This addendum pertains to a construction services solicitation issued by the Jacksonville Electric Authority (JEA) for replacement of underground transmission cable infrastructure in Jacksonville, Florida. The project encompasses installation of approximately 1,200 feet of 69 kilovolt underground cable originating from the Dillon Substation, including open-cut concrete-encased duct banks, horizontal directional drilling duct banks, 69 kV ethylene-propylene rubber insulated cable installation with 2,000 kcmil copper conductors, modifications to overhead transmission riser poles and substation termination structures, removal of existing direct-buried cable, site restoration, traffic maintenance, and permitting. Work will occur within the Dillon Substation and generation facility as well as along City of Jacksonville right-of-way on Talleyrand Avenue and Wigmore Street. A mandatory pre-response meeting is scheduled for October 5, 2026, with proposals due October 27, 2026. Construction is anticipated to begin February 1, 2028, with all cables required to be pulled and terminated by April 12, 2028, with work hours limited to 7 a.m. to 4 p.m. Monday through Friday.

Respondents must be listed on Florida's Responsible Bidder's List for Category EG7 (Underground Transmission Construction 69kV and Above - Solid Dielectric Cables) and cannot appear on state or local disqualified vendor lists or have had contracts terminated for default within two years. Cable must be manufactured exclusively by Okonite, Kerite (Marmon Utility), or Prysmian per ICEA S-108-720 and AEIC CS9 standards with 40-year warranty. A Florida-licensed Professional Surveyor and Mapper approved by JEA is required for control surveys and as-built drawings. Personnel performing high-voltage terminations must hold minimum five years' experience and manufacturer certifications. All contractor personnel must obtain JEA Substation Entry Class certification and complete JEA safety qualification requirements. Liquidated damages are assessed at $1,000 per calendar day for delays exceeding 40 days beyond substantial completion, capped at ten percent of contract price. Evaluation allocates 100 points across low bidder quotation (30 points), project narrative (5 points), work plan and resource availability (15 points), three similar projects completed in Florida within the past five years (30 points), preliminary schedule (15 points), and Jacksonville Small Emerging Business participation for design scope only (5 points). A five-percent bid bond and 100 percent performance bond are required. Payment terms offer either one percent discount at 20 days or net 30 days, or two percent discount at 10 days or net 30 days.

Text of this file

Skip to main content

JavaScript Disabled

This site will not function properly without JavaScript enabled. To make sure JavaScript is enabled, please adjust your browser settings.

How To Enable JavaScript

Close

Storm Center

Outage Center

Meetings & Events

Careers

Contact

Sign In

Search jea-logo

Account Options

Customer Resources

Business Resources

Environment

Engineering and Construction

Procurement

About

Manage My Account

Pay Your Bill

Request an Extension or Arrangement

View Your Bill

Update Your Information

Service Issues

Alert Preferences

Add, Move or Stop Service

Billing and Payment Options

New Customer Information

Online Self-Service

Protecting You and Your Information

Rates

Residential Forms and Policies

Understand My Bill

Ways to Save

Residential Rebates

Ways to Save

Get Assistance

Residential Backflow Requirements

Rates

Start Service

Residential Forms & Policies

Online Self Service

Protecting You and Your Information

New Customer Information

Billing and Payment Options

Community Resources

Commercial Account Update Form

Commercial Backflow Requirements

Commercial Electric Rates

Commercial Fats, Oils, and Grease Requirements

Commercial Forms and Policies

Commercial Standby Power

Commercial Water, Wastewater or Irrigation Bill Adjustments

Economic Development Incentive Program

Fire Hydrant Meter Policy and Applications

Industrial Pretreatment

Landlord Agreement Program

Natural Gas

Power Conditioning Equipment

Rebates for Businesses

Save Energy and Money

Small Business Hub

Tax Exemptions

Telecom Services

Compliance and Reporting

Conserve Energy by Planting Trees

Our Commitment

Drive Electric

Solar Options

Water Sustainability

Wildlife Protection

Call Before You Dig

Community-Initiated Projects

Electric Development

Electric Reference Materials

Five Year Capital Expenditures

JEA Facilities Standards

Meter Search

Neighborhood Construction

SagesGov

Service Availability Form

Water and Wastewater Development

Water and Wastewater Standards

Become a Vendor

Contractor Safety

Jacksonville Small Emerging Business & Supplier Diversity Program

Formal Opportunities

Informal Opportunities

Requests for Information

Bid Results

Awards Meetings iSupplier Invoicing Portal

Bid Forms

Look Up an Invoice

Zycus Vendor Portal

Board and Management

Careers

Community Impact

Electric Systems

History

Investor Relations

Media Relations

Real Estate Services

Wastewater

Water Supply

Sign In

Search

Quick Links

Manage Account

Pay and View Bill

Request an Extension

Report Outages or Service Issues

Payment Locations

Main Menu

Manage My Account

Service

Add

Stop

Transfer

Account Options

Alert Preferences

AutoPay

Bill History

Bill Viewer

MyBudget

Online Bill Payment

Report an Outage

Request a Payment Arrangement

Request an Extension

Account Options

Billing and Payment Options

MyWay

Pay Your Bill Online

Commercial Forms and Policies

Adjustment Requests

Pool Fill Affidavit

JEA Credit Score

Service Charges

Service Reconnection

Create a jea.com Account

New Customer Information

Pay Your Deposit Online

Online Self-Service

High Bills

Changes in Habits and Consumption

Electric Spikes

Water Spikes

Rates

SmartSavings

Access Multiple Accounts

Alerts

Protecting You and Your Information

Scam Alerts

Account Security

Consumers Beware

Scam Alerts

SolarMax

SolarSmart

Residential Forms and Policies

Water, Wastewater and Irrigation Form

Water, Wastewater and Irrigation Terms

Claim Resolution

Deposit and Connection Fees

JEA Credit Score

Medical Alerts

MyWay Terms and Conditions

Name Changes and Account Transfers

Reclaimed Water Inspection Fee

Service Charges

Service Reconnection

Social Security Numbers

Understand My Bill

High Bills

Changes in Habits and Consumption

Electric Spikes

Water Spikes

SmartSavings

Bill Breakdown

Bill Estimator

Bill Explanation

Distributed Generation Bill Breakdown

Meter Reading

Understanding Changes on Your Monthly Bill

Add, Move, or Stop Service

Collections, Disconnections, and Unauthorized Utility Use eBill Address Instructions

Manage Your Account Anytime, Anywhere

Residential Account Policies and Forms

Outage Center

Mutual Aid

Storm Updates

Storm Safety

Storm Updates

Environmental Incident Reporting

Outage FAQ

Outage Map

Streetlight Reporting Map

Water Notices

Storm Center

Damaged Weatherheads

Generator Safety

Mutual Aid

Power Restoration Process

Storm Preparation

Business Resources

Commercial Backflow Requirements

Commercial Best Management Practices

Qualified Backflow Vendors

Commercial FOG Program

FOG Program Small Trap Maintenance Requirements

Industrial Pretreatment

Local Discharge Limits

Pretreatment Program Compliance Forms

Pretreatment Program, Permits, Surveys and Applications

Rebates for Businesses

Business Rebate Program

Electric Savings

Electrification Rebates Program

Water Savings

Claim Resolution for Businesses

Commercial Account Update Form

Commercial Deposit Information

Commercial Electric Rates

Commercial Forms and Policies

Commercial Standby Power

Commercial Water, Wastewater or Irrigation Bill Adjustments

Demand

Economic Development Incentive Programs

Fire Hydrant Meter Policy and Applications

Fleet Electrification Program

JEA Landlord Agreement Program Adding and Removing Addresses

JEA Landlord Agreement Program Form

Landlord Agreement Program

Natural Gas Supply

New Business Customers

Power Conditioning Equipment

Save Energy and Money

Small Business Hub

Tax Exemptions

Telecom Services

Environment

Compliance and Reporting

Distributed Generation

Apply for Distributed Generation

Requirements After Installation

Air and Water Quality

CCR Rule Compliance Data and Information

Regulatory Oversight

Risk Management

Toxic Release Inventory

Conserve Energy by Planting Trees

Drive Electric

EV Education

EV Incentives

Our Commitment

Plug-In Electric Vehicles

Solar Options

Solar Concierge Program

SolarSmart

Water Sustainability

Wildlife Protection

Engineering and Construction

Community-Initiated Projects

Forms and Procedures

Guidelines for Permit Requirements and Permit Modifications

Reference Materials

Reuse_Reclaimed_Delivery_Station_Details

Sewer Flow Metering System Establishment Checklist

Wastewater Flow Meter Annual Calibration FAQs

Wastewater Meter Installation Steps

Self-Service Center

Applications

Capacity Fee Calculator - Average Daily Flow

Development Project Status

Stages of a Project

Completion and Acceptance

Electric Development

Electric Permit Status Request

Motor Approval Request

Standby Generator Request

Street and Area Lights

Underground Apartment Development

Underground Commercial Development

Underground Residential Development

Electric Reference Materials

Electric Transmission Standards

Overhead Electric Distribution Standards

Power Generation Standards

Substation Standards

Underground Electric Distribution Standards

Water and Wastewater Development

Connect Water or Sewer Service

Normandy Village Utilities

NVU Block Grant

Water and Wastewater Standards

Call Before You Dig

Five Year Capital Expenditures

JEA Facilities Standards

Meter Search

SagesGov

Service Availability Form

About

Board and Management

JEA Board Meetings

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .