 PANEL SCHEDULES
E-703 PANEL SCHEDULES
E-704 PANEL SCHEDULES
E-705 PANEL SCHEDULES
H
DATE: 03-06-2025
PRELIMINARY
THIS DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT A
FINAL, SIGNED AND
SEALED DOCUMENT
MECH
DATE: 03-06-2025
DATE: 03-06-2025 DATE: 03-06-2025
F-6691
DATE: 03-06-2025
E
LAVASTID
A
AT
T S
XETE FO
SA
R
EG
IS
TE
RED ARCHITEC
T
24186
GROUND FLOOR PLAN
SCALE:1/8"=1'-0"
A401
AE 101
DRAWING TYPES LEGEND
0- GENERAL INFORMATION
1 - PLANS (HORIZONTAL VIEWS)
2 - ELEVATIONS (VERTICAL VIEWS)
3 - SECTIONS (SECTIONAL VIEWS)
4 - ENLARGED VIEWS (PLANS, ELEVATIONS OR SECTIONS)
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
DISCIPLINE TYPE (ARCHITECTURE SHOWN)
DRAWING TYPE (PLAN, ELEVATION, ETC.)
SERIES/ FLOOR DESIGNATION
DETAIL CALLOUT
ENLARGED PLAN OR DETAIL
ON SHEET INDICATED
STRUCTURAL GRIDS
AS INDICATED ON
DRAWINGS
BUILDING SECTION CALLOUT
ARROWS INDICATE BUILDING
SECTION ON SHEET INDICATED
A301
SECTION CALLOUT
ARROW INDICATE WALL SECTION ON
SHEET INDICATED
A302
ROOM NAME
ROOM NAME & NUMBER SYMBOL
REFER TO ROOM FINISH SCHEDULE
101.1
DOOR NUMBER SYMBOL
REFER TO DOOR SCHEDULE
DOOR NUMBER WITH *
INDICATES ACCESS CONTROL
HARDWARE
PARTITION TYPE SYMBOL
REFER TO PARTITION TYPES
GLAZING TYPE SYMBOL
REFER TO GLAZING TYPES
A
AL1
REVISION SYMBOL
REFER TO SHEET BORDER FOR
REVISION HISTORY
ELEVATION DATUM SYMBOL
INDICATES DATUM ELEVATION AS
INDICATED
Bottom Text Top Text
DISCIPLINE MODIFIER (ELEMENTS SHOWN)
ARCHITECTURAL SYMBOLS LEGEND
DRAWING TITLE
NORTH ARROW AND SCALE
A301
EXTERIOR ELEVATION CALLOUT
ARROW INDICATE ELEVATION ON
SHEET INDICATED
A201
KEYNOTE SYMBOL
INDICATES INFORMATION FOUND IN
KEYNOTES ON PLAN
LOCATED IN THE
BOTTOM RIGHT
SHEET CORNER
A
INTERIOR SECTION CALLOUT
ARROW INDICATES SECTION ON
SHEET INDICATED
1 / A302
FIRE RATING SYMBOL SMOKE RATING SYMBOL
BREAK LINE
MARKS A BREAK OF UNDEFINED
LENGTH IN A OBJECT
CENTERLINE
PROPERTY LINE
1HR
MATCH LINE
USED TO INDICATE WHERE A
VIEW IS SPLIT
2HR
4 HR
3 HR
N
BUILDING CODE INFORMATION
INTERNATIONAL BUILDING CODE
2024 EDITION
INTERNATIONAL EXISRING BUILDING CODE
2021 EDITION
INTERNATIONAL MECHANICAL CODE
2024 EDITION
INTERNATIONAL PLUMBING CODE
2024 EDITION
NATIONAL ELECTRICAL CODE
2023 EDITION
N.F.P.A 101 LIFE SAFETY CODE
2024 EDITION
INTERNATIONAL ENERGY CONSERVATION CODE
2024 EDITION
ASHRAE 90.1
2022 EDITION
IECC - REQ
COUNTY: LIVE OAK COUNTY, TEXAS
CLIMATE ZONE: 2A* [WARM HUMID]
OPAQUE WALLS
METAL : R-13
MAX U-0.079
OPAQUE DOORS:
SWING MAX U-0.37
GARAGE MAX U-0.31
DESIGN LOAD REQ:
WIND SPEED: 128 Vmph
VALUE PROVIDED IS 3-SECOND GUST WIND SPEEDS AT 33 ft ABOVE GROUND FOR EXPOSURE
C CATEGORY, BASED ON LINEAR INTERPOLATION BETWEEN CONTOURS. WIND SPEEDS
CORRESPOND TO APPROXIMATELY A 1.6% PROBABILITY OF EXCEEDANACE IN 50 YEARS.
NOTE: SITE IS IN A HURRICANE-PRONE REGION AS DEFINED IN ASCE/SEI 7-22 SECTION 26.2.
GLAZED OPENINGS NEED NOT BE PROTECTED AGAINST WIND-BORNE DEBRIS.
