01 17 21 Surveying.pdf

PDF 317 KB Posted

Attached to
Circuit 680 UG Cable Replacement Construction Services
Solicitation number
1412223678
Issued by
Duval County, Florida

About this file

This is a Surveying Specification Document (Section 01 17 21) for the Circuit 680 UG Cable Replacement Construction Services project administered by JEA (Jacksonville Electric Authority) in Jacksonville, Florida. The specification outlines comprehensive professional surveying and mapping requirements for approximately 1,200 feet of 69 kV underground cable replacement work occurring within the Dillion Substation, generation facility, and along Talleyrand Avenue and Wigmore Street in Jacksonville. The contractor must retain a Florida-licensed Professional Surveyor and Mapper, approved by JEA, to perform control surveys, construction layout, and As-Built drawings throughout the project. All surveying work shall comply with Florida Administrative Code 5J-17 Minimum Technical Standards and use NAD 83 as the horizontal and vertical datum. The surveyor must document existing utilities including water, wastewater, reclaimed water, storm water, communication, fiber optic, electric, and gas infrastructure, recording elevations and coordinates to two decimal places. Specific deliverables include a boundary survey with certified map and report, construction layout plans, and comprehensive As-Built survey documentation in both AutoCAD 16 (soft copy) and PDF (hard copy) formats submitted as preconstruction and closeout submittals.

Quality assurance measures include JEA's right to conduct random spot checks to verify survey accuracy, with requirements that if more than 10 percent of checks are inaccurate, the surveyor must uncover and reverify all work at their own expense and restore surfaces accordingly. The surveyor must coordinate with JEA to establish control points before field work commences and provide specialized support for horizontal directional drill (HDD) installation, including staking at minimum 10-foot intervals with depth identification and grade elevations. Any work installed but not recorded during construction must be surveyed post-construction at the contractor's expense, including surface restoration. The surveyor is responsible for locating, referencing, and preserving existing control points and property corners, resetting any disturbed monuments at the contractor's expense, and ensuring all construction layout staking is easily verifiable. All survey work products become the property of JEA upon completion.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 17 21

SURVEYING

08/26

1. GENERAL

1.1. Description: Professional Surveyor: Provide professional surveying and mapping work required for the execution of the Contract including, but not limited to, verification of existing survey data, construction layout, and production of the As- Built Drawings. All work shall be performed by a Surveyor that is licensed by the State of Florida as a Professional Surveyor and Mapper pursuant to Chapter 472, F.S.

Boundary Survey: Boundary survey, map, and report certified by a Surveyor and Mapper shall be provided that meets the requirements of Chapter 5J-17 'Minimum Technical Standards', FAC.

1.2. Requirements: The Contractor shall retain the services of a Professional Surveyor and Mapper licensed in the State of

Florida, approved by JEA, to provide professional surveying and mapping services necessary for investigation and/or construction including, but not limited to, a control survey. An As-Built survey shall be created and maintained during construction. The original survey was completed by Johnson Surveying, which used field monuments as the basis of the control points. The control points shall be verified by the Contractor prior to start of construction.

1.3. Submittals:

Provide qualifications of the Surveyor and Mapper:

SD-01 Preconstruction Submittals

Registered Surveyor and Mapper who is proposed by the Contractor to provide the services for this scope of work shall be acceptable to JEA prior to field services being performed.

Submit name, address, and telephone number of the Surveyor and/or Mapper, as appropriate, to JEA for acceptance before starting survey or mapping work.

Submit written acknowledgement from the Surveyor and Mapper stating they have the hardware, software, training, knowledge, and ability to provide the scope of services in the agreement with the Contractor to fully comply with the requirements of this specification and project requirements.

Submit copies of current licenses and registrations.

Submit proposed construction layout.

SD-11 Closeout Submittals

Submit documentation verifying accuracy of survey work

2. SURVEY DOCUMENTS

2.1. Survey Description:

2.1.1. All work, in all forms, shall become property of JEA.

2.1.2. The Surveyor and Mapper shall record elevation and coordinates (location) of all new and existing utilities, known and exposed, including, but not limited to, water, wastewater, reclaimed water, storm water, communication, fiber optic cable, electric, gas, and any other structures located within the limits of construction.

2.1.2.1. Piping/conduit shall be measured to the centerline and to the top of the pipe (T.O.P) or conduit and at every change in direction or elevation.

2.1.2.2. Slopes, where applicable, shall be recorded.

2.1.2.3. Valve elevations shall be measured to the nut operator (not the extension).

2.1.2.4. The top (T.O.D.B) and bottom (B.O.D.B) elevations of electrical duct bank shall be recorded.

2.1.2.5. Provide existing grade shots along the centerline of the utility route.

2.1.3. The Surveyor and Mapper shall record, to 2 decimal places, the elevation and location of all:

2.1.4. The Surveyor and Mapper shall submit a certified survey in both hard and soft copy version. Soft copy versions shall be submitted in AutoCAD 16 format. Hard copy versions are to be submitted in PDF format.

2.2. Quality Assurance:

2.2.1. NAD 83 shall be used as the horizontal and vertical datum.

2.2.2. The Surveyor and Mapper shall coordinate with JEA and schedule the establishment of the survey control points at the onset of any field work.

2.2.3. JEA intends on making random spot checks to verify accuracy of all survey work. If more than 10% of the spot

Baseline Control Locational Accuracy

Benchmarks Changes in Direction/Elevation

Tract and Easement Corners

Existing Utilities and Appurtenant Structures

Surface Body Water Levels

Transitions from One Pipe Material to Another

Waterline and Apparent Bottom of all Bodies of Water

Manhole Rims

Manhole Inverts Slabs on Grade Equipment Pads (All Four Corners)

Pull/Splice Boxes (All Four Corners)

Meters, All kinds, Meter Boxes

Directional Drills

Bore and Jack Casings Thrust Blocks Centerline of Pipelines- Location Top of Pipelines- Elevations

Pipe, Restraints Piping, at 100-feet Maximum Intervals

Pipes, Abandoned in Place or Removed

Conduit/Pipeline Termini Duct Bank Termini Electrical Buried Conduit or Duct Bank by less than one Elevation Shot per 25 Linear Feet

Changes in Conduit Arrangement

Direct Buried Cable Splice Locations

Direct Buried Cable by no less than one Elevation Shot per 25 Linear Feet

Anodes Pole Attachments Top of Pole

Base of Pole Other Project Construction Features checks are found to be inaccurate, then Surveyor and Mapper must uncover all work performed to date and verify each point taken at their own expense. The Surveyor and Mapper is also responsible for the restoration of surfaces as part of this requirement.

2.2.4. Any item that was installed, but not recorded, during construction and is listed in table 2D above must be surveyed post-construction at the Contractor's expense. This includes the restoration of any and all finishes.

3. SURVEY FIELD WORK

3.1. Execution:

3.1.1. Locate, reference, and preserve existing horizontal and vertical control points and property corners shown on the Drawings prior to starting any construction. If the Surveyor and Mapper performing the work discovers any discrepancies that will affect the Project, the Contractor must immediately report these findings to JEA. All survey work shall meet the requirements as defined in Florida Administrative Code 5J-17.

3.1.2. Reference and preserve all survey pins/monuments during Construction. If survey pins/monuments are disturbed, it is the responsibility of the Surveyor and Mapper to reset the pins/monuments at the Contractor's expense.

3.1.3. If the monuments are disturbed, any Work that is governed by these monuments shall be held in abeyance until the monuments are reestablished by the Surveyor and Mapper. The accuracy of all the Contractor's stakes, alignments, grades, layout, and all other work are the responsibility of the Contractor.

3.1.4. The construction layout shall be established from the reference points shown listed on, or derived from, the Drawings. The accuracy of any method of layout shall be the responsibility of the Contractor or the Surveyor and Mapper or jointly. All construction layout staking shall be done such as to provide for easy verification of the Work.

3.1.5. The Surveyor and Mapper shall coordinate with existing project control points if they exist.

3.1.6. The Surveyor and Mapper shall locate and record all elements listed in table 2D as applicable.

3.1.7. Horizontal Directional Drill Support

Roles and Responsibilities shall be as follows:

3.1.7.1. The Surveyor and Mapper shall provide support to the Contractor's Horizontal Directional Drill installation.

3.1.7.2. The Horizontal Directional Drill Contractor will be responsible for providing the electronic tracement of the installed facility.

3.1.7.3. The electronic tracement for submittal purposes will be performed on the final reaming or pulling of the drill.

3.1.7.4. The Surveyor and Mapper in conjunction with the Horizontal Directional Drill Contractor shall stake each directional drill a minimum of every 10 feet (where practical) or individual lengths of bore casing;

whichever is the lesser distance. Each stake shall signify the depth of the drill at that location and shall be consecutively numbered and shown as as-built. Provide existing grade elevations at the same intervals and locations.

3.1.7.5. Field location of data collection points used by the Contractor shall be coordinated with the Surveyor and

Mapper for simultaneous field location so the Surveyor and Mapper can collect the corresponding horizontal location and finished ground elevation for mapping purposes.

3.1.7.6. Every directional drill must be identified by a unique name or number and that referenced identifier will be on the corresponding map, profile and report.

3.1.7.7. The Contractor shall provide an As-Built Bore Log with corresponding grade elevations.

3.1.8. The Contractor shall not permanently conceal any work until required information has been recorded.

File details come from the government source that posted it. Updated .