Attachment 4 -APP_A-DRAWINGS.pdf

PDF 14 MB Posted

Attached to
FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure
Solicitation number
15BNAS27Q00000002
Issued by

About this file

This file is a set of construction drawings and technical documents for the Federal Bureau of Prisons (FBOP) Federal Correctional Institution (FCI) Three Rivers replacement project located at 1700 TX-72, Three Rivers, Texas 78071. The drawings are preliminary in nature, dated March 6, 2025, and prepared by Prime Architects (Project No. 2403) in coordination with Coffman Engineers. The project scope encompasses the replacement of two generators (Generators 1 and 2) at Building N (the Powerhouse), installation of a secondary "Loop B" electrical feeder system between transformers, replacement of fuel system infrastructure, demolition of existing equipment, site restoration, and associated civil, mechanical, plumbing, electrical, and fire protection work. The construction documents include comprehensive site plans, demolition plans, power loop routing plans, civil details with concrete pad specifications and utility trench designs, architectural floor plans showing generator and switchgear room modifications, mechanical schedules for HVAC equipment (three 2-ton Daikin split systems), diesel fuel system design with submersible pump and polishing system specifications, and electrical site plans with one-line diagrams.

Key technical requirements include maintaining minimum 50-foot clearance between the new "Loop B" electrical pathways and existing "Loop A" pathways with 3-inch concrete encasement around electrical conduits, installation of double-wall steel carrier piping with fiber-reinforced plastic containment for fuel delivery approximately 500 linear feet from storage tanks to new generators, jack-and-bore installation of 58 linear feet of carrier pipe across security-fenced areas, concrete equipment pads with specific bearing capacity of 1,500 PSF minimum, and compliance with 2024 International Building Code standards. Critical coordination requirements include notifying One-Call (1-800-344-8377) at least 48 hours before digging, field verification of all existing utility locations, traffic control coordination with FBOP facility engineering minimum two weeks in advance, and compliance with OSHA excavation and construction safety standards. The contractor is responsible for all demolition waste removal, site protection of non-scheduled improvements, hazardous materials identification and notification, as-built documentation of installed subsurface utilities, and restoration of all disturbed surfaces to original or better condition.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G

EN

E

LAVASTID

A

AT

T S

XETE FO

SA

R

EG

IS

TE

RED ARCHITEC

T

24186

425 WEST GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

Au to de sk D oc s:

//2 4Z 5A

U

- F

C I T hr ee R iv er s

- R ep la ce G en er at or s/

FC

I T hr ee R iv er s

- R ep la ce G en er at or s.

rv t

3/ 7/ 1:

:1

AM

FEDERAL CORRECTIONAL INSTITUTION,

THREE RIVERS

REPLACE GENERATORS 1 & 2 / INFRASTRUCTURE / TRANSFORMER

1700 TX-72

THREE RIVERS, TX 78071

Project No. 2403

CONSTRUCTION DOCUMENTS

MARCH 6, 2025

NO DIGGING SHOULD START

UNTIL LOCAL UNDERGROUND

UTILITY IDENTIFYING COMPANY

HAS BEEN NOTIFIED, AND ALL

UNDERGROUND UTILITIES HAVE

BEEN MARKED

SHEET INDEX

SHEET

NO. SHEET NAME

GENERAL

GI001 COVER SHEET

GI003 GENERAL NOTES AND SYMBOLS

CIVIL

C-100 EXISTING CONDITIONS PLAN

C-200 SITE DEMOLITION PLAN

C-300 SITE RESRORATION PLAN

C-301 POWER LOOP ROUTING PLAN

C-302 POWER LOOP ROUTING- POWERHOUSE PLAN

C-303 POWER LOOP ROUTING- POWER HOUSE & GENARATOR PLAN

C-304 CIVIL DETAILS

C-305 CIVIL DETAILS

C-306 CIVIL DETAILS

ARCHITECTURE

AD101 DEMO FLOOR PLAN POWERHOUSE BUILDING

AE101 FLOOR PLAN POWERHOUSE BUILDING

FIRE PROTECTION

FD101 SWITCHGEAR BUILDING FIRE PROTECTION DEMOLITION PLAN

FP101 SWITCHGEAR BUILDING FIRE PROTECTION PLAN

PLUMBING

PD-101 PLUMBING POWERHOUSE BUILDING DEMO PIPING PLANS

MECHANICAL

M-001 MECHANICAL GENERAL NOTES & LEGEND

MD-101 POWERHOUSE BUILDING DEMO PLANS

M-101 POWERHOUSE BUILDING PLANS

SHEET INDEX

SHEET

NO. SHEET NAME

M-601 MECHANICAL SCHEDULES

ELECTRICAL

E-001 ABBREVIATIONS, SYMBOLS LEGEND, AND SHEET INDEX

E-002 GENERAL NOTES

ES101 OVERALL ELECTRICAL DEMOLITION SITE PLAN

ES102 OVERAL ELECTRICAL SITE PLANS

ES401 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS

ES402 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS

ES403 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS

ES404 ENLARGED ELECTRICAL SITE PLAN DEMO VIEWS

ES405 ENLARGED ELECTRICAL SITE PLAN VIEWS

ES406 ENLARGED ELECTRICAL SITE PLAN VIEWS

ES407 ENLARGED ELECTRICAL SITE PLAN VIEWS

ES408 ENLARGED ELECTRICAL SITE PLAN VIEWS

ES409 ENLARGED ELECTRICAL SITE PLAN VIEWS

ES501 ELECTRICAL SITE DETAILS

ES502 ELECTRICAL SITE DETAILS

ES503 ELECTRICAL SITE DETAILS

ES504 ELECTRICAL SITE DETAILS

ES505 ELECTRICAL SITE DETAILS

ES506 ELECTRICAL SITE DETAILS

ES507 ELECTRICAL SITE DETAILS

ES508 ELECTRICAL SITE DETAILS

ES601 DEMOLITION SITE ONE-LINE DIAGRAM

ES602 NEW WORK SITE ONE-LINE DIAGRAM

SHEET INDEX

SHEET

NO. SHEET NAME

ED101 POWERHOUSE BUILDING ELECTRICAL DEMO PLAN

ED401 ENLARGED ELECTRICAL DEMOLITION PLANS

ED402 ENLARGED ELECTRICAL DEMOLITION PLANS

ED501 ELECTRICAL DEMOLITION DETAILS

ED601 BUILDING DEMOLITION ONE-LINE DIAGRAMS

ED602 BUILDING DEMOLITION ONE-LINE DIAGRAMS

ED603 BUILDING DEMOLITION ONE-LINE DIAGRAMS

ED604 BUILDING DEMOLITION ONE-LINE DIAGRAMS

E-101 POWERHOUSE BUILDING PLAN

E-401 ENLARGED ELECTRICAL PLANS

E-402 ENLARGED ELECTRICAL PLANS

E-501 ELECTRICAL DETAILS

E-502 ELECTRICAL DETAILS

E-601 BUILDING ONE-LINE DIAGRAMS

E-602 BUILDING ONE-LINE DIAGRAMS

E-603 BUILDING ONE-LINE DIAGRAMS

E-604 BUILDING ONE-LINE DIAGRAMS

E-605 GROUNDING RISER DIAGRAM

E-700 ELECTRICAL SCHEDULES

E-701 PANEL SCHEDULES

E-702 PANEL SCHEDULES

E-703 PANEL SCHEDULES

E-704 PANEL SCHEDULES

E-705 PANEL SCHEDULES

H

DATE: 03-06-2025

PRELIMINARY

THIS DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT A

FINAL, SIGNED AND

SEALED DOCUMENT

MECH

DATE: 03-06-2025

DATE: 03-06-2025 DATE: 03-06-2025

F-6691

DATE: 03-06-2025

E

LAVASTID

A

AT

T S

XETE FO

SA

R

EG

IS

TE

RED ARCHITEC

T

24186

GROUND FLOOR PLAN

SCALE:1/8"=1'-0"

A401

AE 101

DRAWING TYPES LEGEND

0- GENERAL INFORMATION

1 - PLANS (HORIZONTAL VIEWS)

2 - ELEVATIONS (VERTICAL VIEWS)

3 - SECTIONS (SECTIONAL VIEWS)

4 - ENLARGED VIEWS (PLANS, ELEVATIONS OR SECTIONS)

5 - DETAILS

6 - SCHEDULES & DIAGRAMS

DISCIPLINE TYPE (ARCHITECTURE SHOWN)

DRAWING TYPE (PLAN, ELEVATION, ETC.)

SERIES/ FLOOR DESIGNATION

DETAIL CALLOUT

ENLARGED PLAN OR DETAIL

ON SHEET INDICATED

STRUCTURAL GRIDS

AS INDICATED ON

DRAWINGS

BUILDING SECTION CALLOUT

ARROWS INDICATE BUILDING

SECTION ON SHEET INDICATED

A301

SECTION CALLOUT

ARROW INDICATE WALL SECTION ON

SHEET INDICATED

A302

ROOM NAME

ROOM NAME & NUMBER SYMBOL

REFER TO ROOM FINISH SCHEDULE

101.1

DOOR NUMBER SYMBOL

REFER TO DOOR SCHEDULE

DOOR NUMBER WITH *

INDICATES ACCESS CONTROL

HARDWARE

PARTITION TYPE SYMBOL

REFER TO PARTITION TYPES

GLAZING TYPE SYMBOL

REFER TO GLAZING TYPES

A

AL1

REVISION SYMBOL

REFER TO SHEET BORDER FOR

REVISION HISTORY

ELEVATION DATUM SYMBOL

INDICATES DATUM ELEVATION AS

INDICATED

Bottom Text Top Text

DISCIPLINE MODIFIER (ELEMENTS SHOWN)

ARCHITECTURAL SYMBOLS LEGEND

DRAWING TITLE

NORTH ARROW AND SCALE

A301

EXTERIOR ELEVATION CALLOUT

ARROW INDICATE ELEVATION ON

SHEET INDICATED

A201

KEYNOTE SYMBOL

INDICATES INFORMATION FOUND IN

KEYNOTES ON PLAN

LOCATED IN THE

BOTTOM RIGHT

SHEET CORNER

A

INTERIOR SECTION CALLOUT

ARROW INDICATES SECTION ON

SHEET INDICATED

1 / A302

FIRE RATING SYMBOL SMOKE RATING SYMBOL

BREAK LINE

MARKS A BREAK OF UNDEFINED

LENGTH IN A OBJECT

CENTERLINE

PROPERTY LINE

1HR

MATCH LINE

USED TO INDICATE WHERE A

VIEW IS SPLIT

2HR

4 HR

3 HR

N

BUILDING CODE INFORMATION

INTERNATIONAL BUILDING CODE

2024 EDITION

INTERNATIONAL EXISRING BUILDING CODE

2021 EDITION

INTERNATIONAL MECHANICAL CODE

2024 EDITION

INTERNATIONAL PLUMBING CODE

2024 EDITION

NATIONAL ELECTRICAL CODE

2023 EDITION

N.F.P.A 101 LIFE SAFETY CODE

2024 EDITION

INTERNATIONAL ENERGY CONSERVATION CODE

2024 EDITION

ASHRAE 90.1

2022 EDITION

IECC - REQ

COUNTY: LIVE OAK COUNTY, TEXAS

CLIMATE ZONE: 2A* [WARM HUMID]

OPAQUE WALLS

METAL : R-13

MAX U-0.079

OPAQUE DOORS:

SWING MAX U-0.37

GARAGE MAX U-0.31

DESIGN LOAD REQ:

WIND SPEED: 128 Vmph

VALUE PROVIDED IS 3-SECOND GUST WIND SPEEDS AT 33 ft ABOVE GROUND FOR EXPOSURE

C CATEGORY, BASED ON LINEAR INTERPOLATION BETWEEN CONTOURS. WIND SPEEDS

CORRESPOND TO APPROXIMATELY A 1.6% PROBABILITY OF EXCEEDANACE IN 50 YEARS.

NOTE: SITE IS IN A HURRICANE-PRONE REGION AS DEFINED IN ASCE/SEI 7-22 SECTION 26.2.

GLAZED OPENINGS NEED NOT BE PROTECTED AGAINST WIND-BORNE DEBRIS.

SEISMIC:

Site Soil Class: D - Stiff Soil

RESULTS:

PGA M : 0.032

SMS : 0.081

SM1 : 0.034

SDS : 0.054

SD1 : 0.022

TL : 6

SS : 0.061

S1 : 0.016

VS30 : 260

425 W GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

SHEET NUMBER

A

PROJECT NUMBER

ISSUE DATE

REVISIONS

SHEET TITLE

B

C

D

E

F

F

2 3 4 5 6 7 8 9 10

Autodesk D ocs://24Z5AU

6 - FC

I Three R ivers - R eplace G enerators/2403 - FC I Three R ivers - R eplace G enerators.rvt

3/6/2025 7:57:40 AM

GI003

GENERAL NOTES

AND SYMBOLS

FE

D

ER

A L B U R

EA

U O F

PR

IS

O N S

R

EP

LA

C E G

EN

ER

A

TO

R S 1&

3/6/2025

T X- , T H R

EE

R

IV

ER

S, T X

No. Description Date

3/6/2025

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X X

X X

X X

X

XXX

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X X

X X

X X

X

XX

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X X

X X

X X

X

XX

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

XXX

X

X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X X

X X

ABANDONED

EFFLUENT LAGOON

AA

X

X

L

X

K X X

M

X

X

X X

DD

J

X X X

X

X X

X X

X X

X

X

X

X

X

X

X

SL

X

X

X

X

X

X

X

X

X X

X

X

X X

X X

X X

X

A

BG

X

X X

LOADINGDOCK

X X

X X

X

X

X X

X

H H

X

X

X

X

X

CC

BB

X

X X X

X X

X X

X X X X

X

N

H

X

X X

U

X

X

X

X

X X

X

X X

I

X X

X X

X

X

X

Y X

X X

X

T

X

C F

X

X

X X

X

X X

X X

X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

X

X

X

X

X

XXXX

X X

X

R

X X

X

DE

XXX

S

P

X

V

X X

X

X X

X X

X

X

X

X

X X

X

X

X

X

X

Q

X

X

X X

X X

X X

EE W

X

X

FB

NATURAL GAS PLANT

ELEC. SERVICE POINT

C LV

C

LV

C

LV

C LV

C

LV

HV

C LV

HV

C

LVHV

C

LV

C

HV

LV

HV

C

LV

C

HV

L H

H L C

H

L

C

H

H

L

C

H

L

C

C L H

C

CO

NC

RE

TE

S

ID

EW

AL

K

ANTENNA

DISH

ALUMINUM BUILDING

CONCRETE SIDEWALK

ANTENNA

ANCHOR

ANTENNA

ANCHOR

ANTENNA

ANCHOR

GUARD

RAIL

GUARD

RAIL

24' ASPHALT DRIVEWAY

ASPHALT

DRIVEWAY

CHAINLINK FENCE

STOP

SIGN

SPEED

SIGN

24' ASPH

ALT

DRIVEW

AY

NO

TRUCK

SIGN

SIGN

HEADWALL

FL=238.14'

HEADWALL

FL=238.23'

24" RCP

CONCRETE SIDEWALK

GUARD

RAILFL=239.17'

FL=239.16'

CONCRETE

SLAB

TOP OF BANK

TOP OF BANK20

' A

SP

HA

LT

DR

IV

EW

AY

C O

N C

RE

TE

S

ID

EW

AL

K

BOTTOM OF BANK

3'X3'

COMMUNICATION

VAULT

3'X3'

COMMUNICATION

VAULT

4.7'X3'

COMMUNICATION

VAULT

ABOVE GROUND

DUCT LINES

24" RCP

ASPHALTPAVEMENT

WATER VALVES

X

X

X

SAN

SAN

SAN

SAN

SAN

X

X

X

X

X

NOTES:

1. CONSTRUCTION MEETING - A PRE-CONSTRUCTION MEETING IS REQUIRED BY THE OWNER, OWNER'S REPRESENTATIVE, UTILITY SERVICE

PROVIDERS AND/OR AUTHORITIES HAVING JURISDICTION (AHJ). CONTRACTOR TO COORDINATE WITH THESE PARTIES AND SCHEDULE

PRE-CONSTRUCTION MEETINGS PRIOR TO CONSTRUCTION.

2. EXISTING CONDITIONS - INFORMATION ON EXISTING CONDITIONS AND BOUNDARIES/RIGHT OF WAY SHOWN ON THESE PLANS WAS OBTAINED FROM A SURVEY PROVIDED BY FBOP AND NOT PERFORMED OR VERIFIED BY THE ENGINEER. NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND REQUIRED ELEVATIONS AT THE SUBJECT SITE, AND VERIFY THE LOCATION AND SIZE OF EXISTING UTILITIES BEFORE PROCEEDING WITH CONSTRUCTION ACTIVITIES, INCLUDING UNDERGROUND AND OVERHEAD UTILITIES, UTILITY STRUCTURES, POINTS OF CONNECTION, AND UTILITY CROSSINGS.

NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR EXCEPTIONS ENCOUNTERED PRIOR TO PROCEEDING. THE CONTRACTOR SHALL OBTAIN ADDITIONAL UTILITIES INFORMATION FROM THE APPROPRIATE AGENCIES AND FBOP FACILITY ENGINEERING. THE CONTRACTOR SHALL COORDINATE WITH THE PUBLIC, FBOP FACILITY AND PRIVATE UTILITIES TO DETERMINE THE WORK AND INSPECTIONS NECESSARY TO DISCONNECT, CUT, CAP, ABANDON, RELOCATE, OR REPAIR THEIR FACILITIES. ANY COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY EXISTING CONDITIONS, PRIOR TO BEGINNING CONSTRUCTION, SHALL BE BORNE BY THE CONTRACTOR.

3. UTILITY LOCATION - IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE DRAWINGS. PRIOR TO STARTING CONSTRUCTION, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK. CONTRACTOR TO LOCATE AND DETERMINE DEPTH OF EXISTING UTILITIES, AND NOTIFY THE ENGINEER IF ANY CONFLICTS ARISE BETWEEN EXISTING FEATURES AND THE PLACEMENT OF NEW FACILITIES. NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL

UNDERGROUND UTILITIES HAVE BEEN MARKED.

4. FIELD VERIFICATION - THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION AND COORDINATION OF ALL DIMENSIONS, UTILITY

LOCATIONS AND ELEVATIONS BEFORE PROCEEDING WITH THE WORK.

5. DRAWINGS - A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS, REFERENCES, AND TYPICAL DETAILS OF CONSTRUCTION. NOT EVERY DETAIL OF THE CONSTRUCTION IS SHOWN ON THESE DRAWINGS. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED, BUT ARE OF A SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO APPROVAL BY THE ENGINEER. THE CONTRACTOR SHALL REVIEW THE DRAWINGS PRIOR TO STARTING CONSTRUCTION AND BRING ALL PROBLEMS IMMEDIATELY TO THE ATTENTION OF THE PROJECT DESIGN

TEAM (OWNER, ARCHITECT AND/OR ENGINEERS) IN ORDER TO AVOID DELAYS.

6. AS-BUILTS - AS-BUILTS IDENTIFYING AND ACCURATELY LOCATING SUBSURFACE UTILITIES AND IMPROVEMENTS INSTALLED BY THE CONTRACTOR UNDER THIS CONTRACT AND NOTING AS-CONSTRUCTED CONDITIONS SHALL BE PROVIDED BY THE CONTRACTOR AT THE END

OF CONSTRUCTION.

7. JOB SITE SAFETY - THE CONTRACTOR SHALL CONDUCT ALL WORK IN A SAFE MANNER AS REQUIRED BY ALL APPLICABLE CITY, COUNTY, STATE AND FEDERAL REGULATIONS. THE ENGINEER HAS NOT BEEN RETAINED TO PROVIDE DESIGN AND/OR CONSTRUCTION REVIEW SERVICES RELATED TO THE CONTRACTOR'S SAFETY PRECAUTIONS, OR TO THE MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES FOR THE CONTRACTOR TO PERFORM THEIR WORK. THE UNDERTAKING OF PERIODIC SITE VISITS BY THE ENGINEER SHALL NOT BE CONSTRUED AS THE SUPERVISION OF ACTUAL CONSTRUCTION, NOR MAKE THE ENGINEER RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF WORK BY THE CONTRACTOR OR THE CONTRACTOR'S EMPLOYEES OR EMPLOYEES OF SUPPLIERS OR SUBCONTRACTORS, OR FOR ACCESS, VISITS, USE, WORK, TRAVEL, OR OCCUPANCY BY ANY PERSON. SAFETY STANDARDS AND REQUIREMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COMPLIED WITH AS SET FORTH BY THE OCCUPATIONAL SAFETY

AND HEALTH ADMINISTRATION (OSHA).

8. WORKMANSHIP - THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THIS PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, INCLUDING SUCH INCIDENTALS AS MAY BE NECESSARY TO MEET REQUIREMENTS AND STANDARDS OF THE AUTHORITIES HAVING JURISDICTION. ALL WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER AND IN CONFORMANCE WITH

APPLICABLE CODES AND REGULATIONS.

9. LICENSURE - THE CONTRACTOR SHALL HAVE THE APPROPRIATE LICENSES TO PERFORM THE SPECIFIED WORK IN CONFORMANCE WITH THE

AUTHORITIES HAVING JURISDICTION AND WITH CONTRACT REQUIREMENTS.

10. TRAFFIC CONTROL & SAFETY - THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL ON-SITE AND SHALL COORDINATE THEIR ACTIVITIES WITH THE FBOP AND ENGINEER A MINIMUM OF TWO (2) WEEKS IN ADVANCE OF THE BEGINNING OF WORK. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TRAFFIC CONTROL SIGNS. SAFE VEHICULAR AND PEDESTRIAN ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. SHUTDOWN OF FBOP OPERATION OR ACCESS WILL NOT BE PERMITTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) STANDARDS. COORDINATE REQUIREMENTS WITH THE AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL MAINTAIN ALL

SIGNS, BARRICADES, WARNING LIGHTS, AND OTHER DEVICES NECESSARY FOR SAFETY.

11. PROTECTION OF PROPERTY - THE CONTRACTOR SHALL PROTECT FROM DAMAGE OR DESTRUCTION TO PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK THAT IS NOT SCHEDULED FOR REPAIR, REPLACEMENT OR REMOVAL, AND SHALL ENSURE THAT

INTERFERENCE WITH THE USE OF SUCH PROPERTY IS MINIMIZED.

12. DAMAGE DURING CONSTRUCTION - ANY EXISTING PUBLIC OR PRIVATE IMPROVEMENTS DAMAGED DURING CONSTRUCTION SHALL BE REPLACED IN A MATTER TO BE APPROVED BY THE LOCAL JURISDICTION, APPROPRIATE UTILITY OWNER OR OWNER. IF ROADWAY PAVEMENT MUST BE BROKEN, THE LOCAL TRANSPORTATION DEPARTMENT WILL EITHER REPAIR THE STREET AND BILL THE CONTRACTOR FOR THIS WORK, OR ALLOW THE CONTRACTOR TO COMPLETE THESE REPAIRS TO THEIR STANDARDS. ALL DISTURBED PROPERTY AND VEGETATION

SHALL BE RESTORED TO ORIGINAL CONDITION OR BETTER AS SPECIFIED.

EXISTING

CONDITIONS PLAN

FE

D

ER

A

L B

U R

EA

U

O F

PR

IS

O N

S R

EP

LA

C E

G

EN

ER

A

TO

R

S 1&

03/06/2025

425 W GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

SHEET NUMBER

A

PRELIMINARY

THIS DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT A

FINAL, SIGNED AND

SEALED DOCUMENT

PROJECT NUMBER

ISSUE DATE

REVISIONS

SHEET TITLE

B

C

D

E

F

F

2 3 4 5 6 7 8 9 10

No. Description Date

T X-

, T

H R

EE

R

IV

ER

S, T

X

C-100

XFMR HVT 7

XFMR HVT 8

XFMR HVT 6

XFMR HVT 5

XFMR HVT 3

XFMR HVT 4

HVTN 1HVTN 3

HVTN 2

300150150 75

FEETSCALE:

1 INCH = 150

XFMR HVT 1

XFMR HVT 2

XFMR HVT-U

XFMR HVT-T

XFMR HVT-Q

XFMR HVT-P

XFMR HVT-W

LEGEND:

EXISTING "LOOP A" PRMARY

FEEDER

EXISTING TRANSFORMER

MECH

DATE: 03-06-2025

www.coffman.com

1505 Lyndon B Johnson Fwy, Suite 240

Dallas, TX 75234 ph 214.692.2100

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X X

X X

X X

X

XXX

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

XX

X

X X

X X

X X

X

XX

X X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X X

X X

X X

X

XX

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

XXX

X

X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X X

X X

ABANDONED

EFFLUENT LAGOON

AA

X

X

L

X

K X X

M

X

X

X X

DD

J

X X X

X

X

X X

X X

X

X

X

X

X

X

X

X

SL

X

X

X

X

X

X

X

X

X X

X

X

X X

X X

X X

X

A

BG

X

X X

LOADINGDOCK

X X

X X

X

X

X X

X

H H

X

X

X

X

X

CC

BB

X

X X X

X X

X X

X X X X

X

N

H

X

X X

U

X

X

X

X

X X

X

X X

I

X X

X X

X

X

X

Y X

X X

X

T

X

C F

X

X

X X

X

X X

X X

X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

X

X

X

X

X

XXXX

X X

X

R

X X

X

DE

XXX

S

P

X

V

X X

X

X X

X X

X

X

X

X

X X

X

X

X

X

X

Q

X

X

X X

X X

X X

EE W

X

X

FB

NATURAL GAS PLANT

ELEC. SERVICE POINT

C LV

C

LV

C

LV

C LV

C

LV

HV

C LV

HV

C

LVHV

C

LV

C

HV

LV

HV

C

LV

C HV

L H

H L C

H

L

C

H

H

L

C

H

L

C

C L H

C

CO

NC

RE

TE

S

ID

EW

AL

K

ANTENNA

DISH

ALUMINUM BUILDING

CONCRETE SIDEWALK

ANTENNA

ANCHOR

ANTENNA

ANCHOR

ANTENNA

ANCHOR

GUARD

RAIL

GUARD

RAIL

24' ASPHALT DRIVEWAY

ASPHALT

DRIVEWAY

CHAINLINK FENCE

STOP

SIGN

SPEED

SIGN

24' ASPH

ALT

DRIVEW

AY

NO

TRUCK

SIGN

SIGN

HEADWALL

FL=238.14'

HEADWALL

FL=238.23'

24" RCP

CONCRETE SIDEWALK

GUARD

RAILFL=239.17'

FL=239.16'

CONCRETE

SLAB

TOP OF BANK

TOP OF BANK20

' A

SP

HA

LT

DR

IV

EW

AY

C O

N C

RE

TE

S

ID

EW

AL

K

BOTTOM OF BANK

3'X3'

COMMUNICATION

VAULT

3'X3'

COMMUNICATION

VAULT

4.7'X3'

COMMUNICATION

VAULT

ABOVE GROUND

DUCT LINES

24" RCP

ASPHALTPAVEMENT

WATER VALVES

X

X

X

SAN

SAN

SAN

SAN

SAN

X

X

X

X

X

X

SITE DEMOLITION

PLAN

FE

D

ER

A

L B

U R

EA

U

O F

PR

IS

O N

S R

EP

LA

C E

G

EN

ER

A

TO

R

S 1&

03/06/2025

425 W GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

SHEET NUMBER

A

PRELIMINARY

THIS DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT A

FINAL, SIGNED AND

SEALED DOCUMENT

PROJECT NUMBER

ISSUE DATE

REVISIONS

SHEET TITLE

B

C

D

E

F

F

2 3 4 5 6 7 8 9 10

No. Description Date

T X-

, T

H R

EE

R

IV

ER

S, T

X

C-200

XFMR HVT 7

XFMR HVT 8

XFMR HVT 6

XFMR HVT 5

XFMR HVT 3

XFMR HVT 4

HVTN 1

HVTN 3

HVTN 2

300150150 75

FEETSCALE:

1 INCH = 150

XFMR HVT 1

XFMR HVT 2

XFMR HVT-U

XFMR HVT-T

XFMR HVT-Q

XFMR HVT-P

XFMR HVT-W

LEGEND:

EXISTING "LOOP A" PRMARY

FEEDER

EXISTING TRANSFORMER

DEMO PAVEMENT (ASPHALT,

CONCRETE PAD/ SIDEWALK,

GRAVEL)

DEMO LANDSCAPE

DEMO TREES WITHIN PROPOSED

GRAVEL GENERATOR AREA

NOTES:

1. DEMOLITION - ALL DEMOLITION SHALL BE PERFORMED IN CONFORMANCE TO THE REQUIREMENTS OF THE APPLICABLE SECTIONS OF THE STANDARD SPECIFICATIONS AND THE CURRENT EDITION OF THE UNIFORM BUILDING CODE OR INTERNATIONAL BUILDING CODE, AS APPLICABLE. THE STRIPPED DEBRIS SHALL NOT BE MIXED WITH MATERIALS TO BE USED AS STRUCTURAL FILL. CONDUCT DEMOLITION ACTIVITIES AND DEBRIS REMOVAL OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, WALKWAYS, AND OTHER ADJACENT

FACILITIES.

2. HAZARDOUS MATERIALS - IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB;

IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER AND OWNER.

3. DEMOLITION & DISPOSAL - THE REMOVAL AND DISPOSAL OF ALL FOUNDATIONS, STRUCTURES, PIPING, FENCES, AND OTHER OBSTRUCTIONS SHALL BE DONE IN ACCORDANCE WITH STANDARD SPECIFICATIONS. REMOVE DEMOLITION WASTE MATERIALS AND DEBRIS FROM PROJECT SITE AND LEGALLY DISPOSE OF THEM IN AN EPA-APPROVED LANDFILL ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION.

4. PROTECTION OF PROPERTY - THE CONTRACTOR SHALL PROTECT FROM DAMAGE OR DESTRUCTION PRIVATE AND PUBLIC PROPERTY ON OR IN THE VICINITY OF THE WORK THAT IS NOT SCHEDULED FOR REPAIR, REPLACEMENT OR REMOVAL AND SHALL ENSURE THAT INTERFERENCE WITH THE USE OF SUCH PROPERTY IS MINIMIZED. ANY EXISTING IMPROVEMENTS THAT ARE TO REMAIN AND BECOME DAMAGED SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AS ACCEPTABLE TO PARTIES HAVING JURISDICTION AT NO COST TO OWNER.

5. REMOVAL OF STRUCTURES & OBSTRUCTIONS - THE REMOVAL AND DISPOSAL OF ALL BUILDINGS, FOUNDATIONS, STRUCTURES, FENCES, AND

OTHER OBSTRUCTIONS SHALL BE DONE IN ACCORDANCE WITH STANDARD SPECIFICATIONS.

6. REMOVAL OF PAVEMENT, SIDEWALKS AND CURBS - ALL REMOVAL OF PAVEMENT, SIDEWALKS AND CURBS SHALL BE PERFORMED IN CONFORMANCE WITH STANDARD SPECIFICATIONS. ASPHALT CONCRETE SHALL BE SAWCUT FOR A SMOOTH TRANSITION. CONCRETE WALKS

AND CURBS SHALL BE SAWCUT OR REPLACED TO AN EXISTING JOINT.

7. EXISTING UTILITIES - THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE FBOP FACILITY ENGINEERING AND APPROPRIATE UTILITY COMPANIES FOR SCHEDULING, DISCONNECTING, AND CAPPING OF THE EXISTING UTILITIES. EXISTING UTILITY WORK SHALL BE IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS. ALL CAPPED UTILITIES SHALL BE CLEARLY MARKED WITH AN ABOVE GRADE MARKER.

NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND

UTILITIES HAVE BEEN MARKED.

8. SAFETY FENCING - TEMPORARY 6' HIGH CHAIN LINK FENCE SHALL BE PLACED AROUND THE SITE AND/OR EXCAVATION AREA AS NECESSARY TO PROTECT PEDESTRIANS AND PROVIDE SITE SAFETY WHILE DEMOLITION AND CONSTRUCTION IS IN PROGRESS. AS CONSTRUCTION PROGRESSES AND CONDITIONS DICTATE, THE CONTRACTOR SHOULD ANTICIPATE THAT MORE PROTECTION MAY BE NECESSARY. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INSURE SAFETY OF THE PUBLIC AT ALL TIMES.

9. SALVAGE - TO THE MAXIMUM EXTENT POSSIBLE, THE CONTRACTOR SHALL SALVAGE AND REUSE ALL CATCH BASIN FRAMES, GRATES, COVERS, MANHOLE LIDS AND ANY OTHER EXISTING METAL WORKS IN PAVEMENTS DESIGNATED FOR REMOVAL / REPLACEMENT. ALL SALVAGEABLE MATERIAL CREATED DURING DEMOLITION SHALL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE STATED

BY HEREIN OR THE OWNER.

10. REGULATORY COMPLIANCE - COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING DEMOLITION. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. COORDINATE DEMOLITION OPERATIONS AND ANY REQUIRED UTILITY RELOCATIONS WITH THE FBOP FACILITY ENGINEERING AND APPROPRIATE UTILITY PURVEYOR, INCLUDING REQUIREMENTS AND

SCHEDULING.

11. COORDINATION AND UNKNOWNS - COORDINATE EXTENT OF DEMOLITION WITH PROPOSED IMPROVEMENTS. CONTRACTOR SHALL REVIEW THE PROJECT LIMITS TO DETERMINE THE QUANTITY AND TYPE OF DEMOLITION WASTE MATERIAL AND DEBRIS TO BE INCLUDED IN THEIR BID.

THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, AND RELOCATING IF NECESSARY, ANY ITEMS NOT OTHERWISE NOTED THAT CONFLICT WITH THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICTING ITEMS NOT SHOWN ON THE PLANS THAT MUST BE REMOVED OR RELOCATED. FAILURE TO NOTIFY THE ENGINEER DOES NOT RELIEVE THE

CONTRACTOR OF COST RESPONSIBILITY FOR REMOVING REQUIRED ITEMS.

KEYNOTES:

EXISTING SECURITY FENCE TO BE CUT WHERE

ELECTRICAL TRENCH INTERSECTS AND SHALL BE

REPLACED IN KIND ( +/- 300 LF)

EXISTING SECURITY FENCE TO BE CUT AT GRAVEL ROAD

CONNECTION TO ASPHALT DRIVE (+/- 25 LF)

DEMO EXISTING PAD

DECORATIVE SCREENING WALL TO BE

DEMOLISHED AND REPLACED IN KIND

19.4'

7.4'

EXISTING CONCRETE PAD

LIMITS TO BE DEMOLISHED

EXISTING TREES TO

BE DEMOLISHED

MECH

DATE: 03-06-2025

www.coffman.com

1505 Lyndon B Johnson Fwy, Suite 240

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X X

X X

X X

X

XXX

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

XX

X

X X

X X

X X

X

XX

X X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X X

X X

X X

X

XX

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

XXX

X

X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X X

X X

ABANDONED

EFFLUENT LAGOON

AA

X

X

L

X

K X X

M

X

X

X X

DD

J

X X X

X

X

X X

X X

X

X

X

X

X

X

X

X

SL

X

X

X

X

X

X

X

X

X X

X

X

X X

X X

X X

X

A

BG

X

X X

LOADINGDOCK

X X

X X

X

X

X X

X

H H

X

X

X

X

X

CC

BB

X

X X X

X X

X X

X X X X

X

N

H

X

X X

U

X

X

X

X

X X

X

X X

I

X X

X X

X

X

X

Y X

X X

X

T

X

C F

X

X

X X

X

X X

X X

X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

X

X

X

X

X

XXXX

X X

X

R

X X

X

DE

XXX

S

P

X

V

X X

X

X X

X X

X

X

X

X

X X

X

X

X

X

X

Q

X

X

X X

X X

X X

EE W

X

X

FB

NATURAL GAS PLANT

CO

NC

RE

TE

S

ID

EW

AL

K

ANTENNA

DISH

ALUMINUM BUILDING

CONCRETE SIDEWALK

CONCRETE SIDEWALK

TOP OF BANK

TOP OF BANK

C O

N C

RE

TE

S

ID

EW

AL

K

BOTTOM OF BANK

3'X3'

COMMUNICATION

VAULT

3'X3'

COMMUNICATION

VAULT

4.7'X3'

COMMUNICATION

VAULT

ABOVE GROUND

DUCT LINES

WATER VALVES

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X X

X X

X X

X

XXX

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

XX

X

X X

X X

X X

X

XX

X X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X X

X X

X X

X

XX

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

XXX

X

X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X X

X X

ABANDONED

EFFLUENT LAGOON

AA

X

X

L

X

K X X

M

X

X

X X

DD

J

X X X

X

X

X X

X X

X

X

X

X

X

X

X

X

SL

X

X

X

X

X

X

X

X

X X

X

X

X X

X X

X X

X

A

BG

X

X X

LOADINGDOCK

X X

X X

X

X

X X

X

H H

X

X

X

X

X

CC

BB

X

X X X

X X

X X

X X X X

X

N

H

X

X X

U

X

X

X

X

X X

X

X X

I

X X

X X

X

X

X

Y X

X X

X

T

X

C F

X

X

X X

X

X X

X X

X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

X

X

X

X

X

XXXX

X X

X

R

X X

X

DE

XXX

S

P

X

V

X X

X

X X

X X

X

X

X

X

X X

X

X

X

X

X

Q

X

X

X X

X X

X X

EE W

X

X

FB

NATURAL GAS PLANT

CO

NC

RE

TE

S

ID

EW

AL

K

ANTENNA

DISH

ALUMINUM BUILDING

CONCRETE SIDEWALK

CONCRETE SIDEWALK

TOP OF BANK

TOP OF BANK

C O

N C

RE

TE

S

ID

EW

AL

K

BOTTOM OF BANK

3'X3'

COMMUNICATION

VAULT

3'X3'

COMMUNICATION

VAULT

4.7'X3'

COMMUNICATION

VAULT

ABOVE GROUND

DUCT LINES

WATER VALVES

X

X

X

X

X

X

X

X

NOTES:

1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED

TRANSFORMERS AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING

GENERATORS AT BUILDING N, THE POWERHOUSE.

2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.

3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION. FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK.

NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND UTILITIES

HAVE BEEN MARKED.

4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS SANITARY SEWER.

5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND

STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.

6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED WITHIN

THIS FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.

7. EXCAVATION & BACKFILL - SAFE EXCAVATION & BACKFILL PRACTICES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO REGULATIONS ESTABLISHED BY PERTINENT STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH AGENCIES. EXCAVATIONS DEEPER THAN 4-FEET MUST BE SHORED, SHEETED, BRACED, SLOPED, OR SUPPORTED BY A MEANS OF SUFFICIENT STRENGTH TO PROTECT EMPLOYEES.

EXCAVATIONS DEEPER THAN 20-FEET MUST INCLUDE A PROTECTION SYSTEM DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF TEXAS. EXCAVATION MATERIALS ARE TO BE STORED AT LEAST 2-FEET FROM THE EDGE OF THE EXCAVATION OR TRENCH WHEN EMPLOYEES ARE WORKING IN THE EXCAVATION. SITE DEVICES MAY BE REQUIRED TO PREVENT THE MATERIAL FROM FALLING OR ROLLING INTO THE EXCAVATION. WHEN TRENCHES OR OTHER EXCAVATIONS ARE WITHIN 4-FEET OF PUBLIC PROPERTY, BARRICADES MUST BE SET UP FOR

PUBLIC SAFETY, AND THE EXCAVATION MUST BE COVERED WHEN WORK IS NOT IN PROGRESS.

8. PIPE TRENCH & BEDDING - ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN CONFORMANCE WITH THE REQUIREMENTS OF TXDOT SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "EXCAVATION AND BACKFILL FOR STRUCTURES" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED, PROVIDED THE MATERIAL IN THE BOTTOM OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE UNYIELDING BASE.

9. TRENCH BACKFILL - BACKFILL OF TRENCHES SHALL BE IN ACCORDANCE WITH THE TXDOT STANDARD SPECIFICATIONS OR FBOP STANDARD

REQUIREMENTS.

10. TRENCH SURFACE RESTORATION - THE GROUND SURFACES OF ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY, ONSITE FBOP PROPERTY OR ON OFF-SITE PROPERTIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER IN CONFORMANCE WITH THE REQUIREMENTS OF THE

LOCAL JURISDICTION OR FBOP STANDARDS.

11. COMPACTION OVER UTILITIES - ALL TRENCH BACKFILL AND ROADWAY EMBANKMENT SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR DRY MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D1557, EXCEPT THE TOP 6 INCHES OF TRENCH BELOW THE BOTTOM OF THE PAVEMENT, WHICH

SHALL BE 100%.

12. STRIPING - ALL STRIPING THAT IS REMOVED OR DAMAGED DURING TRENCHING SHALL BE RESTORED IN KIND TO THE ORIGINAL CONDITION AND IN

CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL JURISDICTION OR FBOP STANDARDS.

13. CONCRETE ENCASEMENT- FOR THE SECONDARY ELECTRICAL LOOP, CONTRACTOR SHALL MAINTAIN MINIMUM OF 50' OF CLEARANCE BETWEEN PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS, ENCASING THE SECONDARY B LOOP IN CONCRETE. ENCASEMENT SHALL BE A MINIMUM OF 3-INCHES AROUND ELECTRICAL CONDUITS. IN AREAS WHERE 50' CLEARANCE CANNOT BE MET, MAINTAIN MINIMUM OF 25' OF

CLEARANCE BETWEEN THE PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS.

SITE RESTORATION

PLAN

425 W GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

SHEET NUMBER

A

PRELIMINARY

THIS DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT A

FINAL, SIGNED AND

SEALED DOCUMENT

PROJECT NUMBER

ISSUE DATE

REVISIONS

SHEET TITLE

B

C

D

E

F

F

2 3 4 5 6 7 8 9 10

No. Description Date

C-300 300150150 75

FEETSCALE:

1 INCH = 150

FE

D

ER

A

L B

U R

EA

U

O F

PR

IS

O N

S R

EP

LA

C E

G

EN

ER

A

TO

R

S 1&

03/06/2025

T X-

, T

H R

EE

R

IV

ER

S, T

X

LEGEND:

ASPHALT PAVEMENT

CONCRETE PAVEMENT/SIDEWALK

GRAVEL ROAD

GRAVEL FOOTPATH

GRAVEL UNDER GENERATORS

LANDSCAPING/VEGETATION

ELECTRICAL JUNCTION BOX

FUEL PIPING SHUT OFF VALVE

SWITCH

TRANSFORMER

NEW SITE FENCINGX X

KEYNOTES:

NEW SECURITY FENCE TO BE INSTALLED WHERE

ELECTRICAL TRENCH INTERSECTS AND SHALL MATCH

EXISTING ( +/- 300 LF)

MECH

DATE: 03-06-2025

www.coffman.com

1505 Lyndon B Johnson Fwy, Suite 240

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X X

X X

X X

X

XXX

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

XX

X

X X

X X

X X

X

XX

X X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X X

X X

X X

X

XX

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

XXX

X

X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X X

X X

ABANDONED

EFFLUENT LAGOON

AA

X

X

L

X

K X X

M

X

X

X X

DD

J

X X X

X

X

X X

X X

X

X

X

X

X

X

X

X

SL

X

X

X

X

X

X

X

X

X X

X

X

X X

X X

X X

X

A

BG

X

X X

LOADINGDOCK

X X

X X

X

X

X X

X

H H

X

X

X

X

X

CC

BB

X

X X X

X X

X X

X X X X

X

N

H

X

X X

U

X

X

X

X

X X

X

X X

I

X X

X X

X

X

X

Y X

X X

X

T

X

C F

X

X

X X

X

X X

X X

X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

X

X

X

X

X

XXXX

X X

X

R

X X

X

DE

XXX

S

P

X

V

X X

X

X X

X X

X

X

X

X

X X

X

X

X

X

X

Q

X

X

X X

X X

X X

EE W

X

X

FB

NATURAL GAS PLANT

ELEC. SERVICE POINT

C LV

C

LV

C

LV

C LV

C

LV

HV

C LV

HV

C

LVHV

C

LV

C

HV

LV

HV

C

LV

C HV

L H

H L C

H

L

C

H

H

L

C

H

L

C

C L H

C

CO

NC

RE

TE

S

ID

EW

AL

K

ANTENNA

DISH

ALUMINUM BUILDING

CONCRETE SIDEWALK

CONCRETE SIDEWALK

TOP OF BANK

TOP OF BANK

C O

N C

RE

TE

S

ID

EW

AL

K

BOTTOM OF BANK

3'X3'

COMMUNICATION

VAULT

3'X3'

COMMUNICATION

VAULT

4.7'X3'

COMMUNICATION

VAULT

ABOVE GROUND

DUCT LINES

WATER VALVES

X

X

X

SAN

SAN

SAN

SAN

SAN

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X X

X X

X X

X

XXX

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

XX

X

X X

X X

X X

X

XX

X X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X X

X X

X X

X

XX

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X X

X X

X X

XXX

X

X

X

X

X

X

X X

X X

X

X

X

X

X X

X X

X X

X X

ABANDONED

EFFLUENT LAGOON

AA

X

X

L

X

K X X

M

X

X

X X

DD

J

X X X

X

X

X X

X X

X

X

X

X

X

X

X

X

SL

X

X

X

X

X

X

X

X

X X

X

X

X X

X X

X X

X

A

BG

X

X X

LOADINGDOCK

X X

X X

X

X

X X

X

H H

X

X

X

X

X

CC

BB

X

X X X

X X

X X

X X X X

X

N

H

X

X X

U

X

X

X

X

X X

X

X X

I

X X

X X

X

X

X

Y X

X X

X

T

X

C F

X

X

X X

X

X X

X X

X X

X

X

X

X X

X X

X X

X

X X

X X

X X

X

X

X

X

X

X

XXXX

X X

X

R

X X

X

DE

XXX

S

P

X

V

X X

X

X X

X X

X

X

X

X

X X

X

X

X

X

X

Q

X

X

X X

X X

X X

EE W

X

X

FB

NATURAL GAS PLANT

ELEC. SERVICE POINT

C LV

C

LV

C

LV

C LV

C

LV

HV

C LV

HV

C

LVHV

C

LV

C

HV

LV

HV

C

LV

C HV

L H

H L C

H

L

C

H

H

L

C

H

L

C

C L H

C

CO

NC

RE

TE

S

ID

EW

AL

K

ANTENNA

DISH

ALUMINUM BUILDING

CONCRETE SIDEWALK

CONCRETE SIDEWALK

TOP OF BANK

TOP OF BANK

C O

N C

RE

TE

S

ID

EW

AL

K

BOTTOM OF BANK

3'X3'

COMMUNICATION

VAULT

3'X3'

COMMUNICATION

VAULT

4.7'X3'

COMMUNICATION

VAULT

ABOVE GROUND

DUCT LINES

WATER VALVES

X

X

X

SAN

SAN

SAN

SAN

SAN

X

X

X

X

X

FF

F

F

F

F

F

F

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UGE

UG

E

UG

E

U G

E

UG

E

UGE

UGE

U G

E

U G

E

U G

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E

U G

E U

G E

U G

E U

G E

UGE

UGE

UGE UGE UGE UGE UGE UGE

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UGE

UGE

UG

E

UG

E

UG

E

U G

E

NOTES:

1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED

TRANSFORMERS AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING

GENERATORS AT BUILDING N, THE POWERHOUSE.

2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.

3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION. FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK.

NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND UTILITIES

HAVE BEEN MARKED.

4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS SANITARY SEWER.

5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND

STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.

6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED WITHIN

THIS FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.

7. EXCAVATION & BACKFILL - SAFE EXCAVATION & BACKFILL PRACTICES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO REGULATIONS ESTABLISHED BY PERTINENT STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH AGENCIES. EXCAVATIONS DEEPER THAN 4-FEET MUST BE SHORED, SHEETED, BRACED, SLOPED, OR SUPPORTED BY A MEANS OF SUFFICIENT STRENGTH TO PROTECT EMPLOYEES.

EXCAVATIONS DEEPER THAN 20-FEET MUST INCLUDE A PROTECTION SYSTEM DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF TEXAS. EXCAVATION MATERIALS ARE TO BE STORED AT LEAST 2-FEET FROM THE EDGE OF THE EXCAVATION OR TRENCH WHEN EMPLOYEES ARE WORKING IN THE EXCAVATION. SITE DEVICES MAY BE REQUIRED TO PREVENT THE MATERIAL FROM FALLING OR ROLLING INTO THE EXCAVATION. WHEN TRENCHES OR OTHER EXCAVATIONS ARE WITHIN 4-FEET OF PUBLIC PROPERTY, BARRICADES MUST BE SET UP FOR

PUBLIC SAFETY, AND THE EXCAVATION MUST BE COVERED WHEN WORK IS NOT IN PROGRESS.

8. PIPE TRENCH & BEDDING - ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN CONFORMANCE WITH THE REQUIREMENTS OF TXDOT SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "EXCAVATION AND BACKFILL FOR STRUCTURES" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED, PROVIDED THE MATERIAL IN THE BOTTOM OF THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE UNYIELDING BASE.

9. TRENCH BACKFILL - BACKFILL OF TRENCHES SHALL BE IN ACCORDANCE WITH THE TXDOT STANDARD SPECIFICATIONS OR FBOP STANDARD

REQUIREMENTS.

10. TRENCH SURFACE RESTORATION - THE GROUND SURFACES OF ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY, ONSITE FBOP PROPERTY OR ON OFF-SITE PROPERTIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER IN CONFORMANCE WITH THE REQUIREMENTS OF THE

LOCAL JURISDICTION OR FBOP STANDARDS.

11. COMPACTION OVER UTILITIES - ALL TRENCH BACKFILL AND ROADWAY EMBANKMENT SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR DRY MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D1557, EXCEPT THE TOP 6 INCHES OF TRENCH BELOW THE BOTTOM OF THE PAVEMENT, WHICH

SHALL BE 100%.

12. STRIPING - ALL STRIPING THAT IS REMOVED OR DAMAGED DURING TRENCHING SHALL BE RESTORED IN KIND TO THE ORIGINAL CONDITION AND IN

CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL JURISDICTION OR FBOP STANDARDS.

13. CONCRETE ENCASEMENT- FOR THE SECONDARY ELECTRICAL LOOP, CONTRACTOR SHALL MAINTAIN MINIMUM OF 50' OF CLEARANCE BETWEEN PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS, ENCASING THE SECONDARY B LOOP IN CONCRETE. ENCASEMENT SHALL BE A MINIMUM OF 3-INCHES AROUND ELECTRICAL CONDUITS. IN AREAS WHERE 50' CLEARANCE CANNOT BE MET, MAINTAIN MINIMUM OF 25' OF

CLEARANCE BETWEEN THE PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS.

POWER LOOP

ROUTING PLAN

425 W GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

SHEET NUMBER

A

PRELIMINARY

THIS DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT A

FINAL, SIGNED AND

SEALED DOCUMENT

PROJECT NUMBER

ISSUE DATE

REVISIONS

SHEET TITLE

B

C

D

E

F

F

2 3 4 5 6 7 8 9 10

No. Description Date

C-301

SEE SHEET C-303 FOR

POWERHOUSE INSET PLAN

300150150 75

FEETSCALE:

1 INCH = 150

XFMR HVT 7

XFMR HVT 8

XFMR HVT 6

XFMR HVT 5

XFMR HVT 3

XFMR HVT 4

MV SWITCH HVTN 1

XFMR HVTN 1

XFMR HVT 1

XFMR HVT 2

GEN 1

FE

D

ER

A

L B

U R

EA

U

O F

PR

IS

O N

S R

EP

LA

C E

G

EN

ER

A

TO

R

S 1&

03/06/2025

T X-

, T

H R

EE

R

IV

ER

S, T

X

LOOP B PRIMARY FEED

.0'

.3'

.0'

MV SWITCH HVT 1

MV SWITCH HVT 2

MV SWITCH HVT 3

MV SWITCH HVT 5

MV SWITCH HVT 6

MV SWITCH HVT 7

MV SWITCH HVT 8

GEN 2

GEN 3

XFMR HVT T

XFMR HVT Q

XFMR HVT P

MV SWITCH HVT P&Q

XFMR HVT U

(E) XFMR HVT W

61.0'

47.6'

EXTENDED "LOOP A" PRIMARY

FEEDER (TYP)

NEW MV SWITCH FEEDER TO

NEW TRANSFORMER (TYP)

NEW SECONDARY BUILDING

FEEDER (TYP)

LEGEND:

EXISTING "LOOP A" PRIMARY

FEEDER

NEW "LOOP B" PRIMARY FEEDER

FUEL PIPING

ELECTRICAL JUNCTION BOX

FUEL PIPING SHUT OFF VALVE

SWITCH

TRANSFORMER

NEW SECONDARY BUILDING

FEEDER

EXTENDED "LOOP A" PRIMARY

FEEDER

NEW MV SWITCH FEEDER TO NEW

TRANSFORMER

NEW SIGHT LIGHTING CONDUIT

NEW SITE FENCING

NEW CONDUIT, DUCTBANK AND MV

FEEDERS

UGE UGE

F FF F

X X

MV SWITCH HVT U&T

MV SWITCH HVT W

MEDIUM VOLATGE

PEDESTAL JUNCTION BOX

MEDIUM VOLATGE

PEDESTAL JUNCTION BOX

MECH

DATE: 03-06-2025

www.coffman.com

1505 Lyndon B Johnson Fwy, Suite 240

ANTENNA

ANCHOR

ANTENNA

ANCHOR

GUARD

RAILFL=239.17'

FL=239.16'

CONCRETE

SLAB

TOP OF BANK

TOP OF BANK

BOTTOM OF BANK

ABOVE GROUND

DUCT LINES

24" RCP

WATER VALVES

X X

X

XXXX

X X

X

X

X X

X

X X

XXXXXX

X X

X X

X

X X X X X X

X X

X

X X X X X X X X X

X X

X X X X X X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X

X X

X X

X X

X

X

X

X

X

X

X X

X

X X

X X

X X

X

X

X

X

X X X

X X

X X

X

X

XXXXX

X

X

X

X X

X X

X X

X X

X X

X X

X X

HV

LV

C

HV

ANTENNA

ANCHOR

ANTENNA

ANCHOR

GUARD

RAILFL=239.17'

FL=239.16'

CONCRETE

SLAB

TOP OF BANK

TOP OF BANK

BOTTOM OF BANK

ABOVE GROUND

DUCT LINES

24" RCP

WATER VALVES

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

F F

F F

F

F

F F

FF

F

F F

F F

F F

F F

F F

F

F

F

F

F

F

FFFFFF

F F

F F

F

F

F

F

F

F

F

FFFFF

UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE

UGE

OHE

OHE

OHE

U G

E

UGE

UG

E

UG

E

UG

E

F F F F

X

POWER LOOP

ROUTING -

POWERHOUSE PLAN

425 W GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

SHEET NUMBER

A

PRELIMINARY

THIS DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT A

FINAL, SIGNED AND

SEALED DOCUMENT

PROJECT NUMBER

ISSUE DATE

REVISIONS

SHEET TITLE

B

C

D

E

F

F

2 3 4 5 6 7 8 9 10

No. Description Date

C-302 603030 15

FEETSCALE:

1 INCH = 30

NOTES:

1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED TRANSFORMERS

AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING GENERATORS AT

BUILDING N, THE POWERHOUSE.

2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.

3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE. CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION. FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE STARTING PROJECT SITE WORK. NO DIGGING SHOULD START UNTIL LOCAL UNDERGROUND UTILITY IDENTIFYING COMPANY HAS BEEN NOTIFIED, AND ALL UNDERGROUND UTILITIES HAVE BEEN MARKED.

4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS SANITARY SEWER.

5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND

STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.

6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED WITHIN THIS

FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.

7. EXCAVATION & BACKFILL - SAFE EXCAVATION & BACKFILL PRACTICES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL CONFORM TO REGULATIONS ESTABLISHED BY PERTINENT STATE AND FEDERAL OCCUPATIONAL SAFETY AND HEALTH AGENCIES. EXCAVATIONS DEEPER THAN 4-FEET MUST BE SHORED, SHEETED, BRACED, SLOPED, OR SUPPORTED BY A MEANS OF SUFFICIENT STRENGTH TO PROTECT EMPLOYEES.

EXCAVATIONS DEEPER THAN 20-FEET MUST INCLUDE A PROTECTION SYSTEM DESIGNED BY A PROFESSIONAL ENGINEER REGISTERED WITH THE STATE OF TEXAS. EXCAVATION MATERIALS ARE TO BE STORED AT LEAST 2-FEET FROM THE EDGE OF THE EXCAVATION OR TRENCH WHEN EMPLOYEES ARE WORKING IN THE EXCAVATION. SITE DEVICES MAY BE REQUIRED TO PREVENT THE MATERIAL FROM FALLING OR ROLLING INTO THE EXCAVATION. WHEN TRENCHES OR OTHER EXCAVATIONS ARE WITHIN 4-FEET OF PUBLIC PROPERTY, BARRICADES MUST BE SET UP FOR PUBLIC

SAFETY, AND THE EXCAVATION MUST BE COVERED WHEN WORK IS NOT IN PROGRESS.

8. PIPE TRENCH & BEDDING - ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN CONFORMANCE WITH THE REQUIREMENTS OF TXDOT SPECIFICATIONS. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "EXCAVATION AND BACKFILL FOR STRUCTURES" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED, PROVIDED THE MATERIAL IN THE BOTTOM OF

THE TRENCH IS LOOSENED, REGRADED AND COMPACTED TO FORM A DENSE UNYIELDING BASE.

9. TRENCH BACKFILL - BACKFILL OF TRENCHES SHALL BE IN ACCORDANCE WITH THE TXDOT STANDARD SPECIFICATIONS OR FBOP STANDARD

REQUIREMENTS.

10. TRENCH SURFACE RESTORATION - THE GROUND SURFACES OF ALL TRENCHES IN THE PUBLIC RIGHT-OF-WAY, ONSITE FBOP PROPERTY OR ON OFF-SITE PROPERTIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER IN CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL

JURISDICTION OR FBOP STANDARDS.

11. COMPACTION OVER UTILITIES - ALL TRENCH BACKFILL AND ROADWAY EMBANKMENT SHALL BE COMPACTED TO 95% OF MODIFIED PROCTOR DRY MAXIMUM DENSITY IN ACCORDANCE WITH ASTM D1557, EXCEPT THE TOP 6 INCHES OF TRENCH BELOW THE BOTTOM OF THE PAVEMENT, WHICH

SHALL BE 100%.

12. STRIPING - ALL STRIPING THAT IS REMOVED OR DAMAGED DURING TRENCHING SHALL BE RESTORED IN KIND TO THE ORIGINAL CONDITION AND IN

CONFORMANCE WITH THE REQUIREMENTS OF THE LOCAL JURISDICTION OR FBOP STANDARDS.

13. CONCRETE ENCASEMENT- FOR THE SECONDARY ELECTRICAL LOOP, CONTRACTOR SHALL MAINTAIN MINIMUM OF 50' OF CLEARANCE BETWEEN PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS, ENCASING THE SECONDARY B LOOP IN CONCRETE. ENCASEMENT SHALL BE A MINIMUM OF 3-INCHES AROUND ELECTRICAL CONDUITS. IN AREAS WHERE 50' CLEARANCE CANNOT BE MET, MAINTAIN MINIMUM OF 25' OF CLEARANCE

BETWEEN THE PROPOSED B LOOP PATHWAYS AND EXISTING A LOOP PATHWAYS.

BUILDING N

"POWERHOUSE

ASPHALT ROAD

HVAC PAD

CONCRETE PAVEMENT

FE

D

ER

A

L B

U R

EA

U

O F

PR

IS

O N

S R

EP

LA

C E

G

EN

ER

A

TO

R

S 1&

03/06/2025

T X-

, T

H R

EE

R

IV

ER

S, T

X

LOOP B PRIMARY FEED

(E) ABOVE GROUND FUEL STORAGE TANKS

INTERCONNECTED TO FEED EXISTING

GENERATORS IN THE POWERHOUSE

MV SWITCH HVTN 1

XFMR HVTN 1

GEN 1GEN 2

GEN 3

FUEL ROUTE

+/- 500 LF

2 - 2" STEEL CARRIER PIPING WITH FIBER

REINFORCED PLASTIC (FRP) CONTAINMENT

PIPING (DOUBLE WALL) WITH LEAK DETECTION

BETWEEN AST AND NEW GENERATOR

CONCRETE ENCASED

IN TRAVELWAY

62.7'

LEGEND:

EXISTING "LOOP A" PRIMARY

FEEDER

NEW "LOOP B" PRIMARY FEEDER

FUEL PIPING

GRAVEL ROAD

GRAVEL FOOTPATH

GRAVEL UNDER GENERATORS

ELECTRICAL JUNCTION BOX

FUEL PIPING SHUT OFF VALVE

SWITCH

TRANSFORMER

NEW SECONDARY BUILDING

FEEDER

EXTENDED "LOOP A" PRIMARY

FEEDER

NEW MV SWITCH FEEDER TO NEW

TRANSFORMER

NEW SIGHT LIGHTING CONDUIT

NEW SITE FENCING

NEW CONDUIT, DUCTBANK AND MV

FEEDERS

UGE UGE

F FF F

X X

ASPHALT ROAD

STEP-UP TRANSFORMER (TYP 3)

MECH

DATE: 03-06-2025

www.coffman.com

1505 Lyndon B Johnson Fwy, Suite 240

ANTENNA

ANCHOR

ANTENNA

ANCHOR

ANTENNA

ANCHOR

CHAINLINK FENCE

24' ASPH

ALT

DRIVEW

AY

HEADWALL

FL=238.23'

24" RCP

GUARD

RAILFL=239.17'

FL=239.16'

CONCRETE

SLAB

TOP OF BANK

TOP OF BANK

BOTTOM OF BANK

ABOVE GROUND

DUCT LINES

24" RCP

X X

X X

X X

X

XXXXX

X

X X

X

X X

SA

N

SA

N

SAN

SAN

SAN

SAN

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X

X

X

X

X

X

X

X X

X N

X

X

X

X

HV

LV

C

HV

ANTENNA

ANCHOR

ANTENNA

ANCHOR

ANTENNA

ANCHOR

CHAINLINK FENCE

24' ASPH

ALT

DRIVEW

AY

HEADWALL

FL=238.23'

24" RCP

GUARD

RAILFL=239.17'

FL=239.16'

CONCRETE

SLAB

TOP OF BANK

TOP OF BANK

BOTTOM OF BANK

ABOVE GROUND

DUCT LINES

24" RCP

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

F F

F F

F F

F F

F

F

F F

F

F F

F F

F F

F F

F F

F F

F F

F F

F F

UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE

UGE

UGE

UGE

OHE

OHE

OHE

OHE

OHE

U G

E

UGE

UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

F F

F F

F F

F F

SHUT OFF VALVE (TYP.)

POWER LOOP

ROUTING -

POWERHOUSE &

GENERATOR PLAN

425 W GRAY STREET

NORMAN, OK 73069

TELEPHONE: (866) 226-8071

www.prime-arch.com

SHEET NUMBER

A

PRELIMINARY

THIS DOCUMENT IS

PRELIMINARY IN

NATURE AND IS NOT A

FINAL, SIGNED AND

SEALED DOCUMENT

PROJECT NUMBER

ISSUE DATE

REVISIONS

SHEET TITLE

B

C

D

E

F

F

2 3 4 5 6 7 8 9 10

No. Description Date

402020 10

FEETSCALE:

1 INCH = 20

NOTES:

1. ELECTRICAL SCOPE - THE ELECTRICAL SCOPE OF WORK IS TO FURNISH AND INSTALL A SECONDARY "B" LOOP BETWEEN REPLACED

TRANSFORMERS AS INDICATED IN THE ELECTRICAL ASSESSMENT REPORT PROVIDED BY FCI THREE RIVERS AND TO REPLACE TWO EXISTING

GENERATORS AT BUILDING N, THE POWERHOUSE.

2. NOTE CONFLICT PRECEDENCE - IF THERE IS A CONFLICT BETWEEN THE NOTES INCLUDED ON THIS SHEET AND THE NOTES PROVIDED BY THE AUTHORITY HAVING JURISDICTION (AHJ), THE NOTES PROVIDED BY THE AHJ SHALL TAKE PRECEDENCE.

3. EXISTING UTILITY LOCATIONS - EXISTING UTILITY AND OTHER SUBSURFACE INFORMATION SHOWN ON SHEET C-100 HAS BEEN COMPILED FROM THE BEST INFORMATION AVAILABLE. THIS INFORMATION, HOWEVER, IS NOT GUARANTEED TO BE ACCURATE OR COMPLETE.

CONTRACTOR TO LOCATE (INCLUDING ELEVATION) ALL EXISTING UNDERGROUND UTILITIES PRIOR TO EXCAVATING FOR CONSTRUCTION.

FOR AID IN UTILITY LOCATION,, CONTACT ONE-CALL, (1-800-344-8377) FOR UTILITY LOCATIONS IN AREAS OF PUBLIC RIGHT-OF-WAY AT LEAST 48 HOURS BEFORE STARTING PROJECT SITE WORK, AND NOTIFY THE LOCAL UTILITIES INSPECTOR(S). CONTRACTOR SHALL CONTACT FBOP FACILITY ENGINEERING FOR UTILITY LOCATION INFORMATION AT LEAST 48 HOURS FOR AREAS WITHIN THE FACILITY BOUNDARY BEFORE

STARTING PROJECT SITE WORK.

4. UTILITY COVER & CLEARANCES - THE CONTRACTOR SHALL COORDINATE WITH THE AUTHORITIES HAVING JURISDICTION AND FBOP FOR ALL REQUIREMENTS AND TO CONFIRM THAT AN ADEQUATE DEPTH OF COVER IS MAINTAINED OVER THE UTILITIES, INCLUDING CLEARANCES BETWEEN THE VARIOUS UTILITIES. A MINIMUM VERTICAL SEPARATION OF 24-INCHES IS TO BE MAINTAINED BETWEEN WATER CROSSINGS WITH ALL OTHER UTILITIES, AS WELL AS SEWER CROSSINGS WITH ALL OTHER UTILITIES. SEWER INCLUDES STORM SEWER AS WELL AS

SANITARY SEWER.

5. UTILITY TAPE - UTILITY PIPE AND CONDUITS SHALL BE INSTALLED WITH CONTINUOUS WARNING TAPE DIRECTLY OVER PIPING AT DEPTHS IN COMPLIANCE WITH THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION AND FBOP AND AT OUTSIDE EDGE OF UNDERGROUND

STRUCTURES. USE DETECTABLE WARNING TAPE OVER NONFERROUS PIPING.

6. BUILDING CONNECTIONS - UTILITIES SHALL BE STUBBED FIVE (5) FEET OUTSIDE OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE CONTINUATION OF UTILITY SERVICES AND UTILITY CONNECTIONS TO THE BUILDING. CONTRACT WITH OTHER DOCUMENTS CONTAINED

WITHIN THIS FBOP GENERATOR AND TRANSFORMER REPLACEMENT PROJECT.

7. EXCAVATION & BACKFILL - SAFE EXCAVATION &…

This is the start of the file's text. The full file is on GovTribe.