PROJECT MANUAL SUMMARY
This is a Project Manual for a Federal Bureau of Prisons construction project to replace Generators 1 and 2, associated infrastructure, and Transformer 1700 TX-72 at FCI Three Rivers, located at 1700 HWY 72 West, Three Rivers, Texas. The project is identified as Owner's Project No. 24Z5AU6, Contract No. 15B50020D00000007, and Task Order 15BFA024F00000011, with construction documents issued March 6, 2025. The manual serves as the comprehensive technical specifications and procedural guidance document for all work phases, prepared by Prime Architects (Norman, Oklahoma) in coordination with Coffman Engineers, Inc. (mechanical, plumbing, electrical, and civil) and Rosa D. Cheney AIA, PLLC (specifications consulting). The work encompasses multiple construction divisions including concrete, metals, thermal and moisture protection, openings, finishes, fire suppression, HVAC, electrical systems, earthwork, exterior improvements, and utilities. All project documents are classified as Sensitive But Unclassified (SBU) and marked as property of the United States Government, with strict controls governing dissemination, electronic transmission via SSL encryption, secure storage, and eventual destruction through burning, shredding, or permanent deletion procedures.
The manual establishes comprehensive administrative and procedural requirements for project execution, including detailed security protocols for contractor access to operational facility secure areas (requiring background checks), project management coordination through weekly meetings and RFI processes, payment procedures tied to a schedule of values with retainage, substitution request procedures (pre-bid and post-bid with 90-day window), contract modification procedures with tiered overhead and profit allowances, and closeout requirements. Work is restricted to a 40-hour normal work week at the discretion of the Contracting Officer, with parking and temporary field offices approved by the Supervisory Construction Representative. The contractor must coordinate with existing utility services, provide temporary utilities during construction, prepare detailed security and document control plans within specified timeframes, and implement Autodesk Constructware project management software. Key submittals include project security plans, RFI responses within seven days, applications for payment by the 15th of each month with supporting waivers of lien, and comprehensive closeout documentation including compliance certifications regarding destruction of SBU information at project completion.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
for
Federal Bureau of Prisons Replace Generators 1 and 2/Infrastructure/Transformer
1700 TX-72
Three Rivers, Texas Project No.: 23Z5AU6
Contract No: 15B50020D00000007 Task Order: 15BFA024F00000011
425 West Gray Street Norman, OK 73069
Phone: (866) 226-8071
Construction Documents Issued: March 6, 2025
Property of the United States Government
Copying, disseminating, or distribution of these documents to unauthorized persons is prohibited.
Do not remove this notice Properly destroy document when no longer needed.
SENSITIVE BUT UNCLASSIFIED - SBU
PROJECT MANUAL
Replace Generators 1 and 2/Infrastructure/Transformer
1700 TX-72
Three Rivers, Texas
Owner’s Project No. 24Z5AU6
Contract Number: 15B0020D0000007 Task Order: 15BFA024F00000011
Architect: Prime Architects 212 North Crawford Norman, Oklahoma 73069 866-226-8071
Specifications Consultant: Rosa D. Cheney AIA, PLLC 4075 Wilson Boulevard, 8th Floor Arlington, Virginia 22203 703-650-7442
Mechanical, Plumbing, Coffman Engineers, Inc.
Electrical Engineers: 1505 Lyndon B Johnson Freeway, Suite 240 Dallas, Texas 75234 469-208-9433
Civil Engineer: Coffman Engineers, Inc.
1505 Lyndon B Johnson Freeway, Suite 240 Dallas, Texas 75234 469-208-9433
Issued: March 6, 2025
Federal Bureau of Prisons Prime Architects Replace Generators, Associated Infrastructure, and Transformer Norman, Oklahoma Three Rivers, Texas March 6, 2025
SEALS PAGE 000107 - 1 of 6
DOCUMENT 000107
SEALS PAGE
1.01 ARCHITECT'S CERTIFICATION
A. I, Gene Lavastida, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 02 Division 05 Division 06 Division 07 Division 08 Division 09 and I hereby disclaim any responsibility for all other specifications related to or intended to be used for any part or parts of the "Replace Generators 1 and 2/Infrastructure/Transformer" project.
By: _____________________________________
John Creach Snapshot
Three Rivers, Texas March 6, 2025
SEALS PAGE 000107 - 2 of 6
1.02 FIRE SUPPRESSION ENGINEER'S CERTIFICATION
A. I, Dave Gramlich, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 21 and I hereby disclaim any responsibility for all other specifications related to or intended to be used for any part or parts of the "Replace Generators 1 and 2/Infrastructure/Transformer" project.
By: _____________________________________
3/4/25
Three Rivers, Texas March 6, 2025
SEALS PAGE 000107 - 3 of 6
1.03 PLUMBING ENGINEER'S CERTIFICATION
A.
Division 22 and I hereby disclaim any responsibility for all other specifications related to or intended to be used for any part or parts of the "15th and Holmes" project.
By: _____________________________________
I, Sam Swinbank, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 23
Coffman Engineers Inc Texas Registered Engineering Firm F-6691
1101 2nd Avenue, Suite 400 Seattle, WA 98101
3/5/2025
Three Rivers, Texas March 6, 2025
SEALS PAGE 000107 - 4 of 6
1.04 HEATING, VENTILATING, AND AIR CONDITIONING ENGINEER'S CERTIFICATION
A. I, Sam Swinbank, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 23 and I hereby disclaim any responsibility for all other specifications related to or intended to be used for any part or parts of the "Replace Generators 1 and 2/Infrastructure/Transformer" project.
By: _____________________________________
Coffman Engineers Inc Texas Registered Engineering Firm F-6691
1101 2nd Avenue, Suite 400
3/5/2025
Three Rivers, Texas March 6, 2025
SEALS PAGE 000107 - 5 of 6
1.05 ELECTRICAL ENGINEER'S CERTIFICATION
A. I, Latrice Celio, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 26 and I hereby disclaim any responsibility for all other specifications related to or intended to be used for any part or parts of the "Replace Generators 1 and 2/Infrastructure/Transformer" project.
By: _____________________________________
Coffman Engineers Inc Texas Registered Engineering Firm F-6691
1101 2nd Avenue, Suite 400
Three Rivers, Texas March 6, 2025
SEALS PAGE 000107 - 6 of 6
1.06 CIVIL ENGINEER'S CERTIFICATION
A. I, Jeff Lowe, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 3 Division 31 Division 32 Division 33 and I hereby disclaim any responsibility for all other specifications related to or intended to be used for any part or parts of the "Replace Generators 1 and 2/Infrastructure/Transformer" project.
By: _____________________________________
END OF DOCUMENT
Date: 3/6/2025 Coffman Engineers Inc
Texas Registered Engineering Firm F-6691 1101 2nd Avenue, Suite 400
TABLE OF CONTENTS 000110 - 1 of 4
DOCUMENT 000111
TABLE OF CONTENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
000101 Title Page 000107 Seals Page 000111 Table of Contents
DIVISION 01 GENERAL REQUIREMENTS
010002 Project Security 100002.A1 Document Security Notice 100002.A2 Justification for Receipt 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures 013523 Owner’s Safety Requirements 013543 Environmental Procedures 014000 Quality Requirements 014200 References 014216 Definitions 015000 Temporary Facilities and Controls 015723 Temporary Storm Water Pollution Control 016000 Product Requirements 017300 Execution 017329 Cutting and Patching 017419 Construction Waste Management and Disposal 017500 Starting and Adjusting 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training 019113 General Commissioning Requirements
DIVISION 02 EXISTING CONDITIONS
024119 Selective Demolition
DIVISION 03 CONCRETE
031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete
DIVISION 04 MASONRY
Not Applicable
TABLE OF CONTENTS 000110 - 2 of 4
DIVISION 05 METALS
054000 Cold-Formed Metal Framing
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
061000 Rough Carpentry 061600 Sheathing
DIVISION 07 THERMAL AND MOISTURE PROTECTION
072100 Thermal Insulation 072726 Fluid-Applied Membrane Air Barriers
074213.13 Formed Metal Wall Panels
078413 Penetration Firestopping 079200 Joint Sealants
DIVISION 08 OPENINGS
081113 Hollow Metal Doors and Frames 083323 Overhead Coiling Doors 087100 Door Hardware 089119 Fixed Louvers
DIVISION 09 FINISHES
092900 Gypsum Board 099000 Painting and Coatings
DIVISION 10 SPECIALTIES
DIVISION 11 EQUIPMENT
DIVISION 12 FURNISHINGS
DIVISION 13 SPECIAL CONSTRUCTION
DIVISION 14 CONVEYING EQUIPMENT
DIVISION 21 FIRE SUPPRESSION
210500 Common Work Results for Fire Suppression 210529 Hangers and Supports for Fire-Suppression Piping and Equipment 211000 Water-Based Fire-Suppression Systems
TABLE OF CONTENTS 000110 - 3 of 4
DIVISION 22 PLUMBING
DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING
230593 Testing, Adjusting, and Balancing for HVAC 231113 Facility Fuel-Oil Piping 231323 Facility Aboveground Fuel-Oil Storage Tanks 233400 HVAC Fans
DIVISION 25 INTEGRATED AUTOMATION
DIVISION 26 ELECTRICAL
260010 Supplemental Requirements for Electrical 260513 Medium-Voltage Cables 260519 Low-Voltage Electrical Power Conductors and Cables 260523 Control-Voltage Electrical Power Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems
260533.13 Conduits for Electrical Systems
260533.16 Boxes and Covers for Electrical Systems
260543 Underground Ducts and Raceways for Electrical Systems 260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 260553 Identification for Electrical Systems 260573 Power System Studies 260913 Electrical Power Monitoring 261219 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 261326 Medium-Voltage Metal-Clad Switchgear 261329 Medium-Voltage Compartmentalized Switchgear 262213 Low-Voltage Distribution Transformers 262416 Panelboards 262726 Wiring Devices 262816 Enclosed Switches and Circuit Breakers
263213.13 Diesel-Engine-Driven Generator Sets
265000 Lighting
DIVISION 27 COMMUNICATIONS
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
DIVISION 31 EARTHWORK
311000 Site Clearing 312000 Earth Moving
TABLE OF CONTENTS 000110 - 4 of 4
DIVISION 32 EXTERIOR IMPROVEMENTS
321216 Asphalt Paving 321313 Concrete Paving 321723 Pavement Markings 323113 Chain Link Fences and Gates 329200 Turf and Grasses
DIVISION 33 UTILITIES
330500 Common Work Results for Utilities
DIVISION 34 TRANSPORTATION
DIVISION 35 WATERWAY AND MARINE
DIVISION 40 PROCESS INTERCONNECTIONS
DIVISION 41 MATERIAL PROCESSING AND HANDLING EQUIPMENT
DIVISION 42 PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
DIVISION 43 PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
DIVISION 44 POLLUTION AND WASTE CONTROL EQUIPMENT
DIVISION 45 SPECIFIC MANUFACTURING EQUIPMENT
DIVISION 46 WATER AND WASTEWATER EQUIPMENT
DIVISION 48 ELECTRICAL POWER GENERATION
END OF DOCUMENT
PROJECT SECURITY 010002 - 1 of 5
SECTION 010002
PROJECT SECURITY
PART 1 - GENERAL
1.01 SUMMARY
A. Section includes:
1. Requirements for the handling and dissemination of Sensitive But Unclassified (SBU) documents and electronic design and construction information for FBOP projects.
2. Protection of the project documents, design information, site access and security features of the project.
B. In order to reduce the potential for compromising the security of the proposed correctional facility, or portions thereof, the Contractor shall:
1. Limit the availability of potentially sensitive information concerning design layout, security features and electronic devices and systems, and utility systems for the Work of the Contract.
2. Limit Sensitive But Unclassified - SBU project information to persons having a legitimate need-to-know.
3. Develop, submit for approval, and implement a Project Security Plan.
4. Adhere to procedures developed by the FBOP and the Contractor to limit access to the project site to persons having official business.
5. Comply with security procedures required for contract employees to enter operating
FBOP correctional facilities to perform project related work.
6. Utilize commercial encrypted messaging systems (SSL) when electronically transmitting
Sensitive But Unclassified - SBU design data to other design/build team members who have a need-to- know.
1.02 SUBMITTALS
A. Project Security Plan
1. The plan shall include the following information:
a. A Document/Electronic Media Control Plan.
b. A site access control plan.
c. A listing of persons designated as photographers of ongoing and completed work.
(Revisions of this listed are anticipated during the course of construction.)
2. Prepare and submit a minimum of six (6) printed and electronic copies of the Project Security Plan for review and approval. The report shall be submitted before the Initial Design Meeting as described in Section 010005.
B. Document/Electronic Media Control Plan:
1. Shall include a description of the methods for handling and disseminating sensitive information to entities having the need to know.
2. Clearly describe the methods of issuing Sensitive But Unclassified and shall include the following requirements:
a. Number of plans (or plan sets) and documents issued by the Contractor, and/or design professionals.
b. Dates of issuance.
c. Individuals/firms receiving the documents.
PROJECT SECURITY 010002 - 2 of 5
d. Signed copies of the Document Security Notice from the recipients of the Sensitive But Unclassified - SBU information shall be maintained by the Contractor.
3. Shall describe the method of collecting and forwarding to the FBOP signed Document Security Notices from all recipients of Sensitive But Unclassified - SBU disseminated by the Contractor.
4. Sensitive But Unclassified - SBU information included as a portion of Work of this Contract may be listed or included on a secure Internet site available to authorized users. All electronic transmissions of Sensitive But Unclassified - SBU design data shall be made using commercially available secure sockets layer (SSL) encrypted security systems. The Contractor is to provide a listing of all authorized entities having access to Sensitive But Unclassified - SBU information using this system. The Contractor shall also provide password(s) to allow the FBOP access to the stored Sensitive But Unclassified information.
5. Within fourteen (14) calendar days after the receipt of Contractor’s Document Control Plan, the FBOP will deliver a review report to the Contractor identifying any unacceptable portions thereof. The Contractor shall then make corrections and resubmit the Document Control Plan prior to submitting any Preliminary Design Submissions to the FBOP.
C. Site Access Control Plan:
1. The Contractor shall develop and submit a comprehensive plan describing the methods to be used in controlling access to the site during the construction phase. The plan shall be developed and coordinated with the Supervisory Construction Representative.
1.03 REFERENCES AND/OR CODES
A. Related Documents:
1. FBOP Technical Design Guidelines.
2. Concept Drawings.
3. Security Electronics Model Documents..
1.04 DEFINITIONS
A. Sensitive But Unclassified - SBU: Building designs, floor plans, construction plans, specifications and details, equipment locations and types, information concerning utility service designs and layouts, and any other information considered a security risk.
B. Non-Sensitive Information: All project related information, including written and electronic media, not classified as Sensitive But Unclassified - SBU. The Contractor shall request and receive approval from the Contracting Officer prior to making project related information available to the public.
C. Reasonable Care: Limiting dissemination to authorized users. Dissemination of information shall only be made upon determining the recipient is authorized to receive it.
D. Need-To-Know: Architects, engineers, consultants, contractors, subcontractors, suppliers, and other government entities the Contractor deems necessary to perform the Work of the Contract.
E. Secure Areas: The area inside the security perimeter fence of an operational FBOP correctional facility and within 328 ft. of the perimeter patrol road and any ancillary building.
F. Operational Institution: FBOP facilities/institutions are deemed operational upon Final Acceptance by the FBOP.
PROJECT SECURITY 010002 - 3 of 5
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
3.01 PROTECTION OF SECURE INFORMATION
A. The entity disseminating Sensitive But Unclassified - SBU project information shall obtain an original Document Security Notice form signed by authorized users of Sensitive But Unclassified - SBU information. The Contractor shall submit the original signed Document Security Notices to the Owner on a monthly basis. Only one Document Security Notice is required for each person or firm receiving Sensitive But Unclassified - SBU information for duration of this Contract.
3.02 LABELING OF INFORMATION
A. All Sensitive But Unclassified - SBU information, either in electronic media or paper formats shall have imprinted on each page and diskette/DVD:
PROPERTY OF THE UNITED STATES GOVERNMENT
SENSITIVE BUT UNCLASSIFIED
Properly destroy documents/media when no longer needed.
B. The following paragraph will be included on the cover sheet of the construction drawings and project specifications and on the label of all electronic storage media:
PROPERTY OF THE UNITED STATES GOVERNMENT
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS,
SPECIFICATIONS, OR INFORMATION TO UNAUTHORIZED USERS IS PROHIBITED.
Do not remove this notice Properly destroy documents/media when no longer needed.
C. The previous two statements shall be prominently labeled in bold type in a size appropriate for the document.
3.03 SITE ACCESS
A. The Contractor is responsible for controlling access into the project site beginning at mobilization after the Construction Notice to Proceed is issued and ending at Final Completion. (Refer to Section 011100 for additional requirements.) The method(s) of site access control shall be described in the Project Security Plan.
B. In cases where the Work is to be performed at an operational facility, access to the work site shall be controlled by the Owner.
3.04 REQUIREMENTS FOR CONTRACT WORKERS ENTERING INTO SECURE AREAS AT OPERATIONAL
FBOP FACILITIES
A. Frequently a new facility will be constructed on the same site as an existing FBOP correctional facility. Upon Final Acceptance a new facility is deemed operational.
Contractor workers may have the need to enter secure areas to perform portions of the contract work. This work typically involves, but is not limited to, connection of Security Electronics Systems, utility connections and warranty work. The following procedures shall be implemented for entry of Contractor worker into secure areas at operational FBOP facilities:
1. A list of personnel shall be provided to the Contracting Officer for all Contractor workers who may have a need to perform work inside of secure areas.
2. Refer to the Solicitation Documents for specific information regarding entry requirements. Background checks for all contract workers are required prior to receiving clearance to enter activated federal prison facilities. The background
PROJECT SECURITY 010002 - 4 of 5 investigation is made in order to determine the appropriateness of the individual listed on the form to enter secure areas of an operational correctional facility and is a mandatory requirement for all work and site visits inside the secure facility perimeter.
3. The completed background check forms shall be hand delivered by the Contractor to the FBOP Contracting Officer to initiate the check. Once the check has been completed and a decision made, the Contractor shall be informed of the personnel approved for entry. In cases of disapproval, the FBOP shall only inform the Contractor that entry approval has been denied, in compliance with the Privacy Act requirements.
4. The Contractor shall coordinate scheduled work inside the secure areas of the existing institution with the Supervisory Construction Representative.
5. All scheduled utility outages and service interruptions shall be coordinated through the Supervisory Construction Representative. For major outages and service interruptions, the Contractor shall provide a minimum of a five (5) day advance notice to the FBOP.
6. Interactions with inmates are prohibited.
7. The contractor shall not take any direction from institution staff. No work outside of the approved contract shall be undertaken during such interaction.
3.05 KEY CONTROL PROCEDURES
A. The FBOP shall maintain control of all security keys. (Refer to Section 087163 for key issuance, storage, and accountability requirements.)
3.06 SECURITY REQUIREMENTS FOR SENSITIVE BUT UNCLASSIFIED - SBU INFORMATION
A. The Contractor shall maintain a secure location at the contract site where Sensitive But Unclassified - SBU documents are stored. A secure location is an area under supervision of the Contractor’s employees that is not accessible to unauthorized persons. Secure storage facilities are required for Sensitive But Unclassified - SBU documents when not attended.
B. The Contractor, Architects and Engineers of Record, subcontractors, and vendors shall provide secure storage for all Sensitive But Unclassified - SBU construction documents for this project at their off-site places of business.
3.07 PHOTOGRAPHY
A. Photography of the Work of the Contract by persons other than representatives of the Federal Government is prohibited, with the following exceptions:
1. Photography by the Contractor is limited to making photographic and/or digital records of construction progress necessary for monthly reports, issue resolution and contract requirements.
2. Photographic records made of the construction or equipment installations showing Sensitive But Unclassified - SBU information shall not be made available to the public.
B. Use of other photographic records for dissemination in advertising, publishing, and printing is prohibited unless prior approval is granted by the FBOP.
C. Cellular telephones with photographic capabilities are prohibited on the construction site.
D. Photography if inmates or FBOP staff either within or outside the secure perimeter is strictly prohibited without exceptions. Doing to may subject the perpetrators to immediate removal from the property and prosecution.
3.08 RETAINING AND DESTROYING DOCUMENTS
A. Necessary record copies for legal purposes (such as those retained by the Designers of record and the Contractor) must be safeguarded against unauthorized use for the term of retention.
Documents no longer needed shall be destroyed.
B. Destruction shall be accomplished by burning or shredding of hard copy, and/or physically destroying CDs, deleting, and removing Sensitive But Unclassified - SBU files from the
PROJECT SECURITY 010002 - 5 of 5 electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.
C. At Project Closeout for all contracts using Sensitive But Unclassified - SBU information, the Contractor shall submit a compliance certification letter to the FBOP certifying that all known copies of non-record plans and specifications containing Sensitive But Unclassified - SBU building information have been located and disposed of in a manner that ensures information security. This certification extends to Sensitive But Unclassified - SBU documents and electronic media issued to subcontractors and vendors.
ATTACHMENTS
01 00 02 - A1 FBOP DOCUMENT SECURITY NOTICE
(for Design-Builder’s use with firms that are directly related to project, having a need to know about the TDG)
01 00 02 - A2 JUSTIFICATION FOR RECEIPT OF FBOP TECHNICAL DESIGN
GUIDELINES
(for Design-Builder’s & FBOP’s use with firms that are not related to a specific FBOP project, but have requested to receive the TDG - also requires submitting form 01 00 02- A1)
END OF SECTION
FBOP DOCUMENT SECURITY NOTICE 010002.A1 - 1 of 1
FBOP DOCUMENT SECURITY NOTICE
Project Name: RFP No.
Contract No.
☐ Prospective Bidder/Offeror Firm:
☐ Contractor Firm:
☐ A/E of Record / Designer of Record Firm:
☐ Subcontractor/Design Consultant Firm:
☐ Vendor Firm:
☐ Firm:
* The Contractor is responsible for: the distribution of this Notice to applicable parties, to obtain required signatures and to maintain a file of the signed Notices for turnover when requested to the
FBOP Contracting Officer.
This Notice addresses Sensitive But Unclassified building information. Documents provided under this solicitation/contract are intended for use by “authorized users only” and those firms and individuals with a “need-to-know.” FBOP requires the holder of the documents to exercise reasonable care related to the dissemination, storage and handling, and destruction of Sensitive But Unclassified documents per the following strictures and the FBOP Technical Guidelines, Section 010002:
1. Limiting dissemination to authorized users only. Dissemination of information shall only be made upon the determination the recipient is authorized to receive it. The criterion to determine authorization is need-to-know. Those with a need-to-know are those specifically granted access for the conduct of business on behalf of or with FBOP. This includes all persons or firms necessary to do work at the request of the Government, such as architects and engineers, consultants, contractors, sub-contractors, suppliers, maintenance and repair contractors, equipment service contractors, firms handling reproduction tasks, and others the contractor deems necessary in order to submit an offer/bid or to complete the work or contract.
NOTE: It is the responsibility of the person or firm disseminating the information, (A) to assure the recipient is an authorized user, (B) to keep a record of the recipients, and (C) to deliver the record to the FBOP Contracting Officer upon notifying the FBOP of the destruction of Sensitive But Unclassified building information.
2. Authorized non-Government users shall provide valid identification to receive Sensitive But Unclassified building information. The identification shall be presented and then verified by the holder of the documents upon a request to provide consultant /subcontract services and/or the initiation of services. Valid identification shall be all items (a) through (c), below, and including item (d), as necessary.
(a) A copy of a valid business license or other documentation granted by the state or local jurisdiction to conduct business. The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. A general contractor’s license may be substituted for the business license in states that issue such licenses. In rare cases where a business license is not available from the jurisdiction, the alternate information shall be provided and testified to by the submitter: and
FBOP DOCUMENT SECURITY NOTICE 010002.A1 - 2 of 1
(b) Verification of a valid DUNS Number against the company name listed on the business license or certification. Verification may be obtained through http//www.fpdc.gov, or by calling Dun & Bradstreet at 703-807-5078 to set up an account, and
(c) A Valid IRS Tax ID Number of the company requesting the information: and, as necessary.
(d) A Valid picture state driver’s license shall be requested of person(s) picking up Sensitive But Unclassified documents. Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. Sensitive But Unclassified documents will not be released to any individual or firm who has not, either previously or at the time of pickup, supplied the required documentation as outlined in paragraphs (a) through (c), above.
3. Retaining and destroying documents. The efforts required above shall continue throughout the entire term of the contract and for whatever specific time thereafter as may be necessary. Record copies retained for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Documents no longer needed shall be destroyed (e.g., after contract award, after completion of any appeals process, after completion of the work, etc.). Destruction shall be done by burning or shredding hardcopy, and/or physically destroying CDs, deleting, and removing files from electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.
4. Written agreement of disposal. For all contracts using Sensitive But Unclassified building information, the contractor shall provide a written statement at the time of Release of Claims or other signifying contract action, testifying the Sensitive But Unclassified building documents have been properly disposed of in order to obtain final payment. A recipient of Sensitive But Unclassified information not awarded a contract acknowledges the requirements to use reasonable care, as outlined above, in order to safeguard the documents and, (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to destroy or render useless all Sensitive But Unclassified information received during the solicitation.
I agree that I will abide by this agreement and will only disseminate Sensitive But Unclassified building information to other authorized users under the conditions set forth above.
Signature: Date:
Title:
Copy of business license attached.
DUNS Number:
IRS Tax ID Number:
Date:
(signature) reviewed by FBOP Contracting Officer http://www.fpdc.gov/
JUSTIFICATION FOR RECEIPT 010002.A2 - 1 of 1
JUSTIFICATION FOR RECEIPT OF FBOP TECHNICAL DESIGN GUIDELINES
Submitting Firm agrees to the stipulations and requirements of the attached Technical Design Guidelines
SECTION 010002- PROJECT SECURITY. Complete this form, and the FBOP DOCUMENT SECURITY
NOTICE in Section 010002.
☐ Architect/Engineer Firm Name:
☐ Consultant Address:
☐ Contractor
☐ Manufacturer
☐ Vendor
☐ Other Telephone Number: ( ) –
Give the JUSTIFICATION FOR A NEED TO KNOW FOR Technical Design Guideline Sections (include the specific Section names / numbers requested):
Firm’s Representative Signature Title Date
DCB Technical Support Section Chief Signature Date
DCB Branch Chief Signature Date
SUMMARY OF WORK 011100 - 1 of 1
SECTION 011100
SUMMARY OF WORK
PART 1 - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Related documents.
2. Project/Work identification.
3. Contractor’s use of premises.
4. Government occupancy.
5. Inspection by regulatory authorities.
6. Intention of the documents.
7. Miscellaneous and general provisions.
8. Archaeological rights.
9. CADD standards.
10. Text Document Standards.
11. Government furnished and contractor products.
12. Use of Constructware™ project management system.
B. Related Sections:
1. Minimum Design Requirements, drawings, general provisions of the contract, and other Division 01 Requirements apply to these requirements, including but not limited to the following:
a. TDG General Information and Instructions.
b. Division 01 Sections.
1.02 PROJECT / WORK IDENTIFICATION
A. Contract Documents to be prepared to indicate the Work of the Contract, including related requirements and conditions that have an impact on the project. Related requirements and conditions that are indicated on the Contract Documents include, but are not necessarily limited to, the following:
1. Existing site conditions and restrictions.
2. Other work prior to Work of Contract.
3. Alterations and coordination with existing work.
4. Other work to be performed concurrently by the Government.
5. Other work to be performed concurrently by separate contractors.
6. Other work subsequent to Work of Contract.
7. Alternates, whether accepted or not.
8. Items furnished by the Government and installed by the Contractor.
9. Items for which separate price is required.
10. Requirements for occupancy by Government prior to completion of
SUMMARY OF WORK 011100 - 2 of 4
1. Work of Contract.
2. Other requirements identified in Section C of the project solicitation.
B. Summary by References: Work of Contract can be summarized by reference to the conditions of the Contract, FBOP Requirements corresponding to specification sections, drawings and other documents bound herewith, addenda and modifications to the Contract Documents issued subsequent to the initial printing, and including, but not necessarily limited to, printed matter referenced by any of these.
C. Abbreviated Written Summary: Briefly, and without force and effect upon Contract Documents, Work of Contract can be summarized as follows:
1. The complete design and construction of the Base Proposal as more completely described in the Contract Documents of which this section is a part, except for Mandatory Option Proposals.
2. Design and construction of work listed as Mandatory Option Proposals in Part I, Section B of the Contract, if and to the extent selected by the Government.
3. Design and construction of work designated as Alternative Proposals (AP’s) in the Offer, if and to the extent selected by the Government.
4. Design and construction of work in the Offer that is above the minimum mandatory requirements of the FBOP.
D. The Contractor shall design and construct the Project using metric dimensions, except building materials specifically addressed by the Savings in Construction Act of 1996, shall be specified, and provided in nominal metric dimensions. The non-metric measurements provided in the FBOP Requirements are for information purposes only.
E. Ownership: The Government, for itself and such others as it deems appropriate, will have unlimited rights under this Contract to all information and materials developed under this Contract and furnished to the Government and documentation thereof, reports, and listings, and all other items pertaining to the work and services pursuant to this agreement including any copyright. Unlimited rights under this Contract are rights to use, duplicate, or disclose text, data, drawings, and information, in whole or in part in any manner and for any purpose whatsoever without compensation to or approval from the Contractor. The Government will at all reasonable times have the right to inspect the work and will have access to and the right to make copies of the above-mentioned items. All text, electronic digital files, data, and other products generated and furnished under this Contract shall become the property of the Government.
F. Documents Control: All documents prepared for use in FBOP projects including but not limited to drawings, specifications, project manuals, narratives, calculations, DVDs, and reports, shall be marked “PROPERTY OF THE UNITED STATES GOVERNMENT – SENSITIVE BUT UNCLASSIFIED”. Documents and information relating to security systems including, but not limited to: Security Electronics Systems; perimeter fences; security hardware; utility distribution; and secure construction, shall not be made available to the general public.
Contractor shall prepare and submit for review and acceptance by the FBOP a “Documents Control Plan” that describes the type of document prepared, controls for use and distribution, and eventual destruction (TDG Sections 01 00 02 and 01 33 10). All FBOP provided guidance, including but not limited to: TDGs, DPGs, Concept Drawings, and Security Electronics Model Documents, other than for record purposes, shall be properly destroyed.
1.03 CONTRACTOR USE OF PREMISES
A. General: During the entire construction period, the Contractor shall have the exclusive use of the premises for construction operations, including full use of the site. The site applicable to this project is delineated and identified by the “Project Limit Line” in the Contract Documents of which this section is a part.
1. All visitors to the construction site shall register with the FBOP site office.
B. General: The Contractor shall limit its use of the premises to the work indicated, so as to allow for Government occupancy and use.
SUMMARY OF WORK 011100 - 3 of 4
1. Use of the Site: Confine operations at the site to the areas permitted under the Contract. Portions of the site beyond areas on which work is indicated are not to be disturbed. Conform to site rules and regulations affecting the work while engaged in project construction. Coordinate connection with existing utilities with Supervisory Construction Representative. See Section 01 31 00 - PROJECT MANAGEMENT AND
COORDINATION.
2. Work Hours: The project site will be open to the Contractor seven (7) days a week. The project schedule is based on a normal forty (40) hour work week. The Contractor shall establish a normal work week schedule for the duration of the project.
Work hours and workdays may be altered only with a forty-eight (48) hour advance approval of the Contracting Officer.
3. Contraband: The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC 1791.
4. Explosives: The use of explosives is absolutely forbidden without written authorization from the Contracting Officer upon no less than thirty (30) days advance written request.
5. Parking: Parking areas, either on or off-site will be furnished for workmen by the Contractor at a location approved by the Supervisory Construction Representative.
6. Temporary Office: Any temporary field office used by the Contractor shall be located in an area approved by the Supervisory Construction Representative.
7. Contractor shall review site layout plan for staging, stockpiles, etc., with Supervisory Construction Representative.
1.04 GOVERNMENT OCCUPANCY
A. Full Government Occupancy: The Government will be the resident on the site and shall be allowed access to the entire site and any existing building(s) during the entire period of design and construction. Cooperate fully with the Government representatives during construction operations to minimize conflicts and to facilitate Government usage and access.
Perform the work so as not to interfere with other ongoing Government operations.
B. Partial Government Occupancy: The Government reserves the right to place and install equipment as necessary in completed areas of the building and to occupy such completed areas prior to substantial completion, provided that such occupancy does not substantially interfere with completion of the work. Such placing of equipment and partial occupancy shall not constitute acceptance of the work or any part of the work.
1.05 INSPECTION BY REGULATORY AUTHORITIES
A. This project is subject to inspection by the following regulatory authorities:
1. U.S. Department of Justice, Federal Bureau of Prisons. The Federal Bureau of Prisons is the Authority Having Jurisdiction for the work of this project.
2. Other regulatory agencies or law enforcement agencies.
1.06 INTENTION OF DOCUMENTS
A. The Contract Documents require that the Contractor provide all design, details, materials, installation, and performance of related site, utility, and other required work for the project.
The Contractor shall, without additional compensation, coordinate and join together all the various subdivisions of the work and provide a complete, operable installation, ready for its designed use.
B. The requirements of this Summary of Work, other FBOP Requirements including but not limited to the: Design Program Guidelines, Technical Design Guidelines, FBOP Concept Drawings, and FBOP Model Documents, shall be considered complimentary and shall be taken as a whole. Anything required in a particular Contract Document shall be taken as being required by all Contract Documents.
SUMMARY OF WORK 011100 - 4 of 4
C. Minor material and work not specified or shown, but necessary for proper completion of the work, shall be provided as specified or shown without additional compensation.
1.07 MISCELLANEOUS AND GENERAL PROVISIONS
A. Existing Utilities: Coordinate to preserve, connect to, or remove existing utilities.
B. Outside Electrical Services: Underground and overhead electrical services shall be provided complete to all points of connection to utility and service lines.
C. Other Utility Services: The Contractor shall coordinate with all other applicable utility companies, including but not necessarily limited to companies providing telephone, cable television, water, sanitary sewer, storm sewer and gas services. Contractor shall provide and install a water meter for the completed facility. The Contractor shall provide the service point connections to required utilities, including extension of utility lines on FBOP property to these connections located within 10' inside of the FBOP property boundaries.
D. New Work: Unless otherwise noted on drawings or specified, new work (if any) tying to or providing an extension of existing conditions shall correspond in all respects with that to which it connects, or to similar existing conditions, in materials, workmanship, and finish.
E. Alterations to Existing Work (if any):
1. Existing Work shall be cut, drilled, altered, removed, or temporarily removed and replaced as necessary for performance of work under the Contract. Work that is replaced shall match similar existing work. Structural members shall not be cut or altered, without authorization of the Contracting Officer. Work remaining in place that is damaged or defaced during this Contract shall be restored to the condition existing at the time of Notice to Proceed with construction.
2. Discolored or unfinished surfaces exposed by removal of existing work and indicated to be the final exposed surfaces shall be refinished or the material shall be replaced as necessary to make contiguous work uniform and harmonious. Work out of alignment where exposed by removal of existing work shall be called to the Contracting Officer's attention. Necessary corrective work directed by the Contracting Officer will be subject to adjustment of the Contract in accordance with the "Differing Site Conditions" Contract Clause.
F. Contractor is responsible for providing temporary utility services during construction and pay all applicable fees associated with such.
G. Design services including all miscellaneous expenses, such as travel, postage, deliveries, long distance telephone calls and printing, shall be included in the Contract Sum and shall be provided at no additional cost to the Government.
1.08 ARCHAEOLOGICAL RIGHTS
A. Items considered to have archaeological significance are the property of the Government.
1.09 TEXT DOCUMENT STANDARDS
A. The Bureau of Prisons currently uses Microsoft (MS) Office Word most recent version as it’s word processing software program. The Contractor shall provide deliverable text documents (e.g., Project Manuals/Specifications, forms contained within the Technical Design Guidelines, etc.) using the Microsoft Office Word most recent version program.
PART 2 - PRODUCTS
2.01 IN THE EVENT THAT ITEMS ARE FURNISHED BY THE GOVERNMENT AND INSTALLED BY THE
CONTRACTOR
A. Notification: Within thirty (30) calendar days after initial Notice to Proceed, submit to the Contracting Officer a schedule in quadruplicate giving desired dates for delivery of items furnished by the Government. Schedule shall be subject to written approval of the
SUMMARY OF WORK 011100 - 5 of 4
Contracting Officer. Approved dates of delivery shall be confirmed thirty (30) days prior to delivery by the Government.
B. Prior to or accompanying the submission of Preliminary Package B, submit to the Contracting Officer a schedule of required dates for delivery of items furnished by the Government.
Schedule shall be subject to written approval by the Contracting Officer. In addition, all delivery dates shall be shown on the contractor’s CPM schedule (P3).
C. The contractor shall be responsible for the unloading of all Government furnished product deliveries. A FBOP representative shall be present during deliveries. Once unloaded, and the FBOP verifies the condition and amount, the contractor then assumes responsibility of the items received. All handling and storage of the items shall be in accordance with manufacturer’s recommendations and the related sections of this Guideline.
D. Installation: Installation shall be as shown and specified for each item.
PART 3 - EXECUTION
3.01 USE OF CONSTRUCTWARE PROJECT MANAGEMENT SYSTEM
A. Project shall utilize the internet-based Autodesk Constructware® project management and collaboration software system. Refer to the project Solicitation Documents for additional information.
SUBSTITUTION PROCEDURES 012500 - 1 of 4
SECTION 012500
SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.01 SUMMARY
A. Section Includes:
1. Administrative and procedural requirements for substitutions.
B. Related Requirements:
1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.
1.02 DEFINITIONS
A. Pre-Bid Substitutions: Bidder or manufacturer proposed changes in products, materials, equipment, and methods of construction from those required by the Bidding Documents.
B. Post-Bid Substitutions: Contractor proposed changes in products, materials, equipment, and methods of construction from those required by the Contract Documents.
1.03 ACTION SUBMITTALS
A. Pre-Bid Substitution Request: Within 10 days prior to the final date scheduled for receipt of bids, submit documentation, to Owner and Architect simultaneously, identifying product or fabrication or installation method to be replaced.
1. Substitution Request Form: Owner's standard form.
2. Include Specification Section number and title, Specification Section paragraph designation and title, and Drawing numbers and titles.
3. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Coordination of information, including a list of changes or revisions needed to other parts of the Work, and to construction performed by Owner and Owner’s separate contractors that will be necessary to accommodate proposed substitution.
b. Detailed comparison of performance characteristics and significant qualities of proposed substitutions with those of the Work specified.
1) Include annotated copy of applicable Specification Section.
2) Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated.
3) Indicate deviations, if any, from the Work specified.
c. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
d. Samples, where applicable or requested.
e. Certificates and qualification data, where applicable or requested.
f. Items specifically required as submittals in applicable Specification Section.
g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.
h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.
i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES, Intertek, or other qualified testing agency acceptable to authorities having jurisdiction.
SUBSTITUTION PROCEDURES 012500 - 2 of 4
j. Proposer’s certification that proposed substitution complies with requirements in the Bidding Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.
k. Proposal’s waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
l. Other data as requested by Owner or Architect.
m. Substitution requests not including sufficient information necessary for an elevation by the Owner and Architect will not be approved, nor will Owner or Architect contact entity requesting substation in order to obtain additional information.
4. The burden of proof on the merit on the proposed substitution is upon the proposer.
5. Architect’s Action: If Owner and Architect approve a proposed substitution, such approval will be set forth in an addendum.
a. Bidders shall not rely on acceptance or approvals many in any other manner.
b. No notification will be issued by the Owner or Architect regarding proposed substitutions not approved.
B. Post Bid Substitution Requests: Within 90 days after execution of the agreement between the Owner and Contractor, submit documentation, to Owner and Architect simultaneously, identifying product or fabrication or installation method to be replaced. Requests received after that time will be rejected.
1. Substitution Request Form: Owner's standard form.
2. Include Specification Section number and title, Specification Section paragraph designation and title, and Drawing numbers and titles.
3. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable, and proposed advantage to Owner.
b. Coordination of information, including a list of changes or revisions needed to other parts of the Work, and to construction performed by Owner and Owner’s separate contractors that will be necessary to accommodate proposed substitution.
c. Detailed comparison of performance characteristics and significant qualities of proposed substitutions with those of the Work specified.
1) Include annotated copy of applicable Specification Section.
2) Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated.
3) Indicate deviations, if any, from the Work specified.
d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. Items specifically required as submittals in applicable Specification Section.
h. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.
i. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.
j. Research reports evidencing compliance with building code in effect for Project, from ICC-ES, Intertek, or other qualified testing agency acceptable to authorities having jurisdiction.
SUBSTITUTION PROCEDURES 012500 - 3 of 4
k. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time.
1) If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer of specified product, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.
l. Cost information, including a proposal of change, if any, in the Contract Sum.
m. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.
n. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
o. Other data as requested by Owner or Architect.
4. Architect's Action: If necessary, Architect will request additional information or…
This is the start of the file's text. The full file is on GovTribe.