SEISMIC:
Site Soil Class: D - Stiff Soil
RESULTS:
PGA M : 0.032
SMS : 0.081
SM1 : 0.034
SDS : 0.054
SD1 : 0.022
TL : 6
SS : 0.061
S1 : 0.016
VS30 : 260
425 W GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
SHEET NUMBER
A
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
B
C
D
E
F
F
2 3 4 5 6 7 8 9 10
Autodesk D ocs://24Z5AU
6 - FC
I Three R ivers - R eplace G enerators/2403 - FC I Three R ivers - R eplace G enerators.rvt
3/6/2025 7:57:40 AM
GI003
GENERAL NOTES
AND SYMBOLS
FE
D
ER
A L B U R
EA
U O F
PR
IS
O N S
R
EP
LA
C E G
EN
ER
A
TO
R S 1&
3/6/2025
T X- , T H R
EE
R
IV
ER
S, T X
No. Description Date
3/6/2025
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X X
X X
X X
X
XXX
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X X
X X
X X
X
XX
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
XXX
X
X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
ABANDONED
EFFLUENT LAGOON
AA
X
X
L
X
K X X
M
X
X
X X
DD
J
X X X
X
X X
X X
X X
X
X
X
X
X
X
X
SL
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X X
X
A
BG
X
X X
LOADINGDOCK
X X
X X
X
X
X X
X
H H
X
X
X
X
X
CC
BB
X
X X X
X X
X X
X X X X
X
N
H
X
X X
U
X
X
X
X
X X
X
X X
I
X X
X X
X
X
X
Y X
X X
X
T
X
C F
X
X
X X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
XXXX
X X
X
R
X X
X
DE
XXX
S
P
X
V
X X
X
X X
X X
X
X
X
X
X X
X
X
X
X
X
Q
X
X
X X
X X
X X
EE W
X
X
FB
NATURAL GAS PLANT
ELEC. SERVICE POINT
C LV
C
LV
C
LV
C LV
C
LV
HV
C LV
HV
C
LVHV
C
LV
C
HV
LV
HV
C
LV
C
HV
L H
H L C
H
L
C
H
H
L
C
H
L
C
C L H
C
CO
NC
RE
TE
S
ID
EW
AL
K
ANTENNA
DISH
ALUMINUM BUILDING
CONCRETE SIDEWALK
ANTENNA
ANCHOR
ANTENNA
ANCHOR
ANTENNA
ANCHOR
GUARD
RAIL
GUARD
RAIL
24' ASPHALT DRIVEWAY
ASPHALT
DRIVEWAY
CHAINLINK FENCE
STOP
SIGN
SPEED
SIGN
24' ASPH
ALT
DRIVEW
AY
NO
TRUCK
SIGN
SIGN
HEADWALL
FL=238.14'
HEADWALL
FL=238.23'
24" RCP
CONCRETE SIDEWALK
GUARD
RAILFL=239.17'
FL=239.16'
CONCRETE
SLAB
TOP OF BANK
TOP OF BANK20
' A
SP
HA
LT
DR
IV
EW
AY
C O
N C
RE
TE
S
ID
EW
AL
K
BOTTOM OF BANK
3'X3'
COMMUNICATION
VAULT
3'X3'
COMMUNICATION
VAULT
4.7'X3'
COMMUNICATION
VAULT
ABOVE GROUND
DUCT LINES
24" RCP
ASPHALTPAVEMENT
WATER VALVES
X
X
X
SAN
SAN
SAN
SAN
SAN
X
X
X
X
X
NOTES:
1. CONSTRUCTION MEETING - A PRE-CONSTRUCTION MEETING IS REQUIRED BY THE OWNER, OWNER'S REPRESENTATIVE, UTILITY SERVICE
PROVIDERS AND/OR AUTHORITIES HAVING JURISDICTION (AHJ). CONTRACTOR TO COORDINATE WITH THESE PARTIES AND SCHEDULE
PRE-CONSTRUCTION MEETINGS PRIOR TO CONSTRUCTION.
2. EXISTING CONDITIONS - INFORMATION ON EXISTING CONDITIONS AND BOUNDARIES/RIGHT OF WAY SHOWN ON THESE PLANS WAS OBTAINED FROM A SURVEY PROVIDED BY FBOP AND NOT PERFORMED OR VERIFIED BY THE ENGINEER. NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND REQUIRED ELEVATIONS AT THE SUBJECT SITE, AND VERIFY THE LOCATION AND SIZE OF EXISTING UTILITIES BEFORE PROCEEDING WITH CONSTRUCTION ACTIVITIES, INCLUDING UNDERGROUND AND OVERHEAD UTILITIES, UTILITY STRUCTURES, POINTS OF CONNECTION, AND UTILITY CROSSINGS.
NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR EXCEPTIONS ENCOUNTERED PRIOR TO PROCEEDING. THE CONTRACTOR SHALL OBTAIN ADDITIONAL UTILITIES INFORMATION FROM THE APPROPRIATE AGENCIES AND FBOP FACILITY ENGINEERING. THE CONTRACTOR SHALL COORDINATE WITH THE PUBLIC, FBOP FACILITY AND PRIVATE UTILITIES TO DETERMINE THE WORK AND INSPECTIONS NECESSARY TO DISCONNECT, CUT, CAP, ABANDON, RELOCATE, OR REPAIR THEIR FACILITIES. ANY COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY EXISTING CONDITIONS, PRIOR TO BEGINNING CONSTRUCTION, SHALL BE BORNE BY THE CONTRACTOR.
3. UTILITY LOCATION - IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE DRAWINGS. PRIOR TO STARTING CONSTRUCTION, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK. CONTRACTOR TO LOCATE AND DETERMINE DEPTH OF EXISTING UTILITIES, AND NOTIFY THE ENGINEER IF ANY CONFLICTS ARISE BETWEEN EXISTING FEATURES AND THE PLACEMENT OF NEW FACILITIES. NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL
UNDERGROUND UTILITIES HAVE BEEN MARKED.
4. FIELD VERIFICATION - THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION AND COORDINATION OF ALL DIMENSIONS, UTILITY
LOCATIONS AND ELEVATIONS BEFORE PROCEEDING WITH THE WORK.
5. DRAWINGS - A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS, REFERENCES, AND TYPICAL DETAILS OF CONSTRUCTION. NOT EVERY DETAIL OF THE CONSTRUCTION IS SHOWN ON THESE DRAWINGS. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED, BUT ARE OF A SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO APPROVAL BY THE ENGINEER. THE CONTRACTOR SHALL REVIEW THE DRAWINGS PRIOR TO STARTING CONSTRUCTION AND BRING ALL PROBLEMS IMMEDIATELY TO THE ATTENTION OF THE PROJECT DESIGN
TEAM (OWNER, ARCHITECT AND/OR ENGINEERS) IN ORDER TO AVOID DELAYS.
6. AS-BUILTS - AS-BUILTS IDENTIFYING AND ACCURATELY LOCATING SUBSURFACE UTILITIES AND IMPROVEMENTS INSTALLED BY THE CONTRACTOR UNDER THIS CONTRACT AND NOTING AS-CONSTRUCTED CONDITIONS SHALL BE PROVIDED BY THE CONTRACTOR AT THE END
OF CONSTRUCTION.
7. JOB SITE SAFETY - THE CONTRACTOR SHALL CONDUCT ALL WORK IN A SAFE MANNER AS REQUIRED BY ALL APPLICABLE CITY, COUNTY, STATE AND FEDERAL REGULATIONS. THE ENGINEER HAS NOT BEEN RETAINED TO PROVIDE DESIGN AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS, OR TO THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM THEIR WORK. THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER SHALL NOT BE CONSTRUED AS THE SUPERVISION OF ACTUAL CONSTRUCTION, NOR MAKE THE ENGINEER RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR OR THE CONTRACTOR'S EMPLOYEES OR EMPLOYEES OF SUPPLIERS OR SUBCONTRACTORS, OR FOR ACCESS, VISITS, USE, WORK, TRAVEL, OR OCCUPANCY BY ANY PERSON. SAFETY STANDARDS AND REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COMPLIED WITH AS SET FORTH BY THE OCCUPATIONAL SAFETY
AND HEALTH ADMINISTRATION (OSHA).
8. WORKMANSHIP - THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, INCLUDING SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET REQUIREMENTS AND STANDARDS OF THE AUTHORITIES HAVING JURISDICTION. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER AND IN CONFORMANCE WITH
APPLICABLE CODES AND REGULATIONS.
9. LICENSURE - THE CONTRACTOR SHALL HAVE THE APPROPRIATE LICENSES TO PERFORM THE SPECIFIED WORK IN CONFORMANCE WITH THE
AUTHORITIES HAVING JURISDICTION AND WITH CONTRACT REQUIREMENTS.
10. TRAFFIC CONTROL & SAFETY - THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL ON-SITE AND SHALL COORDINATE THEIR ACTIVITIES WITH THE FBOP AND ENGINEER A MINIMUM OF TWO (2) WEEKS IN ADVANCE OF THE BEGINNING OF WORK. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TRAFFIC CONTROL SIGNS. SAFE VEHICULAR AND PEDESTRIAN ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. SHUTDOWN OF FBOP OPERATION OR ACCESS WILL NOT BE PERMITTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) STANDARDS. COORDINATE REQUIREMENTS WITH THE AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL MAINTAIN ALL
SIGNS, BARRICADES, WARNING LIGHTS, AND OTHER DEVICES NECESSARY FOR SAFETY.
11. PROTECTION OF PROPERTY - THE CONTRACTOR SHALL PROTECT FROM DAMAGE OR DESTRUCTION TO PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK THAT IS NOT SCHEDULED FOR REPAIR, REPLACEMENT OR REMOVAL, AND SHALL ENSURE THAT
INTERFERENCE WITH THE USE OF SUCH PROPERTY IS MINIMIZED.
12. DAMAGE DURING CONSTRUCTION - ANY EXISTING PUBLIC OR PRIVATE IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED IN A MATTER TO BE APPROVED BY THE LOCAL JURISDICTION, APPROPRIATE UTILITY OWNER OR OWNER. IF ROADWAY PAVEMENT MUST BE BROKEN, THE LOCAL TRANSPORTATION DEPARTMENT WILL EITHER REPAIR THE STREET AND BILL THE CONTRACTOR FOR THIS WORK, OR ALLOW THE CONTRACTOR TO COMPLETE THESE REPAIRS TO THEIR STANDARDS. ALL DISTURBED PROPERTY AND VEGETATION
SHALL BE RESTORED TO ORIGINAL CONDITION OR BETTER AS SPECIFIED.
EXISTING
CONDITIONS PLAN
FE
D
ER
A
L B
U R
EA
U
O F
PR
IS
O N
S R
EP
LA
C E
G
EN
ER
A
TO
R
S 1&
03/06/2025
425 W GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
SHEET NUMBER
A
PRELIMINARY
THIS DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT A
FINAL, SIGNED AND
SEALED DOCUMENT
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
B
C
D
E
F
F
2 3 4 5 6 7 8 9 10
No. Description Date
T X-
, T
H R
EE
R
IV
ER
S, T
X
C-100
XFMR HVT 7
XFMR HVT 8
XFMR HVT 6
XFMR HVT 5
XFMR HVT 3
XFMR HVT 4
HVTN 1HVTN 3
HVTN 2
300150150 75
FEETSCALE:
1 INCH = 150
XFMR HVT 1
XFMR HVT 2
XFMR HVT-U
XFMR HVT-T
XFMR HVT-Q
XFMR HVT-P
XFMR HVT-W
LEGEND:
EXISTING "LOOP A" PRMARY
FEEDER
EXISTING TRANSFORMER
MECH
DATE: 03-06-2025
www.coffman.com
1505 Lyndon B Johnson Fwy, Suite 240
Dallas, TX 75234 ph 214.692.2100
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X X
X X
X X
X
XXX
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
XX
X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
XXX
X
X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
ABANDONED
EFFLUENT LAGOON
AA
X
X
L
X
K X X
M
X
X
X X
DD
J
X X X
X
X
X X
X X
X
X
X
X
X
X
X
X
SL
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X X
X
A
BG
X
X X
LOADINGDOCK
X X
X X
X
X
X X
X
H H
X
X
X
X
X
CC
BB
X
X X X
X X
X X
X X X X
X
N
H
X
X X
U
X
X
X
X
X X
X
X X
I
X X
X X
X
X
X
Y X
X X
X
T
X
C F
X
X
X X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
XXXX
X X
X
R
X X
X
DE
XXX
S
P
X
V
X X
X
X X
X X
X
X
X
X
X X
X
X
X
X
X
Q
X
X
X X
X X
X X
EE W
X
X
FB
NATURAL GAS PLANT
ELEC. SERVICE POINT
C LV
C
LV
C
LV
C LV
C
LV
HV
C LV
HV
C
LVHV
C
LV
C
HV
LV
HV
C
LV
C HV
L H
H L C
H
L
C
H
H
L
C
H
L
C
C L H
C
CO
NC
RE
TE
S
ID
EW
AL
K
ANTENNA
DISH
ALUMINUM BUILDING
CONCRETE SIDEWALK
ANTENNA
ANCHOR
ANTENNA
ANCHOR
ANTENNA
ANCHOR
GUARD
RAIL
GUARD
RAIL
24' ASPHALT DRIVEWAY
ASPHALT
DRIVEWAY
CHAINLINK FENCE
STOP
SIGN
SPEED
SIGN
24' ASPH
ALT
DRIVEW
AY
NO
TRUCK
SIGN
SIGN
HEADWALL
FL=238.14'
HEADWALL
FL=238.23'
24" RCP
CONCRETE SIDEWALK
GUARD
RAILFL=239.17'
FL=239.16'
CONCRETE
SLAB
TOP OF BANK
TOP OF BANK20
' A
SP
HA
LT
DR
IV
EW
AY
C O
N C
RE
TE
S
ID
EW
AL
K
BOTTOM OF BANK
3'X3'
COMMUNICATION
VAULT
3'X3'
COMMUNICATION
VAULT
4.7'X3'
COMMUNICATION
VAULT
ABOVE GROUND
DUCT LINES
24" RCP
ASPHALTPAVEMENT
WATER VALVES
X
X
X
SAN
SAN
SAN
SAN
SAN
X
X
X
X
X
X
SITE DEMOLITION
PLAN
FE
D
ER
A
L B
U R
EA
U
O F
PR
IS
O N
S R
EP
LA
C E
G
EN
ER
A
TO
R
S 1&
03/06/2025
425 W GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
SHEET NUMBER
A
PRELIMINARY
THIS DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT A
FINAL, SIGNED AND
SEALED DOCUMENT
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
B
C
D
E
F
F
2 3 4 5 6 7 8 9 10
No. Description Date
T X-
, T
H R
EE
R
IV
ER
S, T
X
C-200
XFMR HVT 7
XFMR HVT 8
XFMR HVT 6
XFMR HVT 5
XFMR HVT 3
XFMR HVT 4
HVTN 1
HVTN 3
HVTN 2
300150150 75
FEETSCALE:
1 INCH = 150
XFMR HVT 1
XFMR HVT 2
XFMR HVT-U
XFMR HVT-T
XFMR HVT-Q
XFMR HVT-P
XFMR HVT-W
LEGEND:
EXISTING "LOOP A" PRMARY
FEEDER
EXISTING TRANSFORMER
DEMO PAVEMENT (ASPHALT,
CONCRETE PAD/ SIDEWALK,
GRAVEL)
DEMO LANDSCAPE
DEMO TREES WITHIN PROPOSED
GRAVEL GENERATOR AREA
NOTES:
1. DEMOLITION - ALL DEMOLITION SHALL BE PERFORMED IN CONFORMANCE TO THE REQUIREMENTS OF THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS AND THE CURRENT EDITION OF THE UNIFORM BUILDING CODE OR INTERNATIONAL BUILDING CODE, AS APPLICABLE. THE STRIPPED DEBRIS SHALL NOT BE MIXED WITH MATERIALS TO BE USED AS STRUCTURAL FILL. CONDUCT DEMOLITION ACTIVITIES AND DEBRIS REMOVAL OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, WALKWAYS, AND OTHER ADJACENT
FACILITIES.
2. HAZARDOUS MATERIALS - IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB;
IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER AND OWNER.
3. DEMOLITION & DISPOSAL - THE REMOVAL AND DISPOSAL OF ALL FOUNDATIONS, STRUCTURES, PIPING, FENCES, AND OTHER OBSTRUCTIONS SHALL BE DONE IN ACCORDANCE WITH STANDARD SPECIFICATIONS. REMOVE DEMOLITION WASTE MATERIALS AND DEBRIS FROM PROJECT SITE AND LEGALLY DISPOSE OF THEM IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.
4. PROTECTION OF PROPERTY - THE CONTRACTOR SHALL PROTECT FROM DAMAGE OR DESTRUCTION PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK THAT IS NOT SCHEDULED FOR REPAIR, REPLACEMENT OR REMOVAL AND SHALL ENSURE THAT INTERFERENCE WITH THE USE OF SUCH PROPERTY IS MINIMIZED. ANY EXISTING IMPROVEMENTS THAT ARE TO REMAIN AND BECOME DAMAGED SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AS ACCEPTABLE TO PARTIES HAVING JURISDICTION AT NO COST TO OWNER.
5. REMOVAL OF STRUCTURES & OBSTRUCTIONS - THE REMOVAL AND DISPOSAL OF ALL BUILDINGS, FOUNDATIONS, STRUCTURES, FENCES, AND
OTHER OBSTRUCTIONS SHALL BE DONE IN ACCORDANCE WITH STANDARD SPECIFICATIONS.
6. REMOVAL OF PAVEMENT, SIDEWALKS AND CURBS - ALL REMOVAL OF PAVEMENT, SIDEWALKS AND CURBS SHALL BE PERFORMED IN CONFORMANCE WITH STANDARD SPECIFICATIONS. ASPHALT CONCRETE SHALL BE SAWCUT FOR A SMOOTH TRANSITION. CONCRETE WALKS
AND CURBS SHALL BE SAWCUT OR REPLACED TO AN EXISTING JOINT.
7. EXISTING UTILITIES - THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE FBOP FACILITY ENGINEERING AND APPROPRIATE UTILITY COMPANIES FOR SCHEDULING, DISCONNECTING, AND CAPPING OF THE EXISTING UTILITIES. EXISTING UTILITY WORK SHALL BE IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS. ALL CAPPED UTILITIES SHALL BE CLEARLY MARKED WITH AN ABOVE GRADE MARKER.
NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND
UTILITIES HAVE BEEN MARKED.
8. SAFETY FENCING - TEMPORARY 6' HIGH CHAIN LINK FENCE SHALL BE PLACED AROUND THE SITE AND/OR EXCAVATION AREA AS NECESSARY TO PROTECT PEDESTRIANS AND PROVIDE SITE SAFETY WHILE DEMOLITION AND CONSTRUCTION IS IN PROGRESS. AS CONSTRUCTION PROGRESSES AND CONDITIONS DICTATE, THE CONTRACTOR SHOULD ANTICIPATE THAT MORE PROTECTION MAY BE NECESSARY. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INSURE SAFETY OF THE PUBLIC AT ALL TIMES.
9. SALVAGE - TO THE MAXIMUM EXTENT POSSIBLE, THE CONTRACTOR SHALL SALVAGE AND REUSE ALL CATCH BASIN FRAMES, GRATES, COVERS, MANHOLE LIDS AND ANY OTHER EXISTING METAL WORKS IN PAVEMENTS DESIGNATED FOR REMOVAL / REPLACEMENT. ALL SALVAGEABLE MATERIAL CREATED DURING DEMOLITION SHALL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE STATED
BY HEREIN OR THE OWNER.
10. REGULATORY COMPLIANCE - COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING DEMOLITION. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. COORDINATE DEMOLITION OPERATIONS AND ANY REQUIRED UTILITY RELOCATIONS WITH THE FBOP FACILITY ENGINEERING AND APPROPRIATE UTILITY PURVEYOR, INCLUDING REQUIREMENTS AND
SCHEDULING.
11. COORDINATION AND UNKNOWNS - COORDINATE EXTENT OF DEMOLITION WITH PROPOSED IMPROVEMENTS. CONTRACTOR SHALL REVIEW THE PROJECT LIMITS TO DETERMINE THE QUANTITY AND TYPE OF DEMOLITION WASTE MATERIAL AND DEBRIS TO BE INCLUDED IN THEIR BID.
THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, AND RELOCATING IF NECESSARY, ANY ITEMS NOT OTHERWISE NOTED THAT CONFLICT WITH THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICTING ITEMS NOT SHOWN ON THE PLANS THAT MUST BE REMOVED OR RELOCATED. FAILURE TO NOTIFY THE ENGINEER DOES NOT RELIEVE THE
CONTRACTOR OF COST RESPONSIBILITY FOR REMOVING REQUIRED ITEMS.
KEYNOTES:
EXISTING SECURITY FENCE TO BE CUT WHERE
ELECTRICAL TRENCH INTERSECTS AND SHALL BE
REPLACED IN KIND ( +/- 300 LF)
EXISTING SECURITY FENCE TO BE CUT AT GRAVEL ROAD
CONNECTION TO ASPHALT DRIVE (+/- 25 LF)
DEMO EXISTING PAD
DECORATIVE SCREENING WALL TO BE
DEMOLISHED AND REPLACED IN KIND
19.4'
7.4'
EXISTING CONCRETE PAD
LIMITS TO BE DEMOLISHED
EXISTING TREES TO
BE DEMOLISHED
MECH
DATE: 03-06-2025
www.coffman.com
1505 Lyndon B Johnson Fwy, Suite 240
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X X
X X
X X
X
XXX
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
XX
X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
XXX
X
X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
ABANDONED
EFFLUENT LAGOON
AA
X
X
L
X
K X X
M
X
X
X X
DD
J
X X X
X
X
X X
X X
X
X
X
X
X
X
X
X
SL
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X X
X
A
BG
X
X X
LOADINGDOCK
X X
X X
X
X
X X
X
H H
X
X
X
X
X
CC
BB
X
X X X
X X
X X
X X X X
X
N
H
X
X X
U
X
X
X
X
X X
X
X X
I
X X
X X
X
X
X
Y X
X X
X
T
X
C F
X
X
X X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
XXXX
X X
X
R
X X
X
DE
XXX
S
P
X
V
X X
X
X X
X X
X
X
X
X
X X
X
X
X
X
X
Q
X
X
X X
X X
X X
EE W
X
X
FB
NATURAL GAS PLANT
CO
NC
RE
TE
S
ID
EW
AL
K
ANTENNA
DISH
ALUMINUM BUILDING
CONCRETE SIDEWALK
CONCRETE SIDEWALK
TOP OF BANK
TOP OF BANK
C O
N C
RE
TE
S
ID
EW
AL
K
BOTTOM OF BANK
3'X3'
COMMUNICATION
VAULT
3'X3'
COMMUNICATION
VAULT
4.7'X3'
COMMUNICATION
VAULT
ABOVE GROUND
DUCT LINES
WATER VALVES
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X X
X X
X X
X
XXX
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
XX
X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
XXX
X
X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
ABANDONED
EFFLUENT LAGOON
AA
X
X
L
X
K X X
M
X
X
X X
DD
J
X X X
X
X
X X
X X
X
X
X
X
X
X
X
X
SL
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X X
X
A
BG
X
X X
LOADINGDOCK
X X
X X
X
X
X X
X
H H
X
X
X
X
X
CC
BB
X
X X X
X X
X X
X X X X
X
N
H
X
X X
U
X
X
X
X
X X
X
X X
I
X X
X X
X
X
X
Y X
X X
X
T
X
C F
X
X
X X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
XXXX
X X
X
R
X X
X
DE
XXX
S
P
X
V
X X
X
X X
X X
X
X
X
X
X X
X
X
X
X
X
Q
X
X
X X
X X
X X
EE W
X
X
FB
NATURAL GAS PLANT
CO
NC
RE
TE
S
ID
EW
AL
K
ANTENNA
DISH
ALUMINUM BUILDING
CONCRETE SIDEWALK
CONCRETE SIDEWALK
TOP OF BANK
TOP OF BANK
C O
N C
RE
TE
S
ID
EW
AL
K
BOTTOM OF BANK
3'X3'
COMMUNICATION
VAULT
3'X3'
COMMUNICATION
VAULT
4.7'X3'
COMMUNICATION
VAULT
ABOVE GROUND
DUCT LINES
WATER VALVES
X
X
X
X
X
X
X
X
NOTES:
1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED
TRANSFORMERS AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING
GENERATORS AT BUILDING N, THE POWERHOUSE.
2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.
3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION. FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK.
NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND UTILITIES
HAVE BEEN MARKED.
4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS SANITARY SEWER.
5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND
STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.
6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED WITHIN
THIS FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.
7. EXCAVATION & BACKFILL - SAFE EXCAVATION & BACKFILL PRACTICES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO REGULATIONS ESTABLISHED BY PERTINENT STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH AGENCIES. EXCAVATIONS DEEPER THAN 4-FEET MUST BE SHORED, SHEETED, BRACED, SLOPED, OR SUPPORTED BY A MEANS OF SUFFICIENT STRENGTH TO PROTECT EMPLOYEES.
EXCAVATIONS DEEPER THAN 20-FEET MUST INCLUDE A PROTECTION SYSTEM DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF TEXAS. EXCAVATION MATERIALS ARE TO BE STORED AT LEAST 2-FEET FROM THE EDGE OF THE EXCAVATION OR TRENCH WHEN EMPLOYEES ARE WORKING IN THE EXCAVATION. SITE DEVICES MAY BE REQUIRED TO PREVENT THE MATERIAL FROM FALLING OR ROLLING INTO THE EXCAVATION. WHEN TRENCHES OR OTHER EXCAVATIONS ARE WITHIN 4-FEET OF PUBLIC PROPERTY, BARRICADES MUST BE SET UP FOR
PUBLIC SAFETY, AND THE EXCAVATION MUST BE COVERED WHEN WORK IS NOT IN PROGRESS.
8. PIPE TRENCH & BEDDING - ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN CONFORMANCE WITH THE REQUIREMENTS OF TXDOT SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "EXCAVATION AND BACKFILL FOR STRUCTURES" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED, PROVIDED THE MATERIAL IN THE BOTTOM OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE UNYIELDING BASE.
9. TRENCH BACKFILL - BACKFILL OF TRENCHES SHALL BE IN ACCORDANCE WITH THE TXDOT STANDARD SPECIFICATIONS OR FBOP STANDARD
REQUIREMENTS.
10. TRENCH SURFACE RESTORATION - THE GROUND SURFACES OF ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY, ONSITE FBOP PROPERTY OR ON OFF-SITE PROPERTIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER IN CONFORMANCE WITH THE REQUIREMENTS OF THE
LOCAL JURISDICTION OR FBOP STANDARDS.
11. COMPACTION OVER UTILITIES - ALL TRENCH BACKFILL AND ROADWAY EMBANKMENT SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR DRY MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D1557, EXCEPT THE TOP 6 INCHES OF TRENCH BELOW THE BOTTOM OF THE PAVEMENT, WHICH
SHALL BE 100%.
12. STRIPING - ALL STRIPING THAT IS REMOVED OR DAMAGED DURING TRENCHING SHALL BE RESTORED IN KIND TO THE ORIGINAL CONDITION AND IN
CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL JURISDICTION OR FBOP STANDARDS.
13. CONCRETE ENCASEMENT- FOR THE SECONDARY ELECTRICAL LOOP, CONTRACTOR SHALL MAINTAIN MINIMUM OF 50' OF CLEARANCE BETWEEN PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS, ENCASING THE SECONDARY B LOOP IN CONCRETE. ENCASEMENT SHALL BE A MINIMUM OF 3-INCHES AROUND ELECTRICAL CONDUITS. IN AREAS WHERE 50' CLEARANCE CANNOT BE MET, MAINTAIN MINIMUM OF 25' OF
CLEARANCE BETWEEN THE PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS.
SITE RESTORATION
PLAN
425 W GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
SHEET NUMBER
A
PRELIMINARY
THIS DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT A
FINAL, SIGNED AND
SEALED DOCUMENT
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
B
C
D
E
F
F
2 3 4 5 6 7 8 9 10
No. Description Date
C-300 300150150 75
FEETSCALE:
1 INCH = 150
FE
D
ER
A
L B
U R
EA
U
O F
PR
IS
O N
S R
EP
LA
C E
G
EN
ER
A
TO
R
S 1&
03/06/2025
T X-
, T
H R
EE
R
IV
ER
S, T
X
LEGEND:
ASPHALT PAVEMENT
CONCRETE PAVEMENT/SIDEWALK
GRAVEL ROAD
GRAVEL FOOTPATH
GRAVEL UNDER GENERATORS
LANDSCAPING/VEGETATION
ELECTRICAL JUNCTION BOX
FUEL PIPING SHUT OFF VALVE
SWITCH
TRANSFORMER
NEW SITE FENCINGX X
KEYNOTES:
NEW SECURITY FENCE TO BE INSTALLED WHERE
ELECTRICAL TRENCH INTERSECTS AND SHALL MATCH
EXISTING ( +/- 300 LF)
MECH
DATE: 03-06-2025
www.coffman.com
1505 Lyndon B Johnson Fwy, Suite 240
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X X
X X
X X
X
XXX
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
XX
X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
XXX
X
X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
ABANDONED
EFFLUENT LAGOON
AA
X
X
L
X
K X X
M
X
X
X X
DD
J
X X X
X
X
X X
X X
X
X
X
X
X
X
X
X
SL
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X X
X
A
BG
X
X X
LOADINGDOCK
X X
X X
X
X
X X
X
H H
X
X
X
X
X
CC
BB
X
X X X
X X
X X
X X X X
X
N
H
X
X X
U
X
X
X
X
X X
X
X X
I
X X
X X
X
X
X
Y X
X X
X
T
X
C F
X
X
X X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
XXXX
X X
X
R
X X
X
DE
XXX
S
P
X
V
X X
X
X X
X X
X
X
X
X
X X
X
X
X
X
X
Q
X
X
X X
X X
X X
EE W
X
X
FB
NATURAL GAS PLANT
ELEC. SERVICE POINT
C LV
C
LV
C
LV
C LV
C
LV
HV
C LV
HV
C
LVHV
C
LV
C
HV
LV
HV
C
LV
C HV
L H
H L C
H
L
C
H
H
L
C
H
L
C
C L H
C
CO
NC
RE
TE
S
ID
EW
AL
K
ANTENNA
DISH
ALUMINUM BUILDING
CONCRETE SIDEWALK
CONCRETE SIDEWALK
TOP OF BANK
TOP OF BANK
C O
N C
RE
TE
S
ID
EW
AL
K
BOTTOM OF BANK
3'X3'
COMMUNICATION
VAULT
3'X3'
COMMUNICATION
VAULT
4.7'X3'
COMMUNICATION
VAULT
ABOVE GROUND
DUCT LINES
WATER VALVES
X
X
X
SAN
SAN
SAN
SAN
SAN
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X X
X X
X X
X
XXX
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X X
X
X
X
X
X
XX
X
X X
X X
X X
X
XX
X X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X X
X X
X X
X
XX
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
X X
XXX
X
X
X
X
X
X
X X
X X
X
X
X
X
X X
X X
X X
X X
ABANDONED
EFFLUENT LAGOON
AA
X
X
L
X
K X X
M
X
X
X X
DD
J
X X X
X
X
X X
X X
X
X
X
X
X
X
X
X
SL
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X X
X
A
BG
X
X X
LOADINGDOCK
X X
X X
X
X
X X
X
H H
X
X
X
X
X
CC
BB
X
X X X
X X
X X
X X X X
X
N
H
X
X X
U
X
X
X
X
X X
X
X X
I
X X
X X
X
X
X
Y X
X X
X
T
X
C F
X
X
X X
X
X X
X X
X X
X
X
X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
XXXX
X X
X
R
X X
X
DE
XXX
S
P
X
V
X X
X
X X
X X
X
X
X
X
X X
X
X
X
X
X
Q
X
X
X X
X X
X X
EE W
X
X
FB
NATURAL GAS PLANT
ELEC. SERVICE POINT
C LV
C
LV
C
LV
C LV
C
LV
HV
C LV
HV
C
LVHV
C
LV
C
HV
LV
HV
C
LV
C HV
L H
H L C
H
L
C
H
H
L
C
H
L
C
C L H
C
CO
NC
RE
TE
S
ID
EW
AL
K
ANTENNA
DISH
ALUMINUM BUILDING
CONCRETE SIDEWALK
CONCRETE SIDEWALK
TOP OF BANK
TOP OF BANK
C O
N C
RE
TE
S
ID
EW
AL
K
BOTTOM OF BANK
3'X3'
COMMUNICATION
VAULT
3'X3'
COMMUNICATION
VAULT
4.7'X3'
COMMUNICATION
VAULT
ABOVE GROUND
DUCT LINES
WATER VALVES
X
X
X
SAN
SAN
SAN
SAN
SAN
X
X
X
X
X
FF
F
F
F
F
F
F
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
UGE
UG
E
UG
E
U G
E
UG
E
UGE
UGE
U G
E
U G
E
U G
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
U G
E
U G
E U
G E
U G
E U
G E
UGE
UGE
UGE UGE UGE UGE UGE UGE
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE
UGE
UG
E
UG
E
UG
E
U G
E
NOTES:
1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED
TRANSFORMERS AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING
GENERATORS AT BUILDING N, THE POWERHOUSE.
2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.
3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION. FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK.
NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND UTILITIES
HAVE BEEN MARKED.
4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS SANITARY SEWER.
5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND
STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.
6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED WITHIN
THIS FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.
7. EXCAVATION & BACKFILL - SAFE EXCAVATION & BACKFILL PRACTICES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO REGULATIONS ESTABLISHED BY PERTINENT STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH AGENCIES. EXCAVATIONS DEEPER THAN 4-FEET MUST BE SHORED, SHEETED, BRACED, SLOPED, OR SUPPORTED BY A MEANS OF SUFFICIENT STRENGTH TO PROTECT EMPLOYEES.
EXCAVATIONS DEEPER THAN 20-FEET MUST INCLUDE A PROTECTION SYSTEM DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF TEXAS. EXCAVATION MATERIALS ARE TO BE STORED AT LEAST 2-FEET FROM THE EDGE OF THE EXCAVATION OR TRENCH WHEN EMPLOYEES ARE WORKING IN THE EXCAVATION. SITE DEVICES MAY BE REQUIRED TO PREVENT THE MATERIAL FROM FALLING OR ROLLING INTO THE EXCAVATION. WHEN TRENCHES OR OTHER EXCAVATIONS ARE WITHIN 4-FEET OF PUBLIC PROPERTY, BARRICADES MUST BE SET UP FOR
PUBLIC SAFETY, AND THE EXCAVATION MUST BE COVERED WHEN WORK IS NOT IN PROGRESS.
8. PIPE TRENCH & BEDDING - ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN CONFORMANCE WITH THE REQUIREMENTS OF TXDOT SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "EXCAVATION AND BACKFILL FOR STRUCTURES" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED, PROVIDED THE MATERIAL IN THE BOTTOM OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE UNYIELDING BASE.
9. TRENCH BACKFILL - BACKFILL OF TRENCHES SHALL BE IN ACCORDANCE WITH THE TXDOT STANDARD SPECIFICATIONS OR FBOP STANDARD
REQUIREMENTS.
10. TRENCH SURFACE RESTORATION - THE GROUND SURFACES OF ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY, ONSITE FBOP PROPERTY OR ON OFF-SITE PROPERTIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER IN CONFORMANCE WITH THE REQUIREMENTS OF THE
LOCAL JURISDICTION OR FBOP STANDARDS.
11. COMPACTION OVER UTILITIES - ALL TRENCH BACKFILL AND ROADWAY EMBANKMENT SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR DRY MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D1557, EXCEPT THE TOP 6 INCHES OF TRENCH BELOW THE BOTTOM OF THE PAVEMENT, WHICH
SHALL BE 100%.
12. STRIPING - ALL STRIPING THAT IS REMOVED OR DAMAGED DURING TRENCHING SHALL BE RESTORED IN KIND TO THE ORIGINAL CONDITION AND IN
CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL JURISDICTION OR FBOP STANDARDS.
13. CONCRETE ENCASEMENT- FOR THE SECONDARY ELECTRICAL LOOP, CONTRACTOR SHALL MAINTAIN MINIMUM OF 50' OF CLEARANCE BETWEEN PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS, ENCASING THE SECONDARY B LOOP IN CONCRETE. ENCASEMENT SHALL BE A MINIMUM OF 3-INCHES AROUND ELECTRICAL CONDUITS. IN AREAS WHERE 50' CLEARANCE CANNOT BE MET, MAINTAIN MINIMUM OF 25' OF
CLEARANCE BETWEEN THE PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS.
POWER LOOP
ROUTING PLAN
425 W GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
SHEET NUMBER
A
PRELIMINARY
THIS DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT A
FINAL, SIGNED AND
SEALED DOCUMENT
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
B
C
D
E
F
F
2 3 4 5 6 7 8 9 10
No. Description Date
C-301
SEE SHEET C-303 FOR
POWERHOUSE INSET PLAN
300150150 75
FEETSCALE:
1 INCH = 150
XFMR HVT 7
XFMR HVT 8
XFMR HVT 6
XFMR HVT 5
XFMR HVT 3
XFMR HVT 4
MV SWITCH HVTN 1
XFMR HVTN 1
XFMR HVT 1
XFMR HVT 2
GEN 1
FE
D
ER
A
L B
U R
EA
U
O F
PR
IS
O N
S R
EP
LA
C E
G
EN
ER
A
TO
R
S 1&
03/06/2025
T X-
, T
H R
EE
R
IV
ER
S, T
X
LOOP B PRIMARY FEED
.0'
.3'
.0'
MV SWITCH HVT 1
MV SWITCH HVT 2
MV SWITCH HVT 3
MV SWITCH HVT 5
MV SWITCH HVT 6
MV SWITCH HVT 7
MV SWITCH HVT 8
GEN 2
GEN 3
XFMR HVT T
XFMR HVT Q
XFMR HVT P
MV SWITCH HVT P&Q
XFMR HVT U
(E) XFMR HVT W
61.0'
47.6'
EXTENDED "LOOP A" PRIMARY
FEEDER (TYP)
NEW MV SWITCH FEEDER TO
NEW TRANSFORMER (TYP)
NEW SECONDARY BUILDING
FEEDER (TYP)
LEGEND:
EXISTING "LOOP A" PRIMARY
FEEDER
NEW "LOOP B" PRIMARY FEEDER
FUEL PIPING
ELECTRICAL JUNCTION BOX
FUEL PIPING SHUT OFF VALVE
SWITCH
TRANSFORMER
NEW SECONDARY BUILDING
FEEDER
EXTENDED "LOOP A" PRIMARY
FEEDER
NEW MV SWITCH FEEDER TO NEW
TRANSFORMER
NEW SIGHT LIGHTING CONDUIT
NEW SITE FENCING
NEW CONDUIT, DUCTBANK AND MV
FEEDERS
UGE UGE
F FF F
X X
MV SWITCH HVT U&T
MV SWITCH HVT W
MEDIUM VOLATGE
PEDESTAL JUNCTION BOX
MEDIUM VOLATGE
PEDESTAL JUNCTION BOX
MECH
DATE: 03-06-2025
www.coffman.com
1505 Lyndon B Johnson Fwy, Suite 240
ANTENNA
ANCHOR
ANTENNA
ANCHOR
GUARD
RAILFL=239.17'
FL=239.16'
CONCRETE
SLAB
TOP OF BANK
TOP OF BANK
BOTTOM OF BANK
ABOVE GROUND
DUCT LINES
24" RCP
WATER VALVES
X X
X
XXXX
X X
X
X
X X
X
X X
XXXXXX
X X
X X
X
X X X X X X
X X
X
X X X X X X X X X
X X
X X X X X X X
X X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X
X
X
X
X X
X
X X
X X
X X
X
X
X
X
X X X
X X
X X
X
X
XXXXX
X
X
X
X X
X X
X X
X X
X X
X X
X X
HV
LV
C
HV
ANTENNA
ANCHOR
ANTENNA
ANCHOR
GUARD
RAILFL=239.17'
FL=239.16'
CONCRETE
SLAB
TOP OF BANK
TOP OF BANK
BOTTOM OF BANK
ABOVE GROUND
DUCT LINES
24" RCP
WATER VALVES
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
F F
F F
F
F
F F
FF
F
F F
F F
F F
F F
F F
F
F
F
F
F
F
FFFFFF
F F
F F
F
F
F
F
F
F
F
FFFFF
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
OHE
OHE
OHE
U G
E
UGE
UG
E
UG
E
UG
E
F F F F
X
POWER LOOP
ROUTING -
POWERHOUSE PLAN
425 W GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
SHEET NUMBER
A
PRELIMINARY
THIS DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT A
FINAL, SIGNED AND
SEALED DOCUMENT
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
B
C
D
E
F
F
2 3 4 5 6 7 8 9 10
No. Description Date
C-302 603030 15
FEETSCALE:
1 INCH = 30
NOTES:
1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED TRANSFORMERS
AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING GENERATORS AT
BUILDING N, THE POWERHOUSE.
2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.
3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION. FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK. NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND UTILITIES HAVE BEEN MARKED.
4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS SANITARY SEWER.
5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND
STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.
6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED WITHIN THIS
FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.
7. EXCAVATION & BACKFILL - SAFE EXCAVATION & BACKFILL PRACTICES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO REGULATIONS ESTABLISHED BY PERTINENT STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH AGENCIES. EXCAVATIONS DEEPER THAN 4-FEET MUST BE SHORED, SHEETED, BRACED, SLOPED, OR SUPPORTED BY A MEANS OF SUFFICIENT STRENGTH TO PROTECT EMPLOYEES.
EXCAVATIONS DEEPER THAN 20-FEET MUST INCLUDE A PROTECTION SYSTEM DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF TEXAS. EXCAVATION MATERIALS ARE TO BE STORED AT LEAST 2-FEET FROM THE EDGE OF THE EXCAVATION OR TRENCH WHEN EMPLOYEES ARE WORKING IN THE EXCAVATION. SITE DEVICES MAY BE REQUIRED TO PREVENT THE MATERIAL FROM FALLING OR ROLLING INTO THE EXCAVATION. WHEN TRENCHES OR OTHER EXCAVATIONS ARE WITHIN 4-FEET OF PUBLIC PROPERTY, BARRICADES MUST BE SET UP FOR PUBLIC
SAFETY, AND THE EXCAVATION MUST BE COVERED WHEN WORK IS NOT IN PROGRESS.
8. PIPE TRENCH & BEDDING - ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN CONFORMANCE WITH THE REQUIREMENTS OF TXDOT SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "EXCAVATION AND BACKFILL FOR STRUCTURES" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED, PROVIDED THE MATERIAL IN THE BOTTOM OF
THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE UNYIELDING BASE.
9. TRENCH BACKFILL - BACKFILL OF TRENCHES SHALL BE IN ACCORDANCE WITH THE TXDOT STANDARD SPECIFICATIONS OR FBOP STANDARD
REQUIREMENTS.
10. TRENCH SURFACE RESTORATION - THE GROUND SURFACES OF ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY, ONSITE FBOP PROPERTY OR ON OFF-SITE PROPERTIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER IN CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL
JURISDICTION OR FBOP STANDARDS.
11. COMPACTION OVER UTILITIES - ALL TRENCH BACKFILL AND ROADWAY EMBANKMENT SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR DRY MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D1557, EXCEPT THE TOP 6 INCHES OF TRENCH BELOW THE BOTTOM OF THE PAVEMENT, WHICH
SHALL BE 100%.
12. STRIPING - ALL STRIPING THAT IS REMOVED OR DAMAGED DURING TRENCHING SHALL BE RESTORED IN KIND TO THE ORIGINAL CONDITION AND IN
CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL JURISDICTION OR FBOP STANDARDS.
13. CONCRETE ENCASEMENT- FOR THE SECONDARY ELECTRICAL LOOP, CONTRACTOR SHALL MAINTAIN MINIMUM OF 50' OF CLEARANCE BETWEEN PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS, ENCASING THE SECONDARY B LOOP IN CONCRETE. ENCASEMENT SHALL BE A MINIMUM OF 3-INCHES AROUND ELECTRICAL CONDUITS. IN AREAS WHERE 50' CLEARANCE CANNOT BE MET, MAINTAIN MINIMUM OF 25' OF CLEARANCE
BETWEEN THE PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS.
BUILDING N
"POWERHOUSE
ASPHALT ROAD
HVAC PAD
CONCRETE PAVEMENT
FE
D
ER
A
L B
U R
EA
U
O F
PR
IS
O N
S R
EP
LA
C E
G
EN
ER
A
TO
R
S 1&
03/06/2025
T X-
, T
H R
EE
R
IV
ER
S, T
X
LOOP B PRIMARY FEED
(E) ABOVE GROUND FUEL STORAGE TANKS
INTERCONNECTED TO FEED EXISTING
GENERATORS IN THE POWERHOUSE
MV SWITCH HVTN 1
XFMR HVTN 1
GEN 1GEN 2
GEN 3
FUEL ROUTE
+/- 500 LF
2 - 2" STEEL CARRIER PIPING WITH FIBER
REINFORCED PLASTIC (FRP) CONTAINMENT
PIPING (DOUBLE WALL) WITH LEAK DETECTION
BETWEEN AST AND NEW GENERATOR
CONCRETE ENCASED
IN TRAVELWAY
62.7'
LEGEND:
EXISTING "LOOP A" PRIMARY
FEEDER
NEW "LOOP B" PRIMARY FEEDER
FUEL PIPING
GRAVEL ROAD
GRAVEL FOOTPATH
GRAVEL UNDER GENERATORS
ELECTRICAL JUNCTION BOX
FUEL PIPING SHUT OFF VALVE
SWITCH
TRANSFORMER
NEW SECONDARY BUILDING
FEEDER
EXTENDED "LOOP A" PRIMARY
FEEDER
NEW MV SWITCH FEEDER TO NEW
TRANSFORMER
NEW SIGHT LIGHTING CONDUIT
NEW SITE FENCING
NEW CONDUIT, DUCTBANK AND MV
FEEDERS
UGE UGE
F FF F
X X
ASPHALT ROAD
STEP-UP TRANSFORMER (TYP 3)
MECH
DATE: 03-06-2025
www.coffman.com
1505 Lyndon B Johnson Fwy, Suite 240
ANTENNA
ANCHOR
ANTENNA
ANCHOR
ANTENNA
ANCHOR
CHAINLINK FENCE
24' ASPH
ALT
DRIVEW
AY
HEADWALL
FL=238.23'
24" RCP
GUARD
RAILFL=239.17'
FL=239.16'
CONCRETE
SLAB
TOP OF BANK
TOP OF BANK
BOTTOM OF BANK
ABOVE GROUND
DUCT LINES
24" RCP
X X
X X
X X
X
XXXXX
X
X X
X
X X
SA
N
SA
N
SAN
SAN
SAN
SAN
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X
X
X
X
X
X
X
X X
X N
X
X
X
X
HV
LV
C
HV
ANTENNA
ANCHOR
ANTENNA
ANCHOR
ANTENNA
ANCHOR
CHAINLINK FENCE
24' ASPH
ALT
DRIVEW
AY
HEADWALL
FL=238.23'
24" RCP
GUARD
RAILFL=239.17'
FL=239.16'
CONCRETE
SLAB
TOP OF BANK
TOP OF BANK
BOTTOM OF BANK
ABOVE GROUND
DUCT LINES
24" RCP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
F F
F F
F F
F F
F
F
F F
F
F F
F F
F F
F F
F F
F F
F F
F F
F F
UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
UGE
UGE
OHE
OHE
OHE
OHE
OHE
U G
E
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
F F
F F
F F
F F
SHUT OFF VALVE (TYP.)
POWER LOOP
ROUTING -
POWERHOUSE &
GENERATOR PLAN
425 W GRAY STREET
NORMAN, OK 73069
TELEPHONE: (866) 226-8071
www.prime-arch.com
SHEET NUMBER
A
PRELIMINARY
THIS DOCUMENT IS
PRELIMINARY IN
NATURE AND IS NOT A
FINAL, SIGNED AND
SEALED DOCUMENT
PROJECT NUMBER
ISSUE DATE
REVISIONS
SHEET TITLE
B
C
D
E
F
F
2 3 4 5 6 7 8 9 10
No. Description Date
402020 10
FEETSCALE:
1 INCH = 20
NOTES:
1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED
TRANSFORMERS AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING
GENERATORS AT BUILDING N, THE POWERHOUSE.
2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.
3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE.
CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION.
FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE
STARTING PROJECT SITE WORK.
4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS
SANITARY SEWER.
5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND
STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.
6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED
WITHIN THIS FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.
7. EXCAVATION & BACKFILL - SAFE EXCAVATION &…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .