1412223678_Addendum_2_-_Appendix_C_-_Geotechnical_Report
311 KB Posted
- Solicitation number
- 1412223678
- Issued by
- Duval County, Florida
About this file
This is an addendum document issued by the Jacksonville Electric Authority (JEA) for the Circuit 680 UG Cable Replacement Construction Services solicitation. The project involves the replacement of approximately 1,200 feet of 69 kV underground cable originating from the Dillon Substation, with work occurring within the substation and generation facility as well as along City of Jacksonville right-of-way on Talleyrand Avenue and Wigmore Street. The scope of work includes installation of open-cut concrete-encased duct banks, horizontal directional drilling (HDD) duct banks, pulling and installation of 69 kV ethylene-propylene rubber (EPR) insulated cable with 2,000 kcmil copper conductors, modifications to overhead transmission riser poles and substation termination structures, removal of existing direct-buried cable, site restoration, traffic maintenance, and permitting. A mandatory pre-response meeting is scheduled for October 5, 2026, with proposals due October 27, 2026. Construction is anticipated to begin February 1, 2028, with all cables pulled and terminated by April 12, 2028, operating Monday through Friday from 7 a.m. to 4 p.m.
Respondents must be listed on Florida's Responsible Bidder's List for Category EG7 (Underground Transmission Construction 69kV and Above - Solid Dielectric Cables) and cannot appear on state or local disqualified vendor lists or have had contracts terminated for default within two years. The cable must be manufactured exclusively by Okonite, Kerite (Marmon Utility), or Prysmian per ICEA S-108-720 and AEIC CS9 standards and warrantied for 40 years. A Florida-licensed Professional Surveyor and Mapper approved by JEA is required, and personnel performing high-voltage terminations must hold minimum five years' experience with manufacturer certifications. All contractor personnel must obtain JEA Substation Entry Class certification. Evaluation allocates 100 points across low bidder quotation (30 points), project narrative (5 points), work plan and resource availability (15 points), three similar projects completed in Florida within the past five years (30 points), preliminary schedule (15 points), and Jacksonville Small Emerging Business (JSEB) participation for design scope only (5 points). A five-percent bid bond and 100 percent performance bond are required. Liquidated damages are set at $1,000 per calendar day for delays exceeding 40 days beyond substantial completion, capped at ten percent of contract price. Payment terms offer either one percent discount at 20 days or net 30 days, or two percent discount at 10 days or net 30 days.
Text of this file
Skip to main content
JavaScript Disabled
This site will not function properly without JavaScript enabled. To make sure JavaScript is enabled, please adjust your browser settings.
How To Enable JavaScript
Close
Storm Center
Outage Center
Meetings & Events
Careers
Contact
Sign In
Search jea-logo
Account Options
Customer Resources
Business Resources
Environment
Engineering and Construction
Procurement
About
Manage My Account
Pay Your Bill
Request an Extension or Arrangement
View Your Bill
Update Your Information
Service Issues
Alert Preferences
Add, Move or Stop Service
Billing and Payment Options
New Customer Information
Online Self-Service
Protecting You and Your Information
Rates
Residential Forms and Policies
Understand My Bill
Ways to Save
Residential Rebates
Ways to Save
Get Assistance
Residential Backflow Requirements
Rates
Start Service
Residential Forms & Policies
Online Self Service
Protecting You and Your Information
New Customer Information
Billing and Payment Options
Community Resources
Commercial Account Update Form
Commercial Backflow Requirements
Commercial Electric Rates
Commercial Fats, Oils, and Grease Requirements
Commercial Forms and Policies
Commercial Standby Power
Commercial Water, Wastewater or Irrigation Bill Adjustments
Economic Development Incentive Program
Fire Hydrant Meter Policy and Applications
Industrial Pretreatment
Landlord Agreement Program
Natural Gas
Power Conditioning Equipment
Rebates for Businesses
Save Energy and Money
Small Business Hub
Tax Exemptions
Telecom Services
Compliance and Reporting
Conserve Energy by Planting Trees
Our Commitment
Drive Electric
Solar Options
Water Sustainability
Wildlife Protection
Call Before You Dig
Community-Initiated Projects
Electric Development
Electric Reference Materials
Five Year Capital Expenditures
JEA Facilities Standards
Meter Search
Neighborhood Construction
SagesGov
Service Availability Form
Water and Wastewater Development
Water and Wastewater Standards
Become a Vendor
Contractor Safety
Jacksonville Small Emerging Business & Supplier Diversity Program
Formal Opportunities
Informal Opportunities
Requests for Information
Bid Results
Awards Meetings iSupplier Invoicing Portal
Bid Forms
Look Up an Invoice
Zycus Vendor Portal
Board and Management
Careers
Community Impact
Electric Systems
History
Investor Relations
Media Relations
Real Estate Services
Wastewater
Water Supply
Sign In
Search
Quick Links
Manage Account
Pay and View Bill
Request an Extension
Report Outages or Service Issues
Payment Locations
Main Menu
Manage My Account
Service
Add
Stop
Transfer
Account Options
Alert Preferences
AutoPay
Bill History
Bill Viewer
MyBudget
Online Bill Payment
Report an Outage
Request a Payment Arrangement
Request an Extension
Account Options
Billing and Payment Options
MyWay
Pay Your Bill Online
Commercial Forms and Policies
Adjustment Requests
Pool Fill Affidavit
JEA Credit Score
Service Charges
Service Reconnection
Create a jea.com Account
New Customer Information
Pay Your Deposit Online
Online Self-Service
High Bills
Changes in Habits and Consumption
Electric Spikes
Water Spikes
Rates
SmartSavings
Access Multiple Accounts
Alerts
Protecting You and Your Information
Scam Alerts
Account Security
Consumers Beware
Scam Alerts
SolarMax
SolarSmart
Residential Forms and Policies
Water, Wastewater and Irrigation Form
Water, Wastewater and Irrigation Terms
Claim Resolution
Deposit and Connection Fees
JEA Credit Score
Medical Alerts
MyWay Terms and Conditions
Name Changes and Account Transfers
Reclaimed Water Inspection Fee
Service Charges
Service Reconnection
Social Security Numbers
Understand My Bill
High Bills
Changes in Habits and Consumption
Electric Spikes
Water Spikes
SmartSavings
Bill Breakdown
Bill Estimator
Bill Explanation
Distributed Generation Bill Breakdown
Meter Reading
Understanding Changes on Your Monthly Bill
Add, Move, or Stop Service
Collections, Disconnections, and Unauthorized Utility Use eBill Address Instructions
Manage Your Account Anytime, Anywhere
Residential Account Policies and Forms
Outage Center
Mutual Aid
Storm Updates
Storm Safety
Storm Updates
Environmental Incident Reporting
Outage FAQ
Outage Map
Streetlight Reporting Map
Water Notices
Storm Center
Damaged Weatherheads
Generator Safety
Mutual Aid
Power Restoration Process
Storm Preparation
Business Resources
Commercial Backflow Requirements
Commercial Best Management Practices
Qualified Backflow Vendors
Commercial FOG Program
FOG Program Small Trap Maintenance Requirements
Industrial Pretreatment
Local Discharge Limits
Pretreatment Program Compliance Forms
Pretreatment Program, Permits, Surveys and Applications
Rebates for Businesses
Business Rebate Program
Electric Savings
Electrification Rebates Program
Water Savings
Claim Resolution for Businesses
Commercial Account Update Form
Commercial Deposit Information
Commercial Electric Rates
Commercial Forms and Policies
Commercial Standby Power
Commercial Water, Wastewater or Irrigation Bill Adjustments
Demand
Economic Development Incentive Programs
Fire Hydrant Meter Policy and Applications
Fleet Electrification Program
JEA Landlord Agreement Program Adding and Removing Addresses
JEA Landlord Agreement Program Form
Landlord Agreement Program
Natural Gas Supply
New Business Customers
Power Conditioning Equipment
Save Energy and Money
Small Business Hub
Tax Exemptions
Telecom Services
Environment
Compliance and Reporting
Distributed Generation
Apply for Distributed Generation
Requirements After Installation
Air and Water Quality
CCR Rule Compliance Data and Information
Regulatory Oversight
Risk Management
Toxic Release Inventory
Conserve Energy by Planting Trees
Drive Electric
EV Education
EV Incentives
Our Commitment
Plug-In Electric Vehicles
Solar Options
Solar Concierge Program
SolarSmart
Water Sustainability
Wildlife Protection
Engineering and Construction
Community-Initiated Projects
Forms and Procedures
Guidelines for Permit Requirements and Permit Modifications
Reference Materials
Reuse_Reclaimed_Delivery_Station_Details
Sewer Flow Metering System Establishment Checklist
Wastewater Flow Meter Annual Calibration FAQs
Wastewater Meter Installation Steps
Self-Service Center
Applications
Capacity Fee Calculator - Average Daily Flow
Development Project Status
Stages of a Project
Completion and Acceptance
Electric Development
Electric Permit Status Request
Motor Approval Request
Standby Generator Request
Street and Area Lights
Underground Apartment Development
Underground Commercial Development
Underground Residential Development
Electric Reference Materials
Electric Transmission Standards
Overhead Electric Distribution Standards
Power Generation Standards
Substation Standards
Underground Electric Distribution Standards
Water and Wastewater Development
Connect Water or Sewer Service
Normandy Village Utilities
NVU Block Grant
Water and Wastewater Standards
Call Before You Dig
Five Year Capital Expenditures
JEA Facilities Standards
Meter Search
SagesGov
Service Availability Form
About
Board and Management
JEA Board Meetings
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .