1412223678 Schedule of Values.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 1412223678
- Issued by
- Duval County, Florida
About this file
This Schedule of Values document is associated with the Circuit 680 UG Cable Replacement Construction Services project for the City of Jacksonville, Florida. The project encompasses approximately 1,200 feet of 69 kV underground cable replacement originating from the Dillion Substation. Work activities include installation of an open-cut, concrete-encased duct bank; installation of a horizontal directional drilling (HDD) duct bank; pulling and installation of 69 kV EPR cable; modifications to an overhead transmission riser pole and substation termination structures; removal of existing direct-buried 69 kV cable; site restoration; and maintenance of traffic. The project spans multiple locations including the substation, generation facility, and the City of Jacksonville right-of-way along Talleyrand Avenue and Wigmore Street. A mandatory pre-response meeting was scheduled for October 5, 2026, with solicitation responses due October 27, 2026.
The Schedule of Values document provides the contractor's itemized breakdown of costs for various construction activities and materials associated with the underground cable replacement project. This pricing structure allows for transparent cost allocation across different work components and phases of the project. The document serves as the basis for payment requisitions and progress billing throughout the contract execution, ensuring alignment between the contractor's proposed costs and the work performed on this infrastructure improvement project.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Schedule of Values | |||||||
| Scope | # | ITEM DESCRIPTION | UOM | Quantity | Unit Price | Extended Price | |
| Mob / Demob / Bond | 1 | 1.1 MOBILIZATION | Lump Sum | 1 | $ - 0 | ||
| 2 | 1.2 DEMOBILIZATION | Lump Sum | 1 | $ - 0 | |||
| 3 | 1.3 BID BOND | Lump Sum | 1 | $ - 0 | |||
| 4 | 1.4 PERMITS | Lump Sum | 1 | $ - 0 | |||
| 5 | 1.5 SITE SERVICES & SECURITY | Lump Sum | 1 | $ - 0 | |||
| Site Preparation | 6 | 2.1 SURVEYING - LAYOUT PROPOSED BORE PATH | Lump Sum | 1 | $ - 0 | ||
| 7 | 2.2 SURVEYING - STAKE PROPOSED MANHOLE LOCATION AND EXTENTS OF EXCAVATION | Lump Sum | 1 | $ - 0 | |||
| 8 | 2.2 SURVEYING - STAKE BOUNDARIES OF PERMANENT AND TEMPORARY EASEMENTS | Lump Sum | 1 | $ - 0 | |||
| Transmission Structures, Cable and Ductbank Installation/ removal | 9 | 3.1 TRANSPORTATION OF JEA PLATING MATERIALS TO JOB SITE | Lump Sum | 1 | $ - 0 | ||
| 10 | 3.2 RETURN UNUSED JEA MATERIALS AND RECYCLE UNWANTED SCRAP | Lump Sum | 1 | $ - 0 | |||
| 11 | 3.3 RECEIVE, UNLOAD AND SET MANHOLE | Lump Sum | 1 | $ - 0 | |||
| 12 | 3.4 INSTALLATION OF GROUND RODS | Lump Sum | 1 | $ - 0 | |||
| 13 | 3.5 HORIZONTAL DIRECTIONAL DRILL OF (4) 6" AND (1) 2" CONDUITS | Lump Sum | 1 | $ - 0 | |||
| 14 | 3.6 TRENCH INSTALLATION OF (4) 6" AND (1) 2" CONDUITS | Lump Sum | 1 | $ - 0 | |||
| 15 | 3.7 DEMOLITION OF EXISTING CONCRETE CAP AND CABLE IN CONFLICT WITH NEW CABLE INSTALLATION | Lump Sum | 1 | $ - 0 | |||
| 16 | 3.8 MATERIAL COST OF 2000KCM EPR CABLE PLUS SHIPPING TO SITE | FT | 5,070 | $ - 0 | |||
| 17 | 3.9 INSTALLATION OF 2000KCM CABLE AND GROUND CONTINUITY CABLE | Lump Sum | 1 | $ - 0 | |||
| 18 | 3.10 BONDING AND GROUNDING OF UG ELECTRICAL MATERIALS AT TRANSITION RISER STRUCTURE & SUBSTATION TERMINATION STRUCTURES | Lump Sum | 1 | $ - 0 | |||
| 19 | 3.11 REMOVAL OF EXISTING UG POTHEAD/TERMINATIONS/LIGHTNING ARRESTERS AT TRANSITION RISER STRUCTURE & SUBSTATION TERMINATION STRUCTURES | Lump Sum | 1 | $ - 0 | |||
| 20 | 3.12 TESTING AND PROOFING OF INSTALLED DUCT BANKS | Lump Sum | 1 | $ - 0 | |||
| 21 | 3.13 BUILD OUT MANHOLE AND INSTALL SPLICES | Lump Sum | 1 | $ - 0 | |||
| 22 | 3.14 FRAME POLE RISER INCLUDING INSTALLATION TERMINATORS AND ARRESTORS | Lump Sum | 1 | $ - 0 | |||
| 23 | 3.15 FRAME SUBSTATION INCLUDING INSTALLATION TERMINATORS AND ARRESTORS | Lump Sum | 1 | $ - 0 | |||
| 24 | 3.16 BUILD JUMPERS | Lump Sum | 1 | $ - 0 | |||
| 25 | 3.17 INSTALL GALVANIZED STEEL CABLE GUARD | Lump Sum | 1 | $ - 0 | |||
| 26 | 3.18 DEWATERING | Lump Sum | 1 | $ - 0 | |||
| 27 | 3.19 CABLE VLF TESTING | Lump Sum | 1 | $ - 0 | |||
| Civil Materials | |||||||
| (UG Contractor is responsible for procuring sufficient quantity of these items to construct the project to completion in accordance with the drawings and specifications provided) | 28 | 4.1 6-INCH SCHEDULE 40 PVC CONDUITS | Lump Sum | 1 | $ - 0 | ||
| 29 | 4.2 2-INCH SCHEDULE 40 PVC CONDUITS | Lump Sum | 1 | $ - 0 | |||
| 30 | 4.3 PVC FITINGS, PRIMER, GLUE | Lump Sum | 1 | $ - 0 | |||
| 31 | 4.4 MULE TAPE (PER SPECIFICATIONS) | Lump Sum | 1 | $ - 0 | |||
| 32 | 4.5 DUCT SPACERS - DUCT BANK | Lump Sum | 1 | $ - 0 | |||
| 33 | 4.6 CONCRETE FOR DUCT BANK | Lump Sum | 1 | $ - 0 | |||
| 34 | 4.7 BACKFILL FOR DUCT BANK | Lump Sum | 1 | $ - 0 | |||
| 35 | 4.8 6-INCH HDPE SIDR CONDUIT | Lump Sum | 1 | $ - 0 | |||
| 36 | 4.9 2-INCH HDPE SIDR CONDUIT | Lump Sum | 1 | $ - 0 | |||
| 37 | 4.10 HIGH PERFORMANCE 3/4" X 0.04" EMBOSSED POLYESTER CONDUIT BUNDLE STRAPPING | Lump Sum | 1 | $ - 0 | |||
| 38 | 4.11 WARNING TAPE | Lump Sum | 1 | $ - 0 | |||
| 39 | 4.12 ALL OTHER CIVIL MATERIALS UNDER THIS SCOPE OF WORK | Lump Sum | 1 | $ - 0 | |||
| Electrical Materials | |||||||
| (UG Contractor is responsible for procuring sufficient quantity of these items to construct the project to completion in accordance with the drawings and specifications provided) | 40 | 5.1 6 CABLE CLAMPS AND MOUNTING HARDWARE AS REQUIRED FOR MOUNTING CABLE TO EXISTING UG CABLE RISER POLE | Lump Sum | 1 | $ - 0 | ||
| 41 | 5.2 GALVANIZED STEEL CABLE GUARD | Lump Sum | 1 | $ - 0 | |||
| 42 | 5.3 GROUNDING AND BONDING CONENCTION MATERIALS | Lump Sum | 1 | $ - 0 | |||
| 43 | 5.4 ALL OTHER ELECTRICAL MATERIALS UNDER THIS SCOPE OF WORK | Lump Sum | 1 | $ - 0 | |||
| Miscellaneous | 44 | 6.1 RESTORATION | Lump Sum | 1 | $ - 0 | ||
| 45 | 6.2 AS-BUILT DRAWINGS | Lump Sum | 1 | $ - 0 | |||
| 46 | 6.3 SILT FENCE, EROSION AND SEDIMENT CONTROL ASSEMBLY, INSTALLATION, AND REMOVAL | Lump Sum | 1 | $ - 0 | |||
| 47 | 6.4 ADDITIONAL GROUND RODS (FOR EACH ADDITIONAL GROUND ROD, REQUIRED OVER THE BASE SCOPE OF FOUR (4)) | Per Rod | 6 | $ - 0 | |||
| 48 | 6.6 MOT TO BE USED FOR ALL MAINTENANCE OF TRAFFIC | Lump Sum | 1 | $ - 0 | |||
| Subtotal Line 1 - 48 Above | $ - 0 | ||||||
| SWA (10% of Subtotal) | $ - 0 | ||||||
| Total Bid Price (Enter this amount on line 1 of the Bid Form) | $ - 0 |