01 10 00_Summary of Work Revision_Addenda 1.pdf
PDF 120 KB Posted
- Attached to
- OSP IT Room Dual Agent Fire Suppression
- Solicitation number
- S-29100-00014586
- Issued by
- Marion County, Oregon
About this file
This document is a Summary of Work specification section for the Oregon State Penitentiary (OSP) IT Room Dual Agent Fire Suppression – Phase 1 project, involving the Oregon Department of Corrections (ODOC). The project aims to protect security electronics equipment with dual agent fire suppression cylinders, with work to be performed according to MFIA Inc. Consulting Engineers' drawings. The contractor will work inside the secure perimeter of OSP, with owner-provided security escorts, and is limited to working in two buildings or areas at a time. Work hours are restricted to 6 AM - 2:30 PM Monday through Friday, excluding state holidays, and access will be through Vehicle Gate 5 with a security escort. The project has a substantial completion timeline of 150 calendar days and a final completion deadline of 180 calendar days after the Notice to Proceed.
The contractor is responsible for all plan review, permitting, fees, and inspection coordination, with the existing fire alarm system being a Simplex 4100ES. The contractor must verify permit requirements with the City of Salem and provide a Schedule of Values after bid award, breaking out project costs by building for capitalization purposes. No specific pricing details are provided in this document, which serves as a technical specification outlining the project's scope, location, working conditions, and timeline for the fire suppression system installation at the Oregon State Penitentiary.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSP IT Room Dual Agent Fire Suppression – Phase 1 Summary of Work 9/22/2025 01 10 00 - 1
SECTION 01 10 00 – SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Project information
2. Background
3. Work covered by Contract Documents
4. Owner Provided Security Escorts
5. Work Hours and Site Access
6. Schedule of Values
7. Completion Dates
1.3 PROJECT INFORMATION
A. Project Identification: Oregon State Penitentiary (OSP) IT Room Dual Agent Fire Suppression – Phase 1
1. Project Location: Oregon State Penitentiary (OSP), 2605 State Street, Salem, OR
97310
2. Owner: Oregon Department of Corrections (ODOC).
3. Owner's Representative: Rachael Halstead-Jeffreys, ODOC Construction Project Manager
B. Prime Consultant Engineers: Mark Denyer, MFIA Inc. Consulting Engineers
1.4 BACKGROUND
A. This Project will protect security electronics equipment with dual agent fire suppression cylinders.
9/22/2025 01 10 00 - 2
1.5 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists generally of the following:
1. Provide Work as per the MFIA drawings.
2. Existing Fire Alarm System is Simplex 4100ES.
3. Contractor shall verify prior to bid if the AHJ City of Salem will require a single permit or individual permits for this work.
4. Contractor is responsible for all plan review, permitting, fees and coordination of inspections.
1.6 OWNER PROVIDED SECURITY ESCORTS
A. Work will take place inside the Secure Perimeter and on the grounds of OSP. Owner will provide Security Escorts in coordination with the Contractor’s Work Schedule.
Contractor shall be limited to working in only two buildings or areas at a time due to anticipated Security Escort limitations. Owner plans to support this project normally with
(3) three Security Escorts.
1.7 WORK HOURS and SITE ACCESS
A. Contractor may normally perform work within the OSP between 6AM – 2:30PM Monday through Friday, except State of Oregon Holidays.
B. Contractor shall access OSP Work through Vehicle Gate 5 (“5-Gate”) with a Security Escort.
1.8 SCHEDULE OF VALUES
A. Contractor shall provide Owner a Schedule of Values in accordance with the General Conditions after Bid Award. The Schedule of Values shall break out the project by building so that Owner can track costs by building for purposes of capitalization.
1.9 COMPLETION DATES
1. Substantial Completion: 150 Calendar Days after Notice to Proceed.
2. Final Completion: 180 Calendar Days after Notice to Proceed.
9/22/2025 01 10 00 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 10 00
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section Includes: |
| 1. Project information |
| 2. Background |
| 3. Work covered by Contract Documents |
| 4. Owner Provided Security Escorts |
| 5. Work Hours and Site Access |
| 6. Schedule of Values |
| 7. Completion Dates |
| 1.3 PROJECT INFORMATION |
| A. Project Identification: Oregon State Penitentiary (OSP) IT Room Dual Agent Fire Suppression – Phase 1 |
| 1. Project Location: Oregon State Penitentiary (OSP), 2605 State Street, Salem, OR 97310 |
| 2. Owner: Oregon Department of Corrections (ODOC). |
| 3. Owner's Representative: Rachael Halstead-Jeffreys, ODOC Construction Project Manager |
B. Prime Consultant Engineers: Mark Denyer, MFIA Inc. Consulting Engineers
| 1.4 BACKGROUND |
| A. This Project will protect security electronics equipment with dual agent fire suppression cylinders. |
| 1.5 WORK COVERED BY CONTRACT DOCUMENTS |
| A. The Work of Project is defined by the Contract Documents and consists generally of the following: |
| 1. Provide Work as per the MFIA drawings. |
| 2. Existing Fire Alarm System is Simplex 4100ES. |
| 3. Contractor shall verify prior to bid if the AHJ City of Salem will require a single permit or individual permits for this work. |
| 4. Contractor is responsible for all plan review, permitting, fees and coordination of inspections. |
| 1.6 OWNER PROVIDED SECURITY ESCORTS |
| A. Work will take place inside the Secure Perimeter and on the grounds of OSP. Owner will provide Security Escorts in coordination with the Contractor’s Work Schedule. Contractor shall be limited to working in only two buildings or areas at a time due... |
| 1.7 WORK HOURS and SITE ACCESS |
| A. Contractor may normally perform work within the OSP between 6AM – 2:30PM Monday through Friday, except State of Oregon Holidays. |
| B. Contractor shall access OSP Work through Vehicle Gate 5 (“5-Gate”) with a Security Escort. |
| 1.8 SCHEDULE OF VALUES |
| A. Contractor shall provide Owner a Schedule of Values in accordance with the General Conditions after Bid Award. The Schedule of Values shall break out the project by building so that Owner can track costs by building for purposes of capitalization. |
| 1.9 COMPLETION DATES |
| 1. Substantial Completion: 150 Calendar Days after Notice to Proceed. |
| 2. Final Completion: 180 Calendar Days after Notice to Proceed. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION (Not Used) |