This document is a State Environmental Policy Act (SEPA) Determination of Nonsignificance (DNS) and Adoption of Existing Environmental Document issued by the Washington State Department of Ecology for the Clear Creek Dam Fish Passage Project proposed by the U.S. Bureau of Reclamation.

The project involves constructing a new pool and weir fish ladder at Clear Creek Dam to provide upstream fish passage, replacing a non-functioning ladder installed in 1993. The project is located in Yakima County, Washington on federal lands managed by the Bureau of Reclamation and U.S. Forest Service. The Department of Ecology has adopted the Bureau of Reclamation's Final Environmental Assessment and Finding of No Significant Impact for this project, determining it will not have a significant adverse environmental impact. The DNS comment period is from June 7-20, 2024. The related federal contract opportunity, Solicitation Number 140R1024R0015 for the Clear Creek Dam Fish Passage Facility, is being solicited by the Bureau of Reclamation in Fiscal Year 2024 with an anticipated award in Fiscal Year 2025.

View the file

Other files

File Type Posted
Revised_Section_M_for_Amendment_0008_0008.pdf PDF
Sol_140R1024R0015_Amd_0008.pdf PDF
Amd_No_0007_Drawing_Binder_11x17_092024_0007.pdf PDF
Amd_No_0007_Drawing_Binder_22x34_092024_0007.pdf PDF
Sol_140R1024R0015_Amd_0007.pdf PDF
140R1024R0015__Offeror_QA_final_0007.pdf PDF
Amd_No_0007_Specification_Sections_0007.pdf PDF
Sol_140R1024R0015_Amd_0006.pdf PDF
Sol_140R1024R0015_Amd_0005.pdf PDF
Sol_140R1024R0015_Amd_0004.pdf PDF
Amendment_0004_Pictures_0004.pdf PDF
Sol_140R1024R0015_Amd_0003.pdf PDF
Site_Visit_Attendee_Roster_0003.pdf PDF
Sol_140R1024R0015_Amd_0002.pdf PDF
Clear_Creek_Dam_Fish_Passage_Solicitation_-_Revised_for_Amendment_0002_0002.pdf PDF
J_2__Specification_Drawings_Size_11x17_0001.pdf PDF
J_3_E_a__Environmental_Assessment_0001.pdf PDF
J_4__Geology_Drawings_Size_11x17_0001.pdf PDF
J_3_C__Hydraulic_Project_Approval_0001.pdf PDF
J_3_E_b__Finding_of_no_Significant_Impact_(FONSI)_0001.pdf PDF
J_3_A__401_Water_Quality_Certification_0001.pdf PDF
J_2__Specification_Drawings_22x34_0001.pdf PDF
Sol_140R1024R0015_Amd_0001.pdf PDF
J_3_D_Inadvertent_Discovery_Plan_0001.pdf PDF
Clear_Creek_Dam_Fish_Passage_Solicitation_-_Revised_for_Amendment_0001_0001.pdf PDF
J_3_B__404_USACE_Nationwide_Permit_0001.pdf PDF
J_4__Geology_Drawings_Size_22x34_0001.pdf PDF
J_2__05_00_00_02_Dwgs-B3_ClearCreekDam_22x34_08-02-2024.pdf PDF
20240715_email_MMaldonado_ECY_401WQCunder404.pdf PDF
GOV_HPA_Permit_Std.pdf PDF
Solicitation_R0015_Clear_Creek_Fish_Passage_Final.pdf PDF
404_Combined.pdf PDF
Sol_140R1024R0015.pdf PDF
ClearCreekDamFishPassageSEPADNS-Final.pdf PDF
J_4__00_00_02A_GeologyDwgs-B_G1-G26_ClearCreekDam_11x17_08-02-2024.pdf PDF
J_2__04_00_00_02_Dwgs-B3_ClearCreekDam_11x17_08-02-2024.pdf PDF
CCDFP_FONSI_4-23-2024_508.pdf PDF
CCDFP_EA_4-16-2024_508.pdf PDF
20240730-CR-IDP.pdf PDF
J_4__00_00_02A_GeologyDwgs-B_G1-G26_ClearCreekDam_22x34_08-02-2024.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF WASHINGTON

DEPARTMENT OF ECOLOGY

Office of Columbia River

1250 West Alder St., Union Gap, WA 98903-0009 • 509-575-2490

STATE ENVIRONMENTAL POLICY ACT

DETERMINATION OF NONSIGNIFICANCE (DNS) AND ADOPTION OF EXISTING

ENVIRONMENTAL DOCUMENT (ENVIRONMENTAL ASSESSMENT)

Date of Issuance: June 6, 2024

Lead Agency: Department of Ecology, Office of Columbia River

Agency Contact: Kevin Haydon, at (509) 823-6947 or Kevin.Haydon@ecy.wa.gov

Name of Proposal: Clear Creek Dam Fish Passage Project

Description of Proposal: The Bureau of Reclamation proposes to construct and operate a fish passage system at Clear Creek Dam in Yakima County, WA. Clear Creek Dam Fish Passage is identified in the initial development phase of the Yakima Basin Integrated Plan, which is supported by our partnership with the U.S. Forest Service, U.S. Fish and Wildlife Service, the Washington State Departments of Ecology and Fish and Wildlife, and the Confederated Tribes and Bands of the Yakama Nation, and other local, state and federal entities. The proposed fish passage system will replace a non-functioning ladder on the spillway constructed in 1993.

Under the Proposed Action, Reclamation will construct a pool and weir fish ladder to provide upstream fish passage at Clear Creek Dam. Implementation of the Clear Creek Dam Fish Passage Project will include construction of the cast-in-place concrete fish ladder, miscellaneous metalwork, and fencing. Mechanical features to be installed include pump, false weir, valving, slide gates and piping. Electrical features to be installed include lighting, security cameras and receptacles, and other ancillary items. Site development to be completed includes a generator building and resurfacing access roads.

Location of Proposal: On the east side of Washington’s Cascade Mountain Range, about 30 miles southwest of Naches and 48 miles west of Yakima, Clear Creek Dam creates a reservoir (Clear Lake) with an active capacity of 5,300 acre-feet with a consistent pool (lake) elevation of approximately 3,011.3 feet over a surface area of approximately 260 acres. The project location is on federal lands, managed by the U.S. Bureau of Reclamation and the U.S. Forest Service Okanogan-Wenatchee National Forest, in township 13N, Range 12E, Sections 11 and 12.

Latitude: 46°37'46.25"N, Longitude: 121°16'19.20"W.

mailto:Kevin.Haydon@ecy.wa.gov

Applicant/Proponent: Bureau of Reclamation, Columbia-Cascades Area Office, Elizabeth Heether, (509) 573-8023, Eheether@usbr.gov

This determination is based on the following findings and conclusions:

Title of Document Being Adopted: Final Environmental Assessment (EA) titled, “Final Environmental Assessment Clear Creek Dam Fish Passage Project” with Final Decision and Finding of No Significant Impact (FONSI) for that Environmental Assessment, which together make up the Environmental Assessment.

Agency that Prepared Document Being Adopted: United States Bureau of Reclamation, Columbia-Cascades Area Office.

Date Adopted Document was Prepared: Environmental Assessment Decision and Finding of No Significant Impact Notice dated April 22, 2024.

Description of Document (or portion thereof) Being Adopted: U.S. Bureau of Reclamation prepared the Final Environmental Assessment and Finding of No Significant Impact (FONSI).

The FONSI has not been appealed.

The adopted document is available at: https://www.usbr.gov/pn/programs/clearcreek/index.html.

We have identified and adopted this federal environmental review document as being appropriate for this proposal after independent state SEPA review. The document meets our environmental review needs for the current proposal and will accompany the proposal to the decision makers.

Ecology has determined that this proposal will not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). We have reviewed the National Environmental Policy Act (NEPA) Environmental Assessment. This determination is based on the following findings and conclusions:

Upon review of the Environmental Assessment, including Appendix A – Best Management Practices and Environmental Conditions, and Appendix B – Revegetation Plan, along with the additional federal and state permitting requirements, we find that the proposed action will be implemented in such a manner that prevents probable adverse impacts to the environment.

Additionally, we recognize the purpose and need for the project are aimed at improving the long-term viability of the North Fork Tieton bull trout population, which are currently listed as threatened under the Endangered Species Act.

This DNS is issued under WAC 197-11-340 and the comment period begins on June 7, 2024 and will end on June 20, 2024.

mailto:Eheether@usbr.gov https://www.usbr.gov/pn/programs/clearcreek/index.html

Method to Comment: You can submit your comments any one of the following ways:

• Online at the Department of Ecology eComment link at:

https://ocb.ecology.commentinput.com?id=ZtbSfJkUx2

• Email: Kevin.Haydon@ecy.wa.gov

• Mail to the address below, attention Kevin Haydon.

Responsible Official:

G. Thomas Tebb, LG., LHG., LEG.

Director, Office of Columbia River Washington State Department of Ecology 1250 Alder Street Union Gap, WA 98903

(509) 574-3989

Signature Date 6/6/2024 https://ocb.ecology.commentinput.com/?id=ZtbSfJkUx2 mailto:Melissa.Downes@ecy.wa.gov

File details come from the government source that posted it. Updated .