Attachment 6 -APP_E_-_LIGHT_CALCS.pdf

PDF 2 MB Posted

Attached to
FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure
Solicitation number
15BNAS27Q00000002
Issued by

About this file

This document is a set of electrical calculation sheets prepared by Coffman Engineers for the Federal Bureau of Prisons Three Rivers facility project involving the replacement of Generators 1 and 2 with an enlarged site powerhouse. The calculations dated March 5, 2025 include lighting design analysis for the enlarged site powerhouse and switchgear room, along with voltage drop calculations for critical electrical loads.

The lighting calculations establish illuminance requirements for two zones: the site powerhouse (Z01 and Z02) and the switchgear room (Z04). For the site powerhouse, the calculations show average illuminance of 2.19 footcandles with a maximum of 8.2 footcandles and minimum of 0.4 footcandles, utilizing three DSX2 LED P2 40K 80CRI T1S fixtures and two DSX2 LED P2 40K 80CRI TFTM fixtures with 0.8 light loss factor. The switchgear room requires significantly higher illuminance levels with an average of 29.43 footcandles, maximum of 37.2 footcandles, and minimum of 13.7 footcandles, achieved through nine CLX L96 8000LM SEF FDL MVOLT fixtures at 0.88 light loss factor. Voltage drop calculations for 480-volt, 3-phase systems indicate acceptable performance across multiple circuits including sewer lights, exterior lights, and fire pump controller circuits, with voltage drops ranging from 0.0% to 10.49% and all loads terminating within acceptable limits of 277.0 to 429.6 volts.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.2 1.6 2.4 2.6 2.4 1.6 1.0 1.7

1.5 0.0 2.8 2.2 2.2

1.2 1.5 0.1 2.7 0.3 1.7

1.2 0.1 0.1 2.2 0.3 2.1 2.1

1.1 0.1 0.2 1.8 2.5 2.4

0.1 0.1 0.2 0.3 0.5 0.7 0.9 1.2 1.4 0.8 1.1 1.6 3.1 2.5 2.9 2.8

0.1 0.2 0.3 0.4 0.5 0.7 1.0 1.1 1.2 0.8 1.1 1.4 2.5 1.9 2.7 3.1 2.7

0.2 0.2 0.3 0.4 0.6 0.9 1.1 1.1 1.3 1.2 1.4 1.4 2.1 1.4 1.9 2.2 1.8

0.2 0.3 0.4 0.5 0.8 1.3 1.3 1.4 1.7 1.6 1.6 2.1 2.0 1.4 1.6 1.8 1.4

0.3 0.4 0.5 0.7 1.2 1.6 1.9 2.1 2.1 1.8 1.8 2.0 1.9 1.3 1.1 0.9 0.8

0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.3 0.4 0.0 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.3 0.4 0.5 0.6 0.7 0.8 1.1 1.9 2.5 2.4 2.5 2.1 1.8 1.9 1.6 1.0 0.8 0.7 0.5

0.1 0.2 0.2 0.2 0.2 0.3 0.4 0.6 0.8 0.0 0.7 0.5 0.4 0.3 0.3 0.2 0.3 0.3 0.4 0.5 0.7 0.8 0.7 0.7 0.7 0.9 1.3 2.0 2.4 2.4 2.5 2.1 1.8 1.6 1.3 0.8 0.6 0.5 0.6

0.3 0.4 0.4 0.5 0.6 0.7 0.6 0.7 1.1 1.2 0.9 0.6 0.5 0.4 0.3 0.3 0.3 0.4 0.5 0.8 1.1 1.2 1.0 0.8 1.0 1.5 1.9 2.3 2.7 2.7 2.5 2.1 1.7 1.3 1.0 0.8 0.6 0.4 0.4

0.5 0.6 0.8 1.0 1.2 1.3 1.2 1.5 2.0 2.0 1.7 1.1 0.9 0.8 0.7 0.6 0.6 0.7 0.7 1.0 1.6 2.0 1.8 1.6 1.9 2.6 2.7 2.8 2.9 2.7 2.3 1.8 1.4 1.0 0.7 0.5 0.4 0.3 0.3

0.6 0.8 0.9 1.2 1.4 1.6 1.7 1.9 2.0 2.0 2.0 1.6 1.6 1.6 1.4 1.3 1.3 1.5 1.4 1.7 2.2 2.2 2.3 2.3 2.6 2.9 2.9 2.8 2.7 2.4 1.9 1.4 1.0 0.7 0.5 0.4 0.3 0.2 0.2

0.6 0.8 1.0 1.2 1.4 1.6 1.9 2.2 2.2 2.2 2.3 2.1 1.9 1.9 1.8 1.8 1.9 2.0 2.0 2.1 2.3 2.3 2.6 2.8 2.8 2.8 2.8 2.6 2.3 2.0 1.5 1.1 0.8 0.5 0.4 0.3 0.2 0.2 0.2

0.6 0.7 0.9 1.1 1.3 1.5 1.7 2.0 2.1 2.2 2.2 2.1 2.0 2.0 2.0 2.0 2.1 2.1 2.2 2.4 2.5 2.5 2.6 2.7 2.6 2.6 2.5 2.2 1.9 1.5 1.1 0.8 0.6 0.4 0.3 0.2 0.2 0.2 0.1

0.5 0.6 0.7 0.9 1.0 1.2 1.4 1.6 1.7 1.8 1.9 1.9 1.9 1.9 1.9 1.9 2.0 2.0 2.1 2.1 2.2 2.3 2.3 2.3 2.2 2.1 1.9 1.7 1.4 1.1 0.8 0.6 0.4 0.3 0.2 0.2 0.1 0.1 0.1

Project

Date:10/14/2024

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

ENLARGED SITE POWERHOUSE LIGHTING

CALCULATIONS

ELECTRICAL CALCULATION

COVERSHEET

THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK

1.0 1.7 1.9 1.9 1.6 1.4 1.1 1.6

1.5 2.3 1.0

1.3 2.2 2.4 1.6 2.1

0.7 1.7 1.7 1.7

0.6 1.3 2.1 2.0

0.6 1.2 2.3 2.3

1.2 1.8 1.5 1.6 1.9 2.4 2.4 2.3

1.4 1.8 1.3 1.2 1.2 1.7 2.2 1.9

0.5 1.2 1.7 2.1 2.1 1.4 1.1 1.0 1.3 1.6 1.3

0.7 1.4 2.5 3.2 2.9 2.2 1.3 1.0 0.8 0.8 0.9 0.8

0.8 1.7 3.6 5.4 4.7 2.7 1.6 1.0

0.5 1.4 3.7 7.4 7.0 3.5 1.6 1.0

1.2 2.8 6.2 7.9 4.1 1.8 1.1 0.7

0.4 0.6 0.8 1.1 1.4 1.7 2.0 2.2 2.1 1.5 1.0 0.8 0.6 0.4 0.4 0.4 0.4 0.5 0.7 1.1 1.6 1.6 1.6 2.0 2.7 4.2 6.2 4.6 2.1 1.3 0.8 0.4

0.6 0.9 1.2 1.8 2.5 3.7 5.3 6.6 6.3 4.6 2.9 2.0 1.4 1.1 1.0 1.0 1.2 1.6 2.3 3.6 4.8 5.0 4.4 3.9 3.9 4.6 4.4 2.5 1.6 1.0 0.5

0.7 1.0 1.3 1.9 2.7 3.8 5.4 6.8 7.3 6.2 4.6 3.1 2.2 1.7 1.6 1.7 2.1 3.1 4.8 7.0 8.2 7.5 5.9 4.7 4.2 3.9 3.0 1.9 1.2 0.7 0.4

0.6 0.8 1.0 1.2 1.5 1.6 1.8 2.1 2.4 2.7 2.8 2.6 2.2 2.0 1.9 2.1 2.6 3.4 4.2 4.4 3.8 3.2 2.9 2.9 2.9 2.6 2.0 1.3 0.8

0.4 0.5 0.6 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.5 1.6 1.7 1.8 1.9 2.0 2.0 1.8 1.6 1.5 1.5 1.6 1.7 1.7 1.6 1.2 0.8 0.5

Z01

Z01

Z01

Z02

Z02

Project

Date:03/05/2025

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

ENLARGED SITE POWERHOUSE LIGHTING

CALCULATIONS

Project

Date:03/05/2025

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

ENLARGED SITE POWERHOUSE LIGHTING

CALCULATIONS

23.7 27.7 28.8 31.2 33.3 35.0 35.7 36.0 36.2 36.2 36.1 35.7 35.1 34.5 33.6 32.2 30.3 28.6 27.5 27.3 28.0 28.4 28.4 27.9 27.3 26.2 24.4 21.5

27.0 30.8 26.8 29.5 32.4 34.4 35.4 36.0 36.5 36.7 36.7 36.2 35.7 34.8 33.8 32.4 30.0 29.9 29.3 29.6 31.1 31.7 31.8 31.3 30.7 29.6 27.6 24.4

28.5 28.3 26.9 30.4 32.6 33.6 33.8 33.3 32.6 31.5 29.4 25.8

22.2 22.3 19.1 23.4 30.1 32.5 33.5 33.1 32.5 31.4 29.3 25.6

22.4 22.7 18.1 21.9 28.4 30.6 31.2 30.6 30.1 29.2 27.3 24.0

25.4 21.9 16.3 23.1 27.0 26.5 26.9 26.7 26.5 25.7 24.1 21.2

27.3 30.5 22.0 25.0 27.5 29.2 30.5 31.3 31.8 32.0 31.8 31.4 30.5 29.4 27.6 25.4 22.3 19.6 24.1 18.0

25.7 29.4 27.5 29.9 32.4 34.4 35.3 35.9 36.3 36.4 36.2 35.5 34.6 33.3 31.5 29.0 27.0 25.4 22.6 14.7

23.3 27.0 28.5 31.2 33.6 35.6 36.4 36.9 37.2 37.2 36.9 36.5 35.4 34.2 32.5 30.2 27.4 24.6 19.9 14.7

20.4 23.8 27.1 29.9 32.2 33.6 34.4 34.8 35.0 35.0 34.7 34.2 33.2 32.2 30.6 28.4 25.8 21.7 17.5 13.7

Z04 Z04

Z04 Z04 Z04

Z04

Z04 Z04 Z04

Project

Date:03/05/2025

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

ENLARGED POWERHOUSE SWITCHGEAR ROOM

LIGHTING CALCULATIONS

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

ENLARGED POWERHOUSE SWITCHGEAR ROOM

LIGHTING CALCULATIONS

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

VOLTAGE DROP CALCULATIONS

Sheets and Views
Unsaved Drawing1-Layout1
Unsaved Drawing1-Layout2
Unsaved Drawing2-Layout1
Unsaved Drawing2-Layout2

File details come from the government source that posted it. Updated .