14586 OSP IT Room Dual Agent Fire Suppression Phase 1 SOW.pdf

PDF 112 KB Posted

Attached to
OSP IT Room Dual Agent Fire Suppression
Solicitation number
S-29100-00014586
Issued by
Marion County, Oregon

About this file

This document is a Summary of Work section (01 10 00) for the Oregon State Penitentiary (OSP) IT Room Dual Agent Fire Suppression – Phase 1 project, involving the Oregon Department of Corrections (ODOC). The project aims to protect security electronics equipment with dual agent fire suppression cylinders, to be implemented according to MFIA Inc. Consulting Engineers' drawings. The work will take place inside the secure perimeter of OSP, with the contractor limited to working in one building or area at a time, supported by two security escorts. Work hours are restricted to 6 AM - 2:30 PM, Monday through Friday, excluding state holidays, and access will be through Vehicle Gate 5 with a security escort. The project has a substantial completion timeline of 100 calendar days and a final completion timeline of 120 calendar days after the Notice to Proceed.

The contractor is responsible for all plan review, permitting, fees, and coordination of inspections, with the need to verify permit requirements with the City of Salem's Authority Having Jurisdiction (AHJ). The existing fire alarm system is a Simplex 4100ES. After bid award, the contractor must provide a Schedule of Values that breaks out project costs by building to facilitate owner capitalization tracking. No specific pricing details are provided in this document, which primarily focuses on project scope, logistical requirements, and administrative procedures for executing the fire suppression system installation at the Oregon State Penitentiary.

View the file

Other files

File Type Posted
14586 Plan Holder List.pdf PDF
OSP IT ROOMS BID SET_Addenda 1~1.pdf PDF
7113 CONTRACT_Executed.pdf PDF
14586 ITB_GTC_SGC.pdf PDF
14586 ADDENDA 3.pdf PDF
14586 OSP IT Room Dual Agent Fire Suppression Phase 1 Plans.pdf PDF
01 10 00_Summary of Work Revision_Addenda 1.pdf PDF
Rilea Bullet Traps Sole Source Justification Executed.pdf PDF
14586 ADDENDA 2_Final.pdf PDF
14586_Bid Tab.pdf PDF
7113 NTP.pdf PDF
Check Off sheet ITB~6.pdf PDF
14586 ADDENDA 1.pdf PDF
14586 ADDENDA 4.pdf PDF
7113 NOITA.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OSP IT Room Dual Agent Fire Suppression – Phase 1 Summary of Work 01 10 00 - 1

SECTION 01 10 00 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information

2. Background

3. Work covered by Contract Documents

4. Owner Provided Security Escorts

5. Work Hours and Site Access

6. Schedule of Values

7. Completion Dates

1.3 PROJECT INFORMATION

A. Project Identification: Oregon State Penitentiary (OSP) IT Room Dual Agent Fire

Suppression – Phase 1

1. Project Location: Oregon State Penitentiary (OSP), 2605 State Street, Salem, OR

97310

2. Owner: Oregon Department of Corrections (ODOC).

3. Owner's Representative: Rachael Halstead-Jeffreys, ODOC Construction Project

Manager

B. Prime Consultant Engineers: Mark Denyer, MFIA Inc. Consulting Engineers

1.4 BACKGROUND

A. This Project will protect security electronics equipment with dual agent fire suppression cylinders.

01 10 00 - 2

1.5 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists generally of the following:

1. Provide Work as per the MFIA drawings.

2. Existing Fire Alarm System is Simplex 4100ES.

3. Contractor shall verify prior to bid if the AHJ City of Salem will require a single permit or individual permits for this work.

4. Contractor is responsible for all plan review, permitting, fees and coordination of inspections.

1.6 OWNER PROVIDED SECURITY ESCORTS

A. All Work will take place inside the Secure Perimeter of OSP. Owner will provide Security

Escorts in coordination with the Contractor’s Work Schedule. Contractor shall be limited to working in only one building or area at a time due to anticipated Security Escort limitations. Owner plans to support this project normally with (2) two Security Escorts.

1.7 WORK HOURS and SITE ACCESS

A. Contractor may normally perform work within the OSP between 6AM – 2:30PM

Monday through Friday, except State of Oregon Holidays.

B. Contractor shall access OSP Work through Vehicle Gate 5 (“5-Gate”) with a Security

Escort.

1.8 SCHEDULE OF VALUES

A. Contractor shall provide Owner a Schedule of Values in accordance with the General

Conditions after Bid Award. The Schedule of Values shall break out the project by building so that Owner can track costs by building for purposes of capitalization.

1.9 COMPLETION DATES

1. Substantial Completion: 100 Calendar Days after Notice to Proceed.

2. Final Completion: 120 Calendar Days after Notice to Proceed.

01 10 00 - 3

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 10 00

File details come from the government source that posted it. Updated